safe architecture for robust distributed application ......ta-2 & e 4 l-2 24/01/2020...
TRANSCRIPT
CONtributing to Shift2Rail’s
NExt generation of high
Capable and safe TCMS.
Phase 2
SAFE architecture for
Robust distributed
Application Integration
in roLling Stock 2
© CONNECTA-2 & Safe4RAIL-2
The projects CONNECTA-2 and Safe4RAIL-2 have
received funding from the European Union’s Horizon
2020 research and innovation programme under grant
agreement No. 826098 (CONNECTA-2) and No.
826073 (Safe4RAIL-2) respectively. The information
and views set out in this document are those of the
author(s) and do not necessarily reflect the official
opinion of Shift2Rail Joint Undertaking. The JU does
not guarantee the accuracy of the data included in this
article. Neither the JU nor any person acting on the
JU’s behalf may be held responsible for the use which
may be made of the information contained therein.
Imanol de Arriba, CAF
Technical Seminar on Advanced Architectures and Components for Next-Generation TCMS
January 21st 2020, Brussels
©C
ON
NE
CT
A-2
&S
afe
4R
AIL
-2
CONtributing to Shift2Rail’s NExt generation of high Capable and safe TCMS. Phase 2 | SAFE architecture for Robust distributed Application Integration in roLling stock 2
• Introduction
• Urban Train General Description
• Urban Demonstrator Functional Architecture
• TSN Communication Network
• Simulation Framework Architecture
24/01/2020 2
©C
ON
NE
CT
A-2
&S
afe
4R
AIL
-2
CONtributing to Shift2Rail’s NExt generation of high Capable and safe TCMS. Phase 2 | SAFE architecture for Robust distributed Application Integration in roLling stock 224/01/2020 3
©C
ON
NE
CT
A-2
&S
afe
4R
AIL
-2
CONtributing to Shift2Rail’s NExt generation of high Capable and safe TCMS. Phase 2 | SAFE architecture for Robust distributed Application Integration in roLling stock 2
• Laboratory demonstrator for the
proof-of-concept demonstration
of innovative technologies:
Wireless TCMS (WLTB and T2G)
Drive-by-Data
Application Profiles & Functional
Distribution Framework
Simulation Framework
• Composed of two coupled consists
24/01/2020 4
©C
ON
NE
CT
A-2
&S
afe
4R
AIL
-2
CONtributing to Shift2Rail’s NExt generation of high Capable and safe TCMS. Phase 2 | SAFE architecture for Robust distributed Application Integration in roLling stock 224/01/2020 5
©C
ON
NE
CT
A-2
&S
afe
4R
AIL
-2
CONtributing to Shift2Rail’s NExt generation of high Capable and safe TCMS. Phase 2 | SAFE architecture for Robust distributed Application Integration in roLling stock 2
LABORATORY DEMONSTRATION
24/01/2020 6
CONNECTA-1
Sept 2018Sept 2016
CONNECTA-2
Oct 2018 Mar 2021
CONNECTA-3
Dec 2020 Dec 2022
NOW
TECHNOLOGIES SPECIFICATION
Near future
©C
ON
NE
CT
A-2
&S
afe
4R
AIL
-2
CONtributing to Shift2Rail’s NExt generation of high Capable and safe TCMS. Phase 2 | SAFE architecture for Robust distributed Application Integration in roLling stock 2
• The urban laboratory demonstrator (not real train) is based on:
EMU of 3 cars: 2 motor cars (M1 & M2) and a trailer car (R1)
• Each motor car has its own traction equipment: Traction Control Unit (TCU)
• Each car rests on two bogies: Bogie Monitoring System (BMS)
• 3 sliding passenger access doors per side on each car: Doors Control Unit (DCU)
• A Brake Control Unit (BCU) per car
• 5 Heating, Ventilation and Air Conditioning (HVAC) units
• A Central Control Unit (CCU) in each cabin (redundant TCMS control)
24/01/2020 7
©C
ON
NE
CT
A-2
&S
afe
4R
AIL
