s-presentation-1st 4 km

21
Contract No. 09-24859/1 1 JV Egis International & IRD Engineering SUPERVISION OF THE REMAINING LINK ALONG CORRIDOR X TO THE LEVEL OF MOTORWAY SECTION DEMIR KAPIJA – SMOKVICA AT THE FIRST 4 KM

Upload: svet-dotchev

Post on 15-Apr-2017

66 views

Category:

Documents


0 download

TRANSCRIPT

Contract No.

09-24859/1

1

JV Egis International

& IRD Engineering

SUPERVISION OF THE REMAINING LINK

ALONG CORRIDOR X TO THE LEVEL OF MOTORWAY

SECTION DEMIR KAPIJA – SMOKVICA

AT THE FIRST 4 KM

BRIDGE B1

B1 – Placing of reinforcement cage for pile P25 on Abutment A0R B1 – Checking of formwork before concreting for piles C13 and C14 on Pier P1R

B1 – Placing of reinforcement on Abutment A0L B1 – Apply Asphalt coating of pile cap on Abutment A0L

3

BRIDGE B1

B1 – Placing of bearings on Abutment A0Left B1 – Checking of reinforcement on Pier head P1R

B1 – View on Bridge B1 with Abutment A0R B1 – View on Abutment A5 – reinforcement checked and start with formwork(1st stage)

11-Mar-16 4

BRIDGE B1

B1 – Placing of metal sheet between Main girders in the first span, AOLeft-P1Left B1 – View on the concreting of Main Girder No.23 with pump

B1 – Placing reinforcement of Cross Beam on Abutment A4Left B1 – Connection of bearing with Main girder and placing on bearing plinth(Abutment A0Right)

11-Mar-16 5

BRIDGE B1

B1 – Placing of concrete for Crossbeam on Abutment A0 (R.B.) B1 – Placing of concrete for Crossbeam on Pier P1 (R.B.)

B1 – Placing of reinforcement for Sidewalk(right side) (L.B.) B1 – Placing of concrete for Sidewalk(left side) (L.B.)

6

BRIDGE B1

B1 – View on Bridge B1

7

TUNNEL T1

T1 –Mechanical Opening South portal Tunnel T1: Gorge area NRP starting excavation in the underground installation 1st arches LG.

Tunnel T1-Right Branch excavation works at bench. Tunnel T1: Gorge area NRP excavation works jumbo drilling in the bench.

11-Mar-16 8

TUNNEL T1

Tunnel T1: SP L.B: installation of the scaffolding for the placement of geotextile and PVC membrane. Tunnel T1: Southern Portal Left Bore installation of geotextile.

Tunnel T1: Left Bore waterproofing works (placement of PVC membrane). Tunnel T1:South Left Bore cast of concrete for the final lining Block L033

9

TUNNEL T1

Tunnel T1-Left Bore casting concrete at Tunnel vault Northern Portal cut&cover . Tunnel T1-Left Bore reinforcement works at Tunnel vault Northern Portal cut&cover .

Tunnel T1-Left Bore view from cut&cover. Tunnel T1-Right Bore view from cut&cover Northern Portal.

10

BRIDGE B2

B2 – Excavation for foundation(pile cap) P3R B2 – Reinforcement of Pile Cap (1st stage),ready for check, Pier P3(R.B.)

B2 – Concreting of pile cap on P2R

B2 – Concreting of Pilecap(2nd stage),Pier P3(L.B)

11

BRIDGE B2

B2 – Placing of reinforcement on Pier P2R(5th stage)

B2 – Reinforcement of Pier P3Right(3rd stage),ready for check, Pier P2(R.B.)

B2 – Concreting of Pier P3Right(4th stage),Pier P3(R.B)

B2 – Concreting of Pier P3Right (2nd stage)

11-Mar-16 12

BRIDGE B2

B2 – View on Pierhead on Pier P3(R.B) after concreting and start with curing

B2 – Placing of concrete on Segments P2-5R/P2-5L(Side Walls/Upper Slab),Pier P2(R.B)

B2 – View on Bridge B2 with access road B2 – Concreting of Segments P3-5R/P3-5L(Side Walls/Upper Slab),Pier P3(R.B)

13

BRIDGE B2

B2 – View on Bridge B2 with access road

14

R.E.W

Installed face panels at Reinforced Earth Wall (bottom wall 2)

Installation of GeoStrap-5 type strips at Reinforced Earth Wall (bottom wall 1&2)

Installation of GeoStrap-5 type strips at Reinforced Earth Wall (bottom wall 1&2)

Installation of drainage layer at Reinforced Earth Wall (bottom wall 1&2)

15

R.E.W.

R.E.W. – Formation of embankment (TW 3, 4) Layer 2 R.E.W. – Formation of embankment (BW 3, 4) Layer 29/35

R.E.W.- Wall 2 R.E.W.- Wall 3

16

R.E.W.

R.E.W. R.E.W.– view from distance

17

EMBANKMENT E1

View of Embankment 1 Placement of geogrid at embankment E1

Geogrid installation at Embankment E1 Placement od subgrade layer at Embankment 1

18

EMBANKMENT E1

Placement od subgrade layer at Embankment 1 Embankment 1 – Subgrade layer

View of Bridge B2, REW, E1, C1 19

B2, R.E.W., E1,C1

20

CUT 1

CUT 1 Excavation at Cut 1

Cut C1 – Excavation CUT 1 – Wide earth excavation

21

CUT 1

Cut C1 excavation Cut C1 excavation

CUT C1 Excavation CUT C1