Digital Control System for Electrical applicationPACiS

Alain Roux

Sibiu, May 2009

South Europe Sales ManagerBogdan Ianculescu

Commercial Manager Romania

Page 3: Sas-Sistem de control

PACiS Application markets

UTILITIESSUBSTATIONS

INDUSTRIALPLANTS

> PACiS short EN – 20/05/08- Issue H3 3

DISTRIBUTEDGENERATION INFRA-

STRUCTURES

Page 4: Sas-Sistem de control

PACiS : First IEC61850 Solution

2002 PACiS projects

More than 509 PACiS since 2002

2003 PACiS projects 2007 PACiS projects

2006 PACiS projects

2005 PACiS projects

2004 PACiS projects 2008 PACiS projects

> PACiS short EN – 20/05/08- Issue H4 4

Page 5: Sas-Sistem de control

PACiS Application Areas

300 V upto 800 kV

GREEN FIELD & RETROFIT

FAST LOAD SHEDDING,VOLTAGE REGULATION,

SYNCHRO-CHECK

> PACiS short EN – 20/05/08- Issue H5 5

AIS & GIS

INDOOR & OUTDOOR

�AREVA TURNKEY

& LOOSE DELIVERY

Page 6: Sas-Sistem de control

Introducing PACiS: Concepts

SCALABLE SOLUTIONScope, Functions, Architecture, Engineering

> PACiS short EN – 20/05/08- Issue H6 6

HIGH STANDARDIZATIONLEVEL

Communication, Bay/Substation, Services

DEDICATED TO POWER AUTOMATION

Security, Topological automation, Smooth evolutions, Outage optimization

Page 7: Sas-Sistem de control

PACiS: A scalable solution

�Network

�Site

�Substation

� M + C + P +

Power

Management

SCOPE FUNCTIONS

> PACiS short EN – 20/05/08- Issue H7 7

�Substation

�Voltage level

�Busbar

�Bay

� M + C +

Protection

� M + Control

� Monitoring

Page 8: Sas-Sistem de control

High standardization level

�Communications� IEC 61850, IEC60870-5-101,103, 104,

DNP3 & DNP3/IP, MODBUS

�Automation Schemes

> PACiS short EN – 20/05/08- Issue H8 8

�Automation Schemes� IEC 61131-3

�Engineering & Service

Lifetime Cost & Lead Time optimization

Page 9: Sas-Sistem de control

Introducing PACiS: Components

IEDsProtections, Computers, Measurement

> PACiS short EN – 20/05/08- Issue H9 9

SOFTWAREEngineering tools, SCADA

COMMUNICATIONSwitches, Gateways

Page 10: Sas-Sistem de control

AN UNRIVALED IEDs BASIS

MiCOM C264/C264P: Bay Computer, RTU,Feeder Protection, Automatic Voltage Regulator

MiCOM A300 : Solid State PC

> PACiS short EN – 20/05/08- Issue H10 10

Feeder Protection, Automatic Voltage Regulator

MiCOM Mxxx: Measurement & DisturbanceRecorders

MiCOM Hxxx: Manageable Ethernet Switchs

MiCOM Pxxx: Protection Relays

MiCOM Txxx: Telecoms units

Page 11: Sas-Sistem de control

MiCOM A300 : PACiS GATEWAYS

Ensure data exchange with the EMS� Serial and Ethernet ports

� Integrated Ethernet switch

� Hot stand-by redundancy

� Fully configured within PACiS SCE

> PACiS short EN – 20/05/08- Issue H11 11

� Fully configured within PACiS SCE

� PC base solutionwithout rotating part (XPe)

� Fully compliant with Electricalinstallation constraints(IEC 60255 & IEC 1004)

Give the right information to the process

Page 12: Sas-Sistem de control

MiCOM Hxx MANAGEABLE ETHERNET SWITCHES

Complete MiCOM H range � All Ethernet network architecture

� Star, � Redundant ring� Dual attachment

� SNMP management features� Single and multi-mode 10/100 Mbps

> PACiS short EN – 20/05/08- Issue H12 12

� Single and multi-mode 10/100 Mbps� DIN- rail case with redundant

power supply 24/48/60/110/220 Vcc �Fully compliant with Electrical

installation constraints (IEC 60255 & IEC 1004)

�Also as a PCI board (PC integration) or board for C264

Benefit from the protection relay world reliability

Page 13: Sas-Sistem de control

MiCOM C264: The Bay Computer

� Bay controller� IEDs gateway� RTU/Gateway� Data Concentrator� PLC� MV Feeder Protection� SER Events recorder

> PACiS short EN – 20/05/08- Issue H13 13

MiCOM C264 modular bay computer hasthe same design as the MiCOM relay series.

