Robert W. Depke Juvenile Justice Complex Roof Replacement 24647 North Milwaukee Avenue Vernon Hills, Illinois 60061 JUNE 18, 2018 INDEX OF DRAWINGS Architecture Engineering Planning Interiors © , DLR Group inc., an Illinois corporation, ALL RIGHTS RESERVED BENJAMIN TALPOS Revisions 6/29/2018 3:29:52 PM C:\Revit\22-17132-00 Depke_AR_2016_jwozniak65Q8M.rvt 22-17132-00 06/18/2018 DEPKE JUVENILE JUSTICE COMPLEX ROOF REPLACEMENT ISSUED FOR BID COVER SHEET / INDEX OF DRAWINGS G0.0 24647 North Milwaukee Avenue Vernon Hills, Illinois 60061 2018 .ARCHITECTURAL. AD4.0 ARCHITECTURAL DEMO ROOF PLAN A4.0 OVERALL ROOF PLAN A4.4 ROOF DETAILS .GENERAL. G0.1 GENERAL NOTES, SYMBOLS AND ABBREVIATIONS .MECHANICAL ELECTRICAL PLUMBING. RP-D-1.0 MEP DEMO PLAN - ROOF RP-1.0 MEP NEW WORK PLAN - ROOF ADD-1 06.29.18 ADDENDUM #1

Upload: others

Post on 26-Apr-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Robert W. Depke Juvenile Justice Complex · 2018-07-02 · h height h 1e hook one end hb hose bib hc handicap hc hollow core hcb handicap bench hcr hot / chilled water return hcs

Robert W. DepkeJuvenile Justice Complex

Roof Replacement24647 North Milwaukee Avenue

Vernon Hills, Illinois 60061

JUNE 18, 2018

INDEX OF DRAWINGS

Arc

hite

ctu

re E

ngin

eering

P

lan

nin

g In

teriors

©

, D

LR

Gro

up

in

c., a

n Illi

no

is c

orp

ora

tio

n,

AL

L R

IGH

TS

RE

SE

RV

ED

BE

NJA

MIN

TA

LP

OS

Rev

isio

ns

6/2

9/2

018 3

:29:5

2 P

M

C:\R

evit\2

2-1

7132-0

0 D

epke_A

R_2016_jw

oznia

k65Q

8M

.rvt

22-1

7132-0

0

06/1

8/2

018

DE

PK

E J

UV

EN

ILE

JU

ST

ICE

CO

MP

LE

XR

OO

F R

EP

LA

CE

ME

NT

ISS

UE

D F

OR

BID

CO

VE

R S

HE

ET

/ IN

DE

X O

F D

RA

WIN

GS

G0.0

24647 N

ort

h M

ilwaukee A

venue

Vern

on H

ills, Illin

ois

60061

20

18

.ARCHITECTURAL.

AD4.0 ARCHITECTURAL DEMO ROOF PLAN

A4.0 OVERALL ROOF PLAN

A4.4 ROOF DETAILS

.GENERAL.

G0.1 GENERAL NOTES, SYMBOLS AND ABBREVIATIONS

.MECHANICAL ELECTRICAL PLUMBING.

RP-D-1.0 MEP DEMO PLAN - ROOF

RP-1.0 MEP NEW WORK PLAN - ROOF

AD

D-1

06.2

9.18

AD

DE

ND

UM

#1

Page 2: Robert W. Depke Juvenile Justice Complex · 2018-07-02 · h height h 1e hook one end hb hose bib hc handicap hc hollow core hcb handicap bench hcr hot / chilled water return hcs

B to B BACK TO BACKBBO BOILER BLOW OFFBC BALANCING COCKBCMU BURNISHED CONCRETE MASONRY UNITBD BOARDBD BACK DRAFT DAMPERBET BETWEENBFP BACKFLOW PREVENTORBFR BELOW FLOORBF BOILER FEEDBFV BUTTERFLY VALVEBHP BREAK HORSE POWERBKR BREAKERBL BUILDING LINEBLDG BUILDINGBLK BLOCKBLKG BLOCKINGBLKHD BULKHEADBM BEAMBM BENCH MARKBOD BOTTOM OF DUCTBOF BOTTOM OF FOOTINGBOTT BOTTOMBRDG BRIDGINGBRG BEARINGBRKT BRACKETBSMT BASEMENTBT BATH TUBBTU BRITISH THERMAL UNITBTUH BRITISH THERMAL UNIT PER HOURBUR BUILT UP ROOFINGBV BALL VALVE

