July 9, 2010 Sample Procurement Plan I. General 1. Bank’s approval Date of the procurement Plan [This is the first procurement plan) 2. Date of General Procurement Notice: April 25, 2017 3. Period covered by this procurement plan: September 2016 to June 2017 II. Goods and Works and non-consulting services. 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement: [Thresholds for applicable procurement methods (not limited to the list below) will be determined by the Procurement Specialist /Procurement Accredited Staff based on the assessment of the implementing agency’s capacity.] Procurement Method Prior Review Threshold US$ Comments 1. ICB and LIB (Goods) Above US$ 1,500,000 All 2. NCB (Goods) NA 3. ICB (Works) Above US$ 7 million All 4. NCB (Works) NA 5. ICB and LIB (Non-Consultant Services) Above US$ 1,500,000 All 6 NCB (Non-Consultant Services) NA [Add other methods if necessary] 2. Prequalification. Bidders for _Not applicable_ shall be prequalified in accordance with the provisions of paragraphs 2.9 and 2.10 of the Guidelines. 3. Proposed Procedures for CDD Components (as per paragraph. 3.17 of the Guidelines: [CDD project implementation Manual to be issued by DRDIP PIU, MoANR for Bank approval) 4. Reference to (if any) Project Operational/Procurement Manual: DRDIP Procurement Manual to be issued by DRDIP PIU. 5. Any Other Special Procurement Arrangements: NA 6. Summary of the Procurement Packages planned during the first 18 months after project effectiveness ( including those that are subject to retroactive financing and advanced procurement) [List the Packages which require Bank’s prior review first and then the other packages] Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

Upload: others

Post on 09-Sep-2019

3 views

Category:

Documents


0 download

TRANSCRIPT

July 9, 2010

Sample Procurement Plan

I. General

1. Bank’s approval Date of the procurement Plan [This is the first procurement plan)2. Date of General Procurement Notice: April 25, 20173. Period covered by this procurement plan: September 2016 to June 2017

II. Goods and Works and non-consulting services.

1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement: [Thresholds for applicable procurement methods (not limited to the list below) will be determined by the Procurement Specialist /Procurement Accredited Staff based on the assessment of the implementing agency’s capacity.]

Procurement Method Prior Review ThresholdUS$

Comments

1. ICB and LIB (Goods) Above US$ 1,500,000 All2. NCB (Goods) NA3. ICB (Works) Above US$ 7 million All4. NCB (Works) NA5. ICB and LIB (Non-Consultant Services) Above US$ 1,500,000 All6 NCB (Non-Consultant Services) NA

[Add other methods if necessary]

2. Prequalification. Bidders for _Not applicable_ shall be prequalified in accordance with the provisions of paragraphs 2.9 and 2.10 of the Guidelines.

3. Proposed Procedures for CDD Components (as per paragraph. 3.17 of the Guidelines: [CDD project implementation Manual to be issued by DRDIP PIU, MoANR for Bank approval)

4. Reference to (if any) Project Operational/Procurement Manual: DRDIP Procurement Manual to be issued by DRDIP PIU.

5. Any Other Special Procurement Arrangements: NA

6. Summary of the Procurement Packages planned during the first 18 months after project effectiveness ( including those that are subject to retroactive financing and advanced procurement)

[List the Packages which require Bank’s prior review first and then the other packages]

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

July 9, 2010

1 2 3 4 5 6 7

Ref. No.

Description EstimatedCostUS$

million

Packages Domestic

Preference

(yes/no)

Reviewby Bank

(Prior / Post)

Comments

Summary of the ICB (Works)

NA NA NA NA

Summary of the ICB (Goods)

6.69 4 No Prior

Summary of the NCB (Works)

3.8 9 No Post All

Summary of the NCB (Goods)

14.70 14 No Post All

Summary of the ICB (Non-Consultant Services)

NA NA NA NA

III. Selection of Consultants

1. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants:

Selection Method Prior Review Threshold Commentes1. Competitive Methods (Firms) Above US$ 500,0002. Single Source (Firms) All3. Individual Above US$ 200,000

2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $_300,000_equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines.

3. Any Other Special Selection Arrangements: NA

4. Consultancy Assignments with Selection Methods and Time Schedule

1 2 3 4 5 6

Ref. No. Description of Assignment

Estimated CostUS$ million

Packages Reviewby Bank(Prior / Post)

Comments

Summary of number of contracts that

0.35 2 Prior

July 9, 2010

will be let under QCBSSummary of number of contracts that will be let under other methods

1.4 38 Post LCS/ IC

Page 1

PROCUREMENTPLAN Africa : Development Response to Displacement Impacts Project in the HoAGeneral InformationCountry: Africa Bank�s Approval Date of the Original Procurement Plan: 2017-08-10

Revised Plan Date(s): (comma delineated, leave blank if none) 2018-08-10Project ID: P152822 GPN Date: Project Name: Development Response to Displacement Impacts Project in the HoALoan / Credit No: IDA / D1200, IDA / 58320, IDA / 58210, IDA / 58330Executing Agency(ies): Intergovernmental Authority on Development, Ministry of Agriculutre and Natural Resources Development, Office of the Prime Minister, Agence Djiboutienne de Development Social, Tirgray - Development Response to Displacement Impacts Project, AFAR - Development Response to Displacement Impacts Project, ETHIO-SOMALE - Development Response to Displacement Impacts Project, BENISHANGUL - Development Response to Displacement Impacts Project, GAMBELLA - Development Response to Displacement Impacts Project

WORKSActivity Reference No. /

Description Loan / Credit No. Component Review Type Method Market Approach ProcurementProcess

Prequalification(Y/N)

EstimatedAmount (US$)

Actual Amount(US$)

ProcessStatus

Draft Pre-qualificationDocuments

PrequalificationEvaluation Report

Draft Bidding Document/ Justification

Specific ProcurementNotice / Invitation

Bidding Documents asIssued

Proposal Submission /Opening / Minutes

Bid Evaluation Reportand Recommendation

for AwardSigned Contract Contract Completion

Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual

COMP1/T1/2017 / Travauxd'extension de 5 salles de Lycéeet réhabilitation du dortoir àObock

IDA / 58330 Social and Economic Servicesand Infrastructure Post Request for Bids Open - National

Single Stage - OneEnvelope 325,070.00 0.00 Pending

Implementation 2018-02-10 2018-02-17 2018-03-31 2018-04-30 2018-06-04 2018-12-01

COMP1/T3/2017 / Travaux deraccordement pecherie d'Obock

IDA / 58330 Social and Economic Servicesand Infrastructure Post Request for Bids Open - National

Single Stage - OneEnvelope 450,704.00 0.00 Pending

Implementation 2017-11-20 2017-11-27 2018-01-08 2018-02-07 2018-03-14 2018-09-10

COMP1/T8/2017 / constructionde locauxcommunautaire/communautaire àAli addé

IDA / 58330 Social and Economic Servicesand Infrastructure Post Request for

Quotations Limited

Single Stage - OneEnvelope 101,408.00 0.00 Pending

Implementation 2018-03-17 2018-05-12 2018-11-08

COMP1/T9/2017 / Réhabilitationdu local communautaire (UNFD)à Holl-Holl

IDA / 58330 Social and Economic Servicesand Infrastructure Post Request for

Quotations Limited

Single Stage - OneEnvelope 40,000.00 0.00 Pending

Implementation 2018-02-17 2018-04-14 2018-10-11

COMP2/T1/2017 / rénovation etrenforcement de perimetresexistants d'où 5 reservoirs , 5puits , 5 champs solaires pourObock

IDA / 58330 Social and Economic Servicesand Infrastructure Post Request for

Quotations Limited

Single Stage - OneEnvelope 135,211.00 0.00 Pending

Implementation 2017-11-01 2017-12-27 2018-06-25

COMP2/T2/2017 / rénovation etrenforcement de perimetresexistants d'où 5 reservoirs , 5puits, 5 champs solaires pourHolhol

IDA / 58330 Social and Economic Servicesand Infrastructure Post Request for

Quotations Limited

Single Stage - OneEnvelope 135,211.00 0.00 Pending

Implementation 2017-11-01 2017-12-27 2018-06-25

COMP2/T3/2017 / rénovation etrenforcement de perimetresexistants d'où 5 reservoirs , 5puits, 5 champs solaires pourAli Addé

IDA / 58330 Social and Economic Servicesand Infrastructure Post Request for

Quotations Limited

Single Stage - OneEnvelope 135,211.00 0.00 Pending

Implementation 2017-11-01 2017-12-27 2018-06-25

UG-OPM-22288-CW-RFQ /Partitioning of offices at Kampala

IDA / 58210 Project Management, andMonitoring and Evaluation Post Request for Bids Limited

Single Stage - OneEnvelope 32,877.00 0.00 Pending

Implementation 2017-11-30 2017-12-05 2018-01-16 2018-02-15 2018-03-22 2018-09-18

COMP1/T5/2017 / F+P etraccordement des installationsélectriques des logements,locaux commerciaux etétablissements publics à Holl-Holl

IDA / 58330 Social and Economic Servicesand Infrastructure Post Request for Bids Open - National

Single Stage - OneEnvelope 241,392.00 0.00 Pending

Implementation 2017-10-31 2017-11-07 2017-12-07 2018-01-06 2018-02-10 2018-05-11

COMP1/T6/2017 / constructionde collége et logement pour aliAddé et rehabilitation de sallesscientifiques, reservoirs d'eau etlogements enseignants ducollége et toiture de l'écoleprimaire Hol Hol en 2 lotsséparés

IDA / 58330 Social and Economic Servicesand Infrastructure Post Request for Bids Open - National

Single Stage - OneEnvelope 1,616,902.00 0.00 Pending

Implementation 2017-10-31 2017-11-05 2017-12-05 2018-01-04 2018-02-08 2018-05-09

DJ-ADDS-29135-CW-RFB /Travaux extention du centre desanté à Obock

IDA / 58330 Social and Economic Servicesand Infrastructure Post Request for Bids Open - National

Single Stage - OneEnvelope 399,493.00 0.00 Pending

Implementation 2017-10-31 2017-11-05 2017-12-05 2018-02-08 2018-06-08

DJ-ADDS-29136-CW-RFB /rehabilitation/ extention du centrede santé Ali addé et Hol Hol en 2lots séparés

IDA / 58330 Social and Economic Servicesand Infrastructure Post Request for Bids Open - National

Single Stage - OneEnvelope 436,620.00 0.00 Pending

Implementation 2017-10-31 2017-11-05 2017-12-05 2018-01-04 2018-02-08 2018-08-07

DJ-ADDS-29129-CW-DIR /Travaux d'extension Résau/Electricité d'Obock et Holl-Holl

IDA / 58330 Social and Economic Servicesand Infrastructure Prior Direct Selection Direct

1,188,371.09 0.00 Under Review 2017-09-19 2017-10-04 2017-10-27 2019-04-25

ET-TDRDIP-36807-CW-RFB /Construction of New Check dampond for irrigation for AsgedeTsmbla Woreda

IDA / 58320 Sustainable EnvironmentalManagement Post Request for

Quotations Limited

Single Stage - OneEnvelope 80,000.00 0.00 Pending

Implementation 2018-01-01 2018-02-26 2018-04-27

ET-TDRDIP-36815-CW-RFB /Construction of Irrigation CanalExpansion for Tselemti Woreda

IDA / 58320 Sustainable EnvironmentalManagement Post Request for

Quotations Limited

Single Stage - OneEnvelope 98,182.00 0.00 Pending

Implementation 2018-01-06 2018-02-12 2018-04-13

ET-TDRDIP-36821-CW-RFB /Construction of New Communalwell for irrigation for AsgedeTsmbla Woreda

IDA / 58320 Sustainable EnvironmentalManagement Post Request for

Quotations Limited

Single Stage - OneEnvelope 36,418.00 0.00 Pending

Implementation 2018-01-01 2018-02-26 2018-04-27

ET-ADRDP-36827-CW-RFQ /pond construction for barahleworeda

IDA / 58320 Sustainable EnvironmentalManagement Post Request for

Quotations Limited

Single Stage - OneEnvelope 37,000.00 0.00 Pending

Implementation 2018-01-31 2018-03-28 2018-06-26

ET-TDRDIP-36825-CW-RFB /Bio-gas construction for AsgedeTsmbala Woreda

IDA / 58320 Sustainable EnvironmentalManagement Post Request for

Quotations Limited

Single Stage - OneEnvelope 12,978.00 0.00 Pending

Implementation 2017-12-06 2018-01-31 2018-05-01

ET-TDRDIP-36832-CW-RFB /FTC rehabilitation byconstruction of Animal sheds forAsgede TsmblaWoreda(Construction Of CattleShed,Construction Of ShoatsShed,Construction Of BeesShed,Construction Of PoultryShed)

IDA / 58320 Livelihoods Program Post Request forQuotations Limited

Single Stage - OneEnvelope 42,622.00 0.00 Pending

Implementation 2018-01-06 2018-03-03 2018-05-02

Page 2

ET-TDRDIP-36840-CW-RFB /Maintenance of farmers trainingcenter, Animal Vet Clinic forAsgede Tsmbla Woreda

IDA / 58320 Livelihoods Program Post Request forQuotations Limited

Single Stage - OneEnvelope 28,835.00 0.00 Pending

Implementation 2018-01-06 2018-03-03 2018-05-02

ET-ADRDP-40066-CW-RFQ /small scale irrigation for onlyaysaita wored

IDA / 58320 Sustainable EnvironmentalManagement Post Request for

Quotations Limited

Single Stage - OneEnvelope 23,636.00 0.00 Pending

Implementation 2018-01-25 2018-03-22 2018-09-18

ET-ADRDP-40070-CW-RFQ /gab-ion check dam at aysaiytaworeda

IDA / 58320 Sustainable EnvironmentalManagement Post Request for

Quotations Limited

Single Stage - OneEnvelope 17,500.00 0.00 Pending

Implementation 2018-01-13 2018-03-10 2018-09-06

ET-ADRDP-40106-CW-RFQ /rehabilitation of two dis siltingirrigation schemes for aysaitaworeda

IDA / 58320 Sustainable EnvironmentalManagement Post Request for

Quotations Limited

Single Stage - OneEnvelope 34,800.00 0.00 Pending

Implementation 2018-02-04 2018-04-01 2018-09-28

ET-ADRDP-40108-CW-RFQ /Constructions of fodder grindingmachine house for Aysaitaworeda

IDA / 58320 Livelihoods Program Post Request forQuotations Limited

Single Stage - OneEnvelope 8,700.00 0.00 Pending

Implementation 2018-02-04 2018-04-01 2018-09-28

ET-TDRDIP-41226-CW-RFQ /Bio gas Construction for TselemtiWoreda

IDA / 58320 Sustainable EnvironmentalManagement Post Request for

Quotations Limited

Single Stage - OneEnvelope 14,776.00 0.00 Pending

Implementation 2017-12-31 2018-02-06 2018-05-07

ET-TDRDIP-41228-CW-RFQ /Bio gas Construction for TahtayAdyabo Woreda

IDA / 58320 Sustainable EnvironmentalManagement Post Request for

Quotations Limited

Single Stage - OneEnvelope 11,481.00 0.00 Pending

Implementation 2017-12-31 2018-02-06 2018-05-07

ET-TDRDIP-41252-CW-RFQ /Construction of new Communalwell for Irrigation for TselemtiWoreda

IDA / 58320 Sustainable EnvironmentalManagement Post Request for

Quotations Limited

Single Stage - OneEnvelope 20,247.00 0.00 Pending

Implementation 2018-01-06 2018-02-17 2018-04-18

ET-TDRDIP-41258-CW-RFQ /Construction of New Check dampond for Irrigation for TselemtiWoreda

IDA / 58320 Sustainable EnvironmentalManagement Post Request for

Quotations Limited

Single Stage - OneEnvelope 68,182.00 0.00 Pending

Implementation 2017-12-31 2018-02-25 2018-05-26

ET-TDRDIP-41260-CW-RFQ /Construction of Check dam pondfor construction for TahtayAdyabo Woreda

IDA / 58320 Sustainable EnvironmentalManagement Post Request for

Quotations Limited

Single Stage - OneEnvelope 60,000.00 0.00 Pending

Implementation 2017-12-31 2018-02-25 2018-05-26

ET-TDRDIP-41304-CW-RFQ /Rehabilitation of FTC byconstructing Animal Shades forTselemti Woreda(Construction OfShoats Shed,Construction OfBees Shed,Construction OfPoultry Shed..)

