Page 1 of 2 Compressor inspection Mycom SUD-HE / SN: 2053474
SCREW COMPRESSOR INSPECTION REPORT Customer : HOS BV Ref . : Inspection Order : Contact person : Ted Swart Date : Compressor type : Mycom 200 SUD-HE Serial nr : 2053474 Running hours : 30619 Refrigerant : NH3 Type oil : Inspected by :
INSPECTION AND REPAIR SCOPE
Opened compressor for inspection of thrust-bearings , measuring the axial play and the “end-clearence “.
![Page 2: SCREW COMPRESSOR INSPECTION REPORT - HOS BV · Opened compressor for inspection of thrust-bearings , measuring the axial play and the “end-clearence “. Page 2 of 2 Compressor](https://reader033.vdocuments.us/reader033/viewer/2022042111/5e8d086e8243c816c643fe8f/html5/thumbnails/2.jpg)
Page 2 of 2 Compressor inspection Mycom SUD-HE / SN: 2053474
MEASURMENTS AND CLEARENCES
END CLEARENCE male within factory settings female within factory settings RUN OUT ( male shaft ) 0.001 mm THRUST BEARING CONDITON male good , no wear female good , no wear AXIAL PLAY male 0.00 mm female 0.00 mm INDICATOR ASSEMBLY CONDITION working FLANGES PRESENT suction no , compressor mounted on skid discharge no , compressor mounted on skid
TYPE SEAL Double seal in good conditioning. NEW PARTS ADDED TO MACHINE SEAL PARTS LOCKNUTS & WASHERS X THRUSTBEARINGS MAINBEARINGS : O-RING & GASKETS : X BALANCEPISTON & SLEEVE GUIDEBLOCK & PIN PARTS MACHINED & METAL REMOVED LEAKTEST with NITROGEEN X SLIDEVALVE TEST with NITROGEEN PRESSURE X
![Page 3: SCREW COMPRESSOR INSPECTION REPORT - HOS BV · Opened compressor for inspection of thrust-bearings , measuring the axial play and the “end-clearence “. Page 2 of 2 Compressor](https://reader033.vdocuments.us/reader033/viewer/2022042111/5e8d086e8243c816c643fe8f/html5/thumbnails/3.jpg)
Page 3 of 2 Compressor inspection Mycom SUD-HE / SN: 2053474
![Page 4: SCREW COMPRESSOR INSPECTION REPORT - HOS BV · Opened compressor for inspection of thrust-bearings , measuring the axial play and the “end-clearence “. Page 2 of 2 Compressor](https://reader033.vdocuments.us/reader033/viewer/2022042111/5e8d086e8243c816c643fe8f/html5/thumbnails/4.jpg)
Page 4 of 2 Compressor inspection Mycom SUD-HE / SN: 2053474
![Page 5: SCREW COMPRESSOR INSPECTION REPORT - HOS BV · Opened compressor for inspection of thrust-bearings , measuring the axial play and the “end-clearence “. Page 2 of 2 Compressor](https://reader033.vdocuments.us/reader033/viewer/2022042111/5e8d086e8243c816c643fe8f/html5/thumbnails/5.jpg)
Page 5 of 2 Compressor inspection Mycom SUD-HE / SN: 2053474
![Page 6: SCREW COMPRESSOR INSPECTION REPORT - HOS BV · Opened compressor for inspection of thrust-bearings , measuring the axial play and the “end-clearence “. Page 2 of 2 Compressor](https://reader033.vdocuments.us/reader033/viewer/2022042111/5e8d086e8243c816c643fe8f/html5/thumbnails/6.jpg)
Page 6 of 2 Compressor inspection Mycom SUD-HE / SN: 2053474
![Page 7: SCREW COMPRESSOR INSPECTION REPORT - HOS BV · Opened compressor for inspection of thrust-bearings , measuring the axial play and the “end-clearence “. Page 2 of 2 Compressor](https://reader033.vdocuments.us/reader033/viewer/2022042111/5e8d086e8243c816c643fe8f/html5/thumbnails/7.jpg)
Page 7 of 2 Compressor inspection Mycom SUD-HE / SN: 2053474
![Page 8: SCREW COMPRESSOR INSPECTION REPORT - HOS BV · Opened compressor for inspection of thrust-bearings , measuring the axial play and the “end-clearence “. Page 2 of 2 Compressor](https://reader033.vdocuments.us/reader033/viewer/2022042111/5e8d086e8243c816c643fe8f/html5/thumbnails/8.jpg)
Page 8 of 2 Compressor inspection Mycom SUD-HE / SN: 2053474
![Page 9: SCREW COMPRESSOR INSPECTION REPORT - HOS BV · Opened compressor for inspection of thrust-bearings , measuring the axial play and the “end-clearence “. Page 2 of 2 Compressor](https://reader033.vdocuments.us/reader033/viewer/2022042111/5e8d086e8243c816c643fe8f/html5/thumbnails/9.jpg)
Page 1 of 2 Compressor inspection Mycom SUD-HE / SN: 2053500
SCREW COMPRESSOR INSPECTION REPORT Customer : HOS BV Ref . : Inspection Order : Contact person : Ted Swart Date : Compressor type : Mycom 200 SUD-HE Serial nr : 2053500 Running hours : 37639 Refrigerant : NH3 Type oil : Inspected by :
INSPECTION AND REPAIR SCOPE
Opened compressor for inspection of thrust-bearings , measuring the axial play and the “end-clearence “.
