SCIENCE & TECHNOLOGY
CONFERENCE
ARMY REPRESENTATIVE
Mr. Eugene Crostley
CHIEF, CECOM SEC, FSSEC
DSN: 639-3350
COM: 580 442-3350
Email: [email protected]
Date: 7-9 AUG 2001
IV V
CMM CMM-I
NOV 1997 JAN 2003
BACKGROUNDBACKGROUND
39 YEARS GOV’T SERVICE
30 YEARS CIVIL SERVICE FIELD ARTILLERY TACTICAL DATA SYSTEMS
25 YRS MANAGEMENT – (FIRE SUPPORT SWE CENTER) 5 YRS COMPUTER SPECIALIST - (TACFIRE OS)
(FT. SILL, FT. BELVOIR)
9 YEARS MILITARY SUPPLY, FINANCE, LOGISTICS, PERSONNEL
4 YRS - COMPUTER SYSTEMS PROGRAMMER (IBM OS) 3 YRS - COMPUTER OPERATOR/PROGRAMMER 2 YRS - PUNCH CARD MACHINE OPERATOR
(GERMANY, FRANCE, OKINAWA, FT. POLK/BELVOIR)
FSSECOST - SCHEDULE - PERFORMANCE
FSSECOST - SCHEDULE - PERFORMANCE
TRANSITIONED 15 TACTICAL SYSTEMS, 5 UNIQUE PSE’s
DEVELOPED 27 NEW SUPPORT SYSTEMS, 68 MAJOR SOFTWARE VER
DEVELOPED 12 FS PACKAGES, 120 MAJOR SOFTWARE VERSIONS
DEVELOPED 218 VERSIONS, 10,527,648 LOC, USING 9 LANGUAGES
DEVELOPED 11 NEW TACTICAL SYSTEMS, 19 SPECIAL PURPOSE
NEVER MISSED A DELIVERY SCHEDULE
NEVER OVERRAN BUDGET
NEVER IMPACTED A WEAPON, MUNITION, PROPELLANT, COMP SYS
COMMAND & CONTROL FIRE DIRECTION FIRE CONTROL ACQUISITION SYSTEMS
PALADIN(AFCS)
TACTICAL AIRNAVAL GUN FIRE
MLRS(FCS)
FDDM
ATACMSSPAPS
BATTALIONBATTERYPLATOON
CORPS
MLRS-FMS
OBSERVATION(AERIAL/GROUND)
FIST DMDTFDMDFO-CC
FOS
CANNONS(GDU)
MDS
MMS
PLATOONBATTERY
IFSAS
ATHS
FIREFINDER
AFATDS
FO-MSR
DIVARTYFA BRIGADE
BATTALION
Q36Q37V8
LTACFIRE
BATTALIONBATTERY
IMBC
FIRE SUPPORTSYSTEM OF SYSTEMS
FIRE SUPPORTSYSTEM OF SYSTEMS
FIRE SUPPORT PACKAGE DEVELOPMENT
FIRE SUPPORT PACKAGE DEVELOPMENT
RCM SRR RIPR TIPR RIPR TIPR RIPR TIPR TRR
INCREMENT 3SA SD DC
PROJECTPLANNING
SYS REQUIREMENTSANANYSIS & DESIGN
DETAILEDPLANNING
INCREMENT 1SA SD DC
INCREMENT 2SA SD DC
FINALIZATION FQT 1 YR - FIELDINGTOOLS TEST TOOLS TEST TOOLS TEST
1 2 3 4 5 6 7 8 9 10 11 12 13 1514 16 17 18 19 2120 22 23 24
IFSAS
MLRS
BCS
FOS
MMS
ATACMS
FF-Q37
FF-V8
CTS INCREMENT 3SA SD DC
PROJECTPLANNING
SYS REQUIREMENTSANANYSIS & DESIGN
DETAILEDPLANNING
INCREMENT 1SA SD DC
INCREMENT 2SA SD DC
FINALIZATION FQT 1 YR - FIELDINGTOOLS TEST TOOLS TEST TOOLS TEST
INCREMENT 3SA SD DC
PROJECTPLANNING
SYS REQUIREMENTSANANYSIS & DESIGN
DETAILEDPLANNING
INCREMENT 1SA SD DC
INCREMENT 2SA SD DC
FINALIZATION FQT 1 YR - FIELDINGTOOLS TEST TOOLS TEST TOOLS TEST
INCREMENT 3SA SD DC
PROJECTPLANNING
SYS REQUIREMENTSANANYSIS & DESIGN
DETAILEDPLANNING
INCREMENT 1SA SD DC
INCREMENT 2SA SD DC
FINALIZATION FQT 1 YR - FIELDINGTOOLS TEST TOOLS TEST TOOLS TEST
INCREMENT 3SA SD DC
PROJECTPLANNING
SYS REQUIREMENTSANANYSIS & DESIGN
DETAILEDPLANNING