IDA / 58320 Livelihoods Program Post Request forQuotations Limited

Single Stage - OneEnvelope 32,000.00 0.00 Pending

Implementation 2018-01-06 2018-03-03 2018-05-02

ET-TDRDIP-41309-CW-RFQ /Rehabilitation of FTC byconstruction of Animal Shade forTahtay AdyaboWoreda(Construction of cattleshed , Construction of poultryshed, Construction of Beekeeping shed)

IDA / 58320 Livelihoods Program Post Request forQuotations Limited

Single Stage - OneEnvelope 38,671.00 0.00 Pending

Implementation 2018-01-06 2018-03-03 2018-05-02

ET-TDRDIP-41310-CW-RFQ /Maintenance of FTCs forTselemti Woreda (construction ofgate , Construction showroom,Fencing of FTCs...)

IDA / 58320 Livelihoods Program Post Request forQuotations Limited

Single Stage - OneEnvelope 54,152.00 0.00 Pending

Implementation 2018-01-06 2018-03-03 2018-05-02

ET-TDRDIP-41312-CW-RFQ /Maintenance of FTCs, Nurserysite for Tahtay AdyaboWoreda(Maintenance of roofcatchment, Fencing....)

IDA / 58320 Livelihoods Program Post Request forQuotations Limited

Single Stage - OneEnvelope 32,026.00 0.00 Pending

Implementation 2018-01-06 2018-03-03 2018-05-02

ET-SDRDIP-42056-CW-RFQ /Construction of small scale damsfor irrigation(no 1) in awbareworeda

IDA / 58320 Sustainable EnvironmentalManagement Post Request for

Quotations Limited

Single Stage - OneEnvelope 56,364.00 0.00 Pending

Implementation 2018-02-11 2018-04-08 2018-10-05

ET-DRDIP-42220-CW-RFQ /construction of three Hand dugwell for SSI at Bambasi woreda

IDA / 58320 Sustainable EnvironmentalManagement Post Request for

Quotations Limited

Single Stage - OneEnvelope 8,695.00 0.00 Pending

Implementation 2018-02-10 2018-04-07 2018-07-06

ET-DRDIP-42225-CW-RFQ /Construction of house hold pondfor Bambasi woreda

IDA / 58320 Sustainable EnvironmentalManagement Post Request for

Quotations Limited

Single Stage - OneEnvelope 15,018.00 0.00 Pending

Implementation 2018-02-10 2018-04-07 2018-07-06

ET-DRDIP-42251-CW-RFQ /construction of 4 hand dug wellfor demonstration for SSI on FTCfor Homosha woreda

IDA / 58320 Sustainable EnvironmentalManagement Post Request for

Quotations Limited

Single Stage - OneEnvelope 11,636.00 0.00 Pending

Implementation 2018-03-10 2018-05-05 2018-05-25

ET-DRDIP-42260-CW-RFQ /construction of one house holdpond for demonstration forHomosha woreda

IDA / 58320 Sustainable EnvironmentalManagement Post Request for

Quotations Limited

Single Stage - OneEnvelope 15,018.00 0.00 Pending

Implementation 2018-02-27 2018-04-24 2018-05-13

ET-DRDIP-42275-CW-RFQ /construction of one rehabilitationof diversion canal for Homoshaworeda

IDA / 58320 Sustainable EnvironmentalManagement Post Request for

Quotations Limited

Single Stage - OneEnvelope 16,948.00 0.00 Pending

Implementation 2018-03-11 2018-05-06 2018-06-05

ET-DRDIP-42304-CW-RFQ /Construction of one springdevelopment for Mao and Komospecial woreda

IDA / 58320 Sustainable EnvironmentalManagement Post Request for

Quotations Limited

Single Stage - OneEnvelope 7,636.00 0.00 Pending

Implementation 2018-02-12 2018-04-09 2018-05-07

ET-DRDIP-42310-CW-RFQ /construction of 5 hand dug wellfor Mao and Komo specialworeda

IDA / 58320 Sustainable EnvironmentalManagement Post Request for

Quotations Limited

Single Stage - OneEnvelope 11,636.00 0.00 Pending

Implementation 2018-02-25 2018-04-22 2018-05-22

ET-DRDIP-42312-CW-RFQ /construction of one house holdpond for Mao and Komo specialworeda

IDA / 58320 Sustainable EnvironmentalManagement Post Request for

Quotations Limited

Single Stage - OneEnvelope 15,018.00 0.00 Pending

Implementation 2018-02-28 2018-04-25 2018-05-20

Page 3

ET-SDRDIP-42329-CW-RFQ /Construction of small scale damsfor irrigation (no 1) in k/bayahworeda

IDA / 58320 Sustainable EnvironmentalManagement Post Request for

Quotations Limited

Single Stage - OneEnvelope 56,364.00 0.00 Pending

Implementation 2018-02-01 2018-03-29 2018-09-25

ET-DRDIP-42672-CW-RFQ /Construction of 3 Biogass ( onefor Bambsi,one for Mao & Komoand one for Homosha woreda )procured at Regional Level

IDA / 58320 Sustainable EnvironmentalManagement Post Request for

Quotations Limited

Single Stage - OneEnvelope 14,543.00 0.00 Pending

Implementation 2018-02-25 2018-04-22 2018-06-11

ET-SDRDIP-42120-CW-RFQ /construction of hand dug well forirrigation (no 1)and Rehabilitationof existing hand dug well forirrigation (no 1) in boqolmayoworeda

IDA / 58320 Sustainable EnvironmentalManagement Post Request for

Quotations Limited

Single Stage - OneEnvelope 13,010.00 0.00 Pending

Implementation 2018-02-20 2018-04-17 2018-10-14

ET-SDRDIP-42119-CW-RFQ /Canal construction with waterpump and Rehabilitation ofexisting irrigation schemes (km3) respectily (m5) 16002 inboqolmayo woreda

IDA / 58320 Sustainable EnvironmentalManagement Post Request for

Quotations Limited

Single Stage - OneEnvelope 62,350.00 0.00 Pending

Implementation 2018-02-24 2018-04-21 2018-10-18

ET-SDRDIP-42060-CW-RFQ /construction of hand dug well forirrigation( no 1) & Rehabilitationof existing hand dug well forirrigation one in awbare woreda

IDA / 58320 Sustainable EnvironmentalManagement Post Request for

Quotations Limited

Single Stage - OneEnvelope 12,910.00 0.00 Pending

Implementation 2018-02-24 2018-04-21 2018-10-18

ET-SDRDIP-42242-CW-RFQ /Strengthening of nursery site(form tools and planting material)(no 3) in Dollo-ado woreda

IDA / 58320 Sustainable EnvironmentalManagement Post Request for

Quotations Limited

Single Stage - OneEnvelope 20,826.00 0.00 Pending

Implementation 2018-02-26 2018-04-23 2018-10-20

ET-SDRDIP-42249-CW-RFQ /construction Canal construction(m4) 10003 in Dollo-ado woreda

IDA / 58320 Sustainable EnvironmentalManagement Post Request for

Quotations Limited

Single Stage - OneEnvelope 80,560.00 0.00 Pending

Implementation 2018-02-20 2018-04-17 2018-10-14

ET-SDRDIP-42330-CW-RFQ /construction of hand dug well forirrigation (no 1) & Rehabilitationof existing hand dug well forirrigation (no 1 in k/bayah woreda

IDA / 58320 Sustainable EnvironmentalManagement Post Request for

Quotations Limited

Single Stage - OneEnvelope 12,910.00 0.00 Pending

Implementation 2018-03-04 2018-04-29 2018-10-26

ET-SDRDIP-42264-CW-RFQ /construction of hand dug well forirrigation (no 1 ) & Rehabilitationof existing hand dug well forirrigation in Dollo-ado woreda

IDA / 58320 Sustainable EnvironmentalManagement Post Request for

Quotations Limited

Single Stage - OneEnvelope 12,910.00 0.00 Pending

Implementation 2018-02-24 2018-04-21 2018-10-18

ET-TDRDIP-41254-CW-RFQ /Construction of New Communalwell for irrigation for TahtayAdyabo Woreda

IDA / 58320 Sustainable EnvironmentalManagement Post Request for

Quotations Limited

Single Stage - OneEnvelope 66,411.00 0.00 Pending

Implementation 2018-01-06 2018-02-12 2018-04-13

ET-TDRDIP-64824-CW-RFQ /Maintenance of ArtificialInsemination Center in TahtayAdyabo Woreda

IDA / 58320 Livelihoods Program Post Request forQuotations Limited

Single Stage - OneEnvelope 3,704.00 0.00 Pending

Implementation 2018-06-09 2018-08-04 2019-01-31

ET-GDRDIP-36793-CW-RFQ /Pond Construction

IDA / 58320 Sustainable EnvironmentalManagement Post Request for

Quotations Limited

Single Stage - OneEnvelope 48,054.00 0.00 Pending

Implementation 2018-09-23 2018-11-18 2019-05-17

ET-GDRDIP-36798-CW-RFQ /Hand-dug Well Construction

IDA / 58320 Sustainable EnvironmentalManagement Post Request for

Quotations Limited

Single Stage - OneEnvelope 926.00 0.00 Pending

Implementation 2018-08-27 2018-10-22 2019-02-19

GOODSActivity Reference No. /

Description Loan / Credit No. Component Review Type Method Market Approach ProcurementProcess

Prequalification(Y/N)

EstimatedAmount (US$)

Actual Amount(US$)

ProcessStatus

Draft Pre-qualificationDocuments

PrequalificationEvaluation Report

Draft Bidding Document/ Justification

Specific ProcurementNotice / Invitation

Bidding Documents asIssued

Proposal Submission /Opening / Minutes

Bid Evaluation Reportand Recommendation

for AwardSigned Contract Contract Completion

Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual

ET-MOANRD-9134-GO-UN / 30vehicles,(18 Double cab p/up and12 Hard top Station wagon)

IDA / 58320Regional Support forCoordination, Capacity andKnowledge

Prior UN Agencies (Direct) Direct

1,050,000.00 109,319,495.70 Signed 2017-03-06 2017-03-11 2017-04-15 2017-06-27 2017-10-12

ET-MOANRD-9137-GO-UN / 160motorcycles

IDA / 58320Regional Support forCoordination, Capacity andKnowledge

Prior UN Agencies (Direct) Direct

64,000.00 560,035.80 Signed 2017-03-06 2017-03-11 2017-04-15 2017-06-27 2017-10-12

ET-MOANRD-9146-GO-RFQ /office Equipment's

IDA / 58320Regional Support forCoordination, Capacity andKnowledge

Post Request for Bids Open - National

Single Stage - OneEnvelope 175,000.00 0.00 Pending

Implementation 2017-05-05 2017-05-10 2017-06-21 2017-07-21 2017-08-25 2018-02-21

ET-MOANRD-9139-GO-RFQ / ITequipment and accessories

IDA / 58320Regional Support forCoordination, Capacity andKnowledge

Post Request for Bids Open - National

Single Stage - OneEnvelope 180,000.00 0.00 Under

Implementation 2017-05-05 2017-05-10 2017-06-21 2017-05-15 2017-07-21 2017-06-09 2017-08-25 2018-02-21

ET-MOANRD-14032-GO-RFB /Procurement of Stationery for theuse of federal, regional andworedas DRDIP Office

IDA / 58320 Project Management, andMonitoring and Evaluation Post Request for

Quotations Limited

Single Stage - OneEnvelope 15,000.00 0.00 Pending

Implementation 2017-05-09 2017-05-14 2017-06-25 2017-07-25 2017-08-29 2018-02-25

ET-MOANRD-15380-GO-RFB /procurement of furniture forfederal, region, and woredaDRDIP office

IDA / 58320 Project Management, andMonitoring and Evaluation Post Request for Bids Open - National

Single Stage - OneEnvelope 150,000.00 0.00 Pending

Implementation 2017-05-06 2017-05-11 2017-06-22 2017-07-22 2017-08-26 2018-02-22

ET-MOANRD-15385-GO-RFQ /Procurement of Office Suppliesfor the use of Federal, Regionsand woredas office of DRDIP

IDA / 58320 Project Management, andMonitoring and Evaluation Post Request for

Quotations Limited

Single Stage - OneEnvelope 14,000.00 0.00 Pending

Implementation 2017-05-22 2017-07-17 2018-01-13

UG-OPM-22297-GO-RFQ /Installation of Air conditioners atthe DRDIP Kampala office

IDA / 58210 Project Management, andMonitoring and Evaluation Post Request for

Quotations Limited

Single Stage - OneEnvelope 19,178.00 12,369.46 Completed 2017-10-28 2018-02-02 2017-12-23 2018-04-06 2018-06-21 2018-04-28

UG-OPM-22304-GO-RFQ /Installation of Window Blinds atthe Kampala offices

IDA / 58210 Project Management, andMonitoring and Evaluation Post Request for

Quotations Limited

Single Stage - OneEnvelope 2,740.00 2,567.46 Completed 2017-10-28 2018-02-02 2017-12-23 2018-03-09 2018-06-21 2018-05-21

UG-OPM-22312-GO-DIR /Assorted office stationery andother office consumables

IDA / 58210 Project Management, andMonitoring and Evaluation Post Request for

Quotations Limited

Single Stage - OneEnvelope 19,178.00 0.00 Pending

Implementation 2017-11-05 2017-12-31 2018-06-29

Page 4

COMP1/F2/2017 / achat deMatériels informatique pour leslycées bénéficiaires pour lecompte de l'EducationInformatique

IDA / 58330 Social and Economic Servicesand Infrastructure Post Request for

Quotations Limited

Single Stage - OneEnvelope 30,000.00 0.00 Pending

Implementation 2017-10-07 2017-12-02 2018-05-31

COMP1/F4/2017 / equipementsmédicaux et Mobiliers pourObock,Ali Addé et Hol Hol

IDA / 58330 Social and Economic Servicesand Infrastructure Prior Direct Selection Direct

1,305,900.00 0.00 Under

Implementation 2017-10-20 2018-05-31 2017-10-20 2017-12-01 2018-05-30

COMP1/F5/2017 / Foyersaméliorés pour les 2000ménages Obock, 4000 ménagesAli-addé et 1200 ménages Holl-Holl

IDA / 58330 Social and Economic Servicesand Infrastructure Post Request for

Quotations Limited

Single Stage - OneEnvelope 182,211.00 0.00 Pending

Implementation 2017-10-27 2017-12-22 2018-06-20

COMP2/F2/2017 / achat dematériels pour périmetresexistants d'où motopompes,brouettes... pour Obock

IDA / 58330 Social and Economic Servicesand Infrastructure Post Request for Bids Open - National

