seesim 12 unclassified 1 site manager and after-action review (aar) analyst training 25-27 september...

212
SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

Upload: maegan-bailey

Post on 15-Dec-2015

224 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED1

Site Manager andAfter-Action Review

(AAR) Analyst Training

25-27 September 2012Sofia, Bulgaria

Page 2: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED2

Introductions

Page 3: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED3

Time Event POC

0900 – 0915Welcome and Administrative Announcements

Harris

0915 – 0945 Introductions and Training Agenda Harris

0945 – 1000 Exercise Overview Harris

1000 – 1030 Exercise Design and Execution Schedule Harris

1030 – 1045 Break

1045 – 1100Exercise Control (EXCON) Overview and Organization

Harris

1100 – 1200 EXCON Key Billets and Responsibilities Harris

1200 – 1230 Exercise Control Plan Harris

1230 – 1330 Lunch

Training Schedule (Tue, Sep 25)

Page 4: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED4

Time Event POC

1330 – 1345 Basic Network Architecture Overview Harris

1345 – 1430 SEESIM 12 Scenario Yingling

1430 – 1445 Break

1445 – 1500 Mini-Exercise (MINIEX) Plan Yingling

1500 – 1530JTLS Overview and Site Manager’s Role in Model Inputs

Heely

1530 – 1600 Information Management Harris

1600 – 1630EXCON Daily Operational Schedule and Meeting Procedures

Harris

1630 – 1700 Communications Exercise (COMMEX) Plan Harris

Training Schedule (Tue, Sep 25)

Page 5: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED5

Time Event POC

0900 – 0915 Distinguished Visitors (DV) Day Harris

0915 – 0930International Response Cell (IRC) Overview and Processes

Harris

0930 – 1030 Joint Exercise Management Module (JEMM) Brown

1030 – 1045 Break

1045 – 1230 Joint Exercise Management Module (JEMM) Brown

1230 – 1330 Lunch

1330 – 1430 After-Action Review Process Overview Schultz

1430 – 1445 Break

1445 – 1600 Collection Management Plan (CMP) Schultz

1600 – 1700 Preview of Practical Exercises Schultz

Training Schedule (Wed, Sep 26)

Page 6: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED6

Time Event POC

0900 – 1030 Practical Exercise Vignette #1 Schultz

1030 – 1045 Break

1045 – 1230 Practical Exercise Vignette #2 Schultz

1230 – 1330 Lunch

1330 – 1430 Practical Exercise Vignette #3 Schultz

1430 – 1445 Break

1445 – 1530 Preparation for After-Action Review (AAR) Schultz

1530 – 1600 Preparation of Remote Site Visitors’ Brief Schultz

1600 – 1700 Summary and Wrap-up Harris/Schultz

Training Schedule (Thu, Sep 27)

Page 7: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED7

Exercise Overview

Mr. John HarrisSEESIM 12 Deputy EXCON Director

United States Joint Staff, J7

Page 8: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED8

What is SEESIM?

• SEESIM 12 is a Computer Assisted Simulation Exercise conducted within the framework of the Southeastern Europe Defence Ministerial (SEDM) process

• SEDM Ministers agreed in October 2000 to create SEESIM and begin with an exercise based on a civil emergency scenario

• Purpose of SEESIM is to promote cooperation, coordination and interoperability of civilian and military organizations during crisis response operations within and among the SEDM nations

Page 9: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED9

SEDM Members

Albania

Bosnia andHerzegovina

Bulgaria

Croatia

Greece

Italy

the formerYugoslavRepublic ofMacedonia*

Turkey

Ukraine

Slovenia

Georgia Moldova

Romania

Montenegro

Serbia UnitedStates

SEDM Observer Nations

* Turkey recognizes the Republic of Macedonia with its constitutional name

Page 10: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED10

• SEESIM 02: Hosted by Greece. Broad Scenario of floods and earthquakes.

• SEESIM 04: Hosted by Turkey. Broad Scenario of multiple terrorist attacks.

• SEESIM 06: Co-Hosted by Romania and the former Yugoslav Republic of Macedonia*. Broad Scenario of large-scale flooding and earthquakes plus potential terrorist threats to SEDM nations. Two main Exercise Control Groups (EXCONs) in Bucharest and Skopje.

• SEESIM 08: Hosted by Bulgaria. Broad scenario of natural and man made disasters.

• SEESIM 10: Hosted by Albania. Broad scenario of natural and man made disasters, including cyber-terrorism.

SEESIM History

Page 11: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED11

SEESIM 12 Participation

Participants

Host Nation – Bulgaria

Remote Sites – Albania, Bulgaria, Bosnia and Herzegovina, Croatia, Italy, Montenegro, Serbia, the former Yugoslav Republic of Macedonia*, Ukraine, and SEEBRIG HQ (in Greece)

Supporting Nations

Sweden, United States

Observers

Georgia

Not Participating

Greece, Moldova, Romania, Slovenia, Turkey

Page 12: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED12

SEESIM 12 Broad Scenario

“A series of coordinated cyber attacks against the governments of South Eastern Europe followed by biological and/or chemical terrorist attacks on two or three countries with transnational ramifications. A large natural disaster also occurs. These events result in a breakdown of communications and widespread destruction and loss of life. This prompts a comprehensive civilian, military, and political approach by relevant Government and Nongovernment Organizations in the participating nations in performing essential tasks and exercising the responsibilities necessary to respond to national and regional emergencies. These tasks promote: Counterterrorism; Counter proliferation of weapons of mass destruction (WMD), their materials, technologies, know-how, and delivery systems; Transnational and regional cooperation in South Eastern Europe; Border and energy security; Protection of critical infrastructure; Cyber defense capabilities; Emergency response capacities of participating nations; Disaster Relief Operations (DRO); Coordinated, effective responses to transnational threats; Consequence management; Intelligence and Information sharing, collaboration and interoperability; Global communications; and Realistic national training objectives."

Page 13: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED13

NATO Experimentation

• Joint Exercise Management Module (JEMM)

• NATO Training Federation (NTF)

– Joint Theater Level Simulation (JTLS)

– Joint Conflict and Tactical Simulation (JCATS)

• Exercise Scenario Resource Portal (ESRP)

Nations involved in the NATO NTF experiment include Bulgaria, Croatia, and Serbia

Page 14: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED14

NATO Involvement

• Allied Command Transformation (ACT)

• NATO Communications and Information Agency

(NCIA) – was NC3A

• Joint Warfare Centre (JWC)

• Joint Force Training Centre (JFTC)

• Modeling and Simulation Centre of Excellence

(M&S COE)

Page 15: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED15

QUESTIONS? ??

Page 16: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED16

Exercise Design and Execution Schedule

Mr. John HarrisSEESIM 12 Deputy EXCON Director

United States Joint Staff, J7

Page 17: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED17

SEESIM 12 Network Design

VTC, VoIP, Portal, Email, JTLS, JEMM

BulgariaEXCON Main

Page 18: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED18

EOC

SEESIM 12 Exercise Design

EXCON Main (Bulgaria)

Exercise DirectorEXCON Director

Operations ControlScenario Manager

AAR ManagerInformation Manager

Liaison Officers

Remote SitesEXCON Forward

Site ManagerAAR Analyst

National Role PlayersJTLS Operator

MEL/MIL Tracker

International Response Cell(Role Players)

OtherEOCs

TRAININGAUDIENCE

MEL / MIL Injects

Page 19: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SUN MON TUE WED THU FRI SAT

Sep 2

 

Sep 3 Sep 4 Sep 5 Sep 6 Sep 7 Sep 8

Sep 9

 

Sep 10 Sep 11 Sep 12 Sep 13 Sep 14 Sep 15

Sep 16 Sep 17 Sep 18 Sep 19 Sep 20 Sep 21 Sep 22

Sep 23 Sep 24 Sep 25 Sep 26 Sep 27 Sep 28 Sep 29

SEESIM 12 Execution Schedule (Sep 2012)

Equipment Installation and Testing (All sites)

Travel

Travel

Travel

Travel

Site Manager / AAR Training (Bulgaria)

Comms Hot(All sites)

EquipmentDelivered(All sites)

TravelTravel

Travel

Equipment Installation (Bulgaria)

Tech Training (Bulgaria)

19UNCLASSIFIED

Page 20: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SUN MON TUE WED THU FRI SAT

Sep 30

 

Oct 1 Oct 2 Oct 3 Oct 4 Oct 5 Oct 6

Oct 7

 

Oct 8 Oct 9 Oct 10 Oct 11 Oct 12 Oct 13

Oct 14 Oct 15 Oct 16 Oct 17 Oct 18 Oct 19 Oct 20

Oct 21 Oct 22 Oct 23 Oct 24 Oct 25 Oct 26 Oct 27

Execution

DV Day

Pack and Ship Equipment

Final Setup and Testing

OpeningCeremony

AAR

End to End Test (All sites)

EXCONMain

Training

EXCON MainTravels toBulgaria

JCW TechsTravel Home

ClosingCeremony

Hotwash

EXCONMINIEX

EXCON MainTravels Home

JCW TechsTravel toBulgaria

JCW TechsTravel toBulgaria

SEESIM 12 Execution Schedule (Oct 2012)

20UNCLASSIFIED

JTLS Training

Page 21: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED

Exercise Execution Times

0800 – 1600 0900 – 1700

Albania Bulgaria

Bosnia and Herzegovina Ukraine

Croatia SEEBRIG HQ

Italy

Montenegro

Serbia

the former Yugoslav Republic of Macedonia*

21

Page 22: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED22

• Opening Ceremony scheduled for Monday, Oct 15 at 0915

• Remote sites will participate in the Opening Ceremony via VTC

• All sites should connect to VTC bridge by 0900• Be in seats no later than 0900• Opening Ceremony will begin with Opening

Remarks by OSE and OCE• Remote sites will do introductions in alphabetical

order of their capitals (up to 3 minutes each)• Exercise play begins at 1000

Opening Ceremony (Mon, Oct 15)

Note – all times are local Sofia, Bulgaria time

Page 23: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED23

• Closing Ceremony scheduled for Friday, Oct 19 at 1500, immediately after the After-Action Review (AAR)

• Remote sites will participate in the Closing Ceremony via VTC

• Closing Ceremony will begin with Closing Remarks by OSE and OCE

• Remote sites will present “wrap-up remarks” (up to 5 minutes each)

• Closing Ceremony will be followed by distribution of certificates, local gift exchanges and photos

Closing Ceremony (Fri, Oct 19)

Note – all times are local Sofia, Bulgaria time

Page 24: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED24

QUESTIONS? ??

