Page 1: S-ENGINEERING LLCse.ua/images/download/presentatsiya_eng.pdf · solutionforindustrial,residential,municipalandpublicfacilities. ТМ “OBERON”-industrial distribution devices of

S-ENGINEERING LLC

Page 2: S-ENGINEERING LLCse.ua/images/download/presentatsiya_eng.pdf · solutionforindustrial,residential,municipalandpublicfacilities. ТМ “OBERON”-industrial distribution devices of

TURKMENISTAN

SE Group International

UKRAINE

Holding Structure

U.A.E QATARSAUDI ARABIA КAZAKHSTAN

1

Page 3: S-ENGINEERING LLCse.ua/images/download/presentatsiya_eng.pdf · solutionforindustrial,residential,municipalandpublicfacilities. ТМ “OBERON”-industrial distribution devices of

Odessa, Ukraine

Global Coverage

Ashgabat, Turkmenistan

Uralsk, Kazakhstan

Uralsk

KAZAKHSTAN

Riyadh, Saudi Arabia

Riyadh

SAUDI ARABIA

QATAR

Doha

Doha, Qatar

Dubai, UAE

Dubai

UNITED ARAB EMIRATES

2

Page 4: S-ENGINEERING LLCse.ua/images/download/presentatsiya_eng.pdf · solutionforindustrial,residential,municipalandpublicfacilities. ТМ “OBERON”-industrial distribution devices of

More than 300 executed projects in the field of power supply

systems, automation of technological processes, electric drives and

technical security systems.

The industrial complex of the company «S-Manufacturing»

Management system ISO:

9001:2008 14001:2004 18001:2007 50001:2011

Licensee of SIEMENS technology :

SIVACON S8 SIMOPRIME

The technologies of SE GROUP Int.:

SelaM OBERON

Status of the international partner in the program

Siemens Solution Partner Automation

Official partner of the Industrial Automation and Drive Technologies

Department, State Enterprise Siemens Ukraine.

Patented technologies SENUMAC and LEFFOL.

EPC Contractor in construction of Power Engineering and Industry

facilities.

.

About the company

3

Page 5: S-ENGINEERING LLCse.ua/images/download/presentatsiya_eng.pdf · solutionforindustrial,residential,municipalandpublicfacilities. ТМ “OBERON”-industrial distribution devices of

2010146 projects

200995 projects

2011207 projects

2012250 projects.

2013260 projects.

2014293 projects.

2015339 projects.

200851 projects.

Activity in numbers

4

Page 6: S-ENGINEERING LLCse.ua/images/download/presentatsiya_eng.pdf · solutionforindustrial,residential,municipalandpublicfacilities. ТМ “OBERON”-industrial distribution devices of

11%Other

20% Oil & Gas

23% Food

23%Food Industry

4%Chemical

Industries7%

Pulp & Paper

22%Construction

4%Cement

9%Transport

Area of Application

5

Page 7: S-ENGINEERING LLCse.ua/images/download/presentatsiya_eng.pdf · solutionforindustrial,residential,municipalandpublicfacilities. ТМ “OBERON”-industrial distribution devices of

Innovative technologies

Application advantage:

More comprehensive use of the potential of existing equipment andtechnologies by increasing the intellectual level of the algorithms inautomatic control systems (ACS).

SE GROUP Int. Technologies

A unique technology of bulk flow transportation line load automated control

A unique technology of conveyer loading efficiency control

Efficiency sources:

Reduction of staff; Reduction of energy consumption and loss of raw materials; Prevention of losses from accidents and their consequences.

Page 8: S-ENGINEERING LLCse.ua/images/download/presentatsiya_eng.pdf · solutionforindustrial,residential,municipalandpublicfacilities. ТМ “OBERON”-industrial distribution devices of

Innovative technologies

SE Group Int. Technologies

ТМ “SelaM” - low-voltage Switchgear for a unified and simplepower distribution up to 4000A in the civil and industrialconstruction, as well as in industries with continuous productionprocesses.Low Voltage Distribution Switchgear SelaM is intended forreception, distribution of three-phase alternating electric powerhaving voltage up to 1000V of industrial frequency. It is a turnkeysolution for industrial, residential, municipal and public facilities.

ТМ “OBERON” - industrial distribution devices of medium voltage (6-10 kV switchgear assembly) the production of which is based on innovative development, flexible modular solutions along with the integration of standard solutions.

Due to the wide range of withdrawable versions of the switchgear assembly OBERON might be used in the solutions of supply and distribution of electricity in power plants, in various branches of industry and national economy.

7

Page 9: S-ENGINEERING LLCse.ua/images/download/presentatsiya_eng.pdf · solutionforindustrial,residential,municipalandpublicfacilities. ТМ “OBERON”-industrial distribution devices of

Maximum reliability due to the use of fully tested standardcomponents (FT SC) Maximum safety for service personnel due to the design stableto short circuit arc Perfect industrial design to integrate SC into modern spatial solutions Compactness Top or rear location of the busbars Combining different mounting methods in a single section Flexible customization of indoor separation Simple change of door hinges due to versatile hinges Effective ventilation system Top, bottom or rear connection of cables and busbars

High reliability of switchgear and complete customersatisfaction (Customized solution in full compliance withthe requirements) High degree of safety for people (life and health protection) The highest operational readiness Money saving

SIEMENS Technologies

SIVACON S8, S4: low voltage switchgears with amperage up to7000А.