C CONDENSER WATERC CONDUITCA COMBUSTION AIRCAB CABINETCANT CANTILEVERCAP CAPACITYCAS CASINGCBD CHALKBOARDCD CONDENSATE DRAINCCTV CLOSED CIRCUIT TELEVISIONCE COVER ELEVATIONCEM CEMENTCENT CENTRIFUGALCER CERAMICCF CUBIC FEETCFH CUBIC FEET PER HOURCFM CUBIC FEET PER MINUTECG CORNER GUARDCH CHANNELCI CAST IRONCI CURB INLETCIP CAST IN PLACECIP CAST IRON PIPECIRC CIRCULATINGCJ CONTROL JOINTCJA CONTROL JOINT ABOVECKT CIRCUITCKT BK CIRCUIT BREAKERCL CENTERLINECL CIRCUIT LINECLG CEILINGCLOS CLOSETCLR CLEARCM CEILING MOUNTEDCMP CORRUGATED METAL PIPECMU CONCRETE MASONRY UNITCO CLEAN OUTCO CONDUIT ONLYCO2 CARBON DIOXIDECOL COLUMNCOM COMMONCOMB COMBINATIONCOMM COMMUNICATIONSCOMP COMPOSITECOMP COMPRESSOR UNITCOMPR COMPRESSIBLECONC CONCRETECONF CONFERENCECONFIG CONFIGURATIONCONN CONNECTCONN CONNECTIONCONST CONSTRUCTIONCONT CONTINUOUSCONTR CONTRACTOR OR CONTRACTCONV CONVECTORCORR CORRIDORCP CONDENSER PUMPCP COVER PLATECPS CYCLES PER SECONDCPT CARPETCR CONDENSER WATER RETURN

CR CORROSION RESISTANTCS COUNTERSINKCS COMBINATION SEWERCS CONDENSER WATER SUPPLYCSK COUNTERSUNKCSMU CALCIUM SILICATE MASONRY UNITCSP COMBINATION STANDPIPECSTJ CONSTRUCTION JOINTCSWK CASEWORKCT COOLING TOWERCT CERAMIC TILECT CURRENT TRANSFORMERCTR CENTERCU COPPERCU CONDENSING UNITCU CUBICCU COMBINATION UNITCUH CABINET UNIT HEATERCW COLD WATERCV CONDOM VENDORCWR CHILLED WATER RETURNCWS CHILLED WATER SUPPLYCY CUBIC YARDCYL CYLINDER

D DRAIND DEPTHD DATADB DRY BULBDB DECIBELDBA DEFORMED BAR ANCHORDBL DOUBLEDC DIRECT CURRENTDC DUST COLLECTORDCJ DUMMY CONTROL JOINTd PENNY (AS NAIL 10D)DDC DIRECT DIGITAL CONTROLDE DEIONIZED WATERDEG DEGREEDEPR DEPRESS(ION)(ED)DEPT DEPARTMENTDET DETENTIONDF DRINKING FOUNTAINDFR DIESEL FUEL RETURNDFS DIESEL FUEL SUPPLYDFV DIESEL FUEL VENTDG DOOR GRILLEDH DUCT HEATERDI DISTILLED WATERDI DUCTILE IRONDIA DIAMETERDIAG DIAGONALDIFF DIFFUSERDIM DIMENSIONDISC SW DISCONNECT SWITCHDISC DISCONNECTDISCH DISCHARGEDISTR DISTRIBUTIONDL DEAD LOADDM DAMPER MOTORDMPR DAMPERDN DOWNDN DOWNSPOUT NOZZLEDO OR " DITTODPFG DAMPROOFINGDPS DIFFERENTIAL PRESSURE SWITCHDR DOORDR DRAINDS DOWNSPOUTDS DISTILLED WATERDSP DRY STANDPIPEDTL DETAILDTR DUCT THRU ROOFDW DISHWASHERDWG DRAWINGDWL DOWELDWR DRAWERDXS DOUBLE EXTRA STRONG