Page 25: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED25

Exercise Control Overview and Organization

Mr. John HarrisSEESIM 12 Deputy EXCON Director

United States Joint Staff, J7

Page 26: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED26

EXCON Organizational Chart

Exercise DirectorDeputy Exercise Director

EXCON DirectorEXCON Admin

Visitor Observers Bureau (VOB)Public Information Center (PIC)

Operations Group

Operations Officer

MEL/MIL Trackers

Information Manager

Liaison Officers

International Organizations

Site Mgrs / Role Players

AAR Analysts

Scenario Manager

After Action Review Mgr

Systems Technicians

Comm Technicians

JTLS Tech Controller

Database Manager

Technical Coordinator

VTC Operators

VTC Bridge Operator

Technical Group

JTLS Operators

Sr Model Controller

Personnel located in Bulgaria

Personnel located in Bulgariaand remote sites

Page 27: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED27

Exercise Control (EXCON) Organization

OperationsChief

ScenarioManager

MEL/MILManager

Sub-RegionalEvent Manager

EXCONDirector

National EventManagers

MEL/MILTrackers

AARManager

AARAnalysts

JTLSOperators

JTLS DB Manager

JTLS Tech Control

SITFOR

LTC NikolovMr. Gaines

LTC KondovMr. Morton

LTC AtanasovMr. Yingling

Mr. Brown MAJ Öberg

Remote Sites

LNOs

Dr. Cayirci

COL AtanasovMr. Douglass

LTC HristovMr. Schultz

EXCON Main(Bulgaria)

SiteManagers

RolePlayers

Exercise SyncManager

TechnicalCoordinator

Mr. Fraker

Mr. Frumkin

Mr. Heely

27

Page 28: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED28

Exercise Control (EXCON) Purpose

• Ensure that training takes place by using injects to drive the Training Audience in the direction we want them to go

• Provide an environment that increases realism and enhances the training experience

• Coordinate activities of all control elements to ensure a consistent and coherent picture is presented to the Training Audience

• Capture lessons learned to improve future planning and training

Page 29: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED29

Exercise Control Critical Elements

• Scenario events must be injected in a realistic manner to stimulate Training Audience response

• Must monitor all Training Audience reports, communications, briefings, etc for desired action

• If Training Audience action is not the desired action, initiate additional injects as required to maintain the training effect

• Must keep all control activities transparent to the Training Audience

Page 30: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED30

EXCON Main

• EXCON Main will be located in Charalitza, Bulgaria

• EXCON Main provides the central focus for consolidation of information, coordination of events, and overall direction for the exercise

Page 31: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED31

EXCON Main

• EXCON Main is composed of:– Exercise Directors– EXCON Directors– Operations Officers– Scenario Managers– Information Managers– Technical Control– JTLS Senior Model Control– After-Action Review (AAR) Managers– International Response Cell (IRC)– National Liaison Officers (LNOs)

Page 32: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED32

EXCON Forward

• EXCON Forward will be located in each country or organization which has an operational Emergency Operations Center (EOC)

• EXCON Forward is the critical control link with the Training Audience

• EXCON Forward feedback to EXCON Main will determine the effectiveness of the overall regional training

• EXCON Forward generally consists of a Site Manager, AAR Analyst, MEL/MIL Tracker, JTLS Operator, Site Technicians (VTC Operator, Systems, Comms), and other Role Players as required

Page 33: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED33

Exercise Control Principles

• The EXCON Forward and International Organizations provide the primary interface with the Training Audience

• Site Managers and MEL/MIL Trackers will coordinate all injects to the Training Audience with the Scenario Manager

• All changes or additions to the MEL/MIL must be approved by the Scenario Manager before being sent to the Training Audience

Page 34: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED34

Keys to Effective Control

• Know the MEL/MIL• Know the basic functions of all EXCON control

elements• Coordinate activities with appropriate

personnel• Read the news articles• Use the Daily EXCON Meetings and MEL/MIL

Synchronization Meetings to coordinate control efforts

• Bring any problems and issues immediately to the attention of the EXCON Director

Page 35: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED35

QUESTIONS? ??

Page 36: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED36

EXCON Key Billets and Responsibilities

Mr. John HarrisSEESIM 12 Deputy EXCON Director

United States Joint Staff, J7

Page 37: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED37

EXCON Organizational Chart

Exercise DirectorDeputy Exercise Director

EXCON DirectorEXCON Admin

Visitor Observers Bureau (VOB)Public Information Center (PIC)

Operations Group

Operations Officer

MEL/MIL Trackers

Information Manager

Liaison Officers

International Organizations

Site Mgrs / Role Players

AAR Analysts

Scenario Manager

After Action Review Mgr

Systems Technicians

Comm Technicians

JTLS Tech Controller

Database Manager

Technical Coordinator

VTC Operators

VTC Bridge Operator

Technical Group

JTLS Operators

Sr Model Controller

Personnel located in Bulgaria

Personnel located in Bulgariaand remote sites

Page 38: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED38

EXCON Organizational Chart

Exercise DirectorDeputy Exercise Director

EXCON DirectorEXCON Admin

Visitor Observers Bureau (VOB)Public Information Center (PIC)

Operations Group

Operations Officer

MEL/MIL Trackers

Information Manager

Liaison Officers

International Organizations

Site Mgrs / Role Players

AAR Analysts

Scenario Manager

After Action Review Mgr

Systems Technicians

Comm Technicians

JTLS Tech Controller

Database Manager

Technical Coordinator

VTC Operators

VTC Bridge Operator

Technical Group

JTLS Operators

Sr Model Controller

Personnel located in Bulgaria

Personnel located in Bulgariaand remote sites

Exercise Director

• Senior officer from the Host Nation responsible for execution of the exercise in accordance with guidance from the SEDM Ministers

• Responsible for overall success of the exercise

• Monitors the exercise to ensure that exercise objectives are met

• Provides direction to EXCON Director on execution of the exercise

Page 39: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED39

EXCON Organizational Chart

Exercise DirectorDeputy Exercise Director

EXCON DirectorEXCON Admin

Visitor Observers Bureau (VOB)Public Information Center (PIC)

Operations Group

Operations Officer

MEL/MIL Trackers

Information Manager

Liaison Officers

International Organizations

Site Mgrs / Role Players

AAR Analysts

Scenario Manager

After Action Review Mgr

Systems Technicians

Comm Technicians

JTLS Tech Controller

Database Manager

Technical Coordinator

VTC Operators

VTC Bridge Operator

Technical Group

JTLS Operators

Sr Model Controller

Personnel located in Bulgaria

Personnel located in Bulgariaand remote sites

EXCON Director

• Ensures the exercise is conducted in accordance with Exercise Director’s guidance

• Works with the Operations Officer and Technical Coordinator to coordinate activities of all EXCON cells

• Implements control measures to ensure execution meets exercise objectives

• Chairs the daily EXCON Meeting

• Provides feedback to Exercise Director on execution of the exercise

Page 40: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED40

EXCON Organizational Chart

Exercise DirectorDeputy Exercise Director

EXCON DirectorEXCON Admin

Visitor Observers Bureau (VOB)Public Information Center (PIC)

Operations Group

Operations Officer

MEL/MIL Trackers

Information Manager

Liaison Officers

International Organizations

Site Mgrs / Role Players

AAR Analysts

Scenario Manager

After Action Review Mgr

Systems Technicians

Comm Technicians

JTLS Tech Controller

Database Manager

Technical Coordinator

VTC Operators

VTC Bridge Operator

Technical Group

JTLS Operators

Sr Model Controller

Personnel located in Bulgaria

Personnel located in Bulgariaand remote sites

Operations Officer

• Directs the activities of EXCON Operations Group in accordance with guidance from the EXCON Director

• Synchronizes EXCON Operations Group activities via daily EXCON Meetings and direct liaison with EXCON functional cell chiefs

• Prepares slides for the daily EXCON Meeting

• Reviews all scripted events recommended for addition to the MEL/MIL and assess impact on all other exercise events

Page 41: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED41

EXCON Organizational Chart

Exercise DirectorDeputy Exercise Director

EXCON DirectorEXCON Admin

Visitor Observers Bureau (VOB)Public Information Center (PIC)

Operations Group

Operations Officer

MEL/MIL Trackers

Information Manager

Liaison Officers

International Organizations

Site Mgrs / Role Players

AAR Analysts

Scenario Manager

After Action Review Mgr

Systems Technicians

Comm Technicians

JTLS Tech Controller

Database Manager

Technical Coordinator

VTC Operators

VTC Bridge Operator

Technical Group

JTLS Operators

Sr Model Controller

Personnel located in Bulgaria

Personnel located in Bulgariaand remote sites

Information Manager

• Manages and coordinates all Information Management (IM) activities

• Designs and manages the exercise web site and file management system

• Ensures that Information Management tools (email, phones, webpage, etc) are available and properly configured for all exercise participants

• Ensures that all Requests for Information (RFI) are researched and answered in a timely manner

Page 42: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED42

EXCON Organizational Chart

Exercise DirectorDeputy Exercise Director

EXCON DirectorEXCON Admin

Visitor Observers Bureau (VOB)Public Information Center (PIC)

Operations Group

Operations Officer

MEL/MIL Trackers

Information Manager

Liaison Officers

International Organizations

Site Mgrs / Role Players

AAR Analysts

Scenario Manager

After Action Review Mgr

Systems Technicians

Comm Technicians

JTLS Tech Controller

Database Manager

Technical Coordinator

VTC Operators

VTC Bridge Operator

Technical Group

JTLS Operators

Sr Model Controller

Personnel located in Bulgaria

Personnel located in Bulgariaand remote sites

Scenario Manager

• Prepares the scenario and directs development of all MEL/MIL events

• Monitors execution of the MEL/MIL and directs activities of the MEL/MIL Trackers to ensure exercise injects are sent as scheduled

• Provides changes to scripted inputs to the Operations Officer and EXCON Director for approval

• Chairs the daily MEL/MIL Synchronization Meeting

Page 43: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED43

EXCON Organizational Chart

Exercise DirectorDeputy Exercise Director

EXCON DirectorEXCON Admin

Visitor Observers Bureau (VOB)Public Information Center (PIC)

Operations Group

Operations Officer

MEL/MIL Trackers

Information Manager

Liaison Officers

International Organizations

Site Mgrs / Role Players

AAR Analysts

Scenario Manager

After Action Review Mgr

Systems Technicians

Comm Technicians

JTLS Tech Controller

Database Manager

Technical Coordinator

VTC Operators

VTC Bridge Operator

Technical Group

JTLS Operators

Sr Model Controller

Personnel located in Bulgaria

Personnel located in Bulgariaand remote sites

MEL / MIL Trackers

• Assists the Scenario Manager in the execution of the MEL/MIL

• Uses JEMM to send appropriate injects to the assigned Training Audience in accordance with the MEL/MIL

