S tormwater M anagement a nd R oad T unnel A “SMART” Solution. Transportation Research Board Committee ADC60 Sustainable and Resilient Infrastructure Workshop Randall J. Essex, P.E., Executive Vice President. World’s Largest Flood Control Tunnel. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: S tormwater  M anagement  a nd  R oad  T unnel A “SMART” Solution

g

1

Stormwater Management and Road Tunnel A “SMART” Solution

Transportation Research Board Committee ADC60Sustainable and Resilient Infrastructure WorkshopRandall J. Essex, P.E., Executive Vice President

Page 2: S tormwater  M anagement  a nd  R oad  T unnel A “SMART” Solution

g

2

World’s Largest Flood Control Tunnel

Malaysia is one of the world’s fastest-growing economies.

Its capital, Kuala Lumpur (KL), has been the powerhouse of this growth

Page 3: S tormwater  M anagement  a nd  R oad  T unnel A “SMART” Solution

g

3

But monsoon rains have created severe flooding and devastating destruction for decades

World’s Largest Flood Control Tunnel

Page 4: S tormwater  M anagement  a nd  R oad  T unnel A “SMART” Solution

g

4

Initial Challenge: Divert the Flooding

Intercept upper river, and convey flows under city to lower river (blue)

During dry periods, use central third of tunnel to convey traffic (red)

Upper River

Lower River

Page 5: S tormwater  M anagement  a nd  R oad  T unnel A “SMART” Solution

g

5

Discovery Channel Special: “Extreme Engineering”

Page 6: S tormwater  M anagement  a nd  R oad  T unnel A “SMART” Solution

g

6

Major Hydraulic ComponentsUpstream water diversion structure and holding pond

Inlet structure

North Junction gates

Downstream detention pond

South Junction gates and pump station

Downstream diversion structure

Page 7: S tormwater  M anagement  a nd  R oad  T unnel A “SMART” Solution

g

7

Physical Hydraulic Features

· Storage, surge shafts, and pumping

Sur

ge S

haft

0

10

20

30

40

50

-2000 0 2000 4000 6000 8000 10000 12000

Distance (approx scale)

Leve

l m d

atum

Upstream Tunnel (Upper Barrel)

DownstreamTunnel (Lower Barrel)

UpstreamHolding Pond

DownstreamStorage

Pond

Upper

Lower

Lower

Tunn

el In

let

Ground Levels

N J

unct

ion

Box

S J

unct

ion

Box

&

Pum

p S

tn

Upstream water gates

Road Gates in branch tunnels to exits

upstream and downstream

Downstreamwater gates

N V

ent S

haft

S V

ent S

haft

Sg K

lang

Sg K

eray

ong

Culvert

Rd Deck

Rd Deck

Out

let c

ulve

rt an

d ga

tes

Tunn

el O

utle

t Gat

esan

d P

ump

Stn

TWL

TWL

Min WL

Min WL

Div

ersi

on g

ates

Page 8: S tormwater  M anagement  a nd  R oad  T unnel A “SMART” Solution

g

8

Gatehouses

North Ventilation

Shaft

North Gate House

Lower Deck Road Gate (rising flap)

(Upper Gate Above)

North Junction Box

Surge Shafts above

Plan on Lower Road Deck

To South Junction Box

Road entrance and Exit

Flood Flow

Page 9: S tormwater  M anagement  a nd  R oad  T unnel A “SMART” Solution

g

9

Hydraulic Operation

NO STORM

Page 10: S tormwater  M anagement  a nd  R oad  T unnel A “SMART” Solution

g

10

Hydraulic Operation

NO STORM

MOST STORMS (7-10/YR)

Page 11: S tormwater  M anagement  a nd  R oad  T unnel A “SMART” Solution

g

11

Roadway Tunnel Operation

MAJOR STORMS (2 EVERY 5 YRS)

NO STORM

MOST STORMS (7-10/YR)

Page 12: S tormwater  M anagement  a nd  R oad  T unnel A “SMART” Solution

g

12

World’s First Bored Double-Deck Roadway Tunnel

· 1.9-mile highway tunnel– Upper and lower decks– 2 x 11 ft lanes– Emergency lane

· Design speed 40 mph– Indicated speed 35 mph– 800 ft curve radius

· Headroom 8.2 ft– Cars only– 10 MW fire load

· Electrical/Systems– full submergence

Page 13: S tormwater  M anagement  a nd  R oad  T unnel A “SMART” Solution

g

13

Flood water entrance

Video of Tunnel Flooding

Maximum diversion capacity: 280 m3/sec = 4.4 M gals/min)

Page 14: S tormwater  M anagement  a nd  R oad  T unnel A “SMART” Solution

g

14

Bored Tunnels

· Twin 43 ft diameter TBMs· Pressurized face slurry shields· One-pass bolted and gasketed

segmental lining

Page 15: S tormwater  M anagement  a nd  R oad  T unnel A “SMART” Solution

g

15

Bored Tunnels

· Twin 43 ft diameter TBMs· Pressurized face slurry shields· One-pass bolted and gasketed

segmental lining

Page 16: S tormwater  M anagement  a nd  R oad  T unnel A “SMART” Solution

g

16

Bored Tunnels

· Twin 43 ft diameter TBMs· Pressurized face slurry shields· One-pass bolted and gasketed

segmental lining· Mined total of 6.5 miles in two

directions from single slot trench

workers

Page 17: S tormwater  M anagement  a nd  R oad  T unnel A “SMART” Solution

g

17

Construction

Page 18: S tormwater  M anagement  a nd  R oad  T unnel A “SMART” Solution

g

18

Construction

Page 19: S tormwater  M anagement  a nd  R oad  T unnel A “SMART” Solution

g

19

Toll Plaza

Page 20: S tormwater  M anagement  a nd  R oad  T unnel A “SMART” Solution

g

20

Entrance Ramp

Page 21: S tormwater  M anagement  a nd  R oad  T unnel A “SMART” Solution

g

21

Lower Roadway Deck

Page 22: S tormwater  M anagement  a nd  R oad  T unnel A “SMART” Solution

g

22

Upper Roadway Deck

Page 23: S tormwater  M anagement  a nd  R oad  T unnel A “SMART” Solution

g

23

Exit Ramp

Page 24: S tormwater  M anagement  a nd  R oad  T unnel A “SMART” Solution

g

24

M2 M3 M2 M3 M2 M3 M2 M3 M2 M3 2007 2008 2009 2010 2011

0

5

10

15

20

25

30

35

40

45

50

0

50

100

150

200

250

Annual events2007 - 2011

Year

Annual eventM2 = invert onlyM3 = Lower deck

Cumulative events

2 2 1

Current Use

Page 25: S tormwater  M anagement  a nd  R oad  T unnel A “SMART” Solution

g

25

Client Satisfaction

“With SMART under our belt we can be confident that we’ll be ready when a big flood arrives”

Contractor: MMC/ Gamuda JVEngineer: Hatch Mott MacDonald – sub to Gamuda