July 9, 2010
Sample Procurement Plan
I. General
1. Bank’s approval Date of the procurement Plan [This is the first procurement plan)2. Date of General Procurement Notice: April 25, 20173. Period covered by this procurement plan: September 2016 to June 2017
II. Goods and Works and non-consulting services.
1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement: [Thresholds for applicable procurement methods (not limited to the list below) will be determined by the Procurement Specialist /Procurement Accredited Staff based on the assessment of the implementing agency’s capacity.]
Procurement Method Prior Review ThresholdUS$
Comments
1. ICB and LIB (Goods) Above US$ 1,500,000 All2. NCB (Goods) NA3. ICB (Works) Above US$ 7 million All4. NCB (Works) NA5. ICB and LIB (Non-Consultant Services) Above US$ 1,500,000 All6 NCB (Non-Consultant Services) NA
[Add other methods if necessary]
2. Prequalification. Bidders for _Not applicable_ shall be prequalified in accordance with the provisions of paragraphs 2.9 and 2.10 of the Guidelines.
3. Proposed Procedures for CDD Components (as per paragraph. 3.17 of the Guidelines: [CDD project implementation Manual to be issued by DRDIP PIU, MoANR for Bank approval)
4. Reference to (if any) Project Operational/Procurement Manual: DRDIP Procurement Manual to be issued by DRDIP PIU.
5. Any Other Special Procurement Arrangements: NA
6. Summary of the Procurement Packages planned during the first 18 months after project effectiveness ( including those that are subject to retroactive financing and advanced procurement)
[List the Packages which require Bank’s prior review first and then the other packages]
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
July 9, 2010
1 2 3 4 5 6 7
Ref. No.
Description EstimatedCostUS$
million
Packages Domestic
Preference
(yes/no)
Reviewby Bank
(Prior / Post)
Comments
Summary of the ICB (Works)
NA NA NA NA
Summary of the ICB (Goods)
6.69 4 No Prior
Summary of the NCB (Works)
3.8 9 No Post All
Summary of the NCB (Goods)
14.70 14 No Post All
Summary of the ICB (Non-Consultant Services)
NA NA NA NA
III. Selection of Consultants
1. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants:
Selection Method Prior Review Threshold Commentes1. Competitive Methods (Firms) Above US$ 500,0002. Single Source (Firms) All3. Individual Above US$ 200,000
2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $_300,000_equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines.
3. Any Other Special Selection Arrangements: NA
4. Consultancy Assignments with Selection Methods and Time Schedule
1 2 3 4 5 6
Ref. No. Description of Assignment
Estimated CostUS$ million
Packages Reviewby Bank(Prior / Post)
Comments
Summary of number of contracts that
0.35 2 Prior
July 9, 2010
will be let under QCBSSummary of number of contracts that will be let under other methods
1.4 38 Post LCS/ IC
Page 1
PROCUREMENTPLAN Africa : Development Response to Displacement Impacts Project in the HoAGeneral InformationCountry: Africa Bank�s Approval Date of the Original Procurement Plan: 2017-08-10
Revised Plan Date(s): (comma delineated, leave blank if none) 2018-08-10Project ID: P152822 GPN Date: Project Name: Development Response to Displacement Impacts Project in the HoALoan / Credit No: IDA / D1200, IDA / 58320, IDA / 58210, IDA / 58330Executing Agency(ies): Intergovernmental Authority on Development, Ministry of Agriculutre and Natural Resources Development, Office of the Prime Minister, Agence Djiboutienne de Development Social, Tirgray - Development Response to Displacement Impacts Project, AFAR - Development Response to Displacement Impacts Project, ETHIO-SOMALE - Development Response to Displacement Impacts Project, BENISHANGUL - Development Response to Displacement Impacts Project, GAMBELLA - Development Response to Displacement Impacts Project
WORKSActivity Reference No. /
Description Loan / Credit No. Component Review Type Method Market Approach ProcurementProcess
Prequalification(Y/N)
EstimatedAmount (US$)
Actual Amount(US$)
ProcessStatus
Draft Pre-qualificationDocuments
PrequalificationEvaluation Report
Draft Bidding Document/ Justification
Specific ProcurementNotice / Invitation
Bidding Documents asIssued
Proposal Submission /Opening / Minutes
Bid Evaluation Reportand Recommendation
for AwardSigned Contract Contract Completion
Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual
COMP1/T1/2017 / Travauxd'extension de 5 salles de Lycéeet réhabilitation du dortoir àObock
IDA / 58330 Social and Economic Servicesand Infrastructure Post Request for Bids Open - National
Single Stage - OneEnvelope 325,070.00 0.00 Pending
Implementation 2018-02-10 2018-02-17 2018-03-31 2018-04-30 2018-06-04 2018-12-01
COMP1/T3/2017 / Travaux deraccordement pecherie d'Obock
IDA / 58330 Social and Economic Servicesand Infrastructure Post Request for Bids Open - National
Single Stage - OneEnvelope 450,704.00 0.00 Pending
Implementation 2017-11-20 2017-11-27 2018-01-08 2018-02-07 2018-03-14 2018-09-10
COMP1/T8/2017 / constructionde locauxcommunautaire/communautaire àAli addé
IDA / 58330 Social and Economic Servicesand Infrastructure Post Request for
Quotations Limited
Single Stage - OneEnvelope 101,408.00 0.00 Pending
Implementation 2018-03-17 2018-05-12 2018-11-08
COMP1/T9/2017 / Réhabilitationdu local communautaire (UNFD)à Holl-Holl
IDA / 58330 Social and Economic Servicesand Infrastructure Post Request for
Quotations Limited
Single Stage - OneEnvelope 40,000.00 0.00 Pending
Implementation 2018-02-17 2018-04-14 2018-10-11
COMP2/T1/2017 / rénovation etrenforcement de perimetresexistants d'où 5 reservoirs , 5puits , 5 champs solaires pourObock
IDA / 58330 Social and Economic Servicesand Infrastructure Post Request for
Quotations Limited
Single Stage - OneEnvelope 135,211.00 0.00 Pending
Implementation 2017-11-01 2017-12-27 2018-06-25
COMP2/T2/2017 / rénovation etrenforcement de perimetresexistants d'où 5 reservoirs , 5puits, 5 champs solaires pourHolhol
IDA / 58330 Social and Economic Servicesand Infrastructure Post Request for
Quotations Limited
Single Stage - OneEnvelope 135,211.00 0.00 Pending
Implementation 2017-11-01 2017-12-27 2018-06-25
COMP2/T3/2017 / rénovation etrenforcement de perimetresexistants d'où 5 reservoirs , 5puits, 5 champs solaires pourAli Addé
IDA / 58330 Social and Economic Servicesand Infrastructure Post Request for
Quotations Limited
Single Stage - OneEnvelope 135,211.00 0.00 Pending
Implementation 2017-11-01 2017-12-27 2018-06-25
UG-OPM-22288-CW-RFQ /Partitioning of offices at Kampala
IDA / 58210 Project Management, andMonitoring and Evaluation Post Request for Bids Limited
Single Stage - OneEnvelope 32,877.00 0.00 Pending
Implementation 2017-11-30 2017-12-05 2018-01-16 2018-02-15 2018-03-22 2018-09-18
COMP1/T5/2017 / F+P etraccordement des installationsélectriques des logements,locaux commerciaux etétablissements publics à Holl-Holl
IDA / 58330 Social and Economic Servicesand Infrastructure Post Request for Bids Open - National
Single Stage - OneEnvelope 241,392.00 0.00 Pending
Implementation 2017-10-31 2017-11-07 2017-12-07 2018-01-06 2018-02-10 2018-05-11
COMP1/T6/2017 / constructionde collége et logement pour aliAddé et rehabilitation de sallesscientifiques, reservoirs d'eau etlogements enseignants ducollége et toiture de l'écoleprimaire Hol Hol en 2 lotsséparés
IDA / 58330 Social and Economic Servicesand Infrastructure Post Request for Bids Open - National
Single Stage - OneEnvelope 1,616,902.00 0.00 Pending
Implementation 2017-10-31 2017-11-05 2017-12-05 2018-01-04 2018-02-08 2018-05-09
DJ-ADDS-29135-CW-RFB /Travaux extention du centre desanté à Obock
IDA / 58330 Social and Economic Servicesand Infrastructure Post Request for Bids Open - National
Single Stage - OneEnvelope 399,493.00 0.00 Pending
Implementation 2017-10-31 2017-11-05 2017-12-05 2018-02-08 2018-06-08
DJ-ADDS-29136-CW-RFB /rehabilitation/ extention du centrede santé Ali addé et Hol Hol en 2lots séparés
IDA / 58330 Social and Economic Servicesand Infrastructure Post Request for Bids Open - National
Single Stage - OneEnvelope 436,620.00 0.00 Pending
Implementation 2017-10-31 2017-11-05 2017-12-05 2018-01-04 2018-02-08 2018-08-07
DJ-ADDS-29129-CW-DIR /Travaux d'extension Résau/Electricité d'Obock et Holl-Holl
IDA / 58330 Social and Economic Servicesand Infrastructure Prior Direct Selection Direct
1,188,371.09 0.00 Under Review 2017-09-19 2017-10-04 2017-10-27 2019-04-25
ET-TDRDIP-36807-CW-RFB /Construction of New Check dampond for irrigation for AsgedeTsmbla Woreda
IDA / 58320 Sustainable EnvironmentalManagement Post Request for
Quotations Limited
Single Stage - OneEnvelope 80,000.00 0.00 Pending
Implementation 2018-01-01 2018-02-26 2018-04-27
ET-TDRDIP-36815-CW-RFB /Construction of Irrigation CanalExpansion for Tselemti Woreda
IDA / 58320 Sustainable EnvironmentalManagement Post Request for
Quotations Limited
Single Stage - OneEnvelope 98,182.00 0.00 Pending
Implementation 2018-01-06 2018-02-12 2018-04-13
ET-TDRDIP-36821-CW-RFB /Construction of New Communalwell for irrigation for AsgedeTsmbla Woreda
IDA / 58320 Sustainable EnvironmentalManagement Post Request for
Quotations Limited
Single Stage - OneEnvelope 36,418.00 0.00 Pending
Implementation 2018-01-01 2018-02-26 2018-04-27
ET-ADRDP-36827-CW-RFQ /pond construction for barahleworeda
IDA / 58320 Sustainable EnvironmentalManagement Post Request for
Quotations Limited
Single Stage - OneEnvelope 37,000.00 0.00 Pending
Implementation 2018-01-31 2018-03-28 2018-06-26
ET-TDRDIP-36825-CW-RFB /Bio-gas construction for AsgedeTsmbala Woreda
IDA / 58320 Sustainable EnvironmentalManagement Post Request for
Quotations Limited
Single Stage - OneEnvelope 12,978.00 0.00 Pending
Implementation 2017-12-06 2018-01-31 2018-05-01
ET-TDRDIP-36832-CW-RFB /FTC rehabilitation byconstruction of Animal sheds forAsgede TsmblaWoreda(Construction Of CattleShed,Construction Of ShoatsShed,Construction Of BeesShed,Construction Of PoultryShed)
IDA / 58320 Livelihoods Program Post Request forQuotations Limited
Single Stage - OneEnvelope 42,622.00 0.00 Pending
Implementation 2018-01-06 2018-03-03 2018-05-02
Page 2
ET-TDRDIP-36840-CW-RFB /Maintenance of farmers trainingcenter, Animal Vet Clinic forAsgede Tsmbla Woreda
IDA / 58320 Livelihoods Program Post Request forQuotations Limited
Single Stage - OneEnvelope 28,835.00 0.00 Pending
Implementation 2018-01-06 2018-03-03 2018-05-02
ET-ADRDP-40066-CW-RFQ /small scale irrigation for onlyaysaita wored
IDA / 58320 Sustainable EnvironmentalManagement Post Request for
Quotations Limited
Single Stage - OneEnvelope 23,636.00 0.00 Pending
Implementation 2018-01-25 2018-03-22 2018-09-18
ET-ADRDP-40070-CW-RFQ /gab-ion check dam at aysaiytaworeda
IDA / 58320 Sustainable EnvironmentalManagement Post Request for
Quotations Limited
Single Stage - OneEnvelope 17,500.00 0.00 Pending
Implementation 2018-01-13 2018-03-10 2018-09-06
ET-ADRDP-40106-CW-RFQ /rehabilitation of two dis siltingirrigation schemes for aysaitaworeda
IDA / 58320 Sustainable EnvironmentalManagement Post Request for
Quotations Limited
Single Stage - OneEnvelope 34,800.00 0.00 Pending
Implementation 2018-02-04 2018-04-01 2018-09-28
ET-ADRDP-40108-CW-RFQ /Constructions of fodder grindingmachine house for Aysaitaworeda
IDA / 58320 Livelihoods Program Post Request forQuotations Limited
Single Stage - OneEnvelope 8,700.00 0.00 Pending
Implementation 2018-02-04 2018-04-01 2018-09-28
ET-TDRDIP-41226-CW-RFQ /Bio gas Construction for TselemtiWoreda
IDA / 58320 Sustainable EnvironmentalManagement Post Request for
Quotations Limited
Single Stage - OneEnvelope 14,776.00 0.00 Pending
Implementation 2017-12-31 2018-02-06 2018-05-07
ET-TDRDIP-41228-CW-RFQ /Bio gas Construction for TahtayAdyabo Woreda
IDA / 58320 Sustainable EnvironmentalManagement Post Request for
Quotations Limited
Single Stage - OneEnvelope 11,481.00 0.00 Pending
Implementation 2017-12-31 2018-02-06 2018-05-07
ET-TDRDIP-41252-CW-RFQ /Construction of new Communalwell for Irrigation for TselemtiWoreda
IDA / 58320 Sustainable EnvironmentalManagement Post Request for
Quotations Limited
Single Stage - OneEnvelope 20,247.00 0.00 Pending
Implementation 2018-01-06 2018-02-17 2018-04-18
ET-TDRDIP-41258-CW-RFQ /Construction of New Check dampond for Irrigation for TselemtiWoreda
IDA / 58320 Sustainable EnvironmentalManagement Post Request for
Quotations Limited
Single Stage - OneEnvelope 68,182.00 0.00 Pending
Implementation 2017-12-31 2018-02-25 2018-05-26
ET-TDRDIP-41260-CW-RFQ /Construction of Check dam pondfor construction for TahtayAdyabo Woreda
IDA / 58320 Sustainable EnvironmentalManagement Post Request for
Quotations Limited
Single Stage - OneEnvelope 60,000.00 0.00 Pending
Implementation 2017-12-31 2018-02-25 2018-05-26
ET-TDRDIP-41304-CW-RFQ /Rehabilitation of FTC byconstructing Animal Shades forTselemti Woreda(Construction OfShoats Shed,Construction OfBees Shed,Construction OfPoultry Shed..)
IDA / 58320 Livelihoods Program Post Request forQuotations Limited
Single Stage - OneEnvelope 32,000.00 0.00 Pending
Implementation 2018-01-06 2018-03-03 2018-05-02
ET-TDRDIP-41309-CW-RFQ /Rehabilitation of FTC byconstruction of Animal Shade forTahtay AdyaboWoreda(Construction of cattleshed , Construction of poultryshed, Construction of Beekeeping shed)
IDA / 58320 Livelihoods Program Post Request forQuotations Limited
Single Stage - OneEnvelope 38,671.00 0.00 Pending
Implementation 2018-01-06 2018-03-03 2018-05-02
ET-TDRDIP-41310-CW-RFQ /Maintenance of FTCs forTselemti Woreda (construction ofgate , Construction showroom,Fencing of FTCs...)