• Assists AAR Analyst with tracking Training Audience response to injects

• Keeps assigned Liaison Officers informed of status of MEL/MIL injects

Page 44: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED44

EXCON Forward Name

Albania CPT Engjell SHEHU

Bosnia and Herzegovina MAJ Teodor JANJIC

Bulgaria MAJ Radostin PETROV

Croatia CPT Josip ĆURIĆ

Italy Mr. Ferdinando SCARAZZINI

Montenegro Ms. Zorica MARKOVIĆ

SEEBRIG HQ CPT Raffaele ASCIONE

Serbia LT Aleksandar TEPIĆ

the former Yugoslav Republic of Macedonia*

Mr. Zivko STAVRESKI

Ukraine LTC Yaroslav MELNICK

EXCON Forward MEL/MIL Trackers

Page 45: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED45

EXCON Organizational Chart

Exercise DirectorDeputy Exercise Director

EXCON DirectorEXCON Admin

Visitor Observers Bureau (VOB)Public Information Center (PIC)

Operations Group

Operations Officer

MEL/MIL Trackers

Information Manager

Liaison Officers

International Organizations

Site Mgrs / Role Players

AAR Analysts

Scenario Manager

After Action Review Mgr

Systems Technicians

Comm Technicians

JTLS Tech Controller

Database Manager

Technical Coordinator

VTC Operators

VTC Bridge Operator

Technical Group

JTLS Operators

Sr Model Controller

Personnel located in Bulgaria

Personnel located in Bulgariaand remote sites

Liaison Officers (LNOs)

• Responsible for coordinating exercise activity between EXCON Main and EXCON Forward activities with the Site Manager at the remote site

• Monitors implementation of MEL/MIL injects and assists MEL/MIL Tracker as required

• Keeps Operations Officer informed regarding EXCON Forward activities at the remote site

Page 46: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED46

EXCON Forward Name

Albania LTC Ilir BYTYÇI

Bosnia and Herzegovina LTC Slaven ARAMBASIC

Bulgaria MAJ Boyan RADKOV

Croatia MAJ Željko MADŽAR

Italy Mr. Daniele SURIANO

Montenegro Ms. Ljiljana ĐUKANOVIĆ

SEEBRIG HQ MSG Georgios NEMOUKOS

Serbia LTC Dragan NIKOLIĆ

the former Yugoslav Republic of Macedonia*

Mr. Urim VEJSELI

Ukraine MAJ Denis YEFIMOV

EXCON Main Liaison Officers

Page 47: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED47

EXCON Organizational Chart

Exercise DirectorDeputy Exercise Director

EXCON DirectorEXCON Admin

Visitor Observers Bureau (VOB)Public Information Center (PIC)

Operations Group

Operations Officer

MEL/MIL Trackers

Information Manager

Liaison Officers

International Organizations

Site Mgrs / Role Players

AAR Analysts

Scenario Manager

After Action Review Mgr

Systems Technicians

Comm Technicians

JTLS Tech Controller

Database Manager

Technical Coordinator

VTC Operators

VTC Bridge Operator

Technical Group

JTLS Operators

Sr Model Controller

Personnel located in Bulgaria

Personnel located in Bulgariaand remote sites

After Action Review (AAR) Manager

• Responsible for managing all exercise AAR activities

• Directs activities of the AAR Team

• Develops and implements the AAR Collection Management Plan (CMP)

• Provides training to other AAR Analysts and Observers

• Identifies focus areas and collects observations on exercise activities

• Provides feedback to EXCON Main on Training Audience actions

• Assembles slides for the After-Action Review (AAR) and conducts the AAR at the end of the exercise

• Prepares Final Exercise Report (FER) at the conclusion of the exercise

Page 48: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED48

EXCON Organizational Chart

Exercise DirectorDeputy Exercise Director

EXCON DirectorEXCON Admin

Visitor Observers Bureau (VOB)Public Information Center (PIC)

Operations Group

Operations Officer

MEL/MIL Trackers

Information Manager

Liaison Officers

International Organizations

Site Mgrs / Role Players

AAR Analysts

Scenario Manager

After Action Review Mgr

Systems Technicians

Comm Technicians

JTLS Tech Controller

Database Manager

Technical Coordinator

VTC Operators

VTC Bridge Operator

Technical Group

JTLS Operators

Sr Model Controller

Personnel located in Bulgaria

Personnel located in Bulgariaand remote sites

After Action Review (AAR) Analysts

• Assists the Site Manager with operation of EXCON Forward site

• Monitors all exercise injects sent to the Training Audience and provides regular feedback to the Site Manager and AAR Manager

• Uses JEMM to record observations regarding Training Audience reactions to MEL/MIL injects

• Provides input to the After-Action Review (AAR) and the Final Exercise Report (FER)

Page 49: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED49

EXCON Forward Name

Albania LTC Ilirian DAUTI

Bosnia and Herzegovina LTC Ibro ALISPAHIĆ

BulgariaMr. Svetlin STANEV (MOI)Maj Boncho BONEV (MOD)

Croatia Mr. Tomislav LUKAC

Italy TBD

Montenegro Ms. Slavka MILETIĆ

SEEBRIG HQ LTC Kostantinos PLATSAS

Serbia LTC Dragan BRANOVIĆ

the former Yugoslav Republic of Macedonia*

Mr. Toni STANKOVSKIMr. Ljupco STALEVSKI

Ukraine MAJ Yaroslav MELNIK

EXCON Forward AAR Analysts

Page 50: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED50

EXCON Organizational Chart

Exercise DirectorDeputy Exercise Director

EXCON DirectorEXCON Admin

Visitor Observers Bureau (VOB)Public Information Center (PIC)

Operations Group

Operations Officer

MEL/MIL Trackers

Information Manager

Liaison Officers

International Organizations

Site Mgrs / Role Players

AAR Analysts

Scenario Manager

After Action Review Mgr

Systems Technicians

Comm Technicians

JTLS Tech Controller

Database Manager

Technical Coordinator

VTC Operators

VTC Bridge Operator

Technical Group

JTLS Operators

Sr Model Controller

Personnel located in Bulgaria

Personnel located in Bulgariaand remote sites

International Organizations (IO)

• Role players who represent agencies not actively participating in the exercise but would likely be present in an actual disaster

• Representatives from agencies who can participate provide subject matter expertise and role play activities of their respective agencies

• Coordinates requests for assistance (resources, services, information) from affected nation to the international community

• Coordinates all International exercise activity with the EXCON Operations Officer and Scenario Manager

Page 51: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED51

EXCON Organizational Chart

Exercise DirectorDeputy Exercise Director

EXCON DirectorEXCON Admin

Visitor Observers Bureau (VOB)Public Information Center (PIC)

Operations Group

Operations Officer

MEL/MIL Trackers

Information Manager

Liaison Officers

International Organizations

Site Mgrs / Role Players

AAR Analysts

Scenario Manager

After Action Review Mgr

Systems Technicians

Comm Technicians

JTLS Tech Controller

Database Manager

Technical Coordinator

VTC Operators

VTC Bridge Operator

Technical Group

JTLS Operators

Sr Model Controller

Personnel located in Bulgaria

Personnel located in Bulgariaand remote sites

Site Managers

• Responsible for managing all exercise activity at the remote site (operational and technical)

• Provides training to EOC personnel prior to start of the exercise

• Maintains close communication with the EXCON Director and Operations Officer to coordinate remote site activity

• Monitors all EOC communications and notifies assigned JTLS Operator of required model actions

• Uses JEMM to maintain visibility on injects sent to the Training Audience

• Monitors the EOC to ensure all Training Audience information is being received and accurate information is passed

• Coordinates routinely with the appropriate Liaison Officer in EXCON Main on all exercise activity at the remote site

Page 52: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED52

EXCON Forward Name

Albania LTC Etor SHEHU

Bosnia and Herzegovina Mr. Željko DUGONJIĆ

BulgariaMs. Evgenia VLADIMIROVA (MOI)LTC Dimitar DOROSHENKO (MOD)

Croatia LTC Radovan PALMOVIĆ

Italy Mr. Giovanni FERRARI

Montenegro MAJ Živojin BURIĆ

SEEBRIG HQ LTC Jetnor BALLA

Serbia Mr. Saša RANČIĆ

the former Yugoslav Republic of Macedonia*

Mr. Zdravko JAKOVLEVSKI

Ukraine COL Dmitri CHOPA

EXCON Forward Site Managers

Page 53: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED53

EXCON Organizational Chart

Exercise DirectorDeputy Exercise Director

EXCON DirectorEXCON Admin

Visitor Observers Bureau (VOB)Public Information Center (PIC)

Operations Group

Operations Officer

MEL/MIL Trackers

Information Manager

Liaison Officers

International Organizations

Site Mgrs / Role Players

AAR Analysts

Scenario Manager

After Action Review Mgr

Systems Technicians

Comm Technicians

JTLS Tech Controller

Database Manager

Technical Coordinator

VTC Operators

VTC Bridge Operator

Technical Group

JTLS Operators

Sr Model Controller

Personnel located in Bulgaria

Personnel located in Bulgariaand remote sites

Technical Coordinator

• Responsible for managing and directing all technical aspects of the exercise (systems, networks, communications, video teleconferencing, and Modeling and Simulation (M&S))

• Coordinates with the Operations Officer to ensure all technical requirements are satisfied

• Coordinates with Site Managers at each remote site to resolve technical issues affecting exercise execution

• Provides status of technical systems during the daily EXCON Meeting

Page 54: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED54

EXCON Organizational Chart

Exercise DirectorDeputy Exercise Director

EXCON DirectorEXCON Admin

Visitor Observers Bureau (VOB)Public Information Center (PIC)

Operations Group

Operations Officer

MEL/MIL Trackers

Information Manager

Liaison Officers

International Organizations

Site Mgrs / Role Players

AAR Analysts

Scenario Manager

After Action Review Mgr

Systems Technicians

Comm Technicians

JTLS Tech Controller

Database Manager

Technical Coordinator

VTC Operators

VTC Bridge Operator

Technical Group

JTLS Operators

Sr Model Controller

Personnel located in Bulgaria

Personnel located in Bulgariaand remote sites

Systems Technicians

• Responsible for managing assigned computer systems

• Works with Systems Technicians at remote sites to resolve system problems affecting exercise execution

• Notifies the Technical Coordinator of any system issues affecting execution of the exercise

