Recommended Rules for the Care and Operat ion of Heat ing Boi lers
SECTION VI
ASME BPVC.VI-2015
2015 ASME Boiler andPressure Vessel CodeAn International Code
VIRECOMMENDED RULES FORTHE CARE AND OPERATIONOF HEATING BOILERSASME Boiler and Pressure Vessel Committeeon Heating Boilers
AN INTERNATIONAL CODE
2015 ASME Boiler &Pressure Vessel Code2015 Edition July 1, 2015
Two Park Avenue • New York, NY • 10016 USA
Date of Issuance: July 1, 2015
This international code or standard was developed under procedures accredited as meeting the criteria forAmerican National Standards and it is an American National Standard. The Standards Committee that approvedthe code or standard was balanced to assure that individuals from competent and concerned interests havehad an opportunity to participate. The proposed code or standard was made available for public review and com-ment that provides an opportunity for additional public input from industry, academia, regulatory agencies, andthe public-at-large.ASME does not “approve,” “rate,” or “endorse” any item, construction, proprietary device, or activity.ASME does not take any position with respect to the validity of any patent rights asserted in connection with any
items mentioned in this document, and does not undertake to insure anyone utilizing a standard against liabilityfor infringement of any applicable letters patent, nor assume any such liability. Users of a code or standard areexpressly advised that determination of the validity of any such patent rights, and the risk of infringement of suchrights, is entirely their own responsibility.Participation by federal agency representative(s) or person(s) affiliated with industry is not to be interpreted as
government or industry endorsement of this code or standard.ASME accepts responsibility for only those interpretations of this document issued in accordance with the es-
tablished ASME procedures and policies, which precludes the issuance of interpretations by individuals.The endnotes and preamble in this document (if any) are part of this American National Standard.
ASME collective membership mark
Certification Mark
The above ASME symbol is registered in the U.S. Patent Office.
“ASME” is the trademark of The American Society of Mechanical Engineers.
No part of this document may be reproduced in any form, in an electronicretrieval system or otherwise, without the prior written permission of the
publisher.
Library of Congress Catalog Card Number: 56-3934Printed in the United States of America
Adopted by the Council of The American Society of Mechanical Engineers, 1914; latest edition 2015.
The American Society of Mechanical EngineersTwo Park Avenue, New York, NY 10016-5990
Copyright © 2015 byTHE AMERICAN SOCIETY OF MECHANICAL ENGINEERS
All rights reserved
TABLE OF CONTENTS
List of Sections . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . viForeword . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . viiiStatement of Policy on the Use of the Certification Mark and Code Authorization in Advertising . . . . . . . . . . xStatement of Policy on the Use of ASME Marking to Identify Manufactured Items . . . . . . . . . . . . . . . . . . . . . . xSubmittal of Technical Inquiries to the Boiler and Pressure Vessel Standards Committees . . . . . . . . . . . . . . . xiPersonnel . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . xiiiSummary of Changes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . xxxList of Changes in Record Number Order . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . xxxiCross-Referencing and Stylistic Changes in the Boiler and Pressure Vessel Code . . . . . . . . . . . . . . . . . . . . . . . xxxii
Section 1 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11.01 Scope . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11.02 Use of Illustrations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11.03 Manufacturer’s Information . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11.04 Reference to Section IV . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11.05 Glossary of Terms . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1
Section 2 Types of Boilers . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 162.01 Classification . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 162.02 Steel Boilers . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 162.03 Cast Iron Boilers . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 162.04 Modular Boilers . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 162.05 Vacuum Boilers . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16
Section 3 Accessories and Installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 22Accessories . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 22Installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 29
Section 4 Fuels . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 434.01 Gas — Natural, Manufactured, Mixed . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 434.02 Liquefied Petroleum Gas (LPG) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 434.03 Fuel Oils . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 434.04 Coal . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 434.05 Electricity . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 44
Section 5 Fuel Burning Equipment and Fuel Burning Controls . . . . . . . . . . . . . . . . 455.01 Gas Burning Equipment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 455.02 Oil Burning Equipment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 455.03 Coal Burning Equipment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 465.04 Controls . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 46
Section 6 Boiler Room Facilities . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 516.01 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 516.02 Safety . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 516.03 Lighting . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 516.04 Ventilation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 516.05 Water and Drain Connections . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 516.06 Fire Protection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 516.07 Housekeeping . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 516.08 Posting of Certificates and/or Licenses . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 526.09 Recordkeeping, Logs, etc. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 52
iii
Section 7 Operation, Maintenance, and Repair — Steam Boilers . . . . . . . . . . . . . . 537.01 Starting a New Boiler and Heating System . . . . . . . . . . . . . . . . . . . . . . . . . . . 537.02 Starting a Boiler after Layup (Single Boiler Installation) . . . . . . . . . . . . . . . . 547.03 Condensation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 547.04 Cutting in an Additional Boiler . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 547.05 Operation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 547.06 Removal of Boiler From Service . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 567.07 Maintenance . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 567.08 Boiler Repairs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 587.09 Tests and Inspections of Steam Heating Boilers . . . . . . . . . . . . . . . . . . . . . . . 58
Section 8 Operation, Maintenance, and Repair — Hot Water Boilers and HotWater Heating Boilers . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 62
8.01 Starting a New Boiler and Heating System . . . . . . . . . . . . . . . . . . . . . . . . . . . 628.02 Starting a Boiler After Layup (Single Boiler Installation) . . . . . . . . . . . . . . . . 628.03 Condensation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 638.04 Cutting in an Additional Boiler . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 638.05 Operation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 638.06 Removal of Boiler from Service . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 638.07 Maintenance . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 648.08 Boiler Repairs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 668.09 Tests and Inspections of Hot Water Heating and Supply Boilers . . . . . . . . . 66
Section 9 Water Treatment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 709.01 Scope . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 709.02 Considerations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 709.03 Services of Water Treatment Specialists . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 709.04 Conformity with Local Ordinances . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 709.05 Boiler Water Troubles . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 709.06 Chemicals Used . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 709.07 Functions of Chemicals . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 719.08 Treatment Alternatives . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 719.09 Blowdown . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 719.10 Feeders . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 729.11 Procedures . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 729.12 Water Treatment Terms . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 72
Mandatory Appendix I Exhibits . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 74
Mandatory Appendix III Standard Units for Use in Equations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 86
Nonmandatory Appendix A Guidance for the Use of U.S. Customary and SI Units in the ASME Boilerand Pressure Vessel Code . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 87
FIGURES2.02A-1 Horizontal Return Tube, Brick‐Set . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 172.02A-2 Gas Flow Patterns of Scotch‐Type Boilers . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 172.02A-3 Type C Firebox Boiler . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 182.02A-4 Three‐Pass Firebox Boiler . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 182.02A-5 Locomotive Firebox Boiler . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 192.02A-6 Vertical Firetube Boiler . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 202.03A Horizontal Sectional Cast Iron Boiler . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 202.03B Vertical Sectional Cast Iron Boiler . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 202.04A Modules Connected With Parallel Piping . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 212.04B Modules Connected With Primary‐Secondary Piping . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 213.01 Official Certification Mark . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 223.01A Safety Valve . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 233.01B Safety Relief Valve . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 243.02A Float Type Low‐Water Cutoff . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 24
iv
3.02B Electric Probe Type Low‐Water Control . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 253.03-1 Thermostatic Trap . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 263.03-2 Float Trap . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 263.03-3 Float and Thermostatic Trap . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 263.03-4 Bucket Trap With Trap Closed . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 263.05 Typical Return Loop . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 273.11 Pressure Gages . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 283.20I Safety Relief Valve Discharge Pipe . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 313.30-1 Single Hot Water Heating Boiler — Acceptable Piping Installation . . . . . . . . . . . . . . . . . . . . . . . . . 353.30-2 Hot Water Heating Boilers in Battery — Acceptable Piping Installation . . . . . . . . . . . . . . . . . . . . . 363.30-3 Single Steam Boilers — Acceptable Piping Installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 373.30-4A Steam Boilers in Battery — Pumped Return — Acceptable Piping Installation . . . . . . . . . . . . . . . 383.30-4B Steam Boilers in Battery — Gravity Return — Acceptable Piping Installation . . . . . . . . . . . . . . . . 395.01A Atmospheric Gas Burner . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 465.01C Combination Fuel Burners . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 475.02A High‐Pressure Atomizing Burner . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 475.02D Horizontal Rotary Cup Fuel Oil Burner . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 485.03-1 Underfeed Single‐Retort Stoker . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 495.03-2 Overthrow Reciprocating Plate-Feed-Type Spreader Stoker . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 495.03-3 Chain Grate Stoker With Section Showing Links . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 50
TABLES3.20 Minimum Pounds of Steam Per Hour Per Square Foot of Heating Surface (kg/h/m2) . . . . . . . . . . . 293.31C-1 Expansion Tank Capacities for Gravity Hot Water Systems . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 403.31C-2 Expansion Tank Capacities for Forced Hot Water Systems . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 403.33 Size of Bottom Blowoff Piping, Valves, and Cocks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 41III-1 Standard Units for Use in Equations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 86
FORMSI.01-1 Exhibit A . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 75I.02-1 Exhibit B . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 78
ENDNOTES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 91
v
ð15Þ LIST OF SECTIONSSECTIONSI Rules for Construction of Power Boilers
II Materials• Part A — Ferrous Material Specifications• Part B — Nonferrous Material Specifications• Part C — Specifications for Welding Rods, Electrodes, and Filler Metals• Part D — Properties (Customary)• Part D — Properties (Metric)
III Rules for Construction of Nuclear Facility Components• Subsection NCA — General Requirements for Division 1 and Division 2• Appendices• Division 1– Subsection NB — Class 1 Components– Subsection NC — Class 2 Components– Subsection ND — Class 3 Components– Subsection NE — Class MC Components– Subsection NF — Supports– Subsection NG — Core Support Structures– Subsection NH — Class 1 Components in Elevated Temperature Service*
• Division 2 — Code for Concrete Containments• Division 3 — Containments for Transportation and Storage of Spent Nuclear Fuel and High Level RadioactiveMaterial and Waste
• Division 5 — High Temperature Reactors
IV Rules for Construction of Heating Boilers
V Nondestructive Examination
VI Recommended Rules for the Care and Operation of Heating Boilers
VII Recommended Guidelines for the Care of Power Boilers
VIII Rules for Construction of Pressure Vessels• Division 1• Division 2 — Alternative Rules• Division 3 — Alternative Rules for Construction of High Pressure Vessels
IX Welding, Brazing, and Fusing Qualifications
X Fiber-Reinforced Plastic Pressure Vessels
XI Rules for Inservice Inspection of Nuclear Power Plant Components
XII Rules for Construction and Continued Service of Transport Tanks
* The 2015 Edition of Section III is the last edition in which Section III, Division 1, Subsection NH, Class 1 Components in Elevated TemperatureService, will be published. The requirements located within Subsection NH have been moved to Section III, Division 5, Subsection HB, Subpart Bfor the elevated temperature construction of Class A components.
vi
INTERPRETATIONS
Interpretations of the Code have historically been posted in January and July at http://cstools.asme.org/interpreta-tions.cfm. Interpretations issued during the previous two calendar years are included with the publication of the applic-able Section of the Code in the 2015 Edition. Interpretations of Section III, Divisions 1 and 2 and Section III Appendicesare included with Subsection NCA.
Following the 2015 Edition, interpretations will not be included in editions; they will be issued in real time in ASME'sInterpretations Database at http://go.asme.org/Interpretations. Historical BPVC interpretations may also be found inthe Database.
CODE CASES
The Boiler and Pressure Vessel Code committees meet regularly to consider proposed additions and revisions to theCode and to formulate Cases to clarify the intent of existing requirements or provide, when the need is urgent, rules formaterials or constructions not covered by existing Code rules. Those Cases that have been adopted will appear in theappropriate 2015 Code Cases book: “Boilers and Pressure Vessels” or “Nuclear Components.” Supplements will be sentor made available automatically to the purchasers of the Code Cases books up to the publication of the 2017 Code.
vii
ð15Þ FOREWORD*
In 1911, The American Society of Mechanical Engineers established the Boiler and Pressure Vessel Committee to for-mulate standard rules for the construction of steam boilers and other pressure vessels. In 2009, the Boiler and PressureVessel Committee was superseded by the following committees:(a) Committee on Power Boilers (I)(b) Committee on Materials (II)(c) Committee on Construction of Nuclear Facility Components (III)(d) Committee on Heating Boilers (IV)(e) Committee on Nondestructive Examination (V)(f) Committee on Pressure Vessels (VIII)(g) Committee on Welding, Brazing, and Fusing (IX)(h) Committee on Fiber-Reinforced Plastic Pressure Vessels (X)(i) Committee on Nuclear Inservice Inspection (XI)(j) Committee on Transport Tanks (XII)(k) Technical Oversight Management Committee (TOMC)Where reference is made to “the Committee” in this Foreword, each of these committees is included individually and
collectively.The Committee’s function is to establish rules of safety relating only to pressure integrity, which govern the
construction** of boilers, pressure vessels, transport tanks, and nuclear components, and the inservice inspection of nu-clear components and transport tanks. The Committee also interprets these rules when questions arise regarding theirintent. The technical consistency of the Sections of the Code and coordination of standards development activities of theCommittees is supported and guided by the Technical Oversight Management Committee. This Code does not addressother safety issues relating to the construction of boilers, pressure vessels, transport tanks, or nuclear components, orthe inservice inspection of nuclear components or transport tanks. Users of the Code should refer to the pertinent codes,standards, laws, regulations, or other relevant documents for safety issues other than those relating to pressure integ-rity. Except for Sections XI and XII, and with a few other exceptions, the rules do not, of practical necessity, reflect thelikelihood and consequences of deterioration in service related to specific service fluids or external operating environ-ments. In formulating the rules, the Committee considers the needs of users, manufacturers, and inspectors of pressurevessels. The objective of the rules is to afford reasonably certain protection of life and property, and to provide a marginfor deterioration in service to give a reasonably long, safe period of usefulness. Advancements in design and materialsand evidence of experience have been recognized.This Code contains mandatory requirements, specific prohibitions, and nonmandatory guidance for construction ac-
tivities and inservice inspection and testing activities. The Code does not address all aspects of these activities and thoseaspects that are not specifically addressed should not be considered prohibited. The Code is not a handbook and cannotreplace education, experience, and the use of engineering judgment. The phrase engineering judgement refers to tech-nical judgments made by knowledgeable engineers experienced in the application of the Code. Engineering judgmentsmust be consistent with Code philosophy, and such judgments must never be used to overrule mandatory requirementsor specific prohibitions of the Code.The Committee recognizes that tools and techniques used for design and analysis change as technology progresses
and expects engineers to use good judgment in the application of these tools. The designer is responsible for complyingwith Code rules and demonstrating compliance with Code equations when such equations are mandatory. The Codeneither requires nor prohibits the use of computers for the design or analysis of components constructed to the
* The information contained in this Foreword is not part of this American National Standard (ANS) and has not been processed in accordancewith ANSI's requirements for an ANS. Therefore, this Foreword may contain material that has not been subjected to public review or a con-sensus process. In addition, it does not contain requirements necessary for conformance to the Code.
