seminar – data link elements & role of stakeholders

19
1 ICAO SOCM/2 8-10 February 2012 Seminar – Data Link Elements & Role of Stakeholders ICAO – 2 nd Satellite Data Link Operational Continuity Meeting (SOCM/2) Steve Kong – for Inmarsat (UK) 8-10 February 2012

Upload: others

Post on 28-Feb-2022

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Seminar – Data Link Elements & Role of Stakeholders

1 ICAO SOCM/2 8-10 February 2012

Seminar – Data Link Elements & Role of Stakeholders

ICAO – 2nd Satellite Data Link Operational Continuity Meeting (SOCM/2) Steve Kong – for Inmarsat (UK)

8-10 February 2012

Page 2: Seminar – Data Link Elements & Role of Stakeholders

2 ICAO SOCM/2 8-10 February 2012

!  Aero Safety Services Evolution

!  Classic Aero on I-3/I-4 -  Roles

-  Networks & Architecture

-  I-4 Stakeholders & Performance

!  SwiftBroadband Oceanic Safety Services -  GOLD RCP Requirements

-  Reduced Separations

-  Architecture

-  Priority & Pre-emption

-  Products & Services

-  Benefits

!  Study Work – Continental Airspace Satellite ATM

Agenda

Page 3: Seminar – Data Link Elements & Role of Stakeholders

3 ICAO SOCM/2 8-10 February 2012

The Focus on Safety

!   Introduction: Aeronautical services circa 1990’s

!  Continued participation in industry -  ICAO, RTCA, AEEC, PARC CWG

!  Advanced satellite industry initiatives for Safety Services -  EuroControl – NexSAT

-  ESA – Alphasat Extension & IRIS (Continental Airspace)

-  SESAR OPTIMI/SAT-OPTIMI

!  The demands for more safety-critical comms -  Weather applications (e.g. turbulence or volcanic ash)

-  Emergency events triggered data transmission

Inmarsat Aero Evolution

Page 4: Seminar – Data Link Elements & Role of Stakeholders

4 ICAO SOCM/2 8-10 February 2012

Inmarsat – I3/I4: Classic Aero “Roles”

4

Service Provision & Station Identifiers  

LESO CSP APAC EMEA AMER AORE AORW POR IOR

Inm

arsa

t-3

EIK Vizada ARINC XXE XXE XXE

SANTA PAULA Vizada ARINC XXC

AUSSAGUEL Vizada SITA AOE2 AOW2

PERTH Stratos SITA POR1 IOR2

Inm

arsa

t-4

HAWAII Vizada ARINC XXH XXH

Stratos SITA APK1 AME1

FUCINO Vizada ARINC XXF

Stratos SITA EUA1

Page 5: Seminar – Data Link Elements & Role of Stakeholders

5 ICAO SOCM/2 8-10 February 2012

I4F1   I4F3   I4F2  

Classic  aero  aircra1  

Classic  aero  aircra1  

Hawaii    SAS  

Fucino    SAS  

ACSE   MSC  

OAMS   OWS  

CS  

PSTN  network  

ACSE  MSC   CS  

 DCN  

OWS  OAMS  

Data  2  Data  3  

CDR   CDR   Data  2  Data  3  

A-­‐to-­‐G  calls  

 Burum      

MSC  

Meet  Me  Hong  Kong  

 

Meet  Me  Amsterdam  

 

Meet  Me  New  York  

Inmarsat  

OWS  

UEP/INMS/CDR  

G-­‐to-­‐A  calls  G-­‐to-­‐A  calls  

Classic Over I4 System Architecture

Classic  aero  aircra1  

SP   DP   SP   DP  

Page 6: Seminar – Data Link Elements & Role of Stakeholders

6 ICAO SOCM/2 8-10 February 2012

I4-F1 I4-F2I4-F3

SASHawaii US

SASFucino IT

PSTN

All A2G CS Calls and Q9 G2A CS Calls

All A2G CSCalls and Q9 G2A CS

Calls

D2 running on TCPIP

CS G2A 2 part dialer

ATSPFlight Data Processing

System

G2A Q10-12 Calls

G2A Q10-12 Calls

ClassicAero

Aircraft #2

ClassicAero

Aircraft #1

ACARS DSPACARS DSP

ResponsibilitiesInmarsatArinc/SITAVizada/SITAATSP

Classic/I4 End To End FANS data link ATSP/Airbus 7/5/09 & 24/6/09

Airbus  ‘iron  bird’  A380  &  LR  (A340)  