Single Stage - OneEnvelope 166,667.00 0.00 Pending

Implementation 2017-10-05 2017-10-12 2017-11-23 2017-12-23 2018-01-27 2018-07-26

COMP4/F1/2017 / acquisitiond'une pick up et de 2 voitures4X4. HARD TOP

IDA / 58330 Social and Economic Servicesand Infrastructure Post Request for Bids Open - National

Single Stage - OneEnvelope 124,213.00 0.00 Pending

Implementation 2017-10-02 2017-10-09 2017-11-20 2017-12-20 2018-01-24 2018-07-23

COMP4/F2/2017 / acquisition detablettes pour l'enquete

IDA / 58330 Social and Economic Servicesand Infrastructure Post Request for

Quotations Limited

Single Stage - OneEnvelope 30,000.00 0.00 Pending

Implementation 2017-10-09 2017-12-04 2018-06-02

COMP4/F4/2017 / acquisition d'équipement pour le centre deformation de l'ONARS

IDA / 58330 Social and Economic Servicesand Infrastructure Post Request for Bids Open - National

Single Stage - OneEnvelope 84,507.00 0.00 Pending

Implementation 2017-10-03 2017-10-10 2017-11-21 2017-12-21 2018-01-25 2018-07-24

UG-OPM-22310-GO-RFQ /Procurement of Assorted OfficeFurniture (1.No. ConferenceTable plus 26 Visitors Chairs, 13No.Office Desks, 13 No. OfficeChairs, 26 No. Visitors chairs,2No Sofa Sets, 2No. Coffee set,1No. Round Table, 1No.Reception/ Front Desk Unit, 1No.Paper trim

IDA / 58210 Project Management, andMonitoring and Evaluation Post Request for

Quotations Limited

Single Stage - OneEnvelope 73,973.00 33,021.06 Completed 2017-10-25 2017-11-21 2017-12-20 2018-02-28 2018-06-18 2018-05-21

UG-OPM-29346-GO-RFB /Procurement of Motorvehicles(Lot 1: 1 No Station Wagon TypeA (Not exceeding 3000cc),Station Wagon Type B (Notexceeding 2800cc), Lot 2: 15 NoDouble Cabin Pickups, Lot 3: 17No Motorcycles)

IDA / 58210 Project Management, andMonitoring and Evaluation Prior Request for Bids Open - National

Single Stage - OneEnvelope 1,064,600.00 0.00 Canceled 2017-11-24 2017-11-29 2018-01-10 2018-02-09 2018-03-16 2018-09-12

COMP1/F3/2017 / achat deMatériels de SVT et Physiquepour le Ministère de l'EducatioonNationale

IDA / 58330 Social and Economic Servicesand Infrastructure Post Request for Bids Open - National

Single Stage - OneEnvelope 135,201.00 0.00 Pending

Implementation 2017-10-31 2017-11-05 2017-12-05 2018-01-04 2018-02-08 2018-04-09

COMP2/F3/2017 / achat dematériels pour périmetresexistants d'où motopompes,brouettes... pour Ali Addé etHolHol

IDA / 58330 Social and Economic Servicesand Infrastructure Post Request for Bids Open - International

Single Stage - OneEnvelope 333,334.00 0.00 Pending

Implementation 2017-10-31 2017-11-07 2017-12-19 2018-01-18 2018-02-22 2018-06-22

COMP3/F1BIS/2017 /Acquisition de kits culinairespour les GEA

IDA / 58330 Social and Economic Servicesand Infrastructure Post Request for

Quotations Limited

Single Stage - OneEnvelope 20,000.00 0.00 Pending

Implementation 2017-11-05 2017-12-31 2018-01-20

ET-TDRDIP-36769-GO-RFQ / ITEquipment and Accessories forRegional Project C ordinationUnit : ( Lap Top ,Desk top ,Printer ,External hard disk , WiFi modem set , ADSL internetline set , 3G Modem Device ...)

IDA / 58320 Project Management, andMonitoring and Evaluation Post Request for

Quotations Limited

Single Stage - OneEnvelope 2,615.00 0.00 Under

Implementation 2018-01-20 2018-01-26 2018-03-06 2018-04-05

ET-ADRDP-36839-GO-RFQ /energy saving stoves for aysaitaworeda

IDA / 58320 Sustainable EnvironmentalManagement Post Request for

Quotations Limited

Single Stage - OneEnvelope 5,237.00 0.00 Pending

Implementation 2018-01-15 2018-03-12 2018-05-11

ET-ADRDP-36920-GO-RFQ /purchasing fodder grindingmachine for aysaita wored atregional level

IDA / 58320 Livelihoods Program Post Request forQuotations Limited

Single Stage - OneEnvelope 30,500.00 0.00 Pending

Implementation 2018-08-27 2018-10-22 2019-04-20

ET-ADRDP-36926-GO-RFQ /Purchasing of seeds for nurserysite for aysaita woreda at region

IDA / 58320 Livelihoods Program Post Request forQuotations Limited

Single Stage - OneEnvelope 4,300.00 0.00 Pending

Implementation 2018-03-09 2018-05-04 2018-07-03

ET-ADRDP-36932-GO-RFQ /Surface pump for small scaleirrigation for aysaita woreda atregional level

IDA / 58320 Sustainable EnvironmentalManagement Post Request for

Quotations Limited

Single Stage - OneEnvelope 87,000.00 0.00 Pending

Implementation 2018-03-09 2018-05-04 2018-10-31

ET-ADRDP-36936-GO-RFQ /Purchasing of FTC equipment forAysaita wored at regional level

IDA / 58320 Livelihoods Program Post Request forQuotations Limited

Single Stage - OneEnvelope 11,090.00 0.00 Pending

Implementation 2018-03-09 2018-05-04 2018-10-31

ET-SDRDIP-37064-GO-RFQ / ITEquipment ( inawbare,k/bayah,boqolmayo anddollo ado woredas) at regionallevel

IDA / 58320 Social and Economic Servicesand Infrastructure Post Request for

Quotations Limited

Single Stage - OneEnvelope 49,000.00 0.00 Pending

Implementation 2017-12-06 2018-01-31 2018-07-30

ET-SDRDIP-37075-GO-RFQ /tridle pumps for irrigation(WaterPumps) ( in awbare,k/bayah,dollo-ado woredas) At regionallevel

IDA / 58320 Sustainable EnvironmentalManagement Post Request for

Quotations Limited

Single Stage - OneEnvelope 27,500.00 0.00 Pending

Implementation 2018-03-06 2018-05-01 2018-10-28

ET-SDRDIP-37090-GO-RFQ /Artificial Insemination( in awbareand k/bayah woredas) Atregional level

IDA / 58320 Livelihoods Program Post Request forQuotations Limited

Single Stage - OneEnvelope 53,000.00 0.00 Pending

Implementation 2018-03-28 2018-05-23 2018-11-19

Page 5

ET-TDRDIP-37741-GO-RFQ /Stationary materials, OfficeEquipment's and other officeSupplies( Field Bag, Adding Machine, Telephonebox , Adapter/divider,Stapler,puncher, Computer Ink,Computer paper, Air fresher, soft....) for Asgede Tsmbla Woreda

IDA / 58320

Project Management, andMonitoring and EvaluationRegional Support forCoordination, Capacity andKnowledge

Post Request forQuotations Limited

Single Stage - OneEnvelope 3,466.00 0.00 Pending

Implementation 2017-12-22 2018-02-05 2018-03-07

ET-TDRDIP-37759-GO-RFQ /Office Furniture's( Shelf, Desk,Chair, Table, Filing Cabinets,Computer Stand,...) forAsgedeTsmbla Woreda

IDA / 58320

Livelihoods ProgramRegional Support forCoordination, Capacity andKnowledgeProject Management, andMonitoring and Evaluation

Post Request forQuotations Limited

Single Stage - OneEnvelope 21,084.00 0.00 Pending

Implementation 2017-12-22 2018-02-10 2018-03-22

ET-TDRDIP-37766-GO-RFQ /Procurement of AudiovisualEquipment's( Digital camera,DVD, GPS) for Asgede TsmblaWoreda

IDA / 58320

Livelihoods ProgramRegional Support forCoordination, Capacity andKnowledgeProject Management, andMonitoring and Evaluation

Post Request forQuotations Limited

Single Stage - OneEnvelope 1,618.00 0.00 Pending

Implementation 2017-12-15 2018-01-30 2018-03-31

ET-TDRDIP-37770-GO-RFQ /Tools for Soil and WaterConservation and NurseryMaterials( Gabion, shovel,hammer, watering cane,measuring tape, ....) for TselemtiWoreda

IDA / 58320 Sustainable EnvironmentalManagement Post Request for

Quotations Limited

Single Stage - OneEnvelope 8,946.00 0.00 Pending

Implementation 2017-12-08 2018-01-14 2018-02-13

ET-TDRDIP-37771-GO-RFQ /Purchase of Nursery and Forestseeds and seedlings for TselemtiWoreda

IDA / 58320 Sustainable EnvironmentalManagement Post Request for

Quotations Limited

Single Stage - OneEnvelope 4,636.00 0.00 Pending

Implementation 2018-01-03 2018-01-31 2018-05-01

ET-TDRDIP-37774-GO-RFQ /Procurement of motor pump fordemonstration for AsgedeTsmbla Woreda

IDA / 58320 Sustainable EnvironmentalManagement Post Request for

Quotations Limited

Single Stage - OneEnvelope 8,000.00 0.00 Pending

Implementation 2018-02-09 2018-03-31 2018-05-30

ET-TDRDIP-37775-GO-RFQ /Energy Saving Technologies forDemonstration (wood / Energy/saving stoves,Solar energy panels forInstitution,Solar Light for Home)for Asgedetsmbla Woreda

IDA / 58320 Sustainable EnvironmentalManagement Post Request for

Quotations Limited

Single Stage - OneEnvelope 16,928.00 0.00 Pending

Implementation 2017-12-30 2018-02-24 2018-04-25

ET-TDRDIP-37915-GO-RFQ /Rehabilitating Animal vet clinicwith Equipment's for AsgedeTsmbla woreda(Electricalsterilizer of 2 litres,Burdizo forlarge animals,Ice box of 10litres,complete surgical kit....)

,

IDA / 58320 Livelihoods Program Post Request forQuotations Limited

Single Stage - OneEnvelope 3,273.00 0.00 Pending

Implementation 2017-12-29 2018-02-04 2018-04-05

ET-TDRDIP-37916-GO-RFQ /Rehabilitate ArtificialInsemination Center withEquipment's (Funnellarge,Binocular microscope ,Mother container 36 L.....)forAsgedeTsmbla Woreda

IDA / 58320 Livelihoods Program Post Request forQuotations Limited

Single Stage - OneEnvelope 3,636.00 0.00 Pending

Implementation 2017-12-29 2018-02-04 2018-04-05

ET-DRDIP-38273-GO-RFQ /Procurement of file cabinet forBambasi ( 16), Maokoma ( 22)and Homosha woreda ( 26) atRegional Level total of 64 filecabinet

IDA / 58320 Livelihoods Program Post Request forQuotations Limited

Single Stage - OneEnvelope 7,200.00 0.00 Pending

Implementation 2018-01-20 2018-03-17 2018-04-16

UG-OPM-39369-GO-RFB /Procurement of Assorted Motorvehicles - 6 Double cabins, 1station wagon and 23motorcycles for field operations

IDA / 58210 Project Management, andMonitoring and Evaluation Post Request for Bids Open - National

Single Stage - OneEnvelope 1,008,705.00 0.00 Under

Implementation 2018-02-02 2018-01-18 2018-02-07 2018-03-21 2018-04-20 2018-05-25 2018-07-09

ET-ADRDP-40055-GO-RFQ /furnitures for aysaita woredasuch as(chairs, table, shelf,gustchair)

IDA / 58320 Social and Economic Servicesand Infrastructure Post Request for

Quotations Limited

Single Stage - OneEnvelope 6,646.00 0.00 Pending

Implementation 2018-01-13 2018-03-10 2018-09-06

ET-ADRDP-40615-GO-RFQ /Vehicle Parts and Accessories: (Tyre, Tire, inner tube oil filter etc.....)

IDA / 58320Regional Support forCoordination, Capacity andKnowledge

Post Request forQuotations Limited

Single Stage - OneEnvelope 10,000.00 0.00 Under

Implementation 2018-01-13 2018-03-10 2018-09-06

ET-TDRDIP-41113-GO-RFQ /Energy Saving Technologies forDemonstration( Solar energypanels for Institution, wood /Energy/saving stoves, SolarLight for Home ) for TahtayAdyabo Woreda

IDA / 58320 Sustainable EnvironmentalManagement Post Request for

Quotations Limited

Single Stage - OneEnvelope 15,332.00 0.00 Pending

Implementation 2018-01-20 2018-03-09 2018-04-23

ET-TDRDIP-41115-GO-RFQ /Energy Saving Technologies forDemonstration ( Solar energypanels for Institution , SolarLight for Home , wood /Energy/saving stoves ) forTselemti Woreda

IDA / 58320 Sustainable EnvironmentalManagement Post Request for

Quotations Limited

Single Stage - OneEnvelope 14,337.00 0.00 Pending

Implementation 2018-01-20 2018-03-02 2018-04-16

ET-TDRDIP-41120-GO-RFQ / ITEquipment's and Accessories forAsgede TsmblaWoreda(Laptop,D-Link, Desktop,External Hard disk....)

IDA / 58320

Livelihoods ProgramRegional Support forCoordination, Capacity andKnowledgeProject Management, andMonitoring and Evaluation

Post Request forQuotations Limited

Single Stage - OneEnvelope 17,916.00 0.00 Pending

Implementation 2018-01-20 2018-03-17 2018-05-01

ET-TDRDIP-41123-GO-RFQ / ITEquipment's with Accessories forTselemti Woreda( Desktopcomputer, Laptop computer...)

IDA / 58320

Livelihoods ProgramRegional Support forCoordination, Capacity andKnowledgeProject Management, andMonitoring and Evaluation

Post Request forQuotations Limited

Single Stage - OneEnvelope 27,782.00 0.00 Pending

Implementation 2018-01-20 2018-03-07 2018-04-21

Page 6

ET-TDRDIP-41125-GO-RFQ / ITEquipment's with accessories forTahtay Adyabo Woreda( Desktop computer, LaptopComputers, ........)