E EASTEA EACHEA EXHAUST AIREAT ENTERING AIR TEMPERATUREEB EXPANSION BOLTEC ELECTRICAL CONTRACTOREDH ELECTRIC DUCT HEATEREE EACH ENDEER ENERGY EFFICIENCY RATIOEEW EMERGENCY EYEWASHEEWS EMERGENCY EYEWASH/SHOWEREF EACH FACEEF EXHAUST FANEFF EFFICIENCYEH ELECTRICAL HEATEREIFS EXTERIOR INSULATION AND FINISH SYSTEMEJ EXPANSION JOINTEL ELEVATIONELAS ELASTOMERICELEC ELECTRIC(AL)ELEV ELEVATOREMER EMERGENCYEMD ESTIMATED MAXIMUM DEMANDEMT ELECTRICAL METALLIC TUBINGEMV EMERGENCY MIXING VALVEENCL ENCLOSUREENTR ENTRANCEEOMD END OF MAIN DRIPEP ELECTRO-PNEUMATICEP EXPLOSION PROOFEPO EMERGENCY POWER OFFERF EPOXY RESIN FLOORINGEQ EQUALEQUIP EQUIPMENTER EXHAUST REGISTERES EMERGENCY SHOWERES EXTRA STRONGESP EXTERNAL STATIC PRESSUREEST ESTIMATEET EXPANSION TANKEW EACH WAYEWC ELECTRIC WATER COOLEREWH ELECTRIC WATER HEATEREWT ENTERING WATER TEMPERATUREEXC EXCAVATEEXH EXHAUSTEXIST EXISTINGEXP EXPANSIONEXP EXPOSEDEXPL EXPLOSIONEXT EXTERIOR

F FAHRENHEITF FIRELINEF FURNACEFA FIRE ALARMFA FRESH AIRFAB FABRICATED

FB FACE BRICKFC FOOT CANDLEFCMU FLUTED CONCRETE MASONRY UNITFCO FLOOR CLEAN OUTFCU FAN COIL UNITFD FIRE DAMPERFD FLOOR DRAINFDC FIRE DEPARTMENT CONNECTIONFDN FOUNDATIONFDR FEEDERFE FIRE EXTINGUISHERFEC FIRE EXTINGUISHER CABINETFF FINISH FLOORFFE FINISH FLOOR ELEVATIONFH FIRE HYDRANTFHC FIRE HOSE CABINETFIG FIGUREFIN FINISHFIX FIXTUREFL FLOORFLASH FLASHINGFLEX FLEXIBLEFLUOR FLUORESCENTFLG FLOORINGFLM FULL LENGTH MIRRORFM FACTORY MUTUALFM FIRE MAINFME FLOW MEASURING EQUIPMENTFO FACE OFFO FINISH OPENINGFOC FACE OF CONCRETEFOF FACE OF FINISHFOF FUEL OIL FILLFOM FACE OF MASONRYFOR FUEL OIL RETURNFOS FACE OF STUDFOS FUEL OIL SUPPLYFOV FUEL OIL VENTFOW FACE OF WALLFP FIREPROOFINGFPD FIRE PUMP DISCHARGEFPM FEET PER MINUTEFR FIRE RESISTIVEFR FRAMEFRP FIBERGLASS REINFORCED PANELFS FLOOR SINKFS FLOW SWITCHFSD FIRE/SMOKE DAMPERFSS FOLDING SHOWER SEATFT FEET (FOOT)FT FIN TUBEFT FLOW TRANSMITTERFTG FOOTINGFUT FUTUREFVC FIRE VALVE CABINETFWC FABRIC WALL COVERING

G GRILLEG NATURAL GASGA GAUGEGAL GALLONGALV GALVANIZEDGB GRAB BARGC GENERAL CONTRACTORGCO GRADE CLEAN OUTGCMU GLAZED CONCRETE MASONRY UNITGD GARBAGE DISPOSALGEN GENERALGEN GENERATORGFA GROSS FLOOR AREAGFI GROUND FAULT INTERRUPTERGFRC GLASS FIBER REINFORCED CONCRETEGHR GLYCOL-WATER HEATING RETURNGHS GLYCOL-WATER HEATING SUPPLYGI GALVANIZED IRONGL GLUE LAMINATEDGL GLASSGMU GLASS MASONRY UNITGND GROUNDGOVT GOVERNMENTGPH GALLONS PER HOURGPM GALLONS PER MINUTEGR GUARD RAILGR GRADEGR GRILLEGRC GLAVANIZED RIGID CONDUITGRC GLASS REINFORCED CONCRETEGRGP GLASS REINFORCED GYPSUM PLASTERGRS GALVANIZED RIGID STEELGS GASOLINEGV GATE VALVEGW GREASE WASTEGWB GYPSUM WALL BOARDGYP GYPSUM

