RTH Washington. Fred Branski, Chief, Performance Monitoring, Support & Data Management Branch Office of the Chief Information Officer NOAA’s National Weather Service OPAG-ISS Meeting Sep 18-22, 2006. NWSTG/RTH Functions. The NWSTG is the central communication facility of the NWS; - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: RTH Washington

RTH WashingtonRTH Washington

Fred Branski, Chief, Performance Monitoring,

Support & Data Management Branch

Office of the Chief Information Officer

NOAA’s National Weather Service

OPAG-ISS Meeting

Sep 18-22, 2006

Fred Branski, Chief, Performance Monitoring,

Support & Data Management Branch

Office of the Chief Information Officer

NOAA’s National Weather Service

OPAG-ISS Meeting

Sep 18-22, 2006

Page 2: RTH Washington

“Taking the pulse of the planet”“Taking the pulse of the planet”

NWSTG/RTH FunctionsNWSTG/RTH Functions

The NWSTG is

the central communication facility of the NWS;

the primary acquisition and distribution center for NWS data and products;

the primary acquisition and distribution center for international data and products to meet WMO, ICAO and bi-laterally agreed US requirements;

A major data exchange hub for NOAA and other agency data and products.

The NWSTG is

the central communication facility of the NWS;

the primary acquisition and distribution center for NWS data and products;

the primary acquisition and distribution center for international data and products to meet WMO, ICAO and bi-laterally agreed US requirements;

A major data exchange hub for NOAA and other agency data and products.

Page 3: RTH Washington

“Taking the pulse of the planet”“Taking the pulse of the planet”

NWSTG Functional OverviewNWSTG Functional Overview

The NWSTG includes

WMO Regional Telecommunication Hub (RTH) Washington

ICAO OPMET Databank (KWBCYMYX)

the ASOS Operations and Monitoring Center (AOMC)

• Operational oversight of U.S. federal automated surface observing systems

the AWIPS Network Control Facility (NCF)

• AWIPS is the main NWS’ system which supports the NWS forecast and warning mission requirement

• The NCF is the central communications hub and technical support center for AWIPS

The NWSTG includes

WMO Regional Telecommunication Hub (RTH) Washington

ICAO OPMET Databank (KWBCYMYX)

the ASOS Operations and Monitoring Center (AOMC)

• Operational oversight of U.S. federal automated surface observing systems

the AWIPS Network Control Facility (NCF)

• AWIPS is the main NWS’ system which supports the NWS forecast and warning mission requirement

• The NCF is the central communications hub and technical support center for AWIPS

Page 4: RTH Washington

“Taking the pulse of the planet”“Taking the pulse of the planet”

Data Input to the RTHData Input to the RTH

IP / Sockets / Frame Relay

X.25

Asynchronous

Dial up

FTP – http://weather.gov/tg/ftpingest.html

Email – http://weather.gov/tg/emailingest.html

Web - http://weather.gov/tg/bullguid.html

IP / Sockets / Frame Relay

X.25

Asynchronous

Dial up

FTP – http://weather.gov/tg/ftpingest.html

Email – http://weather.gov/tg/emailingest.html

Web - http://weather.gov/tg/bullguid.html

Page 5: RTH Washington

“Taking the pulse of the planet”“Taking the pulse of the planet”

Major InitiativesMajor Initiatives

Replacement Telecommunications Gateway

Backup Telecommunications Gateway

NOAANet – National MPLS network

WIS development planning

Code migration

Improved Monitoring

RMTN upgrade

Replacement Telecommunications Gateway

Backup Telecommunications Gateway

NOAANet – National MPLS network

WIS development planning

Code migration

Improved Monitoring

RMTN upgrade

Page 6: RTH Washington

“Taking the pulse of the planet”“Taking the pulse of the planet”

Replacement NWSTG (RTH)Replacement NWSTG (RTH)

Full functional replacement of existing capabilities

Expanded capacity and capability

Transition to new technology

– Message queuing (MQ) for internal transport

– Network centric systems interconnectivity

– Relational database central processing engine

– NAS/SAN storage solutions

Highly scaleable architecture

Hardware refresh

Full functional replacement of existing capabilities

Expanded capacity and capability

Transition to new technology

– Message queuing (MQ) for internal transport

– Network centric systems interconnectivity

– Relational database central processing engine

– NAS/SAN storage solutions

Highly scaleable architecture

Hardware refresh

Page 7: RTH Washington

“Taking the pulse of the planet”“Taking the pulse of the planet”

