sarah wigglesworth completes cycle hub and bridge at kingston

1
FIRST LOOK Sarah Wigglesworth completes cycle hub and bridge at Kingston 7 JUNE 2021 . BY FRAN WILLIAMS Sarah Wigglesworth Architects has completed a new 400-bike cycle hub and bridge for Kingston upon Thames train station 1/20 Site from carpark Source: Buro Happold / Craig Palmer The brief called for a new public space outside Kingston upon Thames railway station to improve pedestrian and cyclist links to the riverfront and routes into the medieval town centre. Two structures have been built along a new linear park on disused railway land connecting the station with the River Thames: a wider cycle and pedestrian bridge within the river link and a cycle hub with capacity for up to 400 bikes. The green strip in which the cycle hub sits includes new planting designed by Dutch landscape architect Okra - aiming to guide people along this route. ADVERTISEMENT The widened cycle bridge provides improved accessibility and waynding. Source:Buro Happold / Craig Palmer As well as providing space for cargo bikes and commuting bicycles, the cycle hub has an open, covered colonnade at ground level with café and cycle workshop. This aims to create a meeting place and information point for bike users as well as accommodating a vending machine for cycle spares, a repair station with tools, and a water fountain. Most of the cycle storage is on the two upper oors, accessed via stairs provided with a wheeling ramp or via a lift. Sarah Wigglesworth Architects worked closely with Kingston Museum and Kingston University (both stakeholders in the project), looking at local references to inuence the hub’s design language. These included the historical industrial manufacture of lattice-like fuselages of Sopwith and Hawker Hurricane planes in Kingston and the work of photographic pioneer Eadweard Muybridge. Kingston’s royal connection and interpretations of the crown motif also provided inspiration for the structural elements that wrap around the hub repetitively. ADVERTISEMENT In 2008, Sarah Wigglesworth completed a bicycle store forming the entrance to London's Bermondsey Square. It was shortlisted for AJ Small Projects in 2009. Source:Buro Happold / Craig Palmer Architect’s view The Kingston Cycle Hub and Bridge, set in a linear landscaped park, provides a vision for how civic infrastructure can be beautiful, functional and accessible. The hub is not only a storage facility with up to 400 cycle spaces but also a new landmark in Kingston’s streetscape, a meeting point and a place to get your bike serviced. The design of both structures, which is inspired by the rich local heritage of Kingston, refocuses the priority from cars to pedestrians and cyclists, paving the way for more sustainable modes of transport. These iconic structures show us that cycle provision should not be an afterthought but can be central to how we design the public realm. Its presence in the townscape signies the raised prole of cycling as a desirable mobility option, positing a new building type that dignies the activity and encourages healthy travel, benetting the environment for everyone. Josh Molnar, project architect, Sarah Wigglesworth Architects Client’s view The Kingston Station project is one of the landmark projects for the Royal Borough of Kingston’s Go Cycle programme. The project comprises a new plaza outside the station, a landscaped river link including a new pedestrian/cycle bridge, cycle hub structures and other public realm improvements. The project has transformed the area and is being recognised as an exemplar in architectural vision and functionality, setting the tone for the wider Kingston regeneration plans and developments. Sarah Wigglesworth Architects has been able to marry its architectural vision of an elegant, modern and sustainable transport infrastructure with the quintessential royal heritage of the borough and reference the transportation movements around the cycle hub tothe zoopraxiscope study of movement by Eadweard Muybridge, who was also born and lived in Kingston. Jean-Christophe Chassard, consultant portfolio delivery manager, Go Cycle programme, Royal Borough of Kingston upon Thames Project data Start on site April 2018 Completion April 2021 Gross (internal + external) Coor area 7,800m² (including pedestrian and cycle network, cycle bridge and cycle hub), 666m² (cycle hub) Form of contract or procurement route NEC3 Short Professional Services Contract Construction cost £4.33 million Construction cost per m 2 £8,400 (bridge), £2,400 (hub), £265 (public realm) Architect Sarah Wigglesworth Architects Client Royal Borough of Kingston Civil engineer Buro Happold Structural engineer Buro Happold Bridge engineer Buro Happold M&E consultant Buro Happold Quantity surveyor RBK Lighting consultant Buro Happold Design, communication and stakeholder engagement Tomato Landscape consultant Okra Project manager RBK Go Cycle Team CDM co-ordinator Buro Happold Approved building inspector Royal Borough of Kingston Structures contractor Walkers Construction Bridge contractor Dyer & Butler CAD software used Vectorworks, Revit Environmental performance data Airtightness at 50pa Open structure so N/A Heating and hot water load 24 kWh/m²/yr Overall area-weighted U-value N/A Predicted design life 120 years Embodied / whole-life carbon 251 kgCO2e/m² COMMENT AND SHARE TAGS You might also be interested in… SIGN IN or REGISTER a new account to join the discussion. Please remember that the submission of any material is governed by our Terms and Conditions and by submitting material you conrm your agreement to these Terms and Conditions. Links may be included in your comments but HTML is not permitted. 1. Bartlett facing investigation following allegations of sexism and racism 2. British Museum names architects on new £45m framework 3. Hawkins\Brown’s Lewisham housing plans quashed by High Court 4. Studio Egret West wins permission for enormous Birmingham masterplan 5. Architect struck off after assaulting train staff and police ofcer 6. The Secret Architect: ‘Keep Calm and Carry On’ is melting my brain 7. London stars win major Norwegian masterplan contest 8. Exclusive: Garden Museum launches open contest for Lambeth Green pavilion 9. SOM-designed block acted like ‘broken chimney’, re report nds 10. AJ100 Practice of the Year 2021 shortlist announced BRIDGE CYCLE STORE KINGSTON UPON THAMES SARAH WIGGLESWORTH ARCHITECTS Greenwich Design District: frst building completes Sheppard Robson bridge links helipad to Manchester hospital A&E Wright & Wright’s Museum of the Home completes Gort Scott designs scenography for Epic Iran exhibition at V&A Most popular Leave a comment CONTACT US WHY SUBSCRIBE ADVERTISE WITH US FAQS TIP US OFF SPONSORED CONTENT ARCHIVE TERMS AND CONDITIONS PRIVACY POLICY COPYRIGHT © 2021 EMAP PUBLISHING LIMITED Courtyard to hub Second oor NEWS COMPETITIONS BUILDINGS SPECIFICATION PRACTICE PODCASTS FILM MAGAZINES LIBRARY EVENTS Building studies House Housing Retrot & sustainable Small project & extension Ofce Education Subscribe ! Search... Login / Register Feedback !