SIMOPRIME: medium voltage switchgear up to 3600А.

Innovative technologies

8

Page 10: S-ENGINEERING LLCse.ua/images/download/presentatsiya_eng.pdf · solutionforindustrial,residential,municipalandpublicfacilities. ТМ “OBERON”-industrial distribution devices of

The license for the design and manufacture of miniature withdrawable units of reduced size 1/4 and 1/2under a license from SIEMENS SIVACON S8

Innovative technologies

SIEMENS Technologies

Cabinet for universal mounting with roll-out modules Miniature withdrawable modules:Height 150 mm and 200 mmUp to 48 withdrawable units per section

Size1/4 Size 1/2

Standard withdrawable modules:Height from 100 mm to 700 mmUp to 18 withdrawable modules per section

9

Page 11: S-ENGINEERING LLCse.ua/images/download/presentatsiya_eng.pdf · solutionforindustrial,residential,municipalandpublicfacilities. ТМ “OBERON”-industrial distribution devices of

Nature of business

1. Electric power supply systems up to 330 kV.

Production of packaged switchgears:

with voltage up to1000V and current up to 7000 А with voltage up to 6-10kV and current up to 3600 А

2. Automation systems:

Process automated control system: centralized and distributed

Dispatch systems: building automation

3. Automatic power control systems:

Electric drive control system: AC and DC

Safety and telecommunication systems

Firefighting systems

Service maintenance

Outsourcing10

Page 12: S-ENGINEERING LLCse.ua/images/download/presentatsiya_eng.pdf · solutionforindustrial,residential,municipalandpublicfacilities. ТМ “OBERON”-industrial distribution devices of

Suggested solutions

increasing productivity up to 30%, reducing energycosts by 20-30%, minimizing emergency situations,increasing the lifetime of the equipment andexception of the mistakes related to the “humanfactor” and optimization of staff.

The main advantages of Implementation oftechnologies SENUMAC and LEFFOL :

1. Complex system of the automation of technological

processes.

2. Power Supply System 0.4 / 6/10/35 kV and above.

3. Lightning protection and grounding system.

4. Lighting system.

5. Technical security system (automatic fire extinguishing

and smoke removal system, access control, video

monitoring etc.)

6. The system of electric heating of industrial pipelines.

11

Page 13: S-ENGINEERING LLCse.ua/images/download/presentatsiya_eng.pdf · solutionforindustrial,residential,municipalandpublicfacilities. ТМ “OBERON”-industrial distribution devices of

Burren Resources Petroleum Limited

Burun field(oil reserves - 50 MT, gas reserves - 30 billion cubic

meters).

Gara Altyn production area: development andimplementation of mobile drilling unit power supplysynchronization system.

Khana production area: development andimplementation of mobile drilling unit power supplysynchronization system.

Oil pretreatment area: reconstruction of powersupply system.

Oil pumping station: reconstruction of powersupply system.

Development and implementation of mobile modulartransformer yard for crude oil distillation plant powersupply.

Production and Supply of Complete ElectricalEquipment; Development of Software for AutomaticControl System of Power Equipment and HVACSystems, Fire Alarm Systems and Inergen Gas FireSuppression.

Development and delivery of temporary powersupply system of two gas-lift compressor stations ofplant on primary separation of oil.

Completed projects

12

Page 14: S-ENGINEERING LLCse.ua/images/download/presentatsiya_eng.pdf · solutionforindustrial,residential,municipalandpublicfacilities. ТМ “OBERON”-industrial distribution devices of

Khazar port power supply: Reconstruction of 6-0,4kV power supply system.

Khazar oil refinery: Khazar Port outdoor IlluminationReconstruction and Sites Construction. -Replacement of 35kV Distribution Device by 52 kVDistribution Device at the Primary Oil Refining Plant.

Dzheitune deposit: Set of works on a turn-key basison development and creation of the power supplysystem for power consumers of dry oil pipelineheating located on fixed offshore platform (LAM A):development of design documentation, manufacturingand supply of low-voltage switchgear 0.4 kV,laboratory testing, installation and commissioningworks.

Dragon Oil

“Belek” oil pumping station: reconstruction of powersupply systems.

“Zapad/West” gas pumping station,“Nebitdagnebit”: a complex reconstruction of powersupply system.

Reconstruction of infrastructure complex powersupply system.

Turkmenneft

Completed projects

13

Page 15: S-ENGINEERING LLCse.ua/images/download/presentatsiya_eng.pdf · solutionforindustrial,residential,municipalandpublicfacilities. ТМ “OBERON”-industrial distribution devices of

ETIREX-CHROMALOX

Set of works on implementation of automated control system of electric heating of thecrude oil distillation unit: software development, delivery of equipment and pre-commissioning for oil refinery of ОАО “Gazprom neftekhim Salavat”, Bashkortostan, theRussian Federation.