Page 55: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED55

EXCON Organizational Chart

Exercise DirectorDeputy Exercise Director

EXCON DirectorEXCON Admin

Visitor Observers Bureau (VOB)Public Information Center (PIC)

Operations Group

Operations Officer

MEL/MIL Trackers

Information Manager

Liaison Officers

International Organizations

Site Mgrs / Role Players

AAR Analysts

Scenario Manager

After Action Review Mgr

Systems Technicians

Comm Technicians

JTLS Tech Controller

Database Manager

Technical Coordinator

VTC Operators

VTC Bridge Operator

Technical Group

JTLS Operators

Sr Model Controller

Personnel located in Bulgaria

Personnel located in Bulgariaand remote sites

Communications Technicians

• Responsible for managing and monitoring assigned communications systems and links with remote sites

• Works with Communications Technicians at remote sites to resolve system problems affecting exercise execution

• Notifies the Technical Coordinator of any communications issues affecting execution of the exercise

Page 56: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED56

EXCON Organizational Chart

Exercise DirectorDeputy Exercise Director

EXCON DirectorEXCON Admin

Visitor Observers Bureau (VOB)Public Information Center (PIC)

Operations Group

Operations Officer

MEL/MIL Trackers

Information Manager

Liaison Officers

International Organizations

Site Mgrs / Role Players

AAR Analysts

Scenario Manager

After Action Review Mgr

Systems Technicians

Comm Technicians

JTLS Tech Controller

Database Manager

Technical Coordinator

VTC Operators

VTC Bridge Operator

Technical Group

JTLS Operators

Sr Model Controller

Personnel located in Bulgaria

Personnel located in Bulgariaand remote sites

VTC Bridge Operator

• Responsible for overall operation and scheduling of all video teleconferencing (VTC) activities

• Operates the VTC Bridge at EXCON Main and coordinates addition of EXCON Forward sites into all VTC sessions

• Works with VTC Operators at EXCON Forward sites to monitor all EXCON VTC sessions

• Notifies the Technical Coordinator of any issues affecting VTC systems

Page 57: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED57

EXCON Organizational Chart

Exercise DirectorDeputy Exercise Director

EXCON DirectorEXCON Admin

Visitor Observers Bureau (VOB)Public Information Center (PIC)

Operations Group

Operations Officer

MEL/MIL Trackers

Information Manager

Liaison Officers

International Organizations

Site Mgrs / Role Players

AAR Analysts

Scenario Manager

After Action Review Mgr

Systems Technicians

Comm Technicians

JTLS Tech Controller

Database Manager

Technical Coordinator

VTC Operators

VTC Bridge Operator

Technical Group

JTLS Operators

Sr Model Controller

Personnel located in Bulgaria

Personnel located in Bulgariaand remote sites

VTC Operators

• Responsible for operation of all video teleconferencing (VTC) activity at EXCON Forward

• Operates the VTC equipment at EXCON Forward and coordinates connection of VTC site with VTC Bridge Operator

• Monitors all EXCON VTC sessions

• Notifies the Site Manager and VTC Bridge Operator of any issues affecting VTC systems

Page 58: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED58

EXCON Organizational Chart

Exercise DirectorDeputy Exercise Director

EXCON DirectorEXCON Admin

Visitor Observers Bureau (VOB)Public Information Center (PIC)

Operations Group

Operations Officer

MEL/MIL Trackers

Information Manager

Liaison Officers

International Organizations

Site Mgrs / Role Players

AAR Analysts

Scenario Manager

After Action Review Mgr

Systems Technicians

Comm Technicians

JTLS Tech Controller

Database Manager

Technical Coordinator

VTC Operators

VTC Bridge Operator

Technical Group

JTLS Operators

Sr Model Controller

Personnel located in Bulgaria

Personnel located in Bulgariaand remote sites

JTLS Technical Coordinator

• Responsible for the coordination and integration of the Joint Theater Level Simulation (JTLS) model activities in support of the exercise

• Coordinates the activities of all supporting JTLS Technical Controllers, the JTLS Database Manager, and the Senior Model Controller

• Resolves any technical and operational simulation issues involving model operation or failure

• Notifies the Technical Coordinator of any issues affecting operation of the JTLS model

Page 59: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED59

EXCON Organizational Chart

Exercise DirectorDeputy Exercise Director

EXCON DirectorEXCON Admin

Visitor Observers Bureau (VOB)Public Information Center (PIC)

Operations Group

Operations Officer

MEL/MIL Trackers

Information Manager

Liaison Officers

International Organizations

Site Mgrs / Role Players

AAR Analysts

Scenario Manager

After Action Review Mgr

Systems Technicians

Comm Technicians

JTLS Tech Controller

Database Manager

Technical Coordinator

VTC Operators

VTC Bridge Operator

Technical Group

JTLS Operators

Sr Model Controller

Personnel located in Bulgaria

Personnel located in Bulgariaand remote sites

JTLS Database Manager

• Responsible for identifying model database requirements, assembling the database from participant inputs, and ensuring integration into the JTLS model

• Works with personnel from participating nations and SEEBRIG prior to execution to identify model requirements that support the exercise objectives

• Builds the JTLS model database and assists with model and database testing throughout the exercise planning process

• Monitors JTLS model activity during execution and makes any required changes to support exercise objectives

• Notifies the Technical Coordinator and JTLS Technical Controller of any issues related to the JTLS database

Page 60: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED60

EXCON Organizational Chart

Exercise DirectorDeputy Exercise Director

EXCON DirectorEXCON Admin

Visitor Observers Bureau (VOB)Public Information Center (PIC)

Operations Group

Operations Officer

MEL/MIL Trackers

Information Manager

Liaison Officers

International Organizations

Site Mgrs / Role Players

AAR Analysts

Scenario Manager

After Action Review Mgr

Systems Technicians

Comm Technicians

JTLS Tech Controller

Database Manager

Technical Coordinator

VTC Operators

VTC Bridge Operator

Technical Group

JTLS Operators

Sr Model Controller

Personnel located in Bulgaria

Personnel located in Bulgariaand remote sites

JTLS Senior Model Controller

• Responsible for JTLS model operations and synchronization of MEL/MIL events that are replicated in the model

• Coordinates with JTLS Operators to effectively manage situational forces

• Coordinates resolution of JTLS technical issues with the JTLS Technical Controller

• Coordinates resolution of JTLS database issues with the JTLS Database Manager

Page 61: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED61

EXCON Organizational Chart

Exercise DirectorDeputy Exercise Director

EXCON DirectorEXCON Admin

Visitor Observers Bureau (VOB)Public Information Center (PIC)

Operations Group

Operations Officer

MEL/MIL Trackers

Information Manager

Liaison Officers

International Organizations

Site Mgrs / Role Players

AAR Analysts

Scenario Manager

After Action Review Mgr

Systems Technicians

Comm Technicians

JTLS Tech Controller

Database Manager

Technical Coordinator

VTC Operators

VTC Bridge Operator

Technical Group

JTLS Operators

Sr Model Controller

Personnel located in Bulgaria

Personnel located in Bulgariaand remote sites

JTLS Operators

• Responsible for entering orders into the JTLS simulation model

• Works closely with the Site Manager and MEL/MIL Tracker to implement actions in the model to replicate national responses identified by the Training Audience

• A JTLS Operator is assigned to each participating nation and to SEEBRIG

Page 62: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED62

EXCON Forward Name

Albania CPT Enkelejda DURBAKU

Bosnia and Herzegovina SGM Djordje VIDAKOVIĆ

Bulgaria Sgt Tsveti ZEKOVA

Croatia SSG Jasenka ĆOSIĆ

ItalyOR-9 Carmine CENVINZOOF-3 Patrizio SPERANZA

Montenegro 1LT Petar KOPRIVICA

SEEBRIG HQ 1LT Iva IVANOVA

Serbia SGT Nenad MLADENOVIĆ

the former Yugoslav Republic of Macedonia*

Mr. Mehmed VEAPI

Ukraine MAJ Roman TIMOSHENKO

EXCON Forward JTLS Operators

Page 63: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED63

QUESTIONS? ??

Page 64: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED64

Review Exercise Manning Document

Page 65: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED65

• Manning Document distributed to all Site Managers

• Site Managers responsible for ensuring all names in the manning list are correct

• Site Managers responsible for ensuring personnel in the manning document are aware of the exercise schedule and in place at the appropriate time

• Exercise certificates will be prepared using the final exercise manning document list

• Site Managers responsible for ensuring names are spelled correctly

Exercise Manning Document

Page 66: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED66

Mr. John HarrisSEESIM 12 Deputy EXCON Director

United States Joint Staff, J7

Exercise Control Plan

Page 67: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED67

Exercise Control Plan

1. References

2. Purpose

3. Background

4. Concept

5. Execution

6. Exercise Schedule and Scenario Timeline

Page 68: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED68

Exercise Control Plan

Appendices

1. EXCON Architecture

2. Manning Document

3. EXCON Meeting

4. EXCON Training Plan

5. Information Management Plan

Page 69: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED69

QUESTIONS? ??

Page 70: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED70

Mr. John HarrisSEESIM 12 Deputy EXCON Director

United States Joint Staff, J7

Basic Network

Architecture (BNA)

Page 71: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED71

SEESIM 12 Network Design

VTC, VoIP, Portal, Email, JTLS, JEMM

BulgariaEXCON Main

Page 72: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED

Bulgaria

EXCON Main

Bulgaria

EXCON Main

72

Basic Network Architecture

IM PC

VPN for Exercise Network (VTC, VOIP, Portal, Mail, JTLS, JEMM) TELCO (POTS/FAX)

EXCON MAIN

EXCON Fwd

ISP

Internet PCJTLS Client

VoIP Phone

VTC Bridge

Virtualized Services (Email, Portal, VoIP Call Mgr, DNS, DC, JTLS, OWA)

EXCON

Forward

EXCON

Forward

IM PC

Firewall

Internet (OWA, JEMM)

Firewall

TELCO

Phone/Fax

Phone/Fax

Internet

JTLS Technical Control

VTC codec

VoIP Phone

2 mbps

12 mbps

Printer

Printer

Mobile Phones

Mobile Phones

EOC and

Experimentation

EOC and

Experimentation

JEMM

Page 73: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED73

Experimentation Conceptual Construct

Page 74: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED74

QUESTIONS? ??