Geographically separatedbackup system in northernVirginia

Replacement / BackupTG Description

Replacement / BackupTG Description

Worldwide users

• WMO/ICAO• Family of

services• Govt. agencies• Internet users• Foreign

countries• Emergency mgrs

NWS users• Nat’l Centers for Environ. Prediction• NWS Regional Offices• Domestic/int’l observation & forecast offices• AWIPS

NWS Telecom Gateway• Located in Silver Spring• New message switching syst.allows future upgrades• x 2 upgradeability• Much improved response time • Redundancy ensuresuninterrupted service• Full configuration management

120GB/461500 GB

85GB/38250 GB

90GB/46900 GB

950GB/383500 GB

Daily Throughput/# of circuits

Legacy over 5 year projection for replacement

Daily total message flow:

Legacy - 1.245TB

RTG/BTG – 6.15TB (2011)

Measurements/Projections based on May 2006 WMO message flow

Page 8: RTH Washington

“Taking the pulse of the planet”“Taking the pulse of the planet”

NOAANet BackboneSprint Peerless IP Network Map

NOAANet BackboneSprint Peerless IP Network Map

Internet Transport Node

OC48

ChicagoChicago

AnaheimAnaheim

San JoseSan Jose Pennsauken, NJPennsauken, NJ

Kansas CityKansas City

StocktonStockton CheyenneCheyenne

FortWorthFort

Worth

New YorkNew York

TacomaTacoma

AtlantaAtlanta

Relay, MDRelay, MD

DCDC

Page 9: RTH Washington

“Taking the pulse of the planet”“Taking the pulse of the planet”

Status for RTG/BTG NOAANet Status

Status for RTG/BTG NOAANet Status

RTG IOC - June 19, 2006

RTG FOC – 3Q 2006

NOAANet OC-3 connection to BTG – June 2006

BTG IOC / OC-12 – 4Q 2006

All projects end – May 31, 2007

RTG IOC - June 19, 2006

RTG FOC – 3Q 2006

NOAANet OC-3 connection to BTG – June 2006

BTG IOC / OC-12 – 4Q 2006

All projects end – May 31, 2007

Page 10: RTH Washington

“Taking the pulse of the planet”“Taking the pulse of the planet”

Status for RTG/BTG NOAANet Status

Status for RTG/BTG NOAANet Status

NOAANet Transition:

– Internal underway, NWS regions, NCF, NESDIS soon

– External – begin December 01, 2006

– Initially two Access Points

• One within the RTG facility but external to the infrastructure

• One at Parsippany New York – GTS, AFTN / FAA / Hawaii / Micronesia, Others???

• Possibly Atlanta, Chicago, Tacoma, ???

NOAANet Transition:

– Internal underway, NWS regions, NCF, NESDIS soon

– External – begin December 01, 2006

– Initially two Access Points

• One within the RTG facility but external to the infrastructure

• One at Parsippany New York – GTS, AFTN / FAA / Hawaii / Micronesia, Others???

• Possibly Atlanta, Chicago, Tacoma, ???

Page 11: RTH Washington

“Taking the pulse of the planet”“Taking the pulse of the planet”

RTG Performance Measures:RTG Performance Measures:

Requirement FOC Actual Variance Threshold FY06 FY06

FY07

Message (Watch&Warning)

Avg. Transit Time (seconds) 10 6 0 0

Message (Routine&Model)

Avg. Transit Time (seconds) 60 7 -53 0

Avg. Message Traffic

(send/receive) (daily) 1.2TB 1.2 TB 0 0

Requirement FOC Actual Variance Threshold FY06 FY06

FY07

Message (Watch&Warning)

Avg. Transit Time (seconds) 10 6 0 0

Message (Routine&Model)

Avg. Transit Time (seconds) 60 7 -53 0

Avg. Message Traffic

(send/receive) (daily) 1.2TB 1.2 TB 0 0

Page 12: RTH Washington

“Taking the pulse of the planet”“Taking the pulse of the planet”

For Watches and Warnings:For Watches and Warnings:

Avg time (seconds) to queue to outbound FEP: 6.16

Max time (seconds) to queue to outbound FEP: 182 (3.03 minutes)

Avg time (seconds) to send from outbound FEP: 37.77

Max time (seconds) to send from outbound FEP: 3838 (63.96 minutes

Avg time (seconds) to queue to outbound FEP: 6.16

Max time (seconds) to queue to outbound FEP: 182 (3.03 minutes)

Avg time (seconds) to send from outbound FEP: 37.77

Max time (seconds) to send from outbound FEP: 3838 (63.96 minutes

Note: Not all connections are moved to the RTG infrastructure. Those still moving through legacy systems have the longest delays. We still see occasional spikes in the RTG processing stream which we are investigating with IBM to determine the cause and resolve.