• “Gubkinskoye” gas field (production extent - 15 BCMPA):safety systems implementation:

Development of a complex of technical means of protection within the project of construction of access control point of the southern site of Gubkinsky gas field.

Work package of equipment design, supply, installation and commissioning works of the following safety systems: alarm TV system; burglar alarm and perimeter control system; access control system; wireless data transmission; system for data collection, processing and representation.

Completed projects

• “SRTO-Torzhok” main gas pipeline, Grazovetskayacompressor station (pumpover scope - 50 BCMPA): GPU(gas pumping unit) power supply systems implementation.

Gazprom

Purgaz

A tank of fuel oil preparation and storage - a range of works on electric heating andfuel oil homogeneity system development and implementation (the tank of 20000m3 )

ТNК-ВР

14

Page 16: S-ENGINEERING LLCse.ua/images/download/presentatsiya_eng.pdf · solutionforindustrial,residential,municipalandpublicfacilities. ТМ “OBERON”-industrial distribution devices of

Completed projects

LUKOIL – ODESSA OIL REFINERY

Cogeneration plant of thermal and electric energygeneration (power generation plant with capacity of18МW) – a range of works on power supply and electricheating control systems reconstruction.

Development and synchronization system forcogeneration plant with power supply system of110/6kV.

HS (system of kerosene cut hydrofining) – a range ofworks on pipeline electrical heating automated systemsdevelopment and implementation.

VU (Visbreaker unit) - a range of works on powersupply system reconstruction.

VU (Visbreaker unit) – pipeline electrical heatingautomated systems development and implementation.

GRMW (goods and raw materials workshop) – a rangeof works on reconstruction of storage parks andpetroleum products transportation power supplysystems.

ELDU – AUT (electrolytical desalting plant) – a full range of works on power supply system reconstruction.

BP (boiler plant) – a full range of works on powersupply system reconstruction.

15

Page 17: S-ENGINEERING LLCse.ua/images/download/presentatsiya_eng.pdf · solutionforindustrial,residential,municipalandpublicfacilities. ТМ “OBERON”-industrial distribution devices of

System Capital Management (SCM)

Korakhovo thermal power plant: modernization of power supplysystems and power generating unit automation №7.

Zuevka thermal power plant: modernization of power supplysystems and power generating unit automation №1, 3, 4.

Lugansk thermal power plant: modernization of power supplysystems and power generating unit automation №17.

Kiev energy construction company

Modernization of the Relay Protection Systems: Production and Supply of more than 50 Relay Protection and Automation Control Systems Cabinets for the seven 750 kV Substations.

Completed projects

Bylche Volytsya Booster compressor station: a full range ofworks on GPU-C-16 power supply systems reconstruction (gaspumping unit with capacity of 16 MV to secure storage operation of17 billion cubic meters).

Dashava Booster compressor station: a full range of works onGPU-C-6,3 power supply systems reconstruction (gas pumping unitwith capacity of 6,3 MV to secure storage operation of 2 billion cubicmeters, transportation of 6 billion cubic peters a day).

KS-2 Dolyna Compressor station: design of “DUG-II gas pipelinereconstruction” power supply system.

Ukrtransgas

16

Page 18: S-ENGINEERING LLCse.ua/images/download/presentatsiya_eng.pdf · solutionforindustrial,residential,municipalandpublicfacilities. ТМ “OBERON”-industrial distribution devices of

KERNEL Holding S.A.Implementation of the power supply system, integrated automationsystem:

1. Elevator v.Devladovo, Dnepropetrovsk region:Set of works on a turn-key basis for design, software development,installation and commissioning of the power supply system andautomatic process control system of corn acceptance, storing andprimary conversion area .

Completed projects

3. Elevator v. Budishche, Cherkassy region:Turn-key project on implementation of power supply system and automatic process control systemof corn acceptance, storing and primary conversion area with capacity of 60 thousand tons: designworks, software development, equipment manufacturing and supply, installation as well as start-upand adjustment works.

4. Elevator v. Vesnyanka, Khmelnitsky region:Set of works on a turn-key basis on power supply systemimplementation and automatic process control system of cornacceptance, storing and primary conversion area with capacity of100 thousand tons: design works, software development,equipment manufacturing and supply, installation as well as start-up and adjustment works. .

2. Elevator v. Smolino, Kirovograd region:Set of works on a turn-key basis on power supply system implementation and automatic processcontrol system of corn acceptance, storing and primary conversion area with capacity of 60 thousandtons: design works, software development, equipment manufacturing and supply, installation as wellas start-up and adjustment works.

Elevators

17

Page 19: S-ENGINEERING LLCse.ua/images/download/presentatsiya_eng.pdf · solutionforindustrial,residential,municipalandpublicfacilities. ТМ “OBERON”-industrial distribution devices of

State Enterprise Odessa Sea Commercial Port

Grain handling terminal “Brooklyn - Kiev“: Design works on engineering networks carry-over from construction footprint “Grain handling

terminal “Brooklyn - Kiev“ LLC in back areas of port terminals No.1-3. Development of project documentation of power supply and outdoor lighting " Grain handling

terminal “Brooklyn - Kiev“ LLC in back areas of port terminals No.1-3.

