52B10SWD025 2.18421 MOSS 010
REPORT ON THE DIAMOND DRILLING COMPLETED FOR THE 1995 OPAP
BY TED AHO (1013968 ONTARIO LTD)
2.164 21
RECEIVED
FEB 2 O 1996
.auiun l AMDS BRANCH
Thunder Bay, January 3, 1996 A
By: Claude LaroucheOvalbay Geological Services Inc.1070 Lithium Drive, Unit f 3Thunder Bay, OntarioP7B 6G3Tel: (807) 623-3770 Fak: (807) 623-2335
S2B10SW0025 2.16421 IIOSS
TABLE OF CONTENT
Table of Contents ............................ ii
Introduction ................................. lLocation and Access .......................... l
Figure 1: Location Map .................. 2Claims ....................................... 3
Figure 2: Sketch of claims .............. 4Geology ...................................... 3Recent Work .................................. 5Results ...................................... 7Conclusions and Recommendations .............. 8Budget ....................................... 8
Cost of work ................................. 9
01OC
List of Naps (in pocket)Hap 1: Compilation Map
INTRODUCTION
The following report presents the results of the limited diamond drilling program completed during the Summer and Fall of 1995. The exploration work was completed as part of an OPAP grant which was granted to Theodore Aho, prospector of Thunder Bay, Ontario.
The diamond drilling, completed by the prospector, was centered around the new surface showings which were uncovered last Summer by Ted Aho ( Opap 1994 ).
Anomalous gold values were intersected by drilling within zones of shearing injected by numerous narrow quartz veins and stringers.
The report was completed by Claude Larouche of Ovalbay Geological Services Inc., Thunder Bay, Ontario.
LOCATION AND ACCESS
The property is located in Moss Township, approximately 75 miles west of the city of Thunder Bay, Ontario. The claims are situated on NTS sheet 52B/10 and the area is present on claim map f G-676 entitled "Moss Township". The mining claims (see following list for numbers) are adjacent and they are all located within the Thunder Bay Mining District.
Access to the property (Figure 1) is obtained by driving west from Thunder Bay on Highway #11-17 and then on Highway f 11 to the Swamp Road intersection, approximately 10 miles west of Kashabowie, Ontario. From this intersection, a main lumber road ( Swamp Road ) heading south branches into numerous bush roads which lead to different portions of the property.
N.T.S.: 52B/10Longitude: 90*44*Latitude: 48'32'Claim Map: G-676Township: Mos^sMining Division: Thunder Bay
Ardeen Cold Mint Property
CAMADA l U.S.A. Horde?'.
Figure 1: Location Hap
Lake Superior
-3-
CLAIMS
The property under study ( figure 2 ) comprises two (2) mining locations HI and 33B along with 12 contiguous non - patented claims numbered as follows:
TB-677468 TB-677469 TB-677470 TB-677471TB-677472 TB-677473 TB-677474 TB-677475TB-677476 TB-687477 TB-677478 TB-677479
The claims are recorded with the Thunder Bay Mining Recorder's office and were transferred from Belore Nines Ltd to:
1013968 ONTARIO LTD 618, VAN NORMAN ST. THUNDER BAY, ONTARIO P7A 3X3 Att: Theodore Aho
GEOLOGY
The Shebandowan Greenstone Belt forms part of the Wawa Subprovince of the Superior Structural Province of the Canadian Shield. The Wawa Subprovince extends eastward through Thunder Bay to the eastern side of Lake Superior. The western half of the greenstone belt, characterized by greenschist facies metavolcanic rocks , partly encircles a terrane of plutonic and amphibolite facies gneissic rocks to the south, referred to as the Sunbar - Batwing Lake Complex. The metasedimentary Quetico Subprovince abuts the Shebandowan Belt to the north, and Proterozoic rocks uncomformably overlap the southern part of the greenstone belt and the Sunbar - Batwing Lakes Complex.
The area under study is occupied by two (2) contrasting suites of older metavolcanic rocks: mafic to intermediate metavolcanic rocks, iron formation and intermediate ash flow rocks in the west and felsic metavolcanic rocks in the east. Metadiabase sills, emplaced mainly, if not solely, in the mafic metavolcanic terrain, are considered the oldest intrusions exposed. Metadiabase and both mafic and felsic metavolcanic rocks are cut by dykes and stocks of feldspar and feldspar - quartz porphyry, hornblende lamprophyre, quartz syenite and larger bodies of hornblende gabbro to diorite.
33B
f
^
l f l J—— ̂ .677476 l677472|677470 j 677468~~ j" "~~i "l
' ' ! ' ^677477 1 677473 j 677471 1677469
l6774781677474
ll
tt f 14/9 16/7475
N
CLAIM MAP
Figure 2: Sketch of claims
-5-
The deformation is very heterogeneous, partitioned mainly along narrow, very schistose, northeasterly striking high strain zones which are closely spaced in the Ardeen Mine area.
*
These zones are characterized by a strong lineation which mainly plunges gently southwest. Carbonate and sericite schists are characteristics of segments of some of the shear zones. The various shear zones in the Ardeen Mine area and the intersection of brittle fracture zones and one of the northeast trending carbonatized shear zone at Snodgrass Lake appear to exert the most significant influence on the localization of gold.
RECENT WORK
During the period of May 3rd, 1995 to October 8th, 1995, a limited exploration program including minor prospecting and 312.25 linear feet of diamond drilling was undertaken by Ted Aho as part of an OPAP 1995 grant.
The prospecting has been conducted by Ted Aho, and was oriented mainly to localized the best areas to carry on diamond drilling. The traverses are presented on the accompanying map ( in pocket ) at the metric scale of l 1,000.