** Construction, as used in this Foreword, is an all-inclusive term comprising materials, design, fabrication, examination, inspection, testing,certification, and pressure relief.
viii
requirements of the Code. However, designers and engineers using computer programs for design or analysis are cau-tioned that they are responsible for all technical assumptions inherent in the programs they use and the application ofthese programs to their design.
The rules established by the Committee are not to be interpreted as approving, recommending, or endorsing any pro-prietary or specific design, or as limiting in any way the manufacturer's freedom to choose any method of design or anyform of construction that conforms to the Code rules.
The Committee meets regularly to consider revisions of the rules, new rules as dictated by technological development,Code Cases, and requests for interpretations. Only the Committee has the authority to provide official interpretations ofthis Code. Requests for revisions, new rules, Code Cases, or interpretations shall be addressed to the Secretary in writingand shall give full particulars in order to receive consideration and action (see Submittal of Technical Inquiries to theBoiler and Pressure Vessel Standards Committees). Proposed revisions to the Code resulting from inquiries will be pre-sented to the Committee for appropriate action. The action of the Committee becomes effective only after confirmationby ballot of the Committee and approval by ASME. Proposed revisions to the Code approved by the Committee are sub-mitted to the American National Standards Institute (ANSI) and published at http://go.asme.org/BPVCPublicReview toinvite comments from all interested persons. After public review and final approval by ASME, revisions are published atregular intervals in Editions of the Code.
The Committee does not rule on whether a component shall or shall not be constructed to the provisions of the Code.The scope of each Section has been established to identify the components and parameters considered by the Committeein formulating the Code rules.
Questions or issues regarding compliance of a specific component with the Code rules are to be directed to the ASMECertificate Holder (Manufacturer). Inquiries concerning the interpretation of the Code are to be directed to the Commit-tee. ASME is to be notified should questions arise concerning improper use of an ASME Certification Mark.
When required by context in this Section, the singular shall be interpreted as the plural, and vice versa, and the fem-inine, masculine, or neuter gender shall be treated as such other gender as appropriate.
ix
STATEMENT OF POLICY ON THE USE OF THE CERTIFICATIONMARK AND CODE AUTHORIZATION IN ADVERTISING
ASME has established procedures to authorize qualified organizations to perform various activities in accordancewith the requirements of the ASME Boiler and Pressure Vessel Code. It is the aim of the Society to provide recognitionof organizations so authorized. An organization holding authorization to perform various activities in accordance withthe requirements of the Code may state this capability in its advertising literature.Organizations that are authorized to use the Certification Mark for marking items or constructions that have been
constructed and inspected in compliance with the ASME Boiler and Pressure Vessel Code are issued Certificates ofAuthorization. It is the aim of the Society to maintain the standing of the Certification Mark for the benefit of the users,the enforcement jurisdictions, and the holders of the Certification Mark who comply with all requirements.Based on these objectives, the following policy has been established on the usage in advertising of facsimiles of the
Certification Mark, Certificates of Authorization, and reference to Code construction. The American Society of MechanicalEngineers does not “approve,” “certify,” “rate,” or “endorse” any item, construction, or activity and there shall be no state-ments or implications that might so indicate. An organization holding the Certification Mark and/or a Certificate ofAuthorization may state in advertising literature that items, constructions, or activities “are built (produced or per-formed) or activities conducted in accordance with the requirements of the ASME Boiler and Pressure Vessel Code,”or “meet the requirements of the ASME Boiler and Pressure Vessel Code.”An ASME corporate logo shall not be usedby any organization other than ASME.The Certification Mark shall be used only for stamping and nameplates as specifically provided in the Code. However,
facsimiles may be used for the purpose of fostering the use of such construction. Such usage may be by an association ora society, or by a holder of the Certification Mark who may also use the facsimile in advertising to show that clearly spe-cified items will carry the Certification Mark. General usage is permitted only when all of a manufacturer’s items areconstructed under the rules.
STATEMENT OF POLICY ON THE USE OF ASME MARKING TOIDENTIFY MANUFACTURED ITEMS
The ASME Boiler and Pressure Vessel Code provides rules for the construction of boilers, pressure vessels, and nuclearcomponents. This includes requirements for materials, design, fabrication, examination, inspection, and stamping. Itemsconstructed in accordance with all of the applicable rules of the Code are identified with the official Certification Markdescribed in the governing Section of the Code.Markings such as “ASME,” “ASME Standard,” or any other marking including “ASME” or the Certification Mark shall not
be used on any item that is not constructed in accordance with all of the applicable requirements of the Code.Items shall not be described on ASME Data Report Forms nor on similar forms referring to ASME that tend to imply
that all Code requirements have been met when, in fact, they have not been. Data Report Forms covering items not fullycomplying with ASME requirements should not refer to ASME or they should clearly identify all exceptions to the ASMErequirements.
x
ð15Þ SUBMITTAL OF TECHNICAL INQUIRIES TO THE BOILER ANDPRESSURE VESSEL STANDARDS COMMITTEES
1 INTRODUCTION
(a) The following information provides guidance to Code users for submitting technical inquiries to the committees.See Guideline on the Approval of New Materials Under the ASME Boiler and Pressure Vessel Code in Section II, Parts Cand D for additional requirements for requests involving adding new materials to the Code. Technical inquiries includerequests for revisions or additions to the Code rules, requests for Code Cases, and requests for Code Interpretations, asdescribed below.
(1) Code Revisions. Code revisions are considered to accommodate technological developments, address administra-tive requirements, incorporate Code Cases, or to clarify Code intent.
(2) Code Cases. Code Cases represent alternatives or additions to existing Code rules. Code Cases are written as aquestion and reply, and are usually intended to be incorporated into the Code at a later date. When used, Code Casesprescribe mandatory requirements in the same sense as the text of the Code. However, users are cautioned that notall jurisdictions or owners automatically accept Code Cases. The most common applications for Code Cases are:
(-a) to permit early implementation of an approved Code revision based on an urgent need
(-b) to permit the use of a new material for Code construction
(-c) to gain experience with new materials or alternative rules prior to incorporation directly into the Code
(3) Code Interpretations. Code Interpretations provide clarification of the meaning of existing rules in the Code, andare also presented in question and reply format. Interpretations do not introduce new requirements. In cases whereexisting Code text does not fully convey the meaning that was intended, and revision of the rules is required to supportan interpretation, an Intent Interpretation will be issued and the Code will be revised.
(b) The Code rules, Code Cases, and Code Interpretations established by the committees are not to be considered asapproving, recommending, certifying, or endorsing any proprietary or specific design, or as limiting in any way the free-dom of manufacturers, constructors, or owners to choose any method of design or any form of construction that con-forms to the Code rules.
(c) Inquiries that do not comply with these provisions or that do not provide sufficient information for a committee’sfull understanding may result in the request being returned to the inquirer with no action.
2 INQUIRY FORMAT
Submittals to a committee shall include:
(a) Purpose. Specify one of the following:
(1) revision of present Code rules
(2) new or additional Code rules
(3) Code Case
(4) Code Interpretation
(b) Background. Provide the information needed for the committee’s understanding of the inquiry, being sure to in-clude reference to the applicable Code Section, Division, edition, addenda (if applicable), paragraphs, figures, and tables.Preferably, provide a copy of the specific referenced portions of the Code.
(c) Presentations. The inquirer may desire or be asked to attend a meeting of the committee to make a formal presen-tation or to answer questions from the committee members with regard to the inquiry. Attendance at a committee meet-ing shall be at the expense of the inquirer. The inquirer’s attendance or lack of attendance at a meeting shall not be abasis for acceptance or rejection of the inquiry by the committee.
xi
3 CODE REVISIONS OR ADDITIONS
Requests for Code revisions or additions shall provide the following:(a) Proposed Revisions or Additions. For revisions, identify the rules of the Code that require revision and submit a copy
of the appropriate rules as they appear in the Code, marked up with the proposed revision. For additions, provide therecommended wording referenced to the existing Code rules.(b) Statement of Need. Provide a brief explanation of the need for the revision or addition.(c) Background Information. Provide background information to support the revision or addition, including any data
or changes in technology that form the basis for the request that will allow the committee to adequately evaluate theproposed revision or addition. Sketches, tables, figures, and graphs should be submitted as appropriate. When applic-able, identify any pertinent paragraph in the Code that would be affected by the revision or addition and identify para-graphs in the Code that reference the paragraphs that are to be revised or added.
4 CODE CASES
Requests for Code Cases shall provide a Statement of Need and Background Information similar to that defined in 3(b)and 3(c), respectively, for Code revisions or additions. The urgency of the Code Case (e.g., project underway or imminent,new procedure, etc.) must be defined and it must be confirmed that the request is in connection with equipment that willbear the Certification Mark, with the exception of Section XI applications. The proposed Code Case should identify theCode Section and Division, and be written as a Question and a Reply in the same format as existing Code Cases. Requestsfor Code Cases should also indicate the applicable Code editions and addenda (if applicable) to which the proposed CodeCase applies.
5 CODE INTERPRETATIONS
(a) Requests for Code Interpretations shall provide the following:(1) Inquiry. Provide a condensed and precise question, omitting superfluous background information and, when
possible, composed in such a way that a “yes” or a “no” Reply, with brief provisos if needed, is acceptable. The questionshould be technically and editorially correct.
(2) Reply. Provide a proposed Reply that will clearly and concisely answer the Inquiry question. Preferably, the Replyshould be “yes” or “no,” with brief provisos if needed.
(3) Background Information. Provide any background information that will assist the committee in understandingthe proposed Inquiry and Reply.(b) Requests for Code Interpretations must be limited to an interpretation of a particular requirement in the Code or a
Code Case. The committee cannot consider consulting type requests such as the following:(1) a review of calculations, design drawings, welding qualifications, or descriptions of equipment or parts to de-
termine compliance with Code requirements;(2) a request for assistance in performing any Code-prescribed functions relating to, but not limited to, material
selection, designs, calculations, fabrication, inspection, pressure testing, or installation;(3) a request seeking the rationale for Code requirements.
6 SUBMITTALS
Submittals to and responses from the committees shall meet the following:(a) Submittal. Inquiries from Code users shall be in English and preferably be submitted in typewritten form; however,
legible handwritten inquiries will also be considered. They shall include the name, address, telephone number, fax num-ber, and e-mail address, if available, of the inquirer and be mailed to the following address:SecretaryASME Boiler and Pressure Vessel CommitteeTwo Park AvenueNew York, NY 10016-5990As an alternative, inquiries may be submitted via e-mail to: [email protected] or via our online tool at
http://go.asme.org/InterpretationRequest.(b) Response. The Secretary of the appropriate committee shall acknowledge receipt of each properly prepared in-
quiry and shall provide a written response to the inquirer upon completion of the requested action by the committee.