![Page 10: SCREW COMPRESSOR INSPECTION REPORT - HOS BV · Opened compressor for inspection of thrust-bearings , measuring the axial play and the “end-clearence “. Page 2 of 2 Compressor](https://reader033.vdocuments.us/reader033/viewer/2022042111/5e8d086e8243c816c643fe8f/html5/thumbnails/10.jpg)
Page 2 of 2 Compressor inspection Mycom SUD-HE / SN: 2053500
MEASURMENTS AND CLEARENCES
END CLEARENCE male within factory settings female within factory settings RUN OUT ( male shaft ) 0.001 mm THRUST BEARING CONDITON male good , no wear female good , no wear AXIAL PLAY male 0.00 mm female 0.00 mm INDICATOR ASSEMBLY CONDITION working FLANGES PRESENT suction no , compressor mounted on skid discharge no , compressor mounted on skid
TYPE SEAL Double seal in good conditioning. NEW PARTS ADDED TO MACHINE SEAL PARTS X LOCKNUTS & WASHERS THRUSTBEARINGS MAINBEARINGS : O-RING & GASKETS : X BALANCEPISTON & SLEEVE GUIDEBLOCK & PIN PARTS MACHINED & METAL REMOVED LEAKTEST with NITROGEEN X SLIDEVALVE TEST with NITROGEEN PRESSURE X
![Page 11: SCREW COMPRESSOR INSPECTION REPORT - HOS BV · Opened compressor for inspection of thrust-bearings , measuring the axial play and the “end-clearence “. Page 2 of 2 Compressor](https://reader033.vdocuments.us/reader033/viewer/2022042111/5e8d086e8243c816c643fe8f/html5/thumbnails/11.jpg)
Page 3 of 2 Compressor inspection Mycom SUD-HE / SN: 2053500
![Page 12: SCREW COMPRESSOR INSPECTION REPORT - HOS BV · Opened compressor for inspection of thrust-bearings , measuring the axial play and the “end-clearence “. Page 2 of 2 Compressor](https://reader033.vdocuments.us/reader033/viewer/2022042111/5e8d086e8243c816c643fe8f/html5/thumbnails/12.jpg)
Page 4 of 2 Compressor inspection Mycom SUD-HE / SN: 2053500
![Page 13: SCREW COMPRESSOR INSPECTION REPORT - HOS BV · Opened compressor for inspection of thrust-bearings , measuring the axial play and the “end-clearence “. Page 2 of 2 Compressor](https://reader033.vdocuments.us/reader033/viewer/2022042111/5e8d086e8243c816c643fe8f/html5/thumbnails/13.jpg)
Page 5 of 2 Compressor inspection Mycom SUD-HE / SN: 2053500
![Page 14: SCREW COMPRESSOR INSPECTION REPORT - HOS BV · Opened compressor for inspection of thrust-bearings , measuring the axial play and the “end-clearence “. Page 2 of 2 Compressor](https://reader033.vdocuments.us/reader033/viewer/2022042111/5e8d086e8243c816c643fe8f/html5/thumbnails/14.jpg)
Page 6 of 2 Compressor inspection Mycom SUD-HE / SN: 2053500
![Page 15: SCREW COMPRESSOR INSPECTION REPORT - HOS BV · Opened compressor for inspection of thrust-bearings , measuring the axial play and the “end-clearence “. Page 2 of 2 Compressor](https://reader033.vdocuments.us/reader033/viewer/2022042111/5e8d086e8243c816c643fe8f/html5/thumbnails/15.jpg)
Page 7 of 2 Compressor inspection Mycom SUD-HE / SN: 2053500
![Page 16: SCREW COMPRESSOR INSPECTION REPORT - HOS BV · Opened compressor for inspection of thrust-bearings , measuring the axial play and the “end-clearence “. Page 2 of 2 Compressor](https://reader033.vdocuments.us/reader033/viewer/2022042111/5e8d086e8243c816c643fe8f/html5/thumbnails/16.jpg)
Page 8 of 2 Compressor inspection Mycom SUD-HE / SN: 2053500
![Page 17: SCREW COMPRESSOR INSPECTION REPORT - HOS BV · Opened compressor for inspection of thrust-bearings , measuring the axial play and the “end-clearence “. Page 2 of 2 Compressor](https://reader033.vdocuments.us/reader033/viewer/2022042111/5e8d086e8243c816c643fe8f/html5/thumbnails/17.jpg)
Page 9 of 2 Compressor inspection Mycom SUD-HE / SN: 2053500