Ted Aho -646 Dawson StreetThunder Bay, OntarioP7A 3X3
Diamond drilling has been conducted over the summer by Ted Aho with a Winkie diamond drill producing AX core. The following persons supplied their service as helpers:
Terry Olford Daniel Bluchier310 Tait Crescent R.R. l, 1st Side RoadApt. 102, Saskatoon Murillo, OntarioSaskatchewanS7H 5L2
Douglas Bluchier Wally MagnussenR.R. l, 1st Side Road General DeliveryMurillo, Ontario Kakabeka Falls, Ontario
A total of 7 holes were drilled. The following table presents the statistics of the drill holes:
1995 DIAMOND DRILLING SUMMARY
HOLE
95-1
95-2
95-3
95-4
95-5
95-6
95-7
TOTALS
AZIMUTH
130
350
355
150
150
136
120
DIP
-40
-40
-40
-40
-40
-36
-40
DRILLED DEPTH
20.00
33.00
58.00
8.00
66.00
64.25
63.00
312.25
REMARKS
ABANDONED BROKEN BIT
ABANDONED BROKEN BIT
A description ( Log ) for every drill hole is presented in appendix along with a copy of the assay certificates and a cross - sections.
The drill holes were logged by Andreas Lichtblau of Ovalbay Geological Services Inc. following a brief description by Terry Olford.
The locations of the holes were also chained one from another and are presented on the accompanying map at the metric scale of l ** 1,000. One casing of BQ diamond drilling completed by Matt Berry in 1987 ( hole 87-6 ) has been located in the area and has been plotted on the map along with a few other holes drilled by Matt Berry in the general area.
-7-
RESULTS
The limited diamond driling program permitted to investigate the surface gold showings which are characterized by gold - bearing quartz stringers and veins ( up to 3 feet wide) injected within chlorite and sericite shear zones of variable widths. These shear zones are located within mafic volcanics and dykes of porphyry are locally present within the mafic volcanics.
The results of the diamond drilling is presented in the following table:
Hole f from to width Assayfeet feet feet Au opt.
95-01 6.5 7.0 0.5 0.160
95-02 3.0 8.0 5.0 0.0138.0 13.0* 5.0 0.013
13.0 18.0 5.0 0.012
95-03 18.0 22.0 4.0 0.010
95-04 No sampling
95-05 29.0 32.0 3.0 0.017
95-06 6.5 7.5 1.0 0.08216.0 22.0 6.0 0.02631.5 34.0 2.5 0.020
95-07 25.25 28.0 2.75 0.017 41.5 42.0 0.5 0.028
The drilling intersected anomalous gold values in most of the holes but over narrow width except for hole 95-02 where the zone of shearing is 15 feet wide.
A compilation of the previous work has also been included on the accompanying map. * It becomes evident, from this compilation, that the better known gold bearing structure, the 11 Beaver Vein " was not intersected by the present diamond drilling. Nevertheless, the recent drilling confirmed the presence of at least three parallel gold - bearing structures including the "Beaver Vein" south of the recent work.
CONCLUSIONS AND RECOMMENDATIONS
It is concluded that the property under study has good exploration potential for gold deposition. The presence of numerous gold bearing shear zones hosting quartz veins and stringers with anomalous gold values has been confirmed.
It is recommended to continue the systematic exploration of the property under study along the lateral extensions of the known surface gold showings. It is possible that the different shear zones may join together along strike or at depth.
The next exploration program should include detailed prospecting on the rest of the claims, detailed geological mapping, stripping and trenching and diamond drilling. Numerous other gold showings are known on the studied property.
Budget
Line cutting and chaining10 km at $450.00/km ................... O 4,500.00
Prospecting 30 days30 days e $150.00/day ................. $ 4,500.00
Geological mapping ......................... ^ 3,500.00Assays ..................................... S 750.00Transportation ............................. S 2,500.00Stripping and trenching .................... S12,000.00Compilation and recommendations ............ S l,OSO.00Diamond drilling ( all inclusive )
1500 linear feet e $30.00/ft. . ......... S45,000.00Contingencies .............................. S 5,000.00
S78,800.00
Claude Laroucfie"Ovalbay Geological Services Inc.
-9-
COST OF WORKPeriod Nay 03, 1995 to Oct. 08, 1995
Prospecting (May 3, 19, 26; June 3;August 2, 9, 16, 23, 24, 31)
Salary Ted Aho 10 days e $150.00/day ....... S 1,500.00
Diamond drilling (June 7, 10, 11, 12,15, 17, 21, 24, 25, 28, 30; July l, 2, 3, 4, 6, 8, 10, 11, 12, 24; September 8, 20, 21, 22, 23, 24, 25, 26, 27; October 8)
Salary Ted Aho 31 days 8 $150.00/day ....... $ 4,650.00Helpers
Daniel Bluchier 6 days e $150.00/day .. $ 900.00 Dough Bluchier 2 days @ ^ISO.OO/day .. ^ 300.00 Terry Olford 10 days 8 SlSO.OO/day .... ^ 1,500.00Wally Magnussen 12 days 8 $150.00 ..... i 1,800.00
Core splittingSalary Ted Aho 2 days 8 $150.00/day ........ $ 300.00
MaterialGas + Oil for drill pump ...........estimate $ 200.002 broken drill bits SlSO.OO/bit ............ S 300.002 worn out drill bits $150.00/bit .......... O 300.00
Travelling by road (245 km round trip)10,066.6 Km 8 $0.30/km .................... O 3,020.00
Food ( $15.00/day )41 days 8 $15.00/day ....................... $ 615.00
Assays .......................................... $ 408.11
Report3 days Ted Aho 8 SlSO.OO/day ............... $ 450.00
Report, drafting, recommendations ............... O 535.00
Photocopies and reproduction .................... $ 42.30
$16,820.41
l l i l l l l
95-1 t-
Q.Ik opV Au
4 oe.