Upload: others

Post on 19-Mar-2022

3 views

Category:

Documents


0 download

TRANSCRIPT

FIRST LOOK

Sarah Wigglesworth completes cycle huband bridge at Kingston7 JUNE 2021 . BY FRAN WILLIAMS

Sarah Wigglesworth Architects has completed a new 400-bike cycle hub andbridge for Kingston upon Thames train station

1/20 Site from carpark

Source: Buro Happold / Craig Palmer

The brief called for a new public space outside Kingston upon Thames railway station to improve pedestrianand cyclist links to the riverfront and routes into the medieval town centre.

Two structures have been built along a new linear park on disused railway land connecting the station with theRiver Thames: a wider cycle and pedestrian bridge within the river link and a cycle hub with capacity for up to400 bikes.

The green strip in which the cycle hub sits includes new planting designed by Dutch landscape architect Okra -aiming to guide people along this route.

ADVERTISEMENT

The widened cycle bridge provides improved accessibility and wayfinding.

Source:Buro Happold / Craig Palmer

As well as providing space for cargo bikes and commuting bicycles, the cycle hub has an open, coveredcolonnade at ground level with café and cycle workshop. This aims to create a meeting place and informationpoint for bike users as well as accommodating a vending machine for cycle spares, a repair station with tools,and a water fountain.

Most of the cycle storage is on the two upper floors, accessed via stairs provided with a wheeling ramp or viaa lift.

Sarah Wigglesworth Architects worked closely with Kingston Museum and Kingston University (bothstakeholders in the project), looking at local references to influence the hub’s design language. These includedthe historical industrial manufacture of lattice-like fuselages of Sopwith and Hawker Hurricane planes inKingston and the work of photographic pioneer Eadweard Muybridge.

Kingston’s royal connection and interpretations of the crown motif also provided inspiration for the structuralelements that wrap around the hub repetitively.

ADVERTISEMENT

In 2008, Sarah Wigglesworth completed a bicycle store forming the entrance to London's Bermondsey Square.It was shortlisted for AJ Small Projects in 2009.

Source:Buro Happold / Craig Palmer

Architect’s viewThe Kingston Cycle Hub and Bridge, set in a linear landscaped park, provides a vision for how civicinfrastructure can be beautiful, functional and accessible. The hub is not only a storage facility with upto 400 cycle spaces but also a new landmark in Kingston’s streetscape, a meeting point and a place toget your bike serviced.

