SAME Tampa Bay Post Joint Engineering & Training Day 2014 August 20, 2014 MacDill AFB, Florida. COL Jon J. Chytka District Engineer Mobile District. Mobile District Area of Operations. District Mission: - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: SAME Tampa Bay Post Joint Engineering & Training Day 2014 August 20, 2014 MacDill  AFB, Florida

US Army Corps of Engineers

BUILDING STRONG®

SAME Tampa Bay Post Joint Engineering & Training Day 2014August 20, 2014MacDill AFB, Florida

COL Jon J. ChytkaDistrict EngineerMobile District

Page 2: SAME Tampa Bay Post Joint Engineering & Training Day 2014 August 20, 2014 MacDill  AFB, Florida

BUILDING STRONG®

Mobile District Area of OperationsDistrict Mission:To provide quality engineering and environmental products and services to our military, civil works, and support for others customers, partners, and stakeholders.

CONUS Boundaries:• Military boundary includes TN, MS, AL & FL• Civil boundary outlined in

blue

OCONUS Boundaries:• Central & South American countries• US SOUTHCOM AOR (minus

Caribbean)

District HQ

2

Page 3: SAME Tampa Bay Post Joint Engineering & Training Day 2014 August 20, 2014 MacDill  AFB, Florida

BUILDING STRONG®

Team & Program

3

District Team consists of… 13 Officers + NCOs 1130 Civilians 289 Engineers 131 Environmental and Scientific Professionals 8 PhDs 533 Minorities, including Women 383 Women

…. Executing $1B annually

Civil WorksMilitarySupport for Others (IIS)Real EstateEnvironmentalRegulatory

Page 4: SAME Tampa Bay Post Joint Engineering & Training Day 2014 August 20, 2014 MacDill  AFB, Florida

BUILDING STRONG®

Mobile District Program

0

100

200

300

400

500

600

700

800

900

FY10 FY11 FY12 FY13 FY14 FY15 FY16

CW Military IIS

$1.90B $1.65B $1.44B $1.24B $1.19B $1.00B $1.00B

4

Page 5: SAME Tampa Bay Post Joint Engineering & Training Day 2014 August 20, 2014 MacDill  AFB, Florida

BUILDING STRONG®

Customers & Contracting Vehicles

Redstone ArsenalFort McClellanAnniston Army Depot

Marshall Space Flight Center

Columbus AFB

Camp Shelby

Stennis Space Center

Cudjoe Key AFS

Tyndall AFB

Cape Canaveral AFS

Southern Command

Homestead AFB

JFK Space CenterPatrick AFB

MacDill AFB

Eglin AFBHurlburt FieldPensacola NAS

Arnold AFB

Fort Rucker

Gunter AFBMaxwell AFB

Military Civil Works LATAM

“C” Contracts AE IDIQs Construction MATOC/SATOC

• “C” Contracts• AE IDIQs• Task Order Dredging

(rental)• O&M Service Contracts

• “C” Contracts• AE IDIQ• Construction MATOC IDIQs

5

Field Office Location

MATOC = Multiple Award Task Order ContractSATOC = Single Award Task Order Contract

Page 6: SAME Tampa Bay Post Joint Engineering & Training Day 2014 August 20, 2014 MacDill  AFB, Florida

Air Force Technical Applications CenterPatrick Air Force Base, FL

Project Scope- Design and construct four facility

- Primary Facility: Multi-story command and control facility (C2)- Radio chemistry laboratory, which includes a Class 10,000 clean room- Central utility plant including an uninterrupted power system- Stand-alone multistory parking garage

Total Costs$157,692,000

StatusRibbon cutting was Mar 14. Actual Contract Award: 06/03/2011Actual Notice to Proceed: 07/06/2011Original Required Completion: 12/02/2015Current Required Completion: 12/02/2015Scheduled Construction Completion: 12/02/2015Original Scheduled BOD: 01/31/2015Scheduled BOD: 02/22/2014 

Page 7: SAME Tampa Bay Post Joint Engineering & Training Day 2014 August 20, 2014 MacDill  AFB, Florida

Mississippi Coastal Improvement ProgramBarrier Island Restoration

Project Scope- Restore eastern shoreface of Cat Island- Comprehensive Restoration of West and East Ship Islands, MS

- Fill Camille Cut, a 3.5 mile wide breach between the islands (Phase I and II)- Restore the southern shoreface of East Ship Island, MS (Phase III)- Install native dune vegetation and sand fencing on the newly placed sand (Phase IV)- Pre-, During, and Post Construction Monitoring of shorebirds, Gulf sturgeon, submerged aquatic

vegetation, waves and currents, salinity, turbidity, shoreline response etc.