xii
ð15Þ PERSONNELASME Boiler and Pressure Vessel Standards Committees,
Subgroups, and Working GroupsJanuary 1, 2015
TECHNICAL OVERSIGHT MANAGEMENT COMMITTEE (TOMC)
T. P. Pastor, ChairR. W. Barnes, Vice ChairJ. S. Brzuszkiewicz, Staff SecretaryR. J. BasileJ. E. BateyT. L. BedeauxD. L. BergerD. A. CanonicoA. ChaudouetD. B. DeMichaelR. P. DeublerP. D. EdwardsJ. G. FeldsteinR. E. GimpleM. GoldT. E. HansenG. W. Hembree
J. F. HenryR. S. Hill IIIG. G. KarcherW. M. LundyJ. R. MacKayW. E. NorrisG. C. ParkM. D. RanaR. F. Reedy, Sr.B. W. RobertsS. C. RobertsF. J. Schaaf, Jr.A. SelzB. F. ShelleyW. J. SperkoR. W. SwayneC. Withers
HONORARY MEMBERS (MAIN COMMITTEE)
F. P. BartonR. J. CepluchT. M. CullenW. D. DotyG. E. FeigelO. F. HeddenM. H. Jawad
A. J. JustinW. G. KnechtJ. LeCoffT. G. McCartyG. C. MillmanR. A. MoenR. F. Reedy, Sr.
ADMINISTRATIVE COMMITTEE
T. P. Pastor, ChairR. W. Barnes, Vice ChairJ. S. Brzuszkiewicz, Staff SecretaryR. J. BasileJ. E. BateyT. L. BedeauxD. L. Berger
J. F. Henry
R. S. Hill III
G. C. Park
M. D. Rana
B. F. Shelley
W. J. Sperko
MARINE CONFERENCE GROUP
J. G. Hungerbuhler, Jr.G. Nair
N. ProkopukJ. D. Reynolds
CONFERENCE COMMITTEE
D. A. Douin — Ohio, SecretaryM. J. Adams — Ontario, CanadaJ. T. Amato — MinnesotaB. P. Anthony — Rhode IslandR. D. Austin — ArizonaR. J. Brockman — MissouriM. A. Burns — FloridaJ. H. Burpee — MaineC. B. Cantrell — NebraskaD. C. Cook — CaliforniaB. J. Crawford — GeorgiaE. L. Creaser — New Brunswick,Canada
J. J. Dacanay — HawaiiC. Dautrich — North DakotaP. L. Dodge— Nova Scotia, CanadaD. Eastman — Newfoundland andLabrador, Canada
J. J. Esch — DelawareC. Fulton — AlaskaR. J. Handy — KentuckyD. R. Hannon — ArkansasE. S. Kawa — MassachusettsJ. C. Klug — WisconsinM. Kotb — Quebec, CanadaT. C. Hellman — OklahomaE. G. Hilton — VirginiaD. T. Jagger — OhioK. J. Kraft — MarylandL. C. Leet — WashingtonA. M. Lorimor — South DakotaM. Mailman — NorthwestTerritories, Canada
D. E. Mallory — New HampshireW. McGivney — New YorkU. Merkle — IowaM. S. Moore — MichiganS. V. Nelson — ColoradoC. C. Novak — IllinoisT. Oda — WashingtonR. P. Pate — AlabamaM. K. Perdue — OregonM. Poehlmann — Alberta, CanadaJ. F. Porcella — West VirginiaA. Pratt — ConnecticutC. F. Reyes — CaliforniaM. J. Ryan — IllinoisM. H. Sansone — New YorkT. S. Scholl — British Columbia,Canada
G. L. Schultz — NevadaT. S. Seine — North DakotaC. S. Selinger — Saskatchewan,Canada
D. Slater — Manitoba, CanadaN. Smith — PennsylvaniaR. Spiker — North CarolinaR. K. Sturm — UtahS. R. Townsend — Prince EdwardIsland, Canada
R. D. Troutt — TexasM. J. Verhagen — WisconsinM. Washington — New JerseyK. L. Watson — MississippiC. J. Wilson III — Kansas
INTERNATIONAL INTEREST REVIEW GROUP
V. FelixY.-G. KimS. H. LeongW. LinO. F. Manafa
C. MinuT. S. G. NarayannenY.-W. ParkR. ReynagaP. Williamson
xiii
COMMITTEE ON POWER BOILERS (BPV I)
D. L. Berger, ChairR. E. McLaughlin, Vice ChairU. D'Urso, Staff SecretaryJ. L. ArnoldS. W. CameronD. A. CanonicoK. K. ColemanP. D. EdwardsP. FalloueyJ. G. FeldsteinG. W. GalanesT. E. HansenJ. F. HenryJ. S. HunterW. L. LowryF. Massi
L. MoedingerP. A. MolvieY. OishiE. M. OrtmanJ. T. PillowB. W. RobertsJ. M. TanzoshD. TompkinsD. E. TuttleJ. VattappillyR. V. WielgoszinskiY. Li, DelegateH. Michael, DelegateD. N. French, Honorary MemberT. C. McGough, Honorary MemberR. L. Williams, Honorary Member
Subgroup on Design (BPV I)
J. Vattappilly, ChairD. I. Anderson, SecretaryD. DeweesP. DhorajiaH. A. Fonzi, Jr.J. P. GlaspieG. B. Komora
P. A. Molvie
D. A. Olson
S. V. Torkildson
M. Wadkinson
C. F. Jeerings, Contributing Member
J. C. Light, Contributing Member
Subgroup on Fabrication and Examination (BPV I)
J. T. Pillow, ChairJ. L. Arnold, SecretaryP. BeckerD. L. BergerS. W. CameronS. FincherG. W. GalanesP. F. Gilston
J. Hainsworth
T. E. Hansen
C. T. McDaris
R. E. McLaughlin
R. J. Newell
Y. Oishi
R. V. Wielgoszinski
Subgroup on General Requirements and Piping (BPV I)
T. E. Hansen, ChairE. M. Ortman, Vice ChairF. Massi, SecretaryP. BeckerD. L. BergerP. D. EdwardsG. W. GalanesW. L. LowryR. E. McLaughlin
B. MollitorJ. T. PillowD. TompkinsS. V. TorkildsonD. E. TuttleM. WadkinsonR. V. WielgoszinskiC. F. Jeerings, Contributing MemberR. Uebel, Contributing Member
Subgroup on Heat Recovery Steam Generators (BPV I)
S. V. Torkildson, ChairJ. L. ArnoldJ. P. BellB. G. CarsonJ. GertzT. E. Hansen
G. B. KomoraC. T. McDarisY. OishiE. M. OrtmanD. TompkinsB. C. Turczynski
Subgroup on Locomotive Boilers (BPV I)
L. Moedinger, ChairS. M. Butler, SecretaryP. BoschanJ. BraunR. C. Franzen, Jr.D. W. GrinerS. D. JacksonM. A. Janssen
S. A. Lee
G. M. Ray
J. E. Rimmasch
R. B. Stone
M. W. Westland
R. Yuill
R. D. Reetz, Contributing Member
Subgroup on Materials (BPV I)
G. W. Galanes, ChairK. K. Coleman, Vice ChairJ. S. Hunter, SecretaryS. H. BowesD. A. CanonicoP. FalloueyK. L. HayesJ. F. Henry
M. Lewis
O. X. Li
F. Masuyama
D. W. Rahoi
B. W. Roberts
J. M. Tanzosh
J. Vattappilly
Subgroup on Solar Boilers (BPV I)
J. S. Hunter, ChairS. V. Torkildson, SecretaryG. W. GalanesR. E. HearneP. Jennings
D. J. KozaF. MassiE. M. OrtmanM. J. SlaterJ. C. Light, Contributing Member
India International Working Group (BPV I)
H. DalalI. KalyanasundaramS. MathurA. J. PatilA. R. PatilG. V. S. Rao
U. Revisanakaran
N. Satheesan
G. U. Shanker
D. Shrivastava
S. Venkataramana
Task Group on Modernization of BPVC Section I
D. I. Anderson, ChairU. D’Urso, Staff SecretaryJ. L. ArnoldS. W. CameronD. DeweesG. W. GalanesJ. P. GlaspieT. E. Hansen
J. F. HenryR. E. McLaughlinP. A. MolvieE. M. OrtmanJ. T. PillowB. W. RobertsD. E. TuttleJ. Vattappilly
xiv
COMMITTEE ON MATERIALS (BPV II)
J. F. Henry, ChairD. W. Rahoi, Vice ChairN. Lobo, Staff SecretaryF. AbeA. AppletonJ. CameronD. A. CanonicoA. ChaudouetP. FalloueyJ. R. FouldsD. W. GandyM. H. GilkeyM. GoldJ. F. GrubbJ. A. HallK. M. HottleM. KatcherO. X. LiF. MasuyamaR. K. NanstadB. W. Roberts
E. ShapiroM. J. SlaterR. C. SutherlinR. W. SwindemanJ. M. TanzoshD. TylerO. Oldani, DelegateH. D. Bushfield, ContributingMember
M. L. Nayyar, Contributing MemberE. G. Nisbett, Contributing MemberE. Upitis, Contributing MemberT. M. Cullen, Honorary MemberW. D. Doty, Honorary MemberW. D. Edsall, Honorary MemberG. C. Hsu, Honorary MemberR. A. Moen, Honorary MemberC. E. Spaeder, Jr., HonoraryMember
A. W. Zeuthen, Honorary Member
Executive Committee (BPV II)
J. F. Henry, ChairD. W. Rahoi, Vice ChairN. Lobo, Staff SecretaryA. AppletonA. ChaudouetJ. R. FouldsM. Gold
J. F. Grubb
R. W. Mikitka
B. W. Roberts
R. C. Sutherlin
R. W. Swindeman
J. M. Tanosh
Subgroup on External Pressure (BPV II)
R. W. Mikitka, ChairD. L. Kurle, Vice ChairJ. A. A. Morrow, SecretaryL. F. CampbellH. ChenD. S. GriffinJ. F. Grubb
J. R. Harris IIIM. H. JawadC. R. ThomasM. WadkinsonM. Katcher, Contributing MemberC. H. Sturgeon, ContributingMember
Subgroup on Ferrous Specifications (BPV II)
A. Appleton, ChairK. M. Hottle, Vice ChairP. Wittenbach, SecretaryH. ChenB. M. DingmanM. J. DosdourianP. FalloueyJ. D. FritzT. GrahamJ. M. GrockiJ. F. GrubbC. Hyde
D. S. Janikowski
L. J. Lavezzi
S. G. Lee
W. C. Mack
A. S. Melilli
K. E. Orie
J. Shick
E. Upitis
J. D. Wilson
R. Zawierucha
E. G. Nisbett, Contributing Member
Subgroup on International Material Specifications (BPV II)
A. Chaudouet, ChairO. X. Li, Vice ChairT. F. Miskell, SecretaryS. W. CameronD. A. CanonicoH. ChenP. FalloueyA. F. GarbolevskyD. O. Henry
M. Ishikawa
W. M. Lundy
A. R. Nywening
E. Upitis
F. Zeller
D. Kwon, Delegate
O. Oldani, Delegate
H. Lorenz, Contributing Member
Subgroup on Nonferrous Alloys (BPV II)
R. C. Sutherlin, ChairM. H. Gilkey, Vice ChairH. AnadaJ. CallandD. B. DenisJ. F. GrubbA. HeinoM. KatcherJ. A. McMasterL. Paul
D. W. RahoiW. RenE. ShapiroM. H. SkillingbergD. TylerJ. WeritzR. WrightR. ZawieruchaW. R. Apblett, Jr., ContributingMember
Subgroup on Physical Properties (BPV II)
J. F. Grubb, ChairH. D. BushfieldD. B. Denis
P. FalloueyE. Shapiro
Subgroup on Strength, Ferrous Alloys (BPV II)
J. M. Tanzosh, ChairM. J. Slater, SecretaryF. AbeH. AnadaD. A. CanonicoA. Di RienzoP. FalloueyJ. R. FouldsM. GoldJ. A. HallJ. F. HenryK. Kimura
S. W. KnowlesF. MasuyamaC. PearceD. W. RahoiB. W. RobertsM. S. SheltonJ. P. ShingledeckerR. W. SwindemanW. R. Apblett, Jr., ContributingMember
H. Murakami, ContributingMember
Subgroup on Strength of Weldments (BPV II & BPV IX)
W. F. Newell, Jr., ChairS. H. BowesK. K. ColemanP. D. FlennerJ. R. FouldsD. W. GandyM. GoldK. L. Hayes
J. F. HenryJ. PensoD. W. RahoiB. W. RobertsJ. P. ShingledeckerW. J. SperkoJ. P. Swezy, Jr.J. M. Tanzosh
Working Group on Materials Database (BPV II)
R. W. Swindeman, ChairN. Lobo, Staff SecretaryF. AbeJ. R. FouldsJ. F. HenryM. KatcherB. W. Roberts
R. C. SutherlinD. Andrei, Contributing MemberJ. L. Arnold, Contributing MemberW. Hoffelner, Contributing MemberT. Lazar, Contributing MemberD. T. Peters, Contributing MemberW. Ren, Contributing Member
xv
Working Group on Creep Strength Enhanced Ferritic Steels (BPV II)
J. F. Henry, ChairF. AbeS. H. BowesD. A. CanonicoK. K. ColemanG. CuminoP. D. FlennerJ. R. FouldsD. W. Gandy
M. Gold
F. Masuyama
W. F. Newell, Jr.
B. W. Roberts
W. J. Sperko
R. W. Swindeman
J. M. Tanzosh
R. G. Young
Working Group on Data Analysis (BPV II)
J. R. Foulds, ChairF. AbeM. GoldJ. F. GrubbJ. F. HenryM. Katcher
F. MasuyamaW. RenB. W. RobertsM. SubanovicM. J. SwindemanR. W. Swindeman
China International Working Group (BPV II)
B. Shou, ChairYong Zhang, Vice ChairX. Tong, SecretaryW. FangQ. C. FengS. HuoH. LiJ. LiS. LiZ. RongcanS. TanC. Wang
X. Wang
F. Yang
G. Yang
R. Ye
L. Yin
H. Zhang
X.-H. Zhang
Yingkai Zhang
Q. Zhao
S. Zhao
J. Zou
COMMITTEE ON CONSTRUCTION OF NUCLEAR FACILITYCOMPONENTS (BPV III)
R. S. Hill III, ChairR. B. Keating, Vice ChairJ. C. Minichiello, Vice ChairA. Byk, Staff SecretaryT. M. AdamsA. AppletonR. W. BarnesW. H. BorterC. W. BrunyT. D. BurchellJ. R. ColeR. P. DeublerA. C. EberhardtB. A. ErlerG. M. FosterW. HoffelnerR. M. JesseeR. I. JetterC. C. KimG. H. KooV. KostarevK. A. ManolyD. E. Matthews
R. P. McIntyreM. N. MitchellM. MorishitaD. K. MortonT. NagataR. F. Reedy, Sr.I. SaitoC. T. SmithW. K. Sowder, Jr.W. J. SperkoK. R. WichmanC. S. WithersY. H. Choi, DelegateT. Ius, DelegateH.-T. Wang, DelegateM. Zhou, Contributing MemberE. B. Branch, Honorary MemberG. D. Cooper, Honorary MemberW. D. Doty, Honorary MemberD. F. Landers, Honorary MemberR. A. Moen, Honorary MemberC. J. Pieper, Honorary Member
Subcommittee on Design (BPV III)
R. P. Deubler, ChairD. E. Matthews, Vice ChairG. L. Hollinger, SecretaryT. M. AdamsG. A. AntakiR. L. BrattonC. W. BrunyP. R. DonavinR. S. Hill IIIP. HirschbergM. H. JawadR. I. Jetter
R. B. Keating
R. A. Ladefian
K. A. Manoly
R. J. Masterson
M. N. Mitchell
W. J. O’Donnell, Sr.E. L. Pleins
T.-L. Sham
J. P. Tucker
K. Wright
J. Yang
Subgroup on Component Design (SC-D) (BPV III)
T. M. Adams, ChairR. B. Keating, Vice ChairS. Pellet, SecretaryG. A. AntakiS. AsadaJ. F. BallJ. R. ColeR. P. DeublerP. HirschbergH. KobayashiR. A. LadefianK. A. ManolyR. J. MastersonD. E. MatthewsJ. C. MinichielloD. K. Morton
T. M. MustoT. NagataA. N. NguyenE. L. PleinsI. SaitoG. C. SlagisJ. R. StinsonG. Z. TokarskiJ. P. TuckerP. VockK. R. WichmanC. WilsonJ. YangC. W. Bruny, Contributing MemberA. A. Dermenjian, ContributingMember
Working Group on Core Support Structures (SG-CD) (BPV III)
J. Yang, ChairJ. F. Kielb, SecretaryL. C. HartlessD. KeckT. LiszkaiH. S. Mehta
M. Nakajima
M. D. Snyder
A. Tsirigotis
R. Vollmer
J. T. Land, Contributing Member
Working Group on Design of Division 3 Containments(SG-CD) (BPV III)
D. K. Morton, ChairD. J. AmmermanG. BjorkmanG. BrozS. HorowitzD. W. LewisJ. C. Minichiello
E. L. Pleins
C. J. Temus
I. D. McInnes, Contributing Member
R. E. Nickell, Contributing Member
H. P. Shrivastava, ContributingMember
Working Group on HDPE Design of Components (SG-CD) (BPV III)
T. M. Musto, ChairJ. Ossmann, SecretaryT. M. AdamsT. A. BaconC. BasavarajuD. BurwellS. Choi
P. KrishnaswamyM. MartinJ. C. MinichielloD. P. MunsonF. J. Schaaf, Jr.R. StakenborghsH. E. Svetlik
xvi
Working Group on Piping (SG-CD) (BPV III)
G. A. Antaki, ChairG. Z. Tokarski, SecretaryT. M. AdamsT. A. BaconC. BasavarajuJ. CatalanoF. ClaeysJ. R. ColeC. M. FaidyR. G. GiladaN. M. GrahamM. A. GrayR. W. HauptA. HiranoP. HirschbergM. KassarJ. Kawahata
R. B. KeatingV. KostarevY. LiuJ. F. McCabeJ. C. MinichielloI.-K. NamA. N. NguyenM. S. SillsG. C. SlagisN. C. SutherlandE. A. WaisC.-I. WuJ. J. Martinez, Contributing MemberN. J. Shah, Contributing MemberE. C. Rodabaugh, HonoraryMember
Working Group on Pressure Relief (SG-CD) (BPV III)
J. F. Ball, ChairA. L. Szeglin
D. G. Thibault
Working Group on Pumps (SG-CD) (BPV III)
R. A. Ladefian, ChairP. W. BehnkeR. E. Cornman, Jr.M. D. EftychiouA. FraserM. A. GaydonR. Ghanbari
M. Higuchi
S. Mauvais
R. A. Patrick
J. Sulley
R. Udo
A. G. Washburn
Working Group on Supports (SG-CD) (BPV III)
J. R. Stinson, ChairU. S. Bandyopadhyay, SecretaryK. AvrithiT. H. BakerF. J. BirchR. P. DeublerN. M. GrahamR. J. Masterson
S. PelletI. SaitoH. P. ShrivastavaC. StirzelT. G. TerryahG. Z. TokarskiP. WisemanC.-I. Wu
Working Group on Valves (SG-CD) (BPV III)
P. Vock, ChairJ. O'Callaghan, SecretaryM. C. BuckleyG. A. JollyJ. KleinT. A. McMahon
C. A. MizerK. E. Reid IIH. R. SondereggerJ. SullyI. TsengJ. P. Tucker
Working Group on Vessels (SG-CD) (BPV III)
D. E. Matthews, ChairR. M. Wilson, SecretaryC. BasavarajuJ. V. Gregg, Jr.W. J. HeilkerA. KalninsR. B. KeatingD. KeckJ. KimO.-S. Kim
K. Matsunaga
M. C. Scott
P. K. Shah
J. Shupert
C. Turylo
D. Vlaicu
W. F. Weitze
T. Yamazaki
R. Z. Ziegler
Subgroup on Design Methods (SC-D) (BPV III)
C. W. Bruny, ChairS. McKillop, SecretaryK. AvrithiW. CulpP. R. Donavin, Jr.J. V. Gregg, Jr.H. T. Harrison IIIK. HsuM. Kassar
D. KeckM. N. MitchellW. J. O’Donnell, Sr.P. J. O’ReganW. D. ReinhardtP. SmithS. D. SnowW. F. WeitzeK. Wright
Working Group on Design Methodology (SG-DM) (BPV III)
S. D. Snow, ChairM. R. Breach, SecretaryK. AvrithiC. BasavarajuR. D. BlevinsD. L. CaldwellD. DeweesC. M. FaidyH. T. Harrison IIIP. HirschbergM. KassarR. B. KeatingJ. KimH. Kobayashi
T. LiszkaiJ. F. McCabeA. N. NguyenW. D. ReinhardtD. H. RoartyP. K. ShahR. VollmerS. WangT. M. WigerK. WrightJ. YangM. K. Au-Yang, ContributingMember
Working Group on Environmental Effects (SG-DM) (BPV III)
W. Culp, ChairB. D. Frew, SecretaryK. AvrithiP. J. DobsonW. J. Heilker
C. JonkerJ. E. NestellT. SchrieferM. S. SheltonY. H. Choi, Delegate
Working Group on Environmental Fatigue Evaluation Methods(SG-DM) (BPV III)
K. Wright, ChairM. A. Gray, Vice ChairW. F. Weitze, SecretaryT. M. AdamsS. AsadaK. AvrithiR. C. CipollaJ. R. ColeT. M. DamianiC. M. Faidy
T. D. GilmanS. R. GosselinY. HeP. HirschbergH. S. MehtaJ.-S. ParkD. H. RoartyI. SaitoD. VlaicuR. Z. Ziegler
Working Group on Fatigue Strength (SG-DM) (BPV III)
P. R. Donavin, ChairT. M. DamianiD. DeweesC. M. FaidyS. R. GosselinR. J. GurdalC. F. Heberling IIC. E. HinnantP. HirschbergK. HsuS. H. KleinsmithS. Majumdar
S. N. Malik
D. H. Roarty
M. S. Shelton
G. Taxacher
A. Tsirigotis
K. Wright
H. H. Ziada
G. S. Chakrabarti, ContributingMember
W. J. O'Donnell, Sr., ContributingMember
xvii
Working Group on Graphite and Composites Design(SG-DM) (BPV III)
M. N. Mitchell, ChairM. W. Davies, Vice ChairC. A. Sanna, Staff SecretaryT. D. Burchell, SecretaryA. AppletonR. L. BrattonS. CadellS.-H. ChiA. CovacS. W. Doms
S. F. Duffy
S. T. Gonczy
Y. Katoh
J. Ossmann
M. Roemmler
N. Salstrom
T. Shibata
S. Yu
G. L. Zeng
Working Group on Probabilistic Methods in Design(SG-DM) (BPV III)
P. J. O'Regan, ChairM. Golliet, SecretaryT. AsayamaK. AvrithiM. R. Graybeal
D. O. HenryR. S. Hill IIIM. MorishitaN. A. PalmI. Saito
Special Working Group on Computational Modeling for ExplicitDynamics (SG-DM) (BPV III)
G. Bjorkman, ChairD. J. Ammerman, SecretaryM. R. BreachG. BrozJ. JordanD. MolitorisJ. Piotter
W. D. Reinhardt
P. Y.-K. Shih
S. D. Snow
C.-F. Tso
M. C. Yaksh
U. Zencker
Subgroup on Elevated Temperature Design (SC-D) (BPV III)
T.-L. Sham, ChairT. AsayamaC. Becht IVF. W. BrustP. CarterJ. F. CervenkaB. F. HantzW. HoffelnerA. B. HullM. H. JawadR. I. Jetter
G. H. Koo
M. Li
S. Majumdar
J. E. Nestell
W. J. O'Donnell, Sr.
R. W. Swindeman
D. S. Griffin, Contributing Member
W. J. Koves, Contributing Member
D. L. Marriott, ContributingMember
Working Group on Allowable Stress Criteria (SG-ETD) (BPV III)
R. W. Swindeman, ChairR. Wright, SecretaryJ. R. FouldsK. KimuraM. LiS. N. Malik
J. E. Nestell
W. Ren
B. W. Roberts
M. Sengupta
T.-I. Sham
Working Group on Analysis Methods (SG-ETD) (BPV III)
P. Carter, ChairM. J. Swindeman, SecretaryM. AndoM. R. Breach
R. I. JetterS. KrishnamurthyT.-I. ShamD. K. Williams
Working Group on Creep-Fatigue and Negligible Creep (SG-ETD)(BPV III)
T. Asayama, ChairM. Li, SecretaryF. W. BrustP. CarterR. I. Jetter
G. H. KooB.-L. LyowS. N. MalikH. QianT.-I. Sham
Working Group on Elevated Temperature Construction (SG-ETD)(BPV III)
M. H. Jawad, ChairB. Mollitor, SecretaryD. I. AndersonR. G. BrownD. DeweesJ. P. GlaspieB. F. Hantz
G. L. HollingerR. I. JetterS. KrishnamurthyA. MannD. L. MarriottM. N. MitchellC. Nadarajah
Working Group on High Temperature Flaw Evaluation (SG-ETD)(BPV III)
F. W. Brust, ChairN. BroomP. CarterW. HoffelnerS. N. Malik
D. L. RudlandP. J. RushD.-J. ShimS. X. Xu
Subgroup on General Requirements (BPV III)
R. P. McIntyre, ChairL. M. Plante, SecretaryV. ApostolescuA. AppletonS. BellJ. R. BerryB. K. BoboJ. DeKleineJ. V. GardinerG. GrattiJ. W. HighlandsG. V. ImbroK. A. Kavanagh
Y.-S. KimM. R. MinickE. C. RenaudD. J. RoszmanC. T. SmithW. K. Sowder, Jr.G. E. SzabaturaT. G. TerryahD. M. VickeryC. S. WithersH. Michael, DelegateG. L. Hollinger, ContributingMember
Working Group on Duties and Responsibilities (SG-GR) (BPV III)
J. V. Gardiner, ChairG. L. Hollinger, SecretaryS. BellJ. R. BerryJ. DeKleineN. DeSantisY. Diaz-CastilloE. L. Farrow
G. Gratti
B. N. Juarez
K. A. Kavanagh
J. M. Lyons
L. M. Plante
D. J. Roszman
T. G. Terryah
xviii
Working Group on Quality Assurance, Certification, and Stamping(SG-GR) (BPV III)
C. T. Smith, ChairC. S. Withers, SecretaryV. ApostolescuA. AppletonB. K. BoboS. M. GoodwinJ. GrimmJ. W. HighlandsY.-S. KimB. McGloneR. P. McIntyre
M. R. Minick
R. B. Patel
E. C. Renaud
T. Rezk
J. Rogers
W. K. Sowder, Jr.
J. F. Strunk
G. E. Szabatura
D. M. Vickery
C. A. Spletter, Contributing Member
Special Working Group on General Requirements Consolidation(SG-GR) (BPV III)
J. V. Gardiner, ChairC. T. Smith, Vice ChairS. BellM. CusickY. Diaz-CastilloJ. GrimmJ. M. LyonsM. McGloneR. PatelE. C. Renaud
T. RezkJ. RogersD. J. RoszmanB. S. SandhuG. J. SoloveyR. SpuhlG. E. SzabaturaC. S. WithersS. F. Harrison, ContributingMember
Subgroup on Materials, Fabrication, and Examination (BPV III)
R. M. Jessee, ChairB. D. Frew, Vice ChairS. Hunter, SecretaryW. H. BorterT. D. BurchellG. R. CannellR. H. DavisG. M. FosterG. B. GeorgievS. E. GingrichM. GollietJ. GrimmJ. Johnston, Jr.C. C. KimM. Lashley
T. MelfiH. MurakamiJ. OssmannJ. E. O’SullivanC. PearceN. M. SimpsonW. J. SperkoJ. R. StinsonJ. F. StrunkK. B. StuckeyR. WrightS. YeeH. Michael, DelegateR. W. Barnes, Contributing Member
Working Group on Graphite and Composite Materials (SG-MFE)(BPV III)
T. D. Burchell, ChairA. AppletonR. L. BrattonS. CadellS.-H. ChiA. CovacM. W. DaviesS. W. DomsS. F. DuffyS. T. Gonzcy
M. G. Jenkins
Y. Katoh
M. N. Mitchell
J. Ossmann
M. Roemmler
N. Salstrom
T. Shibata
S. Yu
G. L. Zeng
Working Group on HDPE Materials (SG-MFE) (BPV III)
M. Golliet, ChairM. A. Martin, SecretaryW. H. BorterM. C. BuckleyE. M. FochtB. HaugerJ. Johnston, Jr.P. Krishnaswamy
E. W. McElroyT. M. MustoS. PattersonS. SchuesslerR. StakenborghsT. TiptonM. TroughtonZ. J. Zhou
Joint ACI-ASME Committee on Concrete Components for NuclearService (BPV III)
A. C. Eberhardt, ChairC. T. Smith, Vice ChairA. Byk, Staff SecretaryJ. F. ArtusoC. J. BangF. FarzamP. S. GhosalB. D. HovisT. C. InmanO. JovallN.-H. LeeJ. McLeanJ. MunshiN. OrbovicJ. F. Strunk
T. TonyanT. J. Ahl, Contributing MemberN. Alchaar, Contributing MemberB. A. Erler, Contributing MemberJ. Gutierrez, Contributing MemberM. F. Hessheimer, ContributingMember
T. E. Johnson, ContributingMember
T. Muraki, Contributing MemberB. B. Scott, Contributing MemberM. R. Senecal, ContributingMember
M. K. Thumm, ContributingMember
Working Group on Design (BPV III-2)
J. Munshi, ChairN. AlchaarM. AllamS. BaeL. J. ColarussoA. C. EberhardtF. FarzamP. S. GhosalB. D. HovisT. C. InmanO. JovallN.-H. Lee
M. Diaz, Contributing Member
S. Diaz, Contributing Member
M. F. Hessheimer, ContributingMember
A. Istar, Contributing Member
T. E. Johnson, ContributingMember
B. R. Laskewitz, ContributingMember
Z. Shang, Contributing Member
M. Sircar, Contributing Member
Working Group on Materials, Fabrication, and Examination(BPV III-2)
P. S. Ghosal, ChairT. Tonyan, Vice ChairM. AllamJ. F. ArtusoJ.-B. DomageA. C. EberhardtC. Jones
C. T. Smith
J. F. Strunk
D. Ufuk
J. Gutierrez, Contributing Member
B. B. Scott, Contributing Member
Z. Shang, Contributing Member
Special Working Group on Modernization (BPV III-2)
J. McLean, ChairN. Orbovic, Vice ChairA. AdediranN. AlchaarO. JovallC. T. Smith
M. A. Ugalde
S. Wang
S. Diaz, Contributing Member
J.-B. Domage, Contributing Member
U. Ricklefs, Contributing Member
xix
Subgroup on Containment Systems for Spent Fuel and High-LevelWaste Transport Packagings (BPV III)
D. K. Morton, ChairG. M. Foster, Vice ChairG. R. Cannell, SecretaryG. AbramczykD. J. AmmermanG. BjorkmanS. HorowitzD. W. LewisP. E. McConnellR. E. NickellE. L. Pleins
R. H. Smith
G. J. Solovey
C. J. Temus
W. H. Borter, Contributing Member
R. S. Hill III, Contributing Member
A. B. Meichler, ContributingMember
T. Saegusa, Contributing Member
N. M. Simpson, ContributingMember
Subgroup on Fusion Energy Devices (BPV III)
W. K. Sowder, Jr., ChairD. Andrei, Staff SecretaryD. J. Roszman, SecretaryR. W. BarnesB. R. DoshiM. HiguchiG. HoltmeierM. KalseyK. A. KavanaghH. J. KimK. Kim
I. KimihiroS. LeeG. LiX. LiP. MokariaT. R. MuldoonM. PortonY. SongM. TrosenC. WaldonI. J. Zatz
Working Group on General Requirements (BPV III-4)
W. K. Sowder, Jr., Chair
Working Group on In-Vessel Components (BPV III-4)
M. Kalsey, Chair
Working Group on Magnets (BPV III-4)
K. Kim, Chair
Working Group on Materials (BPV III-4)
M. Porton, Chair
Working Group on Vacuum Vessels (BPV III-4)
I. Kimihiro, Chair B. R. Doshi
Subgroup on High Temperature Reactors (BPV III)
M. Morishita, ChairR. I. Jetter, Vice ChairT.-L. Sham, SecretaryN. BroomT. D. BurchellW. Hoffelner
G.-H. KooD. K. MortonJ. E. NestellN. N. RayX. Li, Contributing MemberL. Shi, Contributing Member
Working Group on High Temperature Gas-Cooled Reactors(BPV III-5)
J. E. Nestell, ChairM. Sengupta, SecretaryN. BroomT. D. BurchellR. S. Hill IIIE. V. ImbroR. I. JetterY. W. Kim
T. R. Lupold
S. N. Malik
D. L. Marriott
D. K. Morton
T.-L. Sham
X. Li, Contributing Member
L. Shi, Contributing Member
Working Group on High Temperature Liquid-Cooled Reactors(BPV III-5)
T.-L. Sham, ChairT. Asayama, SecretaryM. ArcaroR. W. BarnesP. CarterM. E. CohenA. B. HullR. I. Jetter
G. H. Koo
M. Li
S. Majumdar
M. Morishita
J. E. Nestell
X. Li, Contributing Member
G. Wu, Contributing Member
Executive Committee (BPV III)
R. S. Hill III, ChairA. Byk, Staff SecretaryT. M. AdamsC. W. BrunyR. P. DeublerA. C. EberhardtR. M. JesseeR. B. Keating
R. P. McIntyre
J. C. Minichiello
M. Morishita
D. K. Morton
C. A. Sanna
T.-L. Sham
W. K. Sowder, Jr.
China International Working Group (BPV III)
J. Yan, ChairW. Tang, Vice ChairC. A. Sanna, Staff SecretaryY. He, SecretaryH. GeZ. HanJ. JianY. JingF. KaiD. KangX. LiY. LiB. LiangH. LinS. LinJ. LiuS. LiuW. LiuK. MaoW. Pei
G. SunG. TangY. TuY. WangH. WuX. WuZ. WuS. XueZ. YanC. YeZ. YinS. ZaozhanG. ZhangK. ZhangW. ZhangG. ZhaoW. ZhaoY. ZhongZ. ZhongG. Zhu
xx
Germany International Working Group (BPV III)
C. Huttner, ChairH.-R. Bath, SecretaryB. ArndtM. BauerG. DaumL. GerstnerG. HaenleK.-H. HerterU. JendrichG. KramarzC. KrumbW. MayingerD. Moehring
D. OstermannG. RoosJ. RudolphC. A. SannaH. SchauC. A. SpletterR. TrieglaffP. VöllmeckeJ. WendtF. WilleM. WinterN. Wirtz
India International Working Group (BPV III)
B. Basu, ChairG. Mathivanan, Vice ChairC. A. Sanna, Staff SecretaryS. B. Parkash, SecretaryV. BhasinP. ChellapandiS. Jalaldeen
D. Kulkarni
S. A. Kumar De
N. M. Nadaph
M. Ponnusamy
R. N. Sen
A. Sundararajan
Korea International Working Group (BPV III)
G. H. Koo, ChairS. S. Hwang, Vice ChairO.-S. Kim, SecretaryH. S. ByunS. ChoiJ.-Y. HongN.-S. HuhJ.-K. HwangC. JangI. I. JeongH. J. KimJ. KimJ.-S. KimK. KimY.-B. KimY.-S. Kim
D. KwonB. LeeD. LeeSanghoon LeeSangil LeeD. J. LimH. LimI.-K. NamB. NohC.-K. OhC. ParkJ.-S. ParkT. ShinS. SongO. Yoo
Special Working Group on Editing and Review (BPV III)
D. K. Morton, ChairR. L. BrattonR. P. DeublerA. C. EberhardtR. I. Jetter
J. C. MinichielloL. M. PlanteR. F. Reedy, Sr.W. K. Sowder, Jr.C. Wilson
Special Working Group on HDPE Stakeholders (BPV III)
D. Burwell, ChairS. Patterson, SecretaryT. M. AdamsS. BruceS. ChoiC. M. FaidyE. M. FochtM. GollietJ. GrimesR. M. JesseeJ. Johnston, Jr.D. Keller
M. LashleyT. R. LupoldK. A. ManolyD. P. MunsonT. M. MustoJ. E. O’SullivanM. A. RichterV. RohatgiF. J. Schaaf, Jr.R. StakenborghsM. TroughtonZ. J. Zhou
Special Working Group on Honors and Awards (BPV III)
R. M. Jessee, ChairA. AppletonR. W. Barnes
J. R. ColeD. E. MatthewsJ. C. Minichiello
Special Working Group on Industry Experience for New Plants(BPV III & BPV XI)
G. M. Foster, ChairJ. T. Lindberg, ChairH. L. Gustin, SecretaryJ. Ossmann, SecretaryT. L. ChanD. R. GrahamP. J. HennesseyD. O. HenryJ. HoncharikE. V. ImbroC. G. KimO.-S. Kim
Y.-S. Kim
K. Matsunaga
D. E. Matthews
R. E. McLaughlin
E. L. Pleins
D. W. Sandusky
D. M. Swann
T. Tsuruta
E. R. Willis
R. M. Wilson
S. M. Yee
Special Working Group on International Meetings (BPV III)
C. T. Smith, ChairA. Byk, Staff SecretaryT. D. BurchellS. W. CameronJ. R. ColeR. L. Crane
G. M. Foster
R. S. Hill III
M. N. Mitchell
R. F. Reedy, Sr.
C. A. Sanna
Special Working Group on New Advanced Light Water Reactor PlantConstruction Issues (BPV III)
E. L. Pleins, ChairM. C. Scott, SecretaryA. CardilloP. J. CocoB. GilliganJ. HoncharikG. V. ImbroO.-S Kim
M. KrisJ. C. MinichielloD. W. SanduskyC. A. SannaR. R. StevensonR. TroficantoM. L. WilsonJ. Yan
Special Working Group on Regulatory Interface (BPV III)
G. V. Imbro, ChairS. Bell, SecretaryA. CardilloA. A. DermenjianB. N. JuarezK. Matsunaga
D. E. MatthewsA. T. Roberts IIIR. R. StevensonD. TeraoM. L. WilsonR. A. Yonekawa
COMMITTEE ON HEATING BOILERS (BPV IV)
T. L. Bedeaux, ChairJ. A. Hall, Vice ChairG. Moino, Staff SecretaryB. CalderonJ. CallandJ. P. ChicoineC. M. DoveA. HeinoB. J. IskeP. A. Molvie
R. E. Olson
M. Wadkinson
R. V. Wielgoszinski
H. Michael, Delegate
D. Picart, Delegate
S. V. Voorhees, ContributingMember
J. L. Kleiss, Alternate
W. L. Haag, Jr., Honorary Member
xxi
Subgroup on Care and Operation of Heating Boilers (BPV IV)
M. Wadkinson, ChairT. L. BedeauxJ. Calland
J. A. HallP. A. Molvie
Subgroup on Cast Iron Boilers (BPV IV)
J. P. Chicoine, ChairT. L. Bedeaux, Vice ChairC. M. Dove
J. M. DownsJ. A. HallJ. L. Kleiss
Subgroup on Materials (BPV IV)
J. A. Hall, ChairM. Wadkinson, Vice ChairJ. CallandJ. M. Downs
A. HeinoB. J. IskeJ. L. KleissE. Rightmier
Subgroup on Water Heaters (BPV IV)
J. Calland, ChairJ. P. ChicoineB. J. Iske
R. E. OlsonT. E. Trant
Subgroup on Welded Boilers (BPV IV)
J. Calland, ChairT. L. BedeauxB. CalderonJ. L. Kleiss
P. A. MolvieR. E. OlsonM. WadkinsonR. V. Wielgoszinski
COMMITTEE ON NONDESTRUCTIVE EXAMINATION (BPV V)
G. W. Hembree, ChairF. B. Kovacs, Vice ChairJ. S. Brzuszkiewicz, Staff SecretaryS. J. AkrinC. A. AndersonJ. E. BateyA. S. BirksP. L. BrownM. A. BurnsB. CaccamiseN. Y. FaranssoN. A. FinneyA. F. GarbolevskyJ. F. Halley
J. W. HoufS. A. JohnsonR. W. KruzicC. MayA. B. NagelT. L. PlasekF. J. SattlerG. M. Gatti, DelegateX. Guiping, DelegateB. D. Laite, AlternateH. C. Graber, Honorary MemberO. F. Hedden, Honorary MemberJ. R. MacKay, Honorary MemberT. G. McCarty, Honorary Member
Subgroup on General Requirements/Personnel Qualifications andInquiries (BPV V)
F. B. Kovacs, ChairJ. W. Houf, Vice ChairS. J. AkrinC. A. AndersonJ. E. BateyA. S. BirksC. EmslanderN. Y. Faransso
N. A. Finney
G. W. Hembree
S. A. Johnson
D. I. Morris
A. B. Nagel
J. P. Swezy, Jr., ContributingMember
Special Working Group on NDE Resource Support (SG-GR/PQ & I)(BPV V)
N. A. Finney, ChairD. AdkinsJ. AndersonT. G. BollhalterC. T. BrownN. Carter
J. L. Garner
M. Ghahremani
J. W. Mefford, Jr.
M. Sens
D. Van Allen
Subgroup on Surface Examination Methods (BPV V)
S. A. Johnson, ChairJ. Halley, Vice ChairS. J. AkrinJ. E. BateyA. S. BirksP. L. BrownB. CaccamiseN. Y. FaranssoN. FarenbaughN. A. Finney
G. W. Hembree
R. W. Kruzic
B. D. Laite
C. May
L. E. Mullins
A. B. Nagel
F. J. Sattler
P. Shaw
G. M. Gatti, Delegate
Subgroup on Volumetric Methods (BPV V)
A. B. Nagel, ChairN. A. Finney, Vice ChairS. J. AkrinJ. E. BateyP. L. BrownB. CaccamiseN. Y. FaranssoA. F. GarbolevskyJ. F. HalleyR. W. Hardy
G. W. HembreeS. A. JohnsonF. B. KovacsR. W. KruzicC. MayL. E. MullinsT. L. PlasekF. J. SattlerM. TorokG. M. Gatti, Delegate
Working Group on Acoustic Emissions (SG-VM) (BPV V)
N. Y. Faransso, ChairJ. E. Batey, Vice Chair
S. R. DoctorR. K. Miller
Working Group on Radiography (SG-VM) (BPV V)
B. Caccamise, ChairF. B. Kovacs, Vice ChairS. J. AkrinJ. E. BateyP. L. BrownC. EmslanderN. Y. FaranssoA. F. GarbolevskyR. W. HardyG. W. Hembree
S. A. Johnson
R. W. Kruzic
B. D. Laite
S. Mango
C. May
R. J. Mills
A. B. Nagel
T. L. Plasek
M. Torok
Working Group on Ultrasonics (SG-VM) (BPV V)
N. A. Finney, ChairJ. F. Halley, Vice ChairB. CaccamiseK. J. ChizenJ. M. DavisN. Y. FaranssoP. T. HayesS. A. Johnson
R. W. Kruzic
B. D. Laite
C. May
L. E. Mullins
A. B. Nagel
F. J. Sattler
M. Torok
xxii
Working Group on GuidedWave Ultrasonic Testing (SG-VM) (BPV V)
N. Y. Faransso, ChairJ. E. Batey, Vice ChairD. AlleyneN. AmirJ. F. Halley
S. A. JohnsonG. M. LightP. MudgeM. J. QuarryJ. Vanvelsor
COMMITTEE ON PRESSURE VESSELS (VIII)
R. J. Basile, ChairS. C. Roberts, Vice ChairS. J. Rossi, Staff SecretaryT. Schellens, Staff SecretaryG. Aurioles, Sr.V. BogosianJ. CameronA. ChaudouetD. B. DeMichaelJ. P. GlaspieJ. F. GrubbL. E. Hayden, Jr.G. G. KarcherD. L. KurleK. T. LauM. D. LowerR. MahadeenR. W. MikitkaU. R. MillerT. W. NortonT. P. PastorD. T. PetersM. J. Pischke
M. D. RanaG. B. Rawls, Jr.F. L. RichterC. D. RoderyE. SoltowD. A. SwansonJ. P. Swezy, Jr.S. TeradaE. UpitisP. A. McGowan, DelegateH. Michael, DelegateK. Oyamada, DelegateM. E. Papponetti, DelegateD. Rui, DelegateT. Tahara, DelegateM. Gold, Contributing MemberW. S. Jacobs, Contributing MemberK. Mokhtarian, ContributingMember
C. C. Neely, Contributing MemberA. Selz, Contributing MemberK. K. Tam, Contributing Member
Subgroup on Design (BPV VIII)
D. A. Swanson, ChairJ. C. Sowinski, Vice ChairM. Faulkner, SecretaryG. Aurioles, Sr.S. R. BabkaO. A. BarskyR. J. BasileM. R. BreachF. L. BrownD. ChandiramaniB. F. HantzC. E. HinnantC. S. HinsonM. H. JawadD. L. KurleM. D. LowerR. W. MikitkaU. R. Miller
T. P. PastorM. D. RanaG. B. Rawls, Jr.S. C. RobertsC. D. RoderyD. SrnicJ. VattappillyR. A. WhippleK. XuK. Oyamada, DelegateM. E. Papponetti, DelegateW. S. Jacobs, Contributing MemberP. K. Lam, Contributing MemberK. Mokhtarian, ContributingMember
A. Selz, Contributing MemberS. C. Shah, Contributing MemberK. K. Tam, Contributing Member
Working Group on Design-By-Analysis (BPV III)
B. F. Hantz, ChairT. W. Norton, SecretaryR. G. BrownD. DeweesR. D. DixonZ. GuC. E. HinnantR. JainM. H. Jawad
S. KrishnamurthyA. MannG. A. MillerC. NadarajahM. D. RanaT. G. SeippM. A. ShahS. TeradaD. Arnett, Contributing Member
Subgroup on Fabrication and Inspection (BPV VIII)
C. D. Rodery, ChairJ. P. Swezy, Jr., Vice ChairB. R. Morelock, SecretaryL. F. CampbellD. I. MorrisO. MuletM. J. PischkeM. J. RiceB. F. Shelley
P. L. Sturgill
E. A. Whittle
K. Oyamada, Delegate
W. J. Bees, Contributing Member
W. S. Jacobs, Contributing Member
J. Lee, Contributing Member
R. Uebel, Contributing Member
E. Upitis, Contributing Member
Subgroup on General Requirements (BPV VIII)
M. D. Lower, ChairJ. P. Glaspie, Vice ChairF. L. Richter, SecretaryR. J. BasileV. BogosianD. T. DavisD. B. DeMichaelM. FaulkenerL. E. Hayden, Jr.K. T. Lau
A. S. OlivaresT. P. PastorS. C. RobertsJ. C. SowinskiP. SperanzaD. B. StewartD. A. SwansonR. UebelK. Oyamada, DelegateC. C. Neely, Contributing Member
Task Group on U-2(g) (BPV VIII)
S. R. BabkaR. J. BasileD. K. ChandiramaniR. MahadeenU. R. MillerT. W. NortonT. P. Pastor
R. F. Reedy, Sr.S. C. RobertsM. A. Shah, Jr.D. SrnicD. A. SwansonR. UebelK. K. Tam, Contributing Member
Subgroup on Heat Transfer Equipment (BPV VIII)
G. Aurioles, Sr., ChairP. Matkovics, SecretaryD. AngstadtS. R. BabkaM. BahadoriJ. H. BarbeeO. A. BarskyI. G. CampbellA. ChaudouetM. D. ClarkS. JeyakumarG. G. KarcherD. L. KurleB. J. Lerch
R. MahadeenS. MayeuxU. R. MillerT. W. NortonK. OyamadaD. SrnicA. M. VoytkoR. P. WibergF. E. Jehrio, Contributing MemberJ. Mauritz, Contributing MemberF. Osweiller, Contributing MemberR. Tiwari, Contributing MemberS. Yokell, Contributing MemberS. M. Caldwell, Honorary Member
Task Group on Plate Heat Exchangers (BPV VIII)
M. J. Pischke, ChairS. R. BabkaS. FlynnJ. F. GrubbF. HamtakJ. E. Lane
R. MahadeenP. MetkovicsD. I. MorrisC. M. RomeroE. SoltowD. Srnic
xxiii
Subgroup on High Pressure Vessels (BPV VIII)
D. T. Peters, ChairR. D. Dixon, Vice ChairR. T. Hallman, Vice ChairA. P. Maslowski, Staff SecretaryL. P. AntalffyR. C. BielP. N. ChakuR. CordesL. FridlundD. M. FryerA. H. HonzaJ. A. KappJ. KeltjensA. K. KhareN. McKieS. C. Mordre
G. T. NelsonE. A. RodriguezE. D. RollK. C. Simpson, Jr.D. L. StangF. W. TatarS. TeradaJ. L. TraudR. WinkK.-J. YoungK. Oyamada, DelegateR. M. Hoshman, ContributingMember
G. J. Mraz, Contributing MemberD. J. Burns, Honorary MemberE. H. Perez, Honorary Member
Subgroup on Materials (BPV VIII)
J. F. Grubb, ChairJ. Cameron, Vice ChairP. G. Wittenbach, SecretaryA. Di RienzoJ. D. FritzM. KatcherM. KowalczykW. M. LundyJ. PensoD. W. Rahoi
R. C. Sutherlin
E. Upitis
K. Xu
K. Oyamada, Delegate
G. S. Dixit, Contributing Member
M. Gold, Contributing Member
J. A. McMaster, ContributingMember
E. G. Nisbett, Contributing Member
Subgroup on Toughness (BPV II & BPV VIII)
D. L. Kurle, ChairK. Xu, Vice ChairR. J. BasileW. S. JacobsM. D. RanaF. L. RichterK. SubramanianD. A. Swanson
J. P. Swezy, Jr.
E. Upitis
J. Vattappilly
K. Oyamada, Delegate
K. Mokhtarian, ContributingMember
C. C. Neely, Contributing Member
Subgroup on Graphite Pressure Equipment (BPV VIII)
E. Soltow, ChairG. C. BechererT. F. BonnF. L. Brown
M. R. MinickA. A. StupicaA. Viet
Italy International Working Group (BPV VIII)
G. Pontiggia, ChairA. Veroni, SecretaryB. G. AlboraliP. AngeliniR. BoattiA. CamanniP. ContiP. L. DinelliF. FincoL. GaetaniA. Ghidini
M. Guglielmetti
P. Mantovani
M. Maroni
M. Massobrio
L. Moracchioli
L. Possenti
C. Sangaletti
A. Teli
I. Venier
G. Gobbi, Contributing Member
Special Working Group on Bolted Flanged Joints (BPV VIII)
R. W. Mikitka, ChairG. D. BibelW. BrownH. ChenW. J. Koves
M. MorishitaJ. R. PayneG. B. Rawls, Jr.M. S. Shelton
Working Group on Design (BPV VIII Div. 3)
J. Keltjens, ChairC. Becht VR. C. BielR. CordesR. D. DixonL. FridlundR. T. HallmanG. M. MitalS. C. MordreG. T. NelsonD. T. PetersE. D. Roll
K. C. SimpsonD. L. StangK. SubramanianS. TeradaJ. L. TraudR. WinkY. XuF. Kirkemo, Contributing MemberD. J. Burns, Honorary MemberD. M. Fryer, Honorary MemberG. J. Mraz, Honorary MemberE. H. Perez, Honorary Member
Working Group on Materials (BPV VIII Div. 3)
F. W. Tatar, ChairL. P. AntalffyP. N. Chaku
J. A. KappA. K. Khare
Task Group on Impulsively Loaded Vessels (BPV VIII)
E. A. Rodriguez, ChairP. O. Leslie, SecretaryG. A. AntakiJ. K. AsahinaD. D. BarkerA. M. ClaytonJ. E. Didlake, Jr.T. A. DuffeyB. L. HaroldsenK. HayashiD. HildingK. W. KingR. Kitamura
R. A. Leishear
R. E. Nickell
F. Ohlson
C. Romero
N. Rushton
J. H. Stofleth
Q. Dong, Contributing Member
H.-P. Schildberg, ContributingMember
J. E. Shepherd, ContributingMember
M. Yip, Contributing Member
Subgroup on Interpretations (BPV VIII)
U. R. Miller, ChairT. Schellens, Staff SecretaryG. Aurioles, Sr.R. J. BasileJ. CameronR. D. DixonJ. F. GrubbD. L. KurleM. D. LowerR. Mahadeen
D. T. Peters
S. C. Roberts
C. D. Rodery
D. B. Stewart
P. L. Sturgill
D. A. Swanson
J. P. Swezy, Jr.
J. Vattappilly
T. P. Pastor, Contributing Member
xxiv
COMMITTEE ON WELDING, BRAZING, AND FUSING (BPV IX)
W. J. Sperko, ChairD. A. Bowers, Vice ChairS. J. Rossi, Staff SecretaryM. BernasekM. L. CarpenterJ. G. FeldsteinP. D. FlennerS. E. GingrichR. M. JesseeJ. S. LeeW. M. LundyT. MelfiW. F. Newell, Jr.A. S. OlivaresD. K. PeetzM. J. PischkeM. J. Rice
M. B. SimsM. J. StankoP. L. SturgillJ. P. Swezy, Jr.P. L. Van FossonR. R. YoungA. Roza, DelegateR. K. Brown, Jr., ContributingMember
M. Consonni, Contributing MemberS. A. Jones, Contributing MemberS. Raghunathan, ContributingMember
W. D. Doty, Honorary MemberB. R. Newmark, Honorary MemberS. D. Reynolds, Jr., HonoraryMember
Subgroup on Brazing (BPV IX)
M. J. Pischke, ChairE. W. BeckmanL. F. CampbellM. L. Carpenter
A. F. GarbolevskyA. R. NyweningJ. P. Swezy, Jr.
Subgroup on General Requirements (BPV IX)
P. L. Sturgill, ChairE. W. BeckmanJ. P. BellG. ChandlerP. R. EvansA. HowardR. M. Jessee
A. S. OlivaresD. K. PeetzH. B. PorterK. R. WillensE. W. WoelfelE. Molina, DelegateB. R. Newmark, Honorary Member
Subgroup on Materials (BPV IX)
M. Bernasek, ChairT. AndersonJ. L. ArnoldM. L. CarpenterE. CutlipS. S. FioreS. E. GingrichL. HarbisonR. M. Jessee
C. C. KimT. MelfiM. J. PischkeC. E. SainzW. J. SperkoM. J. StankoP. L. SturgillR. R. YoungV. G. V. Giunto, Delegate
Subgroup on Performance Qualification (BPV IX)
D. A. Bowers, ChairM. J. Rice, SecretaryM. A. BoringR. B. CorbitP. D. FlennerK. L. Hayes
J. S. Lee
W. M. Lundy
T. Melfi
E. G. Reichelt
M. B. Sims
Subgroup on Plastic Fusing (BPV IX)
M. L. Carpenter, ChairD. BurwellJ. M. CraigM. GhahremaniK. L. HayesR. M. JesseeJ. Johnston, Jr.E. W. McElroyJ. E. O’SullivanE. G. ReicheltM. J. Rice
S. Schuessler
P. L. Sturgill
J. P. Swezy, Jr.
M. Troughton
E. W. Woelfel
J. Wright
J. C. Minichiello, ContributingMember
C. W. Rowley, ContributingMember
Subgroup on Procedure Qualification (BPV IX)
D. A. Bowers, ChairM. J. Rice, SecretaryM. BernasekM. A. BoringL. HarbisonW. M. LundyW. F. Newell, Jr.S. Raghunathan
M. B. SimsW. J. SperkoS. A. SpragueJ. P. Swezy, Jr.P. L. Van FossonT. C. WiesnerD. Chandiramani, ContributingMember
COMMITTEE ON FIBER-REINFORCED PLASTIC PRESSURE VESSELS(BPV X)
D. Eisberg, ChairB. F. Shelley, Vice ChairP. D. Stumpf, Staff SecretaryF. L. BrownJ. L. BustillosT. W. CowleyI. L. DinovoT. J. FowlerM. R. GormanB. HebbD. H. Hodgkinson
L. E. Hunt
D. L. Keeler
B. M. Linnemann
N. L. Newhouse
D. J. Painter
G. Ramirez
J. R. Richter
F. W. Van Name
D. O. Yancey, Jr.
P. H. Ziehl
COMMITTEE ON NUCLEAR INSERVICE INSPECTION (BPV XI)
G. C. Park, ChairR. W. Swayne, Vice ChairR. A. Yonekawa, Vice ChairR. L. Crane, Staff SecretaryJ. M. AgoldV. L. ArmentroutJ. F. BallW. H. BamfordT. L. ChanR. C. CipollaD. D. DavisG. H. DeBooR. L. DyleE. V. Farrell, Jr.E. L. FarrowE. B. GerlachR. E. GimpleT. J. GriesbachD. O. HenryR. D. KerrS. D. KulatD. W. LamondD. R. Lee
G. A. LofthusE. J. MaloneyJ. E. O’SullivanR. K. RhyneD. A. ScarthF. J. Schaaf, Jr.J. C. Spanner, Jr.G. L. StevensD. E. WaskeyJ. G. WeicksT. YuharaH. D. Chung, DelegateC. Ye, DelegateB. R. Newton, Contributing MemberR. A. West, Contributing MemberJ. Hakii, AlternateJ. T. Lindberg, AlternateC. J. Wirtz, AlternateC. D. Cowfer, Honorary MemberF. E. Gregor, Honorary MemberO. F. Hedden, Honorary MemberP. C. Riccardella, Honorary Member
xxv
Executive Committee (BPV XI)
R. A. Yonekawa, ChairG. C. Park, Vice ChairR. L. Crane, Staff SecretaryW. H. BamfordR. L. DyleM. J. FerlisiE. B. GerlachR. E. Gimple
S. D. Kulat
J. T. Lindberg
W. E. Norris
R. K. Rhyne
J. C. Spanner, Jr.
G. L. Stevens
R. W. Swayne
China International Working Group (BPV XI)
J. H. Liu, ChairY. Nie, Vice ChairC. Ye, Vice ChairM. W. Zhou, SecretaryJ. CaiD. X. ChenH. ChenH. D. ChenY. B. GuoY. HouP. F. HuD. M. KangX. Y. LiangZ. X. LiangS. X. Lin
L. Q. LiuY. LiuW. N. PeiC. L. PengG. X. TangQ. WangQ. W. WangZ. S. WangF. XuZ. Y. XuQ. YinK. ZhangY. ZhangZ. M. ZhongL. L. Zou
Germany International Working Group (BPV XI)
C. A. Spletter, SecretaryH.-R. BathB. HoffmannU. Jendrich
H. SchauX. SchulerJ. Wendt
Subgroup on Evaluation Standards (SG-ES) (BPV XI)
W. H. Bamford, ChairG. L. Stevens, SecretaryH. D. ChungR. C. CipollaG. H. DeBooR. L. DyleB. R. GantaT. J. GriesbachK. HasegawaK. HojoD. N. HopkinsK. Koyama
D. R. LeeY. LiR. O. McGillH. S. MehtaK. MiyazakiR. PaceJ. C. PoehlerS. RanganathD. A. ScarthT. V. VoK. R. WichmanS. X. Xu
Task Group on Evaluation of Beyond Design Basis Events (SG-ES)(BPV XI)
R. Pace, ChairK. E. Woods, SecretaryG. AntakiP. R. DonavinR. G. GiladaT. J. GriesbachH. L. GustinM. Hayashi
K. HojoS. A. KleinsmithH. S. MehtaD. V. SommervilleT. V. VoK. R. WichmanG. M. WilkowskiT. Weaver, Contributing Member
Working Group on Flaw Evaluation (SG-ES) (BPV XI)
R. C. Cipolla, ChairW. H. BamfordM. L. BensonB. BezensekH. D. ChungG. H. DeBooC. M. FaidyB. R. GantaR. G. GiladaH. L. GustinF. D. HayesP. H. HoangK. HojoD. N. HopkinsY. KimK. KoyamaV. LacroixD. R. Lee
Y. LiH. S. MehtaG. A. A. MiessiK. MiyazakiR. K. QashuS. RanganathH. RathbunP. J. RushD. A. ScarthW. L. ServerD.-J. ShimA. UdyawarT. V. VoB. WasilukK. R. WichmanG. M. WilkowskiD. L. Rudland, Alternate
Task Group on Evaluation Procedures for Degraded Buried Pipe(WG-PFE) (BPV XI)
R. O. McGill, ChairS. X. Xu, SecretaryG. AntakiR. C. CipollaG. H. DeBooK. HasegawaK. M. Hoffman
G. A. A. Miessi
M. Moenssens
D. P. Munson
R. Pace
P. J. Rush
D. A. Scarth
Working Group on Operating Plant Criteria (SG-ES) (BPV XI)
T. J. Griesbach, ChairV. Marthandam, SecretaryK. R. BakerW. H. BamfordH. BehnkeT. L. DicksonR. L. DyleA. E. FreedS. R. GosselinM. HayashiS. A. KleinsmithH. S. MehtaA. D. Odell
R. PaceN. A. PalmJ. C. PoehlerS. RanganathW. L. ServerD. V. SommervilleC. A. TomesA. UdyawarT. V. VoD. P. WeaklandK. E. WoodsT. Hardin, Alternate
Working Group on Pipe Flaw Evaluation (SG-ES) (BPV XI)
D. A. Scarth, ChairG. M. Wilkowski, SecretaryW. H. BamfordH. D. ChungR. C. CipollaN. G. CofieJ. M. DavisG. H. DeBooC. M. FaidyB. R. GantaS. R. GosselinL. F. GoyetteC. E. Guzman-LeongK. HasegawaP. H. HoangK. HojoD. N. HopkinsE. J. Houston
K. KashimaY. LiR. O. McGillH. S. MehtaG. A. A. MiessiK. MiyazakiS. H. PelletH. RathbunD. L. RudlandP. J. RushD.-J. ShimA. UdyawarT. V. VoB. WasilukS. X. XuA. Alleshwaram, AlternateM. L. Benson, Alternate
xxvi
Subgroup on Nondestructive Examination (SG-NDE) (BPV XI)
J. C. Spanner, Jr., ChairD. R. Cordes, SecretaryD. AlleyT. L. ChanC. B. CheezemF. E. DohmenD. O. Henry
J. T. LindbergG. A. LofthusG. R. PerkinsS. A. SaboF. J. Schaaf, Jr.R. V. SwainC. J. Wirtz
Working Group on Personnel Qualification and Surface Visual andEddy Current Examination (SG-NDE) (BPV XI)
J. T. Lindberg, ChairJ. E. Aycock, SecretaryS. E. CumblidgeA. DiazN. FarenbaughD. O. Henry
J. W. HoufJ. C. Spanner, Jr.J. T. TimmM. C. WeatherlyM. L. WhytsellC. J. Wirtz
Working Group on Procedure Qualification and VolumetricExamination (SG-NDE) (BPV XI)
G. A. Lofthus, ChairG. R. Perkins, SecretaryM. T. AndersonM. BrileyC. B. CheezemA. D. ChockieD. R. CordesM. DennisS. R. Doctor
F. E. DohmenK. J. HackerD. B. KingD. A. KullC. A. NoveS. A. SaboR. V. SwainS. J. ToddD. K. Zimmerman
Subgroup on Repair/Replacement Activities (SG-RRA) (BPV XI)
E. B. Gerlach, ChairE. V. Farrell, Jr., SecretaryJ. F. BallS. B. BrownR. E. CantrellR. ClowP. D. FisherR. E. GimpleD. R. GrahamR. A. HermannK. J. KarwoskiR. D. Kerr
S. L. McCracken
B. R. Newton
J. E. O'Sullivan
S. Schuessler
R. R. Stevenson
R. W. Swayne
D. L. Tilly
D. E. Waskey
J. G. Weicks
R. A. Yonekawa
E. G. Reichelt, Alternate
Working Group on Welding and Special Repair Processes (SG-RRA)(BPV XI)
D. E. Waskey, ChairD. J. Tilly, SecretaryR. E. CantrellS. J. FindlanP. D. FisherM. L. HallR. A. HermannK. J. Karwoski
C. C. Kim
S. L. McCracken
D. B. Meredith
B. R. Newton
J. E. O'Sullivan
R. E. Smith
J. G. Weicks
Working Group on Nonmetals Repair/Replacement Activities(SG-RRA) (BPV XI)
J. E. O'Sullivan, ChairS. Schuessler, SecretaryM. T. AudrainJ. Johnston, Jr.T. M. Musto
S. PattersonB. B. RajiF. J. Schaaf, Jr.Z. J. Zhou
Task Group on Repair by Carbon Fiber Composites(WGN-MRR) (BPV XI)
J. E. O'Sullivan, ChairJ. W. CollinsM. GollietL. S. GordonT. JimenezG. M. LupiaM. P. Marohl
R. P. OjdrovicD. PegueroA. PridmoreB. B. RajiC. W. RowleyV. RoyJ. Wen
Working Group on Design and Programs (SG-RRA) (BPV XI)
R. Clow, ChairA. B. Meichler, SecretaryO. BhattyS. B. BrownJ. W. CollinsL. R. CorrR. R. CroftE. V. Farrell, Jr.E. B. Gerlach
D. R. Graham
G. F. Harttraft
T. E. Hiss
H. Malikowski
M. A. Pyne
R. R. Stevenson
R. W. Swayne
R. A. Yonekawa
Subgroup on Water-Cooled Systems (SG-WCS) (BPV XI)
S. D. Kulat, ChairN. A. Palm, SecretaryJ. M. AgoldV. L. ArmentroutJ. M. BoughmanS. T. ChesworthA. D. CinsonD. D. DavisH. Q. DoE. L. Farrow
M. J. Ferlisi
P. J. Hennessey
D. W. Lamond
A. McNeill III
T. Nomura
G. C. Park
J. E. Staffiera
H. M. Stephens, Jr.
R. Turner
Task Group on High Strength Nickel Alloys Issues (SG-WCS) (BPV XI)
R. L. Dyle, ChairB. L. Montgomery, SecretaryW. H. BamfordP. R. DonavinR. E. GimpleR. HardiesK. KoyamaM. LashleyH. Malikowski
S. E. Marlette
G. C. Park
J. M. Shuping
J. C. Spanner, Jr.
K. B. Stuckey
E. J. Sullivan, Jr.
B. C. Thomas
D. P. Weakland
Working Group on Containment (SG-WCS) (BPV XI)
J. E. Staffiera, ChairH. M. Stephens, Jr., SecretaryP. S. GhosalH. T. HillR. D. HoughB. LehmanJ. A. Munshi
D. J. Naus
A. A. Reyes-Cruz
E. A. Rodriguez
M. Sircar
S. G. Brown, Alternate
T. J. Herrity, Alternate
xxvii
Working Group on Inspection of Systems and Components(SG-WCS) (BPV XI)
J. M. Agold, ChairN. Granback, SecretaryR. W. BlydeC. Cueto-FelguerosoR. E. DayH. Q. DoM. J. FerlisiK. W. Hall
K. M. Hoffman
S. D. Kulat
A. Lee
T. Nomura
J. C. Nygaard
R. Rishel
G. J. Navratil, Alternate
Task Group on Optimization of Ultrasonic Evaluation Requirements(WG-ISC) (BPV XI)
M. J. Ferlisi, ChairK. W. HallD. O. HenryK. M. Hoffman
B. L. MontgomeryG. J. NavratilM. OrihuelaJ. C. Poehler
Working Group on Pressure Testing (SG-WCS) (BPV XI)
D. W. Lamond, ChairJ. M. Boughman, SecretaryD. AlleyY.-K. ChungJ. A. Doughty
R. E. HallA. E. KeyserJ. K. McClanahanB. L. MontgomeryS. A. Norman
Task Group on Buried Components Inspection and Testing(WG-PT) (BPV XI)
D. W. Lamond, ChairJ. M. Boughman, SecretaryM. Moenssens, SecretaryC. BlackwelderG. C. CokerR. E. DayR. Hardies
T. Ivy
A. Lee
G. M. Lupia
J. Ossmann
M. A. Richter
D. Smith
Working Group on Risk-Informed Activities (SG-WCS) (BPV XI)
M. A. Pyne, ChairS. T. Chesworth, SecretaryJ. M. AgoldC. Cueto-FelguerosoH. Q. DoR. FougerousseM. R. GraybealR. HaesslerJ. HakiiK. W. Hall
K. M. Hoffman
S. D. Kulat
D. W. Lamond
R. K. Mattu
A. McNeill III
P. J. O’ReganN. A. Palm
D. Vetter
J. C. Younger
Special Working Group on Editing and Review (BPV XI)
R. W. Swayne, ChairC. E. MoyerK. R. Rao
J. E. StaffieraD. J. TillyC. J. Wirtz
Special Working Group on Nuclear Plant Aging Management(BPV XI)
B. R. Snyder, ChairA. B. Meichler, SecretaryT. M. AnselmiS. AsadaD. V. BurgessY.-K. ChungD. D. DavisR. L. Dyle
A. L. Hiser, Jr.R. E. NickellK. SakamotoW. L. ServerR. L. TurnerG. G. YoungZ. ZhongM. Srinivasan, Alternate
Working Group on General Requirements (BPV XI)
R. K. Rhyne, ChairE. J. Maloney, SecretaryJ. F. BallT. L. ChanE. L. Farrow
P. J. HennesseyK. M. HermanR. K. MattuC. E. MoyerR. L. Williams
Special Working Group on Reliability and Integrity ManagementProgram (BPV XI)
F. J. Schaaf, Jr., ChairA. T. Roberts III, SecretaryN. BroomS. R. DoctorJ. FletcherS. R. GosselinN. GranbackJ. GrimmA. B. Hull
D. M. JonesA. L. KrinzmanD. R. LeeR. K. MillerM. N. MitchellR. MorrillT. RoneyR. W. SwayneS. Takaya
JSME/ASME Joint Task Group for System-Based Code (SWG-RIM)(BPV XI)
T. Asayama, ChairK. DozakiM. R. GraybealM. HayashiY. Kamishima
H. MachidaM. MorishitaF. J. Schaaf, Jr.S. TakayaD. Watanabe
COMMITTEE ON TRANSPORT TANKS (BPV XII)
M. D. Rana, ChairN. J. Paulick, Vice ChairT. Schellens, Staff SecretaryA. N. AntoniouP. ChilukuriW. L. GarfieldG. G. KarcherM. Pitts
T. A. RogersS. StaniszewskiA. P. VargheseM. R. WardJ. A. Byers, Contributing MemberR. Meyers, Contributing MemberM. D. Pham, Contributing MemberA. Selz, Contributing Member
Subgroup on Design and Materials (BPV XII)
A. P. Varghese, ChairR. C. Sallash, SecretaryD. K. ChandiramaniP. ChilukuriG. G. KarcherS. L. McWilliamsN. J. PaulickM. D. Rana
T. A. Rogers
A. Selz
M. R. Ward
K. Xu
J. Zheng, Corresponding Member
T. Hitchcock, Contributing Member
M. D. Pham, Contributing Member
xxviii
Subgroup on Fabrication, Inspection, and Continued Service(BPV XII)
M. Pitts, ChairP. Chilukuri, SecretaryW. L. GarfieldD. HayworthK. ManskerG. McRaeO. MuletT. A. RogersM. Rudek
R. C. SallashS. StaniszewskiS. E. Benet, Contributing MemberJ. A. Byers, Contributing MemberA. S. Olivares, ContributingMember
L. H. Strouse, Contributing MemberS. V. Voorhees, ContributingMember
Subgroup on General Requirements (BPV XII)
S. Staniszewski, ChairA. N. AntoniouJ. L. FreilerW. L. GarfieldO. MuletB. Pittel
M. Pitts
T. Rummel
R. C. Sallash
K. L. Gilmore, Contributing Member
L. H. Strouse, Contributing Member
Subgroup on Nonmandatory Appendices (BPV XII)
N. J. Paulick, ChairS. Staniszewski, SecretaryP. ChilukuriD. HayworthK. ManskerS. L. McWilliamsM. PittsT. A. RogersR. C. SallashD. G. Shelton
M. R. WardS. E. Benet, Contributing MemberD. D. Brusewitz, ContributingMember
J. L. Conley, Contributing MemberT. Eubanks, Contributing MemberT. Hitchcock, Contributing MemberA. Selz, Contributing MemberA. P. Varghese, ContributingMember
COMMITTEE ON BOILER AND PRESSURE VESSEL CONFORMITYASSESSMENT (CBPVCA)
P. D. Edwards, ChairL. E. McDonald, Vice ChairK. I. Baron, Staff SecretaryM. Vazquez, Staff SecretaryS. W. CameronJ. P. ChicoineD. C. CookM. A. DeVriesT. E. HansenK. T. LauD. MillerB. R. MorelockJ. D. O'LearyG. ScribnerB. C. TurczynskiD. E. TuttleE. A. WhittleR. V. WielgoszinskiP. Williams
D. Cheetham, Contributing MemberV. Bogosian, AlternateJ. B. Carr, AlternateJ. W. Dickson, AlternateM. B. Doherty, AlternateJ. M. Downs, AlternateB. J. Hackett, AlternateB. L. Krasiun, AlternateP. F. Martin, AlternateK. McPhie, AlternateM. R. Minick, AlternateI. Powell, AlternateR. Pulliam, AlternateR. Rockwood, AlternateR. D. Troutt, AlternateR. Uebel, AlternateJ. A. West, AlternateD. A. Wright, AlternateA. J. Spencer, Honorary Member
COMMITTEE ON NUCLEAR CERTIFICATION (CNC)
R. R. Stevenson, ChairJ. DeKleine, Vice ChairE. Suarez, Staff SecretaryG. GobbiS. M. GoodwinJ. W. HighlandsK. A. HuberJ. C. KraneM. A. LockwoodR. P. McIntyreM. R. MinickL. M. PlanteH. B. PrasseT. E. QuakaC. T. SmithD. M. VickeryC. S. Withers
S. YangS. F. Harrison, ContributingMember
S. Andrews, AlternateV. Bogosian, AlternateP. J. Coco, AlternateP. D. Edwards, AlternateD. P. Gobbi, AlternateK. M. Hottle, AlternateK. A. Kavanagh, AlternateB. G. Kovarik, AlternateM. A. Martin, AlternateM. Paris, AlternateA. Torosyan, AlternateE. A. Whittle, AlternateH. L. Wiger, Alternate
Subcommittee on Safety Valve Requirements (SC-SVR)
D. B. DeMichael, ChairJ. F. Ball, Vice ChairC. E. O’Brien, Staff SecretaryJ. BurgessS. CammeresiJ. A. CoxR. J. DoellingJ. P. Glaspie
S. F. Harrison, Jr.W. F. HartD. MillerB. K. NutterT. PatelZ. WangJ. A. WestR. D. Danzy, Contributing Member
Subgroup on Design (SC-SVR)
D. Miller, ChairC. E. BeairJ. A. ConleyR. J. Doelling
T. PatelJ. A. WestR. D. Danzy, Contributing Member
Subgroup on General Requirements (SC-SVR)
J. F. Ball, ChairG. BrazierJ. BurgessD. B. DeMichael
S. T. FrenchJ. P. GlaspieB. PittelD. E. Tuttle
Subgroup on Testing (SC-SVR)
J. A. Cox, ChairT. BeirneJ. E. BrittS. CammeresiJ. W. DicksonG. D. Goodson
W. F. Hart
B. K. Nutter
C. Sharpe
Z. Wang
A. Wilson
U.S. Technical Advisory Group ISO/TC 185 Safety Relief Valves
T. J. Bevilacqua, ChairC. E. O’Brien, Staff SecretaryJ. F. BallG. Brazier
D. B. DeMichaelD. MillerB. K. NutterJ. A. West
xxix
SUMMARY OF CHANGES
After publication of the 2015 Edition, Errata to the BPV Code may be posted on the ASMEWeb site to provide correctionsto incorrectly published items, or to correct typographical or grammatical errors in the BPV Code. Such Errata shall beused on the date posted.
Information regarding Special Notices and Errata is published by ASME at http://go.asme.org/BPVCerrata.
Changes given below are identified on the pages by a margin note, (15), placed next to the affected area.
The Record Numbers listed below are explained in more detail in “List of Changes in Record Number Order” followingthis Summary of Changes.
Page Location Change (Record Number)
vi List of Sections Revised
viii Foreword (1) Revised(2) New footnote added by errata (13-860)
xi Submittal of TechnicalInquiries to the Boilerand Pressure VesselStandards Committees
In last line of 6(a), URL revised
xiii Personnel Updated
xxx
LIST OF CHANGES IN RECORD NUMBER ORDER
Record Number Change
13-860 In the Foreword, the subtitle has been deleted and replaced with an ANSI disclaimer as a foot-note
xxxi
CROSS-REFERENCING AND STYLISTIC CHANGES IN THE BOILERAND PRESSURE VESSEL CODE
There have been structural and stylistic changes to BPVC, starting with the 2011 Addenda, that should be noted to aidnavigating the contents. The following is an overview of the changes:
Subparagraph Breakdowns/Nested Lists Hierarchy
• First-level breakdowns are designated as (a), (b), (c), etc., as in the past.• Second-level breakdowns are designated as (1), (2), (3), etc., as in the past.• Third-level breakdowns are now designated as (-a), (-b), (-c), etc.• Fourth-level breakdowns are now designated as (-1), (-2), (-3), etc.• Fifth-level breakdowns are now designated as (+a), (+b), (+c), etc.• Sixth-level breakdowns are now designated as (+1), (+2), etc.
Footnotes
With the exception of those included in the front matter (roman-numbered pages), all footnotes are treated as end-notes. The endnotes are referenced in numeric order and appear at the end of each BPVC section/subsection.
Submittal of Technical Inquiries to the Boiler and Pressure Vessel Standards Committees
Submittal of Technical Inquiries to the Boiler and Pressure Vessel Standards Committees has been moved to the frontmatter. This information now appears in all Boiler Code Sections (except for Code Case books).
Cross-References
It is our intention to establish cross-reference link functionality in the current edition and moving forward. To facil-itate this, cross-reference style has changed. Cross-references within a subsection or subarticle will not include the des-ignator/identifier of that subsection/subarticle. Examples follow:• (Sub-)Paragraph Cross-References. The cross-references to subparagraph breakdowns will follow the hierarchy of
the designators under which the breakdown appears.– If subparagraph (-a) appears in X.1(c)(1) and is referenced in X.1(c)(1), it will be referenced as (-a).– If subparagraph (-a) appears in X.1(c)(1) but is referenced in X.1(c)(2), it will be referenced as (1)(-a).– If subparagraph (-a) appears in X.1(c)(1) but is referenced in X.1(e)(1), it will be referenced as (c)(1)(-a).– If subparagraph (-a) appears in X.1(c)(1) but is referenced in X.2(c)(2), it will be referenced as X.1(c)(1)(-a).
• Equation Cross-References. The cross-references to equations will follow the same logic. For example, if eq. (1) ap-pears in X.1(a)(1) but is referenced in X.1(b), it will be referenced as eq. (a)(1)(1). If eq. (1) appears in X.1(a)(1) butis referenced in a different subsection/subarticle/paragraph, it will be referenced as eq. X.1(a)(1)(1).
xxxii
SECTION 1GENERAL
1.01 SCOPE
This portion of the rules is intended to cover generaldescriptions, terminology, and basic fundamentals ofheating boilers, controls, and automatic fuel burningequipment. Because of the wide variety of makes andtypes of equipment in use, it is general in scope.
1.02 USE OF ILLUSTRATIONS
The illustrations used in this Section have been selectedto show typical examples of the equipment referred to inthe text and are not intended to endorse or recommendany one manufacturer’s product; nor are the illustrationsintended to be used as design criteria or as examples ofpreferred configurations of equipment.
1.03 MANUFACTURER’S INFORMATION
For detailed information on any specific unit, the Man-ufacturer’s information should be consulted.
1.04 REFERENCE TO SECTION IV
The boilers discussed in this Section will be those lim-ited to the operating ranges of Section IV, Heating Boilers,of the ASME Boiler and Pressure Vessel Code as follows:
(a) steam boilers for operation at pressure not exceed-ing 15 psi (100 kPa)
(b) hot water heating and hot water supply boilers foroperat ion at pressures not exceeding 160 ps i(1 100 kPa) and/or temperatures not to exceed 250°F(120°C)
1.05 GLOSSARY OF TERMS
For terms relating to boiler design, refer to Section IV,Heating Boilers, Appendix E, Terminology. For terms re-lating to boiler water treatment, refer to 9.12, Glossaryof Water Treatment Terms.
A. Boilers and General Terms
absolute pressure: pressure above zero pressure, the sumof the gage and atmospheric pressures.
accumulator (steam): a pressure vessel containing waterand steam that is used to store the heat of steam foruse at a later period and at some lower pressure.
air purge: the removal of undesired matter by replace-ment with air.
air vent: a valve opening in the top of the highest drum ofa boiler or pressure vessel for venting air. Also a device,manual or automatic, that will effect the removal of airfrom a steam or hot water heating system. It is usually lo-cated at the highest point in the system.
allowable working pressure: the maximum pressure forwhich the boiler was designed and constructed.
altitude gage: a pressure gage calibrated in feet, indicatingthe height of the water in the system above the gage;usually found as combination pressure, altitude, and tem-perature gage.
ambient temperature: the temperature of the air sur-rounding the equipment.
baffle: a plate or wall for deflecting gases or liquids.
base: support for boiler.
beaded tube end: the rounded exposed end of a rolled tubewhen the tube metal is formed over against the sheet inwhich the tube is rolled.
belled tube end: see flared tube end.
bellows seal: a seal in the shape of a bellows used to pre-vent air or gas leakage.
blind nipple: a nipple, or a short piece of piping or tube,closed at one end.
blowdown: the difference between the opening and clos-ing pressures of a safety or safety relief valve.
blowoff valve: a valve or cock in the bottom and/or nearthe water line of a boiler, that, when opened, permits freepassage of scale and sediment during the blowoffoperation.
boiler: a pressure vessel that incorporates a fuel input de-vice or mechanism to heat water for space heating orother purposes or to convert water into steam for usein an external distribution system.
watertube: a boiler in which the tubes contain waterand steam, the heat being applied to the outside surface.