INCREMENT 1SA SD DC
INCREMENT 2SA SD DC
FINALIZATION FQT 1 YR - FIELDINGTOOLS TEST TOOLS TEST TOOLS TEST
INCREMENT 3SA SD DC
PROJECTPLANNING
SYS REQUIREMENTSANANYSIS & DESIGN
DETAILEDPLANNING
INCREMENT 1SA SD DC
INCREMENT 2SA SD DC
FINALIZATION FQT 1 YR - FIELDINGTOOLS TEST TOOLS TEST TOOLS TEST
INCREMENT 3SA SD DC
PROJECTPLANNING
SYS REQUIREMENTSANANYSIS & DESIGN
DETAILEDPLANNING
INCREMENT 1SA SD DC
INCREMENT 2SA SD DC
FINALIZATION FQT 1 YR - FIELDINGTOOLS TEST TOOLS TEST TOOLS TEST
INCREMENT 3SA SD DC
PROJECTPLANNING
SYS REQUIREMENTSANANYSIS & DESIGN
DETAILEDPLANNING
INCREMENT 1SA SD DC
INCREMENT 2SA SD DC
FINALIZATION FQT 1 YR - FIELDINGTOOLS TEST TOOLS TEST TOOLS TEST
INCREMENT 3SA SD DC
PROJECTPLANNING
SYS REQUIREMENTSANANYSIS & DESIGN
DETAILEDPLANNING
INCREMENT 1SA SD DC
INCREMENT 2SA SD DC
FINALIZATION FQT 1 YR - FIELDINGTOOLS TEST TOOLS TEST TOOLS TEST
FF-V8-TD
FF-Q37-TD INCREMENT 3SA SD DC
PROJECTPLANNING
SYS REQUIREMENTSANANYSIS & DESIGN
DETAILEDPLANNING
INCREMENT 1SA SD DC
INCREMENT 2SA SD DC
FINALIZATION FQT 1 YR - FIELDINGTOOLS TEST TOOLS TEST TOOLS TEST
INCREMENT 3SA SD DC
PROJECTPLANNING
SYS REQUIREMENTSANANYSIS & DESIGN
DETAILEDPLANNING
INCREMENT 1SA SD DC
INCREMENT 2SA SD DC
FINALIZATION FQT 1 YR - FIELDINGTOOLS TEST TOOLS TEST TOOLS TEST
MILESTONES
P11 NSTT
NFDD FDC
CERT
DCX1 DCX2 MACS REQUIRED CCX
VERSION 12
NSTT
8.X
NSTT
NSTT
NSTT
ABCS
7.X NSTT
FY04 FY05 FY06 FY07 FY08FY034321 4321 4321 43214321 4321 4321 43214321
FY00 FY01 FY02FY00
FY00 FY01 FY02 FY03 FY04 FY05 FY06 FY07 FY081 2 3 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 44 1 2 3 4
FIRE SUPPORTMILESTONES & EVENTS
FIRE SUPPORTMILESTONES & EVENTS
AFATDSTRANSITION
6.2X
7.X
8.X
9.X 10.X
11.X
9.X
10.X NSTT
12.X
FS VERSION – 11
FS VERSION – 12
FS VERSION - 7
FS VERSION - 8
FS VERSION - 9
FS VERSION - 10
FS VERSION - 11
FS VERSION - 12
12.X
.X
11.X
15 ORGANIZATIONAL OPERATIONS13 SOFTWARE ENGINEERING
7 TESTING14 CONFIGURATION MANAGEMENT
1 SOFTWARE QUALITY ASSURANCE8 SECURITY7 TRAINING
20 LOGISTICS AND OFFICE AUTOMATION15 BUDGET AND ADMINISTRATION
GOVERNMENT OWNS THE PROCESS
PROCESSPOLICIES, PROCEDURES, AND STANDARDS (PPS)
PROCESSPOLICIES, PROCEDURES, AND STANDARDS (PPS)
100 TOTAL PPS’s
COST & RISK DRIVERSCOST & RISK DRIVERS
REQUIREMENT VOLATILITY FUNDING INSTABILITY HARDWARE CHANGE TECHNOLOGY TRANSFER
CONTINUOUS RE-PLANNINGCONTINUOUS RE-PLANNING
MULTIPLE FUNDING CUTS CHANGING REQUIREMENTS HARDWARE BEING ADDED/MODIFIED
CRITICAL ITEM DELAYS EXTERNAL SYSTEM DELAYS/SLIPS
IMPACTSIMPACTS
EFFECTS SCHEDULES DRIVES UP COST INCREASES RISK EFFECTS QUALITY WASTES EFFORT
REQUIREMENT VOLATILITY