� SER Events recorder� Waveform/Disturbance

recorder� Automatic Voltage

Regulator� Ethernet switch

Page 14: Sas-Sistem de control

MiCOM C264 Communications

� Up to 6 Ethernet Ports FX or TX

� Single star

� Redundant ring

� Dual star (double attachment)

� SCADA communication :IEC 61850 Server, IEC 60870-5-104, DNP3.0 Level 3/TCP, MODBUS RTU/TCP

� IED communication :IEC 61850 Client

> PACiS short EN – 20/05/08- Issue H14 14

� Up to 4 Serial Communication Ports (Master or Slave Selectable)

� SCADA communication :IEC 60870-5-101, DNP3.0 Level 3, MODBUS RTU, HNZ

� IED legacy communication :IEC 60870-5-103, Modbus RTU, IEC 60870-5-101, DNP3.0 Level 2

� Local Event printer

Page 15: Sas-Sistem de control

MiCOM C264P : MV Feeder protection

�IEC 61850 MV Feeder OBS�1 ms time tagging�Dedicated Protection CPU�IED Data Concentrator�PLC IEC61131-3

Busbar

Trip

Earth CT

Phase CTs

1 Phase BB VT

67N

81O

MiCOM C264-P

Logic outputs

Logic inputs

59N

81U

37

50

79

50N51N67

52

Analog inputs

> PACiS short EN – 20/05/08- Issue H15 15

�PLC IEC61131-3�SER Events recorder�Disturbance

recorder�Embedded Ethernet switch

Earth CT

Legacy comm.

67N

2732NRS 485/RS232/RS42250

51

50BF

IEC61850

81R

46

59

Analog outputs

3 PhasesVTs

MiCOM C264P MV OBS has the same IOs boardsas the MiCOM C264

Page 16: Sas-Sistem de control

�70 series: M871, M872 (modular) M571, M572 (compact)

Network monitoring solution

Recording � Disturbance

� Trend

� Power Quality

� Measures

� Transducer

� SCADA interface

> PACiS short EN – 20/05/08- Issue H16 16

�Analysis and management softwareDatabase records management, record analysis, report generation.

� SCADA interface

Page 17: Sas-Sistem de control

� Measurement Centres. M2x3 Range

�MiCOM M233 – Basic Measurement centre

Measurement Centres

� Measures

� Tariff registers

� Digital display

MMC

> PACiS short EN – 20/05/08- Issue H17 17

�MiCOM M243 and M253 : Measurement Centre with embedded limited recording functions.

MMC

� Measures

� Tariff register

� Recording

� Digital and graphic display

Page 18: Sas-Sistem de control

MiCOM P portfolioP900 Frequency Protection Relay

P800 Autoreclose Relays

P700 Busbar Protection Relays

P600 Transformer Protection

P500 Line Differential Relays

P400 Distance Protection Relays

> PACiS short EN – 20/05/08- Issue H18 18

P100 Feeder Management Relays

P400 Distance Protection Relays

P300 Generator Protection Relay

P200 Universal Motor Protection

Generation Transmission Distribution Indep.producer

Page 19: Sas-Sistem de control

MiCOM Relays

P630

Generation

Transmission

Industry

P220P120

P240

P140

P340P940 P920

P540 P140P440

P630

P340

P139

P740

> PACiS short EN – 20/05/08- Issue H19 19

MiCOM realys cover all areas of the power system

Low Voltage

Distribution

Home

P120

P140

P630

P130

P210

P110

Page 20: Sas-Sistem de control

MiCOM Relays Hardware & Software Platform

Feeder Feeder Motor Motor GeneratorGenerator FreqFreqDistanceDistance IIDiff.Diff.

Transf. Transf. Diff.Diff.

B.B.B.B.Diff.Diff.

