sardar sarovar narmada nigam limited (a wholly owned ... sarovar narmada nigam limited (a wholly...

147
Sardar Sarovar Narmada Nigam Limited(A wholly owned Government ofGujarat Undertaking) Tender Notice No. 2, of 2015-2016. Office of the Executive Engineer, Saurashtra Branch Canal Division No.1/2, Narmada Colony, Bhavnagar Highway, Dhandhuaka,382460., Phone No 02713-223821 Invites Request For Proposal (RFP) for selection of Third Party Quality Inspection Services to Sardar Sarovar Narmada Nigam Limited for its Item Rate Contracts for construction of Branch canals and Distribution Network of SSP in Gujarat as Quality & Cost Based Selection (QCBS). Last Date of submission is 12-06-2015. .For more details, please contact the above office For RFP documents & other information please visit below websites: www.sardarsarovardam.org. www.nprocure.com . Executive Engineer, S. B. C. Division No.1/2, Dhandhuaka,382460.

Upload: nguyentram

Post on 17-Apr-2018

243 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: Sardar Sarovar Narmada Nigam Limited (A wholly owned ... Sarovar Narmada Nigam Limited (A wholly owned Government ofGujarat Undertaking) Tender Notice No. 2, of 2015-2016. Office of

Sardar Sarovar Narmada Nigam Limited(A

wholly owned Government ofGujarat Undertaking) Tender Notice No. 2, of 2015-2016.

Office of the Executive Engineer, Saurashtra Branch Canal Division No.1/2, Narmada Colony, Bhavnagar Highway, Dhandhuaka,382460., Phone No 02713-223821 Invites Request For Proposal (RFP) for selection of Third Party Quality Inspection Services to Sardar Sarovar Narmada Nigam Limited for its Item Rate Contracts for construction of Branch canals and Distribution Network of SSP in Gujarat as Quality & Cost Based Selection (QCBS). Last Date of submission is 12-06-2015.

.For more details, please contact the above office • For RFP documents & other information

please visit below websites: • www.sardarsarovardam.org. • www.nprocure.com.

Executive Engineer,

S. B. C. Division No.1/2,

Dhandhuaka,382460.

Page 2: Sardar Sarovar Narmada Nigam Limited (A wholly owned ... Sarovar Narmada Nigam Limited (A wholly owned Government ofGujarat Undertaking) Tender Notice No. 2, of 2015-2016. Office of

SARDAR SAROVAR NARMADA NIGAM LIMITED

A Govt. of Gujarat Undertaking

Gandhinagar

Request for Proposal (RFP) for Selection of A TPI for

providing consultancy services to Sardar Sarovar

Narmada Nigam Limited for Item Rate Contracts for

construction of Vallabhipur Branch canal’s Distribution

Network of SSP in Gujarat .

Quality & Cost Based Selection (QCBS)

May 15

[Last Date of Submission: 12/06/2015 at 18.00 hrs]

[Document Fee: Rs. 10,000/-]

Executive Engineer,

Saurashtra Br. Canal Division No.1/2,

Dhandhuaka,382460.

Page 3: Sardar Sarovar Narmada Nigam Limited (A wholly owned ... Sarovar Narmada Nigam Limited (A wholly owned Government ofGujarat Undertaking) Tender Notice No. 2, of 2015-2016. Office of

I N D E X

Sr. No. Description Page No.

Preface 1

1 The Sardar Sarovar Project 1

1.2 A schematic map showing the canal network 2

1.3 Details of Canal Network 2

1.4 Branch Canals 3

1.5 Kutch Branch Canal 4

SECTION – 1 LETTER OF INVITATION 8

1 Schedule of the works Contracts for TPI 9

2 Objective and Broad Scope of the Assignment 9

3 Request for Proposal 10

4 RFP Documents List 11

5 Address for Submission 11

SECTION – 2 INSTRUCTIONS TO CONSULTANTS 12

Data Sheet 33

Eligibility & Qualification Criteria 35

Performance Security 44

SECTION – 3 TECHNICAL PROPOSAL 45

Form Tech – 1 Technical Proposal submission Form 46

Form Tech – 2 Consultants Organization & Experience 50

Form Tech – 3 Comments and suggestions on the terms of reference and on counterpart staff and facilities to be provided by the SSNNL

55

Form Tech – 4 Description of approach, methodology and work plan for performing the assignment

57

Form Tech – 5 Team Composition & Task assignments 58

Form Tech - 6 Curriculum Vitae (CV) for proposed professional staff

59

Form Tech – 7 Staffing Scheduling 61

Form Tech – 8 ABSTRACT OF SIMILAR ASSIGNMENTS OF KEY PERSONNEL

62

Form Tech – 9 ABSTRACT OF SIMILAR ASSIGNMENTS OF APPLICANT

63

Page 4: Sardar Sarovar Narmada Nigam Limited (A wholly owned ... Sarovar Narmada Nigam Limited (A wholly owned Government ofGujarat Undertaking) Tender Notice No. 2, of 2015-2016. Office of

SECTION – 4 FINANCIAL PROPOSAL 64

Form FIN – 1 Financial Submission Form 70

Form FIN – 2 Total Lump Sum Cost 71

Form FIN – 3 Abstract of Financial proposal as per Form No. 4 to 13 (Fin – Abstract)

72

Form FIN – 4 Price Breakup of remuneration of Key personnel (inclusive of Personal Allowance)

73

Form FIN – 5 Price Breakup of Remuneration of Support Personnel (inclusive of all personal allowances)

74

Form FIN – 6 Price Breakup of Office and Laboratory Rent 75

Form FIN – 7 Prize Breakup of Office Establishment (Rental) and Communication Expenses

76

Form FIN – 8 Price Breakup of Laboratory Establishment (Rental) for Quality Assurance

77

Form FIN – 9 Prize Breakup of surveying leveling and measuring Instruments / Devices / Tools

78

Form FIN – 11 Price Breakup of Report and Document Printing 79

Form FIN – 12 Price Breakup of Deployment of Rental Vehicles including Fuel Expenses and M & R

80

Form FIN – 13 Price Breakup of all the miscellaneous expenses not covered under FIN – 1 to Fin – 9

81

Form FIN – 14 Payment Schedule for TPI 82

Form FIN – 15 List of Field Tests 83

SECTION – 5 TERMS OF REFERENCE 84

1 Project Packages 84

2 Overall scope of Services to be Provided by the Project Management Consultant

84

3 Detailed Scope of Work for the Project Management Consultant

85

3.1 TPI & Construction Supervision 85

3.2 Quality Assurance 86

3.3 Progress Reports & Reviews 89

3.4 Review & Coordination Meeting 89

3.5 Checking and Certification of Contractor’s Bills 92

3.6 Contract Administration & Management 92

4A Deployment Schedule For TPI 94

5 Consultant’s Office 95

6 Extension of Assignment 95

SECTION – 6 GENERAL CONDITIONS OF CONTRACT 97

1 General Conditions 97

2 Commencement, Completion, Modification & 101

Page 5: Sardar Sarovar Narmada Nigam Limited (A wholly owned ... Sarovar Narmada Nigam Limited (A wholly owned Government ofGujarat Undertaking) Tender Notice No. 2, of 2015-2016. Office of

Termination of Contract

3 Obligations of the Consultant 108

4 Consultant’s Personnel and Sub-consultants

112

5 Obligations of the SSNNL 115

6 Payments to the Consultant 117

7 Penalty for deficiency in services 112

8 Fairness and Good Faith 123

8 Settlement of Disputes 123

SECTION – 7 SPECIAL CONDITIONS OF CONTRACT 125

Page 6: Sardar Sarovar Narmada Nigam Limited (A wholly owned ... Sarovar Narmada Nigam Limited (A wholly owned Government ofGujarat Undertaking) Tender Notice No. 2, of 2015-2016. Office of

1

PREFACE This Request for Proposal (RFP) document is for selection and appointment

of Project Management Consultants through a Quality and Cost Based

Selection (QCBS) process for the projects taken up under the SardarSarovar

Project. The project is described here under:

1. THE SARDAR SAROVAR PROJECT: 1.1. The SardarSarovar (Narmada) Project is a multipurpose river valley

project on the west flowing river Narmada in Gujarat State located along

the west coast of India.

The project is expected to provide irrigation benefits to a gross area of about

3.43 million hectares, and has hydropower of 1450 MW (installed capacity) and

also provides partial flood control. The revised project cost as approved by the

Government of Gujarat and the Planning Commission, Government of India is

estimated to cost about Rs… . . . . . . . Crores as of 2009-2010. The salient

features of the Project are as under:

Dam

1 Length of main concrete gravity dam 1210.00 m

2 Maximum height above deepest foundation level 163.00 m

3 Top R.L. of dam. 146.50 m

4 Catchments area of river above dam site 88,000 Sq. km

5 Live storage capacity 0.58M.Ha.m (4.7 MAF)

6 Length of reservoir 214.00 km

Maximum width 16.10 km

Average Width 1.77 km

7 Spillway gates

Chute Spillway 7 Nos. 60' x 60'

Service Spillway 23 Nos. 60' x 55'

8 Spillway Capacity 84949.25 cumecs

(30 lakh cusecs)

Power Houses

1 River bed power house 1200 MW

2 Canal head power house 250 MW

Dam

Page 7: Sardar Sarovar Narmada Nigam Limited (A wholly owned ... Sarovar Narmada Nigam Limited (A wholly owned Government ofGujarat Undertaking) Tender Notice No. 2, of 2015-2016. Office of

2

Canal System

Main Canal

1 Full supply level (F.S.L.) at H.R. 91.44 m (300 ft)

2 Length upto Gujarat - Rajasthan border 458.00 km

3 Base width in head reach 73.01 m

4 Full supply depth (F.S.D.) in head reach 7.60 m

5 Design discharge capacity

(1) In head reach 1133 cumecs

(40,000 cusecs)

(2) At Gujarat Rajasthan border 71 cumecs

(2,500 cusecs)

Distribution System

1 Numbers of Branches 38

2 Length of distribution system network 66000.00 km

3 Culturable Command Area 18.45 lakh hectares

1.2. A schematic map showing the canal network : 1.3

. Details of Canal Network:

The Narmada Main Canal is 458 km Long. The Main Canal passes through 9

districts and 27 talukas of Gujarat. These districts are Narmada, Panchmahal,

Page 8: Sardar Sarovar Narmada Nigam Limited (A wholly owned ... Sarovar Narmada Nigam Limited (A wholly owned Government ofGujarat Undertaking) Tender Notice No. 2, of 2015-2016. Office of

3

Vadodara, Kheda, Ahmedabad, Gandhinagar, Mehsana, Patan and Banaskantha.

The works of Narmada Main Canal from Kevadia to Mahi River (0 km. to 144 Km.)

were commenced in 1980 and they were completed by the year 2000. In this

reach of the Main Canal there are 15 branch canals having total length of 657 Km.

All these branch canals has been completed.

The Narmada Main Canal between 144 Km. (Mahi River) to 263 Km. (off take of

Saurashtra Branch Canal) is also completed in the year 2003 and is operational.

There are 7 branches having total length of 217 km. in this portion of the Main

Canal. All the 7 branches have been completed.

The Saurashtra Branch Canal off takes from 263 km. (near Kadi) of the Main

Canal. The SBC is 104 km. long and the works in initial 80 km. is completed and

remaining works are in progress. There are 7 sub-branches off taking from the

Saurashtra Branch Canal which has total length of 865 km. Of this Narsingpura,

Malia and Vallabhipur sub-branch has been completed and works in Dhranghdra,

Limbadi, Botad and Morbi are in progress.

The Saurashtra Branch Canal is having 5 pumping stations which has lift varying

from 10.86 mt. to 17.03 mt. This is one of the largest pumping station of the Asia

and work has been completed for the first pumping station near Lilapur.

The first pumping station has pumping capacity of 300 cubic meter per second

and has a lift of 10.86 mt. The work of remaining 5 pumping stations is in

progress.

The Main Canal from 263 km. (Kadi) to 458 Km. (Gujarat Rajasthan border) is

also operational and water is reached to Rajasthan in March-2008. There are 15

branch canals in this portion of the Main Canal. Of these 15 branch canals one

branch canal is completedwhereas works of remaining 9 branch canals are in

progress whereas works of 4 branch canals would be taken up.

1.4. Branch Canals: There are thirty eight (38) branch canals which are off taking from Narmada Main

Canal. The detail of the same is tabulated as below.

Page 9: Sardar Sarovar Narmada Nigam Limited (A wholly owned ... Sarovar Narmada Nigam Limited (A wholly owned Government ofGujarat Undertaking) Tender Notice No. 2, of 2015-2016. Office of

4

Sr. No.

Name of Canal

Ch. Of NMC (km)

Sr. No.

Name of Canal

Ch. Of NMC (km)

Sr. No.

Name of Canal

Ch. Of NMC (km)

1 Wadia 9.931 16 Sanali 171.961 31 Amarapura 354.000

2 Tilakwada 17.871 17 Mehmdabad 187.074 32 Radhanpur 374.486

3 Mandwa 25.263 18 Ghodasar 202.368 33 Kachchh 385.814

4 Bhilodia 32.694 19 Vehlal 212.546 34 Vejpur 405.722

5 Timbi 38.523 20 Daskroi 223.667 35 Madka 417.792

6 Sankheda 45.109 21 Dholka 246.286 36 Malsan 423.732

7 Miyagam 62.916 22 Sanand 258.632 37 Dhima 438.552

8 Gojali 70.236 23 Saurashtra 263.200 38 Godasisar 453.837

9 Vadodara 81.834 24 Viramgam-I 267.063

10 Dena 88.770 25 Viramgam-II 277.166

11 Dumad 100.026 26 Goriya 290.605

12 Sakarda 102.953 27 Kharaghoda 292.398

13 Zumkha 106.905 28 Zinzuwada 301.041

14 Nahra 111.645 29 Bolera 326.389

15 Desar 126.645 30 Rajpura 344.772

1.5. Kutchh Branch Canal: The Kutchh Branch Canal, off-takes at Ch. 385.814 km of Narmada Main Canal

(NMC), is 360 km long. The branch canal is planned to run through Banaskantha and

Patan districts in its initial reach up to 83 kms& thereafter crossing little Rann of

Kutchh and then finally enters the Kutch district at Ch. 94km. Thus the length of KBC

from 94 km to 360 km falls in the Kutchh district.

Total Culturable Command Area(CCA) of the Kutchh Branch Canal is 1,75,889 ha out

of which 63,111 ha is in Banaskantha / Patan district & 1,12,778 ha is in Kutchh

district.

Total CCA of 1, 12,778 ha is planned to be covered under irrigation by Kachchh

Branch Canal.

Taluka-wise CCA and benefited villages of Banaskantha, Patan and Kachchhdistrictare as below :-

Sr. Nos.

No District Taluka CCA in ha

1 Banaskantha Kankrej 2 2098

Deodar 1 225

Bhabhar 26 18494

Wav 9 7501

SUB-TOTAl (1) 38 28318

2 Patan Radhanpur 2 850

Page 10: Sardar Sarovar Narmada Nigam Limited (A wholly owned ... Sarovar Narmada Nigam Limited (A wholly owned Government ofGujarat Undertaking) Tender Notice No. 2, of 2015-2016. Office of

5

Santalpur 39 33943

SUB-TOTAl (2) 41 34793

3 Kachchh Rapar 47 38560

Bhachau 33 25935

Gandhidham 8 4135

Anjar 24 13367

Mundra 34 18240

Mandvi 30 11198

Bhuj 6 1343

SUB-TOTAl (3) 182 1E+05

GRAND TOTAL (1)+(2)+(3) 261 2E+05

SALIENT FEATURES OF KACHCHH BRANCH CANAL

1 Off-take point At Ch. 385.81 km. of Narmada Main Canal.

2 Length 360.00 Km.

3 At off take

Section 16.50 m x 5.80 m + 0.90 m Free Board

Side Slope 2:01

Bed Slope 1 in 10000

220 cumec at off-take point & 178 cumec at entry

Capacity of Kachchh

4 F.S.L. at Off-take point 49.65 m.

5 Command Area C.C.A. (ha.)

Banaskantha District 28318

SALIENT FEATURES OF KACHCHH BRANCH CANAL

Patan District 34793

Kachchh District 112778

Total 175889

6 Falls Location Height of fall

Ch. 20.67 Km 11.25 m

Ch. 40.30 Km 9.25 m.

Ch. 82..30 Km 10.67 m.

7 Lift Location Lift Ht.

Ch. 100 Km. 18.32 m.

Ch. 111.75 Km. 18.32 m.

Ch. 189.977 Km. 18.72 m.

There are three pumping stations at the ch.100.97 km 111.75 km & 189.97 km

with a pumping head of 18.21 m., 18.21 m. & 18.72 m. respectively.

Page 11: Sardar Sarovar Narmada Nigam Limited (A wholly owned ... Sarovar Narmada Nigam Limited (A wholly owned Government ofGujarat Undertaking) Tender Notice No. 2, of 2015-2016. Office of

6

Most of the canal works of Narmada Main Canal and Branch Canals (except 6

Branch in North Gujarat and Kachchh and 6 Sub Branch Canal of Saurashtra) are

almost completed. Distribution works in Phase I (uptoMahi River) is almost

completed.

Remaining branch canal works and distribution works in remaining command area

are under execution in full swing. It is estimated that works of about 950 crore in

North Gujarat, about 1550 Crore in Kachchh region and about 3600 crore in

Saurashtra region are taken up in near future.

SSNNL has already awarded 82nos of packages for constructions of branch canal

/ distributories and minors of SS Project costing approx. 4138crores.

Page 12: Sardar Sarovar Narmada Nigam Limited (A wholly owned ... Sarovar Narmada Nigam Limited (A wholly owned Government ofGujarat Undertaking) Tender Notice No. 2, of 2015-2016. Office of

7

REQUEST FOR PROPOSALS

RFP No. SSNNL/CANALS/01 OF 2015 Country : INDIA – State of Gujarat

Project Name : Projects of Canal Works of the

SardarSarovar Project.

Title of Consulting

Services

: Providing Third Party Inspection

Services to SardarSarovar Narmada

Nigam Limited for its Item Rate Contracts

for construction of VallabhipurBranch

Canal’s Distribution Network in the state

of Gujarat

Page 13: Sardar Sarovar Narmada Nigam Limited (A wholly owned ... Sarovar Narmada Nigam Limited (A wholly owned Government ofGujarat Undertaking) Tender Notice No. 2, of 2015-2016. Office of

8

SECTION - 1

LETTER OF INVITATION

Invitation of Proposal for Providing Third Party Inspection Services to

SardarSarovar Narmada Nigam Limited for its Item Rate Contracts for

construction of VallabhipurBranch Canal’s Distribution Network in the

state of Gujarat

Date: ____ May 2015. To, ___________________________ ___________________________ ___________________________ Selection of A Third Party Inspection Services for providing consultancy

services to SardarSarovar Narmada Nigam Limited for its Item Rate

Contracts for Remaining construction work for Distribution Network of

command area of VallabhipurBr.Canal of SSP in Gujarat to SardarSarovar

Narmada Nigam Limited for canal works.

SSNNL intends to appoint Third Party Inspection Services for the following Item

Rate contract packages in the command area of VllabhipurBr.Canal as shown in

table under para 1.0 of this section.

SSNNL will award Third Party Inspection Services Contract for one or more

packages listed above to one or more Third Party Inspection Services

consultants. This will be based on the SSNNL evaluation of the Consultant’s

Technical competence, experience and the works on hand with the consultants.

Award to consultants shall be at the sole discretion of the SSNNL.

Page 14: Sardar Sarovar Narmada Nigam Limited (A wholly owned ... Sarovar Narmada Nigam Limited (A wholly owned Government ofGujarat Undertaking) Tender Notice No. 2, of 2015-2016. Office of

9

1.

1. Schedule for the Work Contracts for TPI

cope of the Assignment: Slice-1

Grand Total 49.07 Cr.

2.0 Objective and Broad Scope of Assignment:-

SSNNL, in consultation with the Government of Gujarat is committed to

complete all the remaining branch canals, distributory canals, minors

and sub-minors within next three years. Some Contracts are also to be

awarded in the form and style of item rate construction contracts, and

unit rate contracts.

Sr. No.

Slice No.

Name of Work Remaining Constructio

n Cost In Crore

Time Limit

Months

Date of Work Order

BID PACKAGE – 2

1 Slice-1 Constructing Earth work, C.C. Lining, Structures and Service Road of the PipliDistry( LD-3B, Upper Portion from Ch. 0 to 15614 m.) and its minors (Minors except bhal area off-taking from Vallabhipur Branch Canal @ Ch. 63.625 Km. including Operation, Maintenance & Security for five years.

21.00 6 03/10/2012

2 Slice-2 Constructing Earth work, C.C. Lining, Structures and Service Road of the PipliDistry (LD-3B, Lower Portion from Ch. 15614 to 28260 m.) and its Loliya sub distry (LD-3B1) and its minors (Minors except bhal area off-taking from Vallabhipur Branch Canal @ Ch. 63.625 Km. including Operation, Maintenance & Security for five years.

14.15 6 03/10/2012

3 Slice-3 Constructing Earth work, C.C. Lining, Structures and Service Road of the GorasuDistry( LD-6B) and its minors (Minors except bhal area off-taking from Vallabhipur Branch Canal @ Ch. 67.542 Km. including Operation, Maintenance & Security for five years.

8.47 6 06/06/2012

4 Slice-4 Constructing Earth work, C.C. Lining, Structures and Service Road of the BalolDistry D-12 and its sub distry D-12 with its minors (Minors except bhal area off-taking from Vallabhipur Branch Canal @ Ch. 40.812 Km. including Operation, Maintenance & Security for five years

5.45 6 08/06/2012

TOTAL 49.07

Page 15: Sardar Sarovar Narmada Nigam Limited (A wholly owned ... Sarovar Narmada Nigam Limited (A wholly owned Government ofGujarat Undertaking) Tender Notice No. 2, of 2015-2016. Office of

10

Contracts packages covering comprehensive scope of work including

design of canals, and hydraulic structures, construction of canals and

structures, commissioning, testing and operation and maintenance for

five years have been planned. Operation and maintenance for five

years is excluded from the scope of work of the TPI contract.

SSNNL has decided to outsource the Third Party Inspection Services to

qualified, technically competent, experienced consultancy agencies

with a view to ensure quality assurance, timely completion of the

projects within the determined costs and without any time and cost

overrun.

This Request for Proposal (RFP) is for providing Third Party Inspection

Services for Projects taken under Item rate contracts / unit rate

contracts.. • Witness and certify all the tests that are to be carried out by the

ConstructionContractors each as per the contract specifications and / or the

relevant BIS Specifications.

• Assist SSNNL dispute resolution mechanism in resolution of disputes,

contract claims, etc.

3. REQUEST FOR PROPOSAL

SSNNL has decided to outsource the project management services/Third

Party Inspection Services with broad scope of works as identified

hereinabove and as described in the Detailed Terms of Reference (TOR)

from qualified, technically competent, experienced consultancy agencies

with a view to ensure quality assurance, timely completion of the projects

within the determined costs and without any time and cost overrun.

Forms This Request for Proposal (RFP) is for providing Third Party

Inspection Services for canal works described herein above.

You are, therefore, invited through this Request for Proposal (RFP) to

present your Technical and Financial offers in separate sealed envelopes

for further consideration by SSNNL for selection of the consultants.

A firm will be selected under the quality and cost based selectionprocedures

described in this RFP.

Page 16: Sardar Sarovar Narmada Nigam Limited (A wholly owned ... Sarovar Narmada Nigam Limited (A wholly owned Government ofGujarat Undertaking) Tender Notice No. 2, of 2015-2016. Office of

11

4. The RFP includes the following documents:

Section 1 - Letter of Invitation

Section 2 - Information to Consultants (including Data Sheet)

Section 3 - Technical Proposal - Standard Forms

Section 4 - Financial Proposal - Standard Forms

Section 5 - Terms of Reference

Section 6 - General Conditions of Contract

Section 7 – Special Conditions of Contract

5. ADDRESS FOR SUBMISSION:

5.1 Please inform us in writing to the following address:

(a) that you received the letter of invitation; and

(b) Whether you will submit a proposal alone or in association.

5.2.1 You are requested to ensure that the Technical Proposal and Financial

Proposal are submitted in two separate envelopes. You should submit

Two hard copies and twoCD-ROMs of the Technical Proposal and one

hard copy of the Financial Proposal and mark “Official Documents” with

the reference number, name of the project and clear identification of the

contents on the envelope to:

Executive Engineer,

SaurashtraBranch Canal Division No.1/2,

Narmada Colony, Bhavnagar

Highway,Dhandhuaka,382460.

Phone No.& Fax: 02713-223821

E-mail: [email protected]

6 The Technical Proposal and Financial Proposal must reach the SSNNL not

later than the submission date shown in the data sheet given in Section 2.

Please, ensure that consultant send his Proposals by reputed courier / speed

post and advise the SSNNL by facsimile of the date of dispatch, airway bill no

and expected date of arrival of the Proposal. Hand delivery is not permitted.

Yours sincerely,

Executive Engineer,

S.B.C. Division No.1/2,

Dhandhuaka

Page 17: Sardar Sarovar Narmada Nigam Limited (A wholly owned ... Sarovar Narmada Nigam Limited (A wholly owned Government ofGujarat Undertaking) Tender Notice No. 2, of 2015-2016. Office of

12

SECTION - 2

INSTRUCTIONS TO CONSULTANTS

Definitionsa) “SSNNL” means the SardarSarovarNarmadaNigam Limited,

aGovernment. of Gujarat undertaking, Gandhinagar

b) “Consultant”/“Applicant” means any entity or person that

may provide or provides operational consulting Services to

the SSNNL under the Contract

c) “Contract” means the Contract signed by the Parties to which

the General Conditions (GC) is attached with any

attachments listed in the Special Conditions (SC).

d) “Data Sheet” means such part of the Instructions to

Consultants used to reflect specific country and assignment

conditions. e) “Day” means calendar day.

f) “Government” means the Government of Gujarat g) “Instructions to Consultants” (Section 2 of the RFP) means

the document which provides Consultants with all

information needed to prepare their Proposals h) “LOI” (Section 1 of the RFP) means the Letter of Invitation

being sent by the SSNNL to the Consultants i) “Personnel” means professionals and support staff provided

by the Consultant or by any Sub-Consultant and assigned to

perform the Services or any part thereof; “Foreign

Personnel” means such professionals and support staff who

at the time of being so provided had their domicile outside

the beneficiary’s country; “Local Personnel” means such

professionals and support staff who at the time of being so

provided had their domicile inside the beneficiary’s country j) “Proposal” means the Technical Proposal and the Financial

Proposal k) “RFP” means the Request For Proposal to be prepared by

the Clientfor the selection of Consultants, based on the

SRFP

l) “SRFP” means the Standard Request for Proposals, which

Page 18: Sardar Sarovar Narmada Nigam Limited (A wholly owned ... Sarovar Narmada Nigam Limited (A wholly owned Government ofGujarat Undertaking) Tender Notice No. 2, of 2015-2016. Office of

13

are used by the SSNNL as a guide for the preparation of the

RFP

m) “Services” means the work to be performed by the

Consultant pursuant to the Contract

n) “Sub-Consultant” means any person or entity with whom the

Consultant subcontracts any part of the Services

o) “Terms of Reference” (TOR) means the document included

in the RFP as Section 5 which explains the objectives, scope

of work, activities, tasks to be performed, respective

responsibilities of the SSNNL and the Consultant, and

expected results and deliverables of the assignment.

Introduction 1.1 The SSNNL will select a consulting firm / organization (the

consultant among those who submit their proposals in

response to the Letter of Invitation, in accordance with the

method of selection specified in the Data Sheet.

1.2 The consultants are invited to submit a Technical Proposal

and a Financial Proposal, as specified in the Data Sheet for

consulting services required for the assignment named in

the Data Sheet. The proposal will be the basis for contract

negotiations and ultimately for a signed contract with the

selected firm.