Port elevators

TOEPFER INTERNATIONAL UKRAINE

• Port Elevator "Ukrelevatorprom" Odessa: set of works on aturn-key basis for the development and implementation ofautomated control systems (based on SENUMAC and LEFFOLtechnology), power supply systems, lighting, fire alarm system,lightning protection and grounding of output galleries capacity 500tons / hour site No2 of grain handling complex.

"Khmelnitsky elevator", Khmelnik: set of works on a turn-keybasis for the development and implementation of automatedcontrol systems (based on SENUMAC and LEFFOL technology),power supply systems, indoor and outdoor lighting, lightningprotection and grounding of grain drying and storing complexcapacity 40 000 tons.

ADM Set of works on to create automation of husk granulation line;

design, manufacturing, software development, installation andcommissioning works, putting the equipment into operation.

Development and implementation of automation in oil hydrationplant: design, manufacturing, software development, installationand commissioning, putting the equipment into operation.

Completed projects

18

Page 20: S-ENGINEERING LLCse.ua/images/download/presentatsiya_eng.pdf · solutionforindustrial,residential,municipalandpublicfacilities. ТМ “OBERON”-industrial distribution devices of

Food industryNoble Resources Ukraine

Complex of sunflower seeds processing capacity 2000 tons per day:

• Set of works on equipment manufacturing, implementation ofinstallation and starting-up and adjustment works of electromotors control system of plant oil transferring section based ontechnology Siemens Sivacon S8.

• Set of works on creation of power supply system: manufacturingand packaged supply of Switchgears 0,4kV, manufacturedaccording to technology Siemens Sivacon S8 and Switchgears6kV, manufactured according to technology Siemens Simoprime,power transformers (4х2500kVА); software development ofdispatching system of plant power supply; implementation ofinstallation and starting-up and adjustment works at transformersubstation within the project of construction of new plant ofsunflower seeds processing.

• Set of works on a “turn-key” basis on software developmentprovide the libraries with the models of standard equipment andimplementation of industrial automation system based onSiemens PCS7 technology for new plant of sunflower seedsprocessing.

Completed projects

• Set of works on a "turn-key" basis on development of design documentation, manufacturing ofdrives motor control panels on a basis of Sivacon S8 technology of the elevator, shops forpreparation, extraction, compaction, water treatment and boiler room, performance of installationand start-up and adjustment works, as well as development of operational documentation withinthe framework of the project "Construction of new plant on sunflower seeds processing".

19

Page 21: S-ENGINEERING LLCse.ua/images/download/presentatsiya_eng.pdf · solutionforindustrial,residential,municipalandpublicfacilities. ТМ “OBERON”-industrial distribution devices of

Completed projects

Anheuser-Bush InBev

Brewery “Yantar” Set of works “on a turn-key basis” for enhancement of conveyor control

system of filling lines No.3: equipment supply, implementation ofinstallation works and starting-up and adjustment works.

Enhancement of ACS of continuous beer pasteurizer manufactured byKHS Company.

Design, installation and starting-up works of dispatching system andtechnical recordkeeping of Switchgear 6 kV of Substation RP-71.

Design, installation and starting-up works of TP ACS of storage area ofcleansing agents and power supply system of caustic soda tank storagearea.

Design, manufacturing, installation and starting-up works of fire alarmsystem.

Brewery “Desna” Updating of Main Switchboard MSWB-0.4kV of Transformer Substation No.4 of beer filling line and bottle

washing. Design, manufacturing, installation and starting-up and adjustment works. Updating of Main Switchboard MSWB-0.4kV of Transformer Substation No.2 of water treatment plant and air

handling. Design, manufacturing, installation and starting-up and adjustment works. Construction and tooling of Transformer Substation No.6 for power supply of new line of bottling line. Audit of power wiring harness.

Brewery “Rogan” Design, manufacturing, installation and starting-up and adjustment works

of power supply system of canned beer filling line. Design works and construction of Transformer Substation No.5.

Food-manufacturing

20

Page 22: S-ENGINEERING LLCse.ua/images/download/presentatsiya_eng.pdf · solutionforindustrial,residential,municipalandpublicfacilities. ТМ “OBERON”-industrial distribution devices of

Anheuser-Bush InBev Set of “turnkey” works on upgrading of automation and power supply

system of the bottle washing lines CIP 3,4 (city of Perm). Set of works on modernization of stabilizers metering system:

development and delivery of hard- and software, installation works and pre-commissioning, testing at 6 factories of JSC “SUN InBev”, the RF (Ivanovo, Volzhski, Perm, Novocheboksarsk, Saransk and Klin).

Work package to modernize the filtration plant to ensure dosing new material: development of technical documentation and software, equipment and material supply, installation and commissioning works (city of Klin).

Milk processing plant “Galakton” Set of works on a “turn-key” basis on equipment and materials supply,

implementation of installation and start-up and adjustment works onlighting system reconstruction (implementation of the solid-state lighting)of the warehouses No.1, No.2, No.3 for the storage of products of PJSC“Galakton”.

Milk canning plant Pervomayskyi Set of works on a “turn-key” basis on designing, soft-ware development,

installation supervision and adjustment works of weight measuringsystem at the milk receiving station.