Page 13: RTH Washington

“Taking the pulse of the planet”“Taking the pulse of the planet”

For all other data (except Watches and Warnings):For all other data (except Watches and Warnings):

Avg time (seconds) to queue to outbound FEP: 6.97

Max time (seconds) to queue to outbound FEP: 236 (3.93 minutes)

Avg time (seconds) to send from outbound FEP: 17.13

Max time (seconds) to send from outbound FEP: 4039 (67.32 minutes)

Avg time (seconds) to queue to outbound FEP: 6.97

Max time (seconds) to queue to outbound FEP: 236 (3.93 minutes)

Avg time (seconds) to send from outbound FEP: 17.13

Max time (seconds) to send from outbound FEP: 4039 (67.32 minutes)

Note: Not all connections are moved to the RTG infrastructure. Those still moving through legacy systems have the longest delays. We still see occasional spikes in the RTG processing stream which we are investigating with IBM to determine the cause and resolve.

Page 14: RTH Washington

“Taking the pulse of the planet”“Taking the pulse of the planet”

For Model data:For Model data:

Avg time (seconds) to queue to outbound FEP: 10.25

Max time (seconds) to queue to outbound FEP: 189 (3.15 minutes)

Avg time (seconds) to send from outbound FEP: 62.71

Max time (seconds) to send from outbound FEP: 1910 (31.83 minutes)

Avg time (seconds) to queue to outbound FEP: 10.25

Max time (seconds) to queue to outbound FEP: 189 (3.15 minutes)

Avg time (seconds) to send from outbound FEP: 62.71

Max time (seconds) to send from outbound FEP: 1910 (31.83 minutes)

Note: Not all connections are moved to the RTG infrastructure. Those still moving through legacy systems have the longest delays. We still see occasional spikes in the RTG processing stream which we are investigating with IBM to determine the cause and resolve.

Page 15: RTH Washington

“Taking the pulse of the planet”“Taking the pulse of the planet”

Major InitiativesMajor Initiatives

WIS development planning

– TOC undertaking planning of VGISC development and US WIS plan

– Basis provide by RTH upgrade and MPLS rollout

– Will coordinate with Region IV to develop regional plan

Code migration

– Workstations throughout the regional capable of processing TDCF

– Capability for Upper Air translation exists within RTH.

– Extension of translation capability will be main enabling method outside of native processing

Improved Monitoring

– New initiative to be further developed within the RTH and Region.

– Part of Phase two of RTH upgrade.

WIS development planning

– TOC undertaking planning of VGISC development and US WIS plan

– Basis provide by RTH upgrade and MPLS rollout

– Will coordinate with Region IV to develop regional plan

Code migration

– Workstations throughout the regional capable of processing TDCF

– Capability for Upper Air translation exists within RTH.

– Extension of translation capability will be main enabling method outside of native processing

Improved Monitoring

– New initiative to be further developed within the RTH and Region.

– Part of Phase two of RTH upgrade.

Page 16: RTH Washington

“Taking the pulse of the planet”“Taking the pulse of the planet”

Major InitiativesMajor Initiatives

RMTN upgrade

ISCS follow on planning beginning

EMWIN expansion

– Third Border Initiative funding two pilot projects

– Plan to implement 10 to 15 additional EMWIN site within Region IV - Caribbean, Central American area

Enhanced extra regional connections

– Region III

– Russia

RMTN upgrade

ISCS follow on planning beginning

EMWIN expansion

– Third Border Initiative funding two pilot projects

– Plan to implement 10 to 15 additional EMWIN site within Region IV - Caribbean, Central American area

Enhanced extra regional connections

– Region III

– Russia

Page 17: RTH Washington

“Taking the pulse of the planet”“Taking the pulse of the planet”

Major ConcernMajor Concern

Existing GTS Frame relay contract ends Dec 2007

BT may be willing to extend for 1 year

What will be its replacement ???

MPLS ???

Existing GTS Frame relay contract ends Dec 2007

BT may be willing to extend for 1 year

What will be its replacement ???

MPLS ???