The design of both structures, which is inspired by the rich local heritage of Kingston, refocuses thepriority from cars to pedestrians and cyclists, paving the way for more sustainable modes of transport.These iconic structures show us that cycle provision should not be an afterthought but can be central tohow we design the public realm. Its presence in the townscape signifies the raised profile of cycling as adesirable mobility option, positing a new building type that dignifies the activity and encourages healthytravel, benefitting the environment for everyone.Josh Molnar, project architect, Sarah Wigglesworth Architects

Client’s viewThe Kingston Station project is one of the landmark projects for the Royal Borough of Kingston’s GoCycle programme. The project comprises a new plaza outside the station, a landscaped river linkincluding a new pedestrian/cycle bridge, cycle hub structures and other public realm improvements. Theproject has transformed the area and is being recognised as an exemplar in architectural vision andfunctionality, setting the tone for the wider Kingston regeneration plans and developments.

Sarah Wigglesworth Architects has been able to marry its architectural vision of an elegant, modern andsustainable transport infrastructure with the quintessential royal heritage of the borough and referencethe transportation movements around the cycle hub tothe zoopraxiscope study of movement byEadweard Muybridge, who was also born and lived in Kingston.Jean-Christophe Chassard, consultant portfolio delivery manager, Go Cycle programme, Royal Boroughof Kingston upon Thames

Project dataStart on site April 2018Completion April 2021Gross (internal + external) Coor area 7,800m² (including pedestrian and cycle network, cycle bridge and cyclehub), 666m² (cycle hub)Form of contract or procurement route NEC3 Short Professional Services ContractConstruction cost £4.33 million

Construction cost per m2 £8,400 (bridge), £2,400 (hub), £265 (public realm)Architect Sarah Wigglesworth ArchitectsClient Royal Borough of KingstonCivil engineer Buro HappoldStructural engineer Buro HappoldBridge engineer Buro HappoldM&E consultant Buro HappoldQuantity surveyor RBKLighting consultant Buro HappoldDesign, communication and stakeholder engagement TomatoLandscape consultant OkraProject manager RBK Go Cycle TeamCDM co-ordinator Buro HappoldApproved building inspector Royal Borough of KingstonStructures contractor Walkers ConstructionBridge contractor Dyer & ButlerCAD software used Vectorworks, Revit

Environmental performance dataAirtightness at 50pa Open structure so N/AHeating and hot water load 24 kWh/m²/yrOverall area-weighted U-value N/APredicted design life 120 yearsEmbodied / whole-life carbon 251 kgCO2e/m²

COMMENT AND SHARE

TAGS

You might also be interested in…

SIGN IN or REGISTER a new account to join the discussion.

Please remember that the submission of any material is governed by our Terms and Conditions and by submitting material you confirm your agreement to these Termsand Conditions. Links may be included in your comments but HTML is not permitted.

1. Bartlett facing investigation following allegations of sexism and racism

2. British Museum names architects on new £45m framework

3. Hawkins\Brown’s Lewisham housing plans quashed by High Court

4. Studio Egret West wins permission for enormous Birmingham masterplan

5. Architect struck off after assaulting train staff and police officer

6. The Secret Architect: ‘Keep Calm and Carry On’ is melting my brain

7. London stars win major Norwegian masterplan contest

8. Exclusive: Garden Museum launches open contest for Lambeth Green pavilion

9. SOM-designed block acted like ‘broken chimney’, fire report finds

10. AJ100 Practice of the Year 2021 shortlist announced

BRIDGE CYCLE STORE KINGSTON UPON THAMES SARAH WIGGLESWORTH ARCHITECTS

Greenwich Design District: frstbuilding completes

Sheppard Robson bridge linkshelipad to Manchester hospitalA&E

Wright & Wright’s Museum ofthe Home completes

Gort Scott designs scenographyfor Epic Iran exhibition at V&A

Most popular

Leave a comment

CONTACT US

WHY SUBSCRIBE

ADVERTISE WITH US

FAQS

TIP US OFF

SPONSORED CONTENT

ARCHIVE

TERMS AND CONDITIONS

PRIVACY POLICY

COPYRIGHT © 2021 EMAP PUBLISHING LIMITED

Courtyard to hub

Second floor

NEWS COMPETITIONS BUILDINGS SPECIFICATION PRACTICE PODCASTS FILM MAGAZINES LIBRARY EVENTS

Building studies House Housing Retrofit & sustainable Small project & extension Office Education

Subscribe !Search... Login / Register

Feedback !