1.3 Consultants should familiarize themselves with local

conditions and take them into account in preparing their

Proposals. To obtain first hand information on the

assignment and local conditions, Consultants are

encouraged to visit the SSNNL before submitting a proposal

and to attend a pre-proposal conference if one is specified

in the Date Sheet. Attending the pre-proposal conference is

optional. Consultants should contact the SSNNL officials

named in the Data Sheet to arrange for their visit or to

obtain additional information on the pre-proposal

conference. Consultants should ensure that these officials

are advised of the visit in adequate time to allow them to

Page 19: Sardar Sarovar Narmada Nigam Limited (A wholly owned ... Sarovar Narmada Nigam Limited (A wholly owned Government ofGujarat Undertaking) Tender Notice No. 2, of 2015-2016. Office of

14

make appropriate arrangements.

1.4. The SSNNL will timely provide at no cost to the Consultants theinputs

and facilities specified in the Data Sheet, assist the firm in

obtaining licenses and permits needed to carry out the

services, and make available relevant project data and reports.

1.5.Consultants shall bear all costs associated with the preparation

and submission of their proposals and contract negotiation. The

SSNNL is not bound to accept any proposal, and reserves the right to

annul the selection process at any time prior to Contract

award, without thereby incurring any liability to the

Consultants.

Conflict of

Interest

1.6. SSNNL policy requires that Consultants provide professional,

objective, and impartial advice and at all times hold the SSNNL’s

interests paramount, strictly avoid conflicts with other assignments or

their own corporate interests and act without any consideration for

future work.

1.6.1 Without limitation on the generality of the foregoing,

Consultants, and any of their affiliates, shall be

considered to have a conflict of interest and shall not be

recruited, under any of the circumstances set forth below.

a) A firm that has been engaged by the SSNNL to

provide goods, works or services other than

consulting services for a project, and any of its

affiliates, shall be disqualified from providing

consulting services related to those goods, works or

services. Conversely, a firm hired to provide

consulting services for the preparation or

implementation of a project, and any of its

affiliates, shall be disqualified from

subsequentlyproviding goods or works or services

other than consulting services resulting from or

directly related to the firm’s consulting services for

such preparation or implementation. For the purpose

Page 20: Sardar Sarovar Narmada Nigam Limited (A wholly owned ... Sarovar Narmada Nigam Limited (A wholly owned Government ofGujarat Undertaking) Tender Notice No. 2, of 2015-2016. Office of

15

ofthis paragraph, services other than consulting

services are defined as those leading to a

measurable physical output, for example surveys,

exploratory drilling, aerial photography, and satellite

imagery

b) A Consultant (including its Personnel and Sub

Consultants) or any of its affiliates shall not be hired

for any assignment that, by its nature, may be in

conflict with another assignment of the Consultant

for the same or for another Client

c) The Consultant shall be aware of its obligations

under the Contract to

i) notify the SSNNL of any Personnel including

Sub consultant’s Personnel assigned to provide

the Services under the Contract who is a

former SSNNL staff member and to warrant that

the said former SSNNL staff member is not

subject to any work restrictions by virtue of

such former employment with the SSNNL. For

purposes of this clause, SSNNL staff members

are defined as current and retired SSNNL

employees, and individuals that have worked for

the SSNNL with at least one of the following

types of appointments: Short Term Consultant

(STC), Short Term Temporary (STT),

Extended Term Consultant (ETC), Extended Term

Temporary (ETT) or Junior Professional Associate

(JPA);

ii) use its best efforts not to assign any Personnel

(including Sub consultant’s Personnel) to the

Contract who are relatives of current SSNNL

staff, and in the event that the SSNNL

orConsultant discovers that any Personnel is a

Page 21: Sardar Sarovar Narmada Nigam Limited (A wholly owned ... Sarovar Narmada Nigam Limited (A wholly owned Government ofGujarat Undertaking) Tender Notice No. 2, of 2015-2016. Office of

16

close relative of a current SSNNL staff member, to

promptly replace the said Personnel at no cost to

the SSNNL with an individual having equivalent

skills. For purposes of this clause, a relative is

defined as (including those related by adoption

and/or step or half relationships): Mother, Father,

Sister, Brother, Son, Daughter, Aunt, Uncle, Niece

and Nephew, and

iii) confirm, at the time of signing the Contract, that the

Consultant is not knowingly advising any “outside

party,” defined to mean an individual or firm (A)

with which the SSNNL is engaged in a formal

dispute (i.e., the outside Party is suing or has been

sued by the SSNNL), (B) who is being investigated

by the SSNNL for fraud or corruption, or is

ineligible to be awarded a SSNNL-financed

contract because of fraud or corruption, or (C)

whose complaint against a procurement decision is

under review by the SSNNL

1.6.2 Consultants have an obligation to disclose any situation

of actual or potential conflict that impacts their capacity to

serve the best interest of the SSNNL, or that may

reasonably be perceived as having this effect. Failure to

disclose said situations may lead to the disqualification of

the Consultant or the termination of its Contract

1.6.3 No agency or current employees of SSNNL shall work as

Consultants under their own departments or agencies.

Recruiting former government employees or SSNNL

retired officersto work for SSNNL is acceptable provided

no conflict of interest exists. When the

Consultantnominates any government employee as Personnel

intheir technical proposal, such Personnel must have written

certification from their government or employer

Page 22: Sardar Sarovar Narmada Nigam Limited (A wholly owned ... Sarovar Narmada Nigam Limited (A wholly owned Government ofGujarat Undertaking) Tender Notice No. 2, of 2015-2016. Office of

17

confirming that they are on leave without pay from their

official position and allowed to work full-time outside of their

previous official position. Such certification shall be provided

to the SSNNL by the Consultant as part of his technical

proposal

1.6.4 If a Consultant could derive a competitive advantagefrom

having provided consulting services related to

theassignment in question, the SSNNL shall make available to

all the Consultants together with this RFP all information that

would in that respect give such Consultant any competitive

advantage over competing Consultants

Fraud & Corruption

1.7 SSNNLrequires that all Consultants participating in SSNNL

assignments to adhere to the highest ethical standards, both duringthe

selection process and throughout the execution of a contract.

Inpursuance of this policy, the SSNNL

a) defines, for the purpose of this paragraph, the terms set

forth below as follows

i) “corrupt practice” means the offering,

giving, receiving, or soliciting, directly or

indirectly, of anything of value to influence

the action of SSNNL official in the selection

process or in contract execution

ii) “fraudulent practice” means a

misrepresentation or omission of facts in

order to influence a selection process or the

execution of a contract

iii) “Collusive practices” means a scheme or

arrangement between two or more

consultants with or without the knowledge of

the SSNNL, designed to establish prices at

artificial, noncompetitive levels.

iv) “coercive practices” means harming or threatening to harm, directly or indirectly, persons or their property to influence their participation in a procurement process, or affect the execution of a contract

Page 23: Sardar Sarovar Narmada Nigam Limited (A wholly owned ... Sarovar Narmada Nigam Limited (A wholly owned Government ofGujarat Undertaking) Tender Notice No. 2, of 2015-2016. Office of

18

b) will reject a proposal for award if it determines that

the Consultant recommended for award has,

directly or through an agent, engaged in corrupt,

fraudulent, collusive or coercive practices in

competing for the contract in question

c) will terminate the contract if it determines at any

time that representatives of the consultant were

engaged in corrupt, fraudulent, collusive or coercive

practices during the selection process or the

execution of the contract

d) will sanction a Consultant, including declaring the

Consultant ineligible, either indefinitely or for a

stated period of time, to be awarded a SSNNL

contract if at any time determines that the

Consultant has, directly of through an agent,

engaged in corrupt, fraudulent, collusive or coercive

practices in competing for, or in executing, a

SSNNL contract; and

e) will have the right to require that, in contracts financed by

the SSNNL, a provision be included requiring

Consultants to permit the SSNNL to inspect their

accounts and records and other documents relating to

the submission of proposals and contract performance,

and have them audited by auditors appointed by the

SSNNL

1.8 No Consultant, its Sub-Consultant(s), or associate(s) shall be

under a declaration of ineligibility for corrupt and fraudulent

practices issued by the SSNNL in accordance with the above

para. 1.7. Furthermore, the Consultants shall be aware of the

provisions on fraud and corruption stated in the specific clauses

in the General Conditions of Contract

1.9 Consultants shall furnish information on commissions and gratuities, if

any, paid or to be paid to agents relating to this proposal and during

execution of the assignment if the Consultant is awarded the Contract,

as requested in the FinancialProposalsubmission form (Section 4)

Page 24: Sardar Sarovar Narmada Nigam Limited (A wholly owned ... Sarovar Narmada Nigam Limited (A wholly owned Government ofGujarat Undertaking) Tender Notice No. 2, of 2015-2016. Office of

19

Origin of

Consulting

Services Only

one proposal

1.10 Consultancy firms of Indian origin only are permitted to participate in

this selection process

1.11 Consultants may only submit one proposal. If a Consultant submitsor

participates in more than one proposal, such proposals shall be

disqualified. However, this does not limit the participation of

thesame Sub-Consultant, including individual experts, to more

than one proposal.

Proposal Validity

1.12 The Data Sheet indicates how long Consultants’ Proposals mustremain

valid after the submission date. During this period,

Consultants shall ensure the availability of Key Personnel /

Professional staffnominated in the Proposal. The SSNNL will

make its best effort to complete negotiations within this period.

Should the need arise, however, the SSNNL may request

Consultants to extend the validity period of their proposals.

Consultants who agree to suchextension shall confirm that

they maintain the availability of theKey Personnel /Professional

staff nominated in the Proposal, or in theirconfirmation of

extension of validity of the Proposal, Consultantscould submit

new staff in replacement, who would be considered inthe final

evaluation for contract award. Consultants who do notagree

have the right to refuse to extend the validity of

theirProposals.

EMD 1.13 Consultant has to depositRs.100,000/-(Rs. One lakh)Lump- Sum

amount as Earnest Money Deposit/Bid security in form of FDR or Bank

Guarantee with a validity of at least 180 days.

Performance Security

1.14 Consultant has to provide performance security of 10% ofTotal

accepted value of contract as per follows:

1) 2.5 % of the total accepted fees in the form of Bank

Guarantee (BG) while signing the contract.

2) 2.5 % of the total accepted fees in the form of BG within two

months from the date of actual start of the services after

fullmobilization.

3) 5.0 % of the total accepted fees on completion of 50 % timeof

services.

Page 25: Sardar Sarovar Narmada Nigam Limited (A wholly owned ... Sarovar Narmada Nigam Limited (A wholly owned Government ofGujarat Undertaking) Tender Notice No. 2, of 2015-2016. Office of

20

Eligibility of

Sub

Consultants

1.15 SSNNL normally will not encourage appointment of sub

consultants. However, under very special circumstances,

SSNNL may allow appointment of sub consultants for very

specific purposes

Pre-proposal

conference

2.1 A Pre-proposal conference is scheduled on 21/05/2015 at 12hrsinthe

Committee Room of SardarSarovar Narmada Nigam Limited,Block No.

12, 3rd

Floor, New Sachivalaya Complex, Gandhinagar.The short listed

consultants desirous of participating in the pre-bidconference may kindly

confirm their participation to the contact officer nominated hereinabove.

Site Visit

&Verification

of Information

2.2 Applicant Consultants are encouraged and advised to Submit their

respective Proposals after visiting the Project site and

ascertaining forthemselves the site conditions, traffic, location,

surroundings, climate, access to the site, availability of drawings and

other datawith the SSNNL, Applicable Laws and regulations or any

othermatter considered relevant by them. Visits shall be organized

forthe benefit of prospective Applicant Consultants on dates, time

andvenue as specified in RFP document. All costs for such visits

shallbe met with by the Consultant

Clarification

and

amendment

of RFP

documents

2.3 Consultants may request a clarification of any of the

RFPdocuments up to the number of days indicated in the Data

Sheetbefore the proposal submission date. Any request for

clarificationmust be sent in writing, or by standard electronic means

to theSSNNL’s address indicated in the Data Sheet. The SSNNL

willrespond in writing, or by standard electronic means and will

sendwritten copies of the response (including an explanation of

thequery but without identifying the source of inquiry) to

allConsultants. Should the SSNNL deem it necessary to amend theRFP

as a result of a clarification, it shall do so following the procedure

under Para 2.2

2.4 At any time before the submission of Proposals, the SSNNL mayamend

the RFP by issuing an addendum in writing or by standard electronic

means. The addendum shall be sent to allConsultantsand will be binding

Page 26: Sardar Sarovar Narmada Nigam Limited (A wholly owned ... Sarovar Narmada Nigam Limited (A wholly owned Government ofGujarat Undertaking) Tender Notice No. 2, of 2015-2016. Office of

21

on them. Consultants shall acknowledge receiptof all amendments. To

give Consultants reasonable time in whichto take an amendment into

account in their Proposals the SSNNLmay, if the amendment is

substantial, extend the deadline for thesubmission of Proposals

Preparation of

Proposal

3.1 The Proposal (see Para. 1.2), as well as all related

correspondenceexchanged by the Consultants and the SSNNL,

shall be written inthe language (s) specified in the Data Sheet.

3.2 In preparing their Technical Proposal, consultants are expected

toexamine the documents constituting this RFP in detail.

Materialdeficiencies in providing the information requested

mayresult inrejection of a proposal.

3.3 While preparing the Technical Proposal, consultants must

giveparticular attention to the following

a) The estimated number of Professional staff-months or

thebudget for executing the assignment shall be shown in

theData Sheet, but not both. However, the Proposal shall

bebased on the number of Professional staff-months leading to

alump sum price, as estimated by the Consultants

b) Alternative professional staff shall not be proposed, and onlyone

curriculum vitae (CV) may be submitted for each position

c) Documents to be issued by the Consultants as part of

thisassignment must be in the language(s) specified in

theReference Paragraph 3.1 of the Data Sheet. If

ReferenceParagraph 3.1 indicates two languages, the language in

whichtheproposal of the successful Consultant will besubmittedshall

govern for the purpose of interpretation. It is desirablethat the

firm’s Personnel have a working knowledge ofGujarati

Language

Technical

Proposal

Format and

Content

3.4 Consultants are required to submit a Full Technical

Proposal(FTP), The Data Sheet indicates the format of the

TechnicalProposal to be submitted. Submission of the wrong

type of Technical Proposal will result in the Proposal being

Page 27: Sardar Sarovar Narmada Nigam Limited (A wholly owned ... Sarovar Narmada Nigam Limited (A wholly owned Government ofGujarat Undertaking) Tender Notice No. 2, of 2015-2016. Office of

22

deemed non-responsive. The Technical Proposal shall provide

the informationindicated in the following paras from (a) to (g)

using the attachedStandardForms (Section 3).

a) A brief description of the Consultants’ organization and an

outline of recent experience of the Consultants and, in the case

of joint venture, for each partner, on assignments of a similar

nature are required in Form TECH-2 of Section 3. For each

assignment, theoutline should indicate the names ofSub-

Consultants/ Professional staff who participated, duration

of the assignment, contract amount, and Consultant’s

involvement. Information should be provided only for those

assignments for which the Consultant waslegally contracted by

the client as a corporation or as one of the major firms within

a joint venture. Assignments completed by individual

Professional staff working privately or through other consulting

firms cannot be claimed as the experience of the Consultant,

or that of the Consultant’s associates, but can be claimed by

the Professional staff themselves in their CVs. Consultants

should be prepared to substantiate the claimed experience if

so requested by the SSNNL

b) comments and suggestions on the Terms of Reference

including workable suggestions that could improve the quality/

effectiveness of the assignment; and on requirements for

counterpart staff and facilities including: administrative

support, office space, local transportation, equipment, data,

etc. to be provided by the SSNNL (Form TECH-3 of Section-

3)

c) A description of the approach, methodology and work plan for

performing the assignment covering the following subjects:

technical approach and methodology, work plan, and organization

and staffing schedule. Guidance on the content of this section of

the Technical Proposals is provided under Form TECH-4 of Section

3.

d) The list of the proposed Professional staff team by area of

expertise, the position that would be assigned to each staff team

member, and their tasks (Form TECH-5 of Section 3)

e) Estimates of the staff input (staff-months of foreign and local

Page 28: Sardar Sarovar Narmada Nigam Limited (A wholly owned ... Sarovar Narmada Nigam Limited (A wholly owned Government ofGujarat Undertaking) Tender Notice No. 2, of 2015-2016. Office of

23

professionals) needed to carry out the assignment (Form TECH-

7 of Section 3). The staff months input should be indicated

separately for home office and field activities, and for foreign and

local Professional staff

f) CVs of the Professional staff been recently signed by the staff

themselves and by the authorized representative of the

Professional Staff (Form TECH-6 of Section 3)

g) The CVs shall contain an understanding from the respective

key personnel about his/her availability for the duration

specified in the RFP and /or TOR.

h) If individual Key personnel makes a false averment regarding

his qualification, experience or other particulars or his

commitments regarding availability for the project is not

fulfilled at any stage after signing of the agreement, he shall

be liable to be debarred for any future assignments of SSNNL

for a period of 5 years.

3.5 The Technical Proposal shall not include any financial

information. A Technical Proposal containing financial information

may be declared non responsive.

Financial

Proposal

3.6 TheFinancial Proposal shall be prepared using the attachedStandard

Forms (Section 4). It shall list all costs associated with theassignment,

including (a) remuneration for staff (foreign and local, in the field and

at the Consultants’ home office), and (b)reimbursable expenses

indicated in the Data Sheet. If appropriate,these costs should be broken

down by activity and, if appropriate,intoforeign andlocal expenditures.

All activities and itemsdescribed in the Technical Proposal must be

priced separately;activities and items described in the Technical

Proposal but notpriced, shall be assumed to be included in the

prices of otheractivities or items.

Taxes 3.7 The Consultant may be subject to local taxes (such as: value

addedor sales tax, service tax, social charges or income taxes

onnon-resident Foreign Personnel, duties, fees, levies) on

amountspayable by the SSNNL under the Contract. All such taxes

shallbeincluded in thequotedtotal lump sum price. The SSNNL will

Page 29: Sardar Sarovar Narmada Nigam Limited (A wholly owned ... Sarovar Narmada Nigam Limited (A wholly owned Government ofGujarat Undertaking) Tender Notice No. 2, of 2015-2016. Office of

24

state in theData Sheet if the Consultant is subject to payment of any

otherlocal taxes.

3.8 Consultants may express the price of their services in

IndianRupees Only.

3.9 SSNNL shall not allow payment of any commissions and

gratuitiesunder this consultancy assignment.

3.10 While submitting the Financial Proposal, the

ApplicantConsultant shall ensure the following:

a) All the costs associated with the assignment shall

beincluded in the Financial Proposal. These shallnormallycover

remuneration for all the Personnel (Expatriate andResident, in

the field, home office etc), accommodation, airfare equipment,

printing of documents, surveys, geo-technical investigations

etc.

The total amount indicated in the Financial Proposal shall be

without any condition attached or subject to anyassumption,

and shall be final and binding.

In case any assumption or condition is indicated in theFinancial

Proposal, it shall be considered non-responsiveand liable to be

rejected

b) The Financial Proposal shall take into account all expensesand tax

liabilities. For the avoidance of doubt, it is clarifiedthat all taxes,

except for the service tax as applicable, shallbe deemed to be

included in the costs shown under differentitems of the Financial

Proposal.

Service Tax as applicable to the Consultancy Organizationasper

Government of India rules and regulations shall bepaid by the

Consultant and reimbursed by the SSNNL.

As a condition, precedent for reimbursement of the servicetax, the

Page 30: Sardar Sarovar Narmada Nigam Limited (A wholly owned ... Sarovar Narmada Nigam Limited (A wholly owned Government ofGujarat Undertaking) Tender Notice No. 2, of 2015-2016. Office of

25

Consultant shall provide a valid service taxregistration

number issued by the concerned StatutoryAuthority.

Further, all payments shall be subject to deduction of taxesat

source as per Applicable Laws.

c) Costs (including break down of costs) shall be expressed inINR

Submission,

receipt and

opening of

proposals

4.1 The Applicant shall submit the proposal in hard bound form with

all pages numbered serially and by giving an index of

submissions.

The original proposal (Technical Proposal and, if required,

Financial Proposal; see para 1.2) shall contain no interlineations or

overwriting, except as necessary to correct errors made by theConsultants

themselves. The person who signed the proposal must initial such

corrections. Submission letters for both Technical and Financial

Proposals should respectively be in the form of TECH-1 of Section 3,

and FIN- 1 of Section 44.

4.2 An authorized representative of the Consultants shall initial all

pages of the original Technical and Financial Proposals. The

authorization shall be in the form of a written power of attorney

accompanying the Proposal or in any other form demonstrating

that the representative has been duly authorized to sign. The

signed Technical and Financial Proposal shall be marked

“ORIGINAL”

4.3 The Technical Proposal shall be marked “ORIGINAL” or “COPY”

as appropriate. The Technical Proposals shall be sent to the

addresses referred to in Para 4.5 and in the number of copies

indicated in the Data Sheet. All required copies of the Technical

Proposal are to be made from the original. If there are

discrepancies between the original and the copies of the

Technical Proposal, the original governs.

4.4 The original and all copies of the Technical Proposal shall be

placed in a sealed envelope clearly marked “TECHNICAL

PROPOSAL” Similarly, the original Financial Proposal (if required

under the selection method indicated in the Data Sheet) shall be

Page 31: Sardar Sarovar Narmada Nigam Limited (A wholly owned ... Sarovar Narmada Nigam Limited (A wholly owned Government ofGujarat Undertaking) Tender Notice No. 2, of 2015-2016. Office of

26

placed in another sealed envelope clearly marked “FINANCIAL

PROPOSAL” followed by the SSNNL RFP number and the name

of the assignment with Package No, and with a warning “DO

NOT OPEN WITH THE TECHNICAL PROPOSAL.” The

envelopes containing the Technical and Financial Proposals shall

be placed into an outer envelope and sealed. This outer

envelope shall bear the submission address, reference number

and title of the assignment, and be clearly marked “DO NOT

OPEN, EXCEPT IN PRESENCE OF THE OFFICIAL

APPOINTED, BEFORE 15.30 HRS OF 13/03/2015”. The SSNNL

shall not be responsible for misplacement, losing or premature

opening if the outer envelope is not sealed and/or marked as

stipulated. This circumstance may be cause for Proposal

rejection. If the Financial Proposal is not submitted in a separate

sealed envelope duly marked as indicatedabove, this will constitute

grounds for declaring the Proposal non-responsive

4.5 4.6

The Proposals must be sent to the address/addresses indicated

in the Data Sheet and received by the SSNNL no later than the

time and the date indicated in the Data Sheet, or any extension

to this date in accordance with para. 2.2. Any proposal received

by the SSNNL after the deadline for submission shall be

returned unopened. Proposal submitted by Fax, telex or e-mail

shall not be entertained.

The Proposal shall be made in the forms specified in this RFP.

Any attachment to such forms must be provided on separate

sheets of paper and only information that is directly relevant

should be provided. This may include photo copies of relevant

pages of printed documents. No separate documents like printed

annual Statements, Company broachers, copy of contracts etc

will be entertained.

4.7

The SSNNL shall open the Technical Proposal immediately after

the deadline for their submission. The envelopes with the

Financial Proposal shall remain sealed and securely stored for

opening at a later date.

Page 32: Sardar Sarovar Narmada Nigam Limited (A wholly owned ... Sarovar Narmada Nigam Limited (A wholly owned Government ofGujarat Undertaking) Tender Notice No. 2, of 2015-2016. Office of

27

Proposal

Evaluation

5.1 From the time the Proposals are opened to the time the Contract

is awarded, the Consultants should not contact the SSNNL

on any matter related to its Technical and/or Financial

Proposal. Any effort by Consultants to influence the SSNNL in

the examination, evaluation, ranking of Proposals, and

recommendation for award of Contract may result in the rejection

of the Consultants’ Proposal. Evaluators of Technical

Proposals shall have no access to the Financial Proposals

until the technical evaluation is concluded

Evaluation of

Technical

Proposal

5.2 The evaluation committee shall evaluate the Technical Proposals

on the basis of their responsiveness to the Terms of

Reference, applying the evaluation criteria, sub criteria, and

point system specified in the Data Sheet. Each responsive

Proposal will be given a technical score (St). A Proposal shall be

rejected at this stage if it does not respond to important aspects

of the RFP, and particularly the Terms of Reference or if it

fails to achieve the minimum technical score indicated in the

Data Sheet

Financial

Proposals for

QCBS

5.3 Following the ranking of technical Proposals, when selection is

based on quality & cost basis (QCBS), the first ranked Consultant

is invited to negotiate its proposal and the Contract in accordance

with the instructions given under para. 6 of these Instructions

Public

Opening and

Evaluation of

Financial

Proposals

(only for

QCBS, FBS

and LCS)

5.4 After the technical evaluation is completed the SSNNL shall prepare a

list of pre-qualified and short listed applicants for opening of their

Financial Proposals. A date, Time and Venue will be notified to all

Applicants for announcing the results of Technical evaluation and

opening of Financial Proposals. The opening date should allow

Consultantssufficient time to make arrangements for attending the

opening.Consultants’ attendance at the opening of Financial Proposals

isoptional. SSNNL will not entertain any query or clarifications

from Applicant who fail to qualify at any stage of the selection

process.

Page 33: Sardar Sarovar Narmada Nigam Limited (A wholly owned ... Sarovar Narmada Nigam Limited (A wholly owned Government ofGujarat Undertaking) Tender Notice No. 2, of 2015-2016. Office of

28

5.5 Financial Proposals shall be opened publicly in the presence of the

Consultants’ representatives who choose to attend. Thename of

the Consultants, and the technical scores of theConsultants shall

be read aloud. The Financial Proposal of theConsultants who met

the minimum qualifying mark will then beinspected to confirm that

they have remained sealed andunopened. These Financial

Proposals shall be then opened, andthe total prices read aloud

and recorded. The SSNNLshallprepare a record of the public

opening of Financial Proposals.

5.6 The Evaluation Committee will correct any computational

errors. When correcting computational errors, in case of

discrepancy between a partial amount and the total amount,

orbetween word and figures the formers will prevail. In additionto

the above corrections, as indicated under para. 3.6, activitiesand

items described in the Technical Proposal but not priced,hall be

assumed to be included in the prices of other activitiesor items. In

case an activity or line item is quantified in theFinancial Proposal

differently from the Technical Proposal (i) if it is indicated in the Data

Sheet that remuneration shall be Time Based, the Evaluation

Committee shall correct the quantification indicated in the Financial

Proposal so as to makeit consistent with that indicated in the

Technical Proposal, applythe relevant unit price included in the

Financial Proposal to thecorrected quantity and correct the total

Proposal cost, (ii) if it is indicated in the Data Sheet that

remuneration shall be Lump- Sum, no corrections are applied to the

Financial Proposal in this respect. Prices shall be converted to a

single currency using the selling rates of exchange, source and date

indicated in the Data Sheet.

Consultant will be paid as per the Quoted ratein Form Fin-2 as a lumpsum amount for adefinite time period.

5.7 In case of QCBS, the lowest evaluated Financial Proposal (Fm)will

be given the maximum financial score (Sf) of 100 points. Thefinancial

scores (Sf) of the other Financial Proposals will becomputed as

indicated in the Data Sheet. Proposals will be rankedaccording to their

combined technical (St) and financial (Sf) scoresusing the weights (T =

Page 34: Sardar Sarovar Narmada Nigam Limited (A wholly owned ... Sarovar Narmada Nigam Limited (A wholly owned Government ofGujarat Undertaking) Tender Notice No. 2, of 2015-2016. Office of

29

the weight given to the Technical Proposal; P = the weight given to

the FinancialProposal; T + P = 1) indicated in the Data Sheet: S = St x

T% + Sfx P%. The Technical score obtained shall be converted on a

scale of 100 and the result be than multiplied with weightage factor(T%)

The firm achieving the highest combined technical andfinancial

score will be invited for negotiations.

Negotiations 6.1 Negotiations will be held at the date and address indicated inthe

Data Sheet. The invited Consultant will, as a pre-requisitefor

attendance at the negotiations, confirm availability of

allProfessional staff. Failure in satisfying such requirements

mayresult in the SSNNL proceeding to negotiate with the next-

rankedConsultant. Representatives conducting negotiations on

behalfof the Consultant must have written authority to negotiate

andconclude a Contract.