IDA / 58320 Livelihoods Program Post Request forQuotations Limited
Single Stage - OneEnvelope 54,152.00 0.00 Pending
Implementation 2018-01-06 2018-03-03 2018-05-02
ET-TDRDIP-41312-CW-RFQ /Maintenance of FTCs, Nurserysite for Tahtay AdyaboWoreda(Maintenance of roofcatchment, Fencing....)
IDA / 58320 Livelihoods Program Post Request forQuotations Limited
Single Stage - OneEnvelope 32,026.00 0.00 Pending
Implementation 2018-01-06 2018-03-03 2018-05-02
ET-SDRDIP-42056-CW-RFQ /Construction of small scale damsfor irrigation(no 1) in awbareworeda
IDA / 58320 Sustainable EnvironmentalManagement Post Request for
Quotations Limited
Single Stage - OneEnvelope 56,364.00 0.00 Pending
Implementation 2018-02-11 2018-04-08 2018-10-05
ET-DRDIP-42220-CW-RFQ /construction of three Hand dugwell for SSI at Bambasi woreda
IDA / 58320 Sustainable EnvironmentalManagement Post Request for
Quotations Limited
Single Stage - OneEnvelope 8,695.00 0.00 Pending
Implementation 2018-02-10 2018-04-07 2018-07-06
ET-DRDIP-42225-CW-RFQ /Construction of house hold pondfor Bambasi woreda
IDA / 58320 Sustainable EnvironmentalManagement Post Request for
Quotations Limited
Single Stage - OneEnvelope 15,018.00 0.00 Pending
Implementation 2018-02-10 2018-04-07 2018-07-06
ET-DRDIP-42251-CW-RFQ /construction of 4 hand dug wellfor demonstration for SSI on FTCfor Homosha woreda
IDA / 58320 Sustainable EnvironmentalManagement Post Request for
Quotations Limited
Single Stage - OneEnvelope 11,636.00 0.00 Pending
Implementation 2018-03-10 2018-05-05 2018-05-25
ET-DRDIP-42260-CW-RFQ /construction of one house holdpond for demonstration forHomosha woreda
IDA / 58320 Sustainable EnvironmentalManagement Post Request for
Quotations Limited
Single Stage - OneEnvelope 15,018.00 0.00 Pending
Implementation 2018-02-27 2018-04-24 2018-05-13
ET-DRDIP-42275-CW-RFQ /construction of one rehabilitationof diversion canal for Homoshaworeda
IDA / 58320 Sustainable EnvironmentalManagement Post Request for
Quotations Limited
Single Stage - OneEnvelope 16,948.00 0.00 Pending
Implementation 2018-03-11 2018-05-06 2018-06-05
ET-DRDIP-42304-CW-RFQ /Construction of one springdevelopment for Mao and Komospecial woreda
IDA / 58320 Sustainable EnvironmentalManagement Post Request for
Quotations Limited
Single Stage - OneEnvelope 7,636.00 0.00 Pending
Implementation 2018-02-12 2018-04-09 2018-05-07
ET-DRDIP-42310-CW-RFQ /construction of 5 hand dug wellfor Mao and Komo specialworeda
IDA / 58320 Sustainable EnvironmentalManagement Post Request for
Quotations Limited
Single Stage - OneEnvelope 11,636.00 0.00 Pending
Implementation 2018-02-25 2018-04-22 2018-05-22
ET-DRDIP-42312-CW-RFQ /construction of one house holdpond for Mao and Komo specialworeda
IDA / 58320 Sustainable EnvironmentalManagement Post Request for
Quotations Limited
Single Stage - OneEnvelope 15,018.00 0.00 Pending
Implementation 2018-02-28 2018-04-25 2018-05-20
Page 3
ET-SDRDIP-42329-CW-RFQ /Construction of small scale damsfor irrigation (no 1) in k/bayahworeda
IDA / 58320 Sustainable EnvironmentalManagement Post Request for
Quotations Limited
Single Stage - OneEnvelope 56,364.00 0.00 Pending
Implementation 2018-02-01 2018-03-29 2018-09-25
ET-DRDIP-42672-CW-RFQ /Construction of 3 Biogass ( onefor Bambsi,one for Mao & Komoand one for Homosha woreda )procured at Regional Level
IDA / 58320 Sustainable EnvironmentalManagement Post Request for
Quotations Limited
Single Stage - OneEnvelope 14,543.00 0.00 Pending
Implementation 2018-02-25 2018-04-22 2018-06-11
ET-SDRDIP-42120-CW-RFQ /construction of hand dug well forirrigation (no 1)and Rehabilitationof existing hand dug well forirrigation (no 1) in boqolmayoworeda
IDA / 58320 Sustainable EnvironmentalManagement Post Request for
Quotations Limited
Single Stage - OneEnvelope 13,010.00 0.00 Pending
Implementation 2018-02-20 2018-04-17 2018-10-14
ET-SDRDIP-42119-CW-RFQ /Canal construction with waterpump and Rehabilitation ofexisting irrigation schemes (km3) respectily (m5) 16002 inboqolmayo woreda
IDA / 58320 Sustainable EnvironmentalManagement Post Request for
Quotations Limited
Single Stage - OneEnvelope 62,350.00 0.00 Pending
Implementation 2018-02-24 2018-04-21 2018-10-18
ET-SDRDIP-42060-CW-RFQ /construction of hand dug well forirrigation( no 1) & Rehabilitationof existing hand dug well forirrigation one in awbare woreda
IDA / 58320 Sustainable EnvironmentalManagement Post Request for
Quotations Limited
Single Stage - OneEnvelope 12,910.00 0.00 Pending
Implementation 2018-02-24 2018-04-21 2018-10-18
ET-SDRDIP-42242-CW-RFQ /Strengthening of nursery site(form tools and planting material)(no 3) in Dollo-ado woreda
IDA / 58320 Sustainable EnvironmentalManagement Post Request for
Quotations Limited
Single Stage - OneEnvelope 20,826.00 0.00 Pending
Implementation 2018-02-26 2018-04-23 2018-10-20
ET-SDRDIP-42249-CW-RFQ /construction Canal construction(m4) 10003 in Dollo-ado woreda
IDA / 58320 Sustainable EnvironmentalManagement Post Request for
Quotations Limited
Single Stage - OneEnvelope 80,560.00 0.00 Pending
Implementation 2018-02-20 2018-04-17 2018-10-14
ET-SDRDIP-42330-CW-RFQ /construction of hand dug well forirrigation (no 1) & Rehabilitationof existing hand dug well forirrigation (no 1 in k/bayah woreda
IDA / 58320 Sustainable EnvironmentalManagement Post Request for
Quotations Limited
Single Stage - OneEnvelope 12,910.00 0.00 Pending
Implementation 2018-03-04 2018-04-29 2018-10-26
ET-SDRDIP-42264-CW-RFQ /construction of hand dug well forirrigation (no 1 ) & Rehabilitationof existing hand dug well forirrigation in Dollo-ado woreda
IDA / 58320 Sustainable EnvironmentalManagement Post Request for
Quotations Limited
Single Stage - OneEnvelope 12,910.00 0.00 Pending
Implementation 2018-02-24 2018-04-21 2018-10-18
ET-TDRDIP-41254-CW-RFQ /Construction of New Communalwell for irrigation for TahtayAdyabo Woreda
IDA / 58320 Sustainable EnvironmentalManagement Post Request for
Quotations Limited
Single Stage - OneEnvelope 66,411.00 0.00 Pending
Implementation 2018-01-06 2018-02-12 2018-04-13
ET-TDRDIP-64824-CW-RFQ /Maintenance of ArtificialInsemination Center in TahtayAdyabo Woreda
IDA / 58320 Livelihoods Program Post Request forQuotations Limited
Single Stage - OneEnvelope 3,704.00 0.00 Pending
Implementation 2018-06-09 2018-08-04 2019-01-31
ET-GDRDIP-36793-CW-RFQ /Pond Construction
IDA / 58320 Sustainable EnvironmentalManagement Post Request for
Quotations Limited
Single Stage - OneEnvelope 48,054.00 0.00 Pending
Implementation 2018-09-23 2018-11-18 2019-05-17
ET-GDRDIP-36798-CW-RFQ /Hand-dug Well Construction
IDA / 58320 Sustainable EnvironmentalManagement Post Request for
Quotations Limited
Single Stage - OneEnvelope 926.00 0.00 Pending
Implementation 2018-08-27 2018-10-22 2019-02-19
GOODSActivity Reference No. /
Description Loan / Credit No. Component Review Type Method Market Approach ProcurementProcess
Prequalification(Y/N)
EstimatedAmount (US$)
Actual Amount(US$)
ProcessStatus
Draft Pre-qualificationDocuments
PrequalificationEvaluation Report
Draft Bidding Document/ Justification
Specific ProcurementNotice / Invitation
Bidding Documents asIssued
Proposal Submission /Opening / Minutes
Bid Evaluation Reportand Recommendation
for AwardSigned Contract Contract Completion
Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual
ET-MOANRD-9134-GO-UN / 30vehicles,(18 Double cab p/up and12 Hard top Station wagon)
IDA / 58320Regional Support forCoordination, Capacity andKnowledge
Prior UN Agencies (Direct) Direct
1,050,000.00 109,319,495.70 Signed 2017-03-06 2017-03-11 2017-04-15 2017-06-27 2017-10-12
ET-MOANRD-9137-GO-UN / 160motorcycles
IDA / 58320Regional Support forCoordination, Capacity andKnowledge
Prior UN Agencies (Direct) Direct
64,000.00 560,035.80 Signed 2017-03-06 2017-03-11 2017-04-15 2017-06-27 2017-10-12
ET-MOANRD-9146-GO-RFQ /office Equipment's
IDA / 58320Regional Support forCoordination, Capacity andKnowledge
Post Request for Bids Open - National
Single Stage - OneEnvelope 175,000.00 0.00 Pending
Implementation 2017-05-05 2017-05-10 2017-06-21 2017-07-21 2017-08-25 2018-02-21
ET-MOANRD-9139-GO-RFQ / ITequipment and accessories
IDA / 58320Regional Support forCoordination, Capacity andKnowledge
Post Request for Bids Open - National
Single Stage - OneEnvelope 180,000.00 0.00 Under
Implementation 2017-05-05 2017-05-10 2017-06-21 2017-05-15 2017-07-21 2017-06-09 2017-08-25 2018-02-21
ET-MOANRD-14032-GO-RFB /Procurement of Stationery for theuse of federal, regional andworedas DRDIP Office
IDA / 58320 Project Management, andMonitoring and Evaluation Post Request for
Quotations Limited
Single Stage - OneEnvelope 15,000.00 0.00 Pending
Implementation 2017-05-09 2017-05-14 2017-06-25 2017-07-25 2017-08-29 2018-02-25
ET-MOANRD-15380-GO-RFB /procurement of furniture forfederal, region, and woredaDRDIP office
IDA / 58320 Project Management, andMonitoring and Evaluation Post Request for Bids Open - National
Single Stage - OneEnvelope 150,000.00 0.00 Pending
Implementation 2017-05-06 2017-05-11 2017-06-22 2017-07-22 2017-08-26 2018-02-22
ET-MOANRD-15385-GO-RFQ /Procurement of Office Suppliesfor the use of Federal, Regionsand woredas office of DRDIP
IDA / 58320 Project Management, andMonitoring and Evaluation Post Request for
Quotations Limited
Single Stage - OneEnvelope 14,000.00 0.00 Pending
Implementation 2017-05-22 2017-07-17 2018-01-13
UG-OPM-22297-GO-RFQ /Installation of Air conditioners atthe DRDIP Kampala office
IDA / 58210 Project Management, andMonitoring and Evaluation Post Request for
Quotations Limited
Single Stage - OneEnvelope 19,178.00 12,369.46 Completed 2017-10-28 2018-02-02 2017-12-23 2018-04-06 2018-06-21 2018-04-28
UG-OPM-22304-GO-RFQ /Installation of Window Blinds atthe Kampala offices
IDA / 58210 Project Management, andMonitoring and Evaluation Post Request for
Quotations Limited
Single Stage - OneEnvelope 2,740.00 2,567.46 Completed 2017-10-28 2018-02-02 2017-12-23 2018-03-09 2018-06-21 2018-05-21
UG-OPM-22312-GO-DIR /Assorted office stationery andother office consumables
IDA / 58210 Project Management, andMonitoring and Evaluation Post Request for
Quotations Limited
Single Stage - OneEnvelope 19,178.00 0.00 Pending
Implementation 2017-11-05 2017-12-31 2018-06-29
Page 4
COMP1/F2/2017 / achat deMatériels informatique pour leslycées bénéficiaires pour lecompte de l'EducationInformatique
IDA / 58330 Social and Economic Servicesand Infrastructure Post Request for
Quotations Limited
Single Stage - OneEnvelope 30,000.00 0.00 Pending
Implementation 2017-10-07 2017-12-02 2018-05-31
COMP1/F4/2017 / equipementsmédicaux et Mobiliers pourObock,Ali Addé et Hol Hol
IDA / 58330 Social and Economic Servicesand Infrastructure Prior Direct Selection Direct
1,305,900.00 0.00 Under
Implementation 2017-10-20 2018-05-31 2017-10-20 2017-12-01 2018-05-30
COMP1/F5/2017 / Foyersaméliorés pour les 2000ménages Obock, 4000 ménagesAli-addé et 1200 ménages Holl-Holl
IDA / 58330 Social and Economic Servicesand Infrastructure Post Request for
Quotations Limited
Single Stage - OneEnvelope 182,211.00 0.00 Pending
Implementation 2017-10-27 2017-12-22 2018-06-20
COMP2/F2/2017 / achat dematériels pour périmetresexistants d'où motopompes,brouettes... pour Obock
IDA / 58330 Social and Economic Servicesand Infrastructure Post Request for Bids Open - National
Single Stage - OneEnvelope 166,667.00 0.00 Pending
Implementation 2017-10-05 2017-10-12 2017-11-23 2017-12-23 2018-01-27 2018-07-26
COMP4/F1/2017 / acquisitiond'une pick up et de 2 voitures4X4. HARD TOP
IDA / 58330 Social and Economic Servicesand Infrastructure Post Request for Bids Open - National
Single Stage - OneEnvelope 124,213.00 0.00 Pending
Implementation 2017-10-02 2017-10-09 2017-11-20 2017-12-20 2018-01-24 2018-07-23
COMP4/F2/2017 / acquisition detablettes pour l'enquete
IDA / 58330 Social and Economic Servicesand Infrastructure Post Request for
Quotations Limited
Single Stage - OneEnvelope 30,000.00 0.00 Pending
Implementation 2017-10-09 2017-12-04 2018-06-02
COMP4/F4/2017 / acquisition d'équipement pour le centre deformation de l'ONARS
IDA / 58330 Social and Economic Servicesand Infrastructure Post Request for Bids Open - National
Single Stage - OneEnvelope 84,507.00 0.00 Pending
Implementation 2017-10-03 2017-10-10 2017-11-21 2017-12-21 2018-01-25 2018-07-24
UG-OPM-22310-GO-RFQ /Procurement of Assorted OfficeFurniture (1.No. ConferenceTable plus 26 Visitors Chairs, 13No.Office Desks, 13 No. OfficeChairs, 26 No. Visitors chairs,2No Sofa Sets, 2No. Coffee set,1No. Round Table, 1No.Reception/ Front Desk Unit, 1No.Paper trim
IDA / 58210 Project Management, andMonitoring and Evaluation Post Request for
Quotations Limited
Single Stage - OneEnvelope 73,973.00 33,021.06 Completed 2017-10-25 2017-11-21 2017-12-20 2018-02-28 2018-06-18 2018-05-21
UG-OPM-29346-GO-RFB /Procurement of Motorvehicles(Lot 1: 1 No Station Wagon TypeA (Not exceeding 3000cc),Station Wagon Type B (Notexceeding 2800cc), Lot 2: 15 NoDouble Cabin Pickups, Lot 3: 17No Motorcycles)
IDA / 58210 Project Management, andMonitoring and Evaluation Prior Request for Bids Open - National
Single Stage - OneEnvelope 1,064,600.00 0.00 Canceled 2017-11-24 2017-11-29 2018-01-10 2018-02-09 2018-03-16 2018-09-12
COMP1/F3/2017 / achat deMatériels de SVT et Physiquepour le Ministère de l'EducatioonNationale
IDA / 58330 Social and Economic Servicesand Infrastructure Post Request for Bids Open - National
Single Stage - OneEnvelope 135,201.00 0.00 Pending
Implementation 2017-10-31 2017-11-05 2017-12-05 2018-01-04 2018-02-08 2018-04-09
COMP2/F3/2017 / achat dematériels pour périmetresexistants d'où motopompes,brouettes... pour Ali Addé etHolHol
IDA / 58330 Social and Economic Servicesand Infrastructure Post Request for Bids Open - International
Single Stage - OneEnvelope 333,334.00 0.00 Pending
Implementation 2017-10-31 2017-11-07 2017-12-19 2018-01-18 2018-02-22 2018-06-22
COMP3/F1BIS/2017 /Acquisition de kits culinairespour les GEA
IDA / 58330 Social and Economic Servicesand Infrastructure Post Request for
Quotations Limited
Single Stage - OneEnvelope 20,000.00 0.00 Pending
Implementation 2017-11-05 2017-12-31 2018-01-20
ET-TDRDIP-36769-GO-RFQ / ITEquipment and Accessories forRegional Project C ordinationUnit : ( Lap Top ,Desk top ,Printer ,External hard disk , WiFi modem set , ADSL internetline set , 3G Modem Device ...)