Page 75: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED75

Mr. Bob YinglingSEESIM 12 Scenario Manager

United States Joint Staff, J7

SEESIM 12 Scenario

Page 76: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED76

Overview

• Ten nations and SEEBRIG participating• Each nation experiences a number of natural

or man made disasters in their nation or a sub-regional incident in which they chose to participate

• Each nation will manage the consequences of each disaster as well as offering and accepting assistance from neighbors and nations in the region

Page 77: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED

Event

Incident

Inject

Inject

Inject

Incident

Inject

Inject

Inject

Structure for Injects

Page 78: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED78

Sub-Regional and National

Incidents

Page 79: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED79

Sub-Regional Incidents

– Earthquake• Southeastern Europe Brigade (SEEBRIG)• Bulgaria • the former Yugoslav Republic of Macedonia*

– Biological Threat• Bulgaria• Ukraine

Page 80: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED80

Sub-Regional Incidents

– Firefighting• Albania• Bosnia and Herzegovina• Croatia• Montenegro• Serbia

– Cyber Attacks• Albania• Croatia• the former Yugoslav Republic of Macedonia*

Page 81: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED81

National Incidents

– Albania• Heavy flooding near Shkroda Lake and along

Buna river– Rains and storms impact district of Shkroda

• Contamination of Lake Prespa by unknown individual in boats

• Cyber attack

– Bosnia and Herzegovina • Terror attack on city of Mostar train station • Flooding along Drina river in Višegrad area,

region of Dušće village• Landslide • Cyber attack

Page 82: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED82

National Incidents

– Bulgaria • Cyber attack on the Ministry of Justice, Registry

Agency and skimming on banking system

– Croatia • Terror attack on Zagreb concert hall “Vatroslav

Lisinksi”• Earthquake

– Italy• Italy bound, WMD laden ship intercepted

Page 83: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED83

– the former Yugoslav Republic of Macedonia• Chemical explosion at Okta Refinery• Cyber attack on “Alexander the Great” airport

– Montenegro• Flooding vicinity Plav, Andrijevica, Berane and

Bijelo Polje, landslides in area of Bijelo Polje • Chemical accidental release in river Ibar near

border crossing Dracenovac• Industrial explosives plant “Poliex” explosion in

Berane

National Incidents

Page 84: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED84

– Serbia • Earthquake measures 6.0, epicenter near

Tekeriš• Chemical explosion at plant “Zorka-fitofarmacija

in Šabac

– Ukraine• Accident at nuclear power plant Khmelnytsky

– Fire threatens radiation emission on border of Rivne and Khmelnytsky districts

• Cyber intrusion into immovable property registration bureau and city technical inventory

National Incidents

Page 85: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED85

15-19 October 2012

Scenario Timeline

Page 86: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED86

–Sub-Regional• Earthquake

– Southeastern Europe Brigade (SEEBRIG)– Bulgaria – the former Yugoslav Republic of

Macedonia*

• Cyber Attacks– Albania– Croatia– the former Yugoslav Republic of Macedonia*

15 October 2012 (1 of 3)

Page 87: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED87

– Albania• Heavy flooding Shkroda Lake and Buna river

– Bosnia and Herzegovina• Flooding along Drina river

– Croatia• Earthquake• Terror attack on Zagrab concert hall

– Italy• WMD laden ship interdiction

15 October 2012 (2 of 3)

Page 88: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED88

– Montenegro• Flooding

– Serbia • Earthquake epicenter near Tekeriš• Chemical explosion

– Ukraine• Accident at nuclear power plant Khmelnytsky

15 October 2012 (3 of 3)

Page 89: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED89

–Sub-Regional• Earthquake

– Southeastern Europe Brigade (SEEBRIG)– Bulgaria – the former Yugoslav Republic of

Macedonia*

• Biological Threat– Bulgaria– Ukraine

16 October 2012 (1 of 5)

Page 90: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED90

–Sub-Regional Continued:• Firefighting

– Bosnia and Herzegovina– Croatia– Montenegro– Serbia

• Cyber Attacks– Albania– Croatia– the former Yugoslav Republic of

Macedonia*

16 October 2012 (2 of 5)

Page 91: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED91

– Albania• Heavy flooding Shkroda Lake and Buna river

– Bosnia and Herzegovina• Terror attack Mostar train station

– Croatia• Earthquake• Terror attack on Zagrab concert hall

– Italy • WMD laden ship interdiction

16 October 2012 (3 of 5)

Page 92: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED92

– the former Yugoslav Republic of Macedonia*• Chemical explosion Okta Refinery• Cyber attack on “Alexander the Great” airport

– Montenegro• Flooding • Chemical accidental release in river Ibar• Industrial explosives plant “Poliex”

16 October 2012 (4 of 5)

Page 93: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED93

– Serbia • Earthquake epicenter near Tekeriš• Chemical explosion

– Ukraine• Accident at nuclear power plant Khmelnytsky• Cyber intrusion

16 October 2012 (5 of 5)

Page 94: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED94

–Sub-Regional• Earthquake

– Southeastern Europe Brigade (SEEBRIG)– Bulgaria – the former Yugoslav Republic of

Macedonia*

• Biological Threat– Bulgaria– Ukraine

17 October 2012 (1 of 5)

Page 95: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED95

–Sub-Regional Continued:• Firefighting

– Bosnia and Herzegovina– Croatia– Montenegro– Serbia

• Cyber Attacks– Albania– Croatia– the former Yugoslav Republic of

Macedonia*

17 October 2012 (2 of 5)

Page 96: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED96

– Albania• Heavy flooding Shkroda Lake and Buna river• Contamination of Lake Prespa• Cyber attack

– Bosnia and Herzegovina• Cyber attack

– Bulgaria • Cyber attack on the Ministry of Justice

– Croatia• Earthquake• Terror attack on Zagrab concert hall

17 October 2012 (3 of 5)

Page 97: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED97

– Italy• WMD laden ship interdiction

– the former Yugoslav Republic of Macedonia*• Chemical explosion Okta Refinery• Cyber attack on “Alexander the Great” airport

– Montenegro• Flooding • Chemical accidental release in river Ibar• Industrial explosives plant “Poliex”

17 October 2012 (4 of 5)

Page 98: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED98

– Serbia • Earthquake epicenter near Tekeriš

– Ukraine• Accident at nuclear power plant Khmelnytsky• Cyber intrusion

17 October 2012 (5 of 5)

Page 99: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED99

–Sub-Regional• Earthquake

– Southeastern Europe Brigade (SEEBRIG)– Bulgaria – the former Yugoslav Republic of

Macedonia*

• Biological Threat– Bulgaria– Ukraine

18 October 2012 (1 of 4)

Page 100: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED100

–Sub-Regional Continued:• Firefighting

– Bosnia and Herzegovina– Croatia– Montenegro– Serbia

• Cyber Attacks– Albania– Croatia– the former Yugoslav Republic of

Macedonia*

18 October 2012 (2 of 4)

Page 101: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED101

– Albania• Heavy flooding Shkroda Lake and Buna river• Contamination of Lake Prespa

– Bosnia and Herzegovina• Landslide

– Bulgaria • Cyber attack on the Ministry of Justice

– Croatia• Earthquake

– Italy• WMD explosion

18 October 2012 (3 of 4)

Page 102: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED102

– the former Yugoslav Republic of Macedonia*• Chemical explosion Okta Refinery• Cyber attack on “Alexander the Great” airport

– Montenegro• Flooding • Chemical accidental release in river Ibar• Industrial explosives plant “Poliex”

– Serbia • Earthquake epicenter near Tekeriš

– Ukraine• Accident at nuclear power plant Khmelnytsky• Cyber intrusion

18 October 2012 (4 of 4)

Page 103: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED103

– Sub-Regional• Earthquake

– Southeastern Europe Brigade (SEEBRIG)– Bulgaria – the former Yugoslav Republic of Macedonia*

• Firefighting – Bosnia and Herzegovina– Croatia– Serbia– Montenegro

• Cyber Attacks– Albania– Croatia– the former Yugoslav Republic of Macedonia*

19 October 2012 (1 of 3)

Page 104: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED104

– Albania• Contamination of Lake Prespa

– Croatia• Earthquake

– the former Yugoslav Republic of Macedonia*• Chemical explosion Okta Refinery

– Italy• WMD explosion

19 October 2012 (2 of 3)

Page 105: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED105

– Montenegro• Flooding • Industrial explosives plant “Poliex”

– Serbia • Earthquake epicenter near Tekeriš

– Ukraine• Accident at nuclear power plant Khmelnytsky• Cyber intrusion

19 October 2012 (3 of 3)

Page 106: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED106

Timeline Sub-Regional Incidents

Earthquake (Bulgaria , the former Yugoslav Republic of Macedonia*, SEEBRIG)

15OCT

16OCT

17OCT

18OCT

19OCT

Biological Incident (Bulgaria, Ukraine)

Firefighting ( Bosnia and Herzegovina, Croatia, Montenegro, Serbia)

Cyber (Albania, Croatia, the former Yugoslav Republic of Macedonia*)

Page 107: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED107

Timeline Sub-Regional Incidents

Earthquake (Bulgaria , the former Yugoslav Republic of Macedonia*, SEEBRIG)

15OCT

16OCT

17OCT

18OCT

19OCT

Biological Incident (Bulgaria, Ukraine)

Firefighting ( Bosnia and Herzegovina, Croatia, Montenegro, Serbia)

Cyber (Albania, Croatia, the former Yugoslav Republic of Macedonia*)

Lead

Page 108: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED

Firefighting

108

Timeline National Incidents

15OCT

16OCT

17OCT

18OCT

19OCT

Bosnia and Herzegovina:

Flooding Drina river

Albania: Flooding in Northwest

Contamination of Lake Prespa

Cyber attacks

Cyber attackLandslide

Terrorist attack - Mostar train

station

Croatia: Terrorist attack in Zagreb concert hall

Earthquake

the former Yugoslav Republic of Macedonia*: Chemical incident

Cyber attack

Montenegro: Flooding

Chemical incident

Industrial plant explosion

Serbia :Earthquake

Cyber attack

Terror attack: chemical factory

Ukraine: Nuclear Plant accident

Italy: WMD interdiction Italy: WMD explosion

Bulgaria: Cyber attack

Page 109: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED109

QUESTIONS? ??