Technical

Negotiations

6.2 Negotiations will include a discussion of the Technical Proposal,the

proposed technical approach and methodology, work plan,

andorganization and staffing, and any suggestions made by

theConsultant to improve the Terms of Reference. The SSNNL andthe

Consultants will finalize the Terms of Reference, staffingschedule,

work schedule, logistics, and reporting. These documentswill then be

incorporated in the Contract as “Description ofServices”. Special

attention will be paid to clearly defining theinputs and facilities

required from the SSNNL to ensuresatisfactory implementation

of the assignment. The SSNNL shallprepare minutes of negotiations

which will be signed by theSSNNL and the Consultant

Financial

Negotiations

6.3 If applicable, it is the responsibility of the Consultant,

beforestarting financial negotiations, to contact the local tax authorities

todetermine the local tax amount to be paid by the Consultant underthe

Contract. The financial negotiations will include a clarification(if any) of

the firm’s tax liability in the beneficiary’s country, andthe manner in

which it will be reflected in the Contract; and will reflect the agreed

technical modifications in the cost of theservices. The financial

negotiations will involve neither theremuneration rates for staff

nor other proposed unit rates

Page 35: Sardar Sarovar Narmada Nigam Limited (A wholly owned ... Sarovar Narmada Nigam Limited (A wholly owned Government ofGujarat Undertaking) Tender Notice No. 2, of 2015-2016. Office of

30

Availability of

professional

staff / experts

6.4 Having selected the Consultant on the basis of, among other things,

an evaluation of proposed Professional staff, the SSNNL expects to

negotiate a Contract on the basis of the Professional staff named in the

Proposal. Before contract negotiations, the SSNNL will require

assurances that the Professional staff will be actually available The

SSNNL will not normally consider any requestof the SelectedApplicant

Consultant for substitution of Key Personnel as the ranking ofthe

Applicant Consultant is based on the evaluation of Key Personnel andany

change therein may upset the ranking. Substitution will, however,

bepermitted if the Key Personnel is not available for reasons of

anyincapacity or due to health, subject to equally or better qualified

andexperienced personnel being provided to the satisfaction of the

SSNNL.The SSNNL expects all the Key Personnel to be available during

implementation of the Agreement. The SSNNL will not

considersubstitution of Key Personnel except for reasons of any

incapacity or dueto health. Such substitution shall ordinarily be limited to

KeyPersonnel subject to equally or better qualified and experienced

personnelbeing provided to the satisfaction of the SSNNL. As a condition

to suchsubstitution, a sum equal to 5% (five per cent) of the

remunerationspecified for the original Key Personnel shall be deducted

from thepayments due to the Consultant. In the case of a second

substitutionhereunder, such deduction shall be 10% (Ten per cent) of

theremuneration specified for the original Key Personnel. Any

furthersubstitutionadditional 25% (Twenty five per cent) deduction shall

be made of the original remuneration of key personnel. In case of

substitution of key personnel in theextended period of PMC/TPI, no

Page 36: Sardar Sarovar Narmada Nigam Limited (A wholly owned ... Sarovar Narmada Nigam Limited (A wholly owned Government ofGujarat Undertaking) Tender Notice No. 2, of 2015-2016. Office of

31

deductionshall be made but it is limited to Twosubstitutions only.

For the First substitution,deduction shall bemade equal to 5% of the

remunerationspecified for the original Key personnel. Forthe second

substitution, deduction shall bemade 10% of the remuneration of the

substituted key personnel.For any furthersubstitution, i.e. 3rd, 4th

deduction shall bemade equal to 15% of the remuneration of the

Substituted key personnel.

Conclusion of

the

negotiations

6.5 Negotiations will conclude with a review of the draft Contract. To

complete negotiations the SSNNL and the Consultant will initialthe

agreed Contract. If negotiations fail, the SSNNL will invite the Consultant

whose Proposal received the second highest score to negotiate a

contract.

Award of

Contract

7.1 After completing negotiations the SSNNL shall award the

Contract to the selected Consultant, and promptly notify all

Consultants who have submitted proposals. After Contract

signature, the SSNNL shall return the unopened Financial

Proposals to the unsuccessful Consultants

7.2 The Consultant is expected to commence the assignment

on the date and at the location specified in the Data Sheet.

However, the Consultant can only commence work once the

contract has been signed

Confidentiality

Clarifications

8.1 9.1.

Information relating to evaluation of Proposals and

recommendations concerning awards shall not be disclosed to

the Consultants who submitted the Proposals or to other

persons not officially concerned with the process, until the

winning firm has been notified

To facilitate evaluation of proposal, SSNNL may at its sole

discretion seek clarifications from any Applicant regarding its

proposal. Such clarification(s) shall be provided within the time

specified by SSNNL for this purpose. Any request for

Page 37: Sardar Sarovar Narmada Nigam Limited (A wholly owned ... Sarovar Narmada Nigam Limited (A wholly owned Government ofGujarat Undertaking) Tender Notice No. 2, of 2015-2016. Office of

32

9.2 10

clarification(s) and all clarification(s) in response thereto shall be

in writing.

If an Applicant does not provide clarification(s) sought under

above mentioned clause within the specified time, its proposal

shall be liable to be rejected. In case the proposal is not rejected,

SSNNL may proceed to evaluate the proposal by construing the

particulars requiring clarification to the best of its understanding

and the applicant shall be barred from subsequently questioning

such interpretation of SSNNL.

The SSNNL reserves the right to reject any proposal that does not

address all the requirements of the RFP. In addition the SSNNL

reserves the right to accept or reject anyproposal submitted by the

Consultants, and to cancel the RFP process and reject all

proposal submissions at any time, without thereby incurring any

liability to the affected Consultant or any obligation to inform the

affected Consultant the grounds for SSNNL.

Page 38: Sardar Sarovar Narmada Nigam Limited (A wholly owned ... Sarovar Narmada Nigam Limited (A wholly owned Government ofGujarat Undertaking) Tender Notice No. 2, of 2015-2016. Office of

33

DATA SHEET

Clause / Reference

1.1.1 The method of selection is: Quality & Cost Based Selection (QCBS)

1.2 Financial Proposal to be submitted together with Technical Proposal: Yes

Name of the assignment is: Selection and appointment of Third

Party Inspection Services through a

quality and cost based selection

process for Canal Works under the

SardarSarovar Project.

1.3 The name of the SSNNL’s official (s):

Executive Engineer,

Saurashtra Branch Canal Division No.1/2,

Narmada Colony, Bhavnagar Highway,

Dhandhuaka,382460.

Phone No.& Fax: 02713-223821

E-mail: [email protected]

1.4 The SSNNL will provide the following inputs and facilities:

• Certified copies of itemratecontracts along with the technical bid, price

bid, general conditions of contract, conditions of particular application,

work specifications, terms of payment and all other relevant data

relating to the item rate contracts awarded by SSNNL to the contractor

for the applicable packages.

• Detailed project reports of the sub projects covered under the project.

• Indicative designs, drawings and site survey and soil exploration data

provided to the construction contractor for detailed engineering design.

• Detailed engineering designs, drawings, calculations and reports

presented by the construction contractor as a part of his contractual

scope of work to the engineer-in-charge for scrutiny and further

recommendations for approval.

Page 39: Sardar Sarovar Narmada Nigam Limited (A wholly owned ... Sarovar Narmada Nigam Limited (A wholly owned Government ofGujarat Undertaking) Tender Notice No. 2, of 2015-2016. Office of

34

As per para 1.4 SSNNL will give all the data related to the work as

given in the bullet form.

1.5 The Client envisages the need for continuity for downstream work:Yes

1.6 Proposals must remain valid for 120 days after the submission.

2.1 Clarifications may be requested not later than 10 days before the

submission date. The address for requesting clarifications

Executive Engineer,

SaurashtraBranch Canal Division No.1/2,

Narmada Colony, Bhavnagar Highway,

Dhandhuaka,382460.

Phone No.& Fax: 02713-223821

E-mail: [email protected]

Proposals shall be submitted in English language:

3.1 RFP Document Fee: Rs. 10,000/- in the form of Demand Draft in the

name of “SardarSarovar Narmada Nigam Limited”, Gandhinagar.

3.2 Consultants may associate with other Consultants: No Joint Venture

Association permitted.

3.3 The format of the Technical Proposal to be submitted is: FTP

3.4 [List the applicable Reimbursable expenses in foreign and in local

currency. A sample list is provided below for guidance: items that are

not applicable should be deleted, others may be added]

(1) a per diem allowance in respect of Personnel of the Consultant for

every day in which the Personnel shall be absent from the home office

and, as applicable, outside the beneficiary country for purposes of the

Services;

(2) cost of necessary travel, including transportation of the Personnel

by the most appropriate means of transport and the most direct

practicable route;

(3) cost of office accommodation, investigations and surveys;

(4) cost of applicable international or local communications such as the

use of telephone and facsimile required for the purpose of the

Services;

Page 40: Sardar Sarovar Narmada Nigam Limited (A wholly owned ... Sarovar Narmada Nigam Limited (A wholly owned Government ofGujarat Undertaking) Tender Notice No. 2, of 2015-2016. Office of

35

(5) cost, rental and freight of any instruments or equipment required to

be provided by the Consultants for the purposes of the Services;

(6) cost of printing and dispatching of the reports to be produced for the

Services;

(7) other allowances where applicable and provisional or fixed sums (if

any); and

(8) Cost of such further items required for purposes of the Services not

covered in the foregoing.

No supporting documents against reimbursable items have to be

submitted along with monthly invoices. However SSNNL reserves

the right to ask for the supporting documents against reimbursable

items.

3.5 Amounts payable by the SSNNL to the Consultant under the contract to

be subject to local taxation:

3.6 Consultants to state their cost in Indian national currency only.

4.1 Consultant must submit the original and one copy of the Technical

Proposal, and the original of the Financial Proposal.

4.2 The Proposal submission address is:

Executive Engineer,

SaurashtraBranch Canal Division

No.1/2, Narmada Colony, Bhavnagar

Highway, Dhandhuaka,382460.

Phone No.& Fax: 02713-223821

E-mail: [email protected]

5.1 Proposals must be submitted no later than 12/06/2015at18.00 hrs.

6.0 Eligibility & Qualification Criteria

6.1 Bid Security (EMD): Consultant has to furnish, as part of its proposal,

BidSecurity/Earnest Money Deposit amounting to Rs. 1,00,000/- (i.e.

Rupees One Lakhonly) Lump Sum For all the Packages. The Bid Security

(EMD) shall be given in favour ofthe Executive Engineer,S.B.C. Division

No.1/2, Dhandhuakafor the valid period of not less than 180 (One hundred

eighty) days and shall be in any one of the following form:

Page 41: Sardar Sarovar Narmada Nigam Limited (A wholly owned ... Sarovar Narmada Nigam Limited (A wholly owned Government ofGujarat Undertaking) Tender Notice No. 2, of 2015-2016. Office of

36

(a) Bank Guarantee issued by any scheduled bank listed with the

Reserve Bank of India including co-operative banks and approved

by the Finance Department in the Government of Gujarat/SSNNL

in the form prescribed in Annexure-IV operable at its Branch in

Ahmedabad / Gandhinagar(As per SSNNL Circular. Attached

herewith).

(b) A Fixed Deposit Receipt (FDR) issued by a scheduled bank

pledged in the name of the Executive Engineer,S.B.C. Division

No.1/2, Dhandhuaka.

Notes:

1. Cheques /Demand Drafts shall not be accepted.

2. Proposal without submission of EMD shall be rejected and treated

as non-responsive.

3. EMD shall be forfeited if, (a) if they fail to furnish security of

performance, (b) if the consultant fails to sign the agreement

within ten days from the award, and (c) if the consultant withdraws

or modifies his proposal before the expiry of the validity (180

days) of offer.

6.2 Applicant Consultants must read carefully the minimum conditions of

eligibility (the “Conditions of Eligibility”) provided herein. Proposals of

only those Applicant Consultants who satisfy the Conditions of Eligibility

will be considered for evaluation.

6.3 Organizational, Technical and Financial capacity requirement:

To be eligible for evaluation of its Proposal, the Applicant Consultant shall

fulfil the following minimum requirements:

(A) Organization: The Consultant’s Organization should have a

minimum experience of 10 years as on 31st March, 2015 in the field of

Engineering and Project Management Consultancy.

(B) Technical Capacity: The Applicant Consultant shall have, over the past 5

(five)years preceding 31st

March 2015, completed minimum one (1)

similar Project Management Assignment/TPI Assignments (as applicable),

for a project valuing more than Rs. 50Crores or any any civil engineering

project of at leastRs. 100 Crores. The applicant Consultant shall submit

client certificate in support of such completedassignment.

(C) Financial Capacity: The Consultant should have a minimum financial

turnoverof Rs.5 crore (Five crore) as an average of last three years

Page 42: Sardar Sarovar Narmada Nigam Limited (A wholly owned ... Sarovar Narmada Nigam Limited (A wholly owned Government ofGujarat Undertaking) Tender Notice No. 2, of 2015-2016. Office of

37

proceeding31st

March, 2015. Financial certificate for 03 years is to be

produced with the bid.

(D) Availability of Key Personnel: The Applicant shall offer and make

availableall Key Personnel meeting the requirements.

(E) The consultant can bid for all the packages. However the consultant

shall give separate team of Key Personnel for every package.

Evaluation shall be carried out for each package. If Consultant wishes

to bid for Third Party Services, consultant may bid in separate financial

Proposal form Fin-1 to Fin -13 for Third Party Services. Technical

evaluation shall be carried out on the basis of Team of Project

Management Consultancy/Third Party Inspection Services.

6.4 Certificates in support of Consultant’s capabilities:

The Applicant Consultant shall enclose with its Proposal, certificate(s) from

its Statutory Auditors stating its financial turn over during each of the past

five financial years preceding31st March, 2015.

• In the event that the Applicant Consultant does not have a statutory

auditor, it shall provide the requisite certificate(s) from the firm of

Chartered Accountants that ordinarily audits the annual accounts of

the Applicant Consultant.

• The Applicant Consultant shall also produce authentic and valid

certificates from the clients, establishing their experience in similar

projects. The SSNNL may, at its own discretion, verify the veracity

and validity of the certificates produced by the Applicant

Consultant.The Applicant Consultant shall also produce authentic

and valid certificates from the clients, establishing their experience

in similar projects. Only those similar projects whose valid

completion certificate clearly stated date of start, date of completion,

Cost of the project, etc. attached with RFP are considered for

technical evaluation, No work order, Performance Certificate or

copy of Agreement shall be considered for evaluation. However if

any documents from clients establishing about the information

required which is true it shall be considered.

• If it is established that the Consultant has produced certificates

which are not correct and valid and the Consultant has misled the

SSNNL, SSNNL at its discretion reject the proposal submitted by

the Consultant and also debar the consultant from participating in

the bidding processes taken up by the SSNNL for appointing a

consultant, for a period of three (3) years.

Page 43: Sardar Sarovar Narmada Nigam Limited (A wholly owned ... Sarovar Narmada Nigam Limited (A wholly owned Government ofGujarat Undertaking) Tender Notice No. 2, of 2015-2016. Office of

38

6.5 Power of Attorney:

The Applicant Consultant should submit a Power of Attorney, duly granted

by the Competent Authority of the Consultants’ Organization. In case of a

limited company registered under the Company’s Act, the Power of

Attorney should be from the Managing Director of the Company under

authority of the Board of Directors.

In case of a Partnership firm, the Power of Attorney shall be from the firm or

its duly appointed Competent Authority.

The Power of Attorney shall be as per the format at Performa 4 of

Appendix-I; provided, however, that such Power of Attorney would not be

required if the Application is signed by a partner of the Applicant

Consultant, in case the Applicant Consultant is a partnership firm or limited

liability partnership.

6.6 Information relating to barring of business by Governmental

Organizations:

Any Consultant who has been debarred by the Central Government, any of

the State Governments, a statutory authority or a public sector

undertaking, SSNNL or any other Gujarat State Undertaking from

participating in any project, and such bar subsists as on the date of

Proposal, would not be eligible to submit a Proposal either by itself or

through its Associate. If any such proposal from debarred Consultant is

received, the same shall be out right rejected without further evaluation.

6.6.1 Past Performance:

An Applicant Consultant or its Associate, who during the last three years,

either failed to perform its obligations under any Consultancy Agreement

as evidenced by imposition of a penalty by an arbitral or judicial authority,

statutory / public sector organization, Government of India, State

Governments, or a judicial pronouncement or arbitration award against the

Applicant or its Associates or been expelled from any project or agreement

on have had agreement terminated for breach by such applicant or its

Associates etc., shall be treated as non-responsive and its technical and

financial proposals shall be outright rejected by the SSNNL, at its sole

discretion.

The Consultant while making a proposal to SSNNL shall provide all such

information relating to the imposition of penalties, non-performance of

contract, debarring by any Government or Statutory Organization along

with its technical proposal.

Page 44: Sardar Sarovar Narmada Nigam Limited (A wholly owned ... Sarovar Narmada Nigam Limited (A wholly owned Government ofGujarat Undertaking) Tender Notice No. 2, of 2015-2016. Office of

39

SSNNL at its own discretion may collect and verify such information of its

own. If SSNNL finds that the Consultant has not provided such information

and has tried to mislead SSNNL, it may reject the Consultant’s proposal as

non-responsive.

6.7 While submitting a Proposal, the Applicant Consultant should attach clearly

marked and referenced continuation sheets in the event that the space

provided in the specified forms in the Appendices is insufficient.

Alternatively, Applicant Consultants may format the specified forms making

due provision for incorporation of the requested information.

6.8 Criteria, sub-criteria, and marking system for the evaluation of Full

Technical Proposals are:

Item

Code

Parameters Max.

Marks

Criteria

1 RelevantExperienceofthe

Applicant Consultant

100 Marks under this category shall be

Assigned by the Evaluation

Committee as under:

a) 100 marks for Consultant’s

experience in providing Project

Management Consultancy

Services/ TPI Services (as

applicable) for three or more

civil engineering infra projects

with emphasis on dams, weirs,

barrages, lined or unlined

canals, canal structures, water

and sewerage projects of at

least 100 Crores or any other

civil engineering construction

project of at least 200Crores

or

b) 85 marks for

Consultant’sexperience in

providing Project

Management Consultancy

Services/TPI Services (as

applicable) for two or more

civil engineering infra projects

with emphasis on dams, weirs,

barrages, lined or unlined

Page 45: Sardar Sarovar Narmada Nigam Limited (A wholly owned ... Sarovar Narmada Nigam Limited (A wholly owned Government ofGujarat Undertaking) Tender Notice No. 2, of 2015-2016. Office of

40

canals, canal structures, water

and sewerage projects of at-

least 100 Crores or any other

civil engineering construction

project of at-least 200Crores.

or

c) 70 marks for Consultant’s

experience in providing

Project Management

Consultancy Services/ TPI

Services (as applicable) for

at least one or more civil

engineering infra projects

with emphasis on dams,

weirs, barrages, lined or

unlined canals, canal

structures, water and

sewerage projects of at

least 100 Crores or any

other civil engineering

construction project of at

least 200Crores.

2 Proposed methodology and work

plan

25 Evaluation will be based on the

quality of submission and marks

will be allotted from the breakup

of the total marks as under:

• Consultants approach and

methodology for providing

the services--- Maximum

Mark 05

• Consultants past experience

in providing Project

Management Services ---

Maximum Marks 05

• Consultants past experience

in providing Inspection &

Quality Control Services for

Projects comprising of

Page 46: Sardar Sarovar Narmada Nigam Limited (A wholly owned ... Sarovar Narmada Nigam Limited (A wholly owned Government ofGujarat Undertaking) Tender Notice No. 2, of 2015-2016. Office of

41

Irrigation works or related

projects. Maximum Marks

10

• Consultants work plan and

work schedules --- Maximum

Marks 05

3 Relevant experience of the key

personnel for TPI

175 40% of the maximum marks for

each Key Personnel shall be

awarded for their engineering on

relevant professional

qualification and 60% of the

maximum marks shall be

awarded for their relevant

professional experience.

The Sr Quality control Engineer shall beprovided as per Section�5 Para 4BDeployment schedule (page No103) as1 no for the whole Package. Key professionals not having the

minimum qualification and

minimum experience as

specified in this RFP will be

assigned ‘0’ marks.

a. Team Leader 75

b. Sr. Quality Control

Engineer 1 No 40

c. Quality Control

Engineers 4Nos 60

Total 350

For calculating marks for Key personnel’s professional experience, following

guidelines may be followed. Equal weight-age shall be given for Size of Project and No of projects undertaken.

Consultants past expare covered initem 1 & 2 For the eligibility, Key personnel should at least work for one year on that

project.

A. Size of the Project:

1. Similar assignment having size of project 1000 Cr.-100% Marks

2. Similar assignment having size of project 500 Cr.-85% Marks

3. Similar assignment having size of project 250 Cr.-50% Marks

4. Similar assignment having size of project 100 Cr.-25% Marks

B. No of Projects undertaken

1 No. of similar Assignments More than 5 :- 100% Marks

2 No. of similar Assignments More than 3 :- 85% Marks

3 No. of similar Assignments More than 2 :- 50% Marks

4 No. of similar Assignments More than 1 :- 25% Marks.

The Consultant shall have to score a minimum of 225 marks out of 350 for

qualification and opening of the price bids. However he will have to obtain minimum of 50% of each item code at sr. No 2 & 3 above.However, if the

Page 47: Sardar Sarovar Narmada Nigam Limited (A wholly owned ... Sarovar Narmada Nigam Limited (A wholly owned Government ofGujarat Undertaking) Tender Notice No. 2, of 2015-2016. Office of

42

number of such post-qualified Applicant Consultants is less than two, the SSNNL may, in its sole discretion, post-qualify the Applicant Consultant(s)

whose technical score is less than 225 marks but is more than 200 marks.

6.9 Similar Assignments For the purposes of determining Conditions of Eligibility and for evaluating the

Proposals under this RFP, advisory/ consultancy assignments in respect of

providing project management services/TPI Services (as applicable) detailed in

the terms of reference and the scope of work, following projects shall be deemed

as similar assignments (the “Similar Assignments”):

1. For Third Party Inspection Agency (Canal Works)

(a) Third Party Inspection including quality assurance for a canal irrigation, lift

irrigation / projects / or dams, weirs, barrages, lined or unlined canals,

canal structures water and sewage projects at least Rs. 100 Crore (One

Hundred Crore)

(b) Any project involving civil engineering construction of at least Rs 200

Crore.

6.10 Short-listing of Applicant Consultants

The Consultants who score 225 out of 300 marks as stated hereinabove

shall be qualify and be included in the shortlist for opening and evaluation

of their financial proposal.

However, if the number of such post-qualified Applicant Consultants is less

than two, the SSNNL may, in its sole discretion, post-qualify the Applicant

Consultant(s) whose technical score is less than 225 marks but is more

than 200 marks.

6.11 Evaluation of Financial Proposal

1. In the second stage, the financial evaluation will be carried out as per

this Clause.

2. For financial evaluation, the total lump sum fee indicated in the Financial

Proposal Form Fin-2 only shall be considered. On financial evaluation, the

shortlisted Consultants will be given total score which will be determined

as under:

Page 48: Sardar Sarovar Narmada Nigam Limited (A wholly owned ... Sarovar Narmada Nigam Limited (A wholly owned Government ofGujarat Undertaking) Tender Notice No. 2, of 2015-2016. Office of

43

(a) 60% weight-age will be given to the Technical Score.

(b) 40% weight-age will be given to the financial score.

2.The SSNNL will determine whether the Financial Proposals are complete,

and unconditional. The cost indicated in the Financial Proposal shall be

deemed as final and reflecting the total cost of services. Omissions, if any,

in costing any item shall not entitle the firm to be compensated and the

liability to fulfil its obligations as per the TOR within the total quoted price

shall be that of the Consultant.

6.12 Combined and final evaluation

1.Proposals of the post qualified applicant consultants during the process

of evaluation of the technical bid will finally be ranked according to the

total score (Technical Score + Financial Score).

2. The Selected Applicant Consultant shall be the first ranked Applicant

Consultant (whose total score as per para 3.1.1 is the highest). The second

ranked Applicant Consultant shall be kept in reserve and may be invited for

negotiations in case the first ranked Applicant Consultant withdraws, or fails to

comply with the requirements specified hereinabove.

6.13 Formula for determining the financial scores:

Sf = 100 x Fm / F, in which Sf is the financial score, Fm is the lowest price

and F the price of the proposal under consideration.

The weight age given to the Technical and Financial Proposals are:

T = 0.60,andP = 0.40

Combined total score (S) = (St x0.6) + (Sf x 0.4)

7.0 Performance Security:

Consultant has to provide performance security of 10% of Purchase Order

Value as per follows:

Page 49: Sardar Sarovar Narmada Nigam Limited (A wholly owned ... Sarovar Narmada Nigam Limited (A wholly owned Government ofGujarat Undertaking) Tender Notice No. 2, of 2015-2016. Office of

44

1) 2.5 % of the total accepted fees in the form of Bank Guarantee (BG) while

signing the contract.

2) 2.5 % of the total accepted fees in the form of BG within two months from

the date of actual start of the services after full mobilization.

3) 5.0 % of the total accepted fees on completion of 50 % time of services

(i.e. one year from the award of services).

Note:

a) Within Ten (10) days after the receipt of the notification of Award from the

EMPLOYER, the successful consultant shall furnish the Performance Security

Deposit, in accordance with the Conditions of Contract, in the form provided in the

Proposal Documents.

b) The form for Performance Security is given at Annexure-II-A, and at Annexure-II-B

Page 50: Sardar Sarovar Narmada Nigam Limited (A wholly owned ... Sarovar Narmada Nigam Limited (A wholly owned Government ofGujarat Undertaking) Tender Notice No. 2, of 2015-2016. Office of

45

SECTION 3

TECHNICAL PROPOSAL

Refer to Reference Paragraph 3.4 of the Data Sheet for format of Technical

Proposal to be submitted, and paragraph 3.4 of Section 2 of the RFP for Standard

Forms required and number of pages recommended.

Form TECH-1. Technical Proposal Submission Form

Form TECH-2. Consultant’s Organization and Experience.

A – Consultant’s Organization

B – Consultant’s Experience

Form TECH-3. Comments and Suggestions on the Terms of Reference and on

Counterpart Staff and Facilities to be provided by the SSNNL.

A –On the Terms of Reference

B – On Counterpart Staff and Facilities

Form TECH-4. Description of Approach, Methodology and Work Plan for

Performing the Assignment

Form TECH-5. Team Composition and Task Assignments

Form TECH-6. Curriculum Vitae (CV) for Proposed Professional Staff

Form TECH-7. Staffing Schedule

Form TECH-8. ABSTRACT OF SIMILAR ASSIGNMENTS OF KEY PERSONNEL

Form TECH-9. ABSTRACT OF SIMILAR ASSIGNMENTS OF KEY APPLICANT

Page 51: Sardar Sarovar Narmada Nigam Limited (A wholly owned ... Sarovar Narmada Nigam Limited (A wholly owned Government ofGujarat Undertaking) Tender Notice No. 2, of 2015-2016. Office of

46

FORM TECH – 1

TECHNICAL PROPOSAL SUBMISSION FORM

(On Applicants Letter head)

[Location, Date, Reference]

To:

Executive Engineer,

Saurashtra Branch Canal Division No.1/2,

Narmada Colony, Bhavnagar Highway,

Dhandhuaka,382460.

Sub: Selection of A Third Party Inspection Services for providing

consultancy services to SardarSarovar Narmada Nigam

Limited for its Item Rate Contracts construction

ofVallabhipurBranch canal’s Distribution Network of SSP in

Gujarat toSardarSarovar Narmada Nigam Limited for canal

works.

Dear Sir, With reference to your Notice Inviting Proposals and the Request for

Proposal dated….........I/we, having examined all relevant documents and

understood their contents, hereby submit our Technical and Financial Proposal for

selection as Consultant for providing Project Management Services to the

SardarSarovar Narmada Nigam Limited (SSNNL) for the Providing Project

Management Services to SardarSarovar Narmada Nigam Limited for its Item Rate

Contracts for construction of Branch Canals and Distribution Network in the state

of Gujarat.

We also state that the proposal is unconditional and complete.

2. All information provided in the Proposal and in the Appendices are true and

correct and all documents accompanying such Proposal are true copies of

their respective original.

3. This statement is made for the express purpose of appointment as the

Consultant for the aforesaid Assignment.

4. I/We shall make available to the SSNNL any additional information it may

Page 52: Sardar Sarovar Narmada Nigam Limited (A wholly owned ... Sarovar Narmada Nigam Limited (A wholly owned Government ofGujarat Undertaking) Tender Notice No. 2, of 2015-2016. Office of

47

deem necessary or require for supplementing or authenticating the Proposal.