O 5' 10
A HO
Scale:]" :\0'
DDH SECTION:. 9?- \
l l 1)11
l lO 5 10
AHOScale: f-.10
DDH
fell Hb^
l l l l l l l l l
^ Q .01 opVAu
K
O 5 10
AHO ^ Assocoss Scale:!":
DDH
l l l l l l l l l
O 5 10 i T ift
AMDScale: T: 10'
DDH SECTION:
l l l l l l l l l
O S 10
AVAO
Moss"'
Scole:l"ilO
DDH SECTION:.
1)11 l l l l l l l
1 t*UL
O 5 10i T l
A to
Moss Scale: f MO*
DDH SECTION:- 95 -6
3a*^ ^ -"fc*^
P 5
A HO
Moss Scale:
DDH
OVALBAY GEOLOGICAL SERVICES INC.Mining Exploration Consultant
DIAMOND DRILL RECORDHOLE No:
SHEET:
COMPANY:.
TOWNSHIP:
PROJECT No:
CLAIM No:HOLE No:
COORDINATE:____ ——^
ELEVATION: ___________
BEARING: M i3o *g
DIP: _^_^_
LENGTH:.
CASING:3.0.0
HCASING LEFT IN HOLE: Yes
* OF SAMPLES: —
SECTION SAMPLED:
SPECIAL TESTSETCH TEST
DEPTH RDG DEPTH
TROPARI
BEARING DIP
DRILLED BY: Tad AWo*
COMMENCED: "3"^^
COMPLETED: '
CORE SIZE:'
CORE STORED AT:^^
BY:
DATE:
l l l l
PROPERTY:
DIAMOND DRILL RECORD
Hole*; 95-1
Sheet f: \ l 2•-Li
. Q 'Fie^r
From To Description From To Width Assay -Opt"
, - o i
iO'-HO'
o coo* r
IO'/ ii*. IV *
tor L J *?.O 0*5
2.0-0
gWflft^ Oy. A 7 dft TfrxN y.fJhuv**
* T* * "i*\c. . iVixt. e^YCuA 1-^.A
l l
PROPERTY: Holef:
Sheet If:
DIAMOND DRILL RECORD
From To Description From To Width AssayFt**
•j-- CcJU. r*
uT^rorj
- IS-o
t* 4.0.001
ACCURASSAY LABORATORIESA DIVISION OF ASSAY LABORATORY SERVICES INC.
.1070 LITHIUM DRIVE. UNIT 2THUNDER BAY. ONTARIO P7B 6G3
PHONE (807) 623-6448pa FAX (JJ07) 623-6820
TED AHO 646 DAWSON ST. THUNDER BAY, ONTARIO P7A 3X3
October 18, 1995
Job #9541606
Sample #Accurassay Customer
123456789
1011 Check
35613562357735783579358035813582358335843584
Gold ppb
5533132512
190570150977151716
Gold Oz/t
0.161
^.001 0.006 0.017 0.004 0.028
4:0.001-cO.OOl :0.001
Certified By:
OVALBAY GEOLOGICAL SERVICES INC.Mining Exploration Consultant
DIAMOND DRILL RECORDHOLE No:
SHEET:
95 ~
COMPANY:,
TOWNSHIP: .
PROJECT No:
CLAIM No: TR
HOLE No:
COORDINATE:.
ELEVATION:,
BEARING:.
DIP:
LENGTH: — 33 O rH
CASING: 3-0 ttCASING LEFT IN HOLE: Yes:.
# OF SAMPLES:__
SECTION SAMPLED:
No:
SPECIAL TESTS
ETCH TEST
DEPTH RDG DEPTH
TROPARI
BEARING DIP
DRILLED BY:
COMMENCED:
COMPLETED:
CORE SIZE:4
CORE STORED AT: Cat*. Ufa fivfxx
BY:
DATE:
l l l l l lPROPERTY: Hole*;
Sheet #:
DIAMOND DRILL RECORDcJt SP -^ ' -60^1 Jo-. . ., ac- C 3- Q - 18 - Q ' l *
From To Description From To Width Assay
o -0 at,
N/?,^^,
- vvv\ M&'V JE35SIA
Si*-
vJ
ei . l^i ,-
el ^ U,
. O -
l l
PROPERTY:
DIAMOND DRILL RECORD
l l
Hole*:
Sheet #:
From To Description From To Width Assay
r^ iiiM*U.t~Xe.tt . nroOxtl -
y^orl-ei r ..\ V
l l l l l l l lPROPERTY:
DIAMOND DRILL RECORD
Hole*:
Sheet #:
Fee* From To Description From To Width Assay
EOM
ACCURASSAY LABORATORIESA DIVISION OF ASSAY LABORATORY SERVICES INC.
1070 LITHIUM DRIVE. UNIT 2THUNDER BAY. ONTARIO P7B 6G3
PHONE (807) 623-6448FAX (807) 623-6820
Page l
TED AHO June 22, 1995 646 DAWSON ST.THUNDER BAY, ONTARIO Job #954781 P7A 3X3
Sample # Gold Gold Accurassay Customer ppb Oz/t
1 3551-AJ 436 0.0132 3551-B Q- ? 433 0.0133 3551-C MS ~*- 399 0.0124 CHECK 3551-C 396 0.012
Certified By:
OVALBAY GEOLOGICAL SERVICES INC.Mining Exploration Consultant
DIAMOND DRILL RECORDHOLE No:
SHEET:
COMPANY:m
TOWNSHIP:.
PROJECT No:
CLAIM No: T& -fa"3?
HOLE No:
COORDINATE:.
ELEVATION:. BEARING:
M
DIP:
LENGTH:. CASING:
58.0 H
a- o IHCASING LEFT IN HOLE: Yes:.
# OF SAMPLES:
SECTION SAMPLED:
No:
SPECIAL TESTSETCH TEST
DEPTH RDG DEPTH
TROPARI
BEARING DIP
DRILLED BY:
COMMENCED:
COMPLETED:
CORE SIZE:l
CORE STORED AT!
