ALONG CORRIDOR X TO THE LEVEL OF MOTORWAY
SECTION DEMIR KAPIJA – SMOKVICA
AT THE FIRST 4 KM
BRIDGE B1
B1 – Placing of reinforcement cage for pile P25 on Abutment A0R B1 – Checking of formwork before concreting for piles C13 and C14 on Pier P1R
B1 – Placing of reinforcement on Abutment A0L B1 – Apply Asphalt coating of pile cap on Abutment A0L
3
BRIDGE B1
B1 – Placing of bearings on Abutment A0Left B1 – Checking of reinforcement on Pier head P1R
B1 – View on Bridge B1 with Abutment A0R B1 – View on Abutment A5 – reinforcement checked and start with formwork(1st stage)
11-Mar-16 4
BRIDGE B1
B1 – Placing of metal sheet between Main girders in the first span, AOLeft-P1Left B1 – View on the concreting of Main Girder No.23 with pump
B1 – Placing reinforcement of Cross Beam on Abutment A4Left B1 – Connection of bearing with Main girder and placing on bearing plinth(Abutment A0Right)
11-Mar-16 5
BRIDGE B1
B1 – Placing of concrete for Crossbeam on Abutment A0 (R.B.) B1 – Placing of concrete for Crossbeam on Pier P1 (R.B.)
B1 – Placing of reinforcement for Sidewalk(right side) (L.B.) B1 – Placing of concrete for Sidewalk(left side) (L.B.)
7
TUNNEL T1
T1 –Mechanical Opening South portal Tunnel T1: Gorge area NRP starting excavation in the underground installation 1st arches LG.
Tunnel T1-Right Branch excavation works at bench. Tunnel T1: Gorge area NRP excavation works jumbo drilling in the bench.
11-Mar-16 8
TUNNEL T1
Tunnel T1: SP L.B: installation of the scaffolding for the placement of geotextile and PVC membrane. Tunnel T1: Southern Portal Left Bore installation of geotextile.
Tunnel T1: Left Bore waterproofing works (placement of PVC membrane). Tunnel T1:South Left Bore cast of concrete for the final lining Block L033
9
TUNNEL T1
Tunnel T1-Left Bore casting concrete at Tunnel vault Northern Portal cut&cover . Tunnel T1-Left Bore reinforcement works at Tunnel vault Northern Portal cut&cover .
Tunnel T1-Left Bore view from cut&cover. Tunnel T1-Right Bore view from cut&cover Northern Portal.
10
BRIDGE B2
B2 – Excavation for foundation(pile cap) P3R B2 – Reinforcement of Pile Cap (1st stage),ready for check, Pier P3(R.B.)
B2 – Concreting of pile cap on P2R
B2 – Concreting of Pilecap(2nd stage),Pier P3(L.B)
11
BRIDGE B2
B2 – Placing of reinforcement on Pier P2R(5th stage)
B2 – Reinforcement of Pier P3Right(3rd stage),ready for check, Pier P2(R.B.)
B2 – Concreting of Pier P3Right(4th stage),Pier P3(R.B)
B2 – Concreting of Pier P3Right (2nd stage)
11-Mar-16 12
BRIDGE B2
B2 – View on Pierhead on Pier P3(R.B) after concreting and start with curing
B2 – Placing of concrete on Segments P2-5R/P2-5L(Side Walls/Upper Slab),Pier P2(R.B)
B2 – View on Bridge B2 with access road B2 – Concreting of Segments P3-5R/P3-5L(Side Walls/Upper Slab),Pier P3(R.B)
14
R.E.W
Installed face panels at Reinforced Earth Wall (bottom wall 2)
Installation of GeoStrap-5 type strips at Reinforced Earth Wall (bottom wall 1&2)
Installation of GeoStrap-5 type strips at Reinforced Earth Wall (bottom wall 1&2)
Installation of drainage layer at Reinforced Earth Wall (bottom wall 1&2)
15
R.E.W.
R.E.W. – Formation of embankment (TW 3, 4) Layer 2 R.E.W. – Formation of embankment (BW 3, 4) Layer 29/35
R.E.W.- Wall 2 R.E.W.- Wall 3
17
EMBANKMENT E1
View of Embankment 1 Placement of geogrid at embankment E1
Geogrid installation at Embankment E1 Placement od subgrade layer at Embankment 1