Bashtansky cheese plant Set of works on designing, equipment and materials supply, software development, execution of start-up

and adjustment works for automated control system of technological process at the stage of milk receiving,cooling, storing and its supply to the manufacturing, as well as to the CIP – stations..

Completed projects

Food-manufacturing

NEMIROFF Updating of control system of packaging machine R700: equipment supply, implementation of

installation and starting-up and adjustment works.21

Page 23: S-ENGINEERING LLCse.ua/images/download/presentatsiya_eng.pdf · solutionforindustrial,residential,municipalandpublicfacilities. ТМ “OBERON”-industrial distribution devices of

PepsiCo Sandora

1. Set of works on a “turn-key” basis: design, manufacturing, installationand commissioning works of uninterruptable power supply system oftransformer substations No 1

2. Design, manufacturing, installation and commissioning of the powersupply system of the industrial complex No 2.

3. Design, installation and commissioning works on modernization oftransformer substations No1 and No 2, manufacturing, supply andinstallation of 0.4 kV distribution panels at the new sites of theindustrial complex No 2.

4. Design, manufacturing, installation and commissioning of 0.4 kVswitchgear for power supply system of sugar silo storage.

5. Set of works on a “turn-key” basis on reconstruction of power supplysystems and sewage treatment plants automation at the juiceproduction plant.

DANONE

Full set of works “on a turn-key basis” for development and implementation of utility metering system:software development, design, equipment supply, installation and starting-up and adjustment works.

Set of “turnkey” works on design documentation development, equipment and materials supply, softwaredevelopment, execution of installation and start-up and adjustment works on automation of delivery andstoring system of artesian water.

Set of works on a “turn-key” basis on designing, equipment and materials supply, implementation ofinstallation and start-up and adjustment works on lighting system reconstruction (implementation of thesolid-state lighting) above the Arcil and Ermi lines and for the prepowder warehouse

Power supply system audit of milk plant “DANONE”.

Completed projects

Food-manufacturing

22

Page 24: S-ENGINEERING LLCse.ua/images/download/presentatsiya_eng.pdf · solutionforindustrial,residential,municipalandpublicfacilities. ТМ “OBERON”-industrial distribution devices of

Delta Wilmar CIS

Set of works on equipment and materials supply, execution ofinstallation and start-up and adjustment works for lighting of “Workshopof oil neutralizing and winterization onsite– “Tropical oil handling andprocessing complex”.

"Turnkey" work package of step-down substation 35/6 кV for newoilseed processing facilities: design documentation, equipment andmaterials supply, laboratory tests, installation and commissioningworks.

"Turnkey" work package to create outline grounding and lightningprotection systems of the preparatory oilseed processing workshop:design, equipment and materials supply, installation and commissioningworks, laboratory tests.

Agricultural holding Ukrlandfarming

Agricultural holding Ukrlandfarming, Ternopol region, v. Ostrov: Work package to develop design documentation for systems of

automation, power supply, grounding and lightning system of theelevator with capacity of 252 thousand tons.

Agricultural holding Ukrlandfarming, Zhytomir region, v. Olievka: Work package to develop design documentation for systems of

automation, power supply, grounding and lightning system of theelevator with capacity of 150 thousand tons.

Completed projects

Food-manufacturing

23

Page 25: S-ENGINEERING LLCse.ua/images/download/presentatsiya_eng.pdf · solutionforindustrial,residential,municipalandpublicfacilities. ТМ “OBERON”-industrial distribution devices of

National Bank of Ukraine – Banknote paper Mill

Set of works on designing, execution of installation and start-upand adjustment works on replacement of 5 direct-current drives ofthe paper-making machine with integration to the unified monitoringsystem of electric drive working conditions.

Full set of works and equipment supply of press servo drive systemupdating of filigree meshes processing.

Reconstruction and enhancement of manufacturing technology ofbanknote paper on a make-up line for paper-sizing unit: equipmentsupply, installation and starting-up and adjustment works,commissioning.

Full updating of TP ACS of paper-making “on a turn-key basis” (6manufacturing plants).

Updating of rate setting forming system and the moment of paper-making machine driving.

Design, installation and starting-up and adjustment works ofsmooth-start system of paper pulp refining machine with capacity315 kW.

Design, installation and starting-up and adjustment works ofelectric drive variable-frequency control system of paper-makingblowing machine.

Completed projects

Pulp and Paper

24

Page 26: S-ENGINEERING LLCse.ua/images/download/presentatsiya_eng.pdf · solutionforindustrial,residential,municipalandpublicfacilities. ТМ “OBERON”-industrial distribution devices of

Kiev Cardboard and Paper Mill

Full set of works “on a turn-key basis” on updating of electricdrive control system for longitudinal-cutting machine of paper-making plant.

Soft-ware upgrading, implementation of start-up and adjustmentworks of electric drive control system for longitudinal-cuttingmachine “A. CELLI” of the paper-making workshop.

Audit of automation and electric drive system of longitudinal-

cutting machine “A.Celli”, of the Paper-making manufacturing.

Modernization of DC electric drive control system for longitudinal-cutting machine (LCM-2) of paper-making workshop.

Weidmann - Malin Paper Mill

Design, installation and starting-up and adjustment works of TPACS of pulp refining section at the plant No.6.

Updating of electric drive control system of DC current of highpressure pumps No.1 and No.2 of pulp refining process of theplant No.6.

Design, manufacturing, , installation and starting-up andadjustment works of boards of electric drive variable-frequencycontrol system of pulp refining section at the plant No.6.

Completed projects

Pulp and Paper

25

Page 27: S-ENGINEERING LLCse.ua/images/download/presentatsiya_eng.pdf · solutionforindustrial,residential,municipalandpublicfacilities. ТМ “OBERON”-industrial distribution devices of

AZOVSTAL Set of works on designing and software development for upgrading of

automated control system of mating-detachment of the rails of railhardening machine.

Set of “turnkey” works on upgrading of automated control system ofregenerators temperature maintenance of the oxygen and nitrogenregeneration station-30 No.4.

Designing works and software development within the framework ofthe project on upgrading of thyristor converters of rail and beam shop.

Implementation of the set of works on reconstruction and start-up andcommissioning of frequency converters with capacity 1,5 megawatt atthe section of controlled cooling of the plate rolling train 3600 of theworkshop.

Set of works on the Reconstruction of the Roller Furnace Automatic Heating Control: DesignDocumentation Development, Equipment Supply, Computational Analysis, Orifice Plates Production,Narrowing Devices and Actuators Installation, Commissioning, Preliminary Tests and Pilot Operationof the System.

INTERPIPE NIKO TUBE

DONIKS Modernization of instrumentation and automation system of heating

furnaces of large size shop at PJC MC "Azovstal".

Poltavsky MPC Production and supply of switchgears for control system of the site

of floatation operational development of concentrate.

Turkmen metallurgical plant Modernization of information collection network Profibus.

Completed projects

Iron and steel industry

26

Page 28: S-ENGINEERING LLCse.ua/images/download/presentatsiya_eng.pdf · solutionforindustrial,residential,municipalandpublicfacilities. ТМ “OBERON”-industrial distribution devices of

Bakhchisarai Cement Plant Set of works on development of construction documentation, software, performance of installation and start-up

and adjustment works, manufacturing and equipment supply for automation systems on a basis of SiemensPCS7 technology and power supply of coaling plant of furnaces No.1 and No.2.

Set of works on development of design documentation, software, performance of erecting and commissioning,production and supply of equipment for automatic control system of drying shop of slag.

Completed projects

Odessa Cement Plant Set of works on creation of power supply system and TP ACS of

palletizing line for packets with cement. Electrification and full automation of technological processes of coal

grinding and dosing of black dust. Supply and installation of Control Instrumentation equipment and

aspiration section, starting-up and adjustment works . Design, equipment supply, installation and starting-up of equipment of

project “Gas analysis of silage coal storage section”.

Dyckerhoff Zement International Design and equipment supply of control and access control system. Installation and starting-up of control and access control system and

CCTV system.

LAFARGE Cement Plant Updating of cement grinding mill No.1. Development of control board

344МСС005.

SC Turkmencement Full fitting and delivery of spare parts manufactured by Siemens,

SHADE. Updating of hardware component of process control system server

equipment based on software PCS7 v5.2 and Cemat v5.03.

Cement Industry

27

Page 29: S-ENGINEERING LLCse.ua/images/download/presentatsiya_eng.pdf · solutionforindustrial,residential,municipalandpublicfacilities. ТМ “OBERON”-industrial distribution devices of

Completed projects

General Electric Development and implementation of full dispatching and control

system of reverse osmosis machines General Electric andauxiliary units of the water handling plant of Odessa PortsidePlant.

Logoplaste - Ukraine Design, manufacturing, installation and starting-up of Main

Switchboard 0,4 kV of chiller power supply system. Implementation of set of works and electrical equipment supply.

Main ammonia line Togliatti-Odessa (total length 2195 km,ammonia handling to 2,5 million tons per year): Updating of distributing technological process control system of

ammonia handling. Development and implementation of free digital system of working

conditions registration TP ACS of ammonia handling. Tooling with set of technical safety systems.

UkrChemTransAmmonia

Sintra Development and technical-and-economic justification of power

supply system updating of the plant No.4 of wall paper mill.

Representative office CERIC Laying of channels, installation and connection of cable lines of power supply systems of Brick Factory

“Ceric"

SC Turkmenchemistry Restoring of working conditions of historian based on MIS-Light system.

Chemical

28

Page 30: S-ENGINEERING LLCse.ua/images/download/presentatsiya_eng.pdf · solutionforindustrial,residential,municipalandpublicfacilities. ТМ “OBERON”-industrial distribution devices of

Procter&Gamble Set of works on upgrading of automatic control system of the air

handling unit AНU 3. Technological modernization of the plant Donaldson Filters: set of

works on the Development and Implementation of Donaldson FiltersAutomated Control System for Simona Technological Lines atProcter & Gamble Plant in Boryspil.

Completed projects

LEONI Development and implementation of control system of frequency

electric drive based on Siemens equipment for drive of windermechanical section.

Cherkassy bus Design, manufacturing and supervised installation of Switchboards of

painting shop power supply system .

Ukratlantic Set of works “on a turn-key basis” on development and implementation

of indoor and outdoor electric lighting system of new manufacturingconvectors plant.

Full supply of materials and implementation of installation works onconnection of technological equipment of manufacturing convectorsplant.

Manufacturing and supply of local Switchgears 0,4 kV of technicalequipment power supply of manufacturing convectors plant.

Design, equipment supply, installation, starting-up and commissioningof power supply system 10 и 0,4 кV of new manufacturing climateequipment housing. Full set of works “on a turn-key basis”.

Korostensky MDF Plant Set of starting-up and adjustment works on start-up of control system

drive protection of chipping machine 10 кV, 900 кW. Set of starting-up and adjustment works on start-up of control system

drive protection of defibrator 10 кV, 6,3 МW.

Automobile industry

Light industry

Woodworking

29

Page 31: S-ENGINEERING LLCse.ua/images/download/presentatsiya_eng.pdf · solutionforindustrial,residential,municipalandpublicfacilities. ТМ “OBERON”-industrial distribution devices of

Completed projects

SC “Commercial Seaport “Yuzhnyi” Development of reconstruction project SWGR 10,0/0,4 кV of

transformer substation No.14, providing the work of rigging storagearea, machinery hall, ship electric power poles and loaders.

Updating of Switchgear 0,4кV of transformer substation No.1А.

Designing of transformer substation at the berth No.9.

Design, installation and starting-up of power supply system and firealarm system in domestic compartments of administrative-manufacturing building of the car pool.

Design, manufacturing, installation and starting-up of power supplysystems of bucket unloader of berth No.5 and No.6 SC CSP“Yuzhnyi".

Reconstruction of transformer substation No.14, by technical re-equipment SWGR 10,0/0,4кV, providing the power supply to theberth No.5: replacement of off-market equipment, installation andstarting-up and adjustment works.

SC “Dnepro-Bugskyi Seaport NGZ”

Repair of automated system, constructed at SIMATIC S5.

SC “Ilyichyevsk Commercial Seaport” Updating of power supply system 10 кV of seaport administration

building “on a turn-key basis”.

Reconstruction of Switchgear 0,4кV of transformer substation 4553 andterminal Switchgear 0,4кV of the ICC building.

Sea

30

Page 32: S-ENGINEERING LLCse.ua/images/download/presentatsiya_eng.pdf · solutionforindustrial,residential,municipalandpublicfacilities. ТМ “OBERON”-industrial distribution devices of

Transinvestservice

Terminal TIS-Ore»for transshipment of iron ore and pellets: Audit of transshipment complex power supply system. Set of works on a “turn-key” basis on development of

design documentation, equipment supply, installation andstart-up and adjustment works for implementation ofautomatic transfer switch system at the TS 10/0.4 No.58

Updating with the purpose of energy saving: set of workson a "turn-key" basis on development of designdocumentation, equipment supply, performance ofinstallation and start-up and adjustment works forimplementation of compensation condenser unit at thetransformer substation 10/0.4 No.58

Terminal TIS-Coal Power supply system audit of the manufacturing facilities

BLACK SEA FERRIES SHIPPING LIMITED

Operational analysis of power supply system of “SMAT”. Technicalreport forming.

The tow boat of an ice class with traction effort - 70,2 tons: Performance of commissioning and acceptance tests of winch

control system within the project of construction of a vessel

Rolls-Royce International Limited

Completed projects

Transport

31

Page 33: S-ENGINEERING LLCse.ua/images/download/presentatsiya_eng.pdf · solutionforindustrial,residential,municipalandpublicfacilities. ТМ “OBERON”-industrial distribution devices of

International airport “Аshgabat” Design, manufacturing and supply of control cabinet and

synchronization of diesel generator for Switchgear 10кV.

International Airport “Donetsk” Set of works (design, manufacturing, supply, installation, starting-

up and adjustment works on implementation of continuous powersupply system (the first special assurance factor) of luminous-signal, navigation and meteorological equipment of artificialrunway of the first category with length 4000 meters.

Completed projects

International Airport “Lvov” Development and implementation “on a turn-key basis” of dispatching system and engineering

systems control of air-terminal complex of International Airport “Lvov".

UC “Ilyichevskvodokanal” Design, installation and starting-up of remote touch system and

control with the use of wireless network GSM GPRS at the water-supply plants “Aleksandrovka", “Malaya Dolina", “Molodyozhnoe",UC “Dalnik" and disinfection station UC “Ilyichevskvodokanal".

Reconstruction “on a turn-key basis” of power supply system ofthe Central Water-supply plant Iljichyovsk.

Air Transport

HCS

32

Page 34: S-ENGINEERING LLCse.ua/images/download/presentatsiya_eng.pdf · solutionforindustrial,residential,municipalandpublicfacilities. ТМ “OBERON”-industrial distribution devices of

Bouygues Turkmenistan

National Institute of Sports and Tourism Set of works on a "turnkey" basis on design, manufacturing, installation

and commissioning works of 10kV complete switchgear.