BY: DATE:
: A Q
l l l l ! l l l l l l
PROPERTY: Holef:
Sheet #: 1/7
DIAMOND DRILL RECORD* oA\
From 'To Description From To Width Assay
OT
3-0 ©- O
j
18. 0
Ql U("Tt:o *)
-b S rv^ O.!* jfc a *Vci~ • ft't 6? ^Q'..** C. A. "5*
.AP
H- O o. di
l l
PROPERTY:
DIAMOND DRILL RECORD
Hole*;
Sheet # r a,/
TefcA From To Description From To Width Assay
t 1
- OJi"^^^^^"l"i^T2^~l ""J™ u OD** ButeW rVei a___"^
•^^* q^ u ^
ACCURASSAY LABORATORIESA DIVISION OF ASSAY LABORATORY SERVICES INC.
1070 LITHIUM DRIVE. UNIT 2THUNDER BAY. ONTARIO P7B 6G3
PHONE (807) 623-6448Paje* S07) 623-6820
TED AHO October 3, 1995 645 DAWSON ST.THUNDER BAY, ONTARIO Job #9541499 P7A 3X3
Sample # Gold Gold Accurassay Customer ppb Oz/t
1 3552 205 0.0062 3553 2811 0.0823 3554 ' 898 0.0264 3555 "5-fc 199 0.0065 35566 35577 3558
99 0.003683 0.02023 -cO.OOl
8 3559 Qg-o 241 0.0079 3560 Mao 349 0.010
10 3566 ^J c- 575 0.01711 Check 3566 ^D~^ 5 66 0.01712 3575 20 4:0.00113 3576 227 0.007
OVALBAY GEOLOGICAL SERVICES INC.Mining Exploration Consultant
DIAMOND DRILL RECORDHOLE No:
SHEET:
COMPANY:.
TOWNSHIP:.
PROJECT No:.
CLAIM No:.
HOLE No:
COORDINATE:.
ELEVATION:.
BEARING:.
DIP: ~*fO*
LENGTH:.
CASING:.
CASING LEFT IN HOLE:
# OF SAMPLES:.
SECTION SAMPLED:
8- O
T)
SPECIAL TESTS
ETCH TEST
DEPTH RDG
TROPARI
DEPTH BEARING DIP
DRILLED BY:
COMMENCED:
COMPLETED:
CORE SIZE:
CORE STORED AT:Cc-i C-
DATE: 30/9S
l l l l l l l
PROPERTY: Holef:
Sheet f: I/I
DIAMOND DRILL RECORDK 0*1 *S.*S
From Description From To Width Assay
o C a* 1 1..*
V
i T ii./i fi ̂
*, ^
^ToM
OVALBAY GEOLOGICAL SERVICES INC.Mining Exploration Consultant
DIAMOND DRILL RECORDHOLE No:
COMPANY:.
TOWNSHIP:.
PROJECT No:.
CLAIM No:.
HOLE No: 9 5"'5
COORDINATE:,
ELEVATION:.
BEARING:.
DIP:
LENGTH:,
CASING:
fefe-oflS-ofl
CASING LEFT IN HOLE: Ye
# OF SAMPLES^
SECTION SAMPLED:
No:
SPECIAL TESTSETCH TEST
DEPTH RDG
TROPARI
DEPTH BEARING DIP
DRILLED ™
COMMENCED:
CORE SIZE:
CORE STORED AT:^dre L'.L.,,^ •'•f
BY:.
DATE: Dei
l l l l
PROPERTY: Hole!:
Sheet f:
DIAMOND DRILL RECORD
From Description From To Width Assay
)k.S - 14.g o-tu.
-y^^Wr^TT Vl/
V*?.
\Jt
*XeaA ' l Si vCo!
•d*tty-3irw\
ft rifaorw-^TgE. ^
l l
PROPERTY: Hole*;
Sheet #: a (3
DIAMOND DRILL RECORD
To Description From To Width Assay
**. iX'^w. *\ TW •A.V^V i
(O fap*.. Q
-0-33.0 T1** rt . Si*1" s. o D.OL1-
Vi a-C4H^.
O3*^0
VJ.O
(Q ^-- a
;,, x.rtt^-f
-W.
PROPERTY: Hole*;
Sheet #:
DIAMOND DRILL RECORD
From To Description From To Width Assay
Vi
-?
Hfl-D
58,0
G6-0
66'
ACCURASSAY LABORATORIESA DIVISION OF ASSAY LABORATORY SERVICES INC.
1070 LITHIUM DRIVE. UNIT 2THUNDER BAY. ONTARIO P7B 6G3
PHONE (807) 623-6448pa jg( (807) 623-6820
TED AHO October 3, 1995 645 DAWSON ST.THUNDER BAY, ONTARIO Job #9541499 P7A 3X3
Sample # Gold Gold Accurassay Customer ppb Oz/t
1 3552 205 0.0062 3553 2811 0.0823 3554 n 898 0.0264 3555 "5-fc 199 0.0065 35566 35577 3558
99 0.003683 0.02023 .iO.OOl
S 3559 QcrTt 241 0.0079 3560 ^j0 349 0.010
10 3566 ^3 c 575 0.01711 Check 3566 ^D~^ 566 0.01712 3575 20 'CO.OOI13 3576 227 0.007
Certified By:
OVALBAY GEOLOGICAL SERVICES INC.Mining Exploration Consultant
DIAMOND DRILL RECORDHOLE No:
SHEET:
COMPANY:.
TOWNSHIP:.
PROJECT No:
H
CLAIM No: "Y&
HOLE No: 5 -
COORDINATE:.
ELEVATION:.
BEARING:.
DIP:
/O
LENGTH:
CASING: |. CCASING LEFT IN HOLE: Yes:.