H HEIGHTH 1E HOOK ONE ENDHB HOSE BIBHC HANDICAPHC HOLLOW COREHCB HANDICAP BENCHHCR HOT / CHILLED WATER RETURNHCS HOT / CHILLED WATER SUPPLYHD HAND DRYER OR HAIR DRYERHDBD HARDBOARDHDR HEADERHDWD HARDWOODHDWR HARDWAREHEV HOSE END VALVEHID HIGH INTENSITY DISCHARGEHM HOLLOW METALHOA HAND OFF AUTOMATICHORIZ HORIZONTALHP HEAT PUMPHP HIGH PRESSUREHP HORSEPOWERHPR HIGH PRESSURE STEAM RETURNHPS HIGH PRESSURE SODIUMHPS HIGH PRESSURE STEAM SUPPLYHR HANDRAILHR HOURHS HEADSTUDHSS HOLLOW STRUCTURAL SECTIONHSTR HIGH STRENGTHHT HEIGHTHTG HEATINGHTR HEATERHTWR HIGH TEMP HOT WATER RETURNHTWS HIGH TEMP HOT WATER SUPPLYHUM HUMIDIFIERHV HEATING VENTILATING UNITHVAC HEATING VENTILATING AND AIR CONDITIONINGHW DOMESTIC HOT WATERHWC DOMESTIC HOT WATER RECIRCULATINGHWR LOW TEMP HOT WATER RETURNHWS LOW TEMP HOT WATER SUPPLYHX HEAT EXCHANGERHZ HERTZ

JAN JANITORJB JUNCTION BOXJCT JUNCTIONJST JOISTJFB JOINT FILLER BOARDJT JOINT

KCJ KEYED CONSTRUCTION JOINTKCP KEENE'S CEMENT PLASTERKD KNOCKDOWNKH KITCHEN HOODKHE KITCHEN HOOD EXHAUST FANKHS KITCHEN HOOD SUPPLY FANKIT KITCHENKO KNOCKOUTKS KITCHEN SINKKV KILOVOLTKVA KILOVOLT AMPERESKVAR KILOVOLT AMPERES REACTIVEKW KILOWATTKWH KILOWATT HOUR

L ANGLEL LAVATORYLA LABORATORY COMPRESSED AIRLAB LABORATORYLAM LAMINATE(D)LAT LEAVING AIR TEMPERATURELAV LAVATORYLB POUNDLBR LUMBERLBS POUNDSLDG LOADINGLF LINEAR FOOT (FEET)LG LENGTH (LONG)LIN LINEARLINO LINOLEUMLKR LOCKERLL LIVE LOADLLH LONG LEG HORIZONTALLLV LONG LEG VERTICALLOC LOCATIONLONG LONGITUDINALLOX LIQUID OXYGENLPG LIQUEFIED PETROLEUM GASLPR LOW PRESSURE STEAM RETURNLPS LOW PRESSURE STEAM SUPPLYLR LIVING ROOMLS LAWN SPRINKLERLSC LIFE SAFETY CODELT LIGHTLTD LINED TRANSFER DUCTLTG LIGHTINGLV LOUVERLV LABORATORY VACUUMLW LONG WAYLWT LEAVING WATER TEMPERATURE

M THOUSANDMA MIXED AIRMA MEDICAL COMPRESSED AIRMAC MACHINEMAG MAGNETICMAINT MAINTENANCEMAN MANUALMAS MASONRYMATL MATERIALMAU MAKEUP AIR UNITMAV MANUAL AIR VENTMAX MAXIMUMMB MACHINE BOLTMB MOP BASINMBD MARKER BOARDMBH THOUSAND BTU PER HOURMBTUH THOUSAND BTU PER HOURMC MECHANICAL CONTRACTORMC MEDICINE CABINETMCA MINIMUM CIRCUIT AMPSMCB MAIN CIRCUIT BREAKERJMCM THOUSAND CIRCULAR MILLSMD MANUAL VOLUME DAMPERMDO MEDIUM DENSITY OVERLAYMECH MECHANICALMEMB MEMBRANEMET METALMEZZ MEZZANINEMFR MANUFACTURERMFRG MANUFACTURINGMG MOTOR GENERATORMH MANHOLEMH METAL HALIDEMH MOP HOLDERMIN MINIMUMMISC MISCELLANEOUSML MOTORIZED LOUVERMLDG MOLDINGMLO MAIN LUGS ONLYMLWK MILLWORKMO MASONRY OPENINGMPG MEDIUM PRESSURE GASMPR MEDIUM PRESSURE STEAM RETURNMPS MEDIUM PRESSURE STEAM SUPPLYMR MIRRORMR/S MIRROR WITH SHELFMS MAGNETIC STARTERMTD MOUNTEDMTG MOUNTINGMTL METALMTWR MEDIUM TEMP HOT WATER RETURNMTWS MEDIUM TEMP HOT WATER SUPPLYMUL MULLIONMV MERCURY VAPORMV MEDICAL VACUUMMW MARKER WALL