CBF CBF

61850 61850 61850 61850

> PACiS short EN – 20/05/08- Issue H20 20

P 14x P 24x

P 22x

P 94x

P 13x

P 34x

P 12x P 92xP 22x

P 44x

P 43x

P 54x

Px20

P 63x

P 52x

P 74x

P 82x

P 64x

P 72x

P 84x

61850 61850 61850

61850 6185061850

Page 21: Sas-Sistem de control

MiCOM Telecom Solutions

RTUdistance protection

Differential protection

RTUdistance protection

Differential protectionTeleprotection TeleprotectionPLC T390

Ethernet Subs bus

Ethernet Subs bus

� Universal Power Line carrier MiCOM T390

� Multiplexers, Tele-protections DCX5000, DIP 5000

� Telecom Management system

> PACiS short EN – 20/05/08- Issue H21 21

SDH

Telecom Management MUX MUX

Page 22: Sas-Sistem de control

Introducing PACiS: Components

IEDsProtections, Computers, Measurement

> PACiS short EN – 20/05/08- Issue H22 22

SOFTWAREEngineering tools, SCADA

COMMUNICATIONSwitches, Gateways

Page 23: Sas-Sistem de control

PACiS software

�Local Human Machine Interface :

� PACiS OI single or redundant servers

� Up to 8 PACiS OI local or remote clients

> PACiS short EN – 20/05/08- Issue H23 23

�Engineering tools :

� System Configurator Editor : PACiS SCE

� System Maintenance Tools : PACiS SMT

� MiCOM C264 Remote Maintenance – C264 WEB Server

� MiCOM S1 – C264P Protection parameters

Page 24: Sas-Sistem de control

PACiS HMI :Advanced SCADA features

Substation screens� Control & Command

Primary equipments� Alarm & Event viewer� Measurements� Trend viewer� Video inclusion

> PACiS short EN – 20/05/08- Issue H24 24

Alarm windows� Most recent

alarms� Nature, Status,

Severity, Timestamping 1 ms

� Up to 6 differentAlarm levels

� Up to 8 independent PACiS users� WEB access for remote control� Complete redundancy

Page 25: Sas-Sistem de control

PACiS HMI : Alarm/State/Event browsers

Event list� 1ms datation � Customisable� Colors indication

Event sorter� Logic

condition

> PACiS short EN – 20/05/08- Issue H25 25

Events browser� Tree

presentation� Event per

device � Icon

identification

condition� Name� Date or time� Device� Bay� Voltage level

Page 26: Sas-Sistem de control

PACiS Engineering tools

� System Configurator Editor - PACiS SCE

� System Management Tool - PACiS SMT

� C264 Remote Maintenance – C264 WEB Server

> PACiS short EN – 20/05/08- Issue H26 26

� C264 Remote Maintenance – C264 WEB Server

� MiCOM S1 – C264P Protection parameters

Simplify and Secure Customer engineering

Page 27: Sas-Sistem de control

PACiS System Configurator Editor Objectives

� DATA CONSITENCY: � between domains (communication, HMI, graphical, automation, etc.)

� between devices (HMI, gateway, bay computer, protections, etc)

� LARGE DATA FLOWS:

� More data than with legacy communication protocols

� More flows (client/servers, peer-to-peer), not only master slave

> PACiS short EN – 20/05/08- Issue H27 27

An essential tool for modern Substation Automation Systems

� LIFE CYCLE APPROACH

� Manage evolutions during the system life

� Handle legacy devices

� EASE OF USE

� Implicit processing (data, logic)

� No need to be an IEC 61850 expert

Page 28: Sas-Sistem de control

PACiS SCE : Data consistency

4 Domains in 1 Tool

Electrical Part

System Part

EDITORSObject oriented with hierarchical domain approach in line with IEC 61850 hierarchy

Key features

Create/Delete Relations (bindings) between domains

Template management (per

> PACiS short EN – 20/05/08- Issue H28 28

A single tool

System Part

Graphical Part

Automation Part

Template management (per domain and composite)

Check per editor and global(completion, consistency)

Page 29: Sas-Sistem de control

PACiS SCE : Large volume of data handling

Graphical template example

Instances

CB1CB2

CB3

Automatic

CB1CB2

CB3

Evolution

TEMPLATES

A template can be made ofGraphical, Electrical, System and

Automation domains. It might be imported (typ. An IED)

> PACiS short EN – 20/05/08- Issue H29 29

Industrial approach

QUERIES

Database onMultiple criteria

Page 30: Sas-Sistem de control

PACiS System Management Tool

� Management Configuration database downloadto PACiS equipment (HMI, IEDs)

� Ensure coherency between the ConfigurationDatabases

System Management Tool functions:

> PACiS short EN – 20/05/08- Issue H30 30

Databases

� Store the Configuration Database versions

� Allows upload of Waveform/Disturbance records

Page 31: Sas-Sistem de control

MiCOM C264 – Maintenance Web Server

� Access from Internet Browser (Mozilla Fox or IE) with user + password

� Visualisation of Bay Maintenance data :