Page 110: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED110

Mr. Bob YinglingSEESIM 12 Scenario Manager

United States Joint Staff, J7

Mini-Exercise (MINIEX) Plan

Page 111: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED111

• MINIEX is scheduled for Friday, Oct 12 at 0900 Bulgaria time

• Remote Site participants for MINIEX:– Site Manager– AAR Analyst– MEL/MIL Tracker– JTLS Operator– Liaison Officer (LNO)

• The Training Audience will not participate in the MINIEX

Introduction

Page 112: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED112

• Organize controller cells, refine cell internal techniques and procedures, clarify individual cell member responsibilities

• Facilitate/coordinate the necessary interactions within EXCON

• Understand the JEMM Inject Approval process

• Exercise the Collection Management Plan

• Practice EXCON procedures

• Test Information Management Tools (laptops, Voice over IP Phones, email, portal, etc)

MINIEX Objectives

Page 113: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED113

• All EXCON Forward participants should be familiar with sub-regional scenario themes and national themes

• Review your MINIEX injects and know when your injects are to be sent and the means by which they will be transmitted

• The first EXCON Meeting will be conducted via VTC during the MINIEX at 1600 Bulgaria time (no slides are required)

MIINEX Procedures

Page 114: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED114

• During the MINIEX each MEL/MIL Tracker will open JEMM to their national and if applicable their sub regional MEL/MIL incidents to Oct 12

• Only the MEL/MIL Tracker will send injects during the MINIEX at times corresponding to times within JEMM

• Injects will be sent to the Training Audience (address behind it will be EXCON) contained in the inject unless the MEL/MIL Manager or senior EXCON person changes the status to pause or stop the process of sending injects

MINIEX Procedures

Page 115: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED115

QUESTIONS? ??

Page 116: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED116

Mr. Bill HeelySEESIM 12 JTLS Senior Model Control

United States Joint Staff, J7

Joint Theater Level Simulation (JTLS)

Overview

Page 117: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED

• Site Manager’s Role in Model Inputs

• JTLS Overview‒ Purpose‒ Components‒ Capabilities

• SEESIM 12 Application

Overview

117

Page 118: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED

• Coordinate Between Exercise Control (EXCON) and Training Audience (TA)

• Ensure Events are properly presented to TA‒ Continually review MEL/MIL ‒ Confer with Scenario Manager (VTC or

phone)• Role-Play “HICON” and “LOCON” to TA• Pass TA’s directions to JTLS Operator• Provide requested information to TA from

JTLS…but NEVER mention “the model”

Site Manager’s Duties

118

Page 119: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED

• Replicates actual Units/Organizations doing tasks in real-time distance and speed

• Provides chart of the Operations Area

• JTLS Capabilities and Operations

• Exercise Applications

JTLS Overview

119

Page 120: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED

• Provides “Perceived” view of units, organizations, facilities that are in the data base

• Filtering of icons • Accesses configurable orders and unit data from map• Displays location, terrain, and barrier data

• Zoomable• Map

Web-Hosted Interface Program (WHIP)

120

Page 121: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED

7.5 km

TERRAIN FEATURES

ELEVATION

BARRIERS

MOVEMENTS

GROUND - AIR – SEA(RIVERS – ROADS – BARRIERS – BRIDGES – LAND/WATER)

RIVER

DEPTH

Hex Based Terrain

121

Page 122: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED

Chart Overlays provide improved Situational Awareness

JTLS “Geographics”

122

Page 123: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED

• Google Earth “views” enhance detail

• Saved views; NOT Online

• JTLS icons appear

• User-friendly

• Briefing Aids

Google Earth with JTLS

123

Page 124: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED

• Provides detailed data on your nation’s simulated resources

• Dynamic, Instantaneous, Configurable Spread Sheets

• Multiple Window Capability – 50+

Information Management Tool (IMT)

124

Page 125: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED

• Hypertext Directory of Entire JTLS Database• Updated daily

Online Player’s Manual (OPM)

125

Page 126: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED

• Allows display of current information when object selected

Situation Report (SITREP)

126

Page 127: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED

• Enables you to have your resources conduct specified actions, i.e. move supplies by land/sea/air

• User-friendly Order Templates with multiple Help Options

(Fig 1 - Orders Menu)(Fig 2 - Utility Menu)

Orders and Order Management

127

Page 128: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED

• Provides Instant feedback from Simulation to User • Gives notifications when certain tasks are complete

Message Browser

128

Page 129: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED

National EmergencyOperations

Center(EOC)

Site ManagerMEL/MIL TrackerJTLS Operator

Site ManagerMEL/MIL TrackerJTLS Operator

JTLS MODELJTLS MODEL

TrainingAudience

TrainingAudience

ScenarioManager

Exercise Control(EXCON)

Exercise Control(EXCON)

SEESIM Information Flow

129

Page 130: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED

• MEL/MIL event calls for a ship headed to Italy‒ Determine direction, timing, etc. to make it happen

in JTLS as specified in the MEL/MIL details• EOC asks Site Manager where nearest resources are

to intercept ship and rescue passengers‒ JTLS Operator retrieves information from model ‒ Site Manager passes information to EOC

• EOC directs a specific response with specific resources‒ Site Manager relays orders to JTLS Operator who

sends the orders in JTLS to replicate the ordered action

Site Manager and JTLS Input (Example)

130

Page 131: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED131

QUESTIONS? ??

Page 132: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED132

Mr. John HarrisSEESIM 12 Deputy EXCON Director

United States Joint Staff, J7

Information Management

Page 133: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED133

• Provide visibility over Training Audience activities and plans:• Are training objectives being met?• Is the exercise proceeding as planned?

• Ensure all EXCON activities affecting the Training Audience are coordinated

• Make information available to those who need it

Purpose

Page 134: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED134

Information Management Capabilities

CapabilityEXCON

MainEXCON

Forwards EOCsE-Mail X X X

Commercial Telephone X X X

FAX X X X

VoIP Telephone X X

JEMM X X

EXCON SharePoint Portal X X

VTC X X

JTLS Workstation X X

Internet Café X

Page 135: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED135

EOC

EXCON Main (Bulgaria)

Exercise DirectorEXCON Director

Operations ControlScenario Manager

AAR ManagerInformation Manager

Experimentation ManagerLiaison Officers

Remote SiteEXCON Forward

Site ManagerAAR Analyst

National Role PlayersJTLS Operator

MEL/MIL Tracker

International Response Cell(Role Players)

OtherEOCs

JT

LS

IN

FO

RM

AT

ION

Messages & Coordination

Messages &Coordination

Coordination

Coordination

RF

Is

Guidance

RFIs

Information Flow

TRAININGAUDIENCE

Co

ord

ina

tio

n&

In

form

ati

on

ME

L/M

IL I

nje

cts

RFIs

Page 136: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED136

EXCON Forward IM Responsibilities

• EXCON Forward is most directly responsible for the information provided to the Training Audience; they have the greatest knowledge of what is actually taking place in the EOCs

• EXCON Forward must obtain all possible information from the EOCs; the Site Manager should be included on all emails sent from the EOC

• EXCON Forward ensures that EOC decisions to be entered into the simulation are provided to the JTLS Operator

• EXCON Forwards coordinate with each other to maintain situational awareness and to ensure coordination of activities

Page 137: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED137

SEESIM 12 National Numbers

Numbers assigned to SEESIM 12 nations:

1 – Albania

2 – Bulgaria

4 – Italy

5 – the former Yugoslav Republic of Macedonia*

8 – Bosnia and Herzegovina

9 – Croatia

10 – Ukraine

11 – Montenegro

12 – Serbia

13 – SEEBRIG HQ

Page 138: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED138

EXCON Exercise Accounts

• Exercise account names for EXCON include the assigned country number and the function

• EXCON Account Name Examples:

NATION_1_MGR

NATION_2_MGR

NATION_9_AAR

SEEBRIG_AAR

NATION_1_MELMIL

NATION_10_MELMIL

SEEBRIG_LNO

NATION_12_LNO

NATION_5_JTLS

etc

Page 139: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED139

Account Access for EXCON Forward

• EXCON Account Access:– Password (SM, MEL/MIL, JTLS): $s12Exc0n– Password (AAR): $s12A@r!

• Email Access– Click Microsoft Outlook icon on desktop– Not all EXCON accounts have Email

• SharePoint Portal Access:– Click Internet Explorer icon on desktop– Address: http://pfp-fs1/sites/SS12– SharePoint Portal is for EXCON use only

Zero

Page 140: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED

• A link to JEMM is located on the EXCON portal

• Address for JEMM server is: http://jemm.pfp.cax/jemm

• Log into JEMM with assigned JEMM Username and Password

• Only the MEL/MIL Tracker will send injects to the Training Audience using JEMM

• The AAR Analyst will use JEMM to record observations

140

JEMM Access

Page 141: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED141

EXCON E-Mail

• EXCON E-Mail can be accessed by clicking on the e-mail icon on your computer

• Not all EXCON accounts have email• EXCON Forward Site Managers forward copies

of all original e-mails received from their EOC to their respective LNO (the EXCON Information Manager automatically receives a copy of ALL email messages)

• In the event of communications problems between EXCON Forward and EXCON Main, the LNO in the EXCON Main ensures information is passed

Page 142: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED142

EOC Exercise Accounts

• Exercise account names for the Training Audience include the assigned country number

• EOC Account Name Examples: EOC_NATION_2EOC_NATION_9EOC_NATION_12EOC_SEEBRIGetc

• Password for EOC accounts: $s12E0c!

Zero

Page 143: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED143

EOC E-Mail

• EOCs will use their own computers on the internet to access their exercise email

• Address for EOC WebMail:

https://mail.excon.ddns.net/owa

Note: EOCs should NOT receive EXCON passwords

Page 144: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED

The EOC will see this screen when connecting to their WebMail accounts

over the internet https://mail.excon.ddns.net/owa

Click here to continue

Page 145: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED

Login Screen

Page 146: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED

WebMail Screen

Page 147: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED

To create a new email message,

click here

Page 148: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED

Click here to open the address book

Page 149: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED

Address book will appear. Highlight recipient of the message and click “To” to add them to the “To” line or “Cc” to add them to the “Cc” line. The EOC

should not send to any email account that begins with “X”. These are Exercise Control accounts only.

Page 150: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED150

Account Names in Address Book

EOC – ALBANIAEOC – BOSNIA AND HERZEGOVINAEOC – BULGARIAEOC – CROATIA

SITE MANAGER ALBANIASITE MANAGER BOSNIA AND HERZEGOVINASITE MANAGER BULGARIASITE MANAGER CROATIA

UNOCHAEADRCCEU MIC

……

Training Audience accounts begin with “EOC” in the address book

EXCON Forward Site Manager accounts

International Organizations accounts

Page 151: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED151

Account Names in Address Book

X ALBANIA AAR ANALYSTX ALBANIA JTLS OPERATORX ALBANIA MEL/MIL TRACKERX BOSNIA AND HERZEGOVINA AAR ANALYSTX BOSNIA AND HERZEGOVINA MEL/MIL TRACKERX BOSNIA AND HERZEGOVINA JTLS OPERATORX EXERCISE DIRECTORX EXCON DIRECTORX SCENARIO MANAGER…

Accounts in the address book that begin with “X” are exercise control accounts. The EOC should not be sending email to these accounts.