IDA / 58320

Livelihoods ProgramRegional Support forCoordination, Capacity andKnowledgeProject Management, andMonitoring and Evaluation

Post Request forQuotations Limited

Single Stage - OneEnvelope 32,091.00 0.00 Pending

Implementation 2018-01-20 2018-03-06 2018-04-20

ET-TDRDIP-41130-GO-RFQ /Procurement of Motor Pumps forIrrigation for Demonstration forTselemti Woreda

IDA / 58320 Sustainable EnvironmentalManagement Post Request for

Quotations Limited

Single Stage - OneEnvelope 7,273.00 0.00 Pending

Implementation 2018-01-20 2018-03-17 2018-05-01

ET-TDRDIP-41132-GO-RFQ /Procurement of Motor Pumps forIrrigation for Tahtay AdyaboWoreda for Demonstration

IDA / 58320 Sustainable EnvironmentalManagement Post Request for

Quotations Limited

Single Stage - OneEnvelope 13,091.00 0.00 Pending

Implementation 2018-01-20 2018-03-17 2018-05-01

ET-TDRDIP-41160-GO-RFQ /Procurement of Nursery, Forestseeds and Seedlings for TahtayAdyabo Woreda

IDA / 58320 Sustainable EnvironmentalManagement Post Request for

Quotations Limited

Single Stage - OneEnvelope 1,273.00 0.00 Pending

Implementation 2017-12-31 2018-01-31 2018-05-01

ET-TDRDIP-41168-GO-RFQ /Procurement of soil and waterconservation, Nursery tools andmaterials

IDA / 58320 Sustainable EnvironmentalManagement Post Request for

Quotations Limited

Single Stage - OneEnvelope 5,088.00 0.00 Pending

Implementation 2017-12-31 2018-02-03 2018-03-05

ET-TDRDIP-41172-GO-RFQ /Procurement of tools andmaterials for soil and waterconservation and Nursery forTahtay Adyabo Woreda

IDA / 58320 Sustainable EnvironmentalManagement Post Request for

Quotations Limited

Single Stage - OneEnvelope 5,851.00 0.00 Pending

Implementation 2017-12-31 2018-02-03 2018-03-05

ET-TDRDIP-41177-GO-RFQ /Audiovisual Equipment's( Digitalcamera,GPS,microphone..) forTselemti Woreda

IDA / 58320

Livelihoods ProgramRegional Support forCoordination, Capacity andKnowledgeProject Management, andMonitoring and Evaluation

Post Request forQuotations Limited

Single Stage - OneEnvelope 2,491.00 0.00 Pending

Implementation 2017-12-31 2018-02-25 2018-04-11

ET-TDRDIP-41180-GO-RFQ /Audiovisual Equipment's( DigitalCamera,GPS..) for TahtayAdyabo Woreda

IDA / 58320

Livelihoods ProgramRegional Support forCoordination, Capacity andKnowledgeProject Management, andMonitoring and Evaluation

Post Request forQuotations Limited

Single Stage - OneEnvelope 1,855.00 0.00 Pending

Implementation 2017-12-31 2018-02-25 2018-04-11

ET-TDRDIP-41189-GO-RFQ /Metro-logical Equipment's( DigitalThermometer, Rain Gage..) forTahtay Adyabo Woreda

IDA / 58320 Livelihoods Program Post Request forQuotations Limited

Single Stage - OneEnvelope 56.00 0.00 Pending

Implementation 2017-12-31 2018-02-25 2018-04-11

ET-TDRDIP-41191-GO-RFQ /Purchase of Generator forTselemti Woreda

IDA / 58320Regional Support forCoordination, Capacity andKnowledge

Post Request forQuotations Limited

Single Stage - OneEnvelope 727.00 0.00 Pending

Implementation 2017-12-31 2018-02-25 2018-04-11

ET-TDRDIP-41196-GO-RFQ /Procurement of Office Furniture'sfor Tselemti Woreda(Metallic Filecabinet , Table, Computer Stand, Shelf, Guest Chaire....)

IDA / 58320

Livelihoods ProgramRegional Support forCoordination, Capacity andKnowledgeProject Management, andMonitoring and Evaluation

Post Request forQuotations Limited

Single Stage - OneEnvelope 18,371.00 0.00 Pending

Implementation 2017-12-31 2018-02-06 2018-03-23

ET-TDRDIP-41202-GO-RFQ /Procurement of Office Furniture'sfor Tahtay AdyaboWoreda(Wood shelf ,Chair, Shelf, Metallic FileRabinate, Black Board...)

IDA / 58320

Livelihoods ProgramRegional Support forCoordination, Capacity andKnowledgeProject Management, andMonitoring and Evaluation

Post Request forQuotations Limited

Single Stage - OneEnvelope 14,980.00 0.00 Pending

Implementation 2017-12-31 2018-02-10 2018-03-27

ET-TDRDIP-41209-GO-RFQ /Purchase of Stationary , OfficeEquipment's and other suppliesfor Tselemti Woreda( computerpepper,computer inks, pen,stapler, Field bag,FleshMemory,Air fresh.....)

IDA / 58320

Project Management, andMonitoring and EvaluationRegional Support forCoordination, Capacity andKnowledge

Post Request forQuotations Limited

Single Stage - OneEnvelope 10,779.00 0.00 Pending

Implementation 2017-12-31 2018-02-10 2018-03-27

ET-TDRDIP-41216-GO-RFQ /Purchase of Stationary, Otheroffice Equipment's and Suppliesfor Tahtay AdyaboWoreda(telephone box , FlashMemory, computer inks, FieldBags, Divider, Computerpepper,Sizer, Charts....)

IDA / 58320

Project Management, andMonitoring and EvaluationRegional Support forCoordination, Capacity andKnowledge

Post Request forQuotations Limited

Single Stage - OneEnvelope 2,766.00 0.00 Pending

Implementation 2017-12-31 2018-02-10 2018-03-27

ET-TDRDIP-41232-GO-RFQ /Audiovisual Equipment's forRegional Project CoordinationUnit( Digital Camera, GPS..)

IDA / 58320 Project Management, andMonitoring and Evaluation Post Request for

Quotations Limited

Single Stage - OneEnvelope 3,665.00 0.00 Pending

Implementation 2017-12-31 2018-02-06 2018-03-23

ET-TDRDIP-41235-GO-RFQ /Procurement of Office Furniture's(File Cabinet, Computer Stand...)for Regional Project Coordinationunit.

IDA / 58320 Project Management, andMonitoring and Evaluation Post Request for

Quotations Limited

Single Stage - OneEnvelope 1,505.00 0.00 Pending

Implementation 2018-01-06 2018-02-12 2018-03-14

ET-TDRDIP-41238-GO-RFQ /Procurement of Stationarymaterials, Other officeEquipment's and Supplie forRegional Coordination Unit

IDA / 58320 Project Management, andMonitoring and Evaluation Post Request for

Quotations Limited

Single Stage - OneEnvelope 3,667.00 0.00 Pending

Implementation 2018-01-06 2018-02-12 2018-03-29

ET-TDRDIP-41263-GO-RFQ /Vehicle & Motorcycle SpareParts and Accessories : ( Spare,Tyre, , inner tube .....) forRegional Coordination unit

IDA / 58320 Project Management, andMonitoring and Evaluation Post Request for

Quotations Limited

Single Stage - OneEnvelope 4,604.00 0.00 Pending

Implementation 2018-01-06 2018-02-12 2018-03-29

ET-TDRDIP-41267-GO-RFQ /Vehicle & Motorcycle SpareParts and Accessories : ( Spare,Tire, inner tube etc .....) forAsgede Tsmbla Woreda

IDA / 58320 Project Management, andMonitoring and Evaluation Post Request for

Quotations Limited

Single Stage - OneEnvelope 2,218.00 0.00 Pending

Implementation 2018-01-06 2018-02-12 2018-03-29

ET-TDRDIP-41270-GO-RFQ /Vehicle & Motorcycle SpareParts and Accessories : ( Spare,Tyre, Tire, inner tube etc .....) forTselemti Woreda

IDA / 58320 Project Management, andMonitoring and Evaluation Post Request for

Quotations Limited

Single Stage - OneEnvelope 2,218.00 0.00 Pending

Implementation 2017-12-31 2018-02-06 2018-03-08

Page 7

ET-TDRDIP-41272-GO-RFQ /Vehicle & Motorcycle SpareParts and Accessories : ( Spare,Tyre, , inner tube etc .....) forTahtay Adyabo Woreda

IDA / 58320 Project Management, andMonitoring and Evaluation Post Request for

Quotations Limited

Single Stage - OneEnvelope 2,218.00 0.00 Pending

Implementation 2017-12-31 2018-02-25 2018-04-11

ET-TDRDIP-41280-GO-RFQ /Rehabilitating Animal vet clinicwith Equipment's for TselemtiWoreda(microscope,largecontainer,....)

IDA / 58320 Livelihoods Program Post Request forQuotations Limited

Single Stage - OneEnvelope 3,637.00 0.00 Pending

Implementation 2017-12-31 2018-02-25 2018-04-26

ET-TDRDIP-41283-GO-RFQ /Rehabilitate ArtificialInsemination Center withEquipment's for TselemtiWoreda(EAI bag,fanal nitrogenliquid , Lezer jaket for EAItechnicans....)

IDA / 58320 Livelihoods Program Post Request forQuotations Limited

Single Stage - OneEnvelope 5,090.00 0.00 Pending

Implementation 2017-12-31 2018-02-25 2018-04-26

ET-TDRDIP-41285-GO-RFQ /Rehabilitate ArtificialInsemination Center withEquipment's for Tahtay Adyabo

IDA / 58320 Livelihoods Program Post Request forQuotations Limited

Single Stage - OneEnvelope 2,885.00 0.00 Pending

Implementation 2017-12-31 2018-02-25 2018-04-26

ET-TDRDIP-41296-GO-RFQ /Procurement of LivestockProduction for TselemtiWoreda(poultry , milk cow, goatfor rearing, bee hive, Oxen forfattening....)

IDA / 58320 Livelihoods Program Post Request forQuotations Limited

Single Stage - OneEnvelope 17,855.00 0.00 Pending

Implementation 2018-01-06 2018-03-03 2018-04-17

ET-TDRDIP-41298-GO-RFQ /Livestock Production forDemonstration for Tahtay AdyaboWoreda(Diary(heifer,),Fattening,Poultry...)

IDA / 58320 Livelihoods Program Post Request forQuotations Limited

Single Stage - OneEnvelope 1,755.00 0.00 Pending

Implementation 2018-01-06 2018-03-03 2018-04-17

ET-TDRDIP-41313-GO-RFQ /Purchase of Agricultural inputson FTCs/PTCs for Demonstrationfor Asgede Tsmbla Woreda(Improved seeds, Fertilizers,Furska, Fruskelo...)

IDA / 58320 Livelihoods Program Post Request forQuotations Limited

Single Stage - OneEnvelope 5,745.00 0.00 Canceled 2018-02-05 2018-03-14 2018-04-13

ET-TDRDIP-41314-GO-RFQ /Purchasing of Agricultural Inputson FTCs and PTCs forDemonstration for TselemtiWoreda(Fertilizer, Improvedseeds, Fruska,fruskelo..)

IDA / 58320 Livelihoods Program Post Request forQuotations Limited

Single Stage - OneEnvelope 8,173.00 0.00 Canceled 2018-02-05 2018-03-14 2018-04-13

ET-TDRDIP-41315-GO-RFQ /Purchase of Agricultural Inputsfor Demonstration on FTCs andPTCs for demonstration forTahtay Adyabo Woreda(Improvedseed, Fertlizers, AnimalFeeds.....)

IDA / 58320 Livelihoods Program Post Request forQuotations Limited

Single Stage - OneEnvelope 4,820.00 0.00 Canceled 2018-02-05 2018-03-14 2018-04-13

ET-DRDIP-42019-GO-RFQ /office equipment and other officesupplies Bambasi woreda

IDA / 58320 Project Management, andMonitoring and Evaluation Post Request for

Quotations Limited

Single Stage - OneEnvelope 923.00 0.00 Pending

Implementation 2018-01-15 2018-03-12 2018-04-16

ET-DRDIP-42022-GO-RFQ /procurement of office equipmentand other office supplies forHomosha woreda

IDA / 58320Regional Support forCoordination, Capacity andKnowledge

Post Request forQuotations Limited

Single Stage - OneEnvelope 848.00 0.00 Pending

Implementation 2018-01-18 2018-03-15 2018-04-14

ET-DRDIP-42025-GO-RFQ /procurement of office equipmentand other office supplies forMaokomo woreda

IDA / 58320 Project Management, andMonitoring and Evaluation Post Request for

Quotations Limited

Single Stage - OneEnvelope 912.00 0.00 Pending

Implementation 2018-01-15 2018-03-12 2018-04-16

ET-DRDIP-42049-GO-RFQ /procurement of Stationary itemsfor regional unit

IDA / 58320 Project Management, andMonitoring and Evaluation Post Request for

Quotations Limited

Single Stage - OneEnvelope 6,385.00 0.00 Pending

Implementation 2018-01-10 2018-03-07 2018-03-27

ET-DRDIP-42062-GO-RFQ /procurement of stationary itemsfor Homosha woreda

IDA / 58320 Project Management, andMonitoring and Evaluation Post Request for

Quotations Limited

Single Stage - OneEnvelope 3,435.00 0.00 Pending

Implementation 2018-01-15 2018-03-12 2018-04-01

ET-DRDIP-42065-GO-RFQ /procurement of stationary forBambasi woreda

IDA / 58320 Project Management, andMonitoring and Evaluation Post Request for

Quotations Limited

Single Stage - OneEnvelope 3,219.00 0.00 Pending

Implementation 2018-01-15 2018-03-12 2018-04-16

ET-DRDIP-42069-GO-RFQ /procurement of stationary forMao and Komo special woreda

IDA / 58320 Project Management, andMonitoring and Evaluation Post Request for

Quotations Limited

Single Stage - OneEnvelope 3,185.00 0.00 Pending

Implementation 2018-01-15 2018-03-12 2018-04-06

ET-DRDIP-42072-GO-RFQ /cleaning materials for RegionalUnits

IDA / 58320 Project Management, andMonitoring and Evaluation Post Request for

Quotations Limited

Single Stage - OneEnvelope 786.00 0.00 Pending

Implementation 2018-01-15 2018-03-12 2018-04-01

ET-DRDIP-42074-GO-RFQ /procurement of cleaningmaterials for Bambaso woreda

IDA / 58320 Project Management, andMonitoring and Evaluation Post Request for

Quotations Limited

Single Stage - OneEnvelope 526.00 0.00 Pending

Implementation 2018-01-15 2018-03-12 2018-04-01

ET-DRDIP-42076-GO-RFQ /procurement of cleaningmaterials for Mao komo specialworeda

IDA / 58320 Project Management, andMonitoring and Evaluation Post Request for

Quotations Limited

Single Stage - OneEnvelope 428.00 0.00 Pending

Implementation 2018-01-15 2018-03-12 2018-04-01

ET-DRDIP-42079-GO-RFQ /procurement of cleaningmaterials for Homosha woreda

IDA / 58320 Project Management, andMonitoring and Evaluation Post Request for

Quotations Limited

Single Stage - OneEnvelope 537.00 0.00 Pending

Implementation 2018-01-15 2018-03-12 2018-04-01

ET-DRDIP-42083-GO-RFQ /procurement of printing materialsand brochers for Regional Units

IDA / 58320 Project Management, andMonitoring and Evaluation Post Request for

Quotations Limited

Single Stage - OneEnvelope 1,756.00 0.00 Pending

Implementation 2018-01-25 2018-03-22 2018-04-11

ET-SDRDIP-42087-GO-RFQ /Support the supply of improvedCooking Stoves for promotionand demonstration (no 400)inawbare woreda

IDA / 58320 Sustainable EnvironmentalManagement Post Request for

Quotations Limited

Single Stage - OneEnvelope 14,077.00 0.00 Pending

Implementation 2018-01-31 2018-03-28 2018-09-24

ET-DRDIP-42110-GO-RFQ /procurement of Demonstration ofimproved technologies forBambasi worda

IDA / 58320 Sustainable EnvironmentalManagement Post Request for

Quotations Limited

Single Stage - OneEnvelope 15,516.00 0.00 Pending

Implementation 2018-01-15 2018-03-12 2018-04-01

Page 8

ET-DRDIP-42124-GO-RFQ /procurement ofdemonistrationimprovedtechnologies for Homoshworedas

IDA / 58320 Sustainable EnvironmentalManagement Post Request for

Quotations Limited

Single Stage - OneEnvelope 16,186.00 0.00 Pending

Implementation 2018-01-30 2018-03-27 2018-04-26

ET-DRDIP-42126-GO-RFQ /procurement of demonstrationtechnologies for Mao and komospecial woredas

IDA / 58320 Sustainable EnvironmentalManagement Post Request for

Quotations Limited

Single Stage - OneEnvelope 14,216.00 0.00 Pending

Implementation 2018-01-20 2018-03-17 2018-04-11

ET-SDRDIP-42127-GO-RFQ /Support the supply of improvedCooking Stoves for promotionand demonstration (no 240) inboqolmayo woreda