> PACiS short EN – 20/05/08- Issue H31 31

�MiCOM C264 Hard & Soft Status,

� I/O status,

�Sequence of 2 000 Time stamped stored Events,

� Instantaneous reports (Measures, Counters, Binary Inputs, Status list)

�Legacy IEDs status

Page 32: Sas-Sistem de control

MiCOM S1 - MiCOM Protection setting software

� Upload and download of MiCOM C & P protection parameters

� On-line and Off-line modification of the models

� Connectionvia the Ethernet network

> PACiS short EN – 20/05/08- Issue H32 32

� Available in various languages:

�English,

�French,

�Spanish

�German

Page 33: Sas-Sistem de control

PACiS Automation schemes

� Pre-designed automation schemes� MiCOM C264 level

� Automatic Voltage Regulator� Synchro-check� Autorecloser

� PACiS application level � Fast Load shedding for Large industry and Oil & Gaz

> PACiS short EN – 20/05/08- Issue H33 33

� Fast Load shedding for Large industry and Oil & Gaz� Interlocking

� Personnalized automation schemes � Using the IEC61850 GOOSE peer-to-peer fast data

transfert capabilities� Programmable Scheme Logic� IEC61131-3 automatism language (ISAGRAF)

Page 34: Sas-Sistem de control

MiCOM C264 – Built-In Automation PLC applications - Build in sequences

� Built-in Functions : embedded and validated� Autorecloser

� For feeder control

� up to 4 cycles , 1PH + 3PH, with Interlock checks

� parameters adaptable on the local LCD screen

� Synchronised CB Management (Synchro-Check)

� for Generator connection, or between 2 networks

> PACiS short EN – 20/05/08- Issue H34 34

� Customised criterias : Phase Angle, Frequency, magnitude

� parameters adaptable on the local LCD screen

� Automatic Voltage Regulation

� up to 4 transfos in // , manage up to 7 transfos

� Tap changer - Raise / Lower

� In association with others C264 interfaced on the station Bus -IEC61850

� Compounding – line drop compensation

� Circulating Current minimisation

� // Master/Follower

Page 35: Sas-Sistem de control

MiCOM C264 – Customised Automation

� For various applications :

�Switching sequences,

�Busbar transfer,

�Load management, (slow)

�GIS pressure supervision

�Capacitor Bank management

� IEC61131-3 languages

PLC applications

> PACiS short EN – 20/05/08- Issue H35 35

� IEC61131-3 languages

� Structured Text (ST)

� SFC (Grafcet)

� Large capability to evaluate

�Analog values

�Digital values

� In complement of the fast PSL facilities (Programming Scheme Logic)

Page 36: Sas-Sistem de control

PACiS Fast Load Shedding

� The Fast load shedding has it own dedicated network connected to the main PMS application

� Permanently recalculate the shedding priorities based on the real topology, power available and necessary loads

� Take in account the network constraints

� Transformer capabilities

OVERALLPROCESS CONTROL

> PACiS short EN – 20/05/08- Issue H36 36

� Generator spinning reserve

� In case of a sudden generator fault or grid weakness

� Trip directly the less prior elements

� Recalculate the total network availability

� Load sharing (active and reactive) between generators

� Islanding and reconnection (including synchronization)

Generation Load

Page 37: Sas-Sistem de control

Ring Network Automatic reconfiguration

M

M

DELIVERY SUBSTATION

FEEDER 1 FEEDER 2

1 : THE FAULT IS SEEN :

2 : TRIPPING OF :

4 : RECLOSING OF THE INCOMING FEEDER

> PACiS short EN – 20/05/08- Issue H37 37

MM

M

MM

M

SUBSTATION A

SUBSTATION B

SUBSTATION D

SUBSTATION C

STANDARD OPEN POINT OF THE RING

FAULT

3 : ISOLATION OF THE FAULTY SECTION BY OPENING:

5 : RECLOSING OF THE OPEN POINT OF THE RING

Page 38: Sas-Sistem de control

Introducing PACiS: Components

IEDsProtections, Computers, Measurement

> PACiS short EN – 20/05/08- Issue H38 38

SOFTWAREEngineering tools, SCADA

COMMUNICATIONSwitches, Gateways

Page 39: Sas-Sistem de control

Ethernet Architecture : Redundant ring

Up to 4 TX links

MiCOM H152 PCI board located in one PC

Substation Level

PACiS GATEWAYSPACiS OI

> PACiS short EN – 20/05/08- Issue H39 39

Bay Type 4

Ethernet - up to 6 links

Bay Type 5

Ethernet - up to 4 links

MiCOM H352Din Case

Page 40: Sas-Sistem de control

Ethernet Architecture : Large Dual physical star

Substation Level

PACiS GATEWAYS

MiCOM H600Optical star switch

PACiS OI

> PACiS short EN – 20/05/08- Issue H40 40

Bay level Type 1

Ethernetup to 6 links

C264C

MiCOM M

Ethernet up to 4 links

MiCOM H36xDin Case C264C

Bay level Type 2

Bay level Type 3

C264

RS485-upto 4 links

Page 41: Sas-Sistem de control

Ethernet Architecture : Multi-rings

SCADA GATEWAYS

GATEWAYIEC/IEC

Ring A

PACiS OIPACiS OIPACiS OI

PACiS OIPACiS OI

> PACiS short EN – 20/05/08- Issue H41 41

H352 C264+ SWR

H352C264

+ SWR

Ring B Ring C

Page 42: Sas-Sistem de control

Multi-ring architecture – Customer requirements

� DCS for complex substations (high number of bays / cells)

� High number of IEC 61850 equipments – BCU, Protection relays

� Segregation of voltage levels – signalization, command, maintenance

� Simple and compact system

> PACiS short EN – 20/05/08- Issue H42 42

� Simple and compact system

� Flexibility in outage & commissioning program

� Increased reliability

� Unique point of control

Page 43: Sas-Sistem de control

Complex substations solutions

� Subsystem for each voltage level� Own Operator Interface Server and Workstations

� Own Database storage for events and measurements

� General view for single line diagram and system

� Detailed views for cells – status, commands, measurements

� Supervision of all protection relays in the subsystem

� Own dual optical fiber redundant ring

� Own Gateway (T101)

� System bus network traffic decrease

> PACiS short EN – 20/05/08- Issue H43 43

� Main (top) Subsystem� General single line diagram and system view for entire substation

� Unique point of command for entire substation

� Receive only necessary information from subsystems – positions, some measurements

� Can perform only a limited (predefined) number of commands – switching equipment commands

� Provides the main communication channel to upper level of SCADA (Dispatch center)

� Low network traffic on the main system bus

Page 44: Sas-Sistem de control

…� Increased reliability and security

� Distributed DB – double storage if required� Multiple redundant optical rings� Redundant IEC/IEC Gateway� Lower network traffic on each ring� An eventual failure of a subsystem component or even an entire subsystem will not

affect the functionality of the other subsystems� Subsystem based user access rights. Same user can have different access right on

different subsystems� Dedicated IEC/IEC gateways – no rotating components

� Distribution of processing

> PACiS short EN – 20/05/08- Issue H44 44

� Distribution of processing� All logics run in the own subsystem – only intersystem inputs/outputs are crossing

through IEC/IEC Gateway� Detailed information available and stored only in the origin subsystem� Relay parameterization network for each subsystem� Smaller event database

� Easy installation and commissioning� Each subsystem can act like an stand-alone system and it can be commissioned

without interfering with other running subsystems� Any maintenance activity on one subsystem will not affect the other subsystems� An eventual configuration upgrade will affect only the destination subsystem� Easy to maintain smaller configuration database

Page 45: Sas-Sistem de control

PACiS GTW : the SCADA interface

� Direct interface through serial and Ethernet connections� Integrated MiCOM H Ethernet switch boards

� Redundancy capabilities� Physical support (RS or Ethernet)� Global GTW

�Serial protocols� IEC 60870-5-101 (KEMA certified)� MODBUS

> PACiS short EN – 20/05/08- Issue H45 45

� MODBUS� DNP3� GI74� HNZ

� Ethernet protocols� IEC60870-5-104� OPC� IEC61850 (Reports only)� MODBUS over IP� DNP3 over IP

Page 46: Sas-Sistem de control

Project examples

> PACiS short EN – 20/05/08- Issue H46 46

Page 47: Sas-Sistem de control

Transmission Utility Application

Imprimante CDE N°1

Poste Opérateur N°1

Tranche Générale redondée

Passerelle redondée

raccordement au SCADA

FEDA

Poste Opérateur N°2(redondant)

Imprimante CDE N°2(redondée)

Switch N°1 Switch N°2

Poste Ingéniérie

Imprimante

220 kV susbtation for FEDA (ANDORRA)