N NITROGENN NORTHN2O NITROUS OXIDEN/A NOT APPLICABLE

P PAINTP POLEP/T PRESSURE/TEMPERATURE TEST PORTP PUMPPA PUBLIC ADDRESSPAN B PANIC BOLTPAR PARALLELPB PARTICLE BOARDPB PULL BOXPB PUSH BUTTONPBS PUSH BUTTON STATIONPC PRECASTPC PUMPED CONDENSATEPCD PAPER CUP DISPENSERPCF POUNDS PER CUBIC FOOTPCT PORCELAIN CERAMIC TILEPD PRESSURE DROPPD PUMP DISCHARGEPDI PLUMBING & DRAINAGE INSTITUTEPENT PENTHOUSEPERF PERFORATEDPERP PERPENDICULARPF POWER FACTORPG PRESSURE GAGEPH PHASEPI POINT OF INTERSECTIONPI PRESSURE INDICATORPIC PORTABLE INSTRUMENT CONNECTIONPIV POST INDICATOR VALVEPL PLACE(S)PL PLATEPLAM;PL PLASTIC LAMINATEPLAS PLASTERPLBG PLUMBINGPLYWD PLYWOODPNEU PNEUMATICPNL PANELPOC POINT OF CONNECTIONPORC PORCELAINPPM PARTS PER MILLIONPR PAIRPREFAB PREFABRICATEDPROJ PROJECTIONPRV PRESSURE REDUCING VALVEPS PIPE SUPPORTPS PROJECTION SCREENPSF POUNDS PER SQUARE FOOTPSI POUNDS PER SQUARE INCHPSV PRESSURE SAFETY VALVEPT PLASTER TRAPPT POINTPT POTENTIAL TRANSFORMERPTD PAPER TOWEL DISPENSERPTD/R COMBINATION TOWEL DISPENSER/RECEPTACLEPTN PARTITIONPVC POLYVINYL CHLORIDEPVI POINT OF VERTICAL INTERSECTIONPVT POINT OF VERTICAL TANGENCYPWL SOUND POWER LEVELPWR POWER

QT QUARRY TILEQTR RND QUARTER ROUND

R RISERRA RETURN AIRRAD RADIATORRAD or R RADIUSRB RUBBER BASERC REMOVE CONTROLRCP REFLECTED CEILING PLANRCP REINFORCED CONCRETE PIPERCU RECIPROCATING CHILLER JOINTRD ROOF DRAINRD REFRIGERANT DISCHARGERECP RECEPTACLEREF REFERENCEREFL REFLECTEDREFR REFRIGERANTREFR REFRIGERATORREG REGISTERREINF REINFORCEMENTREM REMOVABLEREQ(D) REQUIRE(D)RESIL RESILIENTRET RETAINING (WALL)REV REVISIONSRF RETURN FANRF RUBBER FLOORRFM RECESSED FLOOR MATRH RELATIVE HUMIDITYRH RELIEF HOODRHC REHEAT COILRH ROBE HOOKRHG REFRIGERANT HOT GASRI&C ROUGH IN AND CONNECTRIJS RISE IN JOIST SPACERL REFRIGERANT LIQUIDRM ROOMRND ROUNDRO ROUGH OPENING

S SINKS SANITARY SEWERS SOAP DISHS SOUTHS SPRINKLER LINESA SHOCK ABSORBERSA SUPPLY AIRSAN SANITARY WASTESC SECURITYSC SOLID CORESC SHOWER CURTAINSC SPECIAL COATINGSCD SEAT COVER DISPENSERSCH SHOWER CURTAIN HOOKSSCHED SCHEDULESCR SHOWER CURTAIN RODSCT STRUCTURAL CLAY TILESCUT SCUTTLESCW SOFT COLD WATERSD SOAP DISPENSERSD SMOKE DAMPERSD SMOKE DETECTORSD STORM DRAINSE STEAM EXHAUST VENTSEC SECONDARYSECT SECTIONSECY SECRETARYSENS SENSIBLESF SQUARE FOOTSF SUPPLY FANSFCMU SPLIT-FACED CONCRETE MASONRY UNITSFU STRUCTURAL FACING UNITSGL SINGLESH SHOWERSHEATH SHEATHINGSHM SECURITY HOLLOW METALSHT SHEETSHWSOFT HOT WATERSIM SIMILARSL SHORT LEGSLNT SEALANTSM SHEET METALSM SPRINKLER MAINSND SANITARY NAPKIN DISPOSALSNV SANITARY NAPKIN VENDORSP STATIC PRESSURE (H2O)SP STAND PIPESP STATIC PRESSURESPEC SPECIFICATIONSSPK SPRINKLERSPL SOUND PRESSURE LEVELSPL SPECIALSPL BLK SPLASH BLOCKSQ SQUARESS STAINLESS STEELSSA STORM SHELTER AREASS SERVICE SINKSS SOLID SURFACEST STAIRST STORM SEWERSTAG'D STAGGEREDSTC SOUND TRANSMISSION CLASSSTD STANDARDSTE SINGLE TAPERED ENDSTGR STRINGERSTL STEELSTOR STORAGESTR STRUCTURAL - STRUCTURESUB SUBSTATIONSUBFL SUBFLOORSURF SURFACESUSP SUSPENDEDSV SHEET VINYLSV SOLENOID VALVESW SHORT WAYSW SWITCHSWBD SWITCH BOARDSWP STEAM WORKING PORESSURESYM SYMMETRICAL

T TEMPEREDT THERMOSTATT & B TOP & BOTTOMT& G TONGUE & GROOVET TREADTA TRANSFER AIRTAB TEST AND BALANCETAN TANGENTTB TERMINAL BOXTB TOWEL BARTBD TACK BOARDTC TEMPERATURE CONTROLTC TIME CLOCKTD TRANSFER DUCTTD TRENCH DRAINTDH TOTAL DYNAMIC HEADTEL TELEPHONETEMP TEMPERED - TEMPORARYTEMP TEMPERATURETERR TERRAZZOTEXT TEXTUREDTGL TOGGLETH THRESHOLDTH TOWEL HOOKTHK THICK(NESS)TMR TILT MIRROR UNITTMV THERMOSTATIC MIXING VALVETOB TOP OF BEAMTOC TOP OF CONCRETETOF TOP OF FOOTINGTOIL TOILETTOP TOP OF PAVINGTOS TOP OF STEELTOW TOP OF WALLTPV TRAP PRIMERTR TRIPTRANS TRANSVERSETRD TREADTS TEMPERATURE SENSORTSP TOTAL STATIC PRESSURETT TEMPERATURE TRANSMITTERTT TERRAZZO TILETTD TOILET TISSUE DISPENSERTV TELEVISIONTW TACK WALLTYP TYPICAL

U URINALUC UNIT COOLERUG UNDERGROUND

V VENTV VOLTV VACUUMVA VALVEVAC VACUUMVAV VARIABLE AIR VOLUMEVB VAPOR BARRIERVB VINYL BASEVBF VENT BELOW FLOORVCB VENTED COVE BASEVCP VITRIFIED CLAY PIPEVCT VINYL COMPOSITION TILEVD VOLUME DAMPER - MANUALVEL VELOCITYVENT VENTILATIONVENT VENTILATORVERT VERTICALVEST VESTIBULEVF VINYL FLOORVFD VARIABLE FREQUENCY DRIVEVM VOLTMETERVOL VOLUMEVP VENEER PLASTERVP VACUUM PUMPVSMC VARIABLE SPEED MOTOR CONTROLLERVT VINYL TILEVTR VENT THROUGH ROOFVWC VINYL WALLCOVERING