Montreal  Shanwick  Oceanic  Centre  Prestwick  Scotland  

Page 7: Seminar – Data Link Elements & Role of Stakeholders

7 ICAO SOCM/2 8-10 February 2012

!  PARC CWG Forum -  ICAO GOLD RCP240/RSP180 Framework

!  Candidates: -  Aircraft with Classic Aero Only

-  Aircraft with Classic Aero & SBB

-  Pacific (ZAN, ZAK, NZZO) & Atlantic (ZNY, EGGX, CYQX)

!  So far (5xCWG Sessions): -  Approximately 20 Airlines/250 aircraft (Airline/Cargo) + over 110 Bizjets

!  PARC CWG 26 Agreement: -  Progress to Post-Implementation Monitoring

-  Clarification Cover Letter: I-4 Classic Aero Evaluated Against RCP240

Classic Aero I-4 Performance

7

FANS1/A over I-4 Classic Aero Project (FOICA)

Inmarsat - 4

Page 8: Seminar – Data Link Elements & Role of Stakeholders

8 ICAO SOCM/2 8-10 February 2012

FOICA Project Plan – Document Status

8

A BIG THANK YOU! – To PARC CWG Forum

ARINC  &  SITA  Airbus,  Boeing,  Gulfstream  Rockwell  Collins,  Thales  &  Honeywell  I-­‐4  Airline  &  Cargo  Operators  

Report,  Results,  RecommendaWon  to  be  submiXed  Summer  2012  @  PARC  

CWG  27  for  final  approval  

FAA,  NAVCAN,    UKNATS,  AirwaysNZ  

Page 9: Seminar – Data Link Elements & Role of Stakeholders

9 ICAO SOCM/2 8-10 February 2012

Reduced Oceanic ATM Separation

!  Communications path time budget: 120s 95%, 150s 99.9% -  Should be easy to exceed with SBB acting as preferred communications path for ATS data

!  Availability (for operational efficiency): 0.9999 (Max accumulated unplanned outage time < 52 min/yr) -  Introducing redundant routes through the use of SwiftBroadband as a parallel

communication system to Aero Classic improves the overall communications system availability

!  Maximum time for notification of unplanned outage: < 5 mins

!  Maximum allowed outage: 10 mins

ATC  Centre  

CSP  Network    

Summary of RCP240/D Requirements

Page 10: Seminar – Data Link Elements & Role of Stakeholders

10 ICAO SOCM/2 8-10 February 2012

SwiftBroadband Oceanic Safety Service !  SwiftBroadband will be preferred communications path, supported by

Classic Aero on I4 and on I3

!   Introducing redundant routes through the use of SwiftBroadband as a parallel communication network to Classic Aero aims to provide: -  Four 9’s communications system availability

-  ATS data transaction times meeting RCP240

NETWORK 1 SwiftBroadband

NETWORK 3 Classic Aero I3

Classic    Aero  Service  Swi1Broadband  Service    

2  Services,  2  Constella1ons,  3  Networks  

RCP240  Safety  service  supporWng  30/30  NM  separaWons  

I4  ConstellaBon    

I3  ConstellaBon    

NETWORK 2 Classic Aero I4

Page 11: Seminar – Data Link Elements & Role of Stakeholders

11 ICAO SOCM/2 8-10 February 2012

RAN

I4 Satellite

Load BatteryLineOn On

BatterySmartBoost

ReplaceBattery

Test

Aero Antenna

SBB Modem

ACARS Air

Gateway

SB Safety SDU

CNSB Safety ACARS Ground

GatewayBGAN Ground

SegmentAirline AOC

Centre

CockpitApplicationTerminal

Aero CUS

Aero GESClassic Aero

I4 GroundSegment

I3 Satellite

Load BatteryLineOn On

BatterySmartBoost

ReplaceBattery

Test

Classic Aero Modem

Fallback to Classic / I4

Fallback to I3 satellite

IBM

Aero CUS

Classic Aero I3 GroundSegment

Aero GES

BGAN IP Service

Classic Aero Service

IBM

Inm

arsa

t DC

N a

nd D

P, S

P N

etw

orks

AR

INC

SIT

A

Air Traffic Service Provider

Airline AOC Centre

Air Traffic Service Provider

IBM High  availability  SB  safety  comms  -­‐ meeBng  ICAO  GOLD  RCP240      -­‐  provides  voice,  ACARS,    prioriBsed  IP  

SwiftBroadband Oceanic Safety Architecture

Page 12: Seminar – Data Link Elements & Role of Stakeholders

12 ICAO SOCM/2 8-10 February 2012

SB Oceanic Safety: Priority and Pre-emption

!  Key provision of Priority, Pre-emption and Precedence (RAN 3.8)

!  Priority levels given to: -  ATS, AOC, AAC data

-  Priority levels for voice

!  SwiftBroadband will be configured to provide communications channel availability for ATS safety -  Priority over cabin users of SwiftBroadband