-2
CONtributing to Shift2Rail’s NExt generation of high Capable and safe TCMS. Phase 2 | SAFE architecture for Robust distributed Application Integration in roLling stock 224/01/2020 8
©C
ON
NE
CT
A-2
&S
afe
4R
AIL
-2
CONtributing to Shift2Rail’s NExt generation of high Capable and safe TCMS. Phase 2 | SAFE architecture for Robust distributed Application Integration in roLling stock 2
• Physical architecture:
Only the functional architecture related to HVAC and BMS functionalities shall run on
top of CAF-FDF:
Including TCMS logic and HVAC/BMS subsystem control logic
Functional interfaces between TCMS and HVAC/BMS subsystem: Application Profiles
This logical architecture will be allocated to physical end devices at consist level
• Simulated architecture:
The train control logic corresponding to the remaining subsystems will be simulated in the
Simulation Host
24/01/2020 9
©C
ON
NE
CT
A-2
&S
afe
4R
AIL
-2
CONtributing to Shift2Rail’s NExt generation of high Capable and safe TCMS. Phase 2 | SAFE architecture for Robust distributed Application Integration in roLling stock 224/01/2020 10
©C
ON
NE
CT
A-2
&S
afe
4R
AIL
-2
CONtributing to Shift2Rail’s NExt generation of high Capable and safe TCMS. Phase 2 | SAFE architecture for Robust distributed Application Integration in roLling stock 224/01/2020 11
ETB Line A
ETBN-TSN-1ETBN-TSN-1
ED-IO2-R1
CS1-PORT2
CS1-PORT3
TSN-CCU-M2
ETBN-TSN-2ETBN-TSN-2
CS3-PORT3
CS1-PORT1
CS3-PORT1
CS4-PORT2
CS4-PORT1
CS4-PORT3
ETBN2-PORT1
ETBN2-PORT3
ETBN2-PORT2
ETBN1-PORT1 ETBN1-PORT2
ETBN1-PORT3
CS1-PORT5
CS2-PORT1
CS2-PORT3
CS2-PORT5
ECN-PLANE-A
ECN-PLANE-B
ETB Line B
MCG-M2
CONSIST - 1
CS-TSN-4CS-TSN-4
TSN-CCU-M1
CS-TSN-2CS-TSN-2
TCMS/OOS SUBNET
CS4-PORT4
CS1-PORT4CS3-PORT4
CS3-PORT2
CS2-PORT2
CS3-PORT5
CS-TSN-3CS-TSN-3
TSN-I01-M1
CCTV-HMI CCTV-C
CS-TSN-1CS-TSN-1
CS2-PORT4
ED-TSN-SWITCH-1ED-TSN-SWITCH-1
CS-TSN-5CS-TSN-5
CS4-PORT5
CS5-PORT2
CS5-PORT3
CS5-PORT1
ETB network:- 2 separated ETB lines, 2 ETBNs per consist- Critical traffic: transmitted on both ETB lines (redundancy scheme)- Non-critical traffic: transmitted on the ‘active’ line
ECN network (ring topology):- 2 separated logical planes (each one connected to each ETB line)- Critical traffic: transmitted on both planes (redundancy scheme)- Non-critical traffic: only transmitted on the plane of the ‘active’ ETBN
©C
ON
NE
CT
A-2
&S
afe
4R
AIL
-2
CONtributing to Shift2Rail’s NExt generation of high Capable and safe TCMS. Phase 2 | SAFE architecture for Robust distributed Application Integration in roLling stock 224/01/2020 12
©C
ON
NE
CT
A-2
&S
afe
4R
AIL
-2
CONtributing to Shift2Rail’s NExt generation of high Capable and safe TCMS. Phase 2 | SAFE architecture for Robust distributed Application Integration in roLling stock 2
• Simulation and Virtualisation Framework (SVF):
Set of tools used for Train Virtualisation, Simulation and Communications Emulation
Ability to test TCMS in a virtualised environment
All train subsystems can be simulated
Allows remote testing, including Hardware in-the-Loop
24/01/2020 13
©C
ON
NE
CT
A-2
&S
afe
4R
AIL
-2
CONtributing to Shift2Rail’s NExt generation of high Capable and safe TCMS. Phase 2 | SAFE architecture for Robust distributed Application Integration in roLling stock 2
• Physical devices / Software components:
1. Simulation Host Device (SH-D): Equipment where Simulations are executed, and where
Simulation Framework and Communication Framework software components are installed
