Case StudyApril 2016
D352384X012
Capacity Expansion for Transportation ProjectSan Antonio’s Project, Bolivia
Using PipelineStudio® from Emerson (formerly Energy Solutions International), Transierra S.A. has successfully planned and optimized a capacity expansion for a critical natural gas pipelineMargarita Natural gas fi eld output is connected through a 10“ set line (17km) with Sabalo GASAN gas fi eld export lines 28“ OD (20km), which goes to Villamontes GASYRG compressor station (MOP 1440 Psig) and is connected with Yabog.
Average Volume Margarita = 1.43 MmcdAverage Volume San Antonio = 13.39 Mmcdtotal Volume SAN + MGT = 14.82 MmcdPressure out San Antonio = 1080 PsigPressure in Villamontes = 1030 Psig
Midstream Oil and Gas Solutions
2 www.EmersonProcess.com/Remote
April 2016
“Gasan” Maximun Transport CapacityThe maximum design transport capacity is 21 MMCD. To achieve this, an output pressure of 1080 Psi (Sabalo) is required and arrival pressure of 1030 Psig (Villamontes) as shown in the simulation below.
Current Transportation System
Transport Capacity with System Compression Booster
To increase transport volume and meet the GTCS, we propose the following alternatives based on simulation:1. Independent booster system2. Integrated booster system3. Loop + booster independent/integer
Installing a booster compression system, at operating conditions of:Suction Pressure = 850-900 PsigDischarge Pressure = 1030 PsigSabalo Pressure = 1073 PsigRequired Power (Approx.) = 8400 Hp is reached at 34 Mmcd
Transport Capacity
www.EmersonProcess.com/Remote 3
Midstream Oil and Gas SolutionsApril 2016
Operating Condition Alternative - 1
Alternative - 1 28/34 Mmcd
Midstream Oil and Gas Solutions
4 www.EmersonProcess.com/Remote
April 2016
Alternative - 1 28/34 Mmcd
Transport System’s Simulation, Using PipelineStudio, Ver. 3.1
www.EmersonProcess.com/Remote 5
Midstream Oil and Gas SolutionsApril 2016
Gasan with Loop 28 MmcdAs has been mentioned before, it is required to build a 7Km Loop and 28 OD to increase the transport capacity.
Gasan with Loop 7 KM
Gasan with Loop 7 KM with Booster
The simulation shows that, to achieve an arrival pressure of 1036 Psig (Villamontes) with a 28 Mmcd Flow and an output pressure 1080 Psig (Sabalo Gas Plant), it is not necessary to use compression for this volume, because the conditions of delivery are achieved at this point.
The simulation shows that, to achieve an arrival Pressure of 979/940 Psig (Villamontes) with a 34 Mmcd Flow and an output pressure 1050/1080 Psig (Sabalo Gas Plant), it is necessary to use compression for this volume, because the conditions of delivery required are not achieved at this point.
The simulation shows that, to achieve an arrival Pressure of 1030 Psig (Villamontes) with a 34 Mmcd Flow and an output pressure 1080 Psig (Sabalo Gas Plant), it is necessary to use a system compression booster with a power of 3000 Hp.
RemoteAutomationSolutions
Remote Automation Solutions Community
Global HeadquartersNorth America and Latin AmericaEmerson Process ManagementRemote Automation Solutions6005 Rogerdale RoadHouston, TX, USA 77072T +1 281 879 2699 F +1 281 988 4445
www.EmersonProcess.com/Remote
EuropeEmerson Process ManagementRemote Automation SolutionsUnit 8, Waterfront Business ParkDudley Road, Brierley HillDudley, UK DY5 1LXT +44 1384 487200 F +44 1384 487258
Middle East and AfricaEmerson Process ManagementRemote Automation SolutionsEmerson FZEPO Box 17033Jebel Ali Free Zone - South 2Dubai, UAET +971 4 8118100 F +1 281 988 4445
Asia PacificEmerson Process ManagementAsia Pacific Private LimitedRemote Automation Solutions1 Pandan CrescentSingapore 128461T +65 6777 8211F +65 6777 0947
D352384X012 / Printed in USA / 04-16
Find us around the corner or around the worldFor a complete list of locations please visit us at www.EmersonProcess.com/Remote
© 2016 Remote Automation Solutions, a business unit of Emerson Process Management. All rights reserved.
Emerson Process Management Ltd, Remote Automation Solutions (UK), is a wholly owned subsidiary of Emerson Electric Co. doing business as Remote Automation Solutions, a business unit of Emerson Process Management. FloBoss, ROCLINK, ControlWave, Helicoid, and OpenEnterprise are trademarks of Remote Automation Solutions. AMS, PlantWeb, and the PlantWeb logo are marks owned by one of the companies in the Emerson Process Management business unit of Emerson Electric Co. Emerson Process Managment, Emerson and the Emerson logo are trademarks and service marks of the Emerson Electric Co. All other marks are property of their respective owners.
The contents of this publication are presented for informational purposes only. While every effort has been made to ensure informational accuracy, they are not to be construed as warranties or guarantees, express or implied, regarding the products or services described herein or their use or applicability. Remote Automation Solutions reserves the right to modify or improve the designs or specifications of such products at any time without notice. All sales are governed by Remote Automation Solutions’ terms and conditions which are available upon request. Remote Automation Solutions does not assume responsibility for the selection, use or maintenance of any product. Responsibility for proper selection, use and maintenance of any Remote Automation Solutions product remains solely with the purchaser and end-user.
Find us in social media
Emerson_RAS
Remote Automation Solutions