* OF SAMPLES: ——-
SECTION SAMPLED:
No:
SPECIAL TESTSETCH TEST
DEPTH RDG
TROPARI
DEPTH BEARING DIP
DRILLED BY: "J^
COMMENCED:
COMPLETED:
CORE SIZE:CORE STORED AT: .w'c\. *. itt-J vi*|• -urn
DATE:
l l l l l l l l l l l
PROPERTY: Hole*;
Sheet # : t 1
DIAMOND DRILL RECORD
From To Description From To Width Assay
\-o
r.
f\Cn.'' P/iftAvx 'j
* tf^HaoyVO
5.0 O- OOfe
jp 7-5
UI^Q - j^^^. ^^^^^^CS^^i
~ C Qa \J.
6 O
l l
PROPERTY:
DIAMOND DRILL RECORD
l l
Holef:
Sheet f:
l l
From To Description From To Width Assayts.
\8-0-iO.O 16-022.0 C?•Jl-ff
It i. t -ll.-
27* O -~ H"? 'O OrV
V'l/C^w^i S* ktafci oAJUy /UofsA .
U U ^ y (J
ACCURASSAY LABORATORIESA DIVISION OF ASSAY LABORATORY SERVICES INC.
1070 LITHIUM DRIVE. UNIT 2THUNDER BAY. ONTARIO P7B 6G3
PHONE (807) 623-6448
TED AHO 646 DAWSON ST. THUNDER BAY, ONTARIO P7A 3X3
October 3, 1995
Job #9541499
Sample #Accurassay Customer
l23456789
1011 Check1213
3552355335543555355635573558355935603566356635753576
Gold ppb
205281189819999
68323
24134957556620
227
Gold Oz/t
0.0060.0820.0260.0060.0030.020
-lO.OOl 0.007 0.010 0.017 0.017
cO.OOl 0.007
Certified By; PL
OVALBAY GEOLOGICAL SERVICES INC.Mining Exploration Consultant
DIAMOND DRILL RECORDHOLE No:
SHEET:
95-^f Go* r
COMPANY:
TOWNSHIP:
PROJECT No:
CLAIM No:
HOLE No:
COORDINATE:m
ELEVATION:.
BEARING:.
DIP:/J
9 f?-"*
LENGTH:.
CASING:
63- O
CASING LEFT IN HOLE: Yes:.
# OF SAMPLES: ——
SECTION SAMPLED:
No-
SPECIAL TESTS
ETCH TEST
DEPTH RDG DEPTH
TROPARI
BEARING DIP
DRILLED BY:
COMMENCED:
COMPLETED:
CORE SIZE:
CORE STORED AT: fM Llrcw-v r&w
BY: .A -C^
DATE: O
l l l l
PROPERTY: Hole*: CfS-T
Sheet #:
DIAMOND DRILL RECORD ,.0.11 U
From *"e To Description From To Width Assay
Jo. o X/7
O &.J*fra*
Kfrvs
-^ *eA
d* c/lf -S QOi
X 0 - 00 1
Ai.o O S*. ̂ 5 2U-0
^'ilW v CiijU
l l l l l l l l
PROPERTY:
DIAMOND DRILL RECORD
Hole*:
Sheet f:
To Description From To Width Assay
0
y Q.OIT-ai AS- 0 , OOH
|Qr
•S SB* ^
T^-I -O ©•S
l l l l l l l \ \ l l
PROPERTY:
DIAMOND DRILL RECORD
Hole*;
Sheet #:
To Description From To Width Assay
r*,A
bru w.
f*. tt*r*.
'X o ' OO
52,- 63*0CoH
4 a..O' g'Q H
ACCURASSAY LABORATORIESA DIVISION OF ASSAY LABORATORY SERVICES INC.
.1070 LITHIUM DRIVE. UNIT 2THUNDER BAY. ONTARIO P7B 6G3
PHONE (807) 623-6448p FAX (g07) 623-6820
TED AHO 646 DAWSON ST. THUNDER BAY, ONTARIO P7A 3Z3
October 18, 1995
Job #9541606
Sample #— Accurassay Customer
123456789
1011 Check
35613562357735783579358035813582358335843584
Gold PPb
5533132512
190570150977151716
Gold Oz/t
0.161 4:0.001 ^.001•cO.OOl 0.006 0.017 0.004 0.028
•cO.OOl•:0.001
Certified By:
IVEDFEB 2 O 1996
MINING LANDS BHAMCH
35-7 \\A" \\
i .••"***
5*-3sJL - rv '-h~
i,........-- o. M op* AM 4.5 K
Ministry ofNorthern Developmentand Mines
Ontario
Report of Work Conducted After Recording Claim
Mining Act
Transaction Number Q96 V6-
. 164Personal information coBacted on this form is obtained under the authority of the Mining Act. Tlte inforntatkm win b* usad for corraspondance. Questions about this collection should be directed to the Provincial Manager. Mining Lands. Minlst' Sudbury. Ontario. P3E 6A5. telephone (705) 670-7264.
52B10SWOO25 2 16421 MOSS
Instruction*: - Please type or print and submit in duplicate.- Refer to the Mining Act and Regulations for requ
Recorder.- A separate copy of this form must be completed to.- Technical reports and maps must accompany this form in duplicate.- A sketch, showing the claims the work is assigned to, must accompany this form.
l900
Recorded HoUer(a)v.
i/wnt No.
AddressST: -r z a
Tom
Telephone No. fS P S* &V/6
Mining DMston ownsMp/ArBv M or Q Plan No.
From:f
To: 7" #:Work Performed (Check One Work Group Only)
WorkGroup
Geotechnical Survey
Physical Work, Including Driling
Rehabilitation
Other Authorized Work
Assays
Assignment from Reserve
Type
*Pt?0^ P Z t T /A/6*
RECEIVED
fe FEB 2"0 1996
MINING LANDS BRANCH
Total Assessment Work Claimed on the Attached Statement of CostsNote: The Minister may reject for assessment work credit all or part of the assessment work submitted if the recorded
holder cannot verify expenditures claimed in the statement of costs within 30 days of a request for verification.