Total Costs$ 439,000,000

StatusCat Island – TBDDates below are scheduled for Ship IslandPhase I Award 29 Apr 2015Phase II Award 7 Mar 2016Phase III Award 3 Nov 2016Phase IV Award 10 Nov 2016Phase V Award 5 Jan 2017Project Complete 24 Aug 2017Monitoring Pre-Construction: Ongoing During Construction: Apr 2016 – Aug 2017 Post Construction: Sep 2017 – Sap 2027

Page 8: SAME Tampa Bay Post Joint Engineering & Training Day 2014 August 20, 2014 MacDill  AFB, Florida

BUILDING STRONG®

Deer Island Ecosystem Restoration

Page 9: SAME Tampa Bay Post Joint Engineering & Training Day 2014 August 20, 2014 MacDill  AFB, Florida

BUILDING STRONG®

Bay St. Louis Seawall Reconstruction

Page 10: SAME Tampa Bay Post Joint Engineering & Training Day 2014 August 20, 2014 MacDill  AFB, Florida

BUILDING STRONG®

Mobile Execution Reality

63% of program by contract amount, 39% of program by actions executed in last quarter

Reimbursable customers (MEDCOM, BCE/DPWs, LATAM, IIS CONUS) represent 50% of total program…requirements frequently undefined and unfunded until late in FY

Heavy reliance on standing contracts and 8a► AE IDIQs► CONUS Construction MATOCs► LATAM Construction MATOCs► 8(a) Construction SATOCs

Strong competition within MATOCs (many as SB) pools; few protests Extensive regional sharing of contract capacity (w/in SAD & w/HNC) SAM historically exhausts capacity of its contracts

10

Page 11: SAME Tampa Bay Post Joint Engineering & Training Day 2014 August 20, 2014 MacDill  AFB, Florida

Regional Environmental Acquisition Tool (REAT)

Project TitleProject

Location

Projected Advertise

DateType Work

Est. Award Value

Set-Aside Category

Procure. Method Notes

A-E Services 541330

South Atlantic Division July 2014

Prof Svcs

Up to 99 million

SBSARFP

IDIQ Contract Pool – Max

Pool 6

A-E Services 541330

South Atlantic Division Sept 2014

Prof Svcs

Up to 249 million Unrestrict. RFP

IDIQ Contract Pool– Max

Pool 9

• Division shares capacity

• Mobile District portion is environmental services (shown above)

• NAICS – 541330 for all AE (there are additional, non-REAT solicitations on subsequent slides),

• $14M size standard except surveying and mapping.

Page 12: SAME Tampa Bay Post Joint Engineering & Training Day 2014 August 20, 2014 MacDill  AFB, Florida

SAM –A/E Opportunities

District Project TitleProject

Location

Projected Advertise

DateType Work

Estimated Award Value

Set-Aside Category

Procurement Method NAICS

SAMAE Planning

Services US1st Qtr FY

15AE Svcs

IDIQ $50M

4 SBSA $2.5m

8 UR $5m Brooks Act 541330

SAMAE Military Design SAD 1st Qtr 15

AE Svcs IDIQ $45M

$22.5 SBSA

$22.5 UR Brooks Act 541330

SAM

AE Air Force Community Partnerships SAD

4th Qtr FY 14 Nov-14

AE Svcs IDIQ $10M UR Brooks Act 541330

SAM

AE Planning & Design for MEDCOM US

1st Qtr FY14

AE Svcs IDIQ $40M

3 UR $10M 1 SBSA$10M

Brooks Act 541330

Page 13: SAME Tampa Bay Post Joint Engineering & Training Day 2014 August 20, 2014 MacDill  AFB, Florida

SAM –A/E and Professional Services Opportunities

District Project TitleProject

Location

Projected Advertise

DateType Work

Estimated Award Value

Set-Aside Category

Procurement Method NAICS

SAMAE Surveying and Mapping SAD

1st qtr FY 15

AE Svcs IDIQ $10

1 SBSA $1M2 UR $4.5m Brooks Act 541370

SAMCultural Resources SAD

Before 30 Sept 2014 Prof. Svc $25M

Women-Owned SB RFP 541990

District Project TitleProject

Location

Projected Advertise

Date Type Work

Estimatedaward Value

Set-Aside Category

Procurement Method NAICS

SAMMEDCOM

O&M US4th qtr FY

14

Construction Army Med

Fac. $248M UR RFP-MATOC 236220

SAMMEDCOM

Design/ Build US1st Qtr FY

15DB Construction $248 UR RFP-MATOC 236220

SAM –Construction Contracts

Page 14: SAME Tampa Bay Post Joint Engineering & Training Day 2014 August 20, 2014 MacDill  AFB, Florida

BUILDING STRONG®

For More Information

Linda SpadaroDeputy, Office of Small Business Programs, Mobile District

251-690-3597

[email protected]

www.sam.usace.army.mil