Page 152: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED152

SEESIM 12 Message Types

Abbreviations for SEESIM 12 message types:

A – Acceptance of Assistance

C – Coordination Report

N – Notification of Disaster

O – Offer of Acceptance

R – Request for Assistance

S – Situation Report

RFI – Request for Information

Page 153: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED153

SEESIM 12 Message Filenames

• Email “Subject” line will include a single letter for the message type, a number for the country, and a sequence number:

– Example: R1-001

• When saving the message as a Microsoft Word document, use a single letter for the message type, a number for the country, and a sequence number:

– Example: R1-001.docx

Page 154: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED154

Request for Information (RFI)

• Requests for Information (RFIs) are specific and time-sensitive requirements for information regarding a situation, operational support available, or other information

• An RFI will be sent by the EOC as an e-mail to the Site Manager at the EXCON Forward

• The EXCON Forward sends or forwards the RFI to the EXCON Information Manager

• Answers to the RFI will be thoroughly researched by the appropriate EXCON Main staff section and approved by the EXCON Operations Officer and Scenario Manager

• The RFI, with the response, is posted by the EXCON Information Manager in the RFI folder on the Portal

Page 155: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED155

Telephone

• Voice over Internet Protocol (VoIP) is EXCON’s primary voice communications

• EOCs will communicate via commercial telephone or email

• EOCs will NOT have access to VoIP phones

• Phone numbers are found in the EXCON and Training Audience Directories available on the SEESIM 12 SharePoint Portal

Page 156: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED156

EXCON SharePoint Portal

• The SharePoint Portal is for EXCON use only. It will:– Provide access to tools, including references, directories,

schedules, EXCON Meeting slides, and RFI messages– Provide access to all exercise messages– Support internal EXCON information management through

sections for each country and SEESIM 12 organizations

• EXCON Forward and International Organizations must determine how they will post and manage information on the Portal

• Draft documents should be created on local drives only, then posted to the portal when final

• The EXCON Information Manager will maintain overall control of information posted on the Portal

Page 157: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED

EXCON Folders

Daily Announcements

Link to JEMM

Page 158: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED

First six folders are:• SEESIM 12 Schedule• EXCON Documents• Phone-Email Directories• Messages• Requests for Information• EXCON Meeting Slides• AAR Documents (AAR only)

“EXCON Documents” includes:• DV Day Guidance for Site Managers• Site Manager and AAR Training slides• COMMEX Checklist• Exercise Control Plan• Exercise Specification• Information Management Plan• Manning Document• Terms of Reference• Collection Management Plan

Page 159: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED

“Messages” folder includes:• Acceptance of Offer Messages• Coordination Reports• Disaster Notification Messages• Offer of Assistance Messages• Request for Assistance Messages• Situation Reports

Page 160: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED

Country folders include:• Albania• Bosnia and Herzegovina• Bulgaria• Croatia• Italy• Montenegro• SEEBRIG HQ• Serbia• the former Yugoslav Republic of Macedonia*• Ukraine

Page 161: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED

International Organizations folders include:• EADRCC• EU MIC• EUROPOL• IFRC• INTERPOL• International Media• UNOCHA

Page 162: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED

Albania folder

Click “Add Document” to upload a file or multiple files

Page 163: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED

Click “Documents”, then “New Folder” to create a new folder

under the current folder

Page 164: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED

Click arrow at far right of file name to open file menu

Options include:1. “Edit Properties” to rename2. “Edit in Microsoft”3. “Delete”

Page 165: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED165

SharePoint Portal Rules

• Anyone in EXCON can post, delete, view, and download documents in the Portal

• Work only with your documents – DO NOT edit, replace, or delete documents belonging to others

Page 166: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED166

JEMM

• JEMM is an exercise management tool that:– Provides EXCON with the ability to manage

training objectives and the MEL/MIL process– Tracks injects sent to the Training Audience and

maintains incident status– Displays inject lists in real-time

• Only the EXCON Forward MEL/MIL Tracker will use JEMM to send injects to the EOC

• The Site Manager will use JEMM to monitor status of injects sent to the Training Audience

• The AAR Analyst will use JEMM to monitor injects and enter observations

Page 167: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED167

Video Teleconferencing (VTC)

• Video Teleconferencing (VTC) is available for EXCON use only at EXCON Main and EXCON Forward, except when approved by EXCON Main

• EOCs will not use VTC to communicate with other EOCs

• Daily MEL/MIL Synchronization Meetings and EXCON Meetings are conducted via VTC

• The SEESIM 12 After-Action Review (AAR), Opening and Closing Ceremonies, and DV Day will be broadcast to remote sites using VTC

Page 168: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED168

Information Management Help Sheet

One page that will contain EXCON procedures for, and information about, the following:

• Computer Log-on • E-mail• Exercise SharePoint Portal • VTC• Telephones and Fax• Message Types and Filenames• How to get Help• End of Exercise – What to do

IM Help Sheet is for EXCON use only!

Page 169: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED169

If you have questions related to Information Management during Execution, refer to:• Information Management Help Sheet (on the Portal)

• Information Management Plan (on the Portal)

• EXCON Information Manager (Phone #7710)

IM Questions during Execution

Page 170: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED170

QUESTIONS? ??

Page 171: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED171

Mr. John HarrisSEESIM 12 Deputy EXCON Director

United States Joint Staff, J7

EXCON Daily Schedule and Meeting

Procedures

Page 172: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED172

• Beginning on Monday, Oct 15 the Exercise will continue throughout the day – no stoppage for breaks or for lunch

• Functional cells must stagger when personnel leave for breaks and lunch so each cell remains operational during the entire exercise day

• Time to conduct the exercise is limited and the exercise operates in two different time zones

EXCON Daily Schedule

Page 173: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED

Exercise Execution Times

0800 – 1600 0900 – 1700

Albania Bulgaria

Bosnia and Herzegovina Ukraine

Croatia SEEBRIG HQ

Italy

Montenegro

Serbia

the former Yugoslav Republic of Macedonia*

173

Page 174: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED

Daily Operational Schedule

Time Event POC

0730 – 0815 Transportation to Charalitza Techs Only

0800 – 0845 Transportation to Charalitza All

0900 Begin Exercise Play All

1000 – 1100 MEL/MIL Synchronization Meeting (VTC) MEL/MIL

1300 – 1400 Experiment Sync Meeting (VTC) Exp Team

1400 EXCON Meeting Slides Due EXCON

1500 – 1600 AAR Daily Meeting (VTC) AAR

1630 – 1730 EXCON Daily Meeting (VTC) EXCON

1700 End Exercise Play All

1730 – 1815 Transportation to Hotel All

174

Note – all times are local Sofia, Bulgaria time

Page 175: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED175

MEL/MIL Synchronization Meeting

• Chaired by Scenario Manager• Begins at 1000 Bulgaria time• Meeting should be no longer than 30 minutes• Purpose

– Review significant MEL/MIL events for the day– Discuss any changes to the MEL/MIL for today or

tomorrow

• Work significant issues off-line

Page 176: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED176

• Scenario Manager (chair)• Liaison Officers• JTLS Senior Model Controller• International Response Cell Coordinator• EXCON Forward Site Managers• EXCON Forward AAR Analysts• EXCON Forward MEL/MIL Trackers

Attendance

MEL/MIL Synchronization Meeting

Page 177: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED177

• Purpose of meeting is to review exercise status and disseminate control guidance

• Each EXCON functional group is represented• Brief and concise summary

– Significant events in your functional area / location for today and expected events for tomorrow

– Issues, concerns, and observations

• Submission of slides due NLT 1400 (Sofia time) to EXCON Operations Admin Officer

• Meeting begins at 1630 (Sofia time)• Keep to less than one hour• In-depth discussions deferred to sidebars

Daily EXCON Meeting

Page 178: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED178

EXCON Main

Exercise Director (3)

Senior Advisor (1)

EXCON Director (3)

Operations Officer (2)

Scenario Manager (2)

AAR Manager (3)

Liaison Officers (10)

IRC Coordinator (1)

Technical Coordinator (2)

Senior JTLS Model Controller (2)

Exercise Synchronization Manager (1)

EXCON Forwards

Site Manager (1)

AAR Analyst (1)

EXCON Meeting Participants

Note: EXCON Forwards will participate via VTC

Page 179: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED179

EXCON Meeting Briefing Order

1. Scenario Manager• Key events• Issues

2. SITFOR Update

3. Media Update

4. Albania

5. Bosnia and Herzegovina

6. Bulgaria

7. Croatia

8. Italy

9. Montenegro

10. SEEBRIG HQ

11. Serbia

12. the former Yugoslav Republic of Macedonia*

13. Ukraine

14. IRC Coordinator

15. Technical Coordinator

16. AAR Manager

17. Operations Officer

18. EXCON Director

19. Exercise Director

* Turkey recognizes the Republic of Macedonia with its constitutional name

Page 180: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED180

Functional Area Name

• Today’s Events– This happened– That happened

• Tomorrow’s Events– This will happen– That will happen

• Issues / Observations– Observed this– This was a problem

x OCT 12

Slide Template

Page 181: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED181

EXCON Meeting Slides

• Site Managers should ensure that respective LNOs receive a copy of the daily EXCON meeting slide sent to the Operations Admin Officer

• The format for EXCON Meeting slides will be provided by the EXCON Operations Admin Officer and can be found on the EXCON SharePoint Portal

• If e-mail is not operating, the EXCON Forwards will provide information verbally to their respective LNO. The LNO will then prepare the slide in the specified format.

• The exercise Operations Admin Officer will post a copy of all EXCON Meeting slides on the EXCON SharePoint Portal

Page 182: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED182

QUESTIONS? ??

