scope of work

Upload: surabhi-gupta

Post on 08-Mar-2016

8 views

Category:

Documents


0 download

DESCRIPTION

Professional practice.

TRANSCRIPT

  • Career, Scope of Work and Services in Practice, Condition of Engagement &Fee

  • CareerPracticeEmployment - I PracticeGovernmentBuilder

  • CareerEmployment IIManager of Design and constructionProduct PromotionDesign BuildArchitecture, Interior, Real EstateJournalistAdvisorDesign review, site selection

  • Architect in PracticeScope of workDesignExecution of project

  • DesignConceptualizationArchitecture, Urban Design, Urban Renewal, Interior, ConservationRealizationStructure, Plumbing, Electrical, HVAC, Electronics, Fire detection & fire fighting, Acoustics, Illumination etcSustainabilityLandscape, Renewable energy, Rain water harvesting, conservation of resources

  • Execution of projectSupervision - ICompliance of relevant laws Supervision - IIConstructionCertificationWorksPaymentInterpretationDrawingsContract

  • Scope of servicesProgramme & Feasibility StageDesign BriefSite evaluationDesign stageConcept design & budgetary estimatesEngagement of consultantsDevelopment of designIntegration of engineering and sustainability concepts

  • Scope of servicesStatutory approvalsDrawings and documentsPresentationsTender stageTender drawingsSpecificationsConditions of ContractBill of quantityEstimates

  • Scope of servicesWorking drawing stageIntegration of engineering servicesWorking drawingsConstruction stagePeriodic supervision Report on progressAdvise to clerk of worksCertification of contractors application for payment

  • Scope of servicesPost Construction stageCertification of completion of worksCertification of building drawings

  • Professional FeePercentage of costArea basisLump-sumTime basis

  • Norms for FeeIIA prescription till 1989COA prescription since 1989International practicePrescription a restrictive trade practice ?

  • IIA fee formulaPercentage of costGraduated scaleHigher the cost, lower the fee

  • COA fee FormulaMinimum feePercentage of costOne scaleBut reduction for repetitionDifferent percentage for different type of project

  • International Practice Architect s associations (like IIA) of many countries havePrescribed feeWithdrawn fee prescriptionNo statutory body prescribes fee

  • PrescriptionA Restrictive Trade PracticeNo weightage to creativityNo weightage to experienceProfessional may exploit the situationViolates the monopolies & restrictive trade practicesDefeats the concept of competitiveness of a market