Persons and Survey Company Who Performed the Work (Give Name and Address of Author of Report)Name Address
t J A*** /o 7 a
(attach a schedule if necessary)
Certification of Beneficial Interest * See Note No. 1 on reverse sidel certify that at the time the work was performed, the claims covered In this work report were recorded in the current holder's name or held under a beneficial interest by the current recorded holder.
Date Recorded Holder or Agent (Signature)
Certification of Work Reportl certify that l have a personal knowledge of the facts set forth In this Work report, having performed the work or witnessed same during and/or after its completion and annexed report is true.
Name and Address of Penon Certifying
V af-7:Tetopone No. Date Certified By
For Office Use OnlyTotal Value Cr. Recorded Date Recorded
0241 (03/91)
fi
XI
IIJ?Z
J
Value Work Done
l1ir
x
o
cvi ^o
S)
^ liftg Zyc'
Credits you are claiming in this report may be cut back. In order to minimize the adverse effects of such deletions, please indicate from which claims you wish to priorize the deletion of credits. Please mark (^) one of the following:
1. D Credits are to be cut back starting with the claim listed last, working backwards.2. D Credits are to be cut back equally over all claims contained in this report of work.3. D Credits are to be cut back as priorized on the attached appendix.
In the event that you havejiot specified your choice of priority, option one will be implemented.______ .t*, '.i Q -it"it*ljH t_______________________ ___ __
r . .- . .•-Note 1: Exarnojaa Qf^eneflcial Interest are unrecorded transfers, option agreements, memorandum of agreements, etc., with respect
to theVitfhfrr^ciaW
Note 2: If woifc haslbeen'jierformed on patented or leased land, please complete the following:
certify {Kal.the t*QprdpcH)e^ertIM'ii' beneficial interest in the patented ir leased land at" tne tmwTtne work was performed.
Signature Date
Ontario
Ministry ofNorthern Developmentnod Mines
Ministeredu DeVetoppement du Nord et des mines
Statement of Costs for Assessment CreditEtat des coOts aux fins du credit devaluation
Mining Act/Loi sur les mines
Transaction NoJN* de transaction
Personal information collected on this form is obtained under the authority of the Mning Act. This information win be used to maintain a record and ongoing status of the mining daim(s). Questions about this collection should be directed to the Provincial Manager. Minings Lands. Ministry of Northern Development and Mines. 4th Floor. 159 Cedar Street. Sudbury, Ontario P3E 6AS. telephone (705) 670-7264.
Les renseignements personnels contenus dans la presente formula sent recueillis en vertu de la Lol sur les mines et sen/front a tenir a jour un registre des concessions minieres. Adresser toute quesKon sur la collece de ces renseignements au chef provincial des terrains miniers, ministers du Devetoppement du Nord et des Mines. 159. rue Cedar. 4* etage. Sudbury (Ontario) P3E 6A5. telephone (705) 670-7264.
1. Direct Costs/CoQts directs
Type
Wages Salaires
Contractor's and Consultant's Fees Drafts de 1 'entrepreneur et de I'expert- conseU
Supplies Used Foufnrtures utlllsees
Equipment Rental Location de mateXel
Description
Labour /6 PA^S Main-d'oeuvreReid Supervision Supervision sur le terrain
Type
Type
Type
Amount Montant
IS-ev
Totals Total global
^0
' •-.N-v*
V&* -
s^S5W-~^*r-
V**3f.-~!^: --Total Direct Costs IflB^A
Total des couts directs ||5f5—
2. Indirect Costs/Couts indirects* * Note: When claiming Rehabintation vrork Indirect costs are not
allowable as assessment work.Pour le remboursement des travaux de rehabilitation, les couts indirects ne sont pas admissibles en tant que travaux d'evaluation.
Type
Transportt Transport
Food and Lodging Nourrituren0D6rQ9fIN
Uobfflzatlo
lion
c*
Description
Type
i/effrMZ JMD
Amount Montant
73sr
\
. i fi 4 d i.fc^ -- —— ̂ f — ̂ ^ — -i. —— rw — -a- ———
RECEIVED
i* iVrtM1N
MoMllMtkm et demobilisation
FEB 2 Q 1996
NG LANDS BRANCH
/S6
Sub Total of Indirect Costs Total partlel des coOts Indirects
Amount Allowable (not greater than 20H of Direct Costs) Montant admissible (n'excMant pas 20 H des coots directs)Total Value of Assessment Credit Vsteur totals du credtt (Total o* Direct and ABowaMe d*evskiaflon Imflrad ctntsl rtam du cote dhKta
Totals Total global
'-.-735Z.
/.^
M&&- --. -^s-.il
3:*ti;ym?
Mki
Note: The recorded holder will be required to verify expenditures claimed in this statement of costs within 30 days of a request for verification. If verification is not made, the Minister may reject for assessment work all or part of the assessment work submitted.
Note : Le titulaire enregistre sera tenu de verifier les depenses demandtes dans le present 6tat des couts dans les 30 jours suivant une demande i cet eftet. Si la verification n'est pas effectuee, le ministre peut rejeter tout ou une partie des travaux d'evaluation presented.
Rling Discounts
1. Work filed within two years of completion is claimed at 100"Hi of the above Total Value of Assessment Credit.
Remises pour depot
1. Les travaux deposes dans les deux arts suivant leur achievement sont refrtfxxl^sesa1(>0%telavaleurtc^alesusfne^tx)^lneeduc^
2. Work filed three, four or five years after completion is claimed at 50"M) of the above Total Value of Assessment Credit. See calculations below:
Total Value of Assessment Credit Total Assessment Claimedx 0.50
2. Les travaux deposes trois. quatre ou cinq ans apres leur achievement sont rembourses a 50 "M) de la valeur totale du credit d'evaluation susmentionne. Voir les calculs ci-dessous.