IDA / 58320 Project Management, andMonitoring and Evaluation Post Request for
Quotations Limited
Single Stage - OneEnvelope 2,615.00 0.00 Under
Implementation 2018-01-20 2018-01-26 2018-03-06 2018-04-05
ET-ADRDP-36839-GO-RFQ /energy saving stoves for aysaitaworeda
IDA / 58320 Sustainable EnvironmentalManagement Post Request for
Quotations Limited
Single Stage - OneEnvelope 5,237.00 0.00 Pending
Implementation 2018-01-15 2018-03-12 2018-05-11
ET-ADRDP-36920-GO-RFQ /purchasing fodder grindingmachine for aysaita wored atregional level
IDA / 58320 Livelihoods Program Post Request forQuotations Limited
Single Stage - OneEnvelope 30,500.00 0.00 Pending
Implementation 2018-08-27 2018-10-22 2019-04-20
ET-ADRDP-36926-GO-RFQ /Purchasing of seeds for nurserysite for aysaita woreda at region
IDA / 58320 Livelihoods Program Post Request forQuotations Limited
Single Stage - OneEnvelope 4,300.00 0.00 Pending
Implementation 2018-03-09 2018-05-04 2018-07-03
ET-ADRDP-36932-GO-RFQ /Surface pump for small scaleirrigation for aysaita woreda atregional level
IDA / 58320 Sustainable EnvironmentalManagement Post Request for
Quotations Limited
Single Stage - OneEnvelope 87,000.00 0.00 Pending
Implementation 2018-03-09 2018-05-04 2018-10-31
ET-ADRDP-36936-GO-RFQ /Purchasing of FTC equipment forAysaita wored at regional level
IDA / 58320 Livelihoods Program Post Request forQuotations Limited
Single Stage - OneEnvelope 11,090.00 0.00 Pending
Implementation 2018-03-09 2018-05-04 2018-10-31
ET-SDRDIP-37064-GO-RFQ / ITEquipment ( inawbare,k/bayah,boqolmayo anddollo ado woredas) at regionallevel
IDA / 58320 Social and Economic Servicesand Infrastructure Post Request for
Quotations Limited
Single Stage - OneEnvelope 49,000.00 0.00 Pending
Implementation 2017-12-06 2018-01-31 2018-07-30
ET-SDRDIP-37075-GO-RFQ /tridle pumps for irrigation(WaterPumps) ( in awbare,k/bayah,dollo-ado woredas) At regionallevel
IDA / 58320 Sustainable EnvironmentalManagement Post Request for
Quotations Limited
Single Stage - OneEnvelope 27,500.00 0.00 Pending
Implementation 2018-03-06 2018-05-01 2018-10-28
ET-SDRDIP-37090-GO-RFQ /Artificial Insemination( in awbareand k/bayah woredas) Atregional level
IDA / 58320 Livelihoods Program Post Request forQuotations Limited
Single Stage - OneEnvelope 53,000.00 0.00 Pending
Implementation 2018-03-28 2018-05-23 2018-11-19
Page 5
ET-TDRDIP-37741-GO-RFQ /Stationary materials, OfficeEquipment's and other officeSupplies( Field Bag, Adding Machine, Telephonebox , Adapter/divider,Stapler,puncher, Computer Ink,Computer paper, Air fresher, soft....) for Asgede Tsmbla Woreda
IDA / 58320
Project Management, andMonitoring and EvaluationRegional Support forCoordination, Capacity andKnowledge
Post Request forQuotations Limited
Single Stage - OneEnvelope 3,466.00 0.00 Pending
Implementation 2017-12-22 2018-02-05 2018-03-07
ET-TDRDIP-37759-GO-RFQ /Office Furniture's( Shelf, Desk,Chair, Table, Filing Cabinets,Computer Stand,...) forAsgedeTsmbla Woreda
IDA / 58320
Livelihoods ProgramRegional Support forCoordination, Capacity andKnowledgeProject Management, andMonitoring and Evaluation
Post Request forQuotations Limited
Single Stage - OneEnvelope 21,084.00 0.00 Pending
Implementation 2017-12-22 2018-02-10 2018-03-22
ET-TDRDIP-37766-GO-RFQ /Procurement of AudiovisualEquipment's( Digital camera,DVD, GPS) for Asgede TsmblaWoreda
IDA / 58320
Livelihoods ProgramRegional Support forCoordination, Capacity andKnowledgeProject Management, andMonitoring and Evaluation
Post Request forQuotations Limited
Single Stage - OneEnvelope 1,618.00 0.00 Pending
Implementation 2017-12-15 2018-01-30 2018-03-31
ET-TDRDIP-37770-GO-RFQ /Tools for Soil and WaterConservation and NurseryMaterials( Gabion, shovel,hammer, watering cane,measuring tape, ....) for TselemtiWoreda
IDA / 58320 Sustainable EnvironmentalManagement Post Request for
Quotations Limited
Single Stage - OneEnvelope 8,946.00 0.00 Pending
Implementation 2017-12-08 2018-01-14 2018-02-13
ET-TDRDIP-37771-GO-RFQ /Purchase of Nursery and Forestseeds and seedlings for TselemtiWoreda
IDA / 58320 Sustainable EnvironmentalManagement Post Request for
Quotations Limited
Single Stage - OneEnvelope 4,636.00 0.00 Pending
Implementation 2018-01-03 2018-01-31 2018-05-01
ET-TDRDIP-37774-GO-RFQ /Procurement of motor pump fordemonstration for AsgedeTsmbla Woreda
IDA / 58320 Sustainable EnvironmentalManagement Post Request for
Quotations Limited
Single Stage - OneEnvelope 8,000.00 0.00 Pending
Implementation 2018-02-09 2018-03-31 2018-05-30
ET-TDRDIP-37775-GO-RFQ /Energy Saving Technologies forDemonstration (wood / Energy/saving stoves,Solar energy panels forInstitution,Solar Light for Home)for Asgedetsmbla Woreda
IDA / 58320 Sustainable EnvironmentalManagement Post Request for
Quotations Limited
Single Stage - OneEnvelope 16,928.00 0.00 Pending
Implementation 2017-12-30 2018-02-24 2018-04-25
ET-TDRDIP-37915-GO-RFQ /Rehabilitating Animal vet clinicwith Equipment's for AsgedeTsmbla woreda(Electricalsterilizer of 2 litres,Burdizo forlarge animals,Ice box of 10litres,complete surgical kit....)
,
IDA / 58320 Livelihoods Program Post Request forQuotations Limited
Single Stage - OneEnvelope 3,273.00 0.00 Pending
Implementation 2017-12-29 2018-02-04 2018-04-05
ET-TDRDIP-37916-GO-RFQ /Rehabilitate ArtificialInsemination Center withEquipment's (Funnellarge,Binocular microscope ,Mother container 36 L.....)forAsgedeTsmbla Woreda
IDA / 58320 Livelihoods Program Post Request forQuotations Limited
Single Stage - OneEnvelope 3,636.00 0.00 Pending
Implementation 2017-12-29 2018-02-04 2018-04-05
ET-DRDIP-38273-GO-RFQ /Procurement of file cabinet forBambasi ( 16), Maokoma ( 22)and Homosha woreda ( 26) atRegional Level total of 64 filecabinet
IDA / 58320 Livelihoods Program Post Request forQuotations Limited
Single Stage - OneEnvelope 7,200.00 0.00 Pending
Implementation 2018-01-20 2018-03-17 2018-04-16
UG-OPM-39369-GO-RFB /Procurement of Assorted Motorvehicles - 6 Double cabins, 1station wagon and 23motorcycles for field operations
IDA / 58210 Project Management, andMonitoring and Evaluation Post Request for Bids Open - National
Single Stage - OneEnvelope 1,008,705.00 0.00 Under
Implementation 2018-02-02 2018-01-18 2018-02-07 2018-03-21 2018-04-20 2018-05-25 2018-07-09
ET-ADRDP-40055-GO-RFQ /furnitures for aysaita woredasuch as(chairs, table, shelf,gustchair)
IDA / 58320 Social and Economic Servicesand Infrastructure Post Request for
Quotations Limited
Single Stage - OneEnvelope 6,646.00 0.00 Pending
Implementation 2018-01-13 2018-03-10 2018-09-06
ET-ADRDP-40615-GO-RFQ /Vehicle Parts and Accessories: (Tyre, Tire, inner tube oil filter etc.....)
IDA / 58320Regional Support forCoordination, Capacity andKnowledge
Post Request forQuotations Limited
Single Stage - OneEnvelope 10,000.00 0.00 Under
Implementation 2018-01-13 2018-03-10 2018-09-06
ET-TDRDIP-41113-GO-RFQ /Energy Saving Technologies forDemonstration( Solar energypanels for Institution, wood /Energy/saving stoves, SolarLight for Home ) for TahtayAdyabo Woreda
IDA / 58320 Sustainable EnvironmentalManagement Post Request for
Quotations Limited
Single Stage - OneEnvelope 15,332.00 0.00 Pending
Implementation 2018-01-20 2018-03-09 2018-04-23
ET-TDRDIP-41115-GO-RFQ /Energy Saving Technologies forDemonstration ( Solar energypanels for Institution , SolarLight for Home , wood /Energy/saving stoves ) forTselemti Woreda
IDA / 58320 Sustainable EnvironmentalManagement Post Request for
Quotations Limited
Single Stage - OneEnvelope 14,337.00 0.00 Pending
Implementation 2018-01-20 2018-03-02 2018-04-16
ET-TDRDIP-41120-GO-RFQ / ITEquipment's and Accessories forAsgede TsmblaWoreda(Laptop,D-Link, Desktop,External Hard disk....)
IDA / 58320
Livelihoods ProgramRegional Support forCoordination, Capacity andKnowledgeProject Management, andMonitoring and Evaluation
Post Request forQuotations Limited
Single Stage - OneEnvelope 17,916.00 0.00 Pending
Implementation 2018-01-20 2018-03-17 2018-05-01
ET-TDRDIP-41123-GO-RFQ / ITEquipment's with Accessories forTselemti Woreda( Desktopcomputer, Laptop computer...)
IDA / 58320
Livelihoods ProgramRegional Support forCoordination, Capacity andKnowledgeProject Management, andMonitoring and Evaluation
Post Request forQuotations Limited
Single Stage - OneEnvelope 27,782.00 0.00 Pending
Implementation 2018-01-20 2018-03-07 2018-04-21
Page 6
ET-TDRDIP-41125-GO-RFQ / ITEquipment's with accessories forTahtay Adyabo Woreda( Desktop computer, LaptopComputers, ........)
IDA / 58320
Livelihoods ProgramRegional Support forCoordination, Capacity andKnowledgeProject Management, andMonitoring and Evaluation
Post Request forQuotations Limited
Single Stage - OneEnvelope 32,091.00 0.00 Pending
Implementation 2018-01-20 2018-03-06 2018-04-20
ET-TDRDIP-41130-GO-RFQ /Procurement of Motor Pumps forIrrigation for Demonstration forTselemti Woreda
IDA / 58320 Sustainable EnvironmentalManagement Post Request for
Quotations Limited
Single Stage - OneEnvelope 7,273.00 0.00 Pending
Implementation 2018-01-20 2018-03-17 2018-05-01
ET-TDRDIP-41132-GO-RFQ /Procurement of Motor Pumps forIrrigation for Tahtay AdyaboWoreda for Demonstration
IDA / 58320 Sustainable EnvironmentalManagement Post Request for
Quotations Limited
Single Stage - OneEnvelope 13,091.00 0.00 Pending
Implementation 2018-01-20 2018-03-17 2018-05-01
ET-TDRDIP-41160-GO-RFQ /Procurement of Nursery, Forestseeds and Seedlings for TahtayAdyabo Woreda
IDA / 58320 Sustainable EnvironmentalManagement Post Request for
Quotations Limited
Single Stage - OneEnvelope 1,273.00 0.00 Pending
Implementation 2017-12-31 2018-01-31 2018-05-01
ET-TDRDIP-41168-GO-RFQ /Procurement of soil and waterconservation, Nursery tools andmaterials
IDA / 58320 Sustainable EnvironmentalManagement Post Request for
Quotations Limited
Single Stage - OneEnvelope 5,088.00 0.00 Pending
Implementation 2017-12-31 2018-02-03 2018-03-05
ET-TDRDIP-41172-GO-RFQ /Procurement of tools andmaterials for soil and waterconservation and Nursery forTahtay Adyabo Woreda
IDA / 58320 Sustainable EnvironmentalManagement Post Request for
Quotations Limited
Single Stage - OneEnvelope 5,851.00 0.00 Pending
Implementation 2017-12-31 2018-02-03 2018-03-05
ET-TDRDIP-41177-GO-RFQ /Audiovisual Equipment's( Digitalcamera,GPS,microphone..) forTselemti Woreda
IDA / 58320
Livelihoods ProgramRegional Support forCoordination, Capacity andKnowledgeProject Management, andMonitoring and Evaluation
Post Request forQuotations Limited
Single Stage - OneEnvelope 2,491.00 0.00 Pending
Implementation 2017-12-31 2018-02-25 2018-04-11
ET-TDRDIP-41180-GO-RFQ /Audiovisual Equipment's( DigitalCamera,GPS..) for TahtayAdyabo Woreda
IDA / 58320
Livelihoods ProgramRegional Support forCoordination, Capacity andKnowledgeProject Management, andMonitoring and Evaluation
Post Request forQuotations Limited
Single Stage - OneEnvelope 1,855.00 0.00 Pending
Implementation 2017-12-31 2018-02-25 2018-04-11
ET-TDRDIP-41189-GO-RFQ /Metro-logical Equipment's( DigitalThermometer, Rain Gage..) forTahtay Adyabo Woreda
IDA / 58320 Livelihoods Program Post Request forQuotations Limited
Single Stage - OneEnvelope 56.00 0.00 Pending
Implementation 2017-12-31 2018-02-25 2018-04-11
ET-TDRDIP-41191-GO-RFQ /Purchase of Generator forTselemti Woreda
IDA / 58320Regional Support forCoordination, Capacity andKnowledge
Post Request forQuotations Limited
Single Stage - OneEnvelope 727.00 0.00 Pending
Implementation 2017-12-31 2018-02-25 2018-04-11
ET-TDRDIP-41196-GO-RFQ /Procurement of Office Furniture'sfor Tselemti Woreda(Metallic Filecabinet , Table, Computer Stand, Shelf, Guest Chaire....)