REQUIREMENT VOLATILITY
REQUIREMENT VOLATILITY• MULTIPLE SOURCES OF REQUIREMENTS• UNCOORDINATED REQUIREMENTS• INCONSISTENT UNDERSTANDING OF REQ.• INTEROPERABILITY CHANGES• REQUIREMENT INSTABILITY (ADD,MOD,DEL)• LATE REQ. INTRODUCED THROUGHOUT DEVELOPMENT
IMPACT• INTEROPERABILITY PROBLEMS ARE IDENTIFIED LATE• LATE CHANGES & REDESIGN INCREASES RISK EFFECTS QUALITY • SCHEDULES GET COMPRESSED, END DATE DOESN’T MOVE• MULTIPLE SYSTEMS IMPACTED• INDIVIDUAL SYSTEM TESTS ARE REDUCED• INSUFFICIENT TIME TO CONDUCT INTEROP TESTING
UNVERIFIED HARDWARE CHANGES
UNVERIFIED HARDWARE CHANGES
HARDWARE• NEW OFF-THE-SHELF HARDWARE
• NEWLY DEVELOPED HARDWARE
• CHANGED HARDWARE COMPONENTS
PROBLEM• INTRODUCED WITHOUT ADEQUATE VERIFICATION
IMPACT• RESOURCES DIVERTED TO CHANGE LEGACY SYSTEMS
FUNDING INSTABILITYFUNDING INSTABILITY
FUNDING• OMA FUNDED
• CUSTOMER FUNDED FOR CUSTOMER CHANGES
PROBLEM• MULTI-YEAR DEVELOPMENT - SINGLE YEAR FUNDING
• CUTS ARE TOO OFTEN AND TOO DEEP
• UNPLANNED CHANGES ARE OUT OF HIDE
• NO DISCRETIONARY FUNDING
IMPACT• CONTINUOUS RE-PLANNING
FY94-09 - OMA Required FY 96 FY 97 FY 98 FY 99 FY 00 FY 01 FY 02 FY 03 FY 04 FY 05 FY 06 FY 07 FY 08 FY 09
IFSAS 4965.00 4213.00 3821.50 4310.30 4971.20 5559.00 5225.00 BCS 3404.00 3052.00 2649.10 3536.60 3781.60 3715.00 4223.00 MLRS 4734.00 4134.00 4008.70 4428.20 4703.00 4917.00 4685.00 ATACMS 292.00 137.00 178.00 333.00 381.20 858.00 787.00 FOS 3402.00 3080.00 3191.00 3576.10 4213.10 4733.00 5058.00 FF-Q37 2153.00 1706.00 1830.30 1590.60 1869.70 3523.00 3633.00 FF-V8 1129.00 1177.00 1311.60 1518.00 1815.00 2205.00 2957.00 FF-TD 563.00 587.00 587.70 586.30 758.40 918.00 837.00 MMS 537.00 638.00 644.10 787.90 1060.10 1181.00 1402.00 LTACFIRE | FF-Q37-TD 2965.00 3135.00 2368.80 1526.40 366.40 0.00 0.00FF-Q36 | AFATDS 2050.00 1654.00 1588.70 1503.00 1768.30 0.00 0.00MDS 536.00 543.00 0.00 0.00 BCS-29 113.00 0.00 0.00 0.00 TF-BCD 113.00 0.00 0.00 0.00 TF-BN | REQ 0.00 0.00 0.00 29827.00 25260.00 26140.00 21237.00 19504.00 43086.79 38694.20 TOTAL 26956.00 24056.00 22179.50 23696.40 25688.00 27609.00 28807.00 29827.00 25260.00 26140.00 21237.00 19504.00 43086.79 38694.20
FY94-09 - OMA Funded FY 96 FY 97 FY 98 FY 99 FY 00 FY 01 FY 02 FY 03 FY 04 FY 05 FY 06 FY 07 FY 08 FY 09