Completed projects

Administrative and public buildings

Administrative building Bouygues TURKMENISTAN Set of works on development and implementation of fire safety

systems. Set of works on a "turnkey" basis on design, manufacturing, installation

and commissioning works of complete 10 kV switchgear.

Ministry of Economy and Finance of Turkmenistan Set of works on a "turnkey" basis on design, manufacturing, supply of

equipment of low voltage (SIEMENS SIVACON S8) and mediumvoltage (SIEMENS 8DJH) power supply systems, dispatching systems,as well as entire technical safety systems.

Palace "Ruhyet" Set of works on a "turnkey" basis on design, supply of equipment,

installation and commissioning works on power supply systems andtechnical safety systems.

Oil and Gas Institute1. Packaged supply of equipment and installation and commissioning

works of fire alarm systems, CCTV and access control systems.2. Development and implementation of automation and dispatching of

office buildings complex.3. Development of design documentation, manufacturing and packaged

supply of 0.4 kV switchgear with SIVACON 8PT technology .

33

Page 35: S-ENGINEERING LLCse.ua/images/download/presentatsiya_eng.pdf · solutionforindustrial,residential,municipalandpublicfacilities. ТМ “OBERON”-industrial distribution devices of

Recreation and Sports Center “Maristella Club” Set of works “on a turn-key basis” on implementation of power supply

system, dispatching, technical safety systems in the building ofrecreation complex: design, manufacturing, installation, commissioningand putting into operation.

Development and implementation “on aturn-key basis” of automation,dispatching systems, automated firealarm system, control and accesscontrol system, security alarm system ofsignaling of Hotel complex objects.

Development and turnkey deployment ofautomation systems, automatic systemof fire alarm system, assess controlsystem for hotel of the increasedcomfort named "Anyuta".

Business Center “Pushkinsky” Equipment by access control system, video

observation, power supply, lighting and computernetworks of business center: supply of equipment,set of erecting and commissioning works.

Group of Companies “Sport Life” Set of works on implementation of building

Structured Cabling System: design, equipmentsupply, installation, starting-up and adjustmentworks

Completed projects

Administrative and public buildings

Hotel complex Krymskyi BrizLuxury hotels Verochka, Anyuta, Chayka, including office and technical building:

34

Page 36: S-ENGINEERING LLCse.ua/images/download/presentatsiya_eng.pdf · solutionforindustrial,residential,municipalandpublicfacilities. ТМ “OBERON”-industrial distribution devices of

Shopping Center “Panorama” Set of works “on a turn-key basis” on implementation of power supply and technical safety systems

in the building: design, manufacturing, installation, commissioning and putting into operation.

Completed projects

Hotel “Bristol”1. Design, equipment supply, installation, starting-up

and adjustment works on integration to thegeneral control system and Access ControlSystem of the Hotel of electronic locks, workingoff-line.

2. Implementation of “turn-key” control system andAccess Control System at the Hotel office part:design, equipment supply, installation, starting-upand adjustment works.

Joint Stock Bank “Pivdennyi” Set of works “on a turn-key basis” on updating of emergency

transfer system of Switchgear 0,4кV: development of projectdocumentation, equipment supply, installation, starting-up andadjustment works.

Administrative and public buildings

Kievstar GSM Set of works on implementation of Structured

Cabling System: design, supply, installation andstarting-up and adjustment works,commissioning.

35

Page 37: S-ENGINEERING LLCse.ua/images/download/presentatsiya_eng.pdf · solutionforindustrial,residential,municipalandpublicfacilities. ТМ “OBERON”-industrial distribution devices of

“TechEnergoTrade” LLC. Warehouse complex with administrative buildings

Development of design documentation of engineering systems at multifunctionalwarehouse complex with area over 90,000 m ²: automatic sprinkler system, fire alarmsystem, warning and evacuation systems, automatic smoke exhaust system; lightningprotection and grounding; indoor and outdoor lighting; internal power supply.

Completed projects

Football club “Chernomorets” Set of works on development and implementation of power supply system of stadium

“Chernomorets": design, manufacturing, supervised installation and starting-up of Switchgear 0,4 кVbased on Siemens equipment.

Development of project documentation for automation and dispatching systems of engineeringsystems of the stadium “Chernomorets".

“Administration GSO under CA MIA of Ukraine” Set of works “on a turn-key basis” on updating of power supply

system: development of project documentation, equipment supply,installation and starting-up of automatic transfer equipment 0,4кV.

Hotel complex “Black Sea - Bugaz” Full set of works “on a turn-key basis” on

installation of CCTV system, Access ControlSystem, Structured Cabling Systems, as wellas dispatching system of Hotel complex“Cruise": design, equipment supply, installation,starting-up and adjustment works,commissioning

Administrative and public buildings

36

Page 38: S-ENGINEERING LLCse.ua/images/download/presentatsiya_eng.pdf · solutionforindustrial,residential,municipalandpublicfacilities. ТМ “OBERON”-industrial distribution devices of

Clients

37

Page 39: S-ENGINEERING LLCse.ua/images/download/presentatsiya_eng.pdf · solutionforindustrial,residential,municipalandpublicfacilities. ТМ “OBERON”-industrial distribution devices of

We unite professionals and create effective solutions to work with the best Companies