5. I/We acknowledge the right of the SSNNL to reject our application without

assigning any reason or otherwise and hereby waive our right to challenge

the same on any account whatsoever.

6. I/We certify that in the last three years, we or any of our Associates have

neither failed to perform on any contract, as evidenced by imposition of a

penalty by an arbitral or judicial authority or a judicial pronouncement or

arbitration award against the Applicant consultant or citsAssociatesnor been

expelled from any project or contract by any public organisation,SSNNL nor

have had any contract terminated by any public organisation,SSNNL for

breach on our part.

7. I/We declare that:

(a) A draft RFP documents prepared on the lines of recently invited tenders

for similar works processed at Nigam level.

(b) I/We have examined and have no reservations to the RFP Documents,

including any Addendum issued by the SSNNL.

(c) I/We do not have any conflict of interest in accordance with the

prescriptions in the RFP Document;

(d) I/We have not directly or indirectly or through an agent engaged or

indulged in any corrupt practice, fraudulent practice, coercive practice,

undesirable practice or restrictive practice, as defined in RFP document,

in respect of any tender or request for proposal issued by or any

agreement entered into with the SSNNL or any other public sector

enterprise or any government, Central or State; and

(e) I/We hereby certify that we have taken steps to ensure that in conformity

with the provisions of the RFP, no person acting for us or on our behalf

will engage in any corrupt practice, fraudulent practice, coercive practice,

undesirable practice or restrictive practice.

8. I/We understand that you may cancel the Selection Process at any time and

that you are neither bound to accept any Proposal that you may receive nor

to select the Consultant, without incurring any liability to the Applicant

consultants in accordance with the RFP document.

Page 53: Sardar Sarovar Narmada Nigam Limited (A wholly owned ... Sarovar Narmada Nigam Limited (A wholly owned Government ofGujarat Undertaking) Tender Notice No. 2, of 2015-2016. Office of

48

9. I/We declare that we are not a Member of any Consortium applying for

Selection as a Consultant.

10. I/We certify that in regard to matters other than security and integrity of the

country, we or any of our Associates have not been convicted by a Court of

Law or indicted or adverse orders passed by a regulatory SSNNL which

would cast a doubt on our ability to undertake the Consultancy for the

Project or which relates to a grave offence that outrages the moral sense of

the community.

11. I/We further certify that in regard to matters relating to security and integrity

of the country, we have not been charge-sheeted by any agency of the

Government or convicted by a Court of Law for any offence committed by us

or by any of our Associates.

12. I/We further certify that no investigation by a regulatory authority is pending

either against us or against our Associates or against our CEO or any of our

Directors/Managers/ employees.

13. I/We hereby irrevocably waive any right or remedy which we may have at

any stage at law or howsoever otherwise arising to challenge or question

any decision taken by the SSNNL [and/ or the Government of India] in

connection with the selection of Consultant or in connection with the

Selection Process itself in respect of the above mentioned Project.

14. I/We agree and understand that the proposal is subject to the provisions of

the RFP document. In no case, shall I/we have any claim or right of

whatsoever nature if the Consultancy for the Project is not awarded to me/us

or our proposal is not opened or rejected.

15. I/We agree to keep this offer valid for 120 (One Twenty Days) days from the

Proposal Due Date specified in the RFP.

16. A Power of Attorney in favour of the authorized signatory to sign and submit

this Proposal and documents is attached herewith.

17. In the event of my/our firm/ being selected as the Consultant, I/we agree to

enter into an Agreement in accordance with the form at Schedule-2 of the

RFP. We agree not to seek any changes in the aforesaid form and agree to

abide by the same.

18. I/We have studied RFP and all other documents carefully and also surveyed

the Project site. We understand that except to the extent as expressly set

forth in the Agreement, we shall have no claim, right or title arising out of any

Page 54: Sardar Sarovar Narmada Nigam Limited (A wholly owned ... Sarovar Narmada Nigam Limited (A wholly owned Government ofGujarat Undertaking) Tender Notice No. 2, of 2015-2016. Office of

49

documents or information provided to us by the SSNNL or in respect of any

matter arising out of or concerning or relating to the Selection Process

including the award of Consultancy.

19. The Financial Proposal is being submitted in a separate cover. This

Technical Proposal read with the Financial Proposal shall constitute the

Application which shall be binding on us.

20. I/We agree and undertake to abide by all the terms and conditions of the

RFP Document. In witness thereof, I/we submit this Proposal under and in

accordance with the terms of the RFP Document.

Yours sincerely,

Authorized Signature [In full and initials]

Name and Title of Signatory:

Name of Firm:

Address:

Seal of the Applicant

Page 55: Sardar Sarovar Narmada Nigam Limited (A wholly owned ... Sarovar Narmada Nigam Limited (A wholly owned Government ofGujarat Undertaking) Tender Notice No. 2, of 2015-2016. Office of

50

FORM TECH – 2

CONSULTANT’S ORGANIZATION AND EXPERIENCE

A – Consultant’s Organization

1.1 Title of Consultancy:

Providing Project Management Services/ Third Party Inspection Services

to SardarSarovar Narmada Nigam Limited

1.2 Title of Project

Providing Project Management Services /Third Party Inspection

Services to SardarSarovar Narmada Nigam Limited for its Item Rate

Contracts for construction of VallabhipurBranch Canal’s Distribution

Network in the state of Gujarat.

1.3 State the Status of the Consultancy Organization namely Public Limited

Company / Private Limited Company / Partnership Firm / Proprietary Firm,

etc

1.4.1 State the following:

Name of Company or Firm:

Legal status (e.g. incorporated private company, unincorporated business,

partnership etc.):

Country of incorporation:

Registered Address:

Year of Incorporation:

Year of commencement of business:

Principal place of business:

Brief description of the Company including details of its main lines of

business.

Name, designation, address and phone numbers of authorized signatory

of the Applicant:

Name :

Designation :

Company :

Address :

Phone No. :

Fax No :

E-Mail Address:

Page 56: Sardar Sarovar Narmada Nigam Limited (A wholly owned ... Sarovar Narmada Nigam Limited (A wholly owned Government ofGujarat Undertaking) Tender Notice No. 2, of 2015-2016. Office of

51

1.5 Does the Applicant’s firm/company (or any member of the

consortium) combine functions as a consultant or adviser along

with the functions as a contractor and/or a manufacturer?

Yes / No

If yes, does the Applicant agree to limit the Applicant’s role

only to that of a consultant/ adviser to the Authority and to

disqualify themselves, their Associates/ affiliates, subsidiaries

and/or parent organization subsequently from work on this

Project in any other capacity?

Yes / No

1.6 Does the Applicant intend to borrow or hire temporarily,

personnel from contractors, manufacturers or suppliers for

performance of the Consulting Services?

Yes / No

If yes, does the Applicant agree that it will only be

acceptable as Consultant, if those contractors, manufacturers and

suppliers disqualify themselves from subsequent execution of

work on this project (including tendering relating to any goods

or services for any other part of the Project) other than that of

the Consultant?

Yes / No

If yes, have any undertakings been obtained (and annexed) from

such contractors, manufacturers, etc. that they agree to disqualify

themselves from subsequent execution of work on this Project

and they agree to limit their role to that of consultant/ adviser

for the Authority only?

Yes / No

Page 57: Sardar Sarovar Narmada Nigam Limited (A wholly owned ... Sarovar Narmada Nigam Limited (A wholly owned Government ofGujarat Undertaking) Tender Notice No. 2, of 2015-2016. Office of

52

FORM TECH – 2

CONSULTANT’S ORGANIZATION AND EXPERIENCE

B – Financial Capacity of the Applicant

Sr. No. Financial Year Annual Turn Over Revenue from

Consultancy Fees

1. 2010-2011

2. 2011- 2012

3. 2012-2013

4. 2013 - 2014

5. 2014 - 2015

Certificate from the Statutory Auditors *

This is to certify that _____ (name of the Applicant) has

received the payments shown above against the

respective years on account of professional fees.

Name of the audit firm:

Seal of the audit firm:

Date:

(Signature, name and designation of the authorized

signatory)

*Note:

• In case the Applicant does not have a statutory auditor, it shall provide

the certificate from its charted account that ordinarily audites the

annual accounts of the Applicants

• Please do not attach any printed Annual financial Statements.

Page 58: Sardar Sarovar Narmada Nigam Limited (A wholly owned ... Sarovar Narmada Nigam Limited (A wholly owned Government ofGujarat Undertaking) Tender Notice No. 2, of 2015-2016. Office of

53

FORM TECH – 2

CONSULTANT’S ORGANIZATION AND EXPERIENCE

C – Statement of Legal Capacity

[To be forwarded on the letter head of the Applicant]

Ref No.:

Date .:

To:

Executive Engineer,

Saurashtra Branch Canal Division No.1/2,

Narmada Colony, Bhavnagar Highway,

Dhandhuaka,382460.

Sub :-Selection of A Project Management Consultant/ Third Party

Inspection Services for providing consultancy services to

SardarSarovar Narmada Nigam Limited for its Item Rate

Contracts construction of VallabhipurBranch canal’s

Distribution Network of SSP in Gujarat to SardarSarovar

Narmada Nigam Limited for canal works.

Dear Sir, I/We hereby confirm that we, the Applicant satisfy the terms and conditions laid

down in the RFP document.

I/We hereby declare that M/s.……………….. (insert Applicant’s name) will act as a

Consultant by ourselves and we will not associate with any other Consultant or

Sub Consultant for the purpose of the subject assignment.

I/We have agreed that ……………….. (insert individual’s name) will act as our

Authorized Representative on our behalf and has been duly authorized to submit

our Proposal. Further, the authorized signatory is vested with requisite powers to

furnish such proposal and all other documents, information or communication and

authenticate the same.

Yours faithfully,

(Signature, name and designation of the authorized signatory)

For and on behalf of

Page 59: Sardar Sarovar Narmada Nigam Limited (A wholly owned ... Sarovar Narmada Nigam Limited (A wholly owned Government ofGujarat Undertaking) Tender Notice No. 2, of 2015-2016. Office of

54

FORM TECH – 2 CONSULTANT’S ORGANIZATION AND EXPERIENCE

D –Abstracts of Similar Assignments of the Applicant Consultants:

Sr. No.

Name of

Project

Name of Client with

address and

contact numbers

Date of Award of

assignment

Date of completion

of assignment

Estimated capital cost of Project

Rs in Cr.

# Professional

fees received by

the Applicant

(Rs. In Crore)

Period during which

services are

provided

1 2 3 4 5 6 7 8

1

2

3

4

# The Applicant should only provide details as per para 6.3 (B) the projects that have been completed by it under its own name.

Certificate from the Statutory Auditor

This is to certify that the information contained in Column 7 above is correct as per the accounts of the Applicant and / or the clients.

Name of the audit firm : Seal of the audit firm : Date : Signature, name and designation of the authorized signatory)

In case the Applicant does not have a statutory auditor, it shall provide the certificate from its chartered accountant that ordinarily audits the annual accounts of the Applicant. Note: The Applicant may attach separate sheets to provide brief particulars of other relevant

experience of the Applicant.

Page 60: Sardar Sarovar Narmada Nigam Limited (A wholly owned ... Sarovar Narmada Nigam Limited (A wholly owned Government ofGujarat Undertaking) Tender Notice No. 2, of 2015-2016. Office of

55

FORM TECH – 3

COMMENTS AND SUGGESTIONS ON THE TERMS OF REFERENCE

AND ON COUNTERPART STAFF AND FACILITIES TO BE

PROVIDED BY THE SSNNL

A – On the Terms of Reference

[Present and justify here any modifications or improvement to the Terms of

Reference you are proposing to improve performance in carrying out the

assignment (such as deleting some activity you consider unnecessary, or adding

another, or proposing a different phasing of the activities). Such suggestions

should be concise and to the point, and incorporated in your Proposal.]

Page 61: Sardar Sarovar Narmada Nigam Limited (A wholly owned ... Sarovar Narmada Nigam Limited (A wholly owned Government ofGujarat Undertaking) Tender Notice No. 2, of 2015-2016. Office of

56

B – On Counterpart Staff and Facilities

[Comment here on counterpart staff and facilities to be provided by the SSNNL

according to Paragraph Reference 1.4 of the Data Sheet including: administrative

support, office space, local transportation, equipment, data, etc.]

Page 62: Sardar Sarovar Narmada Nigam Limited (A wholly owned ... Sarovar Narmada Nigam Limited (A wholly owned Government ofGujarat Undertaking) Tender Notice No. 2, of 2015-2016. Office of

57

FORM TECH – 4

DESCRIPTION OF APPROACH, METHODOLOGY AND WORK PLAN FOR PERFORMING THE ASSIGNMENT

[Technical approach, methodology and work plan are key components of the

Technical Proposal. You are suggested to present your Technical Proposal

divided into the following three chapters:

a) Technical Approach and Methodology,

b) Work Plan, and

c) Organization and Staffing

a) Technical Approach and Methodology. In this chapter you should explain

your understanding of the objectives of the assignment, approach to the

services, methodology for carrying out the activities and obtaining the

expected output, and the degree of detail of such output. You should

highlight the problems being addressed and their importance, and explain

the technical approach you would adopt to address them. You should also

explain the methodologies you propose to adopt and highlight the

compatibility of those methodologies with the proposed approach.

(Not more than 2 pages)

b) Work Plan. In this chapter you should propose the main activities of the

assignment, their content and duration, phasing and interrelations,

milestones (including interim approvals by the Client), and delivery dates of

the reports. The proposed work plan should be consistent with the

technical approach and methodology, showing understanding of the TOR

and ability to translate them into a feasible working plan. A list of the final

documents, including reports, drawings, and tables to be delivered as final

output, should be included here. The work plan should be consistent with

the Work Schedule of Form TECH-8

. (Not more than 3 pages)

c) Organization and Staffing. In this chapter you should propose the structure

and composition of your team. You should list the main disciplines of the

assignment, the key expert responsible, and proposed technical and

support staff.]

Note: Marks will be deducted for writing lengthy and out of contex responses.

Page 63: Sardar Sarovar Narmada Nigam Limited (A wholly owned ... Sarovar Narmada Nigam Limited (A wholly owned Government ofGujarat Undertaking) Tender Notice No. 2, of 2015-2016. Office of

58

FORM TECH – 5

TEAM COMPOSITION & TASK ASSIGNMENTS

Professional Staff

Sr

No

Designation

of

Personnel

Name Educational

Qualification

Length of

Professional

Experience

Present

Employment

Name of

Firm/

Employed

since

No of

Eligible

Assignment

Page 64: Sardar Sarovar Narmada Nigam Limited (A wholly owned ... Sarovar Narmada Nigam Limited (A wholly owned Government ofGujarat Undertaking) Tender Notice No. 2, of 2015-2016. Office of

59

FORM TECH – 6

CURRICULUM VITAE (CV) FOR PROPOSED PROFESSIONAL

STAFF

(Note: - CV in above format shall be mandatory).

Proposed deployed personnel

Sr

No

Proposed Position

1 Name of Staff Member

2 Date of Birth/ Age (DD/MM/YYYY) / Years...................

3 Education Qualification (Mention specific diploma/degree/any others qualification

4 Passing Year ( Mention year of passing for each qualification separately

5 Institute/University (Mention the name of college/institute along with university)

6 Nationality

7 Regular / Permanent

employment with the

present employer

(Mention Duration from…..…to ……….)

2. Employment Record:- Project Related Experience[Starting with present

position, list in reverse order every employment held by staff member since

graduation, giving for each employment (see format here below):

Sr

No

Project Details

Tasks

actually

Performed

Duration of

tasks

Position

Held

Remarks

Name of

Project

Cost

of

Project

Client From Upto

Total Experience: ……………. Years.

Page 65: Sardar Sarovar Narmada Nigam Limited (A wholly owned ... Sarovar Narmada Nigam Limited (A wholly owned Government ofGujarat Undertaking) Tender Notice No. 2, of 2015-2016. Office of

60

3. LANGUAGE

(Indicate proficiency in speaking, reading and writing of English & Hindi

language by "Excellent",

4. CERTIFICATION

I, the undersigned, certify that to the best of my knowledge and belief this

CV correctly describesmyself, my qualifications and my experience.

Date :

Place :

5. Certification:

1. I am willing to work on the project and I will be available for the entire

duration of the Project assignment as required.

2. I, the undersigned, certify that to the best of my knowledge and belief,

this CV correctly describes me, my qualifications, and my experience. I

understand that any wilful misstatement described herein may lead to

my disqualification or dismissal, if engaged.

Signature of Personnel

Signature of Authorized Officer of the Firm

Date:

Full name of authorized representative

Note: Use Separate Sheets for each Key Personnel

Page 66: Sardar Sarovar Narmada Nigam Limited (A wholly owned ... Sarovar Narmada Nigam Limited (A wholly owned Government ofGujarat Undertaking) Tender Notice No. 2, of 2015-2016. Office of

61

FORM TECH – 7

STAFFING SCHEDULE

Name of Staff

Staff input in the form of BAR CHART

Total staff month input

1 2 3 4 5 N Home Field Total

Page 67: Sardar Sarovar Narmada Nigam Limited (A wholly owned ... Sarovar Narmada Nigam Limited (A wholly owned Government ofGujarat Undertaking) Tender Notice No. 2, of 2015-2016. Office of

62

FORM - 8

ABSTRACT OF SIMILAR ASSIGNMENTS OF KEY PERSONNEL

Name of Key Personnel: Designation:

Sr.No Name of

Project* Name of Client

Estimated capital cost of project (in Rs. cr./ US$ million)

Name of firm for which the Key Personnel worked

Designation of the Key Personnel on the assignment

Date of completion of the assignment

Man days spent

1 2 3 4 5 6 7 8

@ Use separate Form for each Key Personnel. * The names and chronology of projects included here should conform to the project-wise details submitted in Form-11 of Appendix-I. Note: The Applicant may attach separate sheets to provide brief particulars of other relevant

experience of the Key Personnel.

Page 68: Sardar Sarovar Narmada Nigam Limited (A wholly owned ... Sarovar Narmada Nigam Limited (A wholly owned Government ofGujarat Undertaking) Tender Notice No. 2, of 2015-2016. Office of

63

FORM 9

ABSTRACT OF SIMILAR ASSIGNMENTS OF APPLICANT

Name of Applicant:

Name of the Project:

Description of services performed

Name of client and

Address:(Indicate whether public or private entity)

Name, telephone no. and fax no. of client’s representative:

Estimated capital cost of Project (in Rs. crore or US$ million):

Payment received by the

Applicant (in Rs. crore):

Start date and finish date of the services (month/ year):

Brief description of the Project:

Notes:

1. Use separate sheet for each similar Assignments. 2. Exchange rate should be taken as Rs. [55] per US $ for conversion to Rupees.

Page 69: Sardar Sarovar Narmada Nigam Limited (A wholly owned ... Sarovar Narmada Nigam Limited (A wholly owned Government ofGujarat Undertaking) Tender Notice No. 2, of 2015-2016. Office of

64

SECTION 4

FINANCIAL PROPOSAL

Financial Proposal Standard Forms shall be used for the preparation of the

Financial Proposal according to the instructions provided under Para 3.6 of

Section 2. Such Forms are to be used whichever is the selection method indicated

in Para 4 of the Letter of Invitation. If Consultant wishes to bid for Third Party

Services a separate Financial Proposal for Third Party Services only shall be

given in the standard Forms Fin -1 to Fin- 15

Form FIN – 1 : Financial Submission Form

Form FIN – 2 : Total Lump Sum Cost

Form FIN – 3 : Abstract of Financial proposal as per Form No. 4 to 13 (Fin –

Abstract)

Form FIN – 4 : Price Breakup of remuneration of Key personnel (inclusive of

Personal Allowance)

Form FIN – 5 : Price Breakup of Remuneration of Support Personnel (inclusive

of all personal allowances)

Form FIN – 6 : Price Breakup of Office and Laboratory Rent

Form FIN – 7 : Prize Breakup of Office Establishment (Rental) and

Communication Expenses

Form FIN – 8 : Price Breakup of Laboratory Establishment (Rental) for Quality

Assurance

Form FIN – 9 : Prize Breakup of surveying levelling and measuring Instruments

/ Devices / Tools

Form FIN – 10 : Price Breakup of Travel and out of pocket expenses of Key

personnel and support personnel(Deleted)

Form FIN – 11 : Price Breakup of Report and Document Printing

Form FIN – 12 : Price Breakup of Deployment of Rental Vehicles including Fuel

Expenses and M & R

Form FIN – 13 : Price Breakup of all the miscellaneous expenses not covered

under FIN – 1 to Fin – 9

Form FIN – 14 : Payment Schedule

Form FIN – 15 : List of Field Tests

Page 70: Sardar Sarovar Narmada Nigam Limited (A wholly owned ... Sarovar Narmada Nigam Limited (A wholly owned Government ofGujarat Undertaking) Tender Notice No. 2, of 2015-2016. Office of

65

Instructions to the Eligible Third Party Inspection (TPI) prior to

submission of the Financial Proposal for Item Rate Bid Packages:

Financial Proposal shall be read in conjunction with the TOR (Scope of Services)

and RFP, Clarifications, set forth applicable to the respective Slices.

Financial Proposal set forth in FORM FIN-3 for the respective Slices and all the

Items outlined under Form FIN-4 to FIN-13 are lump sum prices.

The lump sum prices and other rates of the PMC Bidder set forth herein shall be

inclusive of all costs, risk and expense, head office and site office overheads,

profit and/or fee related to the satisfactory performance and completion of the

work and all taxes and duties (excluding service tax)

The lump sum prices and other rates shall include but not limited to any and all

costs related to Project Management, day to day supervision on 24X7 basis,

attendance at all meetings with the SSNNL and Item Rate Contractors (whether

at SSNNL’s premises, SSNNL’s nominated location or the PMC’s Premises and

Item Rate Contractor’s Site / Campus, inspection, witnessing , witnessing 100%

tests carried out by the Item Rate Contractors as per construction contract ,

additional 25% Conformity Testing and quality assurance/quality control as Third

Party Quality Inspection Agency, contract administration, project scheduling ,

controlling and monitoring, progress monitoring, project financial monitoring ,

witnessing and approving Performance Tests and Commissioning Tests as more

particularly described in the construction contract documents ,TOR, and

elsewhere in the RFP as per the requirement of the respective construction

contract documents.

The quoted price of the bidder shall include, but not limited to the

following:

1. Wages / Salaries, benefits, payroll, incentives, all the allowances, bonus,

medical expenses, overtime, charges for working on holidays and all other

costs or expenses of any type or kind whatsoever which directly or

indirectly relate to accomplishing the work and complying in full with the

provisions of the construction contract of the respective Slices and which

are not otherwise set forth or referred to in the contract as a reimbursable

expenses under Form FIN.2 of Financial Proposal.

Page 71: Sardar Sarovar Narmada Nigam Limited (A wholly owned ... Sarovar Narmada Nigam Limited (A wholly owned Government ofGujarat Undertaking) Tender Notice No. 2, of 2015-2016. Office of

66

2. Head Office and Site Office / Project Office overhead costs and profit shall

not be reimbursed as an extra / additional to the Third Party Inspection. It

is deemed to be included in the lump sum price under FIN-3 and FIN-4 to

FIN-13 Forms set forth under Financial Proposal.

Consultant will be paid as per the Quoted ratein Form Fin-2 as a lump sum

amount for adefinite time period.

3. All the costs and expenses towards third party equipment rental ,

communication equipment, communications charges, general

administrative costs of the PMC’s operation (including travel, lodging,

boarding, transport facility, camp sites, offices).

4. Usage of all existing and / or new office and field laboratory facilities and

electricity charges).

5. Usage of all existing and/ or new computers, hardware, required office

administration, management, engineering and application software,

statistics and CAD software, planning, scheduling and monitoring and

control software etc.

6. All printing, black & white / colour plotting, reproduction, internal and long-

distance communications and courier costs.

7. Fees paid to any other agency, company, organization, consultant /

specialists, techno-legal experts, technology experts, scheduling expert,

electro-mechanical / hydro-mechanical experts, soil engineering and geo-

technical experts etc. for use of the TPI.

8. Any additional efforts due to re-engineering / re-routing, changes in the

technical specifications, revision in drawings or execution methodology

etc., if required and decided by the SSNNL for the respective Slices.

9. All the costs and expenses towards third party equipment rental ,

communication equipment, communications charges, general

administrative costs of the TPI’s operation (including travel, lodging,

boarding, transport facility, camp sites, offices).

10. All the insurance requirements.

Page 72: Sardar Sarovar Narmada Nigam Limited (A wholly owned ... Sarovar Narmada Nigam Limited (A wholly owned Government ofGujarat Undertaking) Tender Notice No. 2, of 2015-2016. Office of

67

11. All downtime due to weather, communication and mechanical breakdown

shall be to the TPI’s account and is deemed to be included in the lump sum

prices quoted under Form FIN.2.

12. Income Tax and any other taxes payable in the TPI’s country or payable in

India (except Service Tax).

TPI BIDDERS TO NOTE

1. SSNNL shall not entertain any financial claim or request for compensation

towards an increase in the Estimated Cost / Bid Price of the Construction

Contractor( whichever is less ) of the respective Slices mentioned in the

‘Schedule of Bid Packages’ for Item Rate Bid Packages. SSNNL shall not

pay any expenses / fees in addition to the Agreed Contract Price to the TPI

as additional fees, financial claim and/or compensation due to increase in

the Estimated Cost / Bid Price of the Construction Contractor (whichever is

less) for respective Slices because of change in the scope of work, extra

items, excess items, claims, compensation, price escalation of the

respective Slicesfor Item Rate Tenders etc.

2. The TPI shall not be allowed to share and use any or all the resources for

which he has been awarded the respective Slices for another / adjoining

Slices also awarded to him. TPI shall inform the EIC in writing about all the

resources (man, material, equipment, systems, testing facilities,

infrastructure, and vehicles etc.) deployed in accordance with the agreed

Contract Agreement regularly.

3. All the Testing Charges towards additional 25% Field Conformity Tests

Field at site shall be administered, managed and borne by the TPI. An

indicative list of such Field Laboratory Tests mentioned separately as Form

FIN-15.

All the equipments necessary for the carrying out the field test shall be made available in the laboratory.

4. Actual Testing Charges for Additional 25% Conformity Tests to be carried

out in the SSNNL approved Material Testing Laboratory or GERI /

Polytechnic / Engineering Colleges / Govt Laboratories shall be borne by

Page 73: Sardar Sarovar Narmada Nigam Limited (A wholly owned ... Sarovar Narmada Nigam Limited (A wholly owned Government ofGujarat Undertaking) Tender Notice No. 2, of 2015-2016. Office of

68

the SSNNL. However all the expenses towards handling, re-handling,

administration, management, communication, expediting, conveyance,

witnessing etc. shall be borne by the TPI for such Additional 25%

Conformity Tests carried out in the SSNNL approved Material Testing

Laboratory or GERI / Polytechnic / Engineering Colleges / Govt

Laboratories.

For Field Testing as per the Fin-15, Consultant has to establish the

laboratory. The cost towards the field Laboratory shall be included in Form-

Fin-6 & Form- Fin-8

5. The lump sum Price shall include all the costs to be incurred during the

construction period and as per TOR (that is up to finalization of the Final

Bill). The Price to be incurred during the finalization of the Final Bill shall be

deemed to be included in the Lump sum Price quoted by the TPI.

6. The consultant can bid for all the packages. However the consultant shall

give separate team of Key Personnel for every package. Evaluation shall

be carried out for each package. If Consultant wishes to bid for Third Party

Services, consultant may bid along with TPI. Evaluation shall be carried

out on the basis of Team of Team of Third Party Inspection Agency. The

Terms of Reference applicable under clause 3.2 Quality Assurance & 3.3,

3.4 of section-5 for Third Party Inspection Services.

7. During negotiation, SSNNL shall reserve an express right to ask the TPI to

justify the reasonableness of the Lump sum Prices quoted for all the items

(Under Forms FIN-4 to FIN13).

8. SSNNL may reject the unreasonable and unbalanced Financial Proposal

(Lump sum Prices under FIN-4 to FIN-13) if justification made by the TPI

Bidder shall not be acceptable to the SSNNL.

9. Proposal for the packages of Third Party Services if they wish in the form

Fin-1 to Fin- 13.