IDA / 58320 Sustainable EnvironmentalManagement Post Request for

Quotations Limited

Single Stage - OneEnvelope 8,446.00 0.00 Pending

Implementation 2018-02-26 2018-04-23 2018-10-20

ET-DRDIP-42128-GO-RFQ /procurement of vehicle spar partsfor Regional Unit

IDA / 58320 Project Management, andMonitoring and Evaluation Post Request for

Quotations Limited

Single Stage - OneEnvelope 7,654.00 0.00 Pending

Implementation 2018-01-15 2018-03-12 2018-04-11

ET-DRDIP-42132-GO-RFQ /procurement of vehicle spar partsfor bambasi woreda

IDA / 58320 Project Management, andMonitoring and Evaluation Post Request for

Quotations Limited

Single Stage - OneEnvelope 6,278.00 0.00 Pending

Implementation 2018-01-15 2018-03-12 2018-04-01

ET-DRDIP-42134-GO-RFQ /procurement of vehicle sparpartfor Homosha woreda

IDA / 58320 Project Management, andMonitoring and Evaluation Post Request for

Quotations Limited

Single Stage - OneEnvelope 4,567.00 0.00 Pending

Implementation 2018-01-29 2018-03-26 2018-04-25

ET-DRDIP-42135-GO-RFQ /procurement of vehicle sparpartfor Mao and komo specialworeda

IDA / 58320 Project Management, andMonitoring and Evaluation Post Request for

Quotations Limited

Single Stage - OneEnvelope 5,654.00 0.00 Pending

Implementation 2018-01-29 2018-03-26 2018-04-30

ET-SDRDIP-42133-GO-RFQ /Support Biogas Development fordemonstration( no 2) boqolmayoworeda

IDA / 58320 Sustainable EnvironmentalManagement Post Request for

Quotations Limited

Single Stage - OneEnvelope 9,455.00 0.00 Pending

Implementation 2018-03-05 2018-04-30 2018-10-27

ET-DRDIP-42248-GO-RFQ /procurement of one rope andwasher for demonstration forBambasi woreda

IDA / 58320 Sustainable EnvironmentalManagement Post Request for

Quotations Limited

Single Stage - OneEnvelope 654.00 0.00 Pending

Implementation 2018-01-30 2018-03-27 2018-04-28

ET-SDRDIP-42254-GO-RFQ /Support the supply of improvedCooking Stoves for promotionand demonstration( no 400) inDollo-ado woreda

IDA / 58320 Sustainable EnvironmentalManagement Post Request for

Quotations Limited

Single Stage - OneEnvelope 14,077.00 0.00 Pending

Implementation 2018-03-04 2018-04-29 2018-10-26

ET-DRDIP-42288-GO-RFQ /procurement of 42 treadle pumpfor demonstration for Mao andKomo special woreda

IDA / 58320 Sustainable EnvironmentalManagement Post Request for

Quotations Limited

Single Stage - OneEnvelope 7,172.00 0.00 Pending

Implementation 2018-01-22 2018-03-19 2018-04-15

ET-DRDIP-42290-GO-RFQ /procurement of one rope andwasher pump for demonstrationfor Mao and Komo specialworeda

IDA / 58320 Sustainable EnvironmentalManagement Post Request for

Quotations Limited

Single Stage - OneEnvelope 545.00 0.00 Pending

Implementation 2018-02-18 2018-04-15 2018-05-15

ET-SDRDIP-42332-GO-RFQ /Support the supply of improvedCooking Stoves for promotionand demonstration(no 200) ink/bayah woreda

IDA / 58320 Sustainable EnvironmentalManagement Post Request for

Quotations Limited

Single Stage - OneEnvelope 7,039.00 0.00 Pending

Implementation 2018-03-04 2018-04-29 2018-10-26

ET-ADRDP-42472-GO-RFQ /energy saving stoves for barahleworeda

IDA / 58320 Sustainable EnvironmentalManagement Post Request for

Quotations Limited

Single Stage - OneEnvelope 4,364.00 0.00 Pending

Implementation 2018-01-15 2018-03-12 2018-09-08

ET-ADRDP-42482-GO-RFQ /furniture for barahle woreda suchas(chair,table, gust chair andshelf)

IDA / 58320 Social and Economic Servicesand Infrastructure Post Request for

Quotations Limited

Single Stage - OneEnvelope 6,500.00 0.00 Under

Implementation 2018-01-10 2017-12-25 2018-03-07 2018-09-03

ET-ADRDP-42485-GO-RFQ / IT-Equipment's for barahle woredasuch as(desk top, lab top,printer)

IDA / 58320 Social and Economic Servicesand Infrastructure Post Request for

Quotations Limited

Single Stage - OneEnvelope 9,910.00 0.00 Under

Implementation 2018-01-10 2018-03-07 2018-09-03

ET-ADRDP-42493-GO-RFQ /Office stationery for barahlewoereda such as(printing papers,pen etc)

IDA / 58320 Project Management, andMonitoring and Evaluation Post Request for

Quotations Limited

Single Stage - OneEnvelope 1,164.00 0.00 Pending

Implementation 2018-01-15 2018-03-12 2018-09-08

ET-DRDIP-42136-GO-DIR /procurement of uniform for driversand safety shoes for CIFemployees for Regional staffsonly

IDA / 58320 Project Management, andMonitoring and Evaluation Post Request for

Quotations Limited

Single Stage - OneEnvelope 4,365.00 0.00 Pending

Implementation 2018-02-20 2018-04-17 2018-05-22

ET-DRDIP-42277-GO-RFQ /procurement of 89 motor pumpfor ( 13 for Homosha woreda ,60for Bambasi woreda and 16 forHomosha ) procured at Regionallevel

IDA / 58320 Sustainable EnvironmentalManagement Post Request for

Quotations Limited

Single Stage - OneEnvelope 97,090.00 0.00 Pending

Implementation 2018-02-11 2018-04-08 2018-05-28

ET-DRDIP-42282-GO-RFQ /procurement of 3 rope andwasher pump for Irrigation fordemonstration, 1for Homoshaworeda ,1 for Bambasi woredaand 1 for Mao Komo Specialworeda ) procured at RegionalLevel

IDA / 58320 Sustainable EnvironmentalManagement Post Request for

Quotations Limited

Single Stage - OneEnvelope 2,120.00 0.00 Pending

Implementation 2018-01-13 2018-03-10 2018-04-24

ET-DRDIP-42098-GO-RFQ /procurement of 1040 wood savingstoves ( 320 for Bambasi , 330for Homosha and 390 for Maoand Komo special woredaprocured at Regional Level

IDA / 58320 Sustainable EnvironmentalManagement Post Request for

Quotations Limited

Single Stage - OneEnvelope 17,698.00 0.00 Pending

Implementation 2018-01-30 2018-03-27 2018-05-01

ET-DRDIP-42103-GO-RFQ /procurement of 156 solar light (40 for Bambasi ,51 for Mao &komo and 65 for Homoshaworeda ) procured at RegionalLevel

IDA / 58320 Sustainable EnvironmentalManagement Post Request for

Quotations Limited

Single Stage - OneEnvelope 39,709.00 0.00 Pending

Implementation 2018-01-30 2018-03-27 2018-04-22

Page 9

ET-DRDIP-42106-GO-RFQ /procurement of 10 solar energypanel ( 3 for Bambasi woreda,3for Homosha woreda and 4 Maoand komo special woreda

IDA / 58320 Sustainable EnvironmentalManagement Post Request for

Quotations Limited

Single Stage - OneEnvelope 25,820.00 0.00 Pending

Implementation 2018-01-27 2018-03-24 2018-04-14

ET-DRDIP-42239-GO-RFQ /procurement of 115 treadlepump(43 for Homoshaworeda ,30for Bambasi woreda and 42 forMao Komo special woreda )atRegional Level

IDA / 58320 Sustainable EnvironmentalManagement Post Request for

Quotations Limited

Single Stage - OneEnvelope 33,454.00 0.00 Pending

Implementation 2018-02-25 2018-04-22 2018-06-01

UG-OPM-22084-GO-RFB /Procurement of ICT Hardware/Equipment (31 Laptops, 3Desktop Computers, 17 Smalland Medium Duty Photocopiers,2 Printers, 15 Scanners, 1Projector, 17 Internet Modems,29 computer Tablets)

IDA / 58210 Project Management, andMonitoring and Evaluation Post Request for Bids Open - National

Single Stage - OneEnvelope 170,693.00 161,492.06 Signed 2018-02-05 2018-02-12 2018-02-10 2018-07-12 2018-03-24 2018-03-12 2018-04-23 2018-03-23 2018-05-28 2018-06-13 2018-11-24

ET-ADRDP-42470-GO-RFQ /Solar lanterns and solar panel forbarahle woreda

IDA / 58320 Sustainable EnvironmentalManagement Post Request for

Quotations Limited

Single Stage - OneEnvelope 18,182.00 0.00 Under

Implementation 2018-01-15 2018-03-12 2018-09-08

ET-ADRDP-36833-GO-RFQ /solar lanterns and solar panel foraysaita woreda

IDA / 58320 Sustainable EnvironmentalManagement Post Request for

Quotations Limited

Single Stage - OneEnvelope 21,820.00 0.00 Pending

Implementation 2017-12-06 2018-01-31 2018-07-30

ET-ADRDP-36799-GO-RFQ / IT-equipment's for aysaitaworeda(desktop,laptop,printer)and one laptop computer for theregion

IDA / 58320 Project Management, andMonitoring and Evaluation Post Request for

Quotations Limited

Single Stage - OneEnvelope 10,900.00 0.00 Under

Implementation 2018-01-08 2018-03-05 2018-09-01

ET-ADRDP-36915-GO-RFQ /Electric transformer for foddergrinding machine for aysaitaworeda at regionit is considered as incomegenerating and the operating costwill be covered by the beneficiarybody

IDA / 58320 Livelihoods Program Post Request forQuotations Limited

Single Stage - OneEnvelope 21,500.00 0.00 Pending

Implementation 2018-05-29 2018-07-24 2018-10-22

ET-ADRDP-40433-GO-RFQ /office stationery for the regionand aysita woreda such as(paper, pen etc)

IDA / 58320 Project Management, andMonitoring and Evaluation Post Request for

Quotations Limited

Single Stage - OneEnvelope 4,200.00 0.00 Under

Implementation 2018-01-23 2018-02-05 2018-03-20 2018-09-16

ET-SDRDIP-37069-GO-RFQ /Office furniture ( inawbare,k/bayah,boqolmayo anddolo-ado woredas ) At regionallevel

IDA / 58320 Social and Economic Servicesand Infrastructure Post Request for

Quotations Limited

Single Stage - OneEnvelope 44,500.00 0.00 Under

Implementation 2017-12-06 2018-01-31 2018-07-30

ET-SDRDIP-42090-GO-RFQ /Supply of Solar energy panel forinstitutions ( n0 3) and SolarLighting for demonstration (20 perkebele ) in awbare woreda

IDA / 58320 Sustainable EnvironmentalManagement Post Request for

Quotations Limited

Single Stage - OneEnvelope 33,000.00 0.00 Pending

Implementation 2018-02-05 2018-04-02 2018-09-29

ET-SDRDIP-42092-GO-RFQ /Establishing and strengtheningHorticultural Nurseries(farmtools& planting material..) (no 2)in awbare woreda

IDA / 58320 Livelihoods Program Post Request forQuotations Limited

Single Stage - OneEnvelope 20,830.00 0.00 Pending

Implementation 2018-01-31 2018-03-28 2018-09-24

ET-SDRDIP-42130-GO-RFQ /Supply of Solar energy panel forinstitutions and Solar Lighting fordemonstration (20 per kebele)(no 100) (no 2) in boqolmayoworeda

IDA / 58320 Sustainable EnvironmentalManagement Post Request for

Quotations Limited

Single Stage - OneEnvelope 20,188.00 0.00 Pending

Implementation 2018-02-25 2018-04-22 2018-10-19

ET-SDRDIP-42223-GO-RFQ /Establishing and strengtheningHorticultural Nurseries( farmtools& planting material..) inboqolmayo woreda

IDA / 58320 Livelihoods Program Post Request forQuotations Limited

Single Stage - OneEnvelope 17,338.00 0.00 Pending

Implementation 2018-02-01 2018-03-29 2018-09-25

ET-SDRDIP-42335-GO-RFQ /Supply of Solar energy panel forinstitutions (no 2) and SolarLighting for demonstration (20 perkebele) (no 100) in k/bayahworeda

IDA / 58320 Sustainable EnvironmentalManagement Post Request for

Quotations Limited

Single Stage - OneEnvelope 17,490.00 0.00 Pending

Implementation 2018-03-02 2018-04-27 2018-10-24

ET-SDRDIP-42336-GO-RFQ /Support Biogas Development fordemonstration(biogas) (no 1) ink/bayah woreda

IDA / 58320 Sustainable EnvironmentalManagement Post Request for

Quotations Limited

Single Stage - OneEnvelope 4,728.00 0.00 Pending

Implementation 2018-02-05 2018-04-02 2018-09-29

ET-SDRDIP-42344-GO-RFQ /Establishing and strengtheningHorticultural Nurseries(farmtools& planting material (no 1) ink/bayah woreda

IDA / 58320 Sustainable EnvironmentalManagement Post Request for

Quotations Limited

Single Stage - OneEnvelope 12,159.00 0.00 Pending

Implementation 2018-01-29 2018-03-26 2018-09-22

ET-SDRDIP-42259-GO-RFQ /Supply of Solar energy panel forinstitutions( no 3) &Solar Lightingfor demonstration (20 per kebele)(no 200) in Dollo-ado woreda

IDA / 58320 Sustainable EnvironmentalManagement Post Request for

Quotations Limited

Single Stage - OneEnvelope 32,980.00 0.00 Pending

Implementation 2018-02-23 2018-04-20 2018-10-17

ET-SDRDIP-42262-GO-RFQ /Support Biogas Development fordemonstration(biogas) (no 2) inDollo-ado woreda

IDA / 58320 Sustainable EnvironmentalManagement Post Request for

Quotations Limited

Single Stage - OneEnvelope 9,455.00 0.00 Pending

Implementation 2018-02-26 2018-04-23 2018-10-20

COMP1/F2/2017 / achat deMatériels informatique pour leslycées bénéficiaires/ Education

IDA / 58330 Social and Economic Servicesand Infrastructure Post Request for Bids Open - National

Single Stage - OneEnvelope 135,000.00 0.00 Pending

Implementation 2018-03-15 2018-03-20 2018-05-01 2018-05-31 2018-07-05 2019-01-01

COMP3/F1/2017 / acquisition dematériels et consommables pourles groupements de femmes etjeunes

IDA / 58330 Social and Economic Servicesand Infrastructure Post Request for Bids Open - National

Single Stage - OneEnvelope 180,000.00 0.00 Pending

Implementation 2017-10-31 2017-11-05 2017-12-05 2018-01-04 2018-02-08 2018-04-09

COMP4/F3/2017 / acquisition delogiciel pour l'analyse desdonnées des enquetes

IDA / 58330 Social and Economic Servicesand Infrastructure Post Request for

Quotations Limited

Single Stage - OneEnvelope 25,000.00 0.00 Pending

Implementation 2017-11-17 2018-01-12 2018-07-11

Page 10

COMP1/F1/2017 / Equipementschauds et Froid pour les lycéstechniques d' Ali Sabieh etObock pour le Ministère de l'Education Nationale

IDA / 58330 Social and Economic Servicesand Infrastructure Post Request for Bids Open - International

Single Stage - OneEnvelope 428,391.00 0.00 Pending

Implementation 2017-10-05 2017-10-12 2017-11-23 2017-12-23 2018-01-27 2018-07-26

DJ-IGAD-55145-GO-RFQ /Procurement of GIS tools (AdobeCreative Crowd and GPSMAP64s (Handheld GPS Kits))

IDA / D1200Regional Support forCoordination, Capacity andKnowledge

Post Request forQuotations Limited

Single Stage - OneEnvelope 2,500.00 0.00 Pending

Implementation 2018-04-03 2018-05-29 2018-11-25

ET-TDRDIP-57977-GO-RFQ /Physical capacity building withoffice Furniture for MultipurposeCooperatives( F Iron shelf, safebox, Table,Rope chair....) forTahtay Adyabo Woreda

IDA / 58320 Livelihoods Program Post Request forQuotations Limited

Single Stage - OneEnvelope 6,546.00 0.00 Pending

Implementation 2018-04-25 2018-06-20 2018-12-17

ET-TDRDIP-57994-GO-RFQ /Purchase of Industrial MaterialsFOR maintenance of offices forMultipurpose Cooperatives inTahtay Adyabo Woreda( Cement,Iron Sheet, Iron Bar, Paintings,door...)