24/01/2020 14
SF: Control of Simulations execution
SH: Main component of SF. Basic application for running simulation models,
based on commands received from the other Simulations, SWTS, HIL-IF
©C
ON
NE
CT
A-2
&S
afe
4R
AIL
-2
CONtributing to Shift2Rail’s NExt generation of high Capable and safe TCMS. Phase 2 | SAFE architecture for Robust distributed Application Integration in roLling stock 2
• Physical devices / Software components:
1. Simulation Host Device (SH-D): Equipment where Simulations are executed, and where
Simulation Framework and Communication Framework software components are installed
24/01/2020 15
EMS: Functional simulation of the wiring schematics (electrical environment) and the physical
environment between EDs
EDS: Functional simulation of the logic of a real ED
connected to CN
©C
ON
NE
CT
A-2
&S
afe
4R
AIL
-2
CONtributing to Shift2Rail’s NExt generation of high Capable and safe TCMS. Phase 2 | SAFE architecture for Robust distributed Application Integration in roLling stock 2
• Physical devices / Software components:
1. Simulation Host Device (SH-D): Equipment where Simulations are executed, and where
Simulation Framework and Communication Framework software components are installed
24/01/2020 16
CF: Set of communication components to forward network traffic from/to
real CN
CB: Communication gateway between remote CNs (LCN and RCN) over an IP network (tunneling mechanism
over the Internet)
CE: Main component of CF. Connects the SH to
the required LCN and RCN
©C
ON
NE
CT
A-2
&S
afe
4R
AIL
-2
CONtributing to Shift2Rail’s NExt generation of high Capable and safe TCMS. Phase 2 | SAFE architecture for Robust distributed Application Integration in roLling stock 2
• Physical devices / Software components:
2. Software Tool Set-PC (SWTS-PC): Personal Computer which allows configuring,
controlling and executing Simulations and tests
3. Hardware-in-the-Loop Interface (HIL-IF): Dedicated device providing physical
(electrical, mechanical, environmental) inputs and outputs to a real ED (wired electrical
interface), in replacement of the real I/O signals of EM environment
24/01/2020 17
SWTS: Set of tools running on the PC of a tester or developer for configuring, controlling and monitoring the components of the Simulation
and Virtualisation Framework
Provides electrical analogue inputs to I/O devices related to BMS functionality
(accelerometer electrical signal and temperature sensor signals), as well as digital I/O signals
©C
ON
NE
CT
A-2
&S
afe
4R
AIL
-2
CONtributing to Shift2Rail’s NExt generation of high Capable and safe TCMS. Phase 2 | SAFE architecture for Robust distributed Application Integration in roLling stock 224/01/2020 18
Coordinator:
IKERLAN, Aitor Arriola
+34 943 712 400
© CONNECTA-2 & Safe4RAIL-2
The projects CONNECTA-2 and Safe4RAIL-2 have
received funding from the European Union’s Horizon
2020 research and innovation programme under grant
agreement No. 826098 (CONNECTA-2) and No.
826073 (Safe4RAIL-2) respectively. The information
and views set out in this document are those of the
author(s) and do not necessarily reflect the official
opinion of Shift2Rail Joint Undertaking. The JU does
not guarantee the accuracy of the data included in this
article. Neither the JU nor any person acting on the
JU’s behalf may be held responsible for the use which
may be made of the information contained therein.
Coordinator:
CAF, Igor López
+34 943 189 241