IDA / 58320
Livelihoods ProgramRegional Support forCoordination, Capacity andKnowledgeProject Management, andMonitoring and Evaluation
Post Request forQuotations Limited
Single Stage - OneEnvelope 18,371.00 0.00 Pending
Implementation 2017-12-31 2018-02-06 2018-03-23
ET-TDRDIP-41202-GO-RFQ /Procurement of Office Furniture'sfor Tahtay AdyaboWoreda(Wood shelf ,Chair, Shelf, Metallic FileRabinate, Black Board...)
IDA / 58320
Livelihoods ProgramRegional Support forCoordination, Capacity andKnowledgeProject Management, andMonitoring and Evaluation
Post Request forQuotations Limited
Single Stage - OneEnvelope 14,980.00 0.00 Pending
Implementation 2017-12-31 2018-02-10 2018-03-27
ET-TDRDIP-41209-GO-RFQ /Purchase of Stationary , OfficeEquipment's and other suppliesfor Tselemti Woreda( computerpepper,computer inks, pen,stapler, Field bag,FleshMemory,Air fresh.....)
IDA / 58320
Project Management, andMonitoring and EvaluationRegional Support forCoordination, Capacity andKnowledge
Post Request forQuotations Limited
Single Stage - OneEnvelope 10,779.00 0.00 Pending
Implementation 2017-12-31 2018-02-10 2018-03-27
ET-TDRDIP-41216-GO-RFQ /Purchase of Stationary, Otheroffice Equipment's and Suppliesfor Tahtay AdyaboWoreda(telephone box , FlashMemory, computer inks, FieldBags, Divider, Computerpepper,Sizer, Charts....)
IDA / 58320
Project Management, andMonitoring and EvaluationRegional Support forCoordination, Capacity andKnowledge
Post Request forQuotations Limited
Single Stage - OneEnvelope 2,766.00 0.00 Pending
Implementation 2017-12-31 2018-02-10 2018-03-27
ET-TDRDIP-41232-GO-RFQ /Audiovisual Equipment's forRegional Project CoordinationUnit( Digital Camera, GPS..)
IDA / 58320 Project Management, andMonitoring and Evaluation Post Request for
Quotations Limited
Single Stage - OneEnvelope 3,665.00 0.00 Pending
Implementation 2017-12-31 2018-02-06 2018-03-23
ET-TDRDIP-41235-GO-RFQ /Procurement of Office Furniture's(File Cabinet, Computer Stand...)for Regional Project Coordinationunit.
IDA / 58320 Project Management, andMonitoring and Evaluation Post Request for
Quotations Limited
Single Stage - OneEnvelope 1,505.00 0.00 Pending
Implementation 2018-01-06 2018-02-12 2018-03-14
ET-TDRDIP-41238-GO-RFQ /Procurement of Stationarymaterials, Other officeEquipment's and Supplie forRegional Coordination Unit
IDA / 58320 Project Management, andMonitoring and Evaluation Post Request for
Quotations Limited
Single Stage - OneEnvelope 3,667.00 0.00 Pending
Implementation 2018-01-06 2018-02-12 2018-03-29
ET-TDRDIP-41263-GO-RFQ /Vehicle & Motorcycle SpareParts and Accessories : ( Spare,Tyre, , inner tube .....) forRegional Coordination unit
IDA / 58320 Project Management, andMonitoring and Evaluation Post Request for
Quotations Limited
Single Stage - OneEnvelope 4,604.00 0.00 Pending
Implementation 2018-01-06 2018-02-12 2018-03-29
ET-TDRDIP-41267-GO-RFQ /Vehicle & Motorcycle SpareParts and Accessories : ( Spare,Tire, inner tube etc .....) forAsgede Tsmbla Woreda
IDA / 58320 Project Management, andMonitoring and Evaluation Post Request for
Quotations Limited
Single Stage - OneEnvelope 2,218.00 0.00 Pending
Implementation 2018-01-06 2018-02-12 2018-03-29
ET-TDRDIP-41270-GO-RFQ /Vehicle & Motorcycle SpareParts and Accessories : ( Spare,Tyre, Tire, inner tube etc .....) forTselemti Woreda
IDA / 58320 Project Management, andMonitoring and Evaluation Post Request for
Quotations Limited
Single Stage - OneEnvelope 2,218.00 0.00 Pending
Implementation 2017-12-31 2018-02-06 2018-03-08
Page 7
ET-TDRDIP-41272-GO-RFQ /Vehicle & Motorcycle SpareParts and Accessories : ( Spare,Tyre, , inner tube etc .....) forTahtay Adyabo Woreda
IDA / 58320 Project Management, andMonitoring and Evaluation Post Request for
Quotations Limited
Single Stage - OneEnvelope 2,218.00 0.00 Pending
Implementation 2017-12-31 2018-02-25 2018-04-11
ET-TDRDIP-41280-GO-RFQ /Rehabilitating Animal vet clinicwith Equipment's for TselemtiWoreda(microscope,largecontainer,....)
IDA / 58320 Livelihoods Program Post Request forQuotations Limited
Single Stage - OneEnvelope 3,637.00 0.00 Pending
Implementation 2017-12-31 2018-02-25 2018-04-26
ET-TDRDIP-41283-GO-RFQ /Rehabilitate ArtificialInsemination Center withEquipment's for TselemtiWoreda(EAI bag,fanal nitrogenliquid , Lezer jaket for EAItechnicans....)
IDA / 58320 Livelihoods Program Post Request forQuotations Limited
Single Stage - OneEnvelope 5,090.00 0.00 Pending
Implementation 2017-12-31 2018-02-25 2018-04-26
ET-TDRDIP-41285-GO-RFQ /Rehabilitate ArtificialInsemination Center withEquipment's for Tahtay Adyabo
IDA / 58320 Livelihoods Program Post Request forQuotations Limited
Single Stage - OneEnvelope 2,885.00 0.00 Pending
Implementation 2017-12-31 2018-02-25 2018-04-26
ET-TDRDIP-41296-GO-RFQ /Procurement of LivestockProduction for TselemtiWoreda(poultry , milk cow, goatfor rearing, bee hive, Oxen forfattening....)
IDA / 58320 Livelihoods Program Post Request forQuotations Limited
Single Stage - OneEnvelope 17,855.00 0.00 Pending
Implementation 2018-01-06 2018-03-03 2018-04-17
ET-TDRDIP-41298-GO-RFQ /Livestock Production forDemonstration for Tahtay AdyaboWoreda(Diary(heifer,),Fattening,Poultry...)
IDA / 58320 Livelihoods Program Post Request forQuotations Limited
Single Stage - OneEnvelope 1,755.00 0.00 Pending
Implementation 2018-01-06 2018-03-03 2018-04-17
ET-TDRDIP-41313-GO-RFQ /Purchase of Agricultural inputson FTCs/PTCs for Demonstrationfor Asgede Tsmbla Woreda(Improved seeds, Fertilizers,Furska, Fruskelo...)
IDA / 58320 Livelihoods Program Post Request forQuotations Limited
Single Stage - OneEnvelope 5,745.00 0.00 Canceled 2018-02-05 2018-03-14 2018-04-13
ET-TDRDIP-41314-GO-RFQ /Purchasing of Agricultural Inputson FTCs and PTCs forDemonstration for TselemtiWoreda(Fertilizer, Improvedseeds, Fruska,fruskelo..)
IDA / 58320 Livelihoods Program Post Request forQuotations Limited
Single Stage - OneEnvelope 8,173.00 0.00 Canceled 2018-02-05 2018-03-14 2018-04-13
ET-TDRDIP-41315-GO-RFQ /Purchase of Agricultural Inputsfor Demonstration on FTCs andPTCs for demonstration forTahtay Adyabo Woreda(Improvedseed, Fertlizers, AnimalFeeds.....)
IDA / 58320 Livelihoods Program Post Request forQuotations Limited
Single Stage - OneEnvelope 4,820.00 0.00 Canceled 2018-02-05 2018-03-14 2018-04-13
ET-DRDIP-42019-GO-RFQ /office equipment and other officesupplies Bambasi woreda
IDA / 58320 Project Management, andMonitoring and Evaluation Post Request for
Quotations Limited
Single Stage - OneEnvelope 923.00 0.00 Pending
Implementation 2018-01-15 2018-03-12 2018-04-16
ET-DRDIP-42022-GO-RFQ /procurement of office equipmentand other office supplies forHomosha woreda
IDA / 58320Regional Support forCoordination, Capacity andKnowledge
Post Request forQuotations Limited
Single Stage - OneEnvelope 848.00 0.00 Pending
Implementation 2018-01-18 2018-03-15 2018-04-14
ET-DRDIP-42025-GO-RFQ /procurement of office equipmentand other office supplies forMaokomo woreda
IDA / 58320 Project Management, andMonitoring and Evaluation Post Request for
Quotations Limited
Single Stage - OneEnvelope 912.00 0.00 Pending
Implementation 2018-01-15 2018-03-12 2018-04-16
ET-DRDIP-42049-GO-RFQ /procurement of Stationary itemsfor regional unit
IDA / 58320 Project Management, andMonitoring and Evaluation Post Request for
Quotations Limited
Single Stage - OneEnvelope 6,385.00 0.00 Pending
Implementation 2018-01-10 2018-03-07 2018-03-27
ET-DRDIP-42062-GO-RFQ /procurement of stationary itemsfor Homosha woreda
IDA / 58320 Project Management, andMonitoring and Evaluation Post Request for
Quotations Limited
Single Stage - OneEnvelope 3,435.00 0.00 Pending
Implementation 2018-01-15 2018-03-12 2018-04-01
ET-DRDIP-42065-GO-RFQ /procurement of stationary forBambasi woreda
IDA / 58320 Project Management, andMonitoring and Evaluation Post Request for
Quotations Limited
Single Stage - OneEnvelope 3,219.00 0.00 Pending
Implementation 2018-01-15 2018-03-12 2018-04-16
ET-DRDIP-42069-GO-RFQ /procurement of stationary forMao and Komo special woreda
IDA / 58320 Project Management, andMonitoring and Evaluation Post Request for
Quotations Limited
Single Stage - OneEnvelope 3,185.00 0.00 Pending
Implementation 2018-01-15 2018-03-12 2018-04-06
ET-DRDIP-42072-GO-RFQ /cleaning materials for RegionalUnits
IDA / 58320 Project Management, andMonitoring and Evaluation Post Request for
Quotations Limited
Single Stage - OneEnvelope 786.00 0.00 Pending
Implementation 2018-01-15 2018-03-12 2018-04-01
ET-DRDIP-42074-GO-RFQ /procurement of cleaningmaterials for Bambaso woreda
IDA / 58320 Project Management, andMonitoring and Evaluation Post Request for
Quotations Limited
Single Stage - OneEnvelope 526.00 0.00 Pending
Implementation 2018-01-15 2018-03-12 2018-04-01
ET-DRDIP-42076-GO-RFQ /procurement of cleaningmaterials for Mao komo specialworeda
IDA / 58320 Project Management, andMonitoring and Evaluation Post Request for
Quotations Limited
Single Stage - OneEnvelope 428.00 0.00 Pending
Implementation 2018-01-15 2018-03-12 2018-04-01
ET-DRDIP-42079-GO-RFQ /procurement of cleaningmaterials for Homosha woreda
IDA / 58320 Project Management, andMonitoring and Evaluation Post Request for
Quotations Limited
Single Stage - OneEnvelope 537.00 0.00 Pending
Implementation 2018-01-15 2018-03-12 2018-04-01
ET-DRDIP-42083-GO-RFQ /procurement of printing materialsand brochers for Regional Units
IDA / 58320 Project Management, andMonitoring and Evaluation Post Request for
Quotations Limited
Single Stage - OneEnvelope 1,756.00 0.00 Pending
Implementation 2018-01-25 2018-03-22 2018-04-11
ET-SDRDIP-42087-GO-RFQ /Support the supply of improvedCooking Stoves for promotionand demonstration (no 400)inawbare woreda
IDA / 58320 Sustainable EnvironmentalManagement Post Request for
Quotations Limited
Single Stage - OneEnvelope 14,077.00 0.00 Pending
Implementation 2018-01-31 2018-03-28 2018-09-24
ET-DRDIP-42110-GO-RFQ /procurement of Demonstration ofimproved technologies forBambasi worda
IDA / 58320 Sustainable EnvironmentalManagement Post Request for
Quotations Limited
Single Stage - OneEnvelope 15,516.00 0.00 Pending
Implementation 2018-01-15 2018-03-12 2018-04-01
Page 8
ET-DRDIP-42124-GO-RFQ /procurement ofdemonistrationimprovedtechnologies for Homoshworedas
IDA / 58320 Sustainable EnvironmentalManagement Post Request for
Quotations Limited
Single Stage - OneEnvelope 16,186.00 0.00 Pending
Implementation 2018-01-30 2018-03-27 2018-04-26
ET-DRDIP-42126-GO-RFQ /procurement of demonstrationtechnologies for Mao and komospecial woredas
IDA / 58320 Sustainable EnvironmentalManagement Post Request for
Quotations Limited
Single Stage - OneEnvelope 14,216.00 0.00 Pending
Implementation 2018-01-20 2018-03-17 2018-04-11
ET-SDRDIP-42127-GO-RFQ /Support the supply of improvedCooking Stoves for promotionand demonstration (no 240) inboqolmayo woreda
IDA / 58320 Sustainable EnvironmentalManagement Post Request for
Quotations Limited
Single Stage - OneEnvelope 8,446.00 0.00 Pending
Implementation 2018-02-26 2018-04-23 2018-10-20
ET-DRDIP-42128-GO-RFQ /procurement of vehicle spar partsfor Regional Unit
IDA / 58320 Project Management, andMonitoring and Evaluation Post Request for
Quotations Limited
Single Stage - OneEnvelope 7,654.00 0.00 Pending
Implementation 2018-01-15 2018-03-12 2018-04-11
ET-DRDIP-42132-GO-RFQ /procurement of vehicle spar partsfor bambasi woreda
IDA / 58320 Project Management, andMonitoring and Evaluation Post Request for
Quotations Limited
Single Stage - OneEnvelope 6,278.00 0.00 Pending
Implementation 2018-01-15 2018-03-12 2018-04-01
ET-DRDIP-42134-GO-RFQ /procurement of vehicle sparpartfor Homosha woreda
IDA / 58320 Project Management, andMonitoring and Evaluation Post Request for
Quotations Limited
Single Stage - OneEnvelope 4,567.00 0.00 Pending
Implementation 2018-01-29 2018-03-26 2018-04-25
ET-DRDIP-42135-GO-RFQ /procurement of vehicle sparpartfor Mao and komo specialworeda
IDA / 58320 Project Management, andMonitoring and Evaluation Post Request for
Quotations Limited
Single Stage - OneEnvelope 5,654.00 0.00 Pending
Implementation 2018-01-29 2018-03-26 2018-04-30
ET-SDRDIP-42133-GO-RFQ /Support Biogas Development fordemonstration( no 2) boqolmayoworeda
IDA / 58320 Sustainable EnvironmentalManagement Post Request for
