Safety Brief
Period 10, 2019/20
08.12.19 – 04.01.20
) including
Period 10, 2019/ 20
ISS Labour Safety Brief
RIDDOR Reportable accident 6th December 2019 (Update)
During period 9 we have had an unfortunate accident that has led to an
ISSL operative sustaining a fracture to his ankle. Due to the severity of
the injury, this falls into the category of a specified injury under RIDDOR.
The RIDDOR was excepted by ISSL as the IP was employed by ISSL.
However due to the collaboration between ISSL, Amey Rail and GB
freight and a thorough investigation, GB freight accepted that the
RIDDOR should be reported by them.
All accidents and incidents should be accompanied by an effective
investigation and working together. This creates an environment where
open and honest relationships are built.
We continue to provide 24/7 on call support to our workforce
Matters arising outside office hours (0800 – 1700) including accidents
and any incidents. Please contact the office from which you have been
deployed using the relevant contact numbers below.
Derby: 07810 657080 |Manchester: 07977 000492|Stafford: 07494 058561
Caerphilly: 07496 789987 |East Kilbride: 07932 717046 |Carlisle:07949 557938
Doncaster: 07943 753039 | Maidstone: 07947 451841
Foreward F Accident and Incidents
During period 10 we have had zero accidents and incidents on the
Managed Infrastructure. During the dates 24 December 2019 to 04
January 2020, ISS Labour have worked approximately 2252 shifts.
This information was provided by all offices at time of writing.
This is a great achievement as during this time of year, rail workers
are at a greater risk from incidents and accidents due to the
Christmas stand down.
The main risks are:
• Road Traffic accidents.
• Slips trips and falls.
• Injuries caused by manual Handling/Lifting.
ISSL have not encountered any of the above. Well done to all for the
safe works carried out over Christmas.
What Has Gone Well F What Has Not Gone Well
Period 10, 2019/ 20
Key Safety Headlines
✓ Positive feedback from clients CRSA and Network Rail for works carried out at Corby Tunnel and Euxton OLE works.
✓ No accidents or Incidents during the period- Well Done
x Reduction in site planned site inspections.
x A large reduction in close calls. Last period was 70, this period 31.
x Operatives not wearing issued ISSL PPE.
x Over the Xmas period we have seen speeding increase well above the national speed limit.
Every close call received is recorded and followed up with the person raising the call (where possible) and actions taken where needed.
To discuss any issues related to Close Calls, please contact:
Brian Knapper, HSQE Advisor
07702 636 109 | [email protected]
Period 10, 2019/ 20
The Period in Numbers
Trades Division
Period 10, 2019/ 20
Period Highlights
Customer Feedback F
Corby Tunnel blockade
ISS lighting/Gary Hendry very well done to you and your team for managing the lighting so well, some circa 5000yds of lighting with 3600yds running
constantly for 16 days within the tunnel has been managed very well with all your team so please pass on my thanks to all that have been involved.
Weekend 33
Gents
Its worth feeding back to our suppliers that the gang we had at Peascliffe on Saturday afternoon and Kettering Sunday afternoon were spot on. It was clear
from the offset that they were all familiar with each other and in turn operated like a professional gang. Nothing was too much trouble and the effort
they put in was great.
Keep up the good work.
CRSA
Euxton OLE Works
I would to pass on my thanks to all the staff you provided over the Christmas works at Euxton. Everybody on site all played an important part in completing
all the planned works undertook over the Xmas block and all helped wherever possible, whether it was assisting the linesman in the machines (Operators)
to helping layout materials, rolling up wire & clearing the site (MC/CC/PO’s & Ground staff) ready for the passage of trains. Can you please relay my thanks
to all your staff that were involved.
Network Rail
CRSA
Period 10, 2019/ 20
Site Inspections
Site Locations Key Themes Identified during Visits
Period 10, 2019/ 20
Close Calls
Please remember - If it isn’t safe, or authorised, don’t do it and report it!
Close Call in Focus
Period 10, 2019/ 20
Theme Of The Month
Why do We Report Close Calls?
Period 10, 2019/ 20
ISS Labour Safety Brief
1. Please continue to deliver quality and safe work. This is the centre of everything we do
and makes us stand out from the rest. Challenging unsafe, bad practice and poor
working conditions is everyone’s responsibility in creating a safe environment.
2. All ISSL operatives must ensure they wear our sponsored PPE and its in a clean and
serviceable condition.
3. Please can all ISSL staff make a concerted effort to report close calls. This is the only
tool we have to ensure that when working on the infrastructure the environment,
people and equipment is safe.
Please remember - If it isn’t safe, or authorised, don’t do it and report
it!
Period 10, 2019/ 20
ISS Labour Safety Brief
Safety Alerts and Briefs
Period 10