Valeur totale du credit d'evaluationx 0.50
Evaluation totale demande*
Certification Verifying Statement of Costs
l hereby certify:that the amounts shown are as accurate as possible and these costs were incurred while conducting assessment work on the lands shown on the accompanying Report of Work form.
that rf f C OR PE b(Recorded HoWw. Agent. Position in Company)
to make this certification
Attestation de I'etat des coOts
J'atteste par la presente :que les montants indiques sont le plus exact possible et que ces depenses ont ete engagees pour effectuer les travaux d'evaluation sur les terrains indiques dans la formule de rapport de travail ci-joint.
l am authorized Et qu'a titre de je suis autorise(titulaire enregistre. representant, poste occupt dans la compagnie)
a faire cotte attestation.
Date
0212HVC91) Nota : Dans cone formula, lorsqu'il designe des personnes, le mascufin est utilise au sens neutre.
Mintetr ofNorthein Developmentand Mines
Ontario
Report of Work Conducted After Recording Claim
Mining Act
Transaction Number
Ut
Personal information collected on mis form is obtained under the authority of the Mining Act. This information will be used for correspondence. Questions about this collection should be directed to the Provincial Manager. Mining Lands. Ministry of Northern Development and Mines. Fourth Floor, 159 Cedar Street. Sudbury. Ontario. P3E 6A5. telephone (705) 670-7264.
Instructions: - Please type or print and submit in duplicate.- Refer to the Mining Act and Regulations for requirements of filing assessment work or consult the Mining
Recorder.- A separate copy of this form must be completed for each Work Group.- Technical reports and maps must accompany this form in duplicate.- A sketch, showing the claims the work is assigned to, must accompany this form.
Recorded Hokter(8)
-7^73 /a f OtST/WoClient No./o '3 s y
Addressfi/? f AA,'/
Telephone No. 7
Mining Division Township/Area M or G Plan No.
Dates From: To:Work Performed (Check One Work Group Only) , - ~ (~~^T~j \ / c ^
WorkGroup
Geotechnical Survey
Physical Work, Including Drilling
Rehabilitation
Other Authorized Work
Assays
Assignment from Reserve
Type -,*-t/
' ' :" -: 0 1996 j
22/tf-SVOA/D Utf//.^ /A-'g - '"V ' " '^"^PRAMMj
Total Assessment Work Claimed on the Attached Statement of CostsNote: The Minister may reject for assessment work credit all or part of the assessment work submitted if the recorded
holder cannot verify expenditures claimed in the statement of costs within 30 days of a request for verification.
Persons and Survey Company Who Performed the Work (Give Name and Address of Author of Report)Name Address
C/L fly D Z
(attach a schedule if necessary)
Certification of Beneficial Interest * See Note No. 1 on reverse sidel certify that at the time the work was performed, the claims covered in this work report were recorded in the current holder's name or held under a beneficial interest by the current recorded holder.
Date Recorded Holder or Agent (Sig
Certification of Work Reportl certify that l have a personal knowledge of the facts set forth in this Work report, having performed the work or witnessed same during and/or after its completion and annexed report is true.
Name and Address of Pereon Certifying
7 C STetepone No.
/ODate y Certified By (Signature)
For Office Use Only / ' THUNDER BAYTotal Value Cr. Recorded Date Recorded
.(WDeeowJ Approval Date
Date Notice for Amendments Sent
Mining Recorder
Dale Approved
MJAM t
0241 (0*91)
s?if
. sJ
-
toJ.
. s
eJ
1
J
ll||
fi i?* 3 JS?
CO f 2. 1 2. 3S3 g"
^
M if|iog? *• i i a
1
!
la
(X)-c*
•'
'
M Nl
\
tj^ IV
iitf 5S*(D
Credits you are claiming in this report may be cut back. In order to minimize the adverse effects of such deletions, please indicate from which claims you wish to priorize the deletion of credits. Please mark (v) one of the following:1. D Credits are to be cut back starting with the claim listed last, working backwards.2. D Credits are to be cut back equally over all claims contained in this report of work.3. D Credits are to be cut back as priorized on the attached appendix.
In the event.trjat you -have np! specified your choice of priority, option one will be implemented.
Hote 1 : ExampMVotfefliftbial interest are unrecorded transfers, option agreements, memorandum of agreements, etc., with respect to the mining claims.
r,-- C '-Vi Note 2: If work has been performed on patented or leased land, please complete the following:
l certify tfi*then*S)hi^ht*dbf haa rf beneficial interest in the patented or leased land at the time the work was performed.
Signature Date
Ontario
Ministry cNorthern Developmentand Mines
Ministere du Developpement du Nord et des mines
Statement of Costs for Assessment CreditEtat des couts aux fins du credit d'evaluation
Mining Act/Loi sur les mines
Transaction NoJN0 de transaction
Personal information collected on this form is obtained under the authority of the Mining Act. This information win be used to maintain a record and ongoing status of the mining daim(s). Questions about this collection should be directed to the Provincial Manager, Minings Lands. Ministry of Northern Development and Mines, 4th Boor, 159 Cedar Street, Sudbury, Ontario P3E 6A5. telephone (705) 670-7264.
Les renseignements personnels contenus dans la presente formula son! recueillis en vcrtu de la Lol sur to* mines et servfront a tenir a jour un registre des concessions minieres. Adresser toute quesiton sur la collece de ces renseignements au chef provincial des terrains miniers, ministere du Developpement du Nord et des Mines. 159. rue Cedar. 4e etage. Sudbury (Ontario) P3E 6A5. telephone (705) 670-7264.
1. Direct Costs/Gouts directs
Type
Wages Salalres
Contractor's and Consultant's Fees Droitsde 1 'entrepreneur et de I'expert- consefl
Supplies Used Foumttures utiltsees
Equipment Rental Location de materiel
Description
Labour Main-d'oeuvreReid Supervision Supervision sur le terrain
Type2.0&&IH fefid
/9S2/H/S:
Type
pV*lo C *Pt El
O/^ f- MS
Amount Montan!
