section b - cornwall.gov.uk · section b the steering group prepared a workshop day, which was to...

5
prepared by csa-architects and CPR Regeneration Ref: csa-2225-Tuckingmill Framework-Appendix: 04.02.10 4 Tuckingmill Framework - Appendix 1 “Statement of Community Involvement” Background Information for Workshop Section B The steering group prepared a workshop day, which was to be attended by stakeholders and statutory consultees of the Cornwall Council. A list of invitees was agreed by the steering group. This included landowners, stakeholders and statutory consultees. The format of the workshop was agreed by the steering group. The workshop was hosted by CPR Regeneration. Facilitators from Cornwall Council, West 2 team chaired the workshop groups. Drawers from csa-architects documented the discussions on large plans. Cornwall Council prepared the base drawings for the workshop. Csa-architects prepared a workshop information pack which included background about the previous masterplan for the area and the current proposals for the EW link road. A walk across the framework site before the workshop day was organised by Cornwall Council’s major project team. Workshop attendees were invited the observations and discussions of the site walk were documented and included as background information during the workshop day.

Upload: others

Post on 10-Jun-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Section B - cornwall.gov.uk · Section B The steering group prepared a workshop day, which was to be attended by stakeholders and statutory consultees of the Cornwall Council. A list

prepared by csa-architects and CPR Regeneration Ref: csa-2225-Tuckingmill Framework-Appendix: 04.02.10

4

Tuckingmill Framework - Appendix 1 “Statement of Community Involvement”

Background Information for Workshop

Section B

The steering group prepared a workshop day, which was to be attended by stakeholders and statutory consultees of the Cornwall Council. A list of invitees was agreed by the steering group. This included landowners, stakeholders and statutory consultees.

The format of the workshop was agreed by the steering group. The workshop was hosted by CPR Regeneration. Facilitators from Cornwall Council, West 2 team chaired the workshop groups. Drawers from csa-architects documented the discussions on large plans.

Cornwall Council prepared the base drawings for the workshop. Csa-architects prepared a workshop information pack which included background about the previous masterplan for the area and the current proposals for the EW link road. A walk across the framework site before the workshop day was organised by Cornwall Council’s major project team. Workshop attendees were invited the observations and discussions of the site walk were documented and included as background information during the workshop day.

Page 2: Section B - cornwall.gov.uk · Section B The steering group prepared a workshop day, which was to be attended by stakeholders and statutory consultees of the Cornwall Council. A list

prepared by csa-architects and CPR Regeneration Ref: csa-2225-Tuckingmill Framework-Appendix: 04.02.10

Stak

ehold

er W

orks

hop

5

Tech

nical

Revie

w an

d Dr

aft F

rame

work

Subm

ission

of F

rame

work

to Co

uncil

Form

al Co

nsult

ation

and

Appr

oval

Proc

ess

Publi

c Con

sulta

tion a

nd

Revis

ion of

Fra

mewo

rk

Tuckingmill Framework - Appendix 1 “Statement of Community Involvement” B Background Information for Workshop

B.1. Pre-Workshop Site Walk

5B Background Information for Workshop

Page 3: Section B - cornwall.gov.uk · Section B The steering group prepared a workshop day, which was to be attended by stakeholders and statutory consultees of the Cornwall Council. A list

prepared by csa-architects and CPR Regeneration Ref: csa-2225-Tuckingmill Framework-Appendix: 04.02.10

Stak

ehold

er W

orks

hop

6

Tech

nical

Revie

w an

d Dr

aft F

rame

work

Subm

ission

of F

rame

work

to Co

uncil

Form

al Co

nsult

ation

and

Appr

oval

Proc

ess

Publi

c Con

sulta

tion a

nd

Revis

ion of

Fra

mewo

rk

Tuckingmill Framework - Appendix 1 “Statement of Community Involvement”

B.2. Workshop Information Pack

An information pack was prepared to provide background information for the workshop. This contained more detailed information and key fi xed parameters of the Framework Study Area such as:

• Conservation Area with proposed extension area, World Heritage Site, Site of Special Scientifi c Interest, signifi cant historic buildings

• Topography constraints of steep valley edge, fl at area of warehouses, the high plateau created by Williams Travel, protection issues of mine shafts

• The proposed East-West Link with new roundabout, new bridge, Sustainable Urban Drainage System (SUDS) with open leat and sub road links towards North and South

• The previous Master Plan prepared for Porthia in October 2006, covering a signifi cant part of the Framework Area

Refer to Appendix A and B, where full details of site walk and workshop information pack can be found.

B Background Information for Workshop

Page 4: Section B - cornwall.gov.uk · Section B The steering group prepared a workshop day, which was to be attended by stakeholders and statutory consultees of the Cornwall Council. A list

prepared by csa-architects and CPR Regeneration Ref: csa-2225-Tuckingmill Framework-Appendix: 04.02.10

Stak

ehold

er W

orks

hop

7

Tech

nical

Revie

w an

d Dr

aft F

rame

work

Subm

ission

of F

rame

work

to Co

uncil

Form

al Co

nsult

ation

and

Appr

oval

Proc

ess

Publi

c Con

sulta

tion a

nd

Revis

ion of

Fra

mewo

rk

Tuckingmill Framework - Appendix 1 “Statement of Community Involvement”

B.2. Workshop Information Pack (continued)

B Background Information for Workshop

Page 5: Section B - cornwall.gov.uk · Section B The steering group prepared a workshop day, which was to be attended by stakeholders and statutory consultees of the Cornwall Council. A list

prepared by csa-architects and CPR Regeneration Ref: csa-2225-Tuckingmill Framework-Appendix: 04.02.10

Stak

ehold

er W

orks

hop

8

Tech

nical

Revie

w an

d Dr

aft F

rame

work

Subm

ission

of F

rame

work

to Co

uncil

Form

al Co

nsult

ation

and

Appr

oval

Proc

ess

Publi

c Con

sulta

tion a

nd

Revis

ion of

Fra

mewo

rk

Tuckingmill Framework - Appendix 1 “Statement of Community Involvement”

B.2. Workshop Information Pack (continued)

B Background Information for Workshop