Quotations Limited
Single Stage - OneEnvelope 9,455.00 0.00 Pending
Implementation 2018-03-05 2018-04-30 2018-10-27
ET-DRDIP-42248-GO-RFQ /procurement of one rope andwasher for demonstration forBambasi woreda
IDA / 58320 Sustainable EnvironmentalManagement Post Request for
Quotations Limited
Single Stage - OneEnvelope 654.00 0.00 Pending
Implementation 2018-01-30 2018-03-27 2018-04-28
ET-SDRDIP-42254-GO-RFQ /Support the supply of improvedCooking Stoves for promotionand demonstration( no 400) inDollo-ado woreda
IDA / 58320 Sustainable EnvironmentalManagement Post Request for
Quotations Limited
Single Stage - OneEnvelope 14,077.00 0.00 Pending
Implementation 2018-03-04 2018-04-29 2018-10-26
ET-DRDIP-42288-GO-RFQ /procurement of 42 treadle pumpfor demonstration for Mao andKomo special woreda
IDA / 58320 Sustainable EnvironmentalManagement Post Request for
Quotations Limited
Single Stage - OneEnvelope 7,172.00 0.00 Pending
Implementation 2018-01-22 2018-03-19 2018-04-15
ET-DRDIP-42290-GO-RFQ /procurement of one rope andwasher pump for demonstrationfor Mao and Komo specialworeda
IDA / 58320 Sustainable EnvironmentalManagement Post Request for
Quotations Limited
Single Stage - OneEnvelope 545.00 0.00 Pending
Implementation 2018-02-18 2018-04-15 2018-05-15
ET-SDRDIP-42332-GO-RFQ /Support the supply of improvedCooking Stoves for promotionand demonstration(no 200) ink/bayah woreda
IDA / 58320 Sustainable EnvironmentalManagement Post Request for
Quotations Limited
Single Stage - OneEnvelope 7,039.00 0.00 Pending
Implementation 2018-03-04 2018-04-29 2018-10-26
ET-ADRDP-42472-GO-RFQ /energy saving stoves for barahleworeda
IDA / 58320 Sustainable EnvironmentalManagement Post Request for
Quotations Limited
Single Stage - OneEnvelope 4,364.00 0.00 Pending
Implementation 2018-01-15 2018-03-12 2018-09-08
ET-ADRDP-42482-GO-RFQ /furniture for barahle woreda suchas(chair,table, gust chair andshelf)
IDA / 58320 Social and Economic Servicesand Infrastructure Post Request for
Quotations Limited
Single Stage - OneEnvelope 6,500.00 0.00 Under
Implementation 2018-01-10 2017-12-25 2018-03-07 2018-09-03
ET-ADRDP-42485-GO-RFQ / IT-Equipment's for barahle woredasuch as(desk top, lab top,printer)
IDA / 58320 Social and Economic Servicesand Infrastructure Post Request for
Quotations Limited
Single Stage - OneEnvelope 9,910.00 0.00 Under
Implementation 2018-01-10 2018-03-07 2018-09-03
ET-ADRDP-42493-GO-RFQ /Office stationery for barahlewoereda such as(printing papers,pen etc)
IDA / 58320 Project Management, andMonitoring and Evaluation Post Request for
Quotations Limited
Single Stage - OneEnvelope 1,164.00 0.00 Pending
Implementation 2018-01-15 2018-03-12 2018-09-08
ET-DRDIP-42136-GO-DIR /procurement of uniform for driversand safety shoes for CIFemployees for Regional staffsonly
IDA / 58320 Project Management, andMonitoring and Evaluation Post Request for
Quotations Limited
Single Stage - OneEnvelope 4,365.00 0.00 Pending
Implementation 2018-02-20 2018-04-17 2018-05-22
ET-DRDIP-42277-GO-RFQ /procurement of 89 motor pumpfor ( 13 for Homosha woreda ,60for Bambasi woreda and 16 forHomosha ) procured at Regionallevel
IDA / 58320 Sustainable EnvironmentalManagement Post Request for
Quotations Limited
Single Stage - OneEnvelope 97,090.00 0.00 Pending
Implementation 2018-02-11 2018-04-08 2018-05-28
ET-DRDIP-42282-GO-RFQ /procurement of 3 rope andwasher pump for Irrigation fordemonstration, 1for Homoshaworeda ,1 for Bambasi woredaand 1 for Mao Komo Specialworeda ) procured at RegionalLevel
IDA / 58320 Sustainable EnvironmentalManagement Post Request for
Quotations Limited
Single Stage - OneEnvelope 2,120.00 0.00 Pending
Implementation 2018-01-13 2018-03-10 2018-04-24
ET-DRDIP-42098-GO-RFQ /procurement of 1040 wood savingstoves ( 320 for Bambasi , 330for Homosha and 390 for Maoand Komo special woredaprocured at Regional Level
IDA / 58320 Sustainable EnvironmentalManagement Post Request for
Quotations Limited
Single Stage - OneEnvelope 17,698.00 0.00 Pending
Implementation 2018-01-30 2018-03-27 2018-05-01
ET-DRDIP-42103-GO-RFQ /procurement of 156 solar light (40 for Bambasi ,51 for Mao &komo and 65 for Homoshaworeda ) procured at RegionalLevel
IDA / 58320 Sustainable EnvironmentalManagement Post Request for
Quotations Limited
Single Stage - OneEnvelope 39,709.00 0.00 Pending
Implementation 2018-01-30 2018-03-27 2018-04-22
Page 9
ET-DRDIP-42106-GO-RFQ /procurement of 10 solar energypanel ( 3 for Bambasi woreda,3for Homosha woreda and 4 Maoand komo special woreda
IDA / 58320 Sustainable EnvironmentalManagement Post Request for
Quotations Limited
Single Stage - OneEnvelope 25,820.00 0.00 Pending
Implementation 2018-01-27 2018-03-24 2018-04-14
ET-DRDIP-42239-GO-RFQ /procurement of 115 treadlepump(43 for Homoshaworeda ,30for Bambasi woreda and 42 forMao Komo special woreda )atRegional Level
IDA / 58320 Sustainable EnvironmentalManagement Post Request for
Quotations Limited
Single Stage - OneEnvelope 33,454.00 0.00 Pending
Implementation 2018-02-25 2018-04-22 2018-06-01
UG-OPM-22084-GO-RFB /Procurement of ICT Hardware/Equipment (31 Laptops, 3Desktop Computers, 17 Smalland Medium Duty Photocopiers,2 Printers, 15 Scanners, 1Projector, 17 Internet Modems,29 computer Tablets)
IDA / 58210 Project Management, andMonitoring and Evaluation Post Request for Bids Open - National
Single Stage - OneEnvelope 170,693.00 161,492.06 Signed 2018-02-05 2018-02-12 2018-02-10 2018-07-12 2018-03-24 2018-03-12 2018-04-23 2018-03-23 2018-05-28 2018-06-13 2018-11-24
ET-ADRDP-42470-GO-RFQ /Solar lanterns and solar panel forbarahle woreda
IDA / 58320 Sustainable EnvironmentalManagement Post Request for
Quotations Limited
Single Stage - OneEnvelope 18,182.00 0.00 Under
Implementation 2018-01-15 2018-03-12 2018-09-08
ET-ADRDP-36833-GO-RFQ /solar lanterns and solar panel foraysaita woreda
IDA / 58320 Sustainable EnvironmentalManagement Post Request for
Quotations Limited
Single Stage - OneEnvelope 21,820.00 0.00 Pending
Implementation 2017-12-06 2018-01-31 2018-07-30
ET-ADRDP-36799-GO-RFQ / IT-equipment's for aysaitaworeda(desktop,laptop,printer)and one laptop computer for theregion
IDA / 58320 Project Management, andMonitoring and Evaluation Post Request for
Quotations Limited
Single Stage - OneEnvelope 10,900.00 0.00 Under
Implementation 2018-01-08 2018-03-05 2018-09-01
ET-ADRDP-36915-GO-RFQ /Electric transformer for foddergrinding machine for aysaitaworeda at regionit is considered as incomegenerating and the operating costwill be covered by the beneficiarybody
IDA / 58320 Livelihoods Program Post Request forQuotations Limited
Single Stage - OneEnvelope 21,500.00 0.00 Pending
Implementation 2018-05-29 2018-07-24 2018-10-22
ET-ADRDP-40433-GO-RFQ /office stationery for the regionand aysita woreda such as(paper, pen etc)
IDA / 58320 Project Management, andMonitoring and Evaluation Post Request for
Quotations Limited
Single Stage - OneEnvelope 4,200.00 0.00 Under
Implementation 2018-01-23 2018-02-05 2018-03-20 2018-09-16
ET-SDRDIP-37069-GO-RFQ /Office furniture ( inawbare,k/bayah,boqolmayo anddolo-ado woredas ) At regionallevel
IDA / 58320 Social and Economic Servicesand Infrastructure Post Request for
Quotations Limited
Single Stage - OneEnvelope 44,500.00 0.00 Under
Implementation 2017-12-06 2018-01-31 2018-07-30
ET-SDRDIP-42090-GO-RFQ /Supply of Solar energy panel forinstitutions ( n0 3) and SolarLighting for demonstration (20 perkebele ) in awbare woreda
IDA / 58320 Sustainable EnvironmentalManagement Post Request for
Quotations Limited
Single Stage - OneEnvelope 33,000.00 0.00 Pending
Implementation 2018-02-05 2018-04-02 2018-09-29
ET-SDRDIP-42092-GO-RFQ /Establishing and strengtheningHorticultural Nurseries(farmtools& planting material..) (no 2)in awbare woreda
IDA / 58320 Livelihoods Program Post Request forQuotations Limited
Single Stage - OneEnvelope 20,830.00 0.00 Pending
Implementation 2018-01-31 2018-03-28 2018-09-24
ET-SDRDIP-42130-GO-RFQ /Supply of Solar energy panel forinstitutions and Solar Lighting fordemonstration (20 per kebele)(no 100) (no 2) in boqolmayoworeda
IDA / 58320 Sustainable EnvironmentalManagement Post Request for
Quotations Limited
Single Stage - OneEnvelope 20,188.00 0.00 Pending
Implementation 2018-02-25 2018-04-22 2018-10-19
ET-SDRDIP-42223-GO-RFQ /Establishing and strengtheningHorticultural Nurseries( farmtools& planting material..) inboqolmayo woreda
IDA / 58320 Livelihoods Program Post Request forQuotations Limited
Single Stage - OneEnvelope 17,338.00 0.00 Pending
Implementation 2018-02-01 2018-03-29 2018-09-25
ET-SDRDIP-42335-GO-RFQ /Supply of Solar energy panel forinstitutions (no 2) and SolarLighting for demonstration (20 perkebele) (no 100) in k/bayahworeda
IDA / 58320 Sustainable EnvironmentalManagement Post Request for
Quotations Limited
Single Stage - OneEnvelope 17,490.00 0.00 Pending
Implementation 2018-03-02 2018-04-27 2018-10-24
ET-SDRDIP-42336-GO-RFQ /Support Biogas Development fordemonstration(biogas) (no 1) ink/bayah woreda
IDA / 58320 Sustainable EnvironmentalManagement Post Request for
Quotations Limited
Single Stage - OneEnvelope 4,728.00 0.00 Pending
Implementation 2018-02-05 2018-04-02 2018-09-29
ET-SDRDIP-42344-GO-RFQ /Establishing and strengtheningHorticultural Nurseries(farmtools& planting material (no 1) ink/bayah woreda
IDA / 58320 Sustainable EnvironmentalManagement Post Request for
Quotations Limited
Single Stage - OneEnvelope 12,159.00 0.00 Pending
Implementation 2018-01-29 2018-03-26 2018-09-22
ET-SDRDIP-42259-GO-RFQ /Supply of Solar energy panel forinstitutions( no 3) &Solar Lightingfor demonstration (20 per kebele)(no 200) in Dollo-ado woreda
IDA / 58320 Sustainable EnvironmentalManagement Post Request for
Quotations Limited
Single Stage - OneEnvelope 32,980.00 0.00 Pending
Implementation 2018-02-23 2018-04-20 2018-10-17
ET-SDRDIP-42262-GO-RFQ /Support Biogas Development fordemonstration(biogas) (no 2) inDollo-ado woreda
IDA / 58320 Sustainable EnvironmentalManagement Post Request for
Quotations Limited
Single Stage - OneEnvelope 9,455.00 0.00 Pending
Implementation 2018-02-26 2018-04-23 2018-10-20
COMP1/F2/2017 / achat deMatériels informatique pour leslycées bénéficiaires/ Education
IDA / 58330 Social and Economic Servicesand Infrastructure Post Request for Bids Open - National
Single Stage - OneEnvelope 135,000.00 0.00 Pending
Implementation 2018-03-15 2018-03-20 2018-05-01 2018-05-31 2018-07-05 2019-01-01
COMP3/F1/2017 / acquisition dematériels et consommables pourles groupements de femmes etjeunes
IDA / 58330 Social and Economic Servicesand Infrastructure Post Request for Bids Open - National
Single Stage - OneEnvelope 180,000.00 0.00 Pending
Implementation 2017-10-31 2017-11-05 2017-12-05 2018-01-04 2018-02-08 2018-04-09
COMP4/F3/2017 / acquisition delogiciel pour l'analyse desdonnées des enquetes
IDA / 58330 Social and Economic Servicesand Infrastructure Post Request for
Quotations Limited
Single Stage - OneEnvelope 25,000.00 0.00 Pending
Implementation 2017-11-17 2018-01-12 2018-07-11
Page 10
COMP1/F1/2017 / Equipementschauds et Froid pour les lycéstechniques d' Ali Sabieh etObock pour le Ministère de l'Education Nationale
IDA / 58330 Social and Economic Servicesand Infrastructure Post Request for Bids Open - International
Single Stage - OneEnvelope 428,391.00 0.00 Pending
Implementation 2017-10-05 2017-10-12 2017-11-23 2017-12-23 2018-01-27 2018-07-26
DJ-IGAD-55145-GO-RFQ /Procurement of GIS tools (AdobeCreative Crowd and GPSMAP64s (Handheld GPS Kits))
IDA / D1200Regional Support forCoordination, Capacity andKnowledge
Post Request forQuotations Limited
Single Stage - OneEnvelope 2,500.00 0.00 Pending
Implementation 2018-04-03 2018-05-29 2018-11-25
ET-TDRDIP-57977-GO-RFQ /Physical capacity building withoffice Furniture for MultipurposeCooperatives( F Iron shelf, safebox, Table,Rope chair....) forTahtay Adyabo Woreda
IDA / 58320 Livelihoods Program Post Request forQuotations Limited
Single Stage - OneEnvelope 6,546.00 0.00 Pending
Implementation 2018-04-25 2018-06-20 2018-12-17
ET-TDRDIP-57994-GO-RFQ /Purchase of Industrial MaterialsFOR maintenance of offices forMultipurpose Cooperatives inTahtay Adyabo Woreda( Cement,Iron Sheet, Iron Bar, Paintings,door...)
IDA / 58320 Livelihoods Program Post Request forQuotations Limited
Single Stage - OneEnvelope 8,364.00 0.00 Pending
Implementation 2018-04-25 2018-06-20 2018-12-17
ET-TDRDIP-58289-GO-RFQ /Physical Capacity Building ofMultipurpose Cooperatives byProviding Office Furniture's andEquipment's in Asgede- TsmblaWoreda( Shelf, Cash box,Tables...)
IDA / 58320 Livelihoods Program Post Request forQuotations Limited
Single Stage - OneEnvelope 10,352.72 0.00 Pending
Implementation 2018-04-25 2018-06-20 2018-12-17
ET-TDRDIP-58293-GO-RFQ /Physical Capacity building byProviding Industrial materials forMaintenance of office servicesfor Multipurpose Cooperatives inAsgede Tsmbla Woreda(Cement, Reinforcement bar, nail,nail, Eucalyptus tree,... )
IDA / 58320 Livelihoods Program Post Request forQuotations Limited
Single Stage - OneEnvelope 823.00 0.00 Pending
Implementation 2018-04-25 2018-06-20 2018-12-17
ET-TDRDIP-58299-GO-RFQ /Physical Capacity Building forMultipurpose Cooperatives byproviding Office Equipment's andIT materials for Asgede - TsmblaWoreda( Printers, Desktop,Photocopier ..)
IDA / 58320 Livelihoods Program Post Request forQuotations Limited
Single Stage - OneEnvelope 3,199.00 0.00 Pending
Implementation 2018-04-25 2018-06-20 2018-12-17
ET-TDRDIP-58312-GO-RFQ /Physical Capacity building ofMultipurpose Cooperatives byproviding Office furniture's inTselemti Woreda( Guest Chair,Table, Window gate......)
IDA / 58320 Livelihoods Program Post Request forQuotations Limited
Single Stage - OneEnvelope 1,011.00 0.00 Pending
Implementation 2018-04-25 2018-06-20 2018-12-17
ET-TDRDIP-58309-GO-RFQ /Physical Capacity Building byProviding Industrial materials forMaintenance of office buildingsof the Multipurpose Cooperativesin Tselemti Woreda( Cement,Ironsheet, Iron bar, nail.....)
IDA / 58320 Livelihoods Program Post Request forQuotations Limited
Single Stage - OneEnvelope 24,047.00 0.00 Pending
Implementation 2018-04-25 2018-06-20 2018-12-17
ET-TDRDIP-60345-GO-RFQ /physical capacity building ofMultipurpose cooperatives foroffice maintenance by providingLocal construction materials atTselemti Woreda( sand,Gravel......)
IDA / 58320 Livelihoods Program Prior Request forQuotations Limited
Single Stage - OneEnvelope 2,986.00 0.00 Pending
Implementation 2018-05-05 2018-06-30 2018-12-27
DJ-IGAD-55119-GO-DIR /Procurement of GIS Application (ArcGIS)
IDA / D1200Regional Support forCoordination, Capacity andKnowledge
Post Direct Selection Direct
20,000.00 0.00 PendingImplementation 2018-05-02 2018-05-07 2018-06-11 2018-12-08
ET-TDRDIP-64753-GO-DIR /Provision of Fuel woodEfficient/saving cooking stove OrEZY Stove for Demonstration atTselemti Woreda
IDA / 58320 Sustainable EnvironmentalManagement Post Direct Selection Direct
5,982.00 0.00 Pending
Implementation 2018-06-01 2018-06-06 2018-06-20 2018-06-30
ET-TDRDIP-64761-GO-DIR /Provision of fuel wood EfficientCooking Stove for Demonstrationfor Asgede Tsmbla Woreda
IDA / 58320 Sustainable EnvironmentalManagement Post Direct Selection Direct
3,196.00 0.00 Pending
Implementation 2018-06-01 2018-06-06 2018-06-20 2018-06-27
ET-TDRDIP-64765-GO-DIR /Provision of fuel wood efficientcooking Stove or EZY Stove forTahtay Adyabo Woreda forFarmers as DemonstrationPurpose
IDA / 58320 Sustainable EnvironmentalManagement Post Direct Selection Direct
3,128.00 0.00 Pending
Implementation 2018-06-01 2018-06-06 2018-06-20 2018-06-30
ET-TDRDIP-64770-GO-DIR /Provision of Agricultural Inputsfor Demonstration at FTCs andFarmers field for Tahtay AdyaboWoreda( Improved Seeds andFertilizer)
IDA / 58320 Livelihoods Program Post Direct Selection Direct
6,575.00 0.00 PendingImplementation 2018-06-01 2018-06-06 2018-06-20 2018-06-30
ET-TDRDIP-64777-GO-DIR /Provision of Agricultural inputs atFTCs and Farmers Field forAsgede Tsmbla Woreda forDemonstration Purpose(Improved Seeds and Fertilizer)
IDA / 58320 Livelihoods Program Post Direct Selection Direct
5,457.00 0.00 PendingImplementation 2018-06-01 2018-06-06 2018-06-20 2018-06-30
ET-TDRDIP-64781-GO-DIR /Provision of Agricultural Inputs atFTCs and Farmers Field forDemonstration at TselemtiWoreda ( improved seeds andFertilizers)
IDA / 58320 Livelihoods Program Post Direct Selection Direct
6,557.00 0.00 PendingImplementation 2018-06-01 2018-06-06 2018-06-20 2018-06-30
ET-TDRDIP-64816-GO-DIR /Purchase of Avocado Scion forDemonstration Purpose by theRegional Project Coordinationunit and to be distributed to theProject three Woreda SelectedBeneficiaries.
IDA / 58320 Livelihoods Program Post Direct Selection Direct
3,702.00 0.00 PendingImplementation 2018-06-01 2018-06-06 2018-06-20 2018-06-30
Page 11
ET-TDRDIP-64821-GO-DIR /Purchase of Forest Plantationseeds to support the governmentNurseries for Asgede TsmblaWoreda (Nim,Moringa,,Eucelapitose ......)
IDA / 58320 Sustainable EnvironmentalManagement Post Request for
Quotations Limited
Single Stage - OneEnvelope 1,820.00 0.00 Pending
Implementation 2018-06-05 2018-07-06 2018-07-21
ET-TDRDIP-64823-GO-RFQ /Procurement of Solar ForInstitutions for Demonstration inAsgede Tsmbla Woreda
IDA / 58320 Sustainable EnvironmentalManagement Post Request for
Quotations Limited
Single Stage - OneEnvelope 36,213.00 0.00 Pending
Implementation 2018-06-08 2018-08-03 2019-01-30
ET-GDRDIP-36803-GO-RFQ /GPS
IDA / 58320 Project Management, andMonitoring and Evaluation Post Request for
Quotations Limited
Single Stage - OneEnvelope 1,852.00 0.00 Pending
Implementation 2018-09-10 2018-11-05 2019-03-05
ET-GDRDIP-36909-GO-RFQ /Electronics (Scanner,HDCamera,Digital Camera)
IDA / 58320 Project Management, andMonitoring and Evaluation Post Request for
Quotations Limited
Single Stage - OneEnvelope 8,148.00 0.00 Pending
Implementation 2018-09-24 2018-11-19 2019-03-19
ET-GDRDIP-36810-GO-RFQ /Farm tools (farm tools, string,water level, )
IDA / 58320 Sustainable EnvironmentalManagement Post Request for
Quotations Limited
Single Stage - OneEnvelope 35,185.00 0.00 Pending
Implementation 2018-08-27 2018-10-22 2019-02-19
ET-GDRDIP-36817-GO-RFQ /Wood-Saving Cooking Stove
IDA / 58320 Sustainable EnvironmentalManagement Post Request for
Quotations Limited
Single Stage - OneEnvelope 30,074.00 0.00 Pending
Implementation 2018-09-16 2018-11-11 2019-03-11
ET-GDRDIP-42055-GO-RFQ /Digital Camera for Gog Woreda
IDA / 58210 Project Management, andMonitoring and Evaluation Post Request for
Quotations Limited
Single Stage - OneEnvelope 218.18 0.00 Pending
Implementation 2018-08-20 2018-10-15 2018-12-14
ET-GDRDIP-42059-GO-RFQ /Office furniture for DimmaWoreda
IDA / 58210 Project Management, andMonitoring and Evaluation Post Request for
Quotations Limited
Single Stage - OneEnvelope 2,196.00 0.00 Pending
Implementation 2018-09-02 2018-10-28 2019-04-26
ET-GDRDIP-36917-GO-RFQ /Dairy cow for Demonstration forItang Special Woreda
IDA / 58320 Livelihoods Program Post Request forQuotations Limited
Single Stage - OneEnvelope 2,963.00 0.00 Pending
Implementation 2018-08-19 2018-10-14 2019-02-11
ET-GDRDIP-36924-GO-RFQ /Poultry for demonstration forDimma Woreda
IDA / 58320 Livelihoods Program Post Request forQuotations Limited
Single Stage - OneEnvelope 740.75 0.00 Pending
Implementation 2018-09-23 2018-11-18 2019-03-18
ET-GDRDIP-42048-GO-RFQ /Poultry for demonstration forItang Special Woreda
IDA / 58320 Social and Economic Servicesand Infrastructure Post Request for
Quotations Limited
Single Stage - OneEnvelope 740.75 0.00 Pending
Implementation 2018-09-23 2018-11-18 2019-05-17
ET-GDRDIP-42084-GO-RFQ /Procurement of Solar light atregional level(Dimma, Gog,Gambella Zuria and Itang SpecialWored)
IDA / 58320Regional Support forCoordination, Capacity andKnowledge
Post Request forQuotations Limited
Single Stage - OneEnvelope 84,364.00 0.00 Pending
Implementation 2018-09-30 2018-11-25 2019-05-24
ET-GDRDIP-42005-GO-RFQ /Procurement of Solar Light for(Dimma,Gs=ambella Zuria,Gogand Itang Special) at Regionallevel
IDA / 58210 Project Management, andMonitoring and Evaluation Post Request for
Quotations Limited
Single Stage - OneEnvelope 85,924.00 0.00 Pending
Implementation 2018-08-27 2018-10-22 2019-04-20
ET-GDRDIP-42031-GO-RFQ /Poultry for demonstratin forGambella Zuria Woreda
IDA / 58320 Social and Economic Servicesand Infrastructure Post Request for
Quotations Limited
Single Stage - OneEnvelope 740.75 0.00 Pending
Implementation 2018-08-19 2018-10-14 2019-04-12
ET-GDRDIP-42028-GO-RFQ /Poultry for demonstration for GogWoreda
IDA / 58320Regional Support forCoordination, Capacity andKnowledge
Post Request forQuotations Limited
Single Stage - OneEnvelope 740.75 0.00 Pending
Implementation 2018-08-27 2018-10-22 2019-04-20
ET-GDRDIP-42057-GO-RFQ /Printer for Gog Woreda
IDA / 58210 Project Management, andMonitoring and Evaluation Post Request for
Quotations Limited
Single Stage - OneEnvelope 727.27 0.00 Pending
Implementation 2018-08-26 2018-10-21 2018-12-20
ET-GDRDIP-67530-GO-RFQ /Farmers Training Center (FTC)Equipment
IDA / 58320 Livelihoods Program Post Request for Bids Open - National
Single Stage - OneEnvelope 160,925.00 0.00 Pending
Implementation 2018-08-24 2018-08-29 2018-10-10 2018-11-09 2018-12-14 2019-06-12
ET-GDRDIP-67564-GO-RFQ /Procurement of cloth and Shoes
IDA / 58320 Livelihoods Program Post Request forQuotations Limited
Single Stage - OneEnvelope 3,710.00 0.00 Pending
Implementation 2018-08-27 2018-10-22 2019-04-20
ET-GDRDIP-67569-GO-RFQ /Procurement of stationery
IDA / 58210 Project Management, andMonitoring and Evaluation Post Request for
Quotations Limited
Single Stage - OneEnvelope 5,555.00 0.00 Pending
Implementation 2018-08-27 2018-10-22 2018-12-21
ET-GDRDIP-67573-GO-RFQ /Vehicles spare parts andmaintenance
IDA / 58320 Project Management, andMonitoring and Evaluation Post Request for
Quotations Limited
Single Stage - OneEnvelope 17,000.00 0.00 Pending
Implementation 2018-08-27 2018-10-22 2018-12-21
UG-OPM-72397-GO-RFQ /Purchase of 30 ElectronicTablets
IDA / 58210 Project Management, andMonitoring and Evaluation Post Request for
Quotations Limited
Single Stage - OneEnvelope 13,077.00 0.00 Pending
Implementation 2018-08-25 2018-10-20 2019-04-18
NON CONSULTING SERVICESActivity Reference No. /
Description Loan / Credit No. Component Review Type Method Market Approach ProcurementProcess
Prequalification(Y/N)
EstimatedAmount (US$)
Actual Amount(US$)
ProcessStatus
Draft Pre-qualificationDocuments
PrequalificationEvaluation Report
Draft Bidding Document/ Justification
Specific ProcurementNotice / Invitation
Bidding Documents asIssued
Proposal Submission /Opening / Minutes
Bid Evaluation Reportand Recommendation
for AwardSigned Contract Contract Completion
Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual
UG-OPM-22095-NC-DIR / LANset up/ extension to the DRDIPOffices
IDA / 58210 Project Management, andMonitoring and Evaluation Prior Direct Selection Direct
10,959.00 11,824.67 Signed 2017-08-21 2018-02-13 2017-08-26 2018-02-23 2017-09-30 2018-05-18 2018-03-29
UG-OPM-22307-NC-DIR /Procurement of Additional OfficeSpace for DRDIP TST at RuthTowers (One years Contract)
IDA / 58210 Project Management, andMonitoring and Evaluation Prior Direct Selection Direct
68,493.00 69,120.00 Completed 2017-08-14 2017-08-19 2017-10-30 2017-09-23 2018-01-23 2018-03-22 2018-02-27
UG-OPM-22306-NC-RFQ /Office Branding for the KampalaOffices
IDA / 58210 Project Management, andMonitoring and Evaluation Post Request for
Quotations Limited
Single Stage - OneEnvelope 548.00 0.00 Pending
Implementation 2017-10-28 2017-12-23 2018-06-21
UG-OPM-22104-NC-RFQ /PABX Upgrade/ extension to therefugees office
IDA / 58210 Project Management, andMonitoring and Evaluation Post Request for
Quotations Limited
Single Stage - OneEnvelope 13,699.00 0.00 Pending
Implementation 2017-10-28 2017-12-23 2018-06-21
UG-OPM-22287-NC-DIR /Development of a ProjectManagement Information System(MIS)
IDA / 58210 Project Management, andMonitoring and Evaluation Prior Direct Selection Direct
300,905.00 287,226.00 Signed 2017-12-08 2017-12-13 2018-02-06 2018-01-17 2018-04-20 2018-07-16
Page 12
ET-TDRDIP-37918-NC-RFQ /Printing for Regional ProjectCoordination unit
IDA / 58320 Project Management, andMonitoring and Evaluation Post Request for
Quotations Limited
Single Stage - OneEnvelope 832.00 0.00 Pending
Implementation 2018-01-20 2018-02-23 2018-04-09
ET-TDRDIP-41108-NC-RFQ /Printing Service for AsgedeTsmbla Woreda
IDA / 58320Regional Support forCoordination, Capacity andKnowledge
Post Request forQuotations Limited
Single Stage - OneEnvelope 832.00 0.00 Pending
Implementation 2018-01-20 2018-03-06 2018-04-20
ET-TDRDIP-41111-NC-RFQ /Printing Services for TselemtiWoreda
IDA / 58320
Project Management, andMonitoring and EvaluationRegional Support forCoordination, Capacity andKnowledge
Post Request forQuotations Limited
Single Stage - OneEnvelope 832.00 0.00 Pending
Implementation 2018-01-20 2018-03-06 2018-04-20
ET-TDRDIP-41112-NC-RFQ /Printing Services for TahtayAdyabo Woreda
IDA / 58320
Project Management, andMonitoring and EvaluationRegional Support forCoordination, Capacity andKnowledge
Post Request forQuotations Limited
Single Stage - OneEnvelope 832.00 0.00 Pending
Implementation 2018-01-20 2018-03-06 2018-04-20
UG-OPM-45668-NC-DIR /Purchase and Installation ofWireless internet for DRDIPOffices
IDA / 58210 Project Management, andMonitoring and Evaluation Prior Direct Selection Direct
9,642.00 8,090.36 Completed 2018-02-05 2018-03-04 2018-02-10 2018-03-09 2018-03-17 2018-05-30 2018-09-13 2018-06-27
UG-OPM-73171-NC-RFQ /Development of a Website forDRDIP
IDA / 58210 Project Management, andMonitoring and Evaluation Post Request for
Quotations Limited
Single Stage - OneEnvelope 15,385.00 0.00 Pending
Implementation 2018-09-01 2018-10-27 2019-04-25
UG-OPM-73186-NC-RFQ /Office Branding for KampalaOffices
IDA / 58210 Project Management, andMonitoring and Evaluation Post Request for
Quotations Limited
Single Stage - OneEnvelope 1,282.00 0.00 Pending
Implementation 2018-08-31 2018-10-26 2019-04-24
CONSULTING FIRMSActivity Reference No. /
Description Loan / Credit No. Component Review Type Method Market Approach Contract Type EstimatedAmount (US$)
Actual Amount(US$) Process Status Terms of Reference Expression of Interest
NoticeShort List and Draft
Request for ProposalsRequest for Proposals
as IssuedOpening of TechnicalProposals / Minutes
Evaluation of TechnicalProposal
Combined EvaluationReport and Draft
Negotiated ContractSigned Contract Contract Completion
Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual
IGAD/ DRDIP/CS/8 /Consultancy for theCommissioning of Joint ResearchOn Displacement & Development
IDA / D1200Regional Support forCoordination, Capacity andKnowledge
Post Quality And Cost-Based Selection Open - International
100,000.00 0.00 Canceled 2017-09-04 2017-09-25 2017-11-08 2017-12-06 2018-01-05 2018-02-09 2018-03-16 2019-03-16
IGAD/ DRDIP/CS/9 /Consultancy to strengthenMonitoring Mechanism on MixedMigration, Migration Trends andthe Assessment of the impact ofintervention in the 3 ProjectCountries on ForcedDisplacement & Mixed Migration
IDA / D1200Regional Support forCoordination, Capacity andKnowledge
Prior Quality And Cost-Based Selection Open - International
500,000.00 0.00 Canceled 2017-09-01 2017-09-22 2017-11-05 2017-12-03 2018-01-02 2018-02-06 2018-03-13 2019-03-13
IGAD/ DRDIP/CS/10 /Consultancy for the Developmentof DRDIP Regional SecretariatWebsite
IDA / D1200Regional Support forCoordination, Capacity andKnowledge
PostConsultantQualificationSelection
Open - National
5,000.00 0.00 UnderImplementation 2017-07-03 2017-07-24 2017-09-06 2017-10-06 2017-11-10 2018-05-09
ET-MOANRD-9153-CS-QCBS /Base line survey consultancy(before the implementation of theproject).
