scoping meeting presentation 4 29-13
TRANSCRIPT
NOP Public Scoping Meeting April 29, 2013
Please sign a speaker card to make a comment tonight
Written comments can be turned in today or mailed and must be received by May 15, 2013
Meeting guidelines and format ◦ Purpose of audio recording
2
Project Team Purpose of a Scoping Meeting Project Description Environmental Review Process How do I Comment?
3
San Diego County Water Authority ◦ Kelley Gage , Environmental Project Manager [email protected] ◦ Paul Gebert, Master Plan Project Manager ◦ Dave Chamberlain, Master Plan Project Principal ◦ Gina Molise, Public Affairs Representative
Harvey-Meyerhoff Consulting Group ◦ Jeffrey Harvey, Ph.D. – Environmental Consultant
4
Scoping is part of the California Environmental Quality Act (CEQA) public process
Water Authority to receive input from the public ◦ Comments/Concerns ◦ Ideas for scope and content of the Program
Environmental Impact Report + Project Alternatives Program EIR will be prepared to include public
input received tonight and via written comments
5
Wholesale water agency created by State Legislature in 1944 ◦ 24 member agencies ◦ 36-member board of directors ◦ 3 million people ◦ $188 billion economy
Mission is to provide safe and reliable water supply to member agencies
Service area ◦ 950,000 acres ◦ 97% county’s population
6
Plan facilities to meet regional treated and untreated water demand and supply projections
Optimize the use of existing regional infrastructure
Protect the public’s health, safety and welfare by maintaining a safe and reliable water supply
Develop facility plans that are adaptive to changes in future conditions
7
Near-Term Infrastructure Options 1. ESP San Vicente Pump Station 3rd VFD
and Power Supply 2. System Regulatory Structure 3. System Isolation Valves (Various
Locations) 4. ESP North County Pump Stations 5. Pipelines P3/P4 Switch 6. Asset Management Program (Various
Locations) 7. Mission Trails Flow Regulatory
Structure Long-Range Supply Options 8. Pipeline 6 9. Camp Pendleton Desalination 10. Colorado River Conveyance
2
5 4
1
7
10
9
8
8
Future Planning Studies Description Renewable Energy Optimization Study
This study would evaluate potential opportunities for in-line hydroelectric generation and optimization of Water Authority energy use.
System Vulnerability Assessment This study would evaluate key facilities that are vulnerable to natural and man-made catastrophic events and recommend structural upgrades necessary to maintain system reliability.
System Water Quality Assessment This study will evaluate new facility needs and operating procedures to control nitrification.
9
Master Plan
Identify future facilities needed and associated
emissions
Climate Action Plan
Will add new facilities to baseline emissions
10
• Inventory greenhouse gas (GHG) sources from facilities, buildings, and fleet
• Estimate emission changes over time, including new facilities from Master Plan
• Establish required targets for compliance • Identify mitigation actions to reduce GHGs • Document GHG reduction measures on
feasibility, cost and implementation • Allow for periodic updates
11
• Climate Action Plan will comply with all mandated GHG reduction target requirements and timelines set forth in AB 32 and CEQA • 1990 levels by 2020 (15% reduction from baseline)
• Uncertainty regarding regulatory requirements beyond 2020 • CAP will be updated every 5 years, concurrent with
Master Plan and UWMP • Address changes in future updates
12
Notice of Preparation (NOP) - released for 30-day public review on April 15th ◦ Near-term infrastructure options ◦ Long-range supply options ◦ Future planning studies ◦ Climate Action Plan (CAP) – greenhouse gas
emissions reduction plan Alternatives in PEIR – different groupings of
near-term infrastructure options ◦ Long-range supply options too speculative under
CEQA to be analyzed in this PEIR ◦ CEQA exempts “planning studies” from analysis
13
Aesthetics Agriculture and Forest
Resources Air Quality Biological Resources Cultural Resources Geology and Soils Greenhouse Gas
Emissions Hazards and Hazardous
Materials Hydrology and Water
Quality Land Use and Planning
Mineral Resources Noise Population and Housing Public Services Recreation Transportation/Traffic Utilities and Service
System Other CEQA mandated
analyses including Alternatives, Cumulative Effects and Growth Inducement
14
Date: Description:
April 29, 2013 Public scoping meeting
May 15, 2013 Scoping comment period closes
Sept. 2013 Draft Master Plan/PEIR/CAP release for public review
Oct.-Nov. 2013 Public hearing on draft Master Plan/PEIR/CAP
Feb. 2014 Final PEIR/Master Plan/CAP certification and approval
15
• Oral Comments: ◦ Fill out speaker card ◦ You will have 3 minutes to offer your comments ◦ Comments are being recorded
• Written Comments: ◦ Hand in previously prepared written comments
tonight ◦ Use written comment sheets provided and turn
them in tonight, or ◦ Mail in written comments – all comments must be
received by May 15, 2013 16