IFSAS 4803.00 4376.00 3073.00 3017.20 4759.00 4296.90 3169.87 BCS 3293.00 3171.00 2129.90 2475.60 3619.00 2894.00 2572.01 MLRS 4580.00 4294.00 3223.40 2742.70 4501.00 3830.70 2847.76 ATACMS 282.00 142.00 143.10 233.10 365.00 668.50 509.27 FOS 3291.00 3200.00 2565.70 2503.30 4032.00 3687.30 3314.99 FF-Q37 2083.00 1773.00 1471.40 1113.40 1789.00 2744.80 2177.36 FF-V8 1092.00 1222.00 1054.60 1062.60 1737.00 1717.70 2135.86 FF-TD 544.00 610.00 472.80 410.40 726.00 714.90 569.31 MMS 519.00 662.00 517.90 551.50 1015.00 920.20 878.57 LTACFIRE | FF-Q37-TD 2868.00 3134.00 1904.80 1425.50 0.00 0.00 0.00FF-Q36 | AFATDS 1983.00 1718.00 1277.60 1052.10 0.00 0.00 0.00MDS 518.00BCS-29 0.00TF-BCD 0.00TF-BN | PBG 28312.00 24450.00 25227.00 6317.00 2347.00 TOTAL 25856.00 24302.00 17834.20 16587.40 22543.00 21475.00 18175.00 28312.00 24450.00 25227.00 6317.00 2347.00 0.00 0.00
FY94-09 - OMA Cut FY 96 FY 97 FY 98 FY 99 FY 00 FY 01 FY 02 FY 03 FY 04 FY 05 FY 06 FY 07 FY 08 FY 09
IFSAS 162.00 163.00 748.50 1293.10 212.20 1262.10 2055.13 BCS 111.00 119.00 519.20 1061.00 162.60 821.00 1650.99 MLRS 154.00 160.00 785.30 1685.50 202.00 1086.30 1837.24 ATACMS 10.00 5.00 34.90 99.90 16.20 189.50 277.73 FOS 111.00 120.00 625.30 1072.80 181.10 1045.70 1743.01 FF-Q37 70.00 67.00 358.90 477.20 80.70 778.20 1455.64 FF-V8 37.00 45.00 257.00 455.40 78.00 487.30 821.14 FF-TD 19.00 23.00 114.90 175.90 32.40 203.10 267.69 MMS 18.00 24.00 126.20 236.40 45.10 260.80 523.43 LTACFIRE | FF-Q37-TD 97.00 1.00 464.00 100.90 366.40 0.00 0.00FF-Q36 | AFATDS 67.00 64.00 311.10 450.90 1768.30 0.00 0.00MDS 18.00 BCS-29 113.00 TF-BCD 113.00 TF-BN | REQ-PBG 1515.00 810.00 913.00 14920.00 17157.00 TOTAL $ CUT (000) 1100.00 789.00 4345.30 7109.00 3145.00 6134.00 10632.00 1515.00 810.00 913.00 14920.00 17157.00 0.00 0.00 TOTAL % CUT -4% 3% -20% -30% -12% -22% -37% -5% -3% -3% -70% -88%
FY94-09 - IMPACT FY 96 FY 97 FY 98 FY 99 FY 00 FY 01 FY 02 FY 03 FY 04 FY 05 FY 06 FY 07 FY 08 FY 09
POSITIONS CUT 63 118PERSONNEL LAYOFF 24 16 96SCHEDULE SLIP 12 24REQ. REDUCED 0REQ. REJECTED 4
TECHNOLOGY TRANSFERPROBLEM
TECHNOLOGY TRANSFERPROBLEM
LEGACY SYSTEMS• OLD TECHNOLOGY (ADA 83)• SCO OPERATING SYSTEM VER 5.02• REACH SIZE LIMITATIONS (DISK, MEMORY, SPEED)
REUSE COMPONENTS• NO ADA 95 COMPILER FOR SCO OPERATING SYSTEM• COMPONENTS TOO LARGE FOR LEGACY REUSE• NO FUNDING TO UPGRADE LEGACY SYSTEM HDW/SW
IMPACT• UNABLE TO REDUCE COST & RISK THROUGH REUSE
AUTOMATED TEST ENVIRONMENT
AUTOMATED TEST ENVIRONMENT
AUTOMATED BALLISTICS TEST AND VERIFICATION SYSTEM
AUTOMATED REGRESSION TEST AND VERIFICATION SYSTEM
AUTOMATED INTEROP TEST AND VERIFICATION SYSTEM
AUTOMATED EFFECTS TEST AND VERIFICATION SYSTEM
AUTOMATED STRESS TEST SYSTEM
AUTOMATED TIMING TEST SYSTEM
S&T RECOMMENDATIONSS&T RECOMMENDATIONS
FORMAL PROCESS FOR MANAGING REQUIREMENTS FOR SOFTWARE BLOCKS
FORMAL PROCESS FOR MANAGING FUNDING
FOR SOFTWARE BLOCKS
FORMAL PROCESS FOR VALIDATING HARDWARE