Page 183: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED183

Mr. John HarrisSEESIM 12 Deputy EXCON Director

United States Joint Staff, J7

COMMEX Plan

Page 184: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED

• Help the technicians to establish that the

Information Management tools are working

properly, that permissions are set up correctly,

and all email addresses and phone numbers

are correct

• Familiarize the users with the Information

Management tools available

• Provides the user with some valuable hands-

on training prior to the exercise

Purpose of COMMEX

184

Page 185: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED185

COMMEX Systems

• Electronic Mail

• Voice Over Internet Protocol (VOIP) Phone

• Document Management

• Exercise SharePoint Portal

Page 186: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED

• COMMEX will be conducted throughout the MINIEX on Fri, Oct 12

• A checklist will be provided to each exercise cell in EXCON Main and each remote site

• Each cell will perform the steps in the checklist to ensure the Information Management tools are working properly

• Refer to the SEESIM 12 COMMEX Checklist Instructions for assistance in completing the checklist

• Notify the Help Desk at 7777 about all problems• Email the completed checklist to the EXCON

Information Manager by 1500 on Oct 12

COMMEX Procedures

186

Page 187: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED187

Key COMMEX Players

• At EXCON Forward (Remote sites)– Site Manager*

– AAR Analyst

– Systems Technicians

• At EXCON Main (Charalitza)– Liaison Officers*

– All Functional Cells*

– Systems Technicians

* Responsible for COMMEX Checklist completion

Page 188: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED

• Log into your computer using your assigned username and password

• Open your Outlook E-mail• Send an E-mail message to someone else in

EXCON• Request a return E-mail indicating they

received your message• Ensure addresses in address book are correct

Electronic Mail (E-mail)

188

Page 189: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED

Your Account NamesAble to Login?

Able toSend E-mail?

Able toReceive E-mail?

Email AddressCorrect in Book?

NATION_1_MGR Yes Yes Yes Yes

NATION_1_AAR Yes Yes No Yes

NATION_1_MELMIL Yes Yes Yes Yes

Description of E-mail Issues:

NATION_1_AAR account could not receive email

Electronic Mail (E-mail)

Electronic Mail (E-mail)

189

Page 190: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED

• Using the VoIP phone, call someone else in EXCON

• Note who you reach with the telephone number you dialed and check to ensure the telephone number and listed name is correct

• Coordinate with someone in an adjoining cell to call your VoIP phone

• Ensure VoIP phone is working properly and your telephone number is listed correctly in the phone book

Voice Over IP Phone (VoIP)

190

Page 191: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED

Your Phone Numbers Numbers CalledNumber Correct in Phone Book?

Name Correct inPhone Book? Phone Working?

5502 5504 Yes Yes Yes

5504 7722 Yes Yes No

5506 5502 Yes Yes Yes

Description of VoIP Issues:

Phone 5504 has broken display. Cannot read phone number.Phone 5506 has wrong Caller ID.

Voice Over IP (VoIP) Phone

Voice Over IP Phone (VoIP)

191

Page 192: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED

• Open Microsoft Office (Word or Excel)

• Create a test document

• Print the document

• Save the document on your computer’s hard drive

• Send the document to someone else in EXCON via email

• Verify that the document was received

Documents

192

Page 193: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED

Your Account NamesCreate Microsoft

Office Document?Document Printed?

Document SavedTo Hard Drive?

Document E-mailed

to EXCON?

NATION_1_MGR Yes Yes No Yes

NATION_1_AAR Yes Yes Yes Yes

NATION_1_MELMIL Yes No Yes Yes

Description of Document Issues:

NATION_1_MGR account could not save file to his computer hard drive.NATION_1_MELMIL account could not print document.

Documents

Documents

193

Page 194: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED

• Open the Exercise Portal (Internet Explorer)

• Navigate to the Document Library and open a document. Close the document.

• Navigate through the folders on the portal to find your associated folder

• Post a document into your folder

Exercise SharePoint Portal

194

Page 195: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED

Your Account Names

Able to OpenExercise Portal?

Open DocumentIn Portal?

Find Associated Folder?

Post Document In Portal?

NATION_1_MGR Yes Yes Yes Yes

NATION_1_AAR Yes Yes Yes Yes

NATION_1_MELMIL Yes Yes Yes No

Description of Exercise Portal and Shared Drive Issues:

NATION_1_MELMIL account could not upload a file to the portal.

Exercise SharePoint Portal

Exercise SharePoint Portal

195

Page 196: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED

• Information Management Items to Check– E-Mail– Voice over IP Phones– Microsoft Office documents– Printers– Exercise SharePoint Portal Access

• If You Have Equipment or Facility Issues Call

7777

Summary

196

Page 197: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED197

QUESTIONS? ??

Page 198: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED198

Distinguished Visitors (DV) Day

Mr. John HarrisSEESIM 12 Deputy EXCON Director

United States Joint Staff, J7

Page 199: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED199

Time Event POC

0930 Distinguished Visitors arrive at Charalitza

0930 – 1000 Meeting with DMOD and DCHOD BG Nachev

1000 – 1015 Opening Remarks and Briefing (VTC) BG Nachev

1015 – 1050 Presentations from Remote Sites (VTC) All

1050 – 1100 Question and Answer Session (VTC) All

1100 – 1120 Press Conference with Media DMOD/DCHOD

1100 – 1210 Tour of Exercise Cells at Charalitza All

1210 Distinguished Visitors depart Exercise site

DV Day Schedule (Fri, Oct 19)

Note – Remote Sites should be connected to the VTC Bridgeno later than 0930 and be seated no later than 0945.

Note – all times are local Sofia, Bulgaria time

Page 200: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED200

• Scheduled for 0930–1210 on Fri, Oct 19• DV Day will only be broadcast to remote sites

approximately 1000–1100 (one hour)• NO EXERCISE ACTIVITY during this one hour

broadcast• At 1015, Site Managers at each remote site will

speak for 3 minutes on activity at your site• Guidance for prepared DV Day script available• Keep microphone muted until called on to speak• Rehearsals will be scheduled prior to DV Day

Distinguished Visitors (DV) Day

Note – all times are local Sofia, Bulgaria time

Page 201: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED201

QUESTIONS? ??

Page 202: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED202

International Response Cell (IRC)

Mr. John HarrisSEESIM 12 Deputy EXCON Director

United States Joint Staff, J7

Page 203: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED203

• The IRC is part of EXCON• Represents agencies not actively participating

in the exercise• Representatives from the agencies provide

subject matter expertise and role play their respective agencies

• Supports national focus and training objectives of the SEESIM countries

• They will interact directly with the Training Audience

International Response Cell (IRC)

Page 204: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED204

International Organizations Invited

• South East Europe Civil-Military Emergency Preparedness (SEE CMEP) Council

• NATO Euro-Atlantic Disaster Response Coordination Centre (EADRCC)

• European Police (EUROPOL)• European Union Monitoring and Information Centre (EU

MIC)• International Federation of Red Cross and Red Crescent

Societies (IFRC)• International Police (INTERPOL)• Swedish Civil Contingencies Agency (SCCA)• United Nations Office for the Coordination of Humanitarian

Assistance (UNOCHA)• World Health Organization (WHO)

Page 205: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED205

• Telephone numbers and e-mail addresses for agencies represented within the IRC will be provided to the Training Audience

• Agencies represented in the IRC will respond to Training Audience requests in accordance with Scenario and MEL/MIL guidelines

• All IRC exercise activity will be coordinated with the Scenario Manager

International Response Cell (IRC)

Page 206: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED206

QUESTIONS? ??

Page 207: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED207

Documents on CD

Training Slides• Site Manager Training Slides• JEMM Training Slides• AAR Training Slides• Suggested slides for Site Managers to train EOCs

Exercise Documents• SEESIM 12 Terms of Reference• SEESIM 12 Exercise Specification• SEESIM 12 Exercise Control Plan• SEESIM 12 Information Management Plan• SEESIM 12 Information Management Help Sheet• SEESIM 12 Exercise Manning Document (27 Sep 2012)

Page 208: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED208

Documents on CD

Exercise Documents• SEESIM 12 Execution Schedule (Charalitza)• SEESIM 12 COMMEX Checklist• SEESIM 12 COMMEX Checklist Instructions• SEESIM 12 EXCON Directory

Site Manager Documents• DRAFT Guidance for Opening Ceremony• DRAFT Guidance for Distinguished Visitors (DV) Day• DRAFT Guidance for Closing Ceremony• SEESIM Fact Sheet

Page 209: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED209

Documents on CD

After-Action Review Documents• SEESIM 12 Collection Management Plan• SEESIM 10 After-Action Review Slides• SEESIM 10 Final Exercise Report

• Documents for EOC• SEESIM 12 EOC Directory (after completion)• Revolutionary Front (RF) Threat Assessment

Page 210: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED210

EXCON Forward Name Email Address

Albania LTC Etor SHEHU [email protected]

Bosnia and Herzegovina

Mr. Željko DUGONJIĆ [email protected]

BulgariaMs. Evgenia VLADIMIROVALTC Dimitar DOROSHENKO

[email protected]@yahoo.com

Croatia LTC Radovan PALMOVIĆ [email protected]

Italy Mr. Giovanni FERRARI [email protected]

Montenegro MAJ Živojin BURIĆ [email protected]]

SEEBRIG HQ LTC Jetnor BALLA [email protected]

Serbia Mr. Saša RANČIĆ [email protected]

the former Yugoslav Republic of Macedonia*

Mr. Zdravko [email protected]

Ukraine COL Dmitri CHOPA [email protected]

Site Managers Email Addresses

Page 211: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED211

EXCON Forward Name Email Address

Albania LTC Ilirjan DAUTI [email protected]

Bosnia and Herzegovina

LTC Ibro ALISPAHIĆ [email protected]

BulgariaMr. Stoytcho PANEVMAJ Boncho BONEV

[email protected]@mail.bg

CroatiaMr. Tomislav LUKAC

[email protected]@zg.t-com.hr

Italy TBD TBD

Montenegro Ms. Slavka MILETIĆ [email protected]

SEEBRIG HQ LTC Konstantinos PLATSAS [email protected]

Serbia LTC Dragan BRANOVIĆ [email protected]

the former Yugoslav Republic of Macedonia*

Mr. Toni STANKOVSKIMr. Ljupco STALEVSKI

[email protected][email protected]

Ukraine LTC Andrey TROKHIN [email protected]

AAR Analyst Email Addresses

Page 212: SEESIM 12 UNCLASSIFIED 1 Site Manager and After-Action Review (AAR) Analyst Training 25-27 September 2012 Sofia, Bulgaria

SEESIM 12 SEESIM 12

UNCLASSIFIED212

Position Name Email Address

EXCON Director

LTC Orlin Nikolov [email protected]

John Harris [email protected]

Scenario Manager

LTC Hristo Atasanov [email protected]

Bob Yingling [email protected]

AARManager

LTC Hristo Hristov [email protected]

Dale Schultz [email protected]

Information Manager

LTC Petar Vrategov [email protected]

Bill Meidenbauer [email protected]

Technical Coordinator

COL Atanas Atanasov [email protected]

Jeff Douglass [email protected]

JEMM Andy Brown [email protected]

Key EXCON Main Personnel