IDA / 58320 Project Management, andMonitoring and Evaluation Post Quality And Cost-
Based Selection Open - International
200,000.00 0.00 UnderImplementation 2017-03-19 2017-08-14 2017-04-09 2017-05-23 2017-11-14 2017-06-20 2017-07-20 2017-08-24 2017-09-28 2018-09-28
ET-MOANRD-15793-CS-LCS /procurement of independentexternal financial audit for theyear 2016/17 june.
IDA / 58320 Project Management, andMonitoring and Evaluation Post Least Cost Selection Open - National
100,000.00 0.00 Under
Implementation 2017-05-30 2017-08-15 2017-06-20 2017-08-03 2017-08-21 2017-08-31 2017-09-21 2017-09-30 2017-10-23 2017-11-04 2017-11-07 2017-12-09 2018-06-07
ET-MOANRD-15796-CS-LCS /procurement of consultancy forPIM translation in to 'Amharic '
IDA / 58320 Project Management, andMonitoring and Evaluation Post Least Cost Selection Open - National
50,000.00 0.00 Pending
Implementation 2017-05-29 2017-06-19 2017-08-02 2017-08-30 2017-09-29 2017-11-03 2017-12-08 2018-06-06
ET-MOANRD-15794-CS-LCS /Procurement of independentexternal procurement audit forthe year 2016/17 June.
IDA / 58320 Project Management, andMonitoring and Evaluation Prior Least Cost Selection Open - National
100,000.00 0.00 Pending
Implementation 2017-05-30 2017-06-20 2017-08-03 2017-08-31 2017-09-30 2017-11-04 2017-12-09 2018-06-07
ET-MOANRD-18835-CS-LCS /PIM and manuals translation withdifferent local language
IDA / 58320 Project Management, andMonitoring and Evaluation Post Least Cost Selection Open - National
21,700.00 0.00 Pending
Implementation 2017-06-19 2017-07-10 2017-08-23 2017-09-20 2017-10-20 2017-11-24 2017-12-29 2018-06-27
COMP1/C1/2017 / Recrutementd'un Bureau d'Etudes et desupervision pour les travauxd'extension, construction,réhabilitation des établissementsscolaires , le localcommunautaire
IDA / 58330 Social and Economic Servicesand Infrastructure Post Quality And Cost-
Based Selection Open - National
252,234.00 0.00 PendingImplementation 2017-10-02 2017-10-23 2017-12-06 2018-01-03 2018-02-02 2018-03-09 2018-04-13 2019-04-13
COMP1/C2/2017 / Recrutementd'un Bureau d'Etudes pour lasupervision des travauxd'extension de centres de santépour obock, ali addé et Hol hol
IDA / 58330 Social and Economic Servicesand Infrastructure Post
ConsultantQualificationSelection
Open - National
83,611.00 0.00 PendingImplementation 2017-10-02 2017-10-23 2017-12-06 2018-01-05 2018-02-09 2018-08-08
COMP1/C3/2017 / Récrutementd'un consultant individuel pour lesétudes et la supervision lestravaux d'installations dans leslogements, locaux commerciauxet établissement publics à Holl-Holl
IDA / 58330 Social and Economic Servicesand Infrastructure Post
ConsultantQualificationSelection
Open - National
30,000.00 0.00 PendingImplementation 2017-10-30 2017-11-20 2018-01-03 2018-02-02 2018-03-09 2018-09-05
COMP1/C4/2017 / Recrutementd'un bureau d'etudes pourraccordement Pecherie (Obock)
IDA / 58330 Social and Economic Servicesand Infrastructure Post
ConsultantQualificationSelection
Open - National
45,070.00 0.00 PendingImplementation 2017-11-30 2017-12-21 2018-02-03 2018-03-05 2018-04-09 2018-10-06
COMP1/C5/2017 / Recrutementd'un BE pour les travaux deforrage de Hol hol et Ali Addé etdu reseau d'adduction d'eau àObock et Holl-Holl
IDA / 58330 Social and Economic Servicesand Infrastructure Post Quality And Cost-
Based Selection Open - National
188,732.00 0.00 PendingImplementation 2017-12-15 2018-01-05 2018-02-18 2018-03-18 2018-04-17 2018-05-22 2018-06-26 2019-06-26
COMP2/C1/2017 / Recrutementd'un bureau d'etudes pour la larénovation et renforcement desperimetres existants
IDA / 58330 Social and Economic Servicesand Infrastructure Post
ConsultantQualificationSelection
Open - National
40,564.00 0.00 PendingImplementation 2017-10-05 2017-10-26 2017-12-09 2018-01-08 2018-02-12 2018-08-11
Page 13
COMP2/C2/2017 / Recrutementd'un bureau d'etudes pourl'extension de la centrale solaireet le forage d'Ali-Addé
IDA / 58330 Social and Economic Servicesand Infrastructure Post Quality And Cost-
Based Selection Open - National
152,369.00 0.00 PendingImplementation 2017-10-02 2017-10-23 2017-12-06 2018-01-03 2018-02-02 2018-03-09 2018-04-13 2019-04-13
COMP4/C10/2017 / recrutementd 'un cabinet pour l'AuditFinancier
IDA / 58330 Social and Economic Servicesand Infrastructure Post Least Cost Selection Open - National
10,000.00 0.00 Pending
Implementation 2017-10-02 2017-10-23 2017-12-06 2018-01-03 2018-02-02 2018-03-09 2018-04-13 2018-10-10
COMP4/C11/2017 /Recrutement d'un consultantpour la collecte de donnéeadministratives de toutes lesinfrastructures sociales de base
IDA / 58330 Social and Economic Servicesand Infrastructure Post
ConsultantQualificationSelection
Open - National
8,000.00 0.00 PendingImplementation 2017-10-02 2017-10-23 2017-12-06 2018-01-05 2018-02-09 2018-08-08
INDIVIDUAL CONSULTANTSActivity Reference No. /
Description Loan / Credit No. Component Review Type Method Market Approach Contract Type EstimatedAmount (US$)
Actual Amount(US$) Process Status Terms of Reference
Invitation toIdentified/Selected
ConsultantDraft Negotiated
Contract Signed Contract Contract Completion
Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual
UG-OPM-22319-CS-CDS /Baseline survey
IDA / 58210 Project Management, andMonitoring and Evaluation Prior Direct Selection Direct
164,383.56 0.00 Pending
Implementation 2017-08-18 2017-08-28 2017-11-01 2018-04-30
UG-OPM-22326-CS-INDV / M &E Officer
IDA / 58210 Project Management, andMonitoring and Evaluation Post Individual Consultant
Selection Open
76,010.88 0.00 PendingImplementation 2017-08-18 2017-10-06 2017-10-27 2017-12-01 2018-05-30
UG-OPM-22332-CS-INDV /Project Engineer
IDA / 58210 Project Management, andMonitoring and Evaluation Post Individual Consultant
Selection Open
98,367.12 0.00 PendingImplementation 2017-08-18 2017-10-06 2017-10-27 2017-12-01 2018-05-30
UG-OPM-22344-CS-INDV /Livelihood Officer
IDA / 58210 Project Management, andMonitoring and Evaluation Post Individual Consultant
Selection Open
76,010.88 0.00 PendingImplementation 2017-08-18 2017-10-06 2017-10-27 2017-12-01 2018-05-30
UG-OPM-22345-CS-INDV /Environment Officer
IDA / 58210 Project Management, andMonitoring and Evaluation Post Individual Consultant
Selection Open
76,010.88 0.00 PendingImplementation 2017-08-18 2017-10-06 2017-10-27 2017-12-01 2018-05-30
UG-OPM-22347-CS-INDV /Social Safeguards Officer
IDA / 58210 Project Management, andMonitoring and Evaluation Post Individual Consultant
Selection Open
76,010.88 0.00 PendingImplementation 2017-08-18 2017-10-06 2017-10-27 2017-12-01 2018-05-30
UG-OPM-22349-CS-INDV /Communication Assistant
IDA / 58210 Project Management, andMonitoring and Evaluation Post Individual Consultant
Selection Open
43,651.20 0.00 Canceled 2017-08-18 2017-10-06 2017-10-27 2017-12-01 2018-05-30
UG-OPM-22352-CS-INDV /Administrative Assistant
IDA / 58210 Project Management, andMonitoring and Evaluation Post Individual Consultant
Selection Open
43,651.20 0.00 PendingImplementation 2017-08-18 2017-10-06 2017-10-27 2017-12-01 2018-05-30
UG-OPM-22355-CS-INDV /Engineering Assistant 1(Kampala Office)
IDA / 58210 Project Management, andMonitoring and Evaluation Post Individual Consultant
Selection Open
43,651.20 0.00 UnderImplementation 2017-08-18 2018-01-30 2017-10-06 2017-10-27 2017-12-01 2018-05-30
UG-OPM-22357-CS-INDV /Engineering Assistant 2(Kampala Office)
IDA / 58210 Project Management, andMonitoring and Evaluation Post Individual Consultant
Selection Open
43,651.20 0.00 Under Review 2017-08-18 2018-01-30 2017-10-06 2017-10-27 2017-12-01 2018-05-30
UG-OPM-22360-CS-INDV /Social Safeguards Assistant 1
IDA / 58210 Project Management, andMonitoring and Evaluation Post Individual Consultant
Selection Open
43,651.20 0.00 Canceled 2017-08-18 2017-10-06 2017-10-27 2017-12-01 2018-05-30
UG-OPM-22361-CS-INDV /Social Safeguards Assistant 2
IDA / 58210 Project Management, andMonitoring and Evaluation Post Individual Consultant
Selection Open
43,651.20 0.00 Canceled 2017-08-18 2017-10-06 2017-10-27 2017-12-01 2018-05-30
UG-OPM-22362-CS-INDV /Accounts Assistant
IDA / 58210 Project Management, andMonitoring and Evaluation Post Individual Consultant
Selection Open
43,651.20 0.00 PendingImplementation 2017-08-18 2017-10-06 2017-10-27 2017-12-01 2018-05-30
UG-OPM-22363-CS-INDV /Executive Assistant
IDA / 58210 Project Management, andMonitoring and Evaluation Post Individual Consultant
Selection Open
43,651.20 0.00 Canceled 2017-08-18 2017-10-06 2017-10-27 2017-12-01 2018-05-30
UG-OPM-22367-CS-INDV /District Engineering Assistant 1
IDA / 58210 Project Management, andMonitoring and Evaluation Post Individual Consultant
Selection Open
13,150.56 0.00 PendingImplementation 2017-08-18 2017-10-06 2017-10-27 2017-12-01 2018-05-30
UG-OPM-22368-CS-INDV /District Engineering Assistant 2
IDA / 58210 Project Management, andMonitoring and Evaluation Post Individual Consultant
Selection Open
13,150.56 0.00 PendingImplementation 2017-08-18 2017-10-06 2017-10-27 2017-12-01 2018-05-30
UG-OPM-22369-CS-INDV /District Engineering Assistant 3
IDA / 58210 Project Management, andMonitoring and Evaluation Post Individual Consultant
Selection Open
13,150.56 0.00 PendingImplementation 2017-08-18 2017-10-06 2017-10-27 2017-12-01 2018-05-30
UG-OPM-22372-CS-INDV /District Engineering Assistant 4
IDA / 58210 Project Management, andMonitoring and Evaluation Post Individual Consultant
Selection Open
13,150.56 0.00 PendingImplementation 2017-08-18 2017-10-06 2017-10-27 2017-12-01 2018-05-30
UG-OPM-22373-CS-INDV /District Engineering Assistant 5
IDA / 58210 Project Management, andMonitoring and Evaluation Post Individual Consultant
Selection Open
13,150.56 0.00 PendingImplementation 2017-08-18 2017-10-06 2017-10-27 2017-12-01 2018-05-30
UG-OPM-22374-CS-INDV /District Engineering Assistant 6
IDA / 58210 Project Management, andMonitoring and Evaluation Post Individual Consultant
Selection Open
13,150.56 0.00 PendingImplementation 2017-08-18 2017-10-06 2017-10-27 2017-12-01 2018-05-30
UG-OPM-22377-CS-INDV /District Engineering Assistant 7
IDA / 58210 Project Management, andMonitoring and Evaluation Post Individual Consultant
Selection Open
13,150.56 0.00 PendingImplementation 2017-08-18 2017-10-06 2017-10-27 2017-12-01 2018-05-30
UG-OPM-22379-CS-INDV /District Engineering Assistant 8
IDA / 58210 Project Management, andMonitoring and Evaluation Post Individual Consultant
Selection Open
13,150.56 0.00 PendingImplementation 2017-08-18 2017-10-06 2017-10-27 2017-12-01 2018-05-30
UG-OPM-22382-CS-INDV /District Engineering Assistant 9
IDA / 58210 Project Management, andMonitoring and Evaluation Post Individual Consultant
Selection Open
13,150.56 0.00 PendingImplementation 2017-08-18 2017-10-06 2017-10-27 2017-12-01 2018-05-30
UG-OPM-22384-CS-INDV /District Engineering Assistant 10
IDA / 58210 Project Management, andMonitoring and Evaluation Post Individual Consultant
Selection Open
13,150.56 0.00 PendingImplementation 2017-08-18 2017-10-06 2017-10-27 2017-12-01 2018-05-30
