www.quantum-project.eu05/06/17 │ QUANTUM General Scope │ 1

Quality management within building commissioningData Management and Building Information Modelling

Dan Rossiter MCIATSenior BIM Communicator

Page 2: Senior BIM Communicator

www.quantum-project.eu05/06/17 │ QUANTUM General Scope │ 2

Quality management within building commissioning

Building Information Modelling (BIM):

Integrated process built on coordinated, reliable information

Used to:

▪ Create coordinated, digital design information and documentation;

▪ Predict performance, appearance, and cost; and

▪ Deliver the project faster, more economically, and with reduced environmental impact.

Build

Operate

Design

BIM

Page 3: Senior BIM Communicator

www.quantum-project.eu05/06/17 │ QUANTUM General Scope │ 3

Quality management within building commissioning

Building Information Modelling (BIM)

• It’s not just 3D CAD

• It’s not just a new technology application

• It’s not next generation, it here and now!

BIM is essentially value creating collaboration through the entire life-cycle of an asset, underpinned by the creation, collation and exchange of shared 3D models and intelligent, structured data attached to them.

BETTER

INFORMATION MANAGEMENT

Page 4: Senior BIM Communicator

www.quantum-project.eu05/06/17 │ QUANTUM General Scope │ 4

Quality management within building commissioning

Page 5: Senior BIM Communicator

www.quantum-project.eu05/06/17 │ QUANTUM General Scope │ 5

Quality management within building commissioning

PAS1192-2:2013

One of the key [BIM] Level 2 requirements is the exchange standard of COBie and PDF, as well as copies of the native files.

Graphical Models Non-graphical Information Documentation

ww

w.B

IMblo

g.h

ouse

Page 6: Senior BIM Communicator

www.quantum-project.eu05/06/17 │ QUANTUM General Scope │ 6

Quality management within building commissioning

Model View Definition

Facility Management handover view

ww

w.B

IMblo

g.h

ouse

Page 7: Senior BIM Communicator

www.quantum-project.eu05/06/17 │ QUANTUM General Scope │ 7

design .

Common

build

Quality management within building commissioning

Type:

• Manufacturers Information

• Warranty Duration & details

Component:

• Location, Installation, Asset Tag

Systems:

• What components are in each system

Attributes:

• Assessment Details

• Performance

Documents:

• Manufactures documentation

• Warranty Documents

• Test records.

Contacts

Documents

Issues

Coordinates

Attributes

Connections

Job

Resource

Spare

Facility

Floor

Space

Zones

Type

Component

Systems

Page 8: Senior BIM Communicator

www.quantum-project.eu05/06/17 │ QUANTUM General Scope │ 8

Quality management within building commissioning

Unique

on ‘contacts’

YYY-MM-DD

on ‘Picklist’

on ‘components’

Automatic

Automatic

Automatic

n/a or Text

Page 9: Senior BIM Communicator

www.quantum-project.eu05/06/17 │ QUANTUM General Scope │ 9

Quality management within building commissioning

Commissioning01

[email protected]

2017-04-27T12:00:00

Report

[email protected]

CIC 5: Build

System

HeatingSystem01

C:\7001\Reports

7001-BRE-ZZ-ZZ-RP...

n/a

n/a

n/a

n/a

n/a

Page 10: Senior BIM Communicator

www.quantum-project.eu05/06/17 │ QUANTUM General Scope │ 10

Quality management within building commissioning

PA

S 1

192

-3

Page 11: Senior BIM Communicator

www.quantum-project.eu05/06/17 │ QUANTUM General Scope │ 11

Quality management within building commissioning

BIM

2A

IM (

Mo

J)

Page 12: Senior BIM Communicator

www.quantum-project.eu05/06/17 │ QUANTUM General Scope │ 12

Quality management within building commissioning

Summary:

Building Information Modelling is a process

used to structure information in order to

represent an asset and it’s information digitally

By specifying a schema such as IFC, information

about an asset can be produced consistent

structure that can be both validated and verified

COBie, a subset of IFC, is already able to

record the systems being commissioned

as well as their associated documents.

Page 13: Senior BIM Communicator

www.quantum-project.eu05/06/17 │ QUANTUM General Scope │ 13

Thank you

[email protected]@DRossiter87

Dan Rossiter MCIATSenior BIM Communicator