-  Priority over other BGAN users

-  Other users with lower priority can be preempted

!  Data bearers are configurable to be ‘always-on’ and thus available at all times for data message delivery

Page 13: Seminar – Data Link Elements & Role of Stakeholders

13 ICAO SOCM/2 8-10 February 2012

SB  Safety  Services  

!  All support the following sub-services: -  ACARS  Data  and  IP  Data  -  2-­‐channels  of  voice  (one  CS,  one  digital  voice)  -  Down  to  5  degrees  elevaWon

!  Using one 200 kHz RF channel in the AES (e.g: one SIM)

RCP  240  Efficiency  0.9999   RCP  240  Safety  0.999  

Class  6    (HGA)  

SB/Classic  

SB200  15-­‐2  (small  antenna)  

SB  Only  

Class  7  (IGA)  

 SB  Only  

Class  6  (HGA)  SB  Only  

SB Oceanic Safety Services - Products

Page 14: Seminar – Data Link Elements & Role of Stakeholders

14 ICAO SOCM/2 8-10 February 2012

What benefits does SwiftBroadband bring to ATM?

!  SBB offers reduced operating costs over ‘Classic’ Aero data link -  At least 30% reduction in SAT ACARS operating costs expected

!  Key provision of Priority, Pre-emption and Precedence -  Priority levels given to: ATS, AOC, AAC data; voice

-  PPP ensures comms availability for ATS safety

-  Priority over cabin users of SwiftBroadband

-  Priority over other BGAN users

-  Other users with lower priority can be pre-empted

!  SBB brings improved performance over classic Aero -  Target to meet requirements of RCP240

!  SBB enables new dynamic capability to FDR applications -  Triggered streaming of FDR (per BEA recommendation following AF447 enquiry)

Page 15: Seminar – Data Link Elements & Role of Stakeholders

15 ICAO SOCM/2 8-10 February 2012

SwiftBroadband Safety Services – Long Term Studies Continental Airspace – Satellite ATM

Page 16: Seminar – Data Link Elements & Role of Stakeholders

16 ICAO SOCM/2 8-10 February 2012

SESAR and ESA ‘Iris’ programme

!  Single European Sky ATM Research (SESAR) -  Multi-€bn program, funded by Commission, Industry and Eurocontrol, and involving all major

European stakeholders

-  To address fact that current VHF voice system cannot support Air Traffic Management (ATM) in the future high density airspace

-  SESAR Master Plan identifies need to validate satellite component

-  2020+ timeframe

!  ESA ‘Iris’ Programme -  Inmarsat is participating in ESA Iris studies (design [B1 phase] and operations [‘HERMES’] ) that

evaluate the SwiftBroadband enhancements necessary to achieve the performance required in Continental Airspace:

º  More stringent latency and reliability requirements º  Regular banking and turning º  Small, low-cost avionics and antenna systems suitable for short-haul and general aviation

Page 17: Seminar – Data Link Elements & Role of Stakeholders

17 ICAO SOCM/2 8-10 February 2012

To Conclude

!   Inmarsat is committed to the long term support of safety services

!  SwiftBroadband-Safety for Oceanic use; development is underway targeting compliance with GOLD RCP requirements

!  Expect FANS 1/A over SwiftBroadband Project Initiation late 2012 @ PARC CWG 28

!  The longer term requirements for adaptation of SwiftBroadband for continental airspace Air Traffic Management are being studied

Inmarsat  is  keen  to  ‘open  the  door’  for  new  safety  service  &  flight  deck  applica;ons  

Page 18: Seminar – Data Link Elements & Role of Stakeholders

18 ICAO SOCM/2 8-10 February 2012

Thank you – Questions? !  Steve Kong

-  [email protected]

Page 19: Seminar – Data Link Elements & Role of Stakeholders

19 ICAO SOCM/2 8-10 February 2012

Acronyms

!   ACSE – Access, Control and Signalling Equipment

!   BSS – Business Support System

!   CDR – Call Data Records

! Cl/I4 – Classic Aero services delivered over the Inmarsat 4 satellite and ground infrastructure

!   CS – Circuit Switched

!   CSI - Commercial Service Introduction

!   DCN – Data Communication Network

!   DP – Distribution Partner

!   ESAS- Electronic Service Activation System

!   INMS – Inmarsat Network Monitoring System

!   MASPS – Minimum Aviation System Performance Standards

!   MOPS - Minimum Operations Performance Standards

!   MSC – Mobile Switching Centre

19

!   OAMS – Off-Air Monitoring System

!   OWS – Operator Work Station

!   PS – Packet Switched

!   PSTN – Public Switched Telecommunication Network

!   SAS – Satellite Access Station

!   SP – Service Provider

!   RAN – Radio Access Network

!   UEP – User Enquiry Process