rpc trigger electronics review
DESCRIPTION
RPC Trigger Electronics Review. Subjects: Link System Low Voltage Link System Upgrade Krzysztof Doroba, University of Warsaw. Krzysztof Doroba, RPC TRigger Review, 22.01.2009. Low Voltage. Low Voltage for Link Board System 68 A3016 9 A3486S+1A3486=10 MAO’s 21 Easy Crates - PowerPoint PPT PresentationTRANSCRIPT
RPC Trigger Electronics Review
Subjects:
• Link System Low Voltage
• Link System Upgrade
Krzysztof Doroba, University of Warsaw
Krzysztof Doroba, RPC TRigger Review, 22.01.2009
Low Voltage
Low Voltage for Link Board System
• 68 A3016
• 9 A3486S+1A3486=10 MAO’s
• 21 Easy Crates
Performance/Problems• Painfull breaking period of CAEN products - factory recalls due to design imperfections
• 4 A3016 not delivered yet• 2 MAOs and 3 A3016 failed during operation
(fixed)Krzysztof Doroba, RPC TRigger Review, 22.01.2009
Low Voltage and Upscope
Power Supply for VM Trigger Crates - already covered by Wojtek Okliński talk
RPC System Upgrade:• re-addinng re4 for η<1.6
• extend acceptance up to η=2.1
Krzysztof Doroba, RPC TRigger Review, 22.01.2009
Reduced RE system|| < 1.6
ME3
1.6
ME4/1 restored
MB1
MB2
MB3
MB4
RPC
Muon Chamber Geometry Today
ME1ME2
ME4/1 restored
MB1
MB2
MB3
MB4
ME1ME2 ME3
Geometry After Upscope
RPC
Upgraded RE system|| < 2.1
RPC Trigger Upgrade
Krzysztof Doroba, RPC TRigger Review, 22.01.2009
RPC Trigger System UpgradeTrigger (USC55) part - covered by Wojtek Okliński
Link System (UXC55) part• more linkboards (MLB,SLB,CB)• more linkboard boxes (LBBox)• more LV PS• extra cabling
Link system (1)
MLB SLB CB LBB
re1,2<1.6 96 192 48 24
re3<1.6 48 96 24 12Total Endcap
144 288 72 36
Total Barrel 300 500 120 60
Total <1.6 444 788 192 96
Staged Link system
Krzysztof Doroba, RPC TRigger Review, 22.01.2009
Krzysztof Doroba, RPC TRigger Review, 22.01.2009
MLB SLB CB LBBox
re1>1.6 72* 12* 12*
re2>1.6 24 24 0
re3>1.6 24 24 0
re4>1.6 24 24 0
total>1.6 144 72 12
MLB SLB CB LBBox
re4<1.6 48 96 24 12
re-adding re4 for |η|<1.6
Extending re1,re2,re3,re4 up to |η|<2.1
Link system (2)
**MLB, CB and LBB for re1/1 are of the special type
Link system (3)
LBB boards MLB SLB CB TotalTotal
(+spares)
produced 444 788 192 1424 1600
upgrade hi eta (w/o re1/1, re4) 48 48 96 110
upgrade re4, <2.1 72 120 24 216 240
upgrade re1/1 72 12 84 100
LV LBB A3016 A3486
installed system 96 64 10
upgrade re4, re1/1 24 16 2
upgrade re1/1 12 8 2
Krzysztof Doroba, RPC TRigger Review, 22.01.2009
Low Voltage system upgrade:
LB System Cables
• LB system for RE4 needs new cabling (from LBB to USC) and room for crates
• RE1/1 requires no new cabling, LBBoxes installed
• RE1/1 requires room for Power Supplies
Krzysztof Doroba, RPC TRigger Review, 22.01.2009
Questions:• room for RE1/1 LV PS at YE+1,YE-1?