UG-OPM-22387-CS-INDV /District Engineering Assistant 11
IDA / 58210 Project Management, andMonitoring and Evaluation Post Individual Consultant
Selection Open
13,150.56 0.00 PendingImplementation 2017-08-18 2017-10-06 2017-10-27 2017-12-01 2018-05-30
UG-OPM-22505-CS-INDV /Office Attendant 1
IDA / 58210 Project Management, andMonitoring and Evaluation Post Individual Consultant
Selection Open
11,835.60 0.00 PendingImplementation 2017-08-18 2017-10-06 2017-10-27 2017-12-01 2018-05-30
UG-OPM-22509-CS-INDV /Office Attendant 2
IDA / 58210 Project Management, andMonitoring and Evaluation Post Individual Consultant
Selection Open
11,835.60 0.00 PendingImplementation 2017-08-18 2017-10-06 2017-10-27 2017-12-01 2018-05-30
UG-OPM-22515-CS-INDV /Driver 1
IDA / 58210 Project Management, andMonitoring and Evaluation Post Individual Consultant
Selection Open
9,863.01 0.00 PendingImplementation 2017-08-18 2017-10-06 2017-10-27 2017-12-01 2018-05-30
UG-OPM-22517-CS-INDV /Driver 2
IDA / 58210 Project Management, andMonitoring and Evaluation Post Individual Consultant
Selection Open
9,863.01 0.00 PendingImplementation 2017-08-18 2017-10-06 2017-10-27 2017-12-01 2018-05-30
Page 14
UG-OPM-22519-CS-INDV /Driver 3
IDA / 58210 Project Management, andMonitoring and Evaluation Post Individual Consultant
Selection Open
9,863.01 0.00 PendingImplementation 2017-08-18 2017-10-06 2017-10-27 2017-12-01 2018-05-30
UG-OPM-22524-CS-INDV /Driver 4
IDA / 58210 Project Management, andMonitoring and Evaluation Post Individual Consultant
Selection Open
9,863.01 0.00 PendingImplementation 2017-08-18 2017-10-06 2017-10-27 2017-12-01 2018-05-30
UG-OPM-22527-CS-INDV /Driver 5
IDA / 58210 Project Management, andMonitoring and Evaluation Post Individual Consultant
Selection Open
9,863.01 0.00 PendingImplementation 2017-08-18 2017-10-06 2017-10-27 2017-12-01 2018-05-30
IGAD/ DRDIP/CS/7 /Recruitment of Consultant forCapacity Support to ProjectCountries
IDA / D1200Regional Support forCoordination, Capacity andKnowledge
Prior Individual ConsultantSelection Open
70,000.00 0.00 Pending
Implementation 2017-11-01 2017-12-20 2018-01-10 2018-02-14 2018-08-13
UG-OPM-22316-CS-CDS /Project Manager - DRDIP
IDA / 58210 Project Management, andMonitoring and Evaluation Prior Direct Selection Direct
120,723.12 0.00 Pending
Implementation 2017-10-02 2017-10-12 2017-12-16 2018-06-14
COMP4/C1/2017 / coordinateurde projet
IDA / 58330 Social and Economic Servicesand Infrastructure Post Individual Consultant
Selection Open
30,000.00 0.00 UnderImplementation 2017-10-02 2016-10-25 2017-11-20 2017-12-11 2018-01-15 2018-07-14
COMP4/C2/2017 / recrutementd'ingénieur en Infrastructures
IDA / 58330 Social and Economic Servicesand Infrastructure Post Individual Consultant
Selection Open
24,000.00 0.00 PendingImplementation 2017-10-02 2017-11-20 2017-12-11 2018-01-15 2018-07-14
COMP4/C3/2017 / recrutementde 4 techniciens supérieurs pourles régions et Djibouti ville
IDA / 58330 Social and Economic Servicesand Infrastructure Post Individual Consultant
Selection Open
62,400.00 0.00 PendingImplementation 2017-10-02 2017-11-20 2017-12-11 2018-01-15 2018-07-14
COMP4/C5/2017 / recrutementd'un spécialiste en sauvegardesenvironnementales et sociales
IDA / 58330 Social and Economic Servicesand Infrastructure Post Individual Consultant
Selection Open
24,000.00 0.00 PendingImplementation 2017-10-02 2017-11-20 2017-12-11 2018-01-15 2018-07-14
COMP4/C6/2017 / recrutementd'un responsable Suivi evaluation
IDA / 58330 Social and Economic Servicesand Infrastructure Post Individual Consultant
Selection Open
24,000.00 0.00 PendingImplementation 2017-10-02 2017-11-20 2017-12-11 2018-01-15 2018-07-14
COMP4/C7/2017 / recrutementd'un comptable
IDA / 58330 Social and Economic Servicesand Infrastructure Post Individual Consultant
Selection Open
24,000.00 0.00 PendingImplementation 2017-10-02 2017-11-20 2017-12-11 2018-01-15 2018-07-14
COMP4/C8/2017 / recrutementd'un assistant de projet
IDA / 58330 Social and Economic Servicesand Infrastructure Post Individual Consultant
Selection Open
12,000.00 0.00 PendingImplementation 2017-11-05 2017-12-24 2018-01-14 2018-02-18 2018-08-17
COMP4/C9/2017 / recrutementd'un spécialiste Passation desmarchés
IDA / 58330 Social and Economic Servicesand Infrastructure Post Individual Consultant
Selection Open
24,000.00 0.00 PendingImplementation 2017-10-05 2017-11-23 2017-12-14 2018-01-18 2018-07-17
COMP4/C12/2017 / Enquettesur les migrants à Balbala et àDjibouti-Ville
IDA / 58330 Social and Economic Servicesand Infrastructure Prior Direct Selection Direct
71,967.00 0.00 Pending
Implementation 2017-10-02 2017-10-07 2017-11-11 2018-05-10
COMP4/C16/2017 /Récrutement d'un expertinternational pour la préparationde la stratégie de l'ONARS
IDA / 58330 Social and Economic Servicesand Infrastructure Post Individual Consultant
Selection Open
30,000.00 0.00 PendingImplementation 2017-10-02 2017-11-20 2017-12-11 2018-01-15 2018-07-14
COMP4/C17/2017 /Récrutement d'un consultantindividuel pour l'appui de l'experten charge de la préparation de lastratégie de l'ONARS
IDA / 58330 Social and Economic Servicesand Infrastructure Post Individual Consultant
Selection Open
11,268.00 0.00 PendingImplementation 2017-10-02 2017-11-20 2017-12-11 2018-01-15 2018-07-14
COMP4/C17/2017_1 /recrutement d'un expertinternational en manuel deprocédures ONARS
IDA / 58330 Social and Economic Servicesand Infrastructure Post Individual Consultant
Selection Open
85,000.00 0.00 PendingImplementation 2017-11-15 2018-01-03 2018-01-24 2018-02-28 2018-08-27
UG-OPM-30462-CS-CDS /Procurement of Consultingservices for Updating of theEnvironmental and SocialManagement Framework andResettlement Policy Frameworkfor the Development Response toDisplacement Impact Project.
IDA / 58210 Project Management, andMonitoring and Evaluation Prior Direct Selection Direct
41,551.00 0.00 Under
Implementation 2017-10-05 2017-10-17 2017-10-09 2017-10-19 2017-10-27 2017-11-24
UG-OPM-22353-CS-CDS /Procurement Assistant Officer
IDA / 58210 Project Management, andMonitoring and Evaluation Prior Direct Selection Direct
43,651.20 0.00 Canceled 2017-08-18 2017-08-28 2017-11-01 2018-04-30
UG-OPM-22343-CS-CDS /Project Accountant
IDA / 58210 Project Management, andMonitoring and Evaluation Post Individual Consultant
Selection Limited
76,010.88 0.00 PendingImplementation 2017-10-20 2017-10-25 2017-11-15 2017-12-20 2018-06-18
UG-OPM-22350-CS-CDS / ICTAssistant Officer
IDA / 58210 Project Management, andMonitoring and Evaluation Post Individual Consultant
Selection Limited
43,651.20 0.00 Canceled 2017-10-27 2017-11-01 2017-11-22 2017-12-27 2018-06-25
COMP4/C4/2017 / recrutementd'un spécialiste en agriculture
IDA / 58330 Social and Economic Servicesand Infrastructure Post Individual Consultant
Selection Open
24,000.00 0.00 PendingImplementation 2017-10-02 2017-11-20 2017-12-11 2018-01-15 2019-01-15
DJ-IGAD-37530-CS-INDV /Renewal of contract for SeniorProgramme Coordinator-IGAD/DRDIP
IDA / D1200Regional Support forCoordination, Capacity andKnowledge
Prior Individual ConsultantSelection Direct
504,000.00 0.00 Canceled 2017-11-22 2017-11-29 2017-12-02 2017-12-23 2018-01-27 2018-07-26
DJ-IGAD-37531-CS-INDV /Renewal of the contract for theProject Accountant-IGAD/ DRDIP
IDA / D1200Regional Support forCoordination, Capacity andKnowledge
Prior Individual ConsultantSelection Direct
192,500.00 0.00 Canceled 2017-11-22 2018-02-28 2017-12-02 2017-12-23 2018-01-27 2018-07-26
DJ-IGAD-38100-CS-INDV /Selection of Consultant toundertake the Study to assessthe socio-economic impact onthe migrant and refugee hostingcommunities in Balbala, DjiboutiVille, Djibouti
IDA / D1200Regional Support forCoordination, Capacity andKnowledge
Post Individual ConsultantSelection Open
20,000.00 0.00 Pending
Implementation 2017-11-24 2018-01-12 2018-02-02 2018-03-09 2018-09-05
COMP4/C13/2017 / recrutementd'un consultant pour l'enquêtequantitative ménage
IDA / 58330 Social and Economic Servicesand Infrastructure Post Individual Consultant
Selection Open
29,734.00 0.00 PendingImplementation 2018-01-15 2018-03-05 2018-03-26 2018-04-30 2018-10-27
COMP4/C14/2017 / recrutementd'un consultant pour l'enquêtequantitative jeunes femmes etpérimètres agro pastoraux
IDA / 58330 Social and Economic Servicesand Infrastructure Post Individual Consultant
Selection Open
26,133.00 0.00 PendingImplementation 2018-01-25 2018-03-15 2018-04-05 2018-05-10 2018-11-06
COMP4/C15/2017 / recrutementd'un consultant pour l'enquetequalitatif (focus groupe)
IDA / 58330 Social and Economic Servicesand Infrastructure Post Individual Consultant
Selection Open - National
50,000.00 0.00 PendingImplementation 2018-01-30 2018-02-27 2018-03-13 2018-03-27 2018-05-26
Page 15
COMP4/C16/2017 /Recrutement d'un consultantpour l'enquête de suivi desindicateurs
IDA / 58330 Social and Economic Servicesand Infrastructure Post Individual Consultant
Selection Limited
34,000.00 0.00 PendingImplementation 2018-03-14 2018-03-19 2018-04-09 2018-05-14 2018-06-28
DJ-ADDS-54279-CS-INDV /recrutement d'un consultantpourla sensibilisation,étude demarchés, mise a jour du listing
IDA / 58330 Social and Economic Servicesand Infrastructure Post Individual Consultant
Selection Limited
20,000.00 0.00 PendingImplementation 2017-10-05 2017-10-10 2017-10-31 2017-12-05 2018-06-03
COMP4/C17/2017_2 /recrutement d'un consultant pourl'enquete de référence
IDA / 58330 Social and Economic Servicesand Infrastructure Post Individual Consultant
Selection Limited
80,000.00 0.00 PendingImplementation 2018-03-15 2018-03-20 2018-04-10 2018-05-15 2018-06-29
40000 / recrutement d'unconsultant pour lacommunication
IDA / 58330 Social and Economic Servicesand Infrastructure Post Individual Consultant
Selection Limited
40,000.00 0.00 PendingImplementation 2018-03-15 2018-03-20 2018-04-10 2018-05-15 2018-11-11
COMP3/C1/2017 / recrutementd'un consultant pour l'analysecomplémentaire de l'enquete
IDA / 58330 Social and Economic Servicesand Infrastructure Post Individual Consultant
Selection Limited
20,000.00 0.00 PendingImplementation 2018-03-15 2018-03-20 2018-04-10 2018-05-15 2018-11-11
UG-OPM-52236-CS-INDV /Consulting Services forCommunications Officer
IDA / 58210 Project Management, andMonitoring and Evaluation Post Individual Consultant
Selection Open
76,010.00 0.00 UnderImplementation 2018-03-05 2018-01-30 2018-04-23 2018-05-14 2018-06-18 2018-12-15
UG-OPM-52238-CS-INDV /Consultant services for ICTOfficer
IDA / 58210 Project Management, andMonitoring and Evaluation Post Individual Consultant
Selection Open
76,010.00 0.00 Under Review 2018-03-05 2018-01-30 2018-04-23 2018-05-14 2018-06-18 2018-12-15
UG-OPM-61708-CS-INDV /Consulting Services for aProcurement Officer
IDA / 58210 Project Management, andMonitoring and Evaluation Post Individual Consultant
Selection Limited
76,010.00 0.00 PendingImplementation 2018-05-22 2018-05-27 2018-06-17 2018-07-22 2019-01-18