W WATER SERVICEW WIDE; WIDTHW WASTE (PLUG)W WATTW WESTW WIDE FLANGEW/ WITHW/O WITHOUTWB WET BULBWC WALL COVERINGWC WATER COLUMNWC WATER CLOSETWCC WATER COOLED CONDENSERWCL WATER CLOSET/LAVATORY COMBINATIONWCO WALL CLEAN OUTWD WOODWDW WINDOWWF WASH FOUNTAINWH WALL HYDRANTWFMD WATER FLOW MEASURING DEVICEWH WATER HEATERWHM WATT HOUR METERWI WROUGHT IRONWLR WATER LOOP RETURNWLS WATER LOOP SUPPLYWMG WATER MOTOR GONGWNSCT WAINSCOTWP WEATHERPROOFWPB WHIRLPOOL BATHWPF WATERPROOFWPFG WATERPROOFINGWR WATER RESISTANTWR WASTE RECEPTACLEWSP WET STAND PIPEWT WEIGHTWW WARM WHITEWWF WELDED WIRE FABRIC

XFMR TRANSFORMERXMTR TRANSMITTER

YD YARDYH YARD HYDRANT

Z IMPEDANCEZCV ZONE CONTROL VALVEZVB ZONE VALVE BOX

& AND@ ATi.e. THAT IS# NUMBER

CG CLEAR FLOAT GLASSCIG CLEAR INSULATING GLASSCTG CLEAR TEMPERED FLOAT GLASSCTIG CLEAR TEMPERED INSULATING GLASSLG LAMINATED GLASSPG PATTERN GLASSPIG PATTERN INSULATING GLASSSG SPANDREL GLASSTG TINTED FLOAT GLASSTIG TINTED INSULATING GLASSTTG TINTED TEMPERED FLOAT GLASSTTIG TINTED TEMPERED INSULATING GLASSWG POLISHED WIRE GLASS

THE FOLLOWING ABBREVIATIONSARE USED WITH GLAZING:

IAQ INDOOR AIR QUALITYIAW IN ACCORDANCE WITHIBC INTERNATIONAL BUILDING CODEIC INTERCOMID INSIDE DIAMETERIE INVERT ELEVATIONIES ILLUMINATING ENGINEERING SOCIETYIF INSIDE FACEIG ISOLATED GROUNDIH INTAKE HOODIJ ISOLATION JOINTIJS IN JOIST SPACEIMC INTERMEDIATE METAL CONDUITIN INCHINC INCLUDE (ING)INSUL INSULATIONINT INTERIORIP IRON PIPEIW INDIRECT WASTE

O&M OPERATION AND MAINTENANCEO to O OUT TO OUTOA OVERALLOA OUTSIDE AIROBSC OBSCUREOC ON CENTEROD OUTSIDE DIAMETEROD OVERFLOW DRAINOF OUTSIDE FACEOVFL OVERFLOWOFC OWNER FURNISHED CONTRACTOR INSTALLEDOFF OFFICEOFOI OWNER FURNISHED OWNER INSTALLEDOHP OVERHEAD POWEROHT OVERHEAD TELEPHONEOPG OPENINGOPP OPPOSITEOSD OVERFLOW STORM DRAINOS&Y OUTSIDE SCREW AND YOKEOTCS OPEN TO CEILING SPACEOVHD OVERHEADOX OXYGEN

A/C AIR CONDITIONING(ER)A AMP AMPEREA COMPRESSED AIRAAP AREA ALARM PANELAAV AUTOMATIC AIR VENTAB ANCHOR BOLTABS ACRYLONITRILE-BUTADIENE-STYRENEAC ACOUSTICAL CEILINGAC ALTERNATING CURRENTACC AIR COOLED CONDENSERACCU AIR COOLED CONDENSING UNITACM ALUMINUM COMPOSITE MATERIALACST ACOUSTICAD ACCESS DOORAD AREA DRAINADDN ADDITION OR ADDITIONALADJ ADJUSTABLEADJT ADJACENTADMIN ADMINISTRATIONAF AIR FILTERAFF ABOVE FINISH FLOORAHJ AUTHORITY HAVING JURISDICTIONAHU AIR HANDLING UNITAI AREA INLETALT ALTERNATEALUM ALUMINUMAMB AMBIENTANCH ANCHORAP ACCESS PANELAPC ACOUSTICAL PANEL CEILINGAPPROX APPROXIMATEAR ACID RESISTINGARCH ARCHITECTURALASB ASBESTOSASPH ASPHALTAUTO AUTOMATICAV ACID VENTAV AIR VENTAV AVERAGEAW ACID WASTEAWG AMERICAN WIRE GAUGEAWP ACOUSTICAL WALL PANEL