> PACiS short EN – 20/05/08- Issue H47 47

Ligne RANSOL Ligne MARGINEDA 1 Ligne CENTRALELigne MARGINEDA 2 Ligne GRAU ROIG COUPLAGE Contrôle BARRE

IRIGB clock

Anneau Optique Ethernet redondant

IEC 61850

Imprimante graphique

Page 48: Sas-Sistem de control

Distribution Utility Application

132/11 kV susbtations for DEWA (DUBAI – UAE)

> PACiS short EN – 20/05/08- Issue H48 48

Page 49: Sas-Sistem de control

Oil & Gaz Application

Dolphin site with Fast Load shedding (< 80 ms)

TO ICSS TO ICSSITR0 / SS0

MS1

7 C264C 3 C264C

Ethernet TCP/IP 100Mb/s

Fast Load Sheeding

3 BM9100 PMS serverTO RTDB

OPC OPCIEC-60870-101 1 BM9200

To Bay Computers in

SS40GPS Clock

TeleProtection

To SS40

Hardwire DO

1 BM9200

+ 4 C264 + 5 BM9200

TO KAHRAMAA

OPC

SYSTEM MAINTENANCE AND ENGINEER’S ROOM

CENTRAL CONTROL ROOM

HUB HUB

> PACiS short EN – 20/05/08- Issue H49 49

SS40+ 4 C264C1 C264

SS2 SS21

SS11 SS14 SS24

SS30

SS1

SS12

3 C2642 BM9200 2 BM9200

2 BM9200 2 BM9200

2 BM9200

3 C264C2 BM9200

SS221 C264 4 C264

2 C264+ 5 C264C

4 C264

+ 6 C264C

Master FLS

2 BM9200 2 BM9200

FO From MS1

TeleProtection

Hardwire DO

+ 4 C264C

2 C264C+ 5 C264C

2 C264

3 C264SS3B

2 BM92003 C264C

+ 3 C264C

SS3A2 BM9200

+ 2 C264C

3 C264C

2 BM9200

FO From MS1

HUB HUB

+ 1 C264 + 3 C264C

Page 50: Sas-Sistem de control

Railway Application

Metro substations for RATP (Metro of PARIS – FRANCE)

> PACiS short EN – 20/05/08- Issue H50 50

Page 51: Sas-Sistem de control

Industrial Application

Georges Besse II for AREVA (Nuclear factory – FRANCE)

> PACiS short EN – 20/05/08- Issue H51 51

Page 52: Sas-Sistem de control

Sensitive building Application

Tour Granite with Load Management (PARIS – FRANCE)

> PACiS short EN – 20/05/08- Issue H52 52

Page 53: Sas-Sistem de control

Automation Romania portofolio

Distribution – Electrica

�110/20 kV Sibiu Aeroport substation with PACiS system� Operator interface server and client in substation� Remote client at Electrica Sibiu� Redundant optical fiber ring to connect system elements� GPS synchronization� Upper scada interface with Helios system via T101 protocol� 5 HV bays – « H » type substation

> PACiS short EN – 20/05/08- Issue H53 53

� 30 + 20 MV cells in substation + PA� LV internal services monitoring

� 110/20 kV Dumbrava Sibiu substation with PACiS system� Similar with Sibiu Aeroport� In final commissioning stage

Page 54: Sas-Sistem de control

Automation Romania portofolio

Transport – Transelectrica

�« 11 Substations » pure automation project with PACiS system

� 220/110/20 kV substations : Targoviste, Cluj Floresti, Turnu Magurele, Stuparei, Isalnita, FAI, Baia Mare, Pestis, Arefu, Hasdat, Raureni� Project was started in 2005 and it’s still running until December 2010.

> PACiS short EN – 20/05/08- Issue H54 54

2010.

�220/110 kV Paroseni substation – turn-key project with Pacis system – finalized 2007

� 400 kV Moldova Axis – turn-key project with Pacis system –� Including Bacau Sud, Roman Nord, Suceava substations� finalized 2009

Page 55: Sas-Sistem de control

Automation Romania portofolio

… Transport – Transelectrica

�400/220/110/20 kV Lacu Sarat – turn-key project with Pacis system – in progress

� 110kV Gutinas – turn-key project with Pacis system – in progress

� 400/110kV Tariverde – turn-key project with Pacis system –

> PACiS short EN – 20/05/08- Issue H55 55

� 400/110kV Tariverde – turn-key project with Pacis system –in progress

Railways – CFR

�Campina – Predeal traction substations – automation project with Pacis system – in progress

Page 56: Sas-Sistem de control

www.areva-td.com