10. The Consultants are advised to refer the Detailed Tender Documents of

Item Rate Contracts of Construction Contract. This will be available either

Page 74: Sardar Sarovar Narmada Nigam Limited (A wholly owned ... Sarovar Narmada Nigam Limited (A wholly owned Government ofGujarat Undertaking) Tender Notice No. 2, of 2015-2016. Office of

69

on the web site www.ssnnl.nprocure.com or contact respective Chief

Engineer (Const) /Chief Engineer (CPC) before filling the Tender.

11. If for reasons whatsoever, one or more slices of any Package is/are

not awarded to the construction Contractor and consequentlyconsultancy

of such slice(s) is/are not intended to be awarded tothe TPI Consultant by

SSNNL, cost of services of the TPI Consultant shall be reduced on prorate

basis. No claim shall be entertained in this regard.

If for reasons whatsoever, one or more slices of any Package is/are not awarded to the construction Contractor and consequently consultancy of such slice(s) is/are not intended to beawarded to the TPI Consultant by SSNNL, cost of services of the TPI Consultant shall be reduced on the basis of the deployment of the Key personnel. The remuneration, travel and out of pocket expenses of Sr. Quality Control Engineer 1 No & Quality Control Engineers 2 Nos per slice will be deducted if TPI is not awarded for.

12. If for reasons whatsoever, the contract period is reduced /enhanced in one

or more slices of any Package before the award of the TPI contract; the

rates quoted by the TPI Consultant shall be proportionately reduced

/increased for such slice(s) of the corresponding Package.

However, If for reasons whatsoever, the contract period is reduced

/enhanced in one or more slices of any Package before the award of the

TPI contract; the rates quoted by the TPI Consultant shall be

proportionately reduced /increased for such slice(s)/Package.

13. The defect Liability period for the Construction Contracts are Two years

from the completion of the Project.

14. The TPI will have to perform duty as and when required during Defect Liability

Period. No regular staff will required during defect Liability period. However

TPI has to deploy the staff on call basis which will be decided by Engineer

in charge.

During Defect Liability period, the TPI will have to perform duty as and

when required during Defect Liability Period. No regular staff will required

during defect Liability period. However TPI has to deploy the staff on call

basis which will be decided by Engineer in charge.

Page 75: Sardar Sarovar Narmada Nigam Limited (A wholly owned ... Sarovar Narmada Nigam Limited (A wholly owned Government ofGujarat Undertaking) Tender Notice No. 2, of 2015-2016. Office of

70

FORM FIN – 1

FINANCIAL PROPOSAL SUBMISSION FORM

Location, Date]

To:

Executive Engineer,

Saurashtra Branch Canal Division No.1/2,

Narmada Colony, Bhavnagar Highway,

Dhandhuaka,382460.

Dear Sir,

I / We, the undersigned, herewith enclose the financial proposal for selection of Project

Management Consultants through a quality and cost based selection process for the

Providing Project Management Services to SardarSarovar Narmada Nigam Limited for its

Item Rate Contracts for construction of VallabhipurBranch Canal’s DistributionNetwork in

thestate of Gujarat under the SardarSarovar Project in accordance with your Request for

Proposal dated ________.

I / We have quoted separate prices for package ____ to _____ and do hereby understand

and agree that SSNNL shall at its sole discretion award one or more packages to me / us

on evaluation of our strengths.

Our Financial Proposal shall be binding upon us subject to the modifications resulting

from Contract negotiations, up to expiration of the validity period of the Proposal, i.e.

before the date indicated in Paragraph Reference 1.6 of the Data Sheet.

We understand you are not bound to accept any Proposal you receive

Yours sincerely,

Authorized Signature [In full and initials]: Name and Title of Signatory

Name of Firm :

Address :

Note :The financial proposal is to be submitted strictly as per forms given in RFP.

Page 76: Sardar Sarovar Narmada Nigam Limited (A wholly owned ... Sarovar Narmada Nigam Limited (A wholly owned Government ofGujarat Undertaking) Tender Notice No. 2, of 2015-2016. Office of

71

FINANCIAL PROPOSAL

(To be quoted by TPI Bidder)

FORM FIN – 2 TOTAL LUMP COST

Name of the TPIBidder :

Serial Number of the Bid Package from Schedule of Bid Package: (Slices- __ to__ )

Name of the work : Providing TPI Servicefor for its Item Rate Contracts for construction of VallabhipurBranch Canal’s DistributionNetwork in thestate of Gujarat under the SardarSarovar Project

Sr. No. Description of the Item Lump Sum Price in Rs. (INR)

1 Providing TPI Servicesto the SardarSarovar

Narmada Nigam Limited as per the Scope of

Work of the respective construction document

of the Bid Packages, Scope of Services as

per TOR and RFP, Clarifications

Total LS Price in Figure (Excluding of Service Tax)

Total LS Price in Words (Excluding of Service Tax)

Date :

Name

Designation

Seal

Page 77: Sardar Sarovar Narmada Nigam Limited (A wholly owned ... Sarovar Narmada Nigam Limited (A wholly owned Government ofGujarat Undertaking) Tender Notice No. 2, of 2015-2016. Office of

72

FINANCIAL PROPOSAL ( To be quoted by TPI Bidder )

Name of the Bidder :

FORM FIN-3

ABSTRACT OF FINANCIAL PROPOSAL AS PER FORM No.4 to 13 ( FIN-ABSTRACT)

Sr. No.

Description of the Items # Total of Breakup of Cost Taken

Off from

LS Bid Price for Bid Package

1 2 3 4

1 TOTAL LS COST OF REMUNERATION OF RESIDENT KEY PERSONNEL ( Inclusive of Personal Allowances

Form No. FIN-4

2 TOTAL LS COST OF REMUNERATION OF RESIDENT SUPPORT PERSONNEL (inclusive of all personal allowances)

Form No. FIN-5

3 TOTAL LS COST OF OFFICE AND LABORATORY RENT

Form No. FIN-6

4 TOTAL LS COST OF OFFICE ESTABLISHMENT ( RENTAL ) AND COMMUNICATION EXPENSES

Form No. FIN-7

5 TOTAL LS COST OF LABORATORY ESTABLISHMENT ( RENTAL ) FOR QUALITY ASSURANCE

Form No. FIN-8

6 TOTAL LS COST OF SURVEYING,LEVELLING AND MEASUREMENT INSTRUMENTS / DEVICES

Form No. FIN-9

7 TOTAL LS COST OF REPORT AND DOCUMENTS Form No. FIN-11

8 TOTAL LS COST OF DEPLOYMENT OF RENTAL VEHICLES INCLUDING FUEL EXPENSES AND M & R

Form No. FIN-12

9 TOTAL LS COST OF ALL THE MISCELLANEOUS EXPENSES NOT COVERED UNDER FIN-1 TO FIN-9

Form No. FIN-13

GRAND TOTAL FOR PRICE BID EVALUATION IN FIGURE

GRAND TOTAL FOR PRICE BID EVALUATION IN WORDS

Name and Signature of Authorised Signatory: Seal of the Company: Date:

Page 78: Sardar Sarovar Narmada Nigam Limited (A wholly owned ... Sarovar Narmada Nigam Limited (A wholly owned Government ofGujarat Undertaking) Tender Notice No. 2, of 2015-2016. Office of

73

FINANCIAL PROPOSAL

(To be quoted by TPI Bidder) Name of the Bidder :

Bid Package No. : (Slices __ to__ )

Name of the Bid Package:

FORM NO. FIN – 4 (For TPI)

PRICE BREAKUP OF REMUNERATION OF KEY PERSONNEL (INCLUSIVE OF

PERSONAL ALLOWANCES)

A B C D C X D = (E) Sr. No.

Designation of the Key Personnel

Monthly Remuneration

in Rs. (INR)

Deployment period as per

Slice Schedule in Months

LS Amount in Rs. (INR)

1 2 3 4 5 1 Team Leader 2 Senior Quality Control Engineer 3 Quality Control Engineer #1 4 Quality Control Engineer #2 5 Quality Control Engineer #3 6 Quality Control Engineer #4 Total in Figure Σ Σ Total in Words Σ Σ

Note:

1. The PMC/TPI shall not change number and discipline of the Key Personnel. DeploymentPeriod shall be as per the 'Schedule of Deployment' for the respective Package. If the deployment schedule is not as per the RFP such bids are rejected.

2. The PMC/TPI shall deploy sufficient nos. of supporting staff to effectively monitor the works in conjunction with the TOR. The no.& designation of staff shall be decided by the PMC/TPI bidder keeping in mind the size of the Package /Slices.

3. All the Items covered under FIN-1 shall be inclusive of overheads and profit but exclusive of Service Tax

4. Remuneration includes Travel and out of pocket expenses of Key

personnel and support personnel

Name and Signature of Authorised Signatory: Seal of the Company: Date :

Page 79: Sardar Sarovar Narmada Nigam Limited (A wholly owned ... Sarovar Narmada Nigam Limited (A wholly owned Government ofGujarat Undertaking) Tender Notice No. 2, of 2015-2016. Office of

74

FINANCIAL PROPOSAL ( To be quoted by TPI Bidder)

Name of the Bidder :

Bid Package No.:(Slices)

Name of the Bid Package:

FORM NO: FIN-5

PRICE BREAKUP OF REMUNERATION OF SUPPORT PERSONNEL (inclusive of all personal allowances)

A B C D E CXDXE = (F)

Sr. No.

List of the Support Personnel # Monthly

Remuneration in Rs.(INR)

Nos. Deployment Period considered as per

Revised Bid Package Schedule

in Months

Amount in Rs.(INR)

1 Qualified Quality Control Engineers

2 Qualified Site Supervisors

3 Laboratory Technicians

4 Office Assistants / Computer Operators

5 Accountants / Clearks

6 Drivers

7 Peons / Office Boys / Helpers

8 Security Personnel / Safety Personnel

9 Add/Omit

Total in Figure Σ Σ Σ

Total in Words Σ Σ Σ

Note :- # This is an illustrative list only. The PMC/TPI shall decide the numbers, designation,

discipline , qualification and experience of the Support Personnel. The PMC/TPI shall

add / omit as per the requirements of Item Rate construction contract of the respective

Bid Package.

The PMC/TPI shall estimate the support personnel as per the quantum of the work. If

on later date looking to the quantum of the work, less/more support personnel

required, the same shall be deployed without extra cost. The PMC/TPI shall not

restrict as per the deployment of the support personnel given in this form.

Name and Signature of Authorised Signatory: Seal of the Company Date:

Page 80: Sardar Sarovar Narmada Nigam Limited (A wholly owned ... Sarovar Narmada Nigam Limited (A wholly owned Government ofGujarat Undertaking) Tender Notice No. 2, of 2015-2016. Office of

75

FINANCIAL PROPOSAL ( To be quoted by TPI Bidder )

Name of the Bidder: Bid Package No.:(Slices___ to___ )

Name of the Bid Package:

FORM No: FIN-6

PRICE BREAKUP OF OFFICE AND LABORATORY RENT

A B C D C X D = (E) Sr. No.

Occupancy# Monthly Rent

/ Cost in Rs. ( INR )

Deployment Period

considered as per Revised Bid

Package Schedule in

Months

Rs. ( INR)

Project Office Rent

Laboratory Rent

Temporary / Mobile On-site Office and Field Laboratory Rent

add / omit

Total in Figure Σ Σ Σ

Total in Words Σ Σ Σ

Note: #

This is an illustrative list only.TheTPI shall add / omit as per the requirements of Item Rate construction contract of the respective Bid Package.

All the Items covered under FIN-3 shall be inclusive of overheads and profit but exclusive of Service Tax.

Name and Signature of Authorised Signatory Seal of the Company Date:

Page 81: Sardar Sarovar Narmada Nigam Limited (A wholly owned ... Sarovar Narmada Nigam Limited (A wholly owned Government ofGujarat Undertaking) Tender Notice No. 2, of 2015-2016. Office of

76

FINANCIAL PROPOSAL ( To be quoted by TPI Bidder )

Name of the Bidder: Bid Package No.: (Slices___ to ___ )

Name of the Bid Package: FORM No: FIN-7

PRICE BREAKUP OF OFFICE ESTABLISHMENT ( RENTAL ) AND COMMUNICATION EXPENSES

A B C D E C X D X E = (F)

Sr. No.

Description of the Item# Nos. Monthly Expenses in Rs. (INR)

Allocation Period considered as per Revised BID Package Schedule in Months

LS Amount in Rs. (INR)

1 Office Furniture and Facilities to accommodate Key Personnel and Support Personnel

2 Office Equipment 3 Computers ( Desktop and

Laptops ) & Hardware

4 Printers 5 Internet Facilities 6 Landline / Mobile Communication

Expenses

7 Office Stationary and Misc. Office Consumable Expenses

8 Digital Cameras and Card Readers

9 First Aid Facilities 10 add / omit

Total in Figure Σ Σ Σ Σ Total in Words Σ Σ Σ Σ

Note: #

This is an illustrative list only.TheTPI shall add / omit as per the requirements of EPC / Item Rate construction contract of the respective Bid Package.

All the Items covered under FIN-4 shall be inclusive of overheads and profit but exclusive of Service Tax.

Name and Signature of Authorised Signatory: Seal of the Company Date

Page 82: Sardar Sarovar Narmada Nigam Limited (A wholly owned ... Sarovar Narmada Nigam Limited (A wholly owned Government ofGujarat Undertaking) Tender Notice No. 2, of 2015-2016. Office of

77

FINANCIAL PROPOSAL ( To be quoted by TPI Bidder )

Name of the Bidder:

Bid Package No.:(Slices___ to___ )

Name of the Bid Package: FORM No: FIN-8

PRICE BREAKUP OF LABORATORY ESTABLISHMENT ( RENTAL ) FOR QUALITY ASSURANCE

A B C D E D X E = (F) Sr. No.

Description of the Item# Give Details

and Numbers

Monthly Expenses

in Rs. (INR)

Allocation Period

considered as per

Revised Bid Package

Schedule in Months

LS Amount in Rs.(INR)

1 Field Laboratory Furniture and

Facilities

2 Calibrated Field Laboratory Test Equipment / Instruments and Facilities

3 Handling, Remanding, Logistics and expediting Expenses towards Field and Laboratory Tests for 25 % additional Conformity Tests to be performed by PMC as Third Party Quality Inspection Agency

4 add / omit

Total in Figure Σ Σ Total in Words Σ Σ

Note: #

This is an illustrative list only.TheTPI shall add / omit as per the requirements Item Rate construction contract of the respective Bid Package. All the Items covered under FIN-5 shall be inclusive of overheads and profit but exclusive of Service Tax. Name and Signature of Authorised Signatory: Seal of the Company: Date:

Page 83: Sardar Sarovar Narmada Nigam Limited (A wholly owned ... Sarovar Narmada Nigam Limited (A wholly owned Government ofGujarat Undertaking) Tender Notice No. 2, of 2015-2016. Office of

78

FINANCIAL PROPOSAL ( To be quoted by TPI Bidder )

Name of the Bidder

Bid Package No.:(Slices___ to___)

Name of the Bid Package:

FORM No: FIN-9

PRICE BREAKUP OF SURVEYING,LEVELLING AND MEASURING INSTRUMENTS / DEVICES / TOOLS

A B C D E

Sr. No.

Name of the instrument / Device / Tools# (Give Details)

Number of Instrument /

Devices to be deployed

Deployment Period in Months

LS Amount in Rs. (INR)

1 2 3

3

4 5

6 Insert as required.

Total in Figure Σ

Total in Words Σ

Note:

# The TPIshalldecide and insert the Details as per the requirements of

Item Rate construction contract of the respective Bid Package. While inserting the above Details, the TPI shall consider the surveying, levelling and measuring instruments / devices / tools for Civil, structural, Electro-mechanical and Hydro-mechanical works for quality assurance and quantity measurement purpose.

All the Items covered under FIN-6 shall be inclusive of overheads and profit but exclusive of Service Tax.

Name and Signature of Authorised Signatory Seal of the Company: Date:

Page 84: Sardar Sarovar Narmada Nigam Limited (A wholly owned ... Sarovar Narmada Nigam Limited (A wholly owned Government ofGujarat Undertaking) Tender Notice No. 2, of 2015-2016. Office of

79

FINANCIAL PROPOSAL ( To be quoted by TPI Bidder )

Name of the Bidder : Bid Package No :(Slices___ to___ )

Name of the Bid Package: FORM No: FIN-11

PRICE BREAKUP OF REPORT AND DOCUMENT PRINTING

A B C

Description of the Item# LS Amount in

Rs. (INR ) 1 Weekly Progress Report in 3 Copies

2 Fortnightly Inspection Report in 6 Copies

3 Monthly Progress Report in 6 Copies

4 Quarterly Progress Report in 8 Copies

5 Final StructurewiseItemwise Quality Certificates 8

Copies

6 Printing and Spiral Binding of other Documents

7 Plotting and Lamination of the Drawings

8 Document Handling Charges by Speed Post / Courier

Total in Figure Σ

Total in Words Σ

Note :# This is an illustrative list only.TheTPI shall add / omit as per the

requirements of Item Rate construction contract of the respective Bid Package.

All the Items covered under FIN-8 shall be inclusive of overheads and profit but exclusive of Service Tax

Name and Signature of Authorised Signatory Seal of the Company: Date:

Page 85: Sardar Sarovar Narmada Nigam Limited (A wholly owned ... Sarovar Narmada Nigam Limited (A wholly owned Government ofGujarat Undertaking) Tender Notice No. 2, of 2015-2016. Office of

80

FINANCIAL PROPOSAL ( To be quoted by TPI Bidder)

Name of the Bidder :

Bid Package No :(Slices___ to ___ )

Name of the Bid Package:

FORM No: FIN-12

PRICE BREAKUP OF DEPLOYMENT OF RENTAL VEHICLES INCLUDING FUEL EXPENSES AND M&R

A B C D E F D X EXF =

G Sr No

Type of Vehicles proposed to be

deployed#

Pl specify Owned / On Hire Basis

Number Vehicles of to be deployed

Deployment Period

considered Bid

Package Schedule in

Months

Rate per Month

LS Amount in Rs.( INR )

1

2

3

4

5

6

Insert as required

Total in Figure

Σ Σ Σ

Total in Words

Σ Σ Σ

Note: #The TPI shall decide the number, type, model and capacity of the Vehicles to be

deployed at site

All the Items covered under FIN-9 shall be inclusive of overheads and profit but

exclusive of Service Tax

Name and Signature of Authorised Signatory Seal of the Company: Date:

Page 86: Sardar Sarovar Narmada Nigam Limited (A wholly owned ... Sarovar Narmada Nigam Limited (A wholly owned Government ofGujarat Undertaking) Tender Notice No. 2, of 2015-2016. Office of

81

FINANCIAL PROPOSAL ( To be quoted by TPI Bidder)

Name of the Bidder : Bid Package No :(Slices___ to__ )

Name of the Bid Package:

FORM No: FIN-13 PRICE BREAKUP OF ALL THE MISCELLANEOUS EXPENSES NOT COVERED

UNDER FIN-1 TO FIN-9

A B C D

Sr.

No.

Description of the Items Pl Give Details LS Amount in Rs. (INR )

1 Cost of Mobilization Expenses from commencement to completion of the PMC/TPI's Professional Services

2 Cost of De-mobilization Expenses from commencement to completion of the PMC/TPI's Professional Services

3 Cost of Premium towards General Insurance, Risks and Indemnity etc.

4 Cost of Expenses towards the Presentations to be made before the SSNNL

5 All the other Miscellaneous Expenses not covered above

Total in Figure Σ

Total in Words Σ

Note: # This is an illustrative list only.TheTPI shall add / omit as per the requirements

of Item Rate construction contract of the respective Bid Package.

All the Items covered under FIN-10 shall be inclusive of overheads and profit but

exclusive of Service Tax.

Name and Signature of Authorised Signatory Seal of the Company: Date:

Page 87: Sardar Sarovar Narmada Nigam Limited (A wholly owned ... Sarovar Narmada Nigam Limited (A wholly owned Government ofGujarat Undertaking) Tender Notice No. 2, of 2015-2016. Office of

82

FORM FIN-14

PAYMENT SCHEDULE FOR TPI

1. Eighty percent (80%) of the Agreed Contract Value shall be paid inMonthly

instalments (as per Deployment Schedule of the respective Package) during

implementation and performance of the contract.

Note: 75% (Seventy five percent) of the above amount payable at the end ofevery

month shall be the guaranteed amount i.e. irrespective of whether or not the

construction contractor has carried out any work during the period. Remaining

5 % ( Five percent) shall be paid upon the work done by construction contractor

excluding price escalation, excess/extra item on prorate basis.

(For calculating the % cost, the Lump sum price quoted by the Consultant shall

be derived in the percentage of the Construction cost.)

3. Further Five percent (5%) of the Agreed Contract Value shall be paid upon

submission of the Project Completion Report (PCR) by the Applicant to SSNNLfor

acceptance.

4. Further Five percent (5%) of the Agreed Contract Value shall be paid upon

acceptance of the Project Completion Report (PCR) by the SSNNL.

5. Further Ten percent (10%) of the Agreed Contract Value shall be paid by the

SSNNL upon completion of the defect liability period.

Note : If for reasons whatsoever, the contract period is reduced /enhanced in one

or more slices of any Package before theaward of the PMC contract; the

rates quoted by the PMCConsultant shall be proportionately reduced

/increased forsuch slice(s) of the corresponding Package.

The payment of the Consultancy fees shall be made by the Engineer- in charge of the

works upon the submission of the following documents.

• Weekly/Monthly Progress report.

• Quality certificates (as per TOR).

• Attendance sheet of the Personnel deployed as per the RFP.

• Testing reports as per TOR (25% additional Testing done by PMC)

• Any other additional information if required.

Page 88: Sardar Sarovar Narmada Nigam Limited (A wholly owned ... Sarovar Narmada Nigam Limited (A wholly owned Government ofGujarat Undertaking) Tender Notice No. 2, of 2015-2016. Office of

83

Form FIN-15

LIST OF THE FIELD TESTS

Soil Field Density Test MDD Test Sieve Analysis Coarse Aggregates Gradation

Water Absorption Silt Content Flakiness & Elongation Index Fine Aggregates Gradation Silt Content

Water Absorption Fineness Modulus Cement Setting Time Compressive Strength

Water pH Chemical Analysis Bricks Dimensions and Tolerances Water Absorption Compressive Strength Concrete Cube Testing and Slump Test Mortar Cube Testing Bitumen Penetration Test Ductility Test Viscosity Test Flash and Fire point Test

Page 89: Sardar Sarovar Narmada Nigam Limited (A wholly owned ... Sarovar Narmada Nigam Limited (A wholly owned Government ofGujarat Undertaking) Tender Notice No. 2, of 2015-2016. Office of

84

SECTION 5

TERMS OF REFERENCE

1. PROJECT PACKAGES

SSNNL has awarded separate and independent Item Rate contracts to the

contractors, for its Item rate contracts for construction of Branch Canals and

Distributory network of SardarSarovar Project detailed below.

SSNNL will select and appoint a Consultant as per the procedure prescribed

under this Request for Proposal Document for providing Project Management

Consultancy Services for its Item rate contracts for Branch Canals and

Distributory network of SardarSarovar Project detailed below:

SSNNL shall award the works as per the financial capacity of the consultant.

However, SSNNL have right to award only one or more works to each consultant.

Bidders can give both the rates for PMC Services &TPI services if they wish. The

Terms of Reference for Third Party Inspection Services is outlined in Clause 3.2

Quality Assurance & 3.3,3.4 under this section.

2. OVERALL SCOPE OF SERVICES TO BE PROVIDED BY THE THIRD

PARTY INSPECTION

The Third Party Quality Inspection Services (TPI) shall provide the following

services -Third Party Quality Inspection Services to the SardarSarovar Narmada

Nigam Limited (SSNNL):

The Third Party Quality Inspection Services by adopting the standard project

management tools like Microsoft Project / Primavera and other appropriate

software with a view to ensure time and cost control. The PMC shall plan,

schedule, monitor and control the super-critical, critical and sub-critical activities,

Page 90: Sardar Sarovar Narmada Nigam Limited (A wholly owned ... Sarovar Narmada Nigam Limited (A wholly owned Government ofGujarat Undertaking) Tender Notice No. 2, of 2015-2016. Office of

85

delay matrix and recommend corrective actions both to the Item Rate Contractor

and the SSNNL.

Consultants have to review and monitor the schedule plan prepared by the contractor. For best performance of the project, consultant has to advise the Contractor by using the latest software such as Microsoft Project / Primavera.

Ensure strict quality control and quality assurance for the works that are designed

and/or being constructed by the Item Rate Contractor as per the Technical

Specifications (TS) contained in the Construction Contract Documents, relevant

Codes , Standards ,Publications and standard engineering practices.

The TPI render all the services related to Performance Testing, Pre-

commissioning and Commissioning and Taking over of the project from Item Rate

Contractor as per the construction contract documents.

3.DETAILED SCOPE OF WORK FOR THE THIRD PARTY INSPECTION

3.1 TPI& Construction Supervision:

1. The TPI shall study the general and technical specifications that are

provided by the SSNNL as a part of the Item Rate construction contract

documents, approved construction drawings of various components for the

canal works / structures / canal lining //gates and other electro- mechanical

and hydro-mechanical equipment provided for under the construction

contract and any discrepancy found during execution shall be brought into

the notice of the SSNNL and get it resolved.

2. The TPI shall review and recommend for approval the contractor’s detailed

work program, method statement for construction / fabrication /

manufacturing and commissioning, of all works in the construction contract.

Availability and adequacy of construction machinery in accordance with the

provisions contained in the work specifications / general conditions of

contract / conditions of particular application.

3. The TPI shall approve the foundation levels proposed in the Construction

Drawings (duly vetted and approved by the SSNNL) in consultation with

the EIC. In case of any problematic soils data / geo-technical data, the

Consultant shall communicate the SSNNL Design Office through the EIC

to resolve the problems.

Page 91: Sardar Sarovar Narmada Nigam Limited (A wholly owned ... Sarovar Narmada Nigam Limited (A wholly owned Government ofGujarat Undertaking) Tender Notice No. 2, of 2015-2016. Office of

86

4. The TPI shall frequently check and evaluate the contractor’s mobilization

on site with respect to tools, plants and machinery related to the project

construction in accordance with the approved Construction Programme

and report to the EIC.

5. The TPI shall frequently inspect the equipment’s / machineries / tools and

plants brought by the contractor on site for deployment in the works in

accordance with the approved construction programme so as to determine

their suitability and acceptability on site within the framework of the work

specifications and the conditions of the construction contract.

6. The TPI shall review and recommend to the EIC approval of the

contractor’s detailed quality assurance plan / program in accordance with

tender provisions as and when required. The PMC shall develop a Quality

Assurance and Control Plan (QAP) for different works covered under the

project. If such a plan / system is already existing, the PMC can suitably

modify and adopt for the project on approval from the SSNNL.

7. The TPI shall review the suitability of sources of materials and their quality

on the basis of inspection, test results, manufacturer’s certificates as and

when required in accordance with the construction contract.

3.2 Quality Assurance:

1. The TPI will witness Item Rate Contractor’s concrete / asphalt mix design

and ensure that cement / bitumen content is in conformity with the relevant

IS Codes or any applicable engineering standards. In case of Item Rate

Contract, any mix design with high cement level / bitumen level shall not be

recommended to the EIC and immediate necessary suggestions for

rectification shall be given by the TPI to the EIC.

2. The TPI will witness all the 100% tests being carried out by the Item Rate

contractor as per quality assurance plan for quality control in accordance

with construction contract specifications.

3. The TPI shall undertake random representative sample checks at minimum

25% frequency of tender specifications (in addition to 100% tests to be

performed by the Item Rate Contractor as mentioned in the construction

Page 92: Sardar Sarovar Narmada Nigam Limited (A wholly owned ... Sarovar Narmada Nigam Limited (A wholly owned Government ofGujarat Undertaking) Tender Notice No. 2, of 2015-2016. Office of

87

contract specifications ), independently for quality control in presence of

representative of Item Rate Contractor and the EIC.

4. The Consultant shall establish his own field testing laboratory for

performing visual tests and field tests (An illustrative list of the Field Tests

is attached). For other tests The TPI may use laboratories of SSNNL /

GERI / Polytechnic / Engineering colleges / SSNNL’s approved

Laboratories for performing 25% Conformity Tests which is better suited for

timely quality control of work. The TPI shall have full access to witness /

supervise all the tests in Item Rate Contractor’s laboratory during contract

implementation period.