ABBREVIATIONS GENERAL SYMBOLS

SHEET ON WHICH DRAWN

REVISION NUMBER

WALL TYPE

DETENTION DOOR NUMBEROR WINDOW NUMBER

COMMERCIAL DOOR NUMBEROR WINDOW NUMBER

ROOM NUMBER

COLUMN LINE

LEGEND/KEY NOTE

BUILDING ELEVATIONINTERIOR ELEVATION

DETAIL OR WALL SECTION

CROSS REFERENCE

DETAIL NUMBER

(CONTINUOUS BLOCKING)

BATT INSULATION

RIGID INSULATION

CARPET (LARGE SCALE)

TILE (LARGE SCALE)

ACOUSTICAL TILE (LARGE SCALE)

PROTECTION BOARD

CONCRETE MASONRY UNIT

METAL STUDS

STEEL (LARGE SCALE)

(LARGE SCALE)GYPSUM WALL BOARD

PLYWOOD (LARGE SCALE)

BRICK VENEER

SHINGLES

STONE

GLASS

(TRIM/FINISH)WOOD

(NON-CONTINUOS BLOCKING)WOOD

GRAVEL/BALLAST

WOOD

GYM FLOOR

STEEL

PRECAST CONCRETE

CONCRETE

SAND

EARTH

CASEWORKELEVATION

SIMILAR OR TYPICAL REFERENCE

SIMILAR OR TYPICAL REFERENCE

?

???

SIMSIM

??E

ast

?/ ?

?

DESCRIPTION

?

???

? SIM

?

???

SIMSIM ?

???

SIMSIM

BUILDING SECTION

1. GENERAL NOTES APPLY TO ALL DRAWINGS

2. ALL DIMENSIONS ARE ACTUAL AND ARE TO FACE OF METALSTUDS, FACE OF MASONRY OR CENTERLINE OF COLUMN,UNLESS NOTED OTHERWISE.

3. ALL ASPECTS OF THE WORK AND ITEMS NOT SPECIFICALLYMENTIONED, BUT WHICH ARE NECESSARY TO MAKE ACOMPLETE WORKING INSTALLATION, SHALL BE INCLUDED,AND INDICATED IN THE CONTRACTORS BID.

4. NO ASBESTOS OR PCB CONTAINING MATERIALS SHALL BEUSED ON THIS PROJECT.

5. THE GENERAL CONTRACTOR AND ALL SUBCONTRACTORSARE RESPONSIBLE FOR PROPER REMOVAL AND DISPOSALOF ALL DEBRIS GENERATED BY CONSTRUCTION OF THISPROJECT. THE REMOVAL AND DISPOSAL OF ALLCONSTRUCTION DEBRIS SHALL BE IN FULL COMPLIANCEWITH ALL FEDERAL, STATE AND LOCAL REGULATIONS. THEPREMISES SHALL BE KEPT CLEAN AND FREE FROM ALLWASTE MATERIALS.

6. GENERAL CONTRACTOR SHALL PROTECT NEWCONSTRUCTION FROM DAMAGE BY ALL TRADES. ALLSUCH DAMAGE CAUSED BY THE CONTRACTOR DURINGTHE COURSE OF THIS WORK SHALL BE REPAIRED ORREPLACED AT THE CONTRACTORS EXPENSE.

7. CONTRACTOR IS RESPONSIBLE FOR FIELDVERIFICATION OF ALL DIMENSIONS AND FIELDCONDITIONS PRIOR TO ORDERING OR INSTALLINGMATERIALS OR EQUIPMENT.

GENERAL NOTES

?

NC NOISE CRITERIANC NORMALLY CLOSEDNC NURSE CALLNEC NATIONAL ELECTRIC CODENEMA NATIONAL ELECTRICAL MANUFACTURERS ASSN.NEUT NEUTRALNIC NOT IN CONTRACTNO NORMALLY OPENNO NUMBERNO NITROUS OXIDENOM NOMINALNS NEUTRAL SENSORNTS NOT TO SCALE

RPM REVOLUTIONS PER MINUTERPZ REDUCED PRESSURE BACKFLOW PREVENTERRS REFRIGERANT SUCTIONRWL RAIN WATER LEADERS SENSOR

UGE UNDERGROUND ELECTRICALUGT UNDERGROUND TELEPHONEUH UNIT HEATERUL UNDERWRITERS LABORATORIESUNEX UNEXCAVATEDUNFIN UNFINISHEDUNO UNLESS NOTED OTHERWISEUR URINALURD UNDERGROUND RESIDENTIAL DISTRIBUTIONