RPC Trigger Electronics Review. Subjects: Link System Low Voltage Link System Upgrade Krzysztof Doroba, University of Warsaw. Krzysztof Doroba, RPC TRigger Review, 22.01.2009. Low Voltage. Low Voltage for Link Board System 68 A3016 9 A3486S+1A3486=10 MAO’s 21 Easy Crates - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: RPC Trigger Electronics Review

RPC Trigger Electronics Review

Subjects:

• Link System Low Voltage

• Link System Upgrade

Krzysztof Doroba, University of Warsaw

Krzysztof Doroba, RPC TRigger Review, 22.01.2009

Page 2: RPC Trigger Electronics Review

Low Voltage

Low Voltage for Link Board System

• 68 A3016

• 9 A3486S+1A3486=10 MAO’s

• 21 Easy Crates

Performance/Problems• Painfull breaking period of CAEN products - factory recalls due to design imperfections

• 4 A3016 not delivered yet• 2 MAOs and 3 A3016 failed during operation

(fixed)Krzysztof Doroba, RPC TRigger Review, 22.01.2009

Page 3: RPC Trigger Electronics Review

Low Voltage and Upscope

Power Supply for VM Trigger Crates - already covered by Wojtek Okliński talk

RPC System Upgrade:• re-addinng re4 for η<1.6

• extend acceptance up to η=2.1

Krzysztof Doroba, RPC TRigger Review, 22.01.2009

Page 4: RPC Trigger Electronics Review

Reduced RE system|| < 1.6

ME3

1.6

ME4/1 restored

MB1

MB2

MB3

MB4

RPC

Muon Chamber Geometry Today

ME1ME2

Page 5: RPC Trigger Electronics Review

ME4/1 restored

MB1

MB2

MB3

MB4

ME1ME2 ME3

Geometry After Upscope

RPC

Upgraded RE system|| < 2.1

Page 6: RPC Trigger Electronics Review

RPC Trigger Upgrade

Krzysztof Doroba, RPC TRigger Review, 22.01.2009

RPC Trigger System UpgradeTrigger (USC55) part - covered by Wojtek Okliński

Link System (UXC55) part• more linkboards (MLB,SLB,CB)• more linkboard boxes (LBBox)• more LV PS• extra cabling

Page 7: RPC Trigger Electronics Review

Link system (1)

  MLB SLB CB LBB

re1,2<1.6 96 192 48 24

re3<1.6 48 96 24 12Total Endcap

144 288 72 36

Total Barrel 300 500 120 60

Total <1.6 444 788 192 96

Staged Link system

Krzysztof Doroba, RPC TRigger Review, 22.01.2009

Page 8: RPC Trigger Electronics Review

Krzysztof Doroba, RPC TRigger Review, 22.01.2009

MLB SLB CB LBBox

re1>1.6 72* 12* 12*

re2>1.6 24 24 0

re3>1.6 24 24 0

re4>1.6 24 24 0

total>1.6 144 72 12

MLB SLB CB LBBox

re4<1.6 48 96 24 12

re-adding re4 for |η|<1.6

Extending re1,re2,re3,re4 up to |η|<2.1

Link system (2)

**MLB, CB and LBB for re1/1 are of the special type

Page 9: RPC Trigger Electronics Review

Link system (3)

LBB boards MLB SLB CB TotalTotal

(+spares)

produced 444 788 192 1424 1600

upgrade hi eta (w/o re1/1, re4) 48 48   96 110

upgrade re4, <2.1 72 120 24 216 240

upgrade re1/1 72   12 84 100

LV LBB A3016 A3486

installed system 96 64 10

upgrade re4, re1/1 24 16 2

upgrade re1/1 12 8 2

Krzysztof Doroba, RPC TRigger Review, 22.01.2009

Low Voltage system upgrade:

Page 10: RPC Trigger Electronics Review

LB System Cables

• LB system for RE4 needs new cabling (from LBB to USC) and room for crates

• RE1/1 requires no new cabling, LBBoxes installed

• RE1/1 requires room for Power Supplies

Krzysztof Doroba, RPC TRigger Review, 22.01.2009

Questions:• room for RE1/1 LV PS at YE+1,YE-1?