5. The TPI will witness calibration of testing equipmentof Item Rate contractor

as per standard frequency specified in relevant BIS / specification. The

PMC/TPI shall also verify the report of calibration of the testing equipment

of SSNNL / GERI / Polytechnic / Engineering colleges performing where

additional 25% Conformity Tests shall be performed. The TPI shall also

witness and inspect the Calibration of the Computerized Batching and

Mixing Plants regularly and report any discrepancy to the EIC.

6. The TPI will check all the records required to be maintained as per quality

assurance program / plan of Item Rate Contractor regularly. Specifically

the PMC/TPI will check cement consumption register with physical balance

of cement every fifteen days and if found any discrepancy, immediately

report to the EIC and also incorporate in his monthly report.

7. The TPI will review curing arrangement and will ensure profuse curing is

done by the Item Rate contractor in accordance with construction contract

specifications.

8. The TPI will ensure a system for the quality assurance of the works. The

system of control of quality of materials and completed works shall also

include sampling methods and criteria and acceptance criteria. The

sampling methods and the acceptance criteria shall be based on

construction contract documents, and provisions made in the relevant

latest IS codes, SSNNL’s quality manual and other relevant publications

and international practices.

Page 93: Sardar Sarovar Narmada Nigam Limited (A wholly owned ... Sarovar Narmada Nigam Limited (A wholly owned Government ofGujarat Undertaking) Tender Notice No. 2, of 2015-2016. Office of

88

9. The TPI shall also furnish the summary of QC test results of all material of

construction in each activity of work and O.K. cards as prescribed by the

SSNNL and furnish a QC certificate (regarding quality of material,

workmanship and performance) and issue no objection certificate for

payment along with Item Rate Contractor’s each invoice (R.A. bill).

10. The TPI shall supervise the works that are executed by the Item Rate

Contractor on a day-to-day (24 x 7) basis through a team of site engineers

and ensure that all the works are executed as per the technical

specifications and in consonance with the quality assurance plan ( QAP )

approved by the SSNNL. Any deficiencies and defects in quality shall be

reported by the TPI to the EIC with a report on actions to be taken for

immediate compliance

11. The TPI shall check and approve the reinforcement bar bending schedules

given by the Item Rate Contractor as per the designs and drawings

reviewed and/or approved by the SSNNL and recommend its acceptance.

Concreting shall be allowed by the TPI only after the bar bending

schedules and the resultant reinforcement placed in the structure is

approved.

12. Consultant has to ensure that the thickness of the road is maintained as

per tender specifications. Frequent checking shall be done during

execution. Cross verification of the Box measurement shall also be made.

13. The TPI shall check the test reports provided by the Item Rate Contractor

for the cement / steel / soil / equipment/electro-mechanical works , hydro-

mechanical gate components that are provided by the Item Rate

contractor and shall also collect representative samples for Conformity

Tests (25% additional testing samples) and identify the conformance / non-

conformance and report to the EIC.

For hydro-mechanical, gate components, PMC shall review the test report

and witness if it is being done by the contractor.

14. To facilitate an advance planning of inspection in addition to giving

Inspection Notice, the Item Rate Contractor shall furnish monthly

inspection program indicating schedule dates of inspection at Customer

Hold Points ( for Stagewise Inspection, Pre-commission Tests,

Page 94: Sardar Sarovar Narmada Nigam Limited (A wholly owned ... Sarovar Narmada Nigam Limited (A wholly owned Government ofGujarat Undertaking) Tender Notice No. 2, of 2015-2016. Office of

89

Commissioning Tests , Trial Runs etc. ).specifically for fabrication , welding

, electro-mechanical works , hydro-mechanical works etc. for all type of the

Gates and Gate Components, The TPI shall prepare Quarterly Inspection

Plan for each three consecutive months and shall be furnished before

beginning of each calendar month to the parties involved.

15 If the TPI considers any item(s) of works substandard or unacceptable as

per technical specifications and acceptance criteria, the TPI shall inform

EIC and the Item Rate contractor for any rectification required in writing

immediately with full justification thereof with all support data and

photographs.

3.3 Progress Reports & Reviews:

1. The TPI shall prepare Monthly Reports of the works, fully describing the progress of the works and the indicating also the problem areas and actions required to overcome them by the relevant authority.Daily day to day activity shall be maintainedand Weekly reports shall be maintained whichshall be submitted along-with the Monthlyreports.

2. Each quality aspect shall be reported item-wise/Structure wise as a

Summary Report periodically / to the SSNNL in an approved and

customised format by the TPI.

3.4 Review & Coordination Meeting

1. The TPI shall inspect materials, workmanship, for electro-mechanical and

hydro-mechanical works, gates etc. at manufacturer’s place as per

specifications, relevant BIS code / standard engineering practices and

approved shop drawings.

2. The TPI shall hold Monthly review and coordination meetings amongst expert /

specialist team members, representative of the Item Rate Contractor, Chief

Engineer / Superintending Engineer – SSNNL / EIC who are in-charge of the

Project in order to appraise the implementation of progress of the assignment.

All the suggestions / comments by the SSNNL Team / EIC during the meeting

shall be incorporated and the PMC shall ensure implementation on site

through the Item Rate Contractor.

3. The TPI shall hold a Quarterly review and co-ordination meeting with the

PMC's team leader & expert specialist team members and Item

Page 95: Sardar Sarovar Narmada Nigam Limited (A wholly owned ... Sarovar Narmada Nigam Limited (A wholly owned Government ofGujarat Undertaking) Tender Notice No. 2, of 2015-2016. Office of

90

RateContractor with the Chief Engineer (Construction) SSNNL in-charge of the

project and the Chief Engineer (Quality Control) SSNNL and other senior

management of SSNNL at Gandhinagar in order to apprise the implementation

and progress of the assignment. During the meeting, the TPI shall also provide

a video recording and digital high resolution photographs encompassing all

major components of the project and appraise about the program during the

quarter through a Microsoft Power Point / Multimedia presentation. All the

suggestions comments that are made during such meetings shall be

implemented by the TPI and Item Rate Contractor.

4. The TPI will submit his confidential and balanced / unbiased written report on

contractual matters if any but not limited to the performance of the Item Rate

Contractor, in respect of excess in quantity, extra work, extension of time,

dispute resolution, contract interpretation, progress, safety etc. to the Chief

Engineer (Construction):

5. Following reports are required to be submitted to the EIC and Chief Engineer

(CPC) / Chief Engineer (Construction):

1) Inspection Report:

2) Quality Assurance Plan of Consultant

3) Daily / Weekly Progress Reports

4) Quarterly Progress Report

5) Final Structure-wise Item wise Quality Certificates

The TPI shall, on completion of the worksprepare a detailed Project Completion Report(PCR) along with a Project CompletionCertificate in favour of the Item RateContractor. The PCR will also highlight thecritical situations faced in the projectimplementation, project outputs and lessonslearned leading to Post Project Appraisal. 03 copies of monthly & Quarterly report to besubmittedis in hard as well as soft copies shallbe submitted.

6. Inspection report shall be inclusive of details regarding the finalized work

schedule and tasks to be performed, finalized staff and officers to be deputed

by the TPI for the assignment including necessary arrangements made

available by the TPI for commencement of the project.

Page 96: Sardar Sarovar Narmada Nigam Limited (A wholly owned ... Sarovar Narmada Nigam Limited (A wholly owned Government ofGujarat Undertaking) Tender Notice No. 2, of 2015-2016. Office of

91

7. The quality assurance plan ( QAP ) of the TPI for the entire project shall cover

type and nature of QC tests to be conducted, place of testing acceptance

criteria, frequency of tests, standard observation sheets (Forms and Formats)

and documentation based on approved construction contract documents.

8 Monthly progress report shall be submitted to the Employer and it shall be

brief and concise and provide means of closely monitoring project progress

and shall cover the following.

(a) Main activities undertaken and events for the period under review and

progress.

(b) Report on the activities of the contractor and supervision staff including

the report of 25% additional random representative sample checks as laid

down in TOR.

(c) Monitoring and evaluation of project progress.

(d) Project accounts, payments of approved bills, claims, certificates and

payment and variation orders.

(e) Photographs showing progress of the works.

(f) Other issues as may be necessary to provide additional information to the

Employer.

Monthly progress Report will be prepared at the end of each calendar

month and delivered in the 1st week of every month in 3 copies.

9. A detailed quarterly report in 3 copies shall be submitted within 15 days of

the end of each quarter. Quarterly report should include description of

project activities, illustrated by progress / completion photographs, status

of any delays and contractual claims, and details of all latest financial

projections. The progress reports (monthly and quarterly) shall contain

details of all meetings, decisions taken therein, mobilization of resources

(Consultants’ and the Contractors’), physical and financial progress and the

.projected progress for the forthcoming periods. The report shall clearly

bring out the delays, if any, reasons for such delay (s) and the

recommendations for corrective measures. The report shall also contain

the performance data for Contractor’s plan and equipment.While

submission of quarterly progress report, photographs also to be submitted

Page 97: Sardar Sarovar Narmada Nigam Limited (A wholly owned ... Sarovar Narmada Nigam Limited (A wholly owned Government ofGujarat Undertaking) Tender Notice No. 2, of 2015-2016. Office of

92

10. The TPI shall issue Certificates regarding quality of work executed for each

activity of work for all individual structures / items.

11. The Consultant shall investigate and initiate early action with regard to the

delays in the execution of works. The Team Leader of the Consultants’

Supervision team shall explain in his monthly progress and special reports

the reasons for delays and explain the actions to be taken / already taken

to correct the situation. All reports prepared by the Consultants’ Team shall

be objective and shall substantiate any event / recommendation with

factual data and information. The progress reports shall contain the

pertinent data and chart form and shall clearly bring out the comparison

between the projected and the actual work done using “S” curves and / or

any other widely accepted superior methods of representation.

13. A Maintenance manual, detailing routine and periodic maintenance tasks

that will be required to maintain the completed project shall also have to

be prepared and submitted by the Consultant. Draft copies of this manual

should be submitted for comments to the Employer within 12 months of

commencing services.

The inputs of Mechanical/electrical Engineer is very less and it will be

supervise by Civil Engineer. Hence the provision made in RFP remains unchanged.

3.6 Functions of TPI :

1. In case of the technical field problems that may arise during execution of

the works, the TPI shall analyze these problems and recommend

necessary corrective actions to the Item Rate Contractor in consultation

with the EIC.

3. The TPI will ensure that the safety arrangements for works, property,

personnel and the public at large are provided and maintained by the

Item Rate Contractor during the period of the construction and suggest

remedial measures if required in accordance with the construction contract

provisions.

Page 98: Sardar Sarovar Narmada Nigam Limited (A wholly owned ... Sarovar Narmada Nigam Limited (A wholly owned Government ofGujarat Undertaking) Tender Notice No. 2, of 2015-2016. Office of

93

4.0 DEPLOYMENT SCHEDULE

4. The TPI shall ensure and provide an active assistance to the Engineer-in-

charge for total performance of the construction contract including

compliance to all the conditions of contract contained in the construction

contract that is awarded by SSNNL to the Item Rate Contractor.

5. The TPI shall, on completion of the works prepare a detailed Project

Completion Report (PCR) along with a Project Completion Certificate in

favour of the Item Rate Contractor. The PCR will also highlight the critical

situations faced in the project implementation, project outputs and lessons

learned leading to Post Project Appraisal.

6. The TPI will supervise and monitor the final performance testing and

commissioning of the canal system, its structures, gates electro-

mechanical and hydro-mechanical parts of structures and issue a

certificate declaring successful commissioning of the project as per the

technical specifications and conditions of the construction contract

documents.

7. The TPI will also prepare a Certificate of Taking over the works by SSNNL

from the Item Rate Contractor and also a document on its re-handing

over to the Item Rate Contractor for O & M.

8. In case of disputes relating to interpretation of drawings, technical

specifications, general conditions of contract, conditions of particular

applications, work specifications as well as the billing by the Item Rate

Contractor and payment by SSNNL, the PMC shall prepare necessary brief

with required documentation for consideration at the level of the Dispute

Resolution Board, if invoked by the Item Rate Contractor, and make

presentations before the DRB for and on behalf of the SSNNL.

9. The TPI shall also provide technical and legal support to the SSNNL for

resolution of the disputes whenever required.

CONSULTANT’S KEY PROFESSIONAL AND SUPPORT STAFF(FOR TPI SERVICES

ONLY)

Page 99: Sardar Sarovar Narmada Nigam Limited (A wholly owned ... Sarovar Narmada Nigam Limited (A wholly owned Government ofGujarat Undertaking) Tender Notice No. 2, of 2015-2016. Office of

94

The consultant shall deploy the staff and put in place on site for the respective

package listed hereinabove, the following key professionals (For TPI services

only):

Sr. No.

Position Qualification Experience Period of deployment in man months

1 2 3 4 5

1 Team Leader B.E./B.Tech (Civil) with 15 years experienceor M.E/M.Tech(Civil) with 10 years experience. from a reputed institute

10 years plus as a Project Leader / Project Manager in infrastructure projects with experience in construction planning and management

6

2. Sr. Quality Control Engineer– 1 Nos.

B.E. / B. Tech (Civil)

7 years plus as a quality control engineer having experience in quality assurance of irrigation, water resources and major infrastructure projects.

6

3. Quality Control Engineers – 4 Nos

B.E./B.Tech (Civil) or DCE

5 years plus as a quality control engineer having experience in quality assurance of irrigation, water resources and major infrastructure projects.

For DCE Min. 10 years’ experience is required.

6

5. CONSULTANT’S OFFICE:

The Consultant shall establish a Project Office at a suitable location in the

Project area for efficient and coordinated performance of its Services. All

the Key Personnel shall be deployed at this office as specified in the

Manning Schedule forming part of the Agreement. The authorised officials

of the Authority may visit the Consultant’s Project Office any time during

office hours for inspection and interaction with the Consultant’s Personnel.

Page 100: Sardar Sarovar Narmada Nigam Limited (A wholly owned ... Sarovar Narmada Nigam Limited (A wholly owned Government ofGujarat Undertaking) Tender Notice No. 2, of 2015-2016. Office of

95

It is not expected of the Consultant to carry out the operations from the

Head/Home Office.

The Consultant shall mobilize and demobilize its Professional Personnel

and Support Personnel with the concurrence of the Authority and shall

maintain the time sheet/ attendance sheet of the working of all Personnel

in the Project Office. These time sheets/ attendance sheets shall be made

available to the Authority as and when asked for and a copy of such record

shall be submitted to the Authority at the end of each calendar month with

the bill.

2. ACTION WHEN DEPLOYED PERSONNEL NOT PROVIDED.

(i) As per Deployment Schedule, the Consultant is required to

providedeployed Personnel with qualifications and experience as laid

down in para 4. The team given in technical proposal will have to be

employed on the work site.

(ii) If services of required staff are not made available at the proper time

and in the specified number, deductions at the rates as given in the

financial proposal shall be made from the consultant's bills.

(iii) In addition action under other clauses of contract, which may ultimately

result in termination of contract, shall be taken.

(iv) Leaves rule of Company act shall be applicable on consultant firm. If a

personal takes the leave,consultants have to substitute the personal

during leave.

During leave, the substitution may be done by providing equally or better qualified and experienced personnel to the satisfaction of the SSNNL. If the leave is beyond 30 days deduction shall be made as per Clause 6.4 of Section�2.

3. EXTENSION OF ASSIGNMENT: “The Consultant has to provide services for the period of construction as specified in the contracts awarded to the construction contractors In case if, these construction contracts are extended beyond the specified period, the consultant’s contract (this contract) may be extended by mutual understanding. During the extended period, the consultant shall provide the services and deploy his staff as per the requirement of the work. The manpower requirement shall be decided by the Engineer in charge. The fees may be worked out on the basis of actual man power deployed during extended period by mutual understanding. The rates shall be decided as per quoted rates in the financial proposal by escalating 8% per annum of the quoted rates by the Consultants.”

Page 101: Sardar Sarovar Narmada Nigam Limited (A wholly owned ... Sarovar Narmada Nigam Limited (A wholly owned Government ofGujarat Undertaking) Tender Notice No. 2, of 2015-2016. Office of

96

SECTION 6

GENERAL CONDITIONS OF CONTRACT

1. GENERAL PROVISIONS

1.1 Definitions Unless the context otherwise requires, the following terms

whenever used in this Contract have the following

meanings:

(a) “Applicable Law” means the laws and any other

instruments having the force of law in the Government’s

country, or in such other country as may be specified in

the Special Conditions of Contract (SC), as they may

be issued and in force from time to time.

(b) “SSNNL” means the SardarSarovar Narmada Nigam

Limited, a Govt. of Gujarat undertaking, Gandhingar.

(a) “Consultant”/”Applicant” means any private or public

entity that will provide the Services to the SSNNL under

the Contract.

(b) “Contract” means the Contract signed by the Parties

and all the attached documents listed in its Clause 1,

that is these General Conditions (GC), the Special

Conditions (SC), and the Appendices.

(c) “Day” means calendar day.

(d) “Effective Date” means the date on which this Contract

comes into force and effect pursuant to Clause GC 2.1.

(g) “Foreign Currency” means any currency other than the

currency of the SSNNL’s country.

(h) “GC” means these General Conditions of Contract.

(i) “Government” means the Government of the SSNNL’s

country.

(j) “Local Currency” means the currency of the SSNNL’s

country.

(k) “Member” means any of the entities that make up the

joint venture/consortium/association, and “Members”

Page 102: Sardar Sarovar Narmada Nigam Limited (A wholly owned ... Sarovar Narmada Nigam Limited (A wholly owned Government ofGujarat Undertaking) Tender Notice No. 2, of 2015-2016. Office of

97

means all these entities.

(l) “Party” means the SSNNL or the Consultant, as the

case may be, and “Parties” means both of them.

(m) “Personnel” means professionals and support staff

provided by the Consultants or by any Sub-Consultants

and assigned to perform the Services or any part

thereof; “Foreign Personnel” means such professionals

and support staff who at the time of being so provided

had their domicile outside the Government’s country;

“Local Personnel” means such professionals and

support staff who at the time of being so provided had

their domicile inside the Government’s country; and

“Key Personnel” means the Personnel referred to in

Clause GC 4.2(a).

(n) “Reimbursable expenses” means all assignment-related

costs other than Consultant’s remuneration.

(o) “SC” means the Special Conditions of Contract by

which the GC may be amended or supplemented.

(p) “Services” means the work to be performed by the

Consultant pursuant to this Contract, as described in

Appendix A hereto.

(q) “Sub-Consultants” means any person or entity to

whom/which the Consultant subcontracts any part of

the Services.

(r) “Third Party” means any person or entity other than the

Government, the SSNNL, the Consultant or a Sub-

Consultant.

(s) “In writing” means communicated in written form with

proof of receipt.

1.2 Relationship Between the Parties

Nothing contained herein shall be construed as

establishing a relationship of master and servant or of

principal and agent as between the SSNNL and the

Consultant. The Consultant, subject to this Contract, has

complete charge of Personnel and Sub-Consultants, if any,

Page 103: Sardar Sarovar Narmada Nigam Limited (A wholly owned ... Sarovar Narmada Nigam Limited (A wholly owned Government ofGujarat Undertaking) Tender Notice No. 2, of 2015-2016. Office of

98

performing the Services and shall be fully responsible for

the Services performed by them or on their behalf

hereunder

1.3 Law Governing Contract

This Contract, its meaning and interpretation, and the

relation between the Parties shall be governed by the

Applicable Law.

1.4 Language This Contract has been executed in the language specified

in the SC, which shall be the binding and controlling

language for all matters relating to the meaning or

interpretation of this Contract.

1.5 Headings The headings shall not limit, alter or affect the meaning

of this Contract.

1.6 Notices 1.6.1 Any notice, request or consent required or permitted

to be given or made pursuant to this Contract shall

be in writing. Any such notice, request or consent

shall be deemed to have been given or made when

delivered in person to an authorized representative

of the Party to whom the communication is

addressed, or when sent to such Party at the

address specified in the SC.

1.6.2 A Party may change its address for notice hereunder

by giving the other Party notice in writing of such

change to the address specified in the SC.

1.7 Location The Services shall be performed at the three pumping

station locations on the Kachchh Branch Canal as well as

at the headquarters of the SSNNL and where the location

of a particular task is not so specified, at such locations.

1.8 Authority of Member in Charge

SSNNL has not permitted a joint venture consortium under

this consultancy contract. Every member of the

consultant’s team deployed for the assignment under this

contract shall have the authority to provide services and

Page 104: Sardar Sarovar Narmada Nigam Limited (A wholly owned ... Sarovar Narmada Nigam Limited (A wholly owned Government ofGujarat Undertaking) Tender Notice No. 2, of 2015-2016. Office of

99

also be responsible to the SSNNL for the quality of

services to be provided under this contract.

1.9 Authorized Representatives

Any action required or permitted to be taken, and any

document required or permitted to be executed under this

Contract by the SSNNL or the Consultant may be taken or

executed by the officials specified in the SC.

1.10 Taxes and Duties

The Consultant, Sub-Consultants, and their Personnel

shall pay such indirect taxes, duties, fees, and other

impositions levied under the Applicable Law as specified in

the SC, the amount of which is deemed to have been

included in the Contract Price.

1.11 Fraud and Corruption

1.11.1 Definitions It is the SSNNL’s policy to observe the highest standard of

ethics during the execution of the Contract. In pursuance of

this policy, the SSNNL:

(a) defines, for the purpose of this provision, the terms set

forth below as follows:

(i) “corrupt practice” means the offering, receiving, or

soliciting, directly or indirectly, of anything of value to

influence the action of a public official in the selection

process or in contract execution;

(ii) “fraudulent practice” means a misrepresentation or

omission of facts in order to influence a selection

process or the execution of a contract;

(iii) “collusive practices” means a scheme or arrangement

between two or more consultants, with or without the

knowledge of the Borrower, designed to establish

prices at artificial, noncompetitive levels;

(iv) “coercive practices” means harming or threatening to

harm, directly or indirectly, persons or their property to

influence their participation in a procurement process,

or affect the execution of a contract;

Page 105: Sardar Sarovar Narmada Nigam Limited (A wholly owned ... Sarovar Narmada Nigam Limited (A wholly owned Government ofGujarat Undertaking) Tender Notice No. 2, of 2015-2016. Office of

100

1.11.2 Measures to be Taken

(b) SSNNL will cancel and terminate the contract if it

determines that representatives of the Consultant were

engaged in corrupt, fraudulent, collusive or coercive

practices during the selection process or the execution

of that contract.

(c) will sanction a Consultant, including declaring the

Consultant ineligible, either indefinitely or for a stated

period of time, to be awarded a SSNNL-financed

contract if it at any time determines that the Consultant

has, directly or through an agent, engaged in corrupt,

fraudulent, collusive or coercive practices in competing

for, or in executing, a SSNNL-financed contract;

1.11.3 Commissions and Fees

(d) will require the successful Consultants to disclose any

commissions or fees that may have been paid or are to

be paid to agents, representatives, or commission

agents with respect to the selection process or

execution of the contract. The information disclosed

must include at least the name and address of the

agent, representative, or commission agent, the

amount and currency, and the purpose of the

commission or fee.

2. COMMENCEMENT, COMPLETION, MODIFICATION &

TERMINATION OF CONTRACT

2.1 Effectiveness

of Contract

This Contract shall come into force and effect on the date

(the “Effective Date”) of the SSNNL’s notice to the

Consultant instructing the Consultant to begin carrying out

the Services. This notice shall confirm that the

effectiveness conditions, if any, listed in the SC have

been met.

2.2 Termination of

Contract for

Failure to

If this Contract has not become effective within such time

period after the date of the Contract signed by the Parties

as specified in the SC, either Party may, by not less than

Page 106: Sardar Sarovar Narmada Nigam Limited (A wholly owned ... Sarovar Narmada Nigam Limited (A wholly owned Government ofGujarat Undertaking) Tender Notice No. 2, of 2015-2016. Office of

101

Become

Effective

twenty one (21) days written notice to the other Party,

declare this Contract to be null and void, and in the event

of such a declaration by either Party, neither Party shall

have any claim against the other Party with respect

hereto.

2.3 Commence-

ment of

Services

The Consultant shall begin carrying out the Services not

later than the number of days after the Effective Date

specified in the SC.

2.4 Expiration of

Contract

Unless terminated earlier pursuant to Clause GC 2.6

hereof, this Contract shall expire at the end of such time

period after the Effective Date as specified in the SC.

2.5 Entire

Agreement

This Contract contains all covenants, stipulations and

provisions agreed by the Parties. No agent or representative

of either Party has authority to make, and the Parties shall

not be bound by or be liable for, any statement,

representation, promise or agreement not set forth herein.

2.6 Modifications

or Variations

(a) Any modification or variation of the terms and

conditions of this Contract, including any modification

or variation of the scope of the Services, may only be

made by written agreement between the Parties.

Pursuant to Clause GC 7.2 here of, however, each

Party shall give due consideration to any proposals

for modification or variation made by the other Party.

(b) In cases of substantial modifications or variations,

the prior written consent of the SSNNL is required.

Please read “Clause GC 8.2” in place of Clause GC 7.2

2.7 Force Majeure

2.7.1 Definition (a) For the purposes of this Contract, “Force Majeure”

means an event which is beyond the reasonable

control of a Party, is not foreseeable, is unavoidable,

Page 107: Sardar Sarovar Narmada Nigam Limited (A wholly owned ... Sarovar Narmada Nigam Limited (A wholly owned Government ofGujarat Undertaking) Tender Notice No. 2, of 2015-2016. Office of

102

and which makes a Party’s performance of its

obligations hereunder impossible or so impractical as

reasonably to be considered impossible in the

circumstances, and includes, but is not limited to, war,

riots, civil disorder, earthquake, fire, explosion, storm,

flood or other adverse weather conditions, strikes,

lockouts or other industrial action (except where such

strikes, lockouts or other industrial action are within the

power of the Party invoking Force Majeure to prevent),

confiscation or any other action by Government

agencies.

(b) Force Majeure shall not include (i) any event which is

caused by the negligence or intentional action of a

consultant or such Sub-Consultants or agents or

employees, nor (ii) any event which a diligent

consultant could reasonably have been expected both

to take into account at the time of the conclusion of this

Contract, and avoid or overcome in the carrying out of

its obligations hereunder.

2.7.2 No Breach of

Contract

The failure of a consultant to fulfil any of its obligations

hereunder shall not be considered to be a breach of, or

default under, this Contract insofar as such inability arises

from an event of Force Majeure, provided that the

Consultant affected by such an event has taken all

reasonable precautions, due care and reasonable

alternative measures, all with the objective of carrying out

the terms and conditions of this Contract.

2.7.3 Measures to

be Taken

(a) A Consultant affected by an event of Force Majeure

shall continue to perform its obligations under the

Contract as far as is reasonably practical, and shall

take all reasonable measures to minimize the

consequences of any event of Force Majeure.

(b) A Consultant affected by an event of Force Majeure

Page 108: Sardar Sarovar Narmada Nigam Limited (A wholly owned ... Sarovar Narmada Nigam Limited (A wholly owned Government ofGujarat Undertaking) Tender Notice No. 2, of 2015-2016. Office of

103

shall notify the SSNNL of such event as soon as

possible, and in any case not later than fourteen (14)

days following the occurrence of such event, providing

evidence of the nature and cause of such event, and

shall similarly give written notice of the restoration of

normal conditions as soon as possible

(c) Any period within which a Consultant shall, pursuant to

this Contract, complete any action or task, shall be

extended for a period equal to the time during which

such Consultant was unable to perform such action as

a result of Force Majeure.

(d) During the period of their inability to perform the

Services as a result of an event of Force Majeure, the

Consultant, upon instructions by the SSNNL, shall

either:

(i) demobilize, in which case the Consultant shall be

reimbursed for additional costs they reasonably

and necessarily incurred, and, if required by the

SSNNL, in reactivating the Services; or

(ii) continue with the Services to the extent possible, in

which case the Consultant shall continue to be

paid under the terms of this Contract and be

reimbursed for additional costs reasonably and

necessarily incurred.

(f) In the case of disagreement between the Parties as to

the existence or extent of Force Majeure, the matter

shall be settled according to Clause GC 8.