IDA / 58320 Livelihoods Program Post Request forQuotations Limited

Single Stage - OneEnvelope 8,364.00 0.00 Pending

Implementation 2018-04-25 2018-06-20 2018-12-17

ET-TDRDIP-58289-GO-RFQ /Physical Capacity Building ofMultipurpose Cooperatives byProviding Office Furniture's andEquipment's in Asgede- TsmblaWoreda( Shelf, Cash box,Tables...)

IDA / 58320 Livelihoods Program Post Request forQuotations Limited

Single Stage - OneEnvelope 10,352.72 0.00 Pending

Implementation 2018-04-25 2018-06-20 2018-12-17

ET-TDRDIP-58293-GO-RFQ /Physical Capacity building byProviding Industrial materials forMaintenance of office servicesfor Multipurpose Cooperatives inAsgede Tsmbla Woreda(Cement, Reinforcement bar, nail,nail, Eucalyptus tree,... )

IDA / 58320 Livelihoods Program Post Request forQuotations Limited

Single Stage - OneEnvelope 823.00 0.00 Pending

Implementation 2018-04-25 2018-06-20 2018-12-17

ET-TDRDIP-58299-GO-RFQ /Physical Capacity Building forMultipurpose Cooperatives byproviding Office Equipment's andIT materials for Asgede - TsmblaWoreda( Printers, Desktop,Photocopier ..)

IDA / 58320 Livelihoods Program Post Request forQuotations Limited

Single Stage - OneEnvelope 3,199.00 0.00 Pending

Implementation 2018-04-25 2018-06-20 2018-12-17

ET-TDRDIP-58312-GO-RFQ /Physical Capacity building ofMultipurpose Cooperatives byproviding Office furniture's inTselemti Woreda( Guest Chair,Table, Window gate......)

IDA / 58320 Livelihoods Program Post Request forQuotations Limited

Single Stage - OneEnvelope 1,011.00 0.00 Pending

Implementation 2018-04-25 2018-06-20 2018-12-17

ET-TDRDIP-58309-GO-RFQ /Physical Capacity Building byProviding Industrial materials forMaintenance of office buildingsof the Multipurpose Cooperativesin Tselemti Woreda( Cement,Ironsheet, Iron bar, nail.....)

IDA / 58320 Livelihoods Program Post Request forQuotations Limited

Single Stage - OneEnvelope 24,047.00 0.00 Pending

Implementation 2018-04-25 2018-06-20 2018-12-17

ET-TDRDIP-60345-GO-RFQ /physical capacity building ofMultipurpose cooperatives foroffice maintenance by providingLocal construction materials atTselemti Woreda( sand,Gravel......)

IDA / 58320 Livelihoods Program Prior Request forQuotations Limited

Single Stage - OneEnvelope 2,986.00 0.00 Pending

Implementation 2018-05-05 2018-06-30 2018-12-27

DJ-IGAD-55119-GO-DIR /Procurement of GIS Application (ArcGIS)

IDA / D1200Regional Support forCoordination, Capacity andKnowledge

Post Direct Selection Direct

20,000.00 0.00 PendingImplementation 2018-05-02 2018-05-07 2018-06-11 2018-12-08

ET-TDRDIP-64753-GO-DIR /Provision of Fuel woodEfficient/saving cooking stove OrEZY Stove for Demonstration atTselemti Woreda

IDA / 58320 Sustainable EnvironmentalManagement Post Direct Selection Direct

5,982.00 0.00 Pending

Implementation 2018-06-01 2018-06-06 2018-06-20 2018-06-30

ET-TDRDIP-64761-GO-DIR /Provision of fuel wood EfficientCooking Stove for Demonstrationfor Asgede Tsmbla Woreda

IDA / 58320 Sustainable EnvironmentalManagement Post Direct Selection Direct

3,196.00 0.00 Pending

Implementation 2018-06-01 2018-06-06 2018-06-20 2018-06-27

ET-TDRDIP-64765-GO-DIR /Provision of fuel wood efficientcooking Stove or EZY Stove forTahtay Adyabo Woreda forFarmers as DemonstrationPurpose

IDA / 58320 Sustainable EnvironmentalManagement Post Direct Selection Direct

3,128.00 0.00 Pending

Implementation 2018-06-01 2018-06-06 2018-06-20 2018-06-30

ET-TDRDIP-64770-GO-DIR /Provision of Agricultural Inputsfor Demonstration at FTCs andFarmers field for Tahtay AdyaboWoreda( Improved Seeds andFertilizer)

IDA / 58320 Livelihoods Program Post Direct Selection Direct

6,575.00 0.00 PendingImplementation 2018-06-01 2018-06-06 2018-06-20 2018-06-30

ET-TDRDIP-64777-GO-DIR /Provision of Agricultural inputs atFTCs and Farmers Field forAsgede Tsmbla Woreda forDemonstration Purpose(Improved Seeds and Fertilizer)

IDA / 58320 Livelihoods Program Post Direct Selection Direct

5,457.00 0.00 PendingImplementation 2018-06-01 2018-06-06 2018-06-20 2018-06-30

ET-TDRDIP-64781-GO-DIR /Provision of Agricultural Inputs atFTCs and Farmers Field forDemonstration at TselemtiWoreda ( improved seeds andFertilizers)

IDA / 58320 Livelihoods Program Post Direct Selection Direct

6,557.00 0.00 PendingImplementation 2018-06-01 2018-06-06 2018-06-20 2018-06-30

ET-TDRDIP-64816-GO-DIR /Purchase of Avocado Scion forDemonstration Purpose by theRegional Project Coordinationunit and to be distributed to theProject three Woreda SelectedBeneficiaries.

IDA / 58320 Livelihoods Program Post Direct Selection Direct

3,702.00 0.00 PendingImplementation 2018-06-01 2018-06-06 2018-06-20 2018-06-30

Page 11

ET-TDRDIP-64821-GO-DIR /Purchase of Forest Plantationseeds to support the governmentNurseries for Asgede TsmblaWoreda (Nim,Moringa,,Eucelapitose ......)

IDA / 58320 Sustainable EnvironmentalManagement Post Request for

Quotations Limited

Single Stage - OneEnvelope 1,820.00 0.00 Pending

Implementation 2018-06-05 2018-07-06 2018-07-21

ET-TDRDIP-64823-GO-RFQ /Procurement of Solar ForInstitutions for Demonstration inAsgede Tsmbla Woreda

IDA / 58320 Sustainable EnvironmentalManagement Post Request for

Quotations Limited

Single Stage - OneEnvelope 36,213.00 0.00 Pending

Implementation 2018-06-08 2018-08-03 2019-01-30

ET-GDRDIP-36803-GO-RFQ /GPS

IDA / 58320 Project Management, andMonitoring and Evaluation Post Request for

Quotations Limited

Single Stage - OneEnvelope 1,852.00 0.00 Pending

Implementation 2018-09-10 2018-11-05 2019-03-05

ET-GDRDIP-36909-GO-RFQ /Electronics (Scanner,HDCamera,Digital Camera)

IDA / 58320 Project Management, andMonitoring and Evaluation Post Request for

Quotations Limited

Single Stage - OneEnvelope 8,148.00 0.00 Pending

Implementation 2018-09-24 2018-11-19 2019-03-19

ET-GDRDIP-36810-GO-RFQ /Farm tools (farm tools, string,water level, )

IDA / 58320 Sustainable EnvironmentalManagement Post Request for

Quotations Limited

Single Stage - OneEnvelope 35,185.00 0.00 Pending

Implementation 2018-08-27 2018-10-22 2019-02-19

ET-GDRDIP-36817-GO-RFQ /Wood-Saving Cooking Stove

IDA / 58320 Sustainable EnvironmentalManagement Post Request for

Quotations Limited

Single Stage - OneEnvelope 30,074.00 0.00 Pending

Implementation 2018-09-16 2018-11-11 2019-03-11

ET-GDRDIP-42055-GO-RFQ /Digital Camera for Gog Woreda

IDA / 58210 Project Management, andMonitoring and Evaluation Post Request for

Quotations Limited

Single Stage - OneEnvelope 218.18 0.00 Pending

Implementation 2018-08-20 2018-10-15 2018-12-14

ET-GDRDIP-42059-GO-RFQ /Office furniture for DimmaWoreda

IDA / 58210 Project Management, andMonitoring and Evaluation Post Request for

Quotations Limited

Single Stage - OneEnvelope 2,196.00 0.00 Pending

Implementation 2018-09-02 2018-10-28 2019-04-26

ET-GDRDIP-36917-GO-RFQ /Dairy cow for Demonstration forItang Special Woreda

IDA / 58320 Livelihoods Program Post Request forQuotations Limited

Single Stage - OneEnvelope 2,963.00 0.00 Pending

Implementation 2018-08-19 2018-10-14 2019-02-11

ET-GDRDIP-36924-GO-RFQ /Poultry for demonstration forDimma Woreda

IDA / 58320 Livelihoods Program Post Request forQuotations Limited

Single Stage - OneEnvelope 740.75 0.00 Pending

Implementation 2018-09-23 2018-11-18 2019-03-18

ET-GDRDIP-42048-GO-RFQ /Poultry for demonstration forItang Special Woreda

IDA / 58320 Social and Economic Servicesand Infrastructure Post Request for

Quotations Limited

Single Stage - OneEnvelope 740.75 0.00 Pending

Implementation 2018-09-23 2018-11-18 2019-05-17

ET-GDRDIP-42084-GO-RFQ /Procurement of Solar light atregional level(Dimma, Gog,Gambella Zuria and Itang SpecialWored)

IDA / 58320Regional Support forCoordination, Capacity andKnowledge

Post Request forQuotations Limited

Single Stage - OneEnvelope 84,364.00 0.00 Pending

Implementation 2018-09-30 2018-11-25 2019-05-24

ET-GDRDIP-42005-GO-RFQ /Procurement of Solar Light for(Dimma,Gs=ambella Zuria,Gogand Itang Special) at Regionallevel

IDA / 58210 Project Management, andMonitoring and Evaluation Post Request for

Quotations Limited

Single Stage - OneEnvelope 85,924.00 0.00 Pending

Implementation 2018-08-27 2018-10-22 2019-04-20

ET-GDRDIP-42031-GO-RFQ /Poultry for demonstratin forGambella Zuria Woreda

IDA / 58320 Social and Economic Servicesand Infrastructure Post Request for

Quotations Limited

Single Stage - OneEnvelope 740.75 0.00 Pending

Implementation 2018-08-19 2018-10-14 2019-04-12

ET-GDRDIP-42028-GO-RFQ /Poultry for demonstration for GogWoreda

IDA / 58320Regional Support forCoordination, Capacity andKnowledge

Post Request forQuotations Limited

Single Stage - OneEnvelope 740.75 0.00 Pending

Implementation 2018-08-27 2018-10-22 2019-04-20

ET-GDRDIP-42057-GO-RFQ /Printer for Gog Woreda

IDA / 58210 Project Management, andMonitoring and Evaluation Post Request for

Quotations Limited

Single Stage - OneEnvelope 727.27 0.00 Pending

Implementation 2018-08-26 2018-10-21 2018-12-20

ET-GDRDIP-67530-GO-RFQ /Farmers Training Center (FTC)Equipment

IDA / 58320 Livelihoods Program Post Request for Bids Open - National

Single Stage - OneEnvelope 160,925.00 0.00 Pending

Implementation 2018-08-24 2018-08-29 2018-10-10 2018-11-09 2018-12-14 2019-06-12

ET-GDRDIP-67564-GO-RFQ /Procurement of cloth and Shoes

IDA / 58320 Livelihoods Program Post Request forQuotations Limited

Single Stage - OneEnvelope 3,710.00 0.00 Pending

Implementation 2018-08-27 2018-10-22 2019-04-20

ET-GDRDIP-67569-GO-RFQ /Procurement of stationery

IDA / 58210 Project Management, andMonitoring and Evaluation Post Request for

Quotations Limited

Single Stage - OneEnvelope 5,555.00 0.00 Pending

Implementation 2018-08-27 2018-10-22 2018-12-21

ET-GDRDIP-67573-GO-RFQ /Vehicles spare parts andmaintenance

IDA / 58320 Project Management, andMonitoring and Evaluation Post Request for

Quotations Limited

Single Stage - OneEnvelope 17,000.00 0.00 Pending

Implementation 2018-08-27 2018-10-22 2018-12-21

UG-OPM-72397-GO-RFQ /Purchase of 30 ElectronicTablets

IDA / 58210 Project Management, andMonitoring and Evaluation Post Request for

Quotations Limited

Single Stage - OneEnvelope 13,077.00 0.00 Pending

Implementation 2018-08-25 2018-10-20 2019-04-18

NON CONSULTING SERVICESActivity Reference No. /

Description Loan / Credit No. Component Review Type Method Market Approach ProcurementProcess

Prequalification(Y/N)

EstimatedAmount (US$)

Actual Amount(US$)

ProcessStatus

Draft Pre-qualificationDocuments

PrequalificationEvaluation Report

Draft Bidding Document/ Justification

Specific ProcurementNotice / Invitation

Bidding Documents asIssued

Proposal Submission /Opening / Minutes

Bid Evaluation Reportand Recommendation

for AwardSigned Contract Contract Completion

Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual

UG-OPM-22095-NC-DIR / LANset up/ extension to the DRDIPOffices

IDA / 58210 Project Management, andMonitoring and Evaluation Prior Direct Selection Direct

10,959.00 11,824.67 Signed 2017-08-21 2018-02-13 2017-08-26 2018-02-23 2017-09-30 2018-05-18 2018-03-29

UG-OPM-22307-NC-DIR /Procurement of Additional OfficeSpace for DRDIP TST at RuthTowers (One years Contract)

IDA / 58210 Project Management, andMonitoring and Evaluation Prior Direct Selection Direct

68,493.00 69,120.00 Completed 2017-08-14 2017-08-19 2017-10-30 2017-09-23 2018-01-23 2018-03-22 2018-02-27

UG-OPM-22306-NC-RFQ /Office Branding for the KampalaOffices

IDA / 58210 Project Management, andMonitoring and Evaluation Post Request for

Quotations Limited

Single Stage - OneEnvelope 548.00 0.00 Pending

Implementation 2017-10-28 2017-12-23 2018-06-21

UG-OPM-22104-NC-RFQ /PABX Upgrade/ extension to therefugees office

IDA / 58210 Project Management, andMonitoring and Evaluation Post Request for

Quotations Limited

Single Stage - OneEnvelope 13,699.00 0.00 Pending

Implementation 2017-10-28 2017-12-23 2018-06-21

UG-OPM-22287-NC-DIR /Development of a ProjectManagement Information System(MIS)

IDA / 58210 Project Management, andMonitoring and Evaluation Prior Direct Selection Direct

300,905.00 287,226.00 Signed 2017-12-08 2017-12-13 2018-02-06 2018-01-17 2018-04-20 2018-07-16

Page 12

ET-TDRDIP-37918-NC-RFQ /Printing for Regional ProjectCoordination unit

IDA / 58320 Project Management, andMonitoring and Evaluation Post Request for

Quotations Limited

Single Stage - OneEnvelope 832.00 0.00 Pending

Implementation 2018-01-20 2018-02-23 2018-04-09

ET-TDRDIP-41108-NC-RFQ /Printing Service for AsgedeTsmbla Woreda

IDA / 58320Regional Support forCoordination, Capacity andKnowledge

Post Request forQuotations Limited

Single Stage - OneEnvelope 832.00 0.00 Pending

Implementation 2018-01-20 2018-03-06 2018-04-20

ET-TDRDIP-41111-NC-RFQ /Printing Services for TselemtiWoreda

IDA / 58320

Project Management, andMonitoring and EvaluationRegional Support forCoordination, Capacity andKnowledge

Post Request forQuotations Limited

Single Stage - OneEnvelope 832.00 0.00 Pending

Implementation 2018-01-20 2018-03-06 2018-04-20

ET-TDRDIP-41112-NC-RFQ /Printing Services for TahtayAdyabo Woreda

IDA / 58320

Project Management, andMonitoring and EvaluationRegional Support forCoordination, Capacity andKnowledge

Post Request forQuotations Limited

Single Stage - OneEnvelope 832.00 0.00 Pending

Implementation 2018-01-20 2018-03-06 2018-04-20

UG-OPM-45668-NC-DIR /Purchase and Installation ofWireless internet for DRDIPOffices

IDA / 58210 Project Management, andMonitoring and Evaluation Prior Direct Selection Direct

9,642.00 8,090.36 Completed 2018-02-05 2018-03-04 2018-02-10 2018-03-09 2018-03-17 2018-05-30 2018-09-13 2018-06-27

UG-OPM-73171-NC-RFQ /Development of a Website forDRDIP

IDA / 58210 Project Management, andMonitoring and Evaluation Post Request for

Quotations Limited

Single Stage - OneEnvelope 15,385.00 0.00 Pending

Implementation 2018-09-01 2018-10-27 2019-04-25

UG-OPM-73186-NC-RFQ /Office Branding for KampalaOffices

IDA / 58210 Project Management, andMonitoring and Evaluation Post Request for

Quotations Limited

Single Stage - OneEnvelope 1,282.00 0.00 Pending

Implementation 2018-08-31 2018-10-26 2019-04-24

CONSULTING FIRMSActivity Reference No. /

Description Loan / Credit No. Component Review Type Method Market Approach Contract Type EstimatedAmount (US$)

Actual Amount(US$) Process Status Terms of Reference Expression of Interest

NoticeShort List and Draft

Request for ProposalsRequest for Proposals

as IssuedOpening of TechnicalProposals / Minutes

Evaluation of TechnicalProposal

Combined EvaluationReport and Draft

Negotiated ContractSigned Contract Contract Completion

Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual

IGAD/ DRDIP/CS/8 /Consultancy for theCommissioning of Joint ResearchOn Displacement & Development

IDA / D1200Regional Support forCoordination, Capacity andKnowledge

Post Quality And Cost-Based Selection Open - International

100,000.00 0.00 Canceled 2017-09-04 2017-09-25 2017-11-08 2017-12-06 2018-01-05 2018-02-09 2018-03-16 2019-03-16

IGAD/ DRDIP/CS/9 /Consultancy to strengthenMonitoring Mechanism on MixedMigration, Migration Trends andthe Assessment of the impact ofintervention in the 3 ProjectCountries on ForcedDisplacement & Mixed Migration

IDA / D1200Regional Support forCoordination, Capacity andKnowledge

Prior Quality And Cost-Based Selection Open - International

500,000.00 0.00 Canceled 2017-09-01 2017-09-22 2017-11-05 2017-12-03 2018-01-02 2018-02-06 2018-03-13 2019-03-13

IGAD/ DRDIP/CS/10 /Consultancy for the Developmentof DRDIP Regional SecretariatWebsite

IDA / D1200Regional Support forCoordination, Capacity andKnowledge

PostConsultantQualificationSelection

Open - National

5,000.00 0.00 UnderImplementation 2017-07-03 2017-07-24 2017-09-06 2017-10-06 2017-11-10 2018-05-09

ET-MOANRD-9153-CS-QCBS /Base line survey consultancy(before the implementation of theproject).

IDA / 58320 Project Management, andMonitoring and Evaluation Post Quality And Cost-

Based Selection Open - International

200,000.00 0.00 UnderImplementation 2017-03-19 2017-08-14 2017-04-09 2017-05-23 2017-11-14 2017-06-20 2017-07-20 2017-08-24 2017-09-28 2018-09-28

ET-MOANRD-15793-CS-LCS /procurement of independentexternal financial audit for theyear 2016/17 june.

IDA / 58320 Project Management, andMonitoring and Evaluation Post Least Cost Selection Open - National

100,000.00 0.00 Under

Implementation 2017-05-30 2017-08-15 2017-06-20 2017-08-03 2017-08-21 2017-08-31 2017-09-21 2017-09-30 2017-10-23 2017-11-04 2017-11-07 2017-12-09 2018-06-07

ET-MOANRD-15796-CS-LCS /procurement of consultancy forPIM translation in to 'Amharic '

IDA / 58320 Project Management, andMonitoring and Evaluation Post Least Cost Selection Open - National

50,000.00 0.00 Pending

Implementation 2017-05-29 2017-06-19 2017-08-02 2017-08-30 2017-09-29 2017-11-03 2017-12-08 2018-06-06

ET-MOANRD-15794-CS-LCS /Procurement of independentexternal procurement audit forthe year 2016/17 June.

IDA / 58320 Project Management, andMonitoring and Evaluation Prior Least Cost Selection Open - National

100,000.00 0.00 Pending

Implementation 2017-05-30 2017-06-20 2017-08-03 2017-08-31 2017-09-30 2017-11-04 2017-12-09 2018-06-07

ET-MOANRD-18835-CS-LCS /PIM and manuals translation withdifferent local language

IDA / 58320 Project Management, andMonitoring and Evaluation Post Least Cost Selection Open - National

21,700.00 0.00 Pending

Implementation 2017-06-19 2017-07-10 2017-08-23 2017-09-20 2017-10-20 2017-11-24 2017-12-29 2018-06-27

COMP1/C1/2017 / Recrutementd'un Bureau d'Etudes et desupervision pour les travauxd'extension, construction,réhabilitation des établissementsscolaires , le localcommunautaire

IDA / 58330 Social and Economic Servicesand Infrastructure Post Quality And Cost-

Based Selection Open - National

252,234.00 0.00 PendingImplementation 2017-10-02 2017-10-23 2017-12-06 2018-01-03 2018-02-02 2018-03-09 2018-04-13 2019-04-13

COMP1/C2/2017 / Recrutementd'un Bureau d'Etudes pour lasupervision des travauxd'extension de centres de santépour obock, ali addé et Hol hol

IDA / 58330 Social and Economic Servicesand Infrastructure Post

ConsultantQualificationSelection

Open - National

83,611.00 0.00 PendingImplementation 2017-10-02 2017-10-23 2017-12-06 2018-01-05 2018-02-09 2018-08-08

COMP1/C3/2017 / Récrutementd'un consultant individuel pour lesétudes et la supervision lestravaux d'installations dans leslogements, locaux commerciauxet établissement publics à Holl-Holl

IDA / 58330 Social and Economic Servicesand Infrastructure Post

ConsultantQualificationSelection

Open - National

30,000.00 0.00 PendingImplementation 2017-10-30 2017-11-20 2018-01-03 2018-02-02 2018-03-09 2018-09-05

COMP1/C4/2017 / Recrutementd'un bureau d'etudes pourraccordement Pecherie (Obock)

IDA / 58330 Social and Economic Servicesand Infrastructure Post

ConsultantQualificationSelection

Open - National

45,070.00 0.00 PendingImplementation 2017-11-30 2017-12-21 2018-02-03 2018-03-05 2018-04-09 2018-10-06

COMP1/C5/2017 / Recrutementd'un BE pour les travaux deforrage de Hol hol et Ali Addé etdu reseau d'adduction d'eau àObock et Holl-Holl

IDA / 58330 Social and Economic Servicesand Infrastructure Post Quality And Cost-

Based Selection Open - National

188,732.00 0.00 PendingImplementation 2017-12-15 2018-01-05 2018-02-18 2018-03-18 2018-04-17 2018-05-22 2018-06-26 2019-06-26

COMP2/C1/2017 / Recrutementd'un bureau d'etudes pour la larénovation et renforcement desperimetres existants

IDA / 58330 Social and Economic Servicesand Infrastructure Post

ConsultantQualificationSelection

Open - National

40,564.00 0.00 PendingImplementation 2017-10-05 2017-10-26 2017-12-09 2018-01-08 2018-02-12 2018-08-11

Page 13

COMP2/C2/2017 / Recrutementd'un bureau d'etudes pourl'extension de la centrale solaireet le forage d'Ali-Addé

IDA / 58330 Social and Economic Servicesand Infrastructure Post Quality And Cost-

Based Selection Open - National

152,369.00 0.00 PendingImplementation 2017-10-02 2017-10-23 2017-12-06 2018-01-03 2018-02-02 2018-03-09 2018-04-13 2019-04-13

COMP4/C10/2017 / recrutementd 'un cabinet pour l'AuditFinancier

IDA / 58330 Social and Economic Servicesand Infrastructure Post Least Cost Selection Open - National

10,000.00 0.00 Pending

Implementation 2017-10-02 2017-10-23 2017-12-06 2018-01-03 2018-02-02 2018-03-09 2018-04-13 2018-10-10

COMP4/C11/2017 /Recrutement d'un consultantpour la collecte de donnéeadministratives de toutes lesinfrastructures sociales de base

IDA / 58330 Social and Economic Servicesand Infrastructure Post

ConsultantQualificationSelection

Open - National

8,000.00 0.00 PendingImplementation 2017-10-02 2017-10-23 2017-12-06 2018-01-05 2018-02-09 2018-08-08

INDIVIDUAL CONSULTANTSActivity Reference No. /

Description Loan / Credit No. Component Review Type Method Market Approach Contract Type EstimatedAmount (US$)

Actual Amount(US$) Process Status Terms of Reference

Invitation toIdentified/Selected

ConsultantDraft Negotiated

Contract Signed Contract Contract Completion

Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual

UG-OPM-22319-CS-CDS /Baseline survey

IDA / 58210 Project Management, andMonitoring and Evaluation Prior Direct Selection Direct

164,383.56 0.00 Pending

Implementation 2017-08-18 2017-08-28 2017-11-01 2018-04-30

UG-OPM-22326-CS-INDV / M &E Officer

IDA / 58210 Project Management, andMonitoring and Evaluation Post Individual Consultant

Selection Open

76,010.88 0.00 PendingImplementation 2017-08-18 2017-10-06 2017-10-27 2017-12-01 2018-05-30

UG-OPM-22332-CS-INDV /Project Engineer

IDA / 58210 Project Management, andMonitoring and Evaluation Post Individual Consultant

Selection Open

98,367.12 0.00 PendingImplementation 2017-08-18 2017-10-06 2017-10-27 2017-12-01 2018-05-30

UG-OPM-22344-CS-INDV /Livelihood Officer

IDA / 58210 Project Management, andMonitoring and Evaluation Post Individual Consultant

Selection Open

76,010.88 0.00 PendingImplementation 2017-08-18 2017-10-06 2017-10-27 2017-12-01 2018-05-30

UG-OPM-22345-CS-INDV /Environment Officer

IDA / 58210 Project Management, andMonitoring and Evaluation Post Individual Consultant

Selection Open

76,010.88 0.00 PendingImplementation 2017-08-18 2017-10-06 2017-10-27 2017-12-01 2018-05-30

UG-OPM-22347-CS-INDV /Social Safeguards Officer

IDA / 58210 Project Management, andMonitoring and Evaluation Post Individual Consultant

Selection Open

76,010.88 0.00 PendingImplementation 2017-08-18 2017-10-06 2017-10-27 2017-12-01 2018-05-30

UG-OPM-22349-CS-INDV /Communication Assistant

IDA / 58210 Project Management, andMonitoring and Evaluation Post Individual Consultant

Selection Open

43,651.20 0.00 Canceled 2017-08-18 2017-10-06 2017-10-27 2017-12-01 2018-05-30

UG-OPM-22352-CS-INDV /Administrative Assistant

IDA / 58210 Project Management, andMonitoring and Evaluation Post Individual Consultant

Selection Open

43,651.20 0.00 PendingImplementation 2017-08-18 2017-10-06 2017-10-27 2017-12-01 2018-05-30

UG-OPM-22355-CS-INDV /Engineering Assistant 1(Kampala Office)

IDA / 58210 Project Management, andMonitoring and Evaluation Post Individual Consultant

Selection Open

43,651.20 0.00 UnderImplementation 2017-08-18 2018-01-30 2017-10-06 2017-10-27 2017-12-01 2018-05-30

UG-OPM-22357-CS-INDV /Engineering Assistant 2(Kampala Office)

IDA / 58210 Project Management, andMonitoring and Evaluation Post Individual Consultant

Selection Open

43,651.20 0.00 Under Review 2017-08-18 2018-01-30 2017-10-06 2017-10-27 2017-12-01 2018-05-30

UG-OPM-22360-CS-INDV /Social Safeguards Assistant 1

IDA / 58210 Project Management, andMonitoring and Evaluation Post Individual Consultant

Selection Open

43,651.20 0.00 Canceled 2017-08-18 2017-10-06 2017-10-27 2017-12-01 2018-05-30

UG-OPM-22361-CS-INDV /Social Safeguards Assistant 2

IDA / 58210 Project Management, andMonitoring and Evaluation Post Individual Consultant

Selection Open

43,651.20 0.00 Canceled 2017-08-18 2017-10-06 2017-10-27 2017-12-01 2018-05-30

UG-OPM-22362-CS-INDV /Accounts Assistant

IDA / 58210 Project Management, andMonitoring and Evaluation Post Individual Consultant

Selection Open

43,651.20 0.00 PendingImplementation 2017-08-18 2017-10-06 2017-10-27 2017-12-01 2018-05-30

UG-OPM-22363-CS-INDV /Executive Assistant

IDA / 58210 Project Management, andMonitoring and Evaluation Post Individual Consultant

Selection Open

43,651.20 0.00 Canceled 2017-08-18 2017-10-06 2017-10-27 2017-12-01 2018-05-30

UG-OPM-22367-CS-INDV /District Engineering Assistant 1

IDA / 58210 Project Management, andMonitoring and Evaluation Post Individual Consultant

Selection Open

13,150.56 0.00 PendingImplementation 2017-08-18 2017-10-06 2017-10-27 2017-12-01 2018-05-30

UG-OPM-22368-CS-INDV /District Engineering Assistant 2

IDA / 58210 Project Management, andMonitoring and Evaluation Post Individual Consultant

Selection Open

13,150.56 0.00 PendingImplementation 2017-08-18 2017-10-06 2017-10-27 2017-12-01 2018-05-30

