s t r sr 408 pd&e study - segment 3 -at grade center … · 2016-08-23 · sr 408 pd&e...
TRANSCRIPT
E. COLONIAL DR (SR 50)
E. COLONIAL DR (SR 50)
E. COLONIAL DR (SR 50)
E. COLONIAL DR (SR 50)
975
980
985
990
995
1000
1005
1015
1020
1025
1030
1035
1040
1045
1050
1055
1060
1065
1070
10
15
20
25
30
35
40
N
EXETE
R S
T
EXIS
TIN
G S
R 5
0 R/W
WORLD ORLANDO SPEED
WORLD ORLANDO SPEED
EXISTING SR 50 R/W
EXIS
TIN
G S
R 5
0 R/W
PROPOSED R/W
LINE
PR
OP
OSE
D R/W LIN
E
LANSING ST
520
1055
1055
3,000
50
50
LIN
E
MA
TC
H
LIN
E
MA
TC
H
1"=200'
50
50
520
LEGEND
SR 50 MAINLINE
SR 408 MAINLINE
EMBANKMENT (ELEVATED)
SR 408 MAINLINE ON
SR 408 MAINLINE BRIDGE
POTENTIAL POND SITE
TWO-WAY MAINLINE AADT
AADT = SR 408 Average Annual Daily Traffic Design Year 2045
SEE SR 520 INTERCHANGE OPTION B
SR 520 INTERCHANGE OPTION B
SR 408 PD&E STUDY - SEGMENT 3 -AT GRADE CENTER CONT.
END STUDY
1:200