2.8 Suspension The SSNNL may, by written notice of suspension to the

Consultant, suspend all payments to the Consultant

hereunder if the Consultant fails to perform any of its

obligations under this Contract, including the carrying out of

the Services, provided that such notice of suspension (i)

shall specify the nature of the failure, and (ii) shall request

the Consultant to remedy such failure within a period not

Page 109: Sardar Sarovar Narmada Nigam Limited (A wholly owned ... Sarovar Narmada Nigam Limited (A wholly owned Government ofGujarat Undertaking) Tender Notice No. 2, of 2015-2016. Office of

104

exceeding thirty (30) days after receipt by the Consultant of

such notice of suspension.

2.9 Termination

2.9.1 By the

SSNNL

The SSNNL may terminate this Contract in case of the

occurrence of any of the events specified in paragraphs (a)

to (g) of this Clause GC 2.9.1. In such an occurrence the

SSNNL shall give a not less than thirty (30) days’ written

notice of termination to the Consultants, and sixty (60)

days’ in case of the event referred to in (g).

(a) If the Consultant fails to remedy a failure in the

performance of its obligations hereunder, as specified

in a notice of suspension pursuant to Clause GC 2.8

hereinabove, within thirty (30) days of receipt of such

notice of suspension or within such further period as

the SSNNL may have subsequently approved in

writing.

(b) If the Consultant becomes (or, if the Consultant consists

of more than one entity, if any of its Members

becomes) insolvent or bankrupt or enter into any

agreements with their creditors for relief of debt or take

advantage of any law for the benefit of debtors or go

into liquidation or receivership whether compulsory or

voluntary.

(c) If the Consultant fails to comply with any final decision

reached as a result of arbitration proceedings pursuant

to Clause GC 8 hereof.

(d) If the Consultant, in the judgment of the SSNNL, has

engaged in corrupt or fraudulent practices in competing

for or in executing this Contract

(e) If the Consultant submits to the SSNNL a false

statement which has a material effect on the rights,

obligations or interests of the SSNNL.

(f) If, as the result of Force Majeure, the Consultant is

unable to perform a material portion of the Services for

Page 110: Sardar Sarovar Narmada Nigam Limited (A wholly owned ... Sarovar Narmada Nigam Limited (A wholly owned Government ofGujarat Undertaking) Tender Notice No. 2, of 2015-2016. Office of

105

a period of not less than sixty (60) days.

(g) If the SSNNL, in its sole discretion and for any reason

whatsoever, decides to terminate this Contract.

(h) If the Construction Contracts is

completed/withdrawn/terminated before the time Limit.

By the

Consultant

The Consultants may terminate this Contract, by not less

than thirty (30) days’ written notice to the SSNNL, such

notice to be given after the occurrence of any of the events

specified in paragraphs (a) to (d) of this Clause GC 2.9.2:

(a) If the SSNNL fails to pay any money due to the

Consultant pursuant to this Contract and not subject to

dispute pursuant to Clause GC 8 hereof within forty-five

(45) days after receiving written notice from the

Consultant that such payment is overdue.

(b) If, as the result of Force Majeure, the Consultant is

unable to perform a material portion of the Services for

a period of not less than sixty (60) days.

(c) If the SSNNL fails to comply with any final decision

reached as a result of arbitration pursuant to Clause

GC 8 hereof.

(e) If the SSNNL is in material breach of its obligations

pursuant to this Contract and has not remedied the

same within forty-five (45) days (or such longer period

as the Consultant may have subsequently approved in

writing) following the receipt by the SSNNL of the

Consultant’s notice specifying such breach.

2.9.3 Cessation of

Rights and

Obligations

Upon termination of this Contract pursuant to Clauses GC

2.2 or GC 2.9 hereof, or upon expiration of this Contract

pursuant to Clause GC 2.4 hereof, all rights and obligations

of the Parties hereunder shall cease, except (i) such rights

and obligations as may have accrued on the date of

termination or expiration, (ii) the obligation of confidentiality

set forth in Clause GC 3.3 hereof, (iii) the Consultant’s

Page 111: Sardar Sarovar Narmada Nigam Limited (A wholly owned ... Sarovar Narmada Nigam Limited (A wholly owned Government ofGujarat Undertaking) Tender Notice No. 2, of 2015-2016. Office of

106

obligation to permit inspection, copying and auditing of their

accounts and records set forth in Clause GC 3.6 hereof,

and(iv) any right which a Consultant may have under the

Applicable Law.

2.9.4 Cessation of

Services

Upon termination of this Contract by notice of either

Consultant to the other pursuant to Clauses GC 2.9.1 or

GC 2.9.2 hereof, the Consultant shall, immediately upon

dispatch or receipt of such notice, take all necessary steps

to bring the Services to a close in a prompt and orderly

manner and shall make every reasonable effort to keep

expenditures for this purpose to a minimum. With respect to

documents prepared by the Consultant and equipment and

materials furnished by the SSNNL, the Consultant shall

proceed as provided, respectively, by Clauses GC 3.9 or

GC 3.10 hereof.

2.9.5 Payment

upon

Termination

Upon termination of this Contract pursuant to Clauses GC

2.9.1 or GC 2.9.2 hereof, the SSNNL shall make the

following payments to the Consultant:

(a) remuneration pursuant to Clause GC 6 hereof for

Services satisfactorily performed prior to the effective

date of termination, and reimbursable expenditures

pursuant to Clause GC 6 hereof for expenditures

actually incurred prior to the effective date of

termination; and

(b) except in the case of termination pursuant to

paragraphs through (e) of Clause GC 2.9.1 hereof,

reimbursement reasonable cost incidental to the

prompt and termination of this Contract including the

cost of the travel of the Personnel and their eligible

dependents.

2.9.6 Disputes

About Events

of

Termination

If either Consultant disputes whether an event specified in

paragraphs (a) to (f) of Clause GC 2.9.1 or in Clause GC

2.9.2 hereof has occurred, such Consultant may, within

forty-five (45) days after receipt of notice of termination

Page 112: Sardar Sarovar Narmada Nigam Limited (A wholly owned ... Sarovar Narmada Nigam Limited (A wholly owned Government ofGujarat Undertaking) Tender Notice No. 2, of 2015-2016. Office of

107

from the other Consultant, refer the matter to Clause GC 8

hereof, and this Contract shall not be terminated on

account of such event except in accordance with the terms

of any resulting arbitral award.

3. OBLIGATIONS OF THE CONSULTANT

3.1 General

3.1.1 Standard of Performance

The Consultant shall perform the Services and carry out

their obligations hereunder with all due diligence,

efficiency and economy, in accordance with generally

accepted professional standards and practices, and

shall observe sound management practices, and employ

appropriate technology and safe and effective

equipment, machinery, materials and methods. The

Consultant shall always act, in respect of any matter

relating to this Contract or to the Services, as faithful

adviser to the SSNNL, and shall at all times support and

safeguard the SSNNL’s legitimate interests in any

dealings with contractors, Sub-Consultants or Third

Parties.

3.1.2 Law Governing Services

The Consultant shall perform the Services in accordance

with the Applicable Law and shall take all practicable

steps to ensure that any Sub-Consultants, as well as the

Personnel of the Consultant and any Sub-Consultants,

comply with the Applicable Law. The SSNNL shall notify

the Consultant in writing of relevant local customs, and

the Consultant shall, after such notification, respect such

customs.

3.2 Conflict of Interests

The Consultant shall hold the SSNNL’s interests

paramount, without any consideration for future work,

and strictly avoid conflict with other assignments or their

own corporate interests.

3.2.1 Consultants

not to Benefit

from

(a) The payment of the Consultant pursuant to Clause

GC 6 hereof shall constitute the Consultant’s only

payment in connection with this Contract and,

Page 113: Sardar Sarovar Narmada Nigam Limited (A wholly owned ... Sarovar Narmada Nigam Limited (A wholly owned Government ofGujarat Undertaking) Tender Notice No. 2, of 2015-2016. Office of

108

Commissions,

Discounts, etc.

subject to Clause GC 3.2.2 hereof, the Consultant

shall not accept for its own benefit any trade

commission, discount or similar payment in

connection with activities pursuant to this Contract

or in the discharge of its obligations hereunder, and

the Consultant shall use its best efforts to ensure

that any Sub-Consultants, as well as the Personnel

and agents of either of them, similarly shall not

receive any such additional payment.

(b) Furthermore, if the Consultant, as part of the

Services, has the responsibility of advising the

SSNNL on the procurement of goods, works or

services, the Consultant shall comply with the

SSNNL’s applicable procurement guidelines, and

shall at all times exercise such responsibility in the

best interest of the SSNNL. Any discounts or

commissions obtained by the Consultant in the

exercise of such procurement responsibility shall be

for the account of the SSNNL.

3.2.2 Consultant and

Affiliates not to

be Otherwise

Interested in

Project

The Consultant agrees that, during the term of this

Contract and after its termination, the Consultant and

any entity affiliated with the Consultant, as well as any

Sub-Consultants and any entity affiliated with such Sub-

Consultants, shall be disqualified from providing goods,

works or services (other than consulting services)

resulting from or directly related to the Consultant’s

Services for the preparation or implementation of the

project.

3.2.3 Prohibition of

Conflicting

Activities

The Consultant shall not engage, and shall cause their

Personnel as well as their Sub-Consultants and their

Personnel not to engage, either directly or indirectly, in

any business or professional activities which would

conflict with the activities assigned to them under this

Contract.

Page 114: Sardar Sarovar Narmada Nigam Limited (A wholly owned ... Sarovar Narmada Nigam Limited (A wholly owned Government ofGujarat Undertaking) Tender Notice No. 2, of 2015-2016. Office of

109

3.3 Confidentiality Except with the prior written consent of the SSNNL, the

Consultant and the Personnel shall not at any time

communicate to any person or entity any confidential

information acquired in the course of the Services, nor

shall the Consultant and the Personnel make public the

recommendations formulated in the course of, or as a

result of, the Services.

3.4 Liability of the

Consultant

Subject to additional provisions, if any, set forth in the

SC, the Consultants’ liability under this Contract shall be

provided by the Applicable Law.

3.5 Insurance to be

Taken Out by

the Consultant

The Consultant (i) shall take out and maintain, and shall

cause any Sub-Consultants to take out and maintain, at

their (or the Sub- Consultants’, as the case may be) own

cost but on terms and conditions approved by the

SSNNL, insurance against the risks, and for the

coverages specified in the SC, and (ii) at the SSNNL’s

request, shall provide evidence to the SSNNL showing

that such insurance has been taken out and maintained

and that the current premiums therefore have been paid.

3.6 Accounting,

Inspection and

Auditing

The Consultant (i) shall keep accurate and systematic

accounts and records in respect of the

Serviceshereunder, in accordance with internationally

accepted accounting principles and in such form and

detail as will clearly identify all relevant time changes

and costs, and the bases thereof, and (ii) shall

periodically permit the SSNNL or its designated

representative and/or the SSNNL, and up to five years

from expiration or termination of this Contract, to inspect

the same and make copies thereof as well as to have

them audited by auditors appointed by the SSNNL or the

SSNNL, if so required by the SSNNL or the SSNNL as

the case may be.

3.7 Consultant’s The Consultant shall obtain the SSNNL’s prior approval

Page 115: Sardar Sarovar Narmada Nigam Limited (A wholly owned ... Sarovar Narmada Nigam Limited (A wholly owned Government ofGujarat Undertaking) Tender Notice No. 2, of 2015-2016. Office of

110

Actions

Requiring

SSNNL’s Prior

Approval

in writing before taking any of the following actions:

(a) Any change or addition to the Personnel listed as

key professionals under the Terms of Reference.

(b) Subcontracts: SSNNL will not permit sub-

contracting of any part of the assignment as per the

Terms of Reference. In special circumstances that

may require the consultant to subcontract work

relating to the Services to an extent and with such

experts and entities, SSNNL may at its sole

discretion consider such subcontracting. The

Consultant shall have to obtain SSNNL’s prior

approval for such subcontracting. Notwithstanding

such approval, the Consultant shall retain full

responsibility for the Services. In the event that any

Sub-Consultants are found by the SSNNL to be

incompetent or incapable in discharging assigned

duties, the SSNNL may request the Consultant to

provide a replacement, with qualifications and

experience acceptable to the SSNNL, or to resume

the performance of the Services itself.

3.8 Reporting

Obligations

The Consultant shall submit to the SSNNL the reports

and documents specified in the Terms of Reference, in

the form, in the numbers and within the time periods set

forth in the said Terms of Reference. Final reports shall

be delivered in CD ROM in addition to the hard copies

specified in said Terms of Reference.

3.9 Documents

Prepared by the

Consultant to be

the Property of

the SSNNL

All plans, drawings, specifications, designs, reports,

other documents and software prepared by the

Consultant for the SSNNL under this Contract shall

become and remain the property of the SSNNL, and the

Consultant shall, not later than upon termination or

expiration of this Contract, deliver all such documents to

the SSNNL, together with a detailed inventory thereof.

The Consultant may retain a copy of such documents

Page 116: Sardar Sarovar Narmada Nigam Limited (A wholly owned ... Sarovar Narmada Nigam Limited (A wholly owned Government ofGujarat Undertaking) Tender Notice No. 2, of 2015-2016. Office of

111

and software, and use such software for their own use

with prior written approval of the SSNNL. If license

agreements are necessary or appropriate between the

Consultant and third parties for purposes of

development of any such computer programs, the

Consultant shall obtain the SSNNL’s prior written

approval to such agreements, and the SSNNL shall be

entitled at its discretion to require recovering the

expenses related to the development of the program(s)

concerned. Other restrictions about the future use of

these documents and software, if any, shall be specified

in the SC.

3.10 Equipment,

Vehicles and

Materials

Furnished by the

SSNNL

Equipment, vehicles and materials made available to the

Consultant by the SSNNL, or purchased by the

Consultant wholly or partly with funds provided by the

SSNNL, shall be the property of the SSNNL and shall be

marked accordingly. Upon termination or expiration of

this Contract, the Consultant shall make available to the

SSNNL an inventory of such equipment, vehicles and

materials and shall dispose of such equipment and

materials in accordance with the SSNNL’s instructions.

While in possession of such equipment, vehicles and

materials, the Consultant, unless otherwise instructed by

the SSNNL in writing, shall insure them at the expense

of the SSNNL in an amount equal to their full

replacement value.

3.11 Equipment and

Materials

Provided by the

Consultants

Equipment or materials brought by the Consultant and

the Personnel and used either for the Project or personal

use shall remain the property of the Consultant or the

Personnel concerned, as applicable.

4. CONSULTANT’S PERSONNEL AND SUB-CONSULTANTS

4.1 General The Consultant shall employ and provide such qualified

and experienced Personnel and Sub-Consultants as are

Page 117: Sardar Sarovar Narmada Nigam Limited (A wholly owned ... Sarovar Narmada Nigam Limited (A wholly owned Government ofGujarat Undertaking) Tender Notice No. 2, of 2015-2016. Office of

112

required to carry out the Services

4.2 Description of Personnel

(a) The title, agreed job description, minimum

qualification and estimated period of engagement in

the carrying out of the Services of each of the

Consultant’s Key Personnel are described in Terms

of Reference. If any of the Key Personnel has

already been approved by the SSNNL, his/her

name is listed as well.

(b) If required to comply with the provisions of Clause

GC 3.1.1 hereof, adjustments with respect to the

estimated periods of engagement of Key Personnel

set forth in Terms of Reference may be made by

the Consultant by written notice to the SSNNL,

provided (i) that such adjustments shall not alter the

originally estimated period of engagement of any

individual by more than 10% or one week,

whichever is larger, and (ii) that the aggregate of

such adjustments shall not cause payments under

this Contract to exceed the ceilings set forth in

Clause GC 6.1(b) of this Contract. Any other such

adjustments shall only be made with the SSNNL’s

written approval.

4.3 Approval of Personnel

The Key Personnel and Sub-Consultants listed by title

as well as by name in Terms of Reference and the

technical proposal made by the consultant and

accepted by SSNNL, are hereby approved by the

SSNNL. In respect of other Personnel which the

Consultant proposes to use in the carrying out of the

Services, the Consultant shall submit to the SSNNL for

review and approval a copy of their Curricula Vitae

(CVs). If the SSNNL does not object in writing (stating

the reasons for the objection) within twenty-one (21)

Page 118: Sardar Sarovar Narmada Nigam Limited (A wholly owned ... Sarovar Narmada Nigam Limited (A wholly owned Government ofGujarat Undertaking) Tender Notice No. 2, of 2015-2016. Office of

113

days from the date of receipt of such CVs, such

Personnel shall be deemed to have been approved by

the SSNNL.

4.4 Working Hours,

Overtime,

Leave etc.

(a) The consultant and his professional staff at the

project site shall work as per the work schedule

agreed with the SSNNL and shall provide their

services on 24 x 7 basis including the weekends

and public holidays.

(b) The Key Personnel shall not be entitled to be paid

for overtime nor to take paid sick leave or vacation

leave, the Consultant’s remuneration shall be

deemed to cover these items. All leave to be

allowed to the Personnel is included in the staff-

months of service set forth in Terms of Reference.

Any taking of leave by Personnel shall be subject to

the prior approval by the Consultant and the

SSNNL who shall ensure that absence for leave

purposes will not delay the progress and adequate

supervision of the Services.

4.5 Removal and /

or Replacement

of Personnel

(a) Except as the SSNNL may otherwise agree, no

changes shall be made in the Key Personnel. If, for

any reason beyond the reasonable control of the

Consultant, such as retirement, death, medical

incapacity, among others, it becomes necessary to

replace any of the Key Personnel, the Consultant

shall provide as a replacement a person of

equivalent or better qualifications

(b) If the SSNNL finds that any of the Personnel have

(i) committed serious misconduct or have been

charged with having committed a criminal action, or

(ii) have reasonable cause to be dissatisfied with

the performance of any of the Personnel, then the

Page 119: Sardar Sarovar Narmada Nigam Limited (A wholly owned ... Sarovar Narmada Nigam Limited (A wholly owned Government ofGujarat Undertaking) Tender Notice No. 2, of 2015-2016. Office of

114

Consultant shall, at the SSNNL’s written request

specifying the grounds thereof, provide as a

replacement a person with qualifications and

experience acceptable to the SSNNL.

4.6 Substitute of

Key Personnel

The SSNNL expects all the Key Personnel to be

available duringimplementation of the Agreement. The

SSNNL will not considersubstitution of Key Personnel

except for reasons of any incapacity or dueto health.

Such substitution shall ordinarily be limited to

KeyPersonnel subject to equally or better qualified and

experienced personnelbeing provided to the satisfaction

of the SSNNL. As a condition to suchsubstitution, a sum

equal to 5% (five per cent) of the remunerationspecified

for the original Key Personnel shall be deducted from

thepayments due to the Consultant. In the case of a

second substitutionhereunder, such deduction shall be

10% (Ten per cent) of theremuneration specified for the

original Key Personnel. Any furthersubstitutionadditional

25% (Twenty five per cent) deduction shall be made of

the original remuneration of key personnel.

5. OBLIGATIONS OF THE SSNNL

5.1 Assistance and

Exemptions

SSNNL shall assist the consultant and his staff for

getting necessary statutory permissions, approvals as

may be required under the law for their stay at the

project site and for providing services as per the terms

of the reference. Such assistance shall not be

considered as SSNNL’s obligation.

5.2 Access to Land The SSNNL warrants that the Consultant shall have,

free of charge unimpeded access to all land at the

project site in respect of which access is required for the

performance of the Services. The SSNNL will be

Page 120: Sardar Sarovar Narmada Nigam Limited (A wholly owned ... Sarovar Narmada Nigam Limited (A wholly owned Government ofGujarat Undertaking) Tender Notice No. 2, of 2015-2016. Office of

115

responsible for any damage to such land or any

property thereon resulting from such access and will

indemnify the Consultant and each of the Personnel in

respect of liability for any such damage, unless such

damage is caused by the default or negligence of the

Consultant or any Sub-Consultants or the Personnel of

either of them.

5.3 Change in the

Applicable Law

Related to

Taxes and

Duties

If, after the date of this Contract, there is any change in

the Applicable Law with respect to taxes and duties

which increases or decreases the cost incurred by the

Consultant in performing the Services, then the

remuneration and reimbursable expenses otherwise

payable to the Consultant under this Contract shall be

increased or decreased accordingly by agreement

between the Parties hereto, and corresponding

adjustments shall be made to the ceiling amounts

specified in Clause GC 6.1(b).

5.4 Services,

Facilities and

Property of the

SSNNL

(a) The SSNNL shall make available to the Consultant

and the Personnel, for the purposes of the Services

and free of any charge, the services, facilities and

property described in the Terms of Reference and

the Data Sheet.

(b) In case that such services, facilities and property

shall not be made available to the Consultant as

and when specified in Terms of Reference and the

Data Sheet, the Parties shall agree on (i) any time

extension that it may be appropriate to grant to the

Consultant for the performance of the Services, (ii)

the manner in which the Consultant shall procure

any such services, facilities and property from other

sources, and (iii) the additional payments, if any, to

be made to the Consultant as a result thereof

Page 121: Sardar Sarovar Narmada Nigam Limited (A wholly owned ... Sarovar Narmada Nigam Limited (A wholly owned Government ofGujarat Undertaking) Tender Notice No. 2, of 2015-2016. Office of

116

pursuant to Clause GC 6.1(c) hereinafter.

5.5 Payment In consideration of the Services performed by the

Consultant under this Contract, the SSNNL shall make

to the Consultant such payments and in such manner

as is provided by Clause GC 6 of this Contract.

5.6 Counterpart

Personnel

(a) The SSNNL shall make available to the Consultant

free of charge such professional and support

counterpart personnel, to be nominated by the

SSNNL with the Consultant’s advice, if specified in

Terms of Reference and the Data Sheet.

(b) If counterpart personnel are not provided by the

SSNNL to the Consultant as and when specified in

Terms of Reference and the Data Sheet, the

SSNNL and the Consultant shall agree on (i) how

the affected part of the Services shall be carried

out, and (ii) the additional payments, if any, to be

made by the SSNNL to the Consultant as a result

thereof pursuant to Clause GC 6.1(c) hereof.

(c) Professional and support counterpart personnel,

excluding SSNNL’s liaison personnel, shall work

under the exclusive direction of the Consultant. If

any member of the counterpart personnel fails to

perform adequately any work assigned to such

member by the Consultant that is consistent with

the position occupied by such member, the

Consultant may request the replacement of such

member, and the SSNNL shall not unreasonably

refuse to act upon such request.

6. PAYMENTS TO THE CONSULTANT

6.1 Cost Estimates;

Ceiling Amount

(a) The consultant shall be paid a lump sum fee as

quoted under the financial proposal and accepted

by the SSNNL. Such payment will be only in Indian

Page 122: Sardar Sarovar Narmada Nigam Limited (A wholly owned ... Sarovar Narmada Nigam Limited (A wholly owned Government ofGujarat Undertaking) Tender Notice No. 2, of 2015-2016. Office of

117

Rupees. The lump sum price will be for the entire

scope of services to be provided by the consultant

as per Terms of Reference.

(b) Except as may be otherwise agreed under Clause

GC 2.6 and subject to Clause GC 6.1(c), payments

under this Contract shall not exceed the lump sum

price quoted by the consultant and accepted by the

SSNNL.

(c) Notwithstanding Clause GC 6.1(b) hereof, if

pursuant to any of the Clauses GC 5.3, 5.4 or 5.6

hereof, the Parties shall agree that additional

payments in local and/or foreign currency, as the

case may be, shall be made to the Consultant in

order to cover an necessary additional expenditures

not envisaged as per the Terms of Reference and

the Data Sheet and the lump sum price referred to

in Clause GC 6.1(a) above, the ceiling or ceilings,

as the case may be, set forth in Clause GC 6.1(b)

above shall be increased by the amount or

amounts, as the case may be, of any such

additional payments. Such increase shall be agreed

mutually.

6.2 Remuneration

and

Reimbursable

Expenses

The Consultant shall be paid a lump sum price as

proposed by him and accepted by the SSNNL as a part

of the financial proposal. In case if, any extra work, not

covered within the scope of the terms of reference is

required, SSNNL shall pay the consultant additionally as

per the breakdown of costs contained in the financial

proposal as accepted by the SSNNL.

6.3 Currency of

Payment

All payments will be made in Indian Rupees

6.4

Mode of Billing

and Payment

Billings and payments in respect of the Services shall be

made as follows:

(a) Within the number of days after the Effective Date

Page 123: Sardar Sarovar Narmada Nigam Limited (A wholly owned ... Sarovar Narmada Nigam Limited (A wholly owned Government ofGujarat Undertaking) Tender Notice No. 2, of 2015-2016. Office of

118

specified in the SC, the SSNNL shall cause to be

paid to the Consultant advance payments in Indian

currency as specified in the SC. When the SC

indicate advance payment, this will be due after

provision by the Consultant to the SSNNL of an

advance payment guarantee acceptable to the

SSNNL in an amount (or amounts) and in a currency

(or currencies) specified in the SC. Such guarantee

(i) to remain effective until the advance payment has

been fully set off, and (ii) to be in the form as may be

prescribed by the SSNNL. The advance payments

will be set off by the SSNNL in equal instalments

against the statements for the number of months of

the Services specified in the SC until said advance

payments have been fully set off.

(b) As soon as practicable and not later than fifteen (15)

days after the end of each calendar month during

the period of the Services, or after the end of each

time intervals otherwise indicated in the SC, the

Consultant shall submit to the SSNNL, in duplicate,

itemized statements, accompanied by copies of

weekly/monthly progress reports, testing done,

attendance sheet of deployed staff, invoices,

vouchers and other appropriate supporting

materials, of the amounts payable pursuant to

Clauses GC 6.3 and GC 6.4 for such month, or any

other period indicated in the SC. Each statement

shall distinguish that portion of the total eligible costs

which pertains to remuneration from that portion

which pertains to reimbursable expenses, if eligible

under the financial proposal accepted by the

SSNNL.

(c) The SSNNL shall pay the Consultant’s statements

within thirty (30) days after the receipt by the SSNNL

Page 124: Sardar Sarovar Narmada Nigam Limited (A wholly owned ... Sarovar Narmada Nigam Limited (A wholly owned Government ofGujarat Undertaking) Tender Notice No. 2, of 2015-2016. Office of

119

of such statements with supporting documents. Only

such portion of a statement that is not satisfactorily

supported may be withheld from payment. Should

any discrepancy be found to exist between actual

payment and costs authorized to be incurred by the

Consultant, the SSNNL may add or subtract the

difference from any subsequent payments. Interest

at the annual rate specified in the SC shall become

payable as from the above due date on any amount

due by, but not paid on, such due date.

(d) The final payment under this Clause shall be made

only after the final report and a final statement,

identified as such, shall have been submitted by the

Consultant and approved as satisfactory by the

SSNNL. The Services shall be deemed completed

and finally accepted by the SSNNL and the final

report and final statement shall be deemed

approved by the SSNNL as satisfactory ninety (90)

calendar days after receipt of the final report and

final statement by the SSNNL unless the SSNNL,

within such ninety (90) day period, gives written

notice to the Consultant specifying in detail

deficiencies in the Services, the final report or final

statement. The Consultant shall thereupon promptly

make any necessary corrections, and thereafter the

foregoing process shall be repeated. Any amount,

which the SSNNL has paid or caused to be paid in

accordance with this Clause in excess of the

amounts actually payable in accordance with the

provisions of this Contract, shall be reimbursed by

the Consultant to the SSNNL within thirty (30) days

after receipt by the Consultant of notice thereof. Any

such claim by the SSNNL for reimbursement must

be made within twelve (12) calendar months after

Page 125: Sardar Sarovar Narmada Nigam Limited (A wholly owned ... Sarovar Narmada Nigam Limited (A wholly owned Government ofGujarat Undertaking) Tender Notice No. 2, of 2015-2016. Office of

120

receipt by the SSNNL of a final report and a final

statement approved by the SSNNL in accordance

with the above.

(e) All payments under this Contract shall be made to

the accounts of the Consultant specified in the SC.

(f) With the exception of the final payment under (d)

above, payments do not constitute acceptance of

the Services nor relieve the Consultant of any

obligations hereunder.