UG-OPM-22369-CS-INDV /District Engineering Assistant 3

IDA / 58210 Project Management, andMonitoring and Evaluation Post Individual Consultant

Selection Open

13,150.56 0.00 PendingImplementation 2017-08-18 2017-10-06 2017-10-27 2017-12-01 2018-05-30

UG-OPM-22372-CS-INDV /District Engineering Assistant 4

IDA / 58210 Project Management, andMonitoring and Evaluation Post Individual Consultant

Selection Open

13,150.56 0.00 PendingImplementation 2017-08-18 2017-10-06 2017-10-27 2017-12-01 2018-05-30

UG-OPM-22373-CS-INDV /District Engineering Assistant 5

IDA / 58210 Project Management, andMonitoring and Evaluation Post Individual Consultant

Selection Open

13,150.56 0.00 PendingImplementation 2017-08-18 2017-10-06 2017-10-27 2017-12-01 2018-05-30

UG-OPM-22374-CS-INDV /District Engineering Assistant 6

IDA / 58210 Project Management, andMonitoring and Evaluation Post Individual Consultant

Selection Open

13,150.56 0.00 PendingImplementation 2017-08-18 2017-10-06 2017-10-27 2017-12-01 2018-05-30

UG-OPM-22377-CS-INDV /District Engineering Assistant 7

IDA / 58210 Project Management, andMonitoring and Evaluation Post Individual Consultant

Selection Open

13,150.56 0.00 PendingImplementation 2017-08-18 2017-10-06 2017-10-27 2017-12-01 2018-05-30

UG-OPM-22379-CS-INDV /District Engineering Assistant 8

IDA / 58210 Project Management, andMonitoring and Evaluation Post Individual Consultant

Selection Open

13,150.56 0.00 PendingImplementation 2017-08-18 2017-10-06 2017-10-27 2017-12-01 2018-05-30

UG-OPM-22382-CS-INDV /District Engineering Assistant 9

IDA / 58210 Project Management, andMonitoring and Evaluation Post Individual Consultant

Selection Open

13,150.56 0.00 PendingImplementation 2017-08-18 2017-10-06 2017-10-27 2017-12-01 2018-05-30

UG-OPM-22384-CS-INDV /District Engineering Assistant 10

IDA / 58210 Project Management, andMonitoring and Evaluation Post Individual Consultant

Selection Open

13,150.56 0.00 PendingImplementation 2017-08-18 2017-10-06 2017-10-27 2017-12-01 2018-05-30

UG-OPM-22387-CS-INDV /District Engineering Assistant 11

IDA / 58210 Project Management, andMonitoring and Evaluation Post Individual Consultant

Selection Open

13,150.56 0.00 PendingImplementation 2017-08-18 2017-10-06 2017-10-27 2017-12-01 2018-05-30

UG-OPM-22505-CS-INDV /Office Attendant 1

IDA / 58210 Project Management, andMonitoring and Evaluation Post Individual Consultant

Selection Open

11,835.60 0.00 PendingImplementation 2017-08-18 2017-10-06 2017-10-27 2017-12-01 2018-05-30

UG-OPM-22509-CS-INDV /Office Attendant 2

IDA / 58210 Project Management, andMonitoring and Evaluation Post Individual Consultant

Selection Open

11,835.60 0.00 PendingImplementation 2017-08-18 2017-10-06 2017-10-27 2017-12-01 2018-05-30

UG-OPM-22515-CS-INDV /Driver 1

IDA / 58210 Project Management, andMonitoring and Evaluation Post Individual Consultant

Selection Open

9,863.01 0.00 PendingImplementation 2017-08-18 2017-10-06 2017-10-27 2017-12-01 2018-05-30

UG-OPM-22517-CS-INDV /Driver 2

IDA / 58210 Project Management, andMonitoring and Evaluation Post Individual Consultant

Selection Open

9,863.01 0.00 PendingImplementation 2017-08-18 2017-10-06 2017-10-27 2017-12-01 2018-05-30

Page 14

UG-OPM-22519-CS-INDV /Driver 3

IDA / 58210 Project Management, andMonitoring and Evaluation Post Individual Consultant

Selection Open

9,863.01 0.00 PendingImplementation 2017-08-18 2017-10-06 2017-10-27 2017-12-01 2018-05-30

UG-OPM-22524-CS-INDV /Driver 4

IDA / 58210 Project Management, andMonitoring and Evaluation Post Individual Consultant

Selection Open

9,863.01 0.00 PendingImplementation 2017-08-18 2017-10-06 2017-10-27 2017-12-01 2018-05-30

UG-OPM-22527-CS-INDV /Driver 5

IDA / 58210 Project Management, andMonitoring and Evaluation Post Individual Consultant

Selection Open

9,863.01 0.00 PendingImplementation 2017-08-18 2017-10-06 2017-10-27 2017-12-01 2018-05-30

IGAD/ DRDIP/CS/7 /Recruitment of Consultant forCapacity Support to ProjectCountries

IDA / D1200Regional Support forCoordination, Capacity andKnowledge

Prior Individual ConsultantSelection Open

70,000.00 0.00 Pending

Implementation 2017-11-01 2017-12-20 2018-01-10 2018-02-14 2018-08-13

UG-OPM-22316-CS-CDS /Project Manager - DRDIP

IDA / 58210 Project Management, andMonitoring and Evaluation Prior Direct Selection Direct

120,723.12 0.00 Pending

Implementation 2017-10-02 2017-10-12 2017-12-16 2018-06-14

COMP4/C1/2017 / coordinateurde projet

IDA / 58330 Social and Economic Servicesand Infrastructure Post Individual Consultant

Selection Open

30,000.00 0.00 UnderImplementation 2017-10-02 2016-10-25 2017-11-20 2017-12-11 2018-01-15 2018-07-14

COMP4/C2/2017 / recrutementd'ingénieur en Infrastructures

IDA / 58330 Social and Economic Servicesand Infrastructure Post Individual Consultant

Selection Open

24,000.00 0.00 PendingImplementation 2017-10-02 2017-11-20 2017-12-11 2018-01-15 2018-07-14

COMP4/C3/2017 / recrutementde 4 techniciens supérieurs pourles régions et Djibouti ville

IDA / 58330 Social and Economic Servicesand Infrastructure Post Individual Consultant

Selection Open

62,400.00 0.00 PendingImplementation 2017-10-02 2017-11-20 2017-12-11 2018-01-15 2018-07-14

COMP4/C5/2017 / recrutementd'un spécialiste en sauvegardesenvironnementales et sociales

IDA / 58330 Social and Economic Servicesand Infrastructure Post Individual Consultant

Selection Open

24,000.00 0.00 PendingImplementation 2017-10-02 2017-11-20 2017-12-11 2018-01-15 2018-07-14

COMP4/C6/2017 / recrutementd'un responsable Suivi evaluation

IDA / 58330 Social and Economic Servicesand Infrastructure Post Individual Consultant

Selection Open

24,000.00 0.00 PendingImplementation 2017-10-02 2017-11-20 2017-12-11 2018-01-15 2018-07-14

COMP4/C7/2017 / recrutementd'un comptable

IDA / 58330 Social and Economic Servicesand Infrastructure Post Individual Consultant

Selection Open

24,000.00 0.00 PendingImplementation 2017-10-02 2017-11-20 2017-12-11 2018-01-15 2018-07-14

COMP4/C8/2017 / recrutementd'un assistant de projet

IDA / 58330 Social and Economic Servicesand Infrastructure Post Individual Consultant

Selection Open

12,000.00 0.00 PendingImplementation 2017-11-05 2017-12-24 2018-01-14 2018-02-18 2018-08-17

COMP4/C9/2017 / recrutementd'un spécialiste Passation desmarchés

IDA / 58330 Social and Economic Servicesand Infrastructure Post Individual Consultant

Selection Open

24,000.00 0.00 PendingImplementation 2017-10-05 2017-11-23 2017-12-14 2018-01-18 2018-07-17

COMP4/C12/2017 / Enquettesur les migrants à Balbala et àDjibouti-Ville

IDA / 58330 Social and Economic Servicesand Infrastructure Prior Direct Selection Direct

71,967.00 0.00 Pending

Implementation 2017-10-02 2017-10-07 2017-11-11 2018-05-10

COMP4/C16/2017 /Récrutement d'un expertinternational pour la préparationde la stratégie de l'ONARS

IDA / 58330 Social and Economic Servicesand Infrastructure Post Individual Consultant

Selection Open

30,000.00 0.00 PendingImplementation 2017-10-02 2017-11-20 2017-12-11 2018-01-15 2018-07-14

COMP4/C17/2017 /Récrutement d'un consultantindividuel pour l'appui de l'experten charge de la préparation de lastratégie de l'ONARS

IDA / 58330 Social and Economic Servicesand Infrastructure Post Individual Consultant

Selection Open

11,268.00 0.00 PendingImplementation 2017-10-02 2017-11-20 2017-12-11 2018-01-15 2018-07-14

COMP4/C17/2017_1 /recrutement d'un expertinternational en manuel deprocédures ONARS

IDA / 58330 Social and Economic Servicesand Infrastructure Post Individual Consultant

Selection Open

85,000.00 0.00 PendingImplementation 2017-11-15 2018-01-03 2018-01-24 2018-02-28 2018-08-27

UG-OPM-30462-CS-CDS /Procurement of Consultingservices for Updating of theEnvironmental and SocialManagement Framework andResettlement Policy Frameworkfor the Development Response toDisplacement Impact Project.

IDA / 58210 Project Management, andMonitoring and Evaluation Prior Direct Selection Direct

41,551.00 0.00 Under

Implementation 2017-10-05 2017-10-17 2017-10-09 2017-10-19 2017-10-27 2017-11-24

UG-OPM-22353-CS-CDS /Procurement Assistant Officer

IDA / 58210 Project Management, andMonitoring and Evaluation Prior Direct Selection Direct

43,651.20 0.00 Canceled 2017-08-18 2017-08-28 2017-11-01 2018-04-30

UG-OPM-22343-CS-CDS /Project Accountant

IDA / 58210 Project Management, andMonitoring and Evaluation Post Individual Consultant

Selection Limited

76,010.88 0.00 PendingImplementation 2017-10-20 2017-10-25 2017-11-15 2017-12-20 2018-06-18

UG-OPM-22350-CS-CDS / ICTAssistant Officer

IDA / 58210 Project Management, andMonitoring and Evaluation Post Individual Consultant

Selection Limited

43,651.20 0.00 Canceled 2017-10-27 2017-11-01 2017-11-22 2017-12-27 2018-06-25

COMP4/C4/2017 / recrutementd'un spécialiste en agriculture

IDA / 58330 Social and Economic Servicesand Infrastructure Post Individual Consultant

Selection Open

24,000.00 0.00 PendingImplementation 2017-10-02 2017-11-20 2017-12-11 2018-01-15 2019-01-15

DJ-IGAD-37530-CS-INDV /Renewal of contract for SeniorProgramme Coordinator-IGAD/DRDIP

IDA / D1200Regional Support forCoordination, Capacity andKnowledge

Prior Individual ConsultantSelection Direct

504,000.00 0.00 Canceled 2017-11-22 2017-11-29 2017-12-02 2017-12-23 2018-01-27 2018-07-26

DJ-IGAD-37531-CS-INDV /Renewal of the contract for theProject Accountant-IGAD/ DRDIP

IDA / D1200Regional Support forCoordination, Capacity andKnowledge

Prior Individual ConsultantSelection Direct

192,500.00 0.00 Canceled 2017-11-22 2018-02-28 2017-12-02 2017-12-23 2018-01-27 2018-07-26

DJ-IGAD-38100-CS-INDV /Selection of Consultant toundertake the Study to assessthe socio-economic impact onthe migrant and refugee hostingcommunities in Balbala, DjiboutiVille, Djibouti

IDA / D1200Regional Support forCoordination, Capacity andKnowledge

Post Individual ConsultantSelection Open

20,000.00 0.00 Pending

Implementation 2017-11-24 2018-01-12 2018-02-02 2018-03-09 2018-09-05

COMP4/C13/2017 / recrutementd'un consultant pour l'enquêtequantitative ménage

IDA / 58330 Social and Economic Servicesand Infrastructure Post Individual Consultant

Selection Open

29,734.00 0.00 PendingImplementation 2018-01-15 2018-03-05 2018-03-26 2018-04-30 2018-10-27

COMP4/C14/2017 / recrutementd'un consultant pour l'enquêtequantitative jeunes femmes etpérimètres agro pastoraux

IDA / 58330 Social and Economic Servicesand Infrastructure Post Individual Consultant

Selection Open

26,133.00 0.00 PendingImplementation 2018-01-25 2018-03-15 2018-04-05 2018-05-10 2018-11-06

COMP4/C15/2017 / recrutementd'un consultant pour l'enquetequalitatif (focus groupe)

IDA / 58330 Social and Economic Servicesand Infrastructure Post Individual Consultant

Selection Open - National

50,000.00 0.00 PendingImplementation 2018-01-30 2018-02-27 2018-03-13 2018-03-27 2018-05-26

Page 15

COMP4/C16/2017 /Recrutement d'un consultantpour l'enquête de suivi desindicateurs

IDA / 58330 Social and Economic Servicesand Infrastructure Post Individual Consultant

Selection Limited

34,000.00 0.00 PendingImplementation 2018-03-14 2018-03-19 2018-04-09 2018-05-14 2018-06-28

DJ-ADDS-54279-CS-INDV /recrutement d'un consultantpourla sensibilisation,étude demarchés, mise a jour du listing

IDA / 58330 Social and Economic Servicesand Infrastructure Post Individual Consultant

Selection Limited

20,000.00 0.00 PendingImplementation 2017-10-05 2017-10-10 2017-10-31 2017-12-05 2018-06-03

COMP4/C17/2017_2 /recrutement d'un consultant pourl'enquete de référence

IDA / 58330 Social and Economic Servicesand Infrastructure Post Individual Consultant

Selection Limited

80,000.00 0.00 PendingImplementation 2018-03-15 2018-03-20 2018-04-10 2018-05-15 2018-06-29

40000 / recrutement d'unconsultant pour lacommunication

IDA / 58330 Social and Economic Servicesand Infrastructure Post Individual Consultant

Selection Limited

40,000.00 0.00 PendingImplementation 2018-03-15 2018-03-20 2018-04-10 2018-05-15 2018-11-11

COMP3/C1/2017 / recrutementd'un consultant pour l'analysecomplémentaire de l'enquete

IDA / 58330 Social and Economic Servicesand Infrastructure Post Individual Consultant

Selection Limited

20,000.00 0.00 PendingImplementation 2018-03-15 2018-03-20 2018-04-10 2018-05-15 2018-11-11

UG-OPM-52236-CS-INDV /Consulting Services forCommunications Officer

IDA / 58210 Project Management, andMonitoring and Evaluation Post Individual Consultant

Selection Open

76,010.00 0.00 UnderImplementation 2018-03-05 2018-01-30 2018-04-23 2018-05-14 2018-06-18 2018-12-15

UG-OPM-52238-CS-INDV /Consultant services for ICTOfficer

IDA / 58210 Project Management, andMonitoring and Evaluation Post Individual Consultant

Selection Open

76,010.00 0.00 Under Review 2018-03-05 2018-01-30 2018-04-23 2018-05-14 2018-06-18 2018-12-15

UG-OPM-61708-CS-INDV /Consulting Services for aProcurement Officer

IDA / 58210 Project Management, andMonitoring and Evaluation Post Individual Consultant

Selection Limited

76,010.00 0.00 PendingImplementation 2018-05-22 2018-05-27 2018-06-17 2018-07-22 2019-01-18