915-0
' S35~
V&&
v^360
Bjrs (DRIUJL 6*-6Type
Total Direct Costs Total des couts directs
Totals Total global
w**
TO
10^7-2*
tfl36
2. Indirect Costs/Couts indirects* * Note: When claiming Rehabilitation work Indirect costs are not
allowable as assessment work.Pour le remboursement des travaux de rehabilitation, les couts indirects ne sont pas admissibles en tant que travaux d'evaluation.
Type
Transportation Transport
Food and Lodging Nourrfture et
Mobilization and Demobilization Mobilisation et demobilisation
Description
Type X 6 A DVZ#fCJL#'
Amount Montan!
322S--.
q Ls~
Sub Total of Indirect Costs Total partlel des couts indirects
Amount Allowable (not greater than 20H of Direct Costs) Montan! admissible (n'excedant pas 20 M des coots directs)Total Value of Assessment Credit Valeur totale du credit Total of Direct and Allowable d'evaluation indirect costa) (Total dn cnOti dbKtt
Totals Total global
^fe
y t *:T f*-
-* "•"••'•?v-^^^S^E&GSr
.*frv*8fc•t'-.'.-. 5***
3 7 tt
1M?/3*ftZ
•tin
Note: The recorded holder will be required to verify expenditures claimed in this statement of costs within 30 days of a request for verification. If verification is not made, the Minister may reject for assessment work all or part of the assessment work submitted.
Note : Le titulaire enregistre sera tenu de verifier les depenses demandees dans le present etat des couts dans les 30 jours suivant une demande a cet effet. Si la verification n'est pas effectuee, le ministre peut rejeter tout ou une partie des travaux d'evaluation presentes.
Filing Discounts
1 . Work filed within two years of completion is claimed at the above Total Value of Assessment Credit.
of
Remises pour depot
1. Les travaux deposes dans les deux ans suivant leur achevement sent rembourses a 100 'to de la vateur totale susmentionnee du cnkJH d'evaluation.
2. Work filed three, four or five years after completion is claimed at SO1*) of the above Total Value of Assessment Credit. See calculations below:
I Total Value of Assessment Credit Total Assessment Claimedx 0.50
2. Les travaux deposes trois. quatre ou cinq ans apres leur achevement sont rembourses a 50 "to de la valeur totale du credit d'evaluation susmentionne. Voir les calculs ci-dessous.
Valeur totale du credit d'evaluationx 0,50
Evaluation totale demandee
Certification Verifying Statement of Costs
l hereby certify:that the amounts shown are as accurate as possible and these costs were incurred while conducting assessment work on the lands shown on the accompanying Report of Work form.
that as A ̂ C 6 /t O ̂ D(Recorded Holder. Agent. Position in Company)
to make this certification
Attestation de I'elat des couts
J'atteste par la presente :que les montants indiques sont le plus exact possible et que ces depenses ont ete engagees pour effectuer les travaux d'evaluation sur les terrains indiques dans la formule de rapport de travail ci-joint.
am authorized Et qu'a litre de je suis autorise(titulaire enregistre. representant. paste occupe dans la compagnie)
a faire cette attestation.
Signature Date
0212 (04/91)7 /
Nota : Dans cette formule. lorsqu'il designe des personnes. le mascuGn est utifise au sens neutre.
OntarioMinistry ofNorthern Developmentand Mines
MinistereduDeveloppement du Nord et des Mines
April 04, 1996
Geoscience Approvals Office g33 Ramsev Lake Road gtn pioorSudbury, Ontario P3E 6B5
Telephone: (705) 670-5853 Fax: (705) 670-5863
Our File: 2.16421 Transaction 1 1 W9640. 00071
Mining RecorderMinistry of Northern Development fc Mines435 James Street SouthSuite B003Thunder Bay, OntarioP7E 6E3
Dear Mr. Weirmeir:
Subject: APPROVAL OF ASSESSMENT WORK CREDITS ON MINING CLAIMS 677469 6 677471 IN MOSS TOWNSHIP
Assessment credits have been approved as outlined on the report of work form. The credits have been approved under Section 9 (Prospecting) of the Mining Act Regulations.
The approval date is April 03, 1996.
If you have any questions regarding this correspondence, please contact Steven Beneteau at (705) 670-5855.
Yours sincerely, ORIGINAL SIGNED BY:
Ron C. GashinskiSenior Manager, Mining Lands Section Mining and Land Management Branch Mines and Minerals Division
SBB/jl Enclosure:
cc: Resident GeologistThunder Bay, Ontario
Assessment Files Library Sudbury, Ontario
to
o
o
jo m y m x m, z o m (A
NO
RT
H
AS
TR
ON
OM
IC
TIL
LY
L
AK
E G
-562
t 12
0520
4 .J
. J,
-.--
,— --
.,.. 11
.651
95
; g
i \
i /' l
/A-!
BU
RC
HE
LL
LA
KE
G
-706
3 (n O o en (D
•p roo z a
* CD 09 10
O
O)
3J Z
SO)
Q)
^
w cr
3.
o ^
w o
w ? 2
5*
g S
O)
M
CA
0 s 2
m ^
man
2 3
0* 12
CD
mCA
O en CO
z o I o I w
•o
m O -n 8 O 'm ,Z CO l
CO O
CO
" m
S o m Z
S
S
O
33
CO>
3)
3) co
!L'
S5|5
O
m o
O
^
li3J
—
If 33
Wm
2
O33 m Z >
O -
o 3) o o
52ig
*
o
z **
t/I
O
S
m o
? 5
l -
oo Cr-
-*
33
O
O
<
^ l
K^
CO
rrire
?
z ^
- z" z
C 03
rr
-t
O
I
co
I
m 33 O
C I C
* T
-) >
r-
00 M -c o
o
00
o I Z
o
4-
m T| m TO m z o m --*n
: