sample building

Upload: ronald-victa

Post on 07-Jul-2018

223 views

Category:

Documents


4 download

TRANSCRIPT

  • 8/19/2019 Sample Building

    1/8

    1A

    S-3

    TYPICAL MASONRY ELEVATION   1BS-3

    TYP. CHB WALL OPENING ELEV.

    1C

    S-3

    R.C. & CHB EXTERIOR WALL

    SIDE ANCHORAGE DET.

    1D

    S-3

    TYPICAL LINTEL BEAM DETAIL

    1 STANDARD DETAILSS-3

  • 8/19/2019 Sample Building

    2/8

    1 FOUNDATION PLANS-4

    4 DETAIL OF STIFFENERS-4

    5 DETAIL OF FOOTING TIE BEAMS-4

    2 DETAIL OF F1/C1S-4

    3 COLUMN ELEVATIONS-4

    7 OF CORRIDORS-4

    6 DETAIL SECTION OF RAMP & CORRIDORS-4

    DETAIL SECTION

  • 8/19/2019 Sample Building

    3/8

    OIC. BUILDING DIVISION

    (SEECOVER SHEET)

    GILBERTO S. REYES

    DIRECTORIV. BOD

    (SEECOVER SHEET) (SEECOVER SHEET)

    RAUL C. ASIS

    UNDERSECRETARY

    ROGELIO L. SINGSON

    SECRETARY

    VARIOUSDPWH

    PROPOSEDPROJECTS

    STANDARD ONE-STOREYSCHOOL BUILDING

    (4-CLASSROOM)

    BOD

     A- 2

    1 ROOF FRAMING PLANS-5

    2 DETAIL OF ROOF BEAM (RB-1)S-5

    3 DETAIL OF ROOF BEAM (RB-2)S-5

  • 8/19/2019 Sample Building

    4/8

    4 ROOF FRAMING PLANS-5

    6 DETAILS-5

    7 DETAILS-5

    8 DETAILS-5 9 PURLINS TO LRB-1

    S-5

    CONNECTION OF

    5 ELEV. OF END WALL FRAMES-5

    NOTE: ADOPTED FROM DPWH STANDARD PLANS

    OIC. BUILDING DIVISION

    (SEECOVER SHEET)

    GILBERTO S. REYES

    DIRECTORIV. BOD

    (SEECOVER SHEET) (SEECOVER SHEET)

    RAUL C. ASIS

    UNDERSECRETARY

    ROGELIO L. SINGSON

    SECRETARY

    VARIOUSDPWH

    PROPOSEDPROJECTS

    STANDARD ONE-STOREYSCHOOL BUILDING

    (4-CLASSROOM)

    BOD

     A- 2

  • 8/19/2019 Sample Building

    5/8

    1 DETAIL ELEVATION OF TRUSSS-6

    2 DETAIL-1S-6

    3 DETAIL-2S-6

    4 SHEET ROOFING TO PURLINS-6

    CONSTRUCTION OF G.I.

    5 DETAIL-3S-6

    6 DETAIL-S-6

    7 DETAILS-6

  • 8/19/2019 Sample Building

    6/8

    1 DETAIL SECTION AT EAVESS-7

    2

    ISOMETRIC VIEW OF CONNECTION

    S-7

    OF G.I. SHEET TO PURLIN

    3 TRUSS SUPPORT CONN. DETAILS-7

    4 SPOT DETAILS-7

    5 DETAIL CONN. OF CROSS BRACINGS-7

    6 PURLIN SPLICES-7

    7 ROOFING FIXERS-7

    8

    DETAIL PLAN CONN. OF

    S-7

    PURLINS AND SAG ROD

    9

    DETAIL OF EAVE @

    S-7END WALL OF BUILDING

  • 8/19/2019 Sample Building

    7/8

    NOTE: ADOPTED FROM DPWH STANDARD PLANS

    OIC. BUILDING DIVISION

    (SEECOVER SHEET)

    GILBERTO S. REYES

    DIRECTORIV. BOD

    (SEECOVER SHEET) (SEECOVERSHEET)

    RAUL C. ASIS

    UNDERSECRETARY

    ROGELIO L. SINGSON

    SECRETARY

    VARIOUSDPWH

    PROPOSEDPROJECTS

    STANDARD ONE-STOREYSCHOOL BUILDING

    (4-CLASSROOM)

    BOD

    EE-1

    1 POWER LAYOUTEE-1

    2 LIGHTING LAYOUTEE-1

  • 8/19/2019 Sample Building

    8/8

    NOTE: ADOPTED FROM DPWH STANDARD PLANS

    OIC. BUILDING DIVISION

    (SEECOVER SHEET)

    GILBERTO S. REYES

    DIRECTORIV. BOD

    (SEECOVER SHEET) (SEECOVERSHEET)

    RAUL C. ASIS

    UNDERSECRETARY

    ROGELIO L. SINGSON

    SECRETARY

    VARIOUSDPWH

    PROPOSEDPROJECTS

    STANDARD ONE-STOREYSCHOOL BUILDING

    (4-CLASSROOM)

    BOD

    EE-2

    1 ELECTRICAL RISER DIAGRAMEE-2

       3   1   0   0  m  m    (

       M .   N .   )

       1   8   0   0

      m  m

       1   8

       0   0  m  m

    BUILDING LINE