6.5 6.6

Liquidated

Damages

Liquidated

Damages for

delay

Liquidated Damages for error/variation In case any

error or variation is detected in the reports

submitted by the Consultant and such error/variation

is the result of negligence or lack of due diligence on

the part of the Consultant, the consequential

damages thereof shall be quantified by the SSNNL in

a reasonable manner and recovered from the

Consultant by way of deemed liquidated damages,

subject to a maximum of 0.50% (Zero Point Fifty

percent) of the Agreement Value.

In case of delay in completion of Services, liquidated

damages not exceeding an amount equal to 0.2%

(zero point two per cent) of the Agreement Value

per day, subject to a maximum of 10% (ten per

cent) of the Agreement Value will be imposed and

shall be recovered by appropriation from the

Performance Security or otherwise. However, in

case of delay due to reasons beyond the control of

the Consultant, suitable extension of time shall be

granted.

If the reasons for delay attributed to the consultant

Page 126: Sardar Sarovar Narmada Nigam Limited (A wholly owned ... Sarovar Narmada Nigam Limited (A wholly owned Government ofGujarat Undertaking) Tender Notice No. 2, of 2015-2016. Office of

121

in completion of Services, this Clause is applicable.

6.7 Encashment

and

appropriation

of

Performance

Security

The SSNNL shall have the right to invoke and

appropriate the proceeds ofthe Performance

Security, in whole or in part, without notice to the

Consultant in the event of breach of this Agreement

or for recovery ofliquidated damages specified in this

Clause 6.5.

7.0

Penalties for

deficiency in

Services

a)In addition to the liquidated damages not

amounting to penalty, as specified in Clause 6.5,

warning may be issued to the Consultant for minor

deficiencies on its part. In the case of significant

deficiencies in Services

causing adverse effect on the Project or on the

reputation of the SSNNL,other penal action including

debarring for a specified period may also be initiated

as per policy of the SSNNL.

b)SSNNL may conduct independent Quality monitoring

and checking of works carried out by the Consultant.

If such checks disclose that works carried out by the

Consultant do not meet the specified requirement,

the SSNNL will not pay the Consultant’s fees for the

affected portion. In addition, the Consultant will

incur a penalty equal to 100% of such fee and

without entitlement to payment of further fees in

this respect.

c) If the service of a team member provided by the

Consultant is not acceptable to SSNNL, the

consultant shall immediately replace the team

member on request of SSNNL. If the consultant fails

to quickly deploy / replace a team member as

instructed by the employer, the employer may make

temporary arrangement which shall be paid by

Page 127: Sardar Sarovar Narmada Nigam Limited (A wholly owned ... Sarovar Narmada Nigam Limited (A wholly owned Government ofGujarat Undertaking) Tender Notice No. 2, of 2015-2016. Office of

122

SSNNL with commensurate reduction in the man-

month scope of the PMC contract. The consultant

shall incur a penalty equal to 50% (fifty percent) of

the cost to the employer of the temporary

replacement until such time that the consultant

provides an acceptable replacement / team member

8.0 FAIRNESS AND GOOD FAITH

8.1 Good Faith The Parties undertake to act in good faith with respect

to each other’s rights under this Contract and to adopt

all reasonable measures to ensure the realization of the

objectives of this Contract

8.2 Operation of

the Contract

The Parties recognize that it is impractical in this

Contract to provide for every contingency which may

arise during the life of the Contract, and the Parties

hereby agree that it is their intention that this Contract

shall operate fairly as between them, and without

detriment to the interest of either of them, and that, if

during the term of this Contract either Consultant

believes that this Contract is operating unfairly, the

Parties will use their best efforts to agree on such action

as may be necessary to remove the cause or causes of

such unfairness, but no failure to agree on any action

pursuant to this Clause shall give rise to a dispute

subject to arbitration in accordance with Clause GC 8

hereof.

9.0 SETTLEMENT OF DISPUTES

8.1 Amicable Settlement

If either Consultant objects to any action or inaction of

the other Consultant, the objecting Consultant may file a

written Notice of Dispute to the other Consultant

providing in detail the basis of the dispute. The

Consultant receiving the Notice of Dispute will consider

Page 128: Sardar Sarovar Narmada Nigam Limited (A wholly owned ... Sarovar Narmada Nigam Limited (A wholly owned Government ofGujarat Undertaking) Tender Notice No. 2, of 2015-2016. Office of

123

it and respond in writing within 14 days after receipt. If

that Consultant fails to respond within 14 days, or the

dispute cannot be amicably settled within 14 days

following the response of that Consultant, Clause GC

8.2 shall apply.

8.2 Disputes

Resolution

Any dispute between the Parties as to matters arising

pursuant to this Contract that cannot be settled

amicably according to Clause GC 8.1 may be submitted

by either Consultant for settlement in accordance with

the provisions specified in the SC.

Page 129: Sardar Sarovar Narmada Nigam Limited (A wholly owned ... Sarovar Narmada Nigam Limited (A wholly owned Government ofGujarat Undertaking) Tender Notice No. 2, of 2015-2016. Office of

124

SECTION 7

SPECIAL CONDITIONS ON CONTRACT

(Clauses in brackets { } are optional; all notes should be deleted in final text)

Number of GC Clause

Amendments of, and Supplements to, Clauses in the General Conditions of Contract

1.4 The language/s is : English

1.6 The addresses are: For SSNNL Executive Engineer,

Saurashtra Branch Canal

Division No.1/2, Narmada

Colony, Bhavnagar

Highway,

Dhandhuaka, 382460.

Phone No. & Fax: 02713-223821

E-mail: [email protected]

For Consultant : ____________

Attention : ____________

Facsimile : ____________

1.8 {The Member in Charge is [Insert name of member]}

1.9 The Authorized Representatives are:

For the SSNNL : _______________

For the Consultant : _____________

(2.1) (The effectiveness conditions are the following:)

(a) Client’s approval of Consultant’s proposals for

appointment of specified key staff members;

(b) effectiveness of the project for which the

assignment is sought for;

(c) receipt by Consultant of advance payment and by

SSNNL of advance payment guarantee (see

Page 130: Sardar Sarovar Narmada Nigam Limited (A wholly owned ... Sarovar Narmada Nigam Limited (A wholly owned Government ofGujarat Undertaking) Tender Notice No. 2, of 2015-2016. Office of

125

Clause SC 6.4(a)),etc.

(d) others…..

Following clause is also added to become a part of the

contract:

“The Consultant has to provide services for the period of

construction as specified in the contracts awarded to the

construction contractors In case if, these construction

contracts are extended beyond the specified period, the

consultant’s contract (this contract) may be extended by

mutual understanding. During the extended period, the

consultant shall provide the services and deploy his staff as

per the requirement of the work. The manpower requirement

shall be decided by the Engineer in charge. The fees may be

worked out on the basis of actual man power deployed during

extended period by mutual understanding. The rates shall

be decided as per quoted rates in the financial proposal

by escalating 8% per annum of the quoted rates by the

Consultants.”

2.2 The time period shall be ________________or such other

time period as the parties may agree in writing.

(3.4) “3.4 Limitation of the Consultants’ Liability towards the

SSNNL.

(a) Except in case of gross negligence or wilful

misconduct on the part of the Consultants or on the

part of any person or firm acting on behalf of the

Consultants in carrying out the Services, the

Consultants, with respect to damage caused by the

Consultants to the SSNNL’s property, shall not be

liable to the SSNNL.

(i) for any indirect or consequential loss or

damage; and

(ii) for any direct loss or damage that exceeds by

two times the total value of the Contract;

Page 131: Sardar Sarovar Narmada Nigam Limited (A wholly owned ... Sarovar Narmada Nigam Limited (A wholly owned Government ofGujarat Undertaking) Tender Notice No. 2, of 2015-2016. Office of

126

(b) This limitation of liability shall not affect the

Consultants’ liability, if any, for damage to Third

Parties caused by the Consultants or any person or

firm acting on behalf of the Consultants in carrying out

the Services.”

3.5 The risks and the coverage shall be as follows:

(a) Third Party motor vehicle liability insurance in respect

of motor vehicles operated in Gujarat / India by the

Consultant or its Personnel or any Sub-Consultants or

their Personnel, with a minimum coverage as per

Motor Vehicles Act 1988.

(b) Third Party liability insurance, with a minimum

coverage of INR 5 lakhs.

(c) professional liability insurance, with a minimum

coverage equivalent to the total amount of lump sum

fees to be paid by the SSNNL to the consultant.

(d) employer’s liability and workers’ compensation

insurance in respect of the Personnel of the

Consultant and of any Sub-Consultants, in accordance

with the relevant provisions of the Applicable Law, as

well as, with respect to such Personnel, any such life,

health, accident, travel or other insurance as may be

appropriate; and

(e) insurance against loss of or damage to (i) equipment

purchased in whole or in part with funds provided

under this Contract, (ii) the Consultant’s property used

in the performance of the Services, and (iii) any

documents prepared by the Consultant in the

performance of the Services.

(3.7 (c)) (The other actions are:

{taking any action under a civil works contract designating

the Consultant as “Engineer”, for which action, pursuant

to such civil works contract, the written approval of the

SSNNL as “Employer” is required.}

Page 132: Sardar Sarovar Narmada Nigam Limited (A wholly owned ... Sarovar Narmada Nigam Limited (A wholly owned Government ofGujarat Undertaking) Tender Notice No. 2, of 2015-2016. Office of

127

3.9 The consultant shall not use their documents and

software for purposes unrelated to this contract without

the prior written approval of the SSNNL.

{4.6} {The person designated as Resident Project Manager in

the Terms of Reference shall serve in that capacity, as

specified in Clause GC 4.6.}

6.4 (a) The following provisions shall apply to the advance

payment ( Mobilisation Advance) and the advance

payment guarantee:

(1) An advance payment equivalent to 5% of the total

lump sum fee quoted by the consultant under the

financial proposal and accepted by the SSNNL in

Indian Rupees shall be made within 30 days after the

Effective Date. The advance payment will be

recovered by the SSNNL in equal instalments against

the statements/bills from the sixth (6th) month to

fifteenth (15th) months of the Services until the

advance payment has been fully recovered.

(2) The advance payment guarantee shall be for an

amount equivalent to the advance payment to be

paid to the consultant.

6.4 (c) The interest rate for advance payment is : 14%

6.4(e) The accounts are Indian Rupee accounts

8.2 Disputes shall be settled by arbitration in accordance with

the following provisions:

8.2.1 Selection of Arbitrators

Each dispute submitted by a Party to arbitration shall be

heard by a sole arbitrator or an arbitration panel

composed of three arbitrators, in accordance with the

Indian Arbitration & Conciliation Act, 1996.

8.2.2 Rules of Procedure

Page 133: Sardar Sarovar Narmada Nigam Limited (A wholly owned ... Sarovar Narmada Nigam Limited (A wholly owned Government ofGujarat Undertaking) Tender Notice No. 2, of 2015-2016. Office of

128

Arbitration proceedings shall be conducted in accordance

with procedure of the Arbitration & Conciliation Act 1996,

of India unless the Consultant is a foreign national/firm,

where arbitration proceedings shall be conducted in

accordance with the rules of procedure for arbitration of

the United Nations Commission on International Trade

Law (UNCITRAL) as in force on the date of this Contract.

8.2.3 Substitute Arbitrators.

If for any reason an arbitrator is unable to perform his

function, a substitute shall be appointed in the same

manner as the original arbitrator

8.2.4 Qualifications of Arbitrators

The sole arbitrator or the third arbitrator appointed

pursuant to paragraphs (a) through (c) of Clause 8.2.1

hereof shall be recognized legal or technical expert with

extensive experience in relation to the matter in dispute.

8.2.5 Miscellaneous

In any arbitration proceeding hereunder:

(a) proceedings shall, unless otherwise agreed by the

Parties, be held in Gandhinagar/ Ahmedabad.

(b) the English language shall be the official language for

all purposes; and

(c) the decision of the sole arbitrator or of a majority of the

arbitrators (or of the third arbitrator if there is no such

majority) shall be final and binding and shall be

enforceable in any court of competent jurisdiction.

Page 134: Sardar Sarovar Narmada Nigam Limited (A wholly owned ... Sarovar Narmada Nigam Limited (A wholly owned Government ofGujarat Undertaking) Tender Notice No. 2, of 2015-2016. Office of

129

AGREEMENT FORM

AGREEMENT

This agreement, made the ________ day of ______ 20_____, between

__________________________________________________(name and

address of Employer ) (hereinafter called “the Employer)’ of the one part

and __________________________________ (name and address of

Consultant) (hereinafter called “the Consultant”) of the other part.

Whereas the Employer is desirous that the Consultant execute

____________________________________________________ (name

and identification number of Contract) (hereinafter called “the PMC/TPI

Services”) and the Employer has accepted the Bid by the Consultant for

the execution and completion of such Works and the remedying of any

defects therein, at a contract price of Rs……………………………

NOW THIS AGREEMENT WITNESSETH as follows:

1. In this Agreement, words and expression shall have the same

meanings as are respectively assigned to them in the Conditions of

Contract hereinafter referred to, and they shall be deemed to form and

be read and construed as part of this Agreement.

2. In consideration of the payments to be made by the Employer to the

Consultant as hereinafter mentioned, the Consultant hereby covenants

with the Employer to execute and complete the PMC/TPI services and

remedy any defects therein in conformity in all aspects with the provisions

of the Contract.

3. The Employer hereby covenants to pay the Consultant in consideration of

the Project Management Consultancy / TPI services of the Works and the

remedying the defects wherein the Contract Price or such other sum as

may become payable under the provisions of the Contract at the times and

in the manner prescribed by the Contract.

Page 135: Sardar Sarovar Narmada Nigam Limited (A wholly owned ... Sarovar Narmada Nigam Limited (A wholly owned Government ofGujarat Undertaking) Tender Notice No. 2, of 2015-2016. Office of

130

4. The following documents shall be deemed to form and be read and

construed as part of this Agreement, viz.:

i) Letter of Acceptance;

ii) Notice to proceed with the works;

iii) Consultant’s Bid;

iv) Contract Data;

v) Conditions of contract (including Special Conditions of Contract);

vi) Specifications;

vii) Drawings;

viii) Bill of Quantities; and

ix) Any other document listed in the Contract Data as forming part of

the contract.

x) RFP with amendments and pre bid clarifications

In witness whereof the parties thereto have caused this Agreement to be

executed the day and year first before written.

The Common Seal of _______________________________ was hereunto

affixed in the presence of:

Signed, Sealed and Delivered by the said

In the presence of:

Binding Signature of Employer

Binding Signature of Consultant

Page 136: Sardar Sarovar Narmada Nigam Limited (A wholly owned ... Sarovar Narmada Nigam Limited (A wholly owned Government ofGujarat Undertaking) Tender Notice No. 2, of 2015-2016. Office of

ct)\*1

s Sardar Sarouar ilarmadi ffgam Ltd"b.*o&[MttMd

PROFORMA -4

POWER OF ATTORNEY

the registered office) do hereby constitute, nominate, appoint and authorize Mr / Ms

sonldaughter/wife andpresently residing at .................. who is presently employedwith us and holding the position of ................. ......... as our true and lawful attorney(hereinafter referred to as the "Authorized Representative") to do in our name and on our behalf.all such acts, deeds and things as are necessary or required in connection with or incidental tosubmission of our Proposal for and selection as the consultant for providing project ManagementServices to the SsNNL for the three Pumping stations on the Kutch Branch canal including but notlimited to s-igning and submission of all applications, proposals and other documents and writings,participating in pre-bid and other conferences and providing information/ responses to the ssNNL,representing us in all matters before the ssNNl. signing and execution of all contracts andundertakings consequent to acceptance of our proposal and generally dealing with the sSNNL inall matters in connection with or relating to or arising out of our proposal for the said project

and/or upon award thereof to us till the entering into of the Agreement with the ssNNL.

AND, we do hereby agree to ratify and confirm all acts, deeds and things lawfully done or caused

to be done by our said Authorized Representative pursuant to and in exercise ofthe powers

conferred by this power ofAttorney and that all acts, deeds and things done by our said

Authorized Representative in exercise of the powers hereby conferred shall and shall always be

deemed to have been done by us.

IN WITNESS WHEREOF WE, THE ABOVE NAMED PRINCIPAL HAVE EXECUTED THIS POWER OF

ATTORNEY ON THIS DAY OF

For

(Signature, name, designation and address)

Witnessesi

1..

2.

Notarized Accepted

(Signature, name, designation and address of theAttorney

87 lPage

Page 137: Sardar Sarovar Narmada Nigam Limited (A wholly owned ... Sarovar Narmada Nigam Limited (A wholly owned Government ofGujarat Undertaking) Tender Notice No. 2, of 2015-2016. Office of

I

'if.i $ardar $arnssr [{armrda Hignm Ltd.

ANNEXURE-II -A

PROFORMA OF BANK GUARANTEE (UNCONDTTTONAL)*

FOR PERFORMANCE SECURITY (INITIAL AND ADDITIONAL) DEPOSIT

To:

IName of Employer]..........,.....

[Address of Employer] ..............

WHERE AS lName

Herein after called "The contractor" has undeftaken in pursuance of contract No.

... Dated .. to execute (Name of contract and brief description

of works) (Herein after called "The contract")

AND WHEREAS it has stipulated by you in the said contract that the contractor shall

furnish you with a Bank Guarantee by a recognized bank for the sum specified

therein as security for compliance with his obligations in accordance with the

contract.

AND, WHEREAS, we have agreed to give the Contractor such a Bank Guarantee.

NOW THEREFORE we hereby affirm that we are the Guarantor and responsible

to you, on behalf of the contractor, up to a total of [Amount of Guarantee]

** Rs. (in figures) ...........Rupees (In

words).......

being payable in the types and proportions of currencies in which the contract price

is payable and we undertake to pay you, upon your first written demand and without

cavil or argument, any sum or sums within the limits of fAmount of Guarantee]x*

[2132]

Page 138: Sardar Sarovar Narmada Nigam Limited (A wholly owned ... Sarovar Narmada Nigam Limited (A wholly owned Government ofGujarat Undertaking) Tender Notice No. 2, of 2015-2016. Office of

,jF', $ardar $arovar flarmnda Hignm ltd.: i-l " NitililFo? ttot[ MtavvrcNwtt

.as aforesaid without your needing

to prove or to show grounds or reasons for demand for the sum specified herein'

We hereby waive the necessity of your demanding the said debt from the contractor

before presenting us with the demand'

We further agree that no change or addition to or other modification of the terms of

the contract or of the works to be performed there under or of any of the contractor

documents which be made between you and the contractor shall in any way release

us from any liability under this guarantee and we hereby waive notice of any such

change, addition or modification.

This Guarantee is valid until the fifteen months after the date of issuing

the completion Ceftificate.

SIGNATURE AND SEAL OF THE GUARANTOR ....."....".'

Name of Bank.........

Address

Date ..........

x Bidders are not required to complete this form'

xx An amount is to be insefted by the Guarantor, representing the percentage of

the Contract Price specified in the Contract

[283]

Page 139: Sardar Sarovar Narmada Nigam Limited (A wholly owned ... Sarovar Narmada Nigam Limited (A wholly owned Government ofGujarat Undertaking) Tender Notice No. 2, of 2015-2016. Office of

,rL\r,r Snndar $nruvar Harmrda Higrm ttd': i :l r ilAwM Fot ,E@v ND .Nvmtwxt

PROFORMA OF BANK GUARANTEE (UNCONDITTONAL)

ANNEXURE-II.B

To,

(NAME OF EMPLOYER) ............

(Address of EmPloYer, .'...-

WHERE AS (Name and Address of Contracto| """""'

(herein after called "The contractor") : has undertaken in pursuance of contract No'

dated ........ to execute fName of contract and Brief Description

of works] (hereirrafter called "The Contract",)

and whereas it has been stipulated by you in the said contract that the contractor

shall furnish you with a bank guarantee by a scheduled bank for the sum specified

therein as security for compliance with his obligations in accordance with the

contract.

and whereas we have agreed to give the contractor such bank guarantee :

Now therefore we hereby affirm that we are the guarantor and responsible to you,

on behalf of the contractor, upto a total of (Amount of Guarantee)xx

@ Rupeesinwords

Such sum being paVable and we undertake to pay you, upon your first written

demand and without cavils or argument, any sum or sums within the limits of

fAmount of Guarantee]** .."""" as aforesaid without your needing

to prove or to show grounds or reasons for your demand for the sum specified

therein,

we hereby waive the necessity of your demanding the said debt form the contractor

before presenting us with demand'

[284]

Page 140: Sardar Sarovar Narmada Nigam Limited (A wholly owned ... Sarovar Narmada Nigam Limited (A wholly owned Government ofGujarat Undertaking) Tender Notice No. 2, of 2015-2016. Office of

{lY! $nrdan Sarsysr ffarmr-rtr li-Uam til.

We further agree that no change or addition to or other modification of the terms ofthe contract or of the works to be performed there under or of any of the contractdocuments which may be made between you and the contractor shall in any way

release us from any liability under this guarantee, and we hereby waive notice of any

such change, addition or modification, This guarantee is valid until the date

( .) months after the issuing of the maintenance certificate.

We hereby affirms that we are aware of the stipulation for acceptance of ourguarantee by Sardar Sarovar Narmada Nigam Ltd., Gandhinagar, that the said Nigam

will be for all matters relating to this guarantee shall deal with our bank branch

located at Vadodara / Ahmedabad lGandhinagar and all communication including

invocation, notice of demand and such other matter deemed essential to be advised

to and/ or served on the said branch, on our behalf, of our bank, who without demurshall in accordance with the provisions of this guarantee honour unconditionally all

obligations under this guarantee.

We unequivo:ally surrender our rights to be informed/ advised given notice in

respect thereof in favour of the said branch of our bank in consideration of theaforesaid terms and conditions incorporated in this guarantee. We agree that for all

the operative part and enforceability in the court of law, this guarantee shall be

deemed to have issued by the said branch of our bank,

The obligation under this guarantee shall be performed and discharged at Vadodara/

Ahmedabad /Gandhinagar and the court located there at shall have jurisdiction for all

the matters covered under and/or arising out of this guarantee.

SIGNATURE AND SEAL OF THE GUARANTOR

Name of Bank

Address

Date : I 2070

Confirmed by :-

[28s]

Page 141: Sardar Sarovar Narmada Nigam Limited (A wholly owned ... Sarovar Narmada Nigam Limited (A wholly owned Government ofGujarat Undertaking) Tender Notice No. 2, of 2015-2016. Office of

.J !i 3i $nrdar $rrorsr t{armrds Higan ltd.

Bank Branch located at vadodara/ Gandhinagar / Ahmedabad

we hereby confirm the above Bank Guarantee given by our Branch at

And will honour the same as if it has been issued by us'

Signature & Seal

Bank, Vadodara/Gandhinagar / Ahmedabad

Date :

*

| 20t0

This form shall be used when the bank guarantee to be issued by the branch

other than Vadodara / Gandhinagar / Ahmedabad but operatable at its

Vadodara / Gandhinagar / Ahmedabad'

Bidders are not required to complete this form'

An amcunt is to inserted by the guarantor representing the percentage of the

contra.:t price specified in the contract.

+

*)F

[286]

Page 142: Sardar Sarovar Narmada Nigam Limited (A wholly owned ... Sarovar Narmada Nigam Limited (A wholly owned Government ofGujarat Undertaking) Tender Notice No. 2, of 2015-2016. Office of

av: i

:i:._: $nrdar $arnvar llarilndg Hitram Ltd.

Annexure - IV

FORM OF BANK GUARANTEE

(Brp sEcuRrrY)

Whereas ....(hereinafter called "the Bidder") has submitted its

Offer (hereinafter called "the Bid") dated(date of submission of Bid) for supply,

installation, commissioning and Operation & Maintenance of equipment including all

mechanical, civil and electrical'works on turn key basis for Kachchh Branch Canal

(KBC) Pumping Station no. 1 of Sardar Sarovar Narmada Nigam Ltd. (SSNNL),

located at ............. ..,... Ch. in Gujarat state.

KNOW ALL PEOPLE by these presents that WE..............(name of bank) of (name

of Country), having our registered office at (address of bank)

hereinafter called "the Bank" are bound unto................(name of Employer)

(hereinafter called "Employer") in the sum of ...............for which payment well and

truly to be mac e to the said Employer, the Bank binds itself, its successors and

assigns by these presents. Sealed with the Common Seal of the said Bank this day

of ............. ...............2004.

THE CONDITIONS of this obligation are:

1. If the Applicant

(a) Withdraws its Bid during the validity period of the Bid

Or

2, If the Applicant, having been notified of the acceptance of its Bid by SSNNL

during the validity period of Bid;

(a) Fails or,refuses to sign the conlract Agreement after being selected by

SSNNL.

We undeftake to promptly pay the Employer up to the above amount upon receipt of

its first written demand without any demur, protest and contest and without the

Employer having to substantiate its demand, provided that in its demand the

[288]

Page 143: Sardar Sarovar Narmada Nigam Limited (A wholly owned ... Sarovar Narmada Nigam Limited (A wholly owned Government ofGujarat Undertaking) Tender Notice No. 2, of 2015-2016. Office of

r\;!rlli)i \

Snrdrr $srsv*r Harnrda ffigam !!$..

Employer will note that the amount claimed by it is due to it, owing to the

occurrence of one or both conditions specifying the occurred condition or conditions'

Thisguaranteewillremaininforceuptoandincluding@''.'...'''.''.fromthe

date of the Bid opening and any demand in respect thereof should reach the Bank

not later than the above date'

Witness

Signature

Signature

Name

Bank's Rubber StamP

Official Addre;s

Niame

Designation with Bank StamP

Attorney as per power of Attorney No'

-

Dated

@Thisdateshouldbe30daysafterthedateforwhichbidisvalid.

[28e]

Page 144: Sardar Sarovar Narmada Nigam Limited (A wholly owned ... Sarovar Narmada Nigam Limited (A wholly owned Government ofGujarat Undertaking) Tender Notice No. 2, of 2015-2016. Office of

Agreement Form

Agreement

This agreement, made the day of 20--.,

(hereinafter Employer)"

name and address of Employerl

one part andthe

lname and address of contractor] (hereinafter called ..the

Contractor" ) of the other part,

Whereas the Employer desirous that the Contractor execute

_[ name and identification number ofContractl (hereinafter called "the Works') and the Employer has accepted the Bid by theContractor for the execution and completion of such Works and the remedying of any defectstherein, at a contract price of Rs.

NOW THIS AGREEMENT WITNESSETH as follows:

In this Agreement, words and expression shall have the same meanings as are

respectively assigned to them in the Conditions of Contract hereinafter referred to, and

they shall be deemed to form and be read and construed as paft of this Agreement,

In consideration of the payments to be made by the Employer to the Contractor as

hereinafter mentioned, the Contractor,hereby covenants with the Employer to execute

and complete the Works and remedy any defects therein in conformity in all aspects

with the provisions of the Contract,

The Employer hereby covenants to pay the Contractor in consideration of the execution

and completion of the Works and the remedying the defects wherein the Contract price

1.

2.

3,

Page 145: Sardar Sarovar Narmada Nigam Limited (A wholly owned ... Sarovar Narmada Nigam Limited (A wholly owned Government ofGujarat Undertaking) Tender Notice No. 2, of 2015-2016. Office of

4.

or such other sum as may become payable under the

times and in the manner prescribed by the Contract.

The following documents shall be deemed to form and

this Agreement, viz.:

provisions of the Contract at the

be read and construed as part of

i) Letter of Acceptance;

ii) Notice to proceed with the works;

iii) Contractor's Bid;

iv) Contract Data;

v) conditions of contract (including special conditions of contract);vi) Specifications;

vii)Drawings;

viii) Bill of Quantities; and

Any other document listed in the Contract Data as forming part of the contract.

Joint Venture Agreement

In witness whereof -he parties thereto have caused this Agreement to be executed the day andyear first before writLen,

The Common Seal of

was hereunto affixed in the presence of:

Signed, Sealed and Delivered by the said

ix)

x)

in the presence of:

Binding Signature of Employer

Binding Signature of Contractor

Page 146: Sardar Sarovar Narmada Nigam Limited (A wholly owned ... Sarovar Narmada Nigam Limited (A wholly owned Government ofGujarat Undertaking) Tender Notice No. 2, of 2015-2016. Office of
Page 147: Sardar Sarovar Narmada Nigam Limited (A wholly owned ... Sarovar Narmada Nigam Limited (A wholly owned Government ofGujarat Undertaking) Tender Notice No. 2, of 2015-2016. Office of