rr/2002/475/l - rother.gov.uk file · web viewplanning committee. 11 december 2003. minutes of the...

44
Rother District Council PLANNING COMMITTEE 11 December 2003 Minutes of the Planning Committee held at the Town Hall, Bexhill on Thursday 11 December 2003 at 9.30am. Present:- Councillors: C.N. Ramus (Chairman), R.E. Parren (Vice Chairman), Mrs. J.P. Gadd, G.E.S. Hearn, Mrs. J.B.H. Hopkinson, Mrs. J.M. Hughes, B. Kentfield, C.R. Maynard, Mrs. W.M. Miers, D.W.L.M. Vereker and R. White. Also present: Councillors R.K. Bird (in part), S.H. Earl (in part) and R.H. Patten (in part). Advisory Officers in attendance: Head of Planning, Principal Planning Officer (Development Control), Principal Planning Officer (Appeals/Enforcement), Conservation Officer (in part), Planning Assistant and Democratic Services Officer. D72. MINUTES The Chairman was authorised to sign the minutes of the meeting of the Committee held on 9 November 2003 as a correct record of the proceedings. D73. APOLOGIES FOR ABSENCE Apologies for absence were received from Councillors Mrs. H.R. Bridger, R.F. Dyason and J.A.J. Kemp. DECISIONS TAKEN UNDER DELEGATED POWERS D74. ENFORCEMENT MATTERS The following enforcement matters were reported: 1

Upload: doandiep

Post on 20-Aug-2018

213 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: RR/2002/475/L - rother.gov.uk file · Web viewPLANNING COMMITTEE. 11 December 2003. Minutes of the Planning Committee held at the Town Hall, Bexhill on Thursday 11 December 2003 at

Rother District Council

PLANNING COMMITTEE11 December 2003

Minutes of the Planning Committee held at the Town Hall, Bexhill on Thursday 11 December 2003 at 9.30am.

Present:- Councillors: C.N. Ramus (Chairman), R.E. Parren (Vice Chairman), Mrs. J.P. Gadd, G.E.S. Hearn, Mrs. J.B.H. Hopkinson, Mrs. J.M. Hughes, B. Kentfield, C.R. Maynard, Mrs. W.M. Miers, D.W.L.M. Vereker and R. White.

Also present: Councillors R.K. Bird (in part), S.H. Earl (in part) and R.H. Patten (in part).

Advisory Officers in attendance: Head of Planning, Principal Planning Officer (Development Control), Principal Planning Officer (Appeals/Enforcement), Conservation Officer (in part), Planning Assistant and Democratic Services Officer.

D72. MINUTES

The Chairman was authorised to sign the minutes of the meeting of the Committee held on 9 November 2003 as a correct record of the proceedings.

D73. APOLOGIES FOR ABSENCE

Apologies for absence were received from Councillors Mrs. H.R. Bridger, R.F. Dyason and J.A.J. Kemp.

DECISIONS TAKEN UNDER DELEGATED POWERS

D74. ENFORCEMENT MATTERS

The following enforcement matters were reported:

(1) Peasmarsh - Widening of access and creation of track – Wittersham Road.

RESOLVED: That subject to being satisfied evidentially, the District Secretary be authorised to issue the appropriate Enforcement Notice and take any other steps considered necessary. Compliance period: Step i) - two months and Step ii) – six months.

(2) Ewhurst – Change of use of land from agricultural to use for residential purposes – land adjacent to Sempstead Cottages, Sempstead Lane.

1

Page 2: RR/2002/475/L - rother.gov.uk file · Web viewPLANNING COMMITTEE. 11 December 2003. Minutes of the Planning Committee held at the Town Hall, Bexhill on Thursday 11 December 2003 at

RESOLVED: That subject to being satisfied evidentially, the District Secretary be authorised to issue the appropriate Enforcement Notice and take any other steps considered necessary. Compliance period: One month.

(3) Brede – Creation of hardsurfaced area – Red Lion Inn, Brede Hill.

RESOLVED: That subject to being satisfied evidentially, the District Secretary be authorised to issue the appropriate Enforcement Notice and take any other steps considered necessary. Compliance period: Three months.

(4) Bexhill – Bexhill Central Railway Station.

RESOLVED: That subject to being satisfied evidentially, the District Secretary be authorised to consent to the Section 215 notice issued in respect of Bexhill Railway Station on 11 September 2003 being modified in accordance with the terms set out in Messrs Kennedys’ letter dated 2 December 2003, which are as follows:

1) Carry out glazing works to the two platform ramps and overbridge by 31 December 2004 in accordance with the listed building consent dated 15 August 2002 (RR/2002/1553/L).

2) Carry out works to renovate the woodwork at the station including the ceiling to the platform ramps and canopies in accordance with the listed building consent dated 15 August 2002 by 31 December 2005 (RR/2002/1553/L).

3) Clean down and paint all cast iron spandrel brackets and canopy columns (subject to negotiation).

(This matter was considered exempt from publication by virtue of Paragraph 12 of Part I of Schedule 12A to the Local Government Act 1972).

The Chairman had accepted this item onto the Agenda as a matter of urgency to enable the modification of the Section 215 notice to be made as soon as possible.

D75. PLANNING APPLICATIONS

Outline planning permissions are granted subject to approval by the Council before any development is commenced, of the siting, design, external appearance of the buildings, means of access thereto and landscaping. Unless otherwise stated, every planning permission is granted subject to the development beginning within 5 years from the date of the permission - or in regard to outline permissions, in the case of reserved matters, application for approval within three years from the date of the grant of outline permission; and the development to which the permission relates must begin no later than whichever is the later of the following dates: the expiration of five years from the date of the grant of outline permission or, the expiration of two years from the final approval of the reserved matters, or in the case of approval on different dates, the final approval of the last such matters to be approved.

2

Page 3: RR/2002/475/L - rother.gov.uk file · Web viewPLANNING COMMITTEE. 11 December 2003. Minutes of the Planning Committee held at the Town Hall, Bexhill on Thursday 11 December 2003 at

In certain circumstances the Planning Committee will indicate that it is only prepared to grant or refuse planning permission if, or unless certain amendments to a proposal are undertaken or subject to completion of outstanding consultations. In these circumstances the Head of Planning can be given delegated authority to issue the decision of the Planning Committee once the requirements of the Committee have been satisfactorily complied with. A delegated decision does not mean that planning permission or refusal will automatically be issued. If there are consultation objections, difficulties, or negotiations are not satisfactorily concluded, then the application will have to be reported back to the Planning Committee or placed on the Reserved List as a means of providing further information for elected members. This delegation also allows the Head of Planning to negotiate and amend applications, conditions, reasons for refusal and notes commensurate with the instructions of the Committee. Any applications which are considered prior to the expiry of the consultation reply period are automatically delegated for a decision.

RESOLVED: That the planning applications be determined as shown in Appendix A attached hereto.

D76. PLANNING OBLIGATIONS

RESOLVED: That in relation to the applications below:-

a) the District Secretary be authorised to prepare a Planning Obligation under the provisions of Section 106 of the Town and Country Planning Act 1990 (as amended) in respect of the matters indicated; and

b) power be delegated to the Head of Planning, exercisable upon execution of the Obligation to the satisfaction of the District Secretary, to grant permission subject to the conditions stated.

(1) RR/97/251/P BEXHILL COACH HOUSE, WHYDOWN RIDING SCHOOL, 18 FEB 97 WHYDOWN PLACE, WHYDOWN ROAD.RIDING SCHOOL ADMINISTRATIVE SERVICES AND STORAGE ACCOMMODATION WITH EXTENSION OF EXISTNG DWELLING.Mr & Mrs K Green

Subject to the completion of a Section 106 Obligation to:

1) ensure that the Coach House shall be used and occupied for purposes of human habitation for so long only as the Riding School is used for the purpose of a riding school or riding establishment, that is to say at which horses are kept for the purposes of being let out on hire or being used in providing instruction in riding in return for payment; and

2) ensure that the Coach House shall not be occupied or used as an independent dwelling house, but only as an integral part of the building laying to the east in respect of which planning permission was granted under reference RR/87/2990 subject to an agreement dated 15 July 1988,

the decision be delegated to the Head of Planning to grant full permission subject to the following condition:

3

Page 4: RR/2002/475/L - rother.gov.uk file · Web viewPLANNING COMMITTEE. 11 December 2003. Minutes of the Planning Committee held at the Town Hall, Bexhill on Thursday 11 December 2003 at

1. The Coach House shall not be occupied or used as an independent dwelling house but only as an integral part of the building laying to the east in respect of which planning permission was granted under reference RR/87/2990 subject to an agreement dated 15 July 1988 and so as to accord with Policy S1 of the East Sussex and Brighton & Hove Structure Plan 1991-2011 and Policies GD1, H8 and H10 of the Rother District Local Plan: Revised Deposit (November 2003).

N1A (Amended plan (ref.GWH/01) date stamped 12 March 1997 and amended floor plans stamped 19 March 1997).

(2) RR/2003/2108/P BEXHILL BEXHILL COLLEGE SITE, TURKEY 23 JUL 2003 ROADSUBSTITUTION AND REPOSITIONING OF HOUSE TYPES ON PLOTS 15, 16, 17 AND 18 TO ACCOMMODATE THE PUMPING AND SUB STATION SITES.Redrow Homes (Southern) Ltd

Subject to further consultee responses and the variation of the Section 106 Obligation in relation to the boundaries of open spaces, the decision be delegated to the Head of Planning to grant full permission subject to the following conditions:

1. The gates to the pumping station shall be set back 5m from the edge of the carriageway and shall open inwards.

2. Prior to being discharged into any watercourse, surface water sewer or soakaway system, all surface water drainage from parking areas and hardstandings shall be passed through trapped gullies to BS 5911:1982 with an overall capacity compatible with the site being drained.Reason: To prevent pollution of the water environment.

3. Clean, uncontaminated rock, subsoil, brick rubble, crushed concrete and ceramic only shall be permitted as infill material.Reason: To prevent pollution of controlled waters.

4. CN7G (Schedule of materials)5. CN9H (wall/fencing)6. CN9K (floor levels)7. CN5E (a) (Restriction – windows plots 15/16/18)8. The existing boundary hedges shall be retained and maintained at a height

which shall be subject to the approval in writing of the Local Planning Authority prior to the completion of any dwelling.

(3) RR/2003/2532/P BEXHILL 9-11 AMHERST ROAD04 SEP 2003 ERECTION OF 4, 2 BED FLATS AND 7, 1 BED FLATS INCLUDING 7 CAR PARKING SPACES WITH FORMATION OF NEW VEHICULAR AND PEDESTRIAN ACCESSRother Homes Ltd

Subject to increased car parking provision as appropriate and the completion of a Section 106 Obligation relating to a highways contribution, the decision be delegated to the Head of Planning to grant full permission, subject to the following conditions:

4

Page 5: RR/2002/475/L - rother.gov.uk file · Web viewPLANNING COMMITTEE. 11 December 2003. Minutes of the Planning Committee held at the Town Hall, Bexhill on Thursday 11 December 2003 at

1. CN7B a) roofing tiles, c) facing bricks. (External materials).2. Possible CN5D “The ground and first floor windows in the north and

south side elevations…”. (Obscure glaze windows)3. CN5E a) no windows except as shown on the approved plans shall be

inserted into the north and south side elevations of the building. (Restriction of alterations/additions).

4. CN12S amended “parking of the vehicles of the occupiers of the flats and visitors thereto”. (Parking provision).

5. Prior to being discharged into any watercourse, surface water sewer or soakaway system, all surface water drainage from parking areas and hardstandings shall be passed thorough trapped gullies to BS 5911:1982 with an overall capacity compatible with the site being drained.Reason: To prevent pollution of the water environment and to accord with Policies S1 of the East Sussex and Brighton & Hove Structure Plan 1991-2011 and GD1 of the Revised Deposit Rother District Local Plan.

6. No material shall be deposited at the site other than clean, uncontaminated naturally occurring excavated material, brick and concrete rubble only.Reason: To prevent pollution of the water environment and to accord with Policies S1 of the East Sussex and Brighton & Hove Structure Plan 1991-2011 and GD1 of the Revised Deposit Rother District Local Plan.

7. (As recommended by the Highway Authority)8. CN9H amended by deleting “Before any development takes place” and

inserting “including refuse bin areas” (Walling/fencing - Housing estates)

N1A (Amended plans)

(Cllr Mrs. J.B. Hopkinson declared a personal and prejudicial interest in this matter in so far as she lived next door to the property and in accordance with the Members’ Code of Conduct left the room during consideration thereof.)

(4) RR/2003/3038/P BEXHILL BRETT DRIVE – LAND AT28 OCT 2003 REDEVELOPMENT OF EXISTING PREMISES TO PROVIDE NEW RETAIL WAREHOUSE AND A3 UNIT TOGETHER WITH LANDSCAPING, NEW ACCESS ARRANGEMENTS AND REARRANGEMENT OF PART OF EXISTING CAR PARK AREA AT RAVENSIDE RETAIL AND LEISURE PARK PURSUANT TO OUTLINE CONSENT RR/2000/2798/PRavenside Investments Ltd

1) Subject to satisfactory amended plans re: Brett Drive frontage and landscaping, the decision be delegated to the Head of Planning to approve the reserved matters, subject to the following condition:

1. CN7B (c) (Bricks);and;

2) Variation of the existing Section 106 Obligation in relation to the demolition of the four houses in De La Warr Road

5

Page 6: RR/2002/475/L - rother.gov.uk file · Web viewPLANNING COMMITTEE. 11 December 2003. Minutes of the Planning Committee held at the Town Hall, Bexhill on Thursday 11 December 2003 at

(5) RR/2003/3003/P TICEHURST SUNNYBANK GARAGE, 22 OCT 2003 HAWKHURST ROAD, FLIMWELLDEMOLITION OF EXISTING DWELLING WITHIN ADJACENT GARAGE FORECOURT AND REPLACEMENT ON PART OF ADJACENT PARKING AREA ALSO, VARIATION OF CONDITION 8 OF RR/2002/1163/P TO PROVIDE DETAILS OF ODOUR CONTROL EQUIPMENT TO PAINT SPRAY BOOTH AFTER COMMENCEMENT OF DEVELOPMENTMark Lilly Ltd

Subject to the completion of a Section 106 Obligation relating to the demolition of the existing dwelling and extinguishing any rebuilding rights which may exist, the decision be delegated to the Head of Planning to grant full permission, subject to the following conditions:

1. Prior to the occupation of the dwelling hereby approved the existing dwelling shall be demolished and all materials removed from the site. There shall only be one dwelling within the site area edged in red.

2. CN7C (External materials) Bricks and tiles.3. A scheme for the fitting of odour control equipment to the paint spray

booth shall be submitted for the consideration and approval of the Local Planning Authority. The use of the paint spray booth shall not commence until all odour control equipment works have been carried out in accordance with the approved details. The odour control equipment shall be maintained thereafter.

N1B. Amended plan.N12A S.106 Planning Obligation.

D77. DATE FOR SITE INSPECTIONS – Tuesday 20 January 2004 at 8.30am departing from the Town Hall, Bexhill.

MATTERS FOR INFORMATION

D78. APPEALS

RESOLVED: That the report be noted.

CHAIRMAN

The meeting closed at 2.35p.m. pl031211.rac

6

Page 7: RR/2002/475/L - rother.gov.uk file · Web viewPLANNING COMMITTEE. 11 December 2003. Minutes of the Planning Committee held at the Town Hall, Bexhill on Thursday 11 December 2003 at

PLANNING COMMITTEE – 11 DECEMBER 2003 APPENDIX A

RR/2003/2770/P CATSFIELD PARKGATE STUDIOS24 SEP 2003 CHANGE OF USE FROM RECORDING STUDIOS,

RESIDENTIAL BUILDINGS AND MANAGERS RESIDENCE TO FIVE PRIVATE DWELLINGSDaniel Priest

DECISION: GRANT (FULL PLANNING) DELEGATED (SUBJECT TO RESOLUTION OF VISIBILITY AND FOUL DRAINAGE MATTERS)1. CN4B (Details of doors and windows & roof lights)2. CN5E (Restriction of alterations and additions) A) B) and C)3. CN5C (Exclude GDO all structures)4. CN7B (external materials A) roof tiles, B) hanging tiles and C) facing bricks 5. Before the new dwellings are brought into use on site parking for a

total of 12 vehicles shall be provided as shown on the submitted plan and shall thereafter be permanently retained as such.

Reason: To ensure the safety of the persons and vehicles entering and leaving the access and proceeding along the highway and in the interests of the visual amenities of the locality and to accord with Policy S1 of the East Sussex and Brighton & Hove Structure Plan 1991-2011.

6. CN13C Tree retention7. The fencing details as shown on the submitted drawings are not approved.

RC218. CN8C (Foul and surface water details).N1A/B Amended plans (expected).

RR/2003/3235/P CATSFIELD REDCOAT ORCHARD20 NOV 2003 REMOVAL OF AGRICULTURAL OCCUPANCY RESTRICTION

CONDITION IMPOSED ON RR/86/2078D M Gowland

DEFERRED FOR VIEWS OF RURAL ESTATES SURVEYOR

RR/2003/2553/P CROWHURST 11 AND 13 FOREWOOD RISE - REAR OF04 SEP 2003 ERECTION OF THREE NEW DWELLING

Rother Homes

DEFERRED FOR NEGOTIATIONS WITH APPLICANT/AMENDED PLANS/S.106 OBLIGATION/COMMENTS FROM ENGLISH NATURE

RR/2003/2652/P CROWHURST CHIESA VISTA, 2 STATION ROAD23 SEP 2003 DEMOLITION OF GARAGE AND EXTENSIONS TO FORM

ADDITIONAL BEDROOM AND CONSERVATORYMr and Mrs R G Perry

DECISION: GRANT (FULL PLANNING) DELEGATED (LETTER FROM APPLICANTS RE RETENTION OF BOUNDARY WALL)1. CN7C (Matching external materials)2. The conservatory shall not be constructed until there has been submitted to and

approved by the LPA details of foundations proposed for the building. The

7

Page 8: RR/2002/475/L - rother.gov.uk file · Web viewPLANNING COMMITTEE. 11 December 2003. Minutes of the Planning Committee held at the Town Hall, Bexhill on Thursday 11 December 2003 at

submitted details shall be designed so that tree roots of the tree on adjoining land are not adversely affected. The foundations shall be laid in accordance with the approved details.Reason: To ensure that an adjoining significant tree is not adversely affected by the proposed development and to preserve the amenities of the area and accord with Policy S1 of the SP and Policy GD1 of the RDLP.

RR/2003/2207/P BRIGHTLING LITTLE SPRAYS FARM, PENHURST LANE30 JUL 2003 CHANGE OF USE BY CONVERSION OF BARN TO A

DWELLINGThe Trustees of Sir John Spencer Wills

DECISION: GRANT (FULL PLANNING) DELEGATED (AMENDED PLANS)1. CN4B (Doors and windows).2. CN5E (Restriction of alterations/additions)3. CN11B (Matching materials).4. The chimney flue pipe shall be painted matt black externally prior to occupation

of the dwelling and thereafter the flue shall be maintained in that condition unless otherwise approved in writing by the Local Planning Authority.(Reason: RC4).

RR/2003/2727/P BRIGHTLING COLDHARBOUR FARM ESTATE, WOODS 19 SEP 2003 CORNER

CREATION OF INCREASED HARD SURFACED STORAGE/ TURNING AREA AND INCREASED HEIGHT OF PITCHED ROOF (RETROSPECTIVE APPLICATION)English Heritage Buildings Ltd

DECISION: REFUSE (FULL PLANNING) DELEGATED (UNLESS SATISFACTORY AMENDED PLANS RECEIVED)1. The roof windows within the southern roof slope have resulted in loss of amenity

to Griggs Farmhouse through the potential for overlooking that has been created contrary to Policy GD1(ii) of the Rother District Local Plan: Revised Deposit (November 2003).

(Cllr Mrs. W.M. Miers declared a personal interest in this matter in so far as she had a distant view of the property and in accordance with the Members’ Code of Conduct remained in the room during consideration thereof.)

RR/2003/2974/P MOUNTFIELD BATTLE ROAD SERVICE STATION, JOHNS 20 OCT 2003 CROSS

OUTLINE: REDEVELOPMENT FOR 39 SOCIAL HOUSING UNITS CONSISTING OF 3 FOUR BEDROOM CHALET BUNGALOWS, 2 THREE BEDROOM COTTAGES, 2 THREE BEDROOM BUNGALOWS, 4 THREE BEDROOM HOUSES, 17 TWO BEDROOM TERRACED COTTAGES, 11 THREE BEDROOM TERRACED COTTAGES, INCLUDING ALTERATIONS TO AN EXISTING ACCESS AND CONSTRUCTION OF A NEW ROADHorley & Daly & P J Pallets

8

Page 9: RR/2002/475/L - rother.gov.uk file · Web viewPLANNING COMMITTEE. 11 December 2003. Minutes of the Planning Committee held at the Town Hall, Bexhill on Thursday 11 December 2003 at

DECISION: REFUSE (OUTLINE PLANNING)1. The proposed development would, if permitted, be harmful to the character and

appearance of the High Weald Area of Outstanding Natural Beauty contrary to Policy GD1 (iv) and (v) of the Rother District Local Plan: Revised Deposit (November 2003) and Policies S1(j), EN1 and EN2 of the East Sussex and Brighton & Hove Structure Plan 1991-2011.

2. The Council has considered the proposal as an exceptions site and with regard to sustainability issues, and it is considered that the proposal is contrary to policies DS1, GD1 and HG2 of the Rother District Local Plan: Revised Deposit (November 2003) and Policies S1(c), S1(u) and H5 of the East Sussex and Brighton & Hove Structure Plan 1991-2011.

3. The applicant has failed to demonstrate that the proposal would not result in the intensification of use of a substandard access with a resulting detrimental effect on the free flow and safety of traffic on the A21 trunk road.

RR/2003/447/P BATTLE ASHWOOD HOUSE, CALDBEC HILL26 MAR 2003 DEMOLITION OF EXISTING GARAGES AND CONSTRUCTION

OF NEW GARAGES WITH GRANNY ANNEXE ABOVEMr & Mrs Gray

DECISION: REFUSE (FULL PLANNING)1. The subdivision of the property in the manner proposed to create separate

dwelling unit would be out of character with and detrimental to the amenities of the locality and as such would be contrary to Policy S1(f) of the East Sussex and Brighton & Hove Structure Plan 1991-2011 and Policy GD1 (iv) of the Rother District Local Plan: Revised Deposit (November 2003). Furthermore the development if granted could also set a precedent for similar undesirable development of other properties in the vicinity.

N1A (554/03/03A)

RR/2003/1920/P BATTLE NETHERFIELD HILL - LAND SOUTH OF04 JUL 2003 EARTH WORKS TO PROVIDE PONDS (RETROSPECTIVE

APPLICATION)Mr and Mrs J Avery

DECISION: GRANT (FULL PLANNING)1. CN13F (Tree planting)2. The ponds hereby permitted shall not be used for the purposes of a commercial

fishery or for any other angling purpose other than for private recreational purposes.(Reason: RC35)

RR/2003/2436/P BATTLE BATTLE ABBEY FARM, POWDERMILL LANE26 AUG 2003 FORMATION OF PRIVATE TROUT LAKE FOR USE BY UP TO

20 MEMBERS WITH ACCESS TRACK AND CAR PARKMr and Mrs J Sinden

DECISION: REFUSE (FULL PLANNING) 1. The site lies within the High Weald Area of Outstanding Natural Beauty where

policies S1(j) and EN2 and EN3 of the East Sussex and Brighton & Hove Structure Plan 1991-2011 and Policies DS1(vi), (viii) & (ix) and GD1(v) of the

9

Page 10: RR/2002/475/L - rother.gov.uk file · Web viewPLANNING COMMITTEE. 11 December 2003. Minutes of the Planning Committee held at the Town Hall, Bexhill on Thursday 11 December 2003 at

Rother District Local Plan: Revised Deposit (November 2003) indicate that development will be carefully controlled to protect the character of the area. This part of the High Weald has a tranquil character and adjoins the 1066 battle field. It is considered that the formation of the lake, the introduction of a fishing use and the parking and traffic movements associated with it would not meet the objectives of the development plan and would cause harm to the rural character of the area.

RR/2003/2538/L BATTLE THE OLD COURT HOUSE, MOUNT STREET04 SEP 2003 REBUILD GARAGE ROOF AS MANSARD TO FORM STAFF

FLAT FOR CARERMr and Mrs G Rainbird

RR/2003/2546/P BATTLE THE OLD COURT HOUSE, MOUNT STREET17 SEP 2003 REBUILD GARAGE ROOF AS MANSARD TO FORM STAFF

FLAT FOR CARERMr and Mrs G Rainbird

DECISIONS:RR/2003/2538/L: REFUSE (LISTED BUILDING CONSENT)1. The proposed development would be detrimental to the setting of the Listed

Building which should be preserved in accordance with the provisions of Section 16 of the Planning (Listed Buildings and Conservation Areas) Act 1990.

2. The proposed development would, if permitted, be detrimental to the setting of the Listed Building and therefore contrary to Policy S1(m) of the East Sussex and Brighton & Hove Structure Plan 1991-2011 and Policy GD1(viii) of the Rother District Local Plan: Revised Deposit (November 2003).

RR/2003/2546/P: REFUSE (FULL PLANNING)1. The proposed development would, if permitted, be detrimental to the character

and setting of the adjoining Listed Building which should be preserved in accordance with the provisions of Section 66 of the Planning (Listed Buildings and Conservation Areas) Act 1990.

2. The proposed development would, if permitted be detrimental to the character and setting of the Listed Building and the appearance of the Battle Conservation Area and therefore contrary to Policy S1(m) of the East Sussex and Brighton & Hove Structure Plan 1991-2011 and Policy GD1(viii) of the Rother District Local Plan: Revised Deposit (November 2003).

RR/2003/2979/P BATTLE NETHERFIELD HILL FARM, NETHERFIELD HILL07 NOV 2003 CHANGE OF USE AND CONVERSION OF REDUNDANT

BUILDINGS TO HOLIDAY LET UNITS AND REPLACEMENT OF POLE BARN WITH HOLIDAY LET UNIT AND FORMATION OF STABLES IN EXISTING BARN.Mr T Petzal

DEFERRED FOR SITE INSPECTION

RR/97/251/P BEXHILL COACH HOUSE, WHYDOWN RIDING SCHOOL, 18 FEB 97 WHYDOWN PLACE, WHYDOWN ROAD

10

Page 11: RR/2002/475/L - rother.gov.uk file · Web viewPLANNING COMMITTEE. 11 December 2003. Minutes of the Planning Committee held at the Town Hall, Bexhill on Thursday 11 December 2003 at

RIDING SCHOOL ADMINISTRATIVE SERVICES AND STORAGE ACCOMMODATION WITH EXTENSION OF EXISTNG DWELLING.Mr & Mrs K Green

See Minute D76 (1)

RR/2003/2108/P BEXHILL BEXHILL COLLEGE SITE, TURKEY ROAD23 JUL 2003 SUBSTITUTION AND REPOSITIONING OF HOUSE TYPES ON

PLOTS 15, 16, 17 AND 18 TO ACCOMMODATE THE PUMPING AND SUB STATION SITESRedrow Homes (Southern) Ltd

See Minute D76 (2)

RR/2003/2349/P BEXHILL 1-4 VILLAGE MEWS, LITTLE COMMON13 AUG 2003 PROPOSED CHANGE OF USE OF 4 VILLAGE MEWS TO

EXTEND EXISTING RESTAURANT AND TWO AIR CONDITIONING UNITS TO ROOF OF 1 VILLAGE MEWSMr N Narinsakchai

DECISION: GRANT (FULL PLANNING) DELEGATED (ENVIRONMENTAL HEALTH OFFICER’S COMMENTS)1. No development shall commence until full details of an appropriate

soundproofing scheme for the building has been submitted to and approved by the Local Planning Authority and the use of the premises shall not commence until the soundproofing details have been fully carried out and completed in accordance with the approved details and shall be retained and maintained thereafter. Reason: To ensure the satisfactory soundproofing of the approved use to safeguard the neighbouring residential amenities and to accord with the requirements of policy GD1 of the Rother District Local Plan: Revised Deposit (November 2003)

2. The use hereby permitted including the entire A3 use of units 1- 4 Village Mews, Bexhill shall not be open to customers or any persons and no employee including a proprietor shall carry out any food preparation, cooking, and/or sales or serving to customers or any persons on the premises outside the hours of 09.00 to 23.00 on any day, and all clearing, cleaning, and any other work associated with the approved use shall not continue and no employee including a proprietor or other persons shall be in the premises to carry out such work outside the hours of 08.00 to 23.30 on any day.Reason: To safeguard the neighbouring residential amenities and to accord with the requirements of policy GD1 of the Rother District Local Plan: Revised Deposit (November 2003)

3. Customers and staff using the approved restaurant extension shall enter and exit the premises by the main entrance in unit 1 only. Reason: To safeguard the neighbouring residential amenities and to accord with the requirements of policy GD1 of the Rother District Local Plan: Revised Deposit (November 2003)

4. Amplified music and/or other entertainment noise from within the premises shall not be audible at any adjacent residential premises at any time. Reason: To safeguard the neighbouring residential amenities and to accord with the requirements of policy GD1 of the Rother District Local Plan: Revised Deposit (November 2003)

11

Page 12: RR/2002/475/L - rother.gov.uk file · Web viewPLANNING COMMITTEE. 11 December 2003. Minutes of the Planning Committee held at the Town Hall, Bexhill on Thursday 11 December 2003 at

RR/2003/2448/P BEXHILL HIGHWOODS GOLF CLUB, ELLERSLIE 13 FEB 2003 LANE

OUTLINE: DEMOLITION OF EXISTING GRASSKEEPING FACILITIES AND THE ERECTION OF NEW IMPLEMENT SHEDS AND STAFF FACILITIES.Highwoods Golf Club

DECISION: GRANT (FULL PLANNING) DELEGATED (SUBJECT TO NO ADVERSE COMMENTS FROM RE-CONSULTATION EXERCISE AND EXPIRY OF CONSULTATION PERIOD)1. No development shall commence until details of the finished floor levels of the

new buildings and re sited water tank have been submitted to and approved by the Local Planning Authority and the development shall be carried out in accordance with the approved details. Reason: RC13

2. Hours of use (expected)3. Floodlighting details (possible)4. CN8B (Surface Water Details)5. Fencing/boundary treatment details6. CN13A (Landscape Scheme)7. CN13B (Implementation of landscaping scheme)8. CN13C (Amended) ‘Except as shown for removal on the approved drawing, no

trees..’ (Tree Retention)9. The existing hedge along the northern boundary of the site shall be retained and

maintained at a height of not less than 3m from ground level for a length of 18m from the eastern edge of the oil and chemical store, and 2m high thereafter, in a westerly direction or as otherwise may be agreed in writing with the Local Planning Authority, within six months of any such damage to the hedge or the first signs of any disease, or the hedge being removed as a result of such, or other such time period as may be agreed in writing with the Local Planning Authority. Reason: To maintain as far as possible the appearance of the locality and to accord with the requirements of policies S1, of the East Sussex and Brighton & Hove Structure Plan 1991-2011 and policy GD1 of the Rother District Local Plan: Revised Deposit (November 2003).

N1A/B amended plans

RR/2003/2532/P BEXHILL 9-11 AMHERST ROAD04 SEP 2003 ERECTION OF 4, 2 BED FLATS AND 7, 1 BED FLATS

INCLUDING 7 CAR PARKING SPACES WITH FORMATION OF NEW VEHICULAR AND PEDESTRIAN ACCESSRother Homes Ltd

See Minute D76 (3)

RR/2003/2683/P BEXHILL HOLLENDEN HOUSE, BUCKHURST ROAD17 SEP 2003 CHANGE OF USE, CONVERSION AND EXTENSION OF

RESIDENTIAL HOME TO 24 FLATSThe Ex-Service Fellowship Centres

12

Page 13: RR/2002/475/L - rother.gov.uk file · Web viewPLANNING COMMITTEE. 11 December 2003. Minutes of the Planning Committee held at the Town Hall, Bexhill on Thursday 11 December 2003 at

DEFERRED FOR LEGAL ADVICE AND CONSIDERATION OF APPLICANT’S LETTER DATED 4 NOVEMBER 2003

RR/2003/2834/A BEXHILL 34 ST LEONARDS ROAD2 OCT 2003 INTERNALLY ILLUMINATED SHOP SIGN (RETROSPECTIVE

APPLICATION)Shuttleworth & Co

DECISION: REFUSE (ADVERTISEMENT CONSENT)1. The colour, finish and method of illumination of the fascia advertisement sign is

unacceptable and has a detrimental effect both on the visual amenities of the street scene and on the character and appearance of the Bexhill Town Centre Conservation Area and would therefore be in conflict with Policy S1 of the East Sussex and Brighton & Hove Structure Plan 1991-2011 and Policy GD1 of the Rother District Local Plan: Revised Deposit (November 2003).

(Cllr Mrs. J.B. Hopkinson declared a personal and prejudicial interest in this matter in so far as the applicant acted as her solicitors and in accordance with the Members’ Code of Conduct left the room during consideration thereof.)

RR/2003/2862/P BEXHILL THE WHITE HOUSE, ASHDOWN ROAD06 OCT 2003 OUTLINE: DEMOLITION OF EXISTING FOUR STOREY HOUSE

AND GARAGE AND ERECTION OF BLOCK OF EIGHT TWO BEDROOM FLATS AND PARKING SPACESMr D Angeloni and Mrs H Davies

DECISION: GRANT (OUTLINE PLANNING) DELEGATED (AMENDED LAYOUT PLAN RE TWO METRE LANDSCAPING STRIP/HIGHWAY AUTHORITY FURTHER COMMENTS)1. The detailed plans shall provide an access with a minimum width of 4.5m turning

space and the provision of one car space per unit plus one car space per three units for visitors in accordance with the adopted car parking standards of the Local Planning Authority. The car parking spaces shall be made available for use before any of the flats hereby permitted are first occupied.Reason: In the interests of highway safety and to accord with Policy S1 of the East Sussex and Brighton & Hove Structure Plan 1991-2011 and Policy GD1 of the Rother District Local Plan: Revised Deposit (November 2003).

2. Clean, uncontaminated rock, subsoil, brick rubble, crushed concrete and ceramic only shall be permitted as infill materials.Reason: To prevent pollution of controlled waters and to accord with Policy S1(g) of the East Sussex and Brighton & Hove Structure Plan 1991-2011 and Policy GD1 of the Rother District Local Plan: Revised Deposit (November 2003).

3. Prior to being discharged into any watercourse, surface water sewer or soakaway system, all surface water drainage from parking areas and hardstandings shall be passed through trapped gullies to BS 5911:1982 with an overall capacity compatible with the site being drained.Reason: To prevent pollution of the water environment and to accord with Policy S1(g) of the East Sussex and Brighton & Hove Structure Plan 1991-2011 and Policy GD1 of the Rother District Local Plan: Revised Deposit (November 2003).

4. The size, siting and layout of the building, vehicular access and parking/garage spaces shown on the submitted plan are not approved.

13

Page 14: RR/2002/475/L - rother.gov.uk file · Web viewPLANNING COMMITTEE. 11 December 2003. Minutes of the Planning Committee held at the Town Hall, Bexhill on Thursday 11 December 2003 at

Reason: To provide for the proper development of the site and to accord with Policy S1 of the East Sussex and Brighton & Hove Structure Plan 1991-2011 and Policy GD1 of the Rother District Local Plan: Revised Deposit (November 2003).

Notes:i. The Applicant’s attention is drawn to the comments of Network Rail and

contained in the enclosed copy letter dated 13 October 2003.ii. The Applicant’s attention is drawn to the comments of EDF Energy and

contained in the enclosed copy letter dated 13 October 2003 and attached plan.iii. The Applicant’s attention is drawn to the comments of Sussex Police and

contained in their letter dated 15 October 2003.iv. N1A Amended plan.

RR/2003/2946/P BEXHILL 38 BARRACK ROAD15 OCT 2003 ERECTION OF ONE AND TWO STOREY REAR

EXTENSIONMr R Otto

DECISION: REFUSE (FULL PLANNING)1. By virtue of the two storey element and associated alterations, the

proposal will result in loss of light and privacy to adjoining dwellings and be out of character with and detrimental to the amenities of those dwellings. For these reasons the proposal would be contrary to Policy S1 of the East Sussex and Brighton & Hove Structure Plan 1991-2011 and Policy GD1 of the Rother District Local Plan: Revised Deposit (November 2003).

 

RR/2003/2986/3R BEXHILL BEXHILL SKATE PARK – ADJ TO BEXHILL HIGH 21 OCT 2003 SCHOOL, DOWN ROAD

INSTALLATION OF AN ADDITIONAL 2.4M WELD MESH FENCE ON TOP OF EXISTING BOUNDARY FENCE GIVING A TOTAL HEIGHT OF 4.8M TO PREVENT DAMAGE TO SCHOOL BUILDINGSRother District Council

DECISION: GRANT (FULL PLANNING) REGULATION 3

(Cllr B. Kentfield declared a personal interest in this matter in so far as he was Chairman of the Governors at Bexhill High School and in accordance with the Members’ Code of Conduct remained in the room during consideration thereof.)

RR/2003/3038/P BEXHILL BRETT DRIVE – LAND AT28 OCT 2003 REDEVELOPMENT OF EXISTING PREMISES TO PROVIDE

NEW RETAIL WAREHOUSE AND A3 UNIT TOGETHER WITH LANDSCAPING, NEW ACCESS ARRANGEMENTS AND REARRANGEMENT OF PART OF EXISTING CAR PARK AREA AT RAVENSIDE RETAIL AND LEISURE PARK PURSUANT TO OUTLINE CONSENT RR/2000/2798/PRavenside Investments Ltd

See Minute 76 (4)

14

Page 15: RR/2002/475/L - rother.gov.uk file · Web viewPLANNING COMMITTEE. 11 December 2003. Minutes of the Planning Committee held at the Town Hall, Bexhill on Thursday 11 December 2003 at

RR/2003/3055/P BEXHILL 196 COODEN DRIVE - PAVEMENT IN FRONT OF13 NOV 2003 ERECTION OF GRP KIOSK FOR ELECTRICAL MONITORING

EQUIPMENT FOR MEASURING LOCAL SEWER OVERFLOW DISCHARGE IN STORM CONDITIONS, TO INCLUDE POWER AND BTSouthern Water Services

DECISION: GRANT (FULL PLANNING) DELEGATED (EXPIRY OF CONSULTATION PERIOD)Notes:N1B (Amended plans date stamped 1 December 2003).N8B (Building adjacent to boundary)The applicant is advised to contact the local area Highway Manager at Sidley Goods Yard, Sidley, Bexhill on Sea, East Sussex Tel: 01424 220022 before commencing any works on the highway.

RR/2003/3079/CM BEXHILL PEBSHAM LANDFILL SITE, FRESHFIELDS, 04 NOV 2003 BEXHILL ROAD, PEBSHAM

VARIATION ON CONDITION 2 IMPOSED ON RR/258/CM TO EXTEND USE OF GREEN WASTE COMPOSTING FACILITY UNTIL 31 DECEMBER 2007Biffa Waste Services Ltd

DECISION: NO OBJECTION

(Cllr Mrs. J.B. Hopkinson declared a personal interest in this matter in so far as she was an elected East Sussex County Councillor and in accordance with the Members’ Code of Conduct remained in the room during consideration thereof.)

RR/2003/3140/P BEXHILL 37 THE HIGHLANDS, LENNOX LODGE NURSING 11 NOV 2003 HOME

ERECTION OF A TWO STOREY EXTENSION AT REAR TO PROVIDE 4 ADDITIONAL BEDROOMS AT 1ST AND 2ND FLOORSMr G Haddow

DEFERRED FOR SITE INSPECTION

RR/2003/3147/P BEXHILL 160 NINFIELD ROAD14 NOV 2003 OUTLINE: ERECTION OF 4 TWO STOREY 4 BED HOUSES

AND 2 SEMI DETACHED 3 BED HOUSES WITH ASSOCIATED MEWS ACCESSGemselect Ltd

DECISION: REFUSE (FULL PLANNING)1. It is the opinion of the Local Planning Authority that the sloping topography of the

site with the existence of several mature trees constitute over-riding environmental considerations which would prevent making the best use of the land by achieving an overall net density of at least 30 dwellings per hectare. This

15

Page 16: RR/2002/475/L - rother.gov.uk file · Web viewPLANNING COMMITTEE. 11 December 2003. Minutes of the Planning Committee held at the Town Hall, Bexhill on Thursday 11 December 2003 at

would be contrary to Government Advice contained in PPG3: Housing and to Policy HG4(viii) of the Rother District Local Plan: Revised Deposit (November 2003).

2. It has not been demonstrated to the satisfaction of the Local Planning Authority that the proposal would not result in the felling of several trees that make a significant contribution to the visual amenities of the area, the loss of which would be detrimental to the character and appearance of the area and contrary to Policy S1 of the East Sussex and Brighton & Hove Structure Plan 1991-2011 and Policy GD1 of the Rother District Local Plan: Revised Deposit (November 2003).

3. It has not been demonstrated to the satisfaction of the Local Planning Authority that the site could be satisfactorily developed without significant regrading of land levels. In the absence of details of proposed levels, the Local Planning Authority has been unable to assess the impact of the development upon the amenities of the area, particularly those of the adjoining properties, and ensure that the development would accord with Policy S1 of the East Sussex and Brighton & Hove Structure Plan 1991-2011 and Policy GD1 of the Rother District Local Plan: Revised Deposit (November 2003).

4. By virtue of its close proximity to existing dwellings in the vicinity, the development is likely to result in loss of privacy and noise disturbance and be out of character with and detrimental to the amenities of those dwellings contrary to Policy S1 of the East Sussex and Brighton & Hove Structure Plan 1991-2011 and Policy GD1 of the Rother District Local Plan: Revised Deposit (November 2003).

5. The Local Planning Authority has considered Government advice contained in PPG9: Nature Conservation relating to protected species and considers that it has not been demonstrated that the proposed development would not result in harm to species protected under The Wildlife and Countryside Act 1981 and The Conservation (Natural Habitats, &c) Regulations 1994.

6. The proposal would lead to an increased traffic hazard on the A269 a major distributor route in the County Council’s hierarchy of roads, by reason of the inadequate visibility at the proposed access. In addition the Highway Authority does not consider the proposed kerb re-alignment of the A269 (Ninfield Road) to be in the interests of highway safety.

RR/2003/3189/P BEXHILL KITES NEST WALK, BARNHORN ROAD,17 NOV 2003 LITTLE COMMON

ERECTION OF TWO DETACHED DWELLINGS Dust Management Ltd

DECISION: REFUSE (FULL PLANNING)1. This would be a cramped form of development that would be over development

of this semi rural location, and would have an over dominant impact on the visual amenities, outlook and aspect of neighbouring residential properties such development is unacceptable and contrary to Policy S1 of the East Sussex and Brighton & Hove Structure Plan 1991-2011 and Policy GD1 of the Rother District Local Plan: Revised Deposit (November 2003).

2. The proposed development would lead to an increased traffic hazard at what the Highway Agency consider to be an existing substandard junction with the A259, by reason of inadequate visibility at this existing access.

RR/2003/2554/P BECKLEY HOBBS LANE – FORMER ALLOTMENTS

16

Page 17: RR/2002/475/L - rother.gov.uk file · Web viewPLANNING COMMITTEE. 11 December 2003. Minutes of the Planning Committee held at the Town Hall, Bexhill on Thursday 11 December 2003 at

04 SEP 2003 ERECTION OF 8 DWELLINGS INCLUDING FORMATION OF NEW VEHICULAR ACCESS AND CONSTRUCTION OF NEW ROADRother Homes

DEFERRED FOR CONSIDERATION OF ALTERNATIVE SITE FOR HOUSING

RR/2003/3107/P BECKLEY COURT LODGE COTTAGE – LAND AT5 NOV 2003 OUTLINE: DEMOLITION OF EXISTING COTTAGE AND

OUTBUILDING. ERECTION OF FIVE COTTAGE STYLE STARTER HOMES SERVED VIA NEW ACCESS ROADMr P Southcott

DECISION REFUSE (OUTLINE PLANNING)1. Whilst the site is within a development boundary as defined in the Rother District

Local Plan: Revised Deposit (November 2003) it is considered that the proposal conflicts with Policy GD1 of the Plan in that the scale density form and character of the development would not be compatible with the adjacent surrounding area. In particular the development would detract from the character and appearance of the locality and would be out of keeping with an unreasonably harm the amenities of adjoining properties.

2. The site lies within the high Weald Area of Outstanding Natural Beauty where Polciies S1(j), EN2 and EN3 of the East Sussex and Brighton & Hove Structure Plan 1991-2011 indicate that development will be carefully controlled to protect the character of the area. It is considered that the proposal does not meet this objective and it would cause harm to the rural character of the area.Reason: Non essential development AONB – Structure Plan).

3. RN14A (Precedent)4. It has not been demonstrated to the satisfaction of the Local Planning Authority

that 40% of the total number of dwellings to be provided are intended for affordable housing for local people. The proposal therefore conflicts with the requirements of Policy HG1 of the Rother District Local Plan: Revised Deposit (November 2003).

RR/2003/2922/L NORTHIAM GREAT DIXTER14 OCT 2003 CONVERSION OF REDUNDANT OAST HOUSE TO VISITOR

CENTREMr C Lloyd and Mrs O Eller

RR/2003/2926/P NORTHIAM GREAT DIXTER, HIGH PARK29 OCT 2003 CONVERSION OF REDUNDANT OAST HOUSE TO VISITOR

CENTREMr C Lloyd and Mrs O Eller

RR/2003/2928/L NORTHIAM GREAT DIXTER14 OCT 2003 CONVERSION OF PART REDUNDANT BARN TO STUDENT

ACCOMMODATION AND OFFICEMr C Lloyd and Mrs O Eller

RR/2003/2929/P NORTHIAM GREAT DIXTER28 OCT 2003 CONVERSION OF PART REDUNDANT BARN TO STUDENT

ACCOMMODATION AND OFFICE

17

Page 18: RR/2002/475/L - rother.gov.uk file · Web viewPLANNING COMMITTEE. 11 December 2003. Minutes of the Planning Committee held at the Town Hall, Bexhill on Thursday 11 December 2003 at

Mr C Lloyd and Mrs O Eller

DECISIONS:RR/2003/2922/L THAT THE SECRETARY OF STATE FOR THE ENVIRONMENT BE INFORMED THAT THE COUNCIL IS MINDED TO GRANT LISTED BUILDING CONSENT SUBJECT TO THE FOLLOWING CONDITIONS AND THAT AUTHORITY BE DELEGATED TO THE PLANNING OFFICER TO ISSUE THE CONSENT UPON RECEIPT OF THE APPROPRIATE AUTHORISATION FROM THE SECRETARY OF STATE1. CN11S (Large scale constructional details of windows, doors and shutters.2. Before work commences typical details drawn to a scale of 1:5 showing the

construction of the following shall be submitted to and approved in writing by the Local Planning Authority:i) The proposed access staircase leading to the first floor passage between

the oasts and barn if it is decided to replace the existing staircase.ii) The glazed wall forming the north side and west walls of the proposed

reception areaiii) The proposed access staircases and viewing platforms set above the

drying floors in the two southern most oasthouses.iv) The glazed doors to be hung in the south wall of the oasts, ground and

first floor west wall of the oasts and first floor hoist door to barn west elevation.

v) The proposed fire wall between the new visitor centre and remainder of the barn proper.

Reason: To maintain the character of the listed building and accord with the provisions of Policy S1 of the East Sussex and Brighton & Hove Structure Plan 1991-2011.

3. Before work commences details showing how the existing first floor structures in the new visitor centre is to be strengthened shall be submitted to and agree in writing by the Local Planning Authority.

4. The specification to achieve the necessary internal surface finished to provide fire protection in accordance with the Building Regulations shall be agreed with the Local Planning Authority in writing before work commences.Reason: To protect the character of the listed building.

5. CN7G Amended delete ‘indicating…dwelling’. (Schedule of materials)

RR/2003/2926/P GRANT (FULL PLANNING) DELEGATED (FURTHER INFORMATION)

1. CN11S (Large scale details of windows, doors & shutters)2. Before work commences typical details drawn to a scale of 1:5 showing the

construction of the following shall be submitted to and approved in writing by the Local Planning Authority:i) The proposed access staircase leading to the first floor passage between

the oasts and barn if it is decided to replace the existing staircase.ii) The glazed wall forming the north side and west walls of the proposed

reception areaiii) The proposed access staircases and viewing platforms set above the

drying floors in the two southern most oasthouses.iv) The glazed doors to be hung in the south wall of the oasts, ground and

first floor west wall of the oasts and first floor hoist door to barn west elevation.

v) The proposed fire wall between the new visitor centre and remainder of the barn proper.

18

Page 19: RR/2002/475/L - rother.gov.uk file · Web viewPLANNING COMMITTEE. 11 December 2003. Minutes of the Planning Committee held at the Town Hall, Bexhill on Thursday 11 December 2003 at

Reason: To maintain the character of the listed building and accord with the provisions of Policy S1 of the East Sussex and Brighton & Hove Structure Plan 1991-2011.

3. Before work commences details showing how the existing first floor structures in the new visitor centre is to be strengthened shall be submitted to and agree in writing by the Local Planning Authority.

4. The specification to achieve the necessary internal surface finished to provide fire protection in accordance with the Building Regulations shall be agreed with the Local Planning Authority in writing before work commences.Reason: To protect the character of the listed building.

5. CN7G Amended delete ‘indicating…dwelling’. (Schedule of materials)6. CN14N (Contaminated land – desk top study)N11A (Barn/oast conversions)

RR/2003/2928/L GRANT (LISTED BUILDING CONSENT)1. CN11S ( Large scale details of windows, doors and shutters)2. The specification to achieve the necessary internal surface finished to provide

fire protection in accordance with the Building Regulations shall be agreed with the Local Planning Authority in writing before work commences.Reason: To protect the character of the listed building.

3. CN7G Amended delete ‘indicating … dwelling’ (Schedule of materials)

RR/2003/2929/P GRANT (FULL PLANNING) DELEGATED (FOR FURTHER INFORMATION)

1. CN11S ( Large scale details of windows, doors and shutters)2. The specification to achieve the necessary internal surface finished to provide

fire protection in accordance with the Building Regulations shall be agreed with the Local Planning Authority in writing before work commences.Reason: To protect the character of the listed building.

RR/2003/3180/P NORTHIAM NORTHIAM SERVICE STATION, MAIN STREET17 NOV 2003 OUTLINE: DEMOLITION OF FORECOURT/WORKSHOP AND

ADJOINING HOUSE, ERECTION OF NEW WORKSHOP/ ACCESS ALTERATION/RESIDENTIAL DEVELOPMENTMr and Mrs K B Hedley

RR/2003/3182/P NORTHIAM NORTHIAM SERVICE STATION, MAIN STREET17 NOV 2003 OUTLINE: DEMOLITION OF EXISTING FORECOURT/

WORKSHOP AND ADJOINING HOUSE, ERECTION OF NEW WORKSHOP/ACCESS ALTERATION/RESIDENTIAL DEVELOPMENTMr and Mrs K B Hedley

DECISIONS: RR/2003/3180/P: DEFERRED FOR LEGAL ADVICE AND CONSIDERATION OF APPLICANT’S LETTER DATED 04/12/2003/RECONSULT HIGHWAY AUTHORITY

RR/2003/3182/P: DEFERRED FOR LEGAL ADVICE AND CONSIDERATION OF APPLICANT’S LETTER DATED 04/12/2003/RECONSULT HIGHWAY AUTHORITY

19

Page 20: RR/2002/475/L - rother.gov.uk file · Web viewPLANNING COMMITTEE. 11 December 2003. Minutes of the Planning Committee held at the Town Hall, Bexhill on Thursday 11 December 2003 at

RR/2003/3220/P NORTHIAM SPINDLEWOOD, STATION ROAD19 NOV 2003 ADDITION OF DORMER TO REAR ELEVATION AND SIDE

DOOR TO GARAGEMr W Mewett

 DECISION: REFUSE (FULL PLANNING) 1. By virtue of the bulk of the additional dormer and its visual impact the proposal is

considered out of character with adjoining residential development and detrimental to the amenities of those dwellings. For these reasons the proposal would be contrary to Policy S1 of the East Sussex and Brighton & Hove Structure Plan 1991-2011 and Policy GD1 of the Rother District Local Plan Revised Deposit (November 2003).

  RR/2003/2714/P PEASMARSH NEW HOUSE FARM, WITTERSHAM ROAD13 NOV 2003 CHANGE OF USE AND CONVERSION OF OAST AND BARNS

TO B1 OFFICE AND LIGHT INDUSTRIAL UNITSMr & Mrs Ashby

DECISION GRANT (FULL PLANNING) DELEGATED (FOR ACCESS IMPROVEMENTS)1. CN6A (Use limitation – Class B1 (Business))2. CN12G (Hours of use.3. Before any development is commenced a scheme for the soundproofing of the

building shall be submitted to and approved by the Local Planning Authority. The use of the premises shall not commence until all soundproofing works have been carried out in accordance with the approved plans to the satisfaction of the Local Planning Authority and shall be maintained thereafter to the satisfaction of the Local Planning Authority.Reason: To safeguard the amenities of the locality and accord with the provisions of Policy S1 of the East Sussex and Brighton & Hove Structure Plan 1991-2011.

4. CN12I Amended “The level of noise emitted from the site shall not exceed XdB LA90 (15 minute) nor shall noise emitted from the site comprise any audible tonal content. The noise level and/or tonal content shall be determined …”.Reason: To safeguard the amenities of the locality and accord with the provisions of Policy S1 of the East Sussex and Brighton & Hove Structure Plan 1991-2011.

5. A scheme for the fitting of odour control equipment to the building shall be submitted to the Local Planning Authority and no development shall commence until a scheme is approved by the Local Planning Authority. The use of the premises shall not commence until all odour control equipment works have been carried out to the satisfaction of the Local Planning Authority. The odour control equipment shall be maintained thereafter to the satisfaction of the Local Planning Authority.Reason: To safeguard the amenities of the locality and accord with the provisions of Policy S1 of the East Sussex and Brighton & Hove Structure Plan 1991-2011.

6. A scheme for the sound insulation of odour control equipment referred to in the condition set out above shall be submitted to the Local Planning Authority and no development shall commence until all sound insulation works have been carried out to the satisfaction of the Local Planning Authority. The sound insulation works shall be maintained thereafter to the satisfaction of the Local Planning Authority.

20

Page 21: RR/2002/475/L - rother.gov.uk file · Web viewPLANNING COMMITTEE. 11 December 2003. Minutes of the Planning Committee held at the Town Hall, Bexhill on Thursday 11 December 2003 at

Reason: To safeguard the amenities of the locality and accord with the provisions of Policy S1 of the East Sussex and Brighton & Hove Structure Plan 1991-2011.

7. CN14N (Contaminated land condition (desk top study).8. CN11S (Large scale constructional details of windows and doors and

conservation roof lights and new staging).9. CN7G Amended (delete ‘indicating …dwelling) (Schedule of materials).10. CN4A (Barn conversions)11. Highway conditions as required by the Highway Authority.N11A (Barn conversions)

COUNCILLOR R.E. PARREN IN THE CHAIR

RR/2003/2632/P RYE FOREIGN LEASAM FARM OAST, LEASAM LANE12 SEP 2003 REINSTATEMENT OF UPPER STOREY FORMING SUNROOM

CLAD IN DARK STAINED WEATHERBOARDING TO MATCH EXISTINGAllison Riches

DECISION: GRANT (FULL PLANNING) 1. CN7C (Matching external materials).2. CN11S insert “windows and fanlight”. (Large scale constructional details).3. The external surface of the new stainless steel flue shall be finished in a black

colour and maintained in that finish thereafter.Reason: To maintain the character of the building.

(Cllr C.N. Ramus declared a personal interest in this matter, and in accordance with the Members’ Code of Conduct and chose to leave the room during consideration thereof.

COUNCILLOR C.N. RAMUS IN THE CHAIR

RR/2003/2594/P BODIAM PARK FARM CARAVAN SITE, JUNCTION ROAD24 SEP 2003 TO SITE A MOBILE HOME FOR SITE WARDEN DURING THE

SUMMER SEASON (MARCH-OCTOBER)Richard Bailey

DECISION: GRANT (FULL PLANNING) DELEGATED (RECONSULTATIONS WITH ENVIRONMENT AGENCY)1. The mobile home shall only be occupied for residential purposes by a warden

employed by Park Farm Caravan Park (and his/her family) with responsibility for providing on site management and security.

2. The mobile home shall not be stationed on the site between 1 November and the last day of February in any subsequent year.

3. CN14B (Time limited permission use - 3 years).

RR/2003/3152/P HURST GREEN 55 LONDON ROAD12 NOV 2003 DEMOLITION OF ENGINEERING WORKSHOP/STORE AND

OFFICES, ERECTION OF SEMI-DETACHED 3 BED RESIDENTIAL UNIT INCLUDING CAR PARKING Mr M Fitzcharles

21

Page 22: RR/2002/475/L - rother.gov.uk file · Web viewPLANNING COMMITTEE. 11 December 2003. Minutes of the Planning Committee held at the Town Hall, Bexhill on Thursday 11 December 2003 at

DECISION REFUSE (FULL PLANNING)1. The proposed use of this site for residential development conflicts with Policy

EM2 of the Rother District Local Plan: Revised Deposit (November 2003) in that proposals to change the use of existing buildings or develop site currently or last in employment creating use will generally be resisted. It has not been satisfactorily demonstrated that all means of retaining the site in business/commercial use have been full explored or that the continued use of the site for business/commercial purposes would perpetuate serious harm to residential amenities. The proposal also conflicts with Policies E5 and E7 pf the East Sussex and Brighton & Hove Structure Plan 1991-2011 which sets out a requirement to safeguard the level of the existing stock of industrial and commercial premises.

RR/2003/2489/P SALEHURST/ROBERTSBRIDGE 1 BLENHEIM COURT – 1 SEP 2003 CHESTNUT COTTAGE, GEORGE HILL, ROBERTSBRIDGE

ERECTION OF TWO STOREY EXTENSION AT FRONT OF PROPERTYMr & Mrs J F Stevens

DECISION: REFUSE (FULL PLANNING) DELEGATED (UNLESS SATISFACTORY PLANS INDICATING LINKAGE TO ADJOINING DWELLING ARE SUBMITTED)1. The application proposes linking the extension at the northern end with the

neighbouring dwelling (no 2 Blenheim Court) and the Statutory Notice has been served on the owners of that property. Information that has been received on the application indicates that consent to carry out work affecting the neighbouring property is unlikely to be given. In the circumstances there is serious doubt that, in the event that planning permission is granted, the development will be capable of being fully implemented in accordance with the details shown on the plans. A satisfactory form of extension has not, therefore, been demonstrated that is capable of being fully completed and ‘knitted-in’ at its northern end with no 1 Blenheim Court. Furthermore, it has not been demonstrated that the resultant extension would be of a design, bulk and form that would be in keeping with the street scene and the visual amenities of the area. It has not been demonstrated that the development would comply with plicy S1 of the East Sussex and Brighton & Hove Structure Plan 1991-2011 and Policy GD1 of the Rother District Local Plan: Revised Deposit (November 2003).

RR/2003/2963/P BREDE BURNT HOUSE FARM – LAND AT, UDIMORE 17 OCT 2003 ROAD, BROAD OAK

INSTALLATION OF 6 ANTENNA AND 2 DISHES ON EXISTING TOWER AND ERECTION OF 2 EQUIPMENT CABINETSOrange PCS Ltd

DECISION GRANT (FULL PLANNING) DELEGATED (REFER LETTER FROM ADJOINING RESIDENT TO APPLICANT FOR COMMENT/EXPIRY OF CONSULTATION PERIOD)1. The antennae and all equipment hereby permitted on the site shall be removed

from the land on which it is situated within 6 months of the time when it is no longer required for telecommunication purposes.Reason: To enable the Local Planning Authority to regulate and control the development of the land in accordance with Government Advice in Planning

22

Page 23: RR/2002/475/L - rother.gov.uk file · Web viewPLANNING COMMITTEE. 11 December 2003. Minutes of the Planning Committee held at the Town Hall, Bexhill on Thursday 11 December 2003 at

Policy Guidance Note 8 and Policy EN30 of the East Sussex and Brighton & Hove Structure Plan 1991-2011.

RR/2003/2359/P WESTFIELD CHAPEL COTTAGE – LAND ADJ CHURCH 14 AUG 2003 LANE

ERECTION OF THREE BEDROOM DETACHED HOUSE WITH PROVISION OF PARKING SPACES PURSUANT TO OUTLINE PEMISSION RR/2001/1399/PMr A Cryar

DEFERRED FOR SITE INSPECTION

RR/2003/2925/P WESTFIELD 16 MOAT LANE, EIGHT OAKS14 OCT 2003 DEMOLITION OF EXISTING HOUSE AND ERECTION OF

NEW HOUSEMr & Mrs Williams

DECISION REFUSE (FULL PLANNING) DELEGATED (UNLESS SATISFACTORY AMENDED PLANS ARE SUBMITTED)1. The site is within the countryside and the High Weald Area of Outstanding

Natural Beauty, outside any town or village development boundary as defined in the Rother District Local Plan Revised Deposit, 2003. Within such areas the plan contains a strong presumption against residential development unless it meets the exceptions described. In this case the proposal does not involve the replacement of an existing dwelling on a one for one basis which would result in the replacement of an existing dwelling being of comparable size or scale and therefore having and intrusive character upon the surrounding landscape and out of keeping with surrounding dwelling types. The proposal therefore conflicts with Policies GD1(4) HG10(i) contained within the Rother District Local Plan Revised Deposit, 2003 and Policy S1 of the East Sussex and Brighton & Hove Structure Plan 1991-2011.

RR/2003/2954/P WESTFIELD LEMMS, MOOR LANE22 OCT 2003 OUTLINE: DEMOLITION OF COACH GARAGE BUILDINGS,

ERECTION OF FOUR DETACHED DWELLINGS WITH GARAGES AND ALTERATIONS TO EXISTING ACCESS AND FORMATION OF NEW VEHICULAR ACCESSMarten Properties

DECISION: REFUSE (FULL PLANNING) 1. The proposed development does not provide a mix of dwelling types and sizes

or makes the best use of the land and would be contrary to Policies EM2, GD1, HG3, HG4 and VL9 contained within the Rother District Local Plan: Revised Deposit (November 2003) and Policy H8 of the East Sussex and Brighton & Hove Structure Plan, 1991 – 2011 and Government advice within PPG3.

RR/2003/2985/P WESTFIELD ROSEMARY, CHURCH LANE21 OCT 2003 FORMATION OF OUTDOOR SWIMMING POOL

Mr S. Bellhurst 

23

Page 24: RR/2002/475/L - rother.gov.uk file · Web viewPLANNING COMMITTEE. 11 December 2003. Minutes of the Planning Committee held at the Town Hall, Bexhill on Thursday 11 December 2003 at

  DECISION: GRANT (FULL PLANNING) 1. Swimming pool filter backwash should be passed to soakaway or the public foul

drainage system, and not to a surface water sewer or watercourse.Note: The swimming pool contents must be allowed to dechlorinate by standing for

at least 2 days prior to an approved discharge taking place to controlled waters. The Environment Agency should be advised at least 7 days before such discharge is made. If the pool produces filter backwash water this would need to be discharged to the public foul sewer. The rates and times of discharge of this water to the sewer, and of the contents of the pool, if these needed to be drained to the sewer, would have to be agreed with Southern Water Services Ltd. 

RR/2003/2786/P CAMBER 17 THE SUTTONS25 SEP 2003 ERECTION OF THERAPEUTIC SWIMMING POOL EXTENSION

Mrs Mylcreest   DECISION GRANT (FULL PLANNING) 1. CN7C (Matching external materials)2. Prior to the commencement of development of the hereby approved swimming

pool extension, permeability tests are to be carried out and the results submitted in writing to, and approved by, the Local Authority to demonstrate that suitable subsoil and adequate land is available for the soakaway (BS6297:1983 and BRE 365)

3. Only clean uncontaminated roof water shall discharge direct to soakaway via a sealed drainage system (capable of preventing accidental/unauthorised discharge of contaminated liquid into the soakaway) without passing through either trapped gulleys or interceptors.

4. Swimming pool filter backwash should be passed to soakaway or the public foul drainage system, and not to a surface water sewer or watercourse.

5. This decision notice relates only to the amended proposals as shown on the amended plan(s) date stamped 18th November 2003.

Note: The swimming pool contents must be allowed to dechlorinate by standing for at least 2 days prior to an approved discharge taking place to controlled waters. The Environment Agency should be advised at least 7 days before such discharge is made. If the pool produces filter backwash water this would need to be discharged to the public foul sewer. The rates and times of discharge of this water to the sewer, and of the contents of the pool, if these needed to be drained to the sewer, would have to be agreed with Southern Water Services Ltd.

RR/2003/3069/P EAST GULDEFORD SALTS FARM5 NOV 2003 CHANGE OF USE AND CONVERSION OF REDUNDANT BARN

INTO OFFICES – CLASS B1 BUSINESS, PROVISION OF 18 CAR SPACES AND NEW SEWAGE PLANTH Catt & Son Ltd

DECISION GRANT (FULL PLANNING) DELEGATED (FOR ACCESS IMPROVEMENTS)1. CN7G Amended delete ‘indicating…dwelling’ (Schedule of materials)2. CN11S (Large scale constructional details of windows, doors and shutters)3. CN4A (Conversion details)4. CN14N (Contaminated land)

24

Page 25: RR/2002/475/L - rother.gov.uk file · Web viewPLANNING COMMITTEE. 11 December 2003. Minutes of the Planning Committee held at the Town Hall, Bexhill on Thursday 11 December 2003 at

5. A scheme for the fitting of odour control equipment to the building shall be submitted to the Local Planning Authority and no development shall commence until a scheme is approved by the Local Planning Authority. The use of the premises shall not commence until all odour control equipment works have been carried out to the satisfaction of the Local Planning Authority. The odour control equipment shall be maintained thereafter to the satisfaction of the Local Planning Authority.Reason: To safeguard the amenities of the locality and accord with the provisions of Policy S1 of the East Sussex and Brighton & Hove Structure Plan 1991-2011.

6. A scheme for the sound insulation of odour control equipment referred to in the condition set out above shall be submitted to the Local Planning Authority and no development shall commence until all sound insulation works have been carried out to the satisfaction of the Local Planning Authority. The sound insulation works shall be maintained thereafter to the satisfaction of the Local Planning Authority.Reason: To safeguard the amenities of the locality and accord with the provisions of Policy S1 of the East Sussex and Brighton & Hove Structure Plan 1991-2011.

7. A scheme for the soundproofing of the building shall be submitted to the Local Planning Authority and no development shall commence until a scheme is approved by the Local Planning Authority. The use of the premises shall not commence until all soundproofing works have been carried out to the satisfaction of the Local Planning Authority. The soundproofing works shall be maintained thereafter to the satisfaction of the Local Planning Authority.Reason: To safeguard the amenities of the locality and accord with the provisions of Policy S1 of the East Sussex and Brighton & Hove Structure Plan 1991-2011.

8. CN12I (Noise levels)9. CN12G (Hours of use)10. Any conditions as may be required by the Highways Agency.11. CN9I (Boundary fences – non-estate development)N11A (Barn conversions)

RR/2003/1763/P ICKLESHAM RASTRUM LTD, RYE WHARF, HARBOUR 30 JUN 2003 ROAD

HARDSTANDING TO BE USED FOR THE EXTERNAL STORAGE OF AGGREGATESRastrum Ltd

DEFERRED FOR SUBMISSION OF ADDITIONAL INFORMATION/FURTHER CONSULTATIONS

RR/2003/3011/P ICKLESHAM THE OLD MEARS SITE, HARBOUR ROAD15 OCT 2003 OUTLINE: NEW HGV, MOT TESTING STATION WITH

WORKSHOP AND COACHWORK, NEW BT CIVIL ENGINEERING SUB-CONTRACTOR DEPOT AND ADDITIONAL COACH/ HGV PARKING AREA.Rastrum Ltd

DECISION: GRANT (FULL PLANNING) DELEGATED (SUBJECT TO SUBMISSION OF TRANSPORT ASSESSMENT/AMENDMENTS TO MEET ENVIRONMENT AGENCY COMMENTS)

25

Page 26: RR/2002/475/L - rother.gov.uk file · Web viewPLANNING COMMITTEE. 11 December 2003. Minutes of the Planning Committee held at the Town Hall, Bexhill on Thursday 11 December 2003 at

1. CN9A (Road construction details – amended – delete street lighting)2. CN12L (External lighting)3. CN8B (Surface water details)4. CN8E (No surface water to foul sewer)5. CN8I (Interceptor)6. CN8G (Bunded tank)7. CN13A (Landscaping scheme)8. CN13A (Landscaping scheme)9. CN12B (No storage display)10. These proposed new buildings shall be used for the purposes of Class B1 and

B2 only.Reason: To ensure the appropriate use of the site.

11. No materials stored in the proposed storage yards shall exceed a height of 4m or as otherwise may be agreed in writing by the Local Planning AuthorityReason: To safeguard the amenities of the locality.

RR/2003/3003/P TICEHURST SUNNYBANK GARAGE, HAWKHURST ROAD, 22 OCT 2003 FLIMWELL

DEMOLITION OF EXISTING DWELLING WITHIN ADJACENT GARAGE FORECOURT AND REPLACEMENT ON PART OF ADJACENT PARKING AREA ALSO, VARIATION OF CONDITION 8 OF RR/2002/1163/P TO PROVIDE DETAILS OF ODOUR CONTROL EQUIPMENT TO PAINT SPRAY BOOTH AFTER COMMENCEMENT OF DEVELOPMENTMark Lilly Ltd

See Minute D76 (5)

RR/2002/2507/O EWHURST LORDINE CARAVAN PARK – LAND AT,07 JAN 2003 STAPLECROSS

USE OF LAND FOR STATIONING OF CARAVANS IN CONNECTION WITH LORDINE CARAVAN PARK (AREAS B AND C ON PLAN) AND RESIDENTIAL USE OF CARAVANS (D1 AND D2 ON PLAN)C Horvath

DECISION GRANT (CERTIFICATE OF LAWFUL USE) DELEGATED (AMENDED DESCRIPTION)

RR/2003/3052/P EWHURST CRIPPS CORNER GARAGE, CRIPPS CORNER, 29 OCT 2003 STAPLECROSS

OUTLINE: DEMOLITION OF GARAGE AND ERECTION OF 3 NO. TERRACED COTTAGES WITH ASSOCIATED CAR PARKING SPACES INCLUDING ALTERATIONS TO AN EXISTING ACCESSMr and Mrs J Standen

DECISION: REFUSE (OUTLINE PLANNING)1. The proposed development would result in the loss of an employment site and it

has not been demonstrated that there is no prospect of its continued use for business purposes. For these reasons the development is contrary to Policy E5

26

Page 27: RR/2002/475/L - rother.gov.uk file · Web viewPLANNING COMMITTEE. 11 December 2003. Minutes of the Planning Committee held at the Town Hall, Bexhill on Thursday 11 December 2003 at

of the East Sussex and Brighton & Hove Structure Plan 1991-2011 and Policy EM2 of the Rother District Local Plan: Revised Deposit (November 2003).

2. In exceptional circumstances, planning permission may be granted for residential development outside development boundaries in order to meet a local housing need among those people unable to compete in the normal housing market. Proposals for development will be considered in the context of the following:(i) There should be clear evidence of an unsatisfied housing need in the

town/village or parish that cannot be met through normal market mechanisms;

(ii) The proposed development should be of a size, cost and type appropriate to those people in local housing need established in (i) above;

(iii) Any proposal should ensure that occupation can be controlled through appropriate legal agreements to meet the local housing needs of those people unable to compete in the normal housing market in the town/village or parish both now and in the future;

(iv) The proposed development should be well located within or adjacent to an existing settlement and be of an appropriate scale and character in keeping with existing development in the locality and normally provide good access to local facilities, e.g. shops and schools;

(v) The proposed development should not be intrusive in the landscape and should be in keeping with the character of the surrounding development and locality;

(vi) The proposed development should meet normal local planning and highway authority criteria for access, parking, retention of trees, landscaping and impact on neighbouring properties;

vii) A legal agreement will be required to secure the above objectives.The proposal does not meet these criteria, and therefore the development conflicts with Policy HG2 of the Rother District Local Plan: Revised Deposit (November 2003) and Policies S10(c) and H5 of the East Sussex and Brighton & Hove Structure Plan 1991-2011.

3. The site lies within the High Weald Area of Outstanding Natural Beauty, where policies S1(j), EN2 and EN3 of the East Sussex and Brighton & Hove Structure Plan 1991-2011, Policy DS1 of the Rother District Local Plan: Revised Deposit (November 2003) and Government Advice contained in PPG7 indicate that development will be carefully controlled to protect the character of the area. It is considered that the proposal does not meet this objective, and it would cause harm to the rural character of the area.

RR/2003/1617/P SEDLESCOMBE PARK VIEW, THE STREET23 JUL 2003 OUTLINE: DEMOLITION OF PARK VIEW AND OUTBUILDINGS

AND ERECTION OF 7 HOUSES WITH GARAGES AND NEW ACCESS ROAD AND FORMATION OF NEW VEHICULAR AND PEDESTRIAN ACCESSMarkar Ltd

DECISION: REFUSE (OUTLINE PLANNING)1. Part of the site is within the countryside outside any town or village as defined in

the Rother District Local Plan: Revised Deposit (November 2003). Policies S1, S10 and S11 of the East Sussex and Brighton & Hove Structure Plan 1991-2011 contains a strong presumption against residential development unless it meets one of the exceptions described in the Plan. It has not been demonstrated to the satisfaction of the Local Planning Authority that the proposed residential

27

Page 28: RR/2002/475/L - rother.gov.uk file · Web viewPLANNING COMMITTEE. 11 December 2003. Minutes of the Planning Committee held at the Town Hall, Bexhill on Thursday 11 December 2003 at

development is essential for the needs of an enterprise that must be in a rural location. The proposal is therefore considered to be contrary to those policies.

2. Part of the proposed development site lies outside of the Development Boundary for Sedlescombe set out in the Rother District Local Plan: Revised Deposit (November 2003). No compelling justification for such a location has been demonstrated, the proposal is therefore considered to be contrary to Policy HG10 of the Rother District Local Plan: Revised Deposit (November 2003).

3. The site lies within the High Weald Area of Outstanding Natural Beauty, where Policies EN1, EN2 and EN3 of the East Sussex and Brighton & Hove Structure Plan 1991-2011 and government advice in PPG7 indicate that development will be carefully controlled to protect the character of the area. It is considered that the proposal does not meet this objective and it would have a harmful effect on the rural character of the area.

4. The proposed access road development would affect land of special nature conservation interest. The land is within the Brede Valley designated site of Nature Conservation Importance indicated in the Rother District Council Local Sites of Nature Conservation Importance supplementary planning guidance document. There is no compelling justification for the proposed development and the proposal is contrary to Policy CNE10 of the Rother District Local Plan: Revised Deposit (November 2003).

5. The site falls within the proposed Sedlescombe Conservation Area. The illustrative drawing provided with the outline application suggests a suburban form of development that would be out of keeping with the special architectural and historic character of the area. The proposal is contrary to Policies S1(m), S8(e) of the East Sussex and Brighton & Hove Structure Plan 1991-2011 and Policy GD1 of the Rother District Local Plan: Revised Deposit (November 2003).

6. Notwithstanding the aforementioned policy objections to the principle development of the site, the proposed scheme does not include any provision for affordable housing for local people on the site as required under Policy HG1 of the Rother District Local Plan: Revised Deposit (November 2003). Affordable housing would normally be controlled through appropriate legal agreements by a Housing Association approved by the Local Planning Authority.

RR/2003/2548/P FAIRLIGHT MEADOW SWEET, GORSETHORN WAY30 SEP 2003 RAISING OF ROOF, INSERTION OF DORMER WINDOWS,

SINGLE EXTENSIONS AND REPLACEMENT SINGLE GARAGEMrs L S Rokhsar

   DECISION GRANT (FULL PLANNING) 1. CN7C (Matching external materials)2. No development shall take place until details of the new access have been

submitted to and approved in writing by the Local Planning Authority.

RR/2003/2882/P FAIRLIGHT PETER JAMES LANE – LAND AT08 OCT 2003 RE-SITING OF ORIGINAL GATEWAY AT EXISTING

VEHICULAR ACCESS FROM PETER JAMES LANE AND PROPOSED FIVE-BAR WOODEN GATE AND POSTS (RETROSPECTIVE APPLICATION)Mr D B Juby 

 DECISION: GRANT (FULL PLANNING)

28

Page 29: RR/2002/475/L - rother.gov.uk file · Web viewPLANNING COMMITTEE. 11 December 2003. Minutes of the Planning Committee held at the Town Hall, Bexhill on Thursday 11 December 2003 at

1. The vehiclar access hereby approved shall be used for agricultural purposes only and not at any time for purposes incidental to any residential use.Reason: To safeguard the amenity of the surrounding countryside in accordance with Policies S1, S10, EN2 and EN3 of the East Sussex and Brighton & Hove Structure Plan 1991-2011 and Policy DS1 (vi) of the Rother District Local Plan: Revised Deposit (November 2003).

2. Within two months of the date of this removal, full details of surface water drainage shall be submitted to, and approved in writing by, the Local Planning Authority. The drainage works shall be constructed in accordance with the approved plans prior to the access being brought into use and thereafter retained. Reason: To safeguard the amenity of neighbouring residential occupiers and the safety of users of the highway.

3. No floodlighting or illumination of the access point and gateway hereby approved take place at any time. Reason: To safeguard the amenity of the surrounding countryside.

4. Within two months of the date of this permission a wooden five bar gate of the design as shown on the submitted drawing 1008/02 dated 8 October 2003 shall be erected on the site and retained thereafter.

5. CN10A (Highway conditions)6. CN13F (Tree/shrub planting)

RR/2003/2885/P FAIRLIGHT PETER JAMES LANE – LAND AT08 OCT 2003 RELOCATION AND LAYING OF A MORE SUBSTANTIAL

TRACK FROM THE EXISTING VEHICULAR ACCESS FROM PETER JAMES LANE AND FOR THE PROPOSED COVERING OF THIS TRACK WITH A TOPSOIL AND GRASS FINISH (RETROSPECTIVE APPLICATION)Mr B J Juby

DECISION: REFUSE (FULL PLANNING) 1. The site lies within the High Weald Area of Outstanding Natural Beauty, where

Policies S1, EN2 and EN3 of the East Sussex and Brighton & Hove Structure Plan 1991-2011 and DS1(vi) of the Rother District Local Plan: Revised Deposit (November 2003) indicate that development can be carefully controlled to protect the character of the area. It is considered that the creation of the access and track and its usage would have a harmful effect on the rural character of the area. It is therefore contrary to the above policies and Government Advice contained in PPG7.

RR/2003/2835/P GUESTLING ADAMS FRUIT FARM, IVYHOUSE LANE24 SEP 2003 USE OF LAND FOR PAINTBALL GAMES AND USE OF

EXISTING FIELD SHELTER AS BASE CAMPMr B C Adams

DECISION REFUSE (FULL PLANNING) 1. The proposed use of the land within the High Weald AONB is considered

inappropriate due to the detrimental impact it would have upon the ancient woodland in terms of its setting, ecological value and the impact upon the residential amenities of neighbouring properties. As such the proposal conflicts with Policy DS1(vi)(ix)(x) and GD1(ii)(v) contained within the Rother District

29

Page 30: RR/2002/475/L - rother.gov.uk file · Web viewPLANNING COMMITTEE. 11 December 2003. Minutes of the Planning Committee held at the Town Hall, Bexhill on Thursday 11 December 2003 at

Local Plan, Revised Deposit, 2003 and Policies EN7, EN17 East Sussex and Brighton & Hove Structure Plan, 1991 – 2011.

RR/2003/3196/P GUESTLING FRAYSLAND FARM17 NOV 2003 INSTALLATION OF 15M PHASE 2 MONOPOLE WITH 4 NO.

ANTENNAS, 2 NO 300MM DISHES, RADIO EQUIPMENT HOUSING AND ANCILLARY DEVELOPMENT THERETOVodafone Ltd

DEFERRED FOR SITE INSPECTION

RR/2003/1901/P PETT POTTING SHED, PETT ROAD30 JUNE 2003 OUTLINE: DEMOLITION OF EXISTING BUILDINGS, ERECTION

OF 2 FOUR BEDROOM WORK/LIVE UNITS AND 2 FOUR/FIVE BEDROOM HOUSES WITH FORMATION OF ASSOCIATED ACCESSES AND PARKINGMr Walsh

DECISION: REFUSE (FULL PLANNING)1. The site is located within Pett village and is considered acceptable for a

residential live/work scheme. The site is on a sloping site closely related to adjoining residential properties. The illustrative layout deposited in support of the proposed scheme fails to demonstrate that development of the scale and size proposed will not have an adverse environmental impact on the residential amenities of adjoining properties. The development as proposed does not satisfy the requirements of Policy GD1 (ii) & (iv) of the Rother District Local Plan: Revised Deposit (November 2003) and Policy S1(f) of the East Sussex and Brighton & Hove Structure Plan 1991-2011.

RR/2003/2776/P RYE 59/59A CINQUE PORTS STREET02 OCT 2003 REDESIGNED ELEVATIONS TO CONSENTED SCHEME

RR/2001/1322/P AND ADDITIONAL FLAT

RR/2003/2794/H RYE 59/59A CINQUE PORTS STREET26 SEPT 2003 REDESIGNED ELEVATIONS TO CONSENTED SCHEME

RR/2001/1349/H AND ADDITIONAL FLATAppledore Ltd

DECISIONRR/2003/2776/P GRANT (FULL PLANNING) 1. CN7G (Schedule of materials – amended to relate to buildings and add ‘The

proposed roof tiles shall be hand made plain clay tiles.)2. CN8C (Drainage)3. CN9H (Walls/fences)4. CN4B (Doors and windows)5. CN5C (Exclude GDO structures)6. CN5E (Restriction of alterations - a, b & d)7. CN12L (External lighting)8. Prior to the commencement of development, details of the proposed shop fronts

shall be submitted to and subject to the approval of the Local Planning Authority. The development shall be carried out in accordance with the submitted details,

30

Page 31: RR/2002/475/L - rother.gov.uk file · Web viewPLANNING COMMITTEE. 11 December 2003. Minutes of the Planning Committee held at the Town Hall, Bexhill on Thursday 11 December 2003 at

which shall include all shop fronts and windows/doors being painted timber construction.

9. Details of the construction of the proposed access road together with any hard surfaced areas on the site shall be submitted to and subject to the approval of the Local Planning Authority prior to commencement of development. The development shall be carried out in accordance with the approved details.

10. Details of the proposed metal gates to the access road shall be submitted to and be subject of the approval of the Local Planning Authority and the works shall be carried out in accordance with the approved details.

11. The ground floor converted unit shall be used for other A1/A2 or B1 office purposes.

12. Before development commences and at least four weeks before any works in pursuance of this permission are commenced on site, the County Planning Officer shall be notified in writing and the County Archaeological Adviser shall thereafter be given reasonable access to the site for archaeological records both before and during the course of development.

13. The development shall be constructed with pile foundation or such alternative foundation detail as may be agreed in accordance with details to be submitted to and approved by the Local Planning Authority. Details of foundations including groundworks and service works/trenches shall be submitted for the approval of the Local Planning Authority prior the commencement development.Implementation of archaeological investigation statement.

14. Amend to drawing 59-CPS-02BN1A/B (Amended plans).

RR/2003/2794/H GRANT (CONSERVATION AREA CONSENT)1. Detail of any temporary fencing or boarding on the site shall be submitted to and

be subject to the approval of the Local Planning Authority. Any fencing/boarding shall be constructed in accordance with the approved detail.

RR/2003/2996/L RYE 19 WATCHBELL STREET22 OCT 2003 INSERTION OF NEW WINDOW AT REAR WITH THREE FIXED

SASHES IN TIMBER UNDER EXISTING TRANSOMS TO MATCH EXISTING WINDOWSJohn Griffiths

RR/2003/3156/P RYE 19 WATCHBELL STREET12 NOV 2003 INSERTION OF NEW WINDOW TO THE WEST, THREE FIXED

SASHES IN BLACK PAINTED TIMBER UNDER EXISTING TRANSOMS AND TO MATCH THE EXISTING WINDOWS TO THE SOUTH AND EASTJohn Griffiths

DECISIONS:RR/2003/2996/L: GRANT (LISTED BUILDING CONSENT)1. CN11S (Large scale constructional details of new windows)

RR/2003/3156/P: GRANT (FULL PLANNING)1. CN11S (Large scale constructional details of new windows).

31

Page 32: RR/2002/475/L - rother.gov.uk file · Web viewPLANNING COMMITTEE. 11 December 2003. Minutes of the Planning Committee held at the Town Hall, Bexhill on Thursday 11 December 2003 at

RR/2003/3239/P RYE FISH PROCESSING BUILDING, ROCK CHANNEL20 NOV 2003 RECLAD BUILDING AND FORM NEW OPENINGS

The Rye Partnership

DECISION: GRANT (FULL PLANNING) DELEGATED (EXPIRATION OF STATUTORY ADVERTISEMENT PERIOD)1. CN7G Amended ‘No development … of all external colour finishes and the

development shall be carried out using the approved colour finishes.’(Reason: In the interests of the visual amenities of the locality and to accord with the provisions of Policy S1 of the East Sussex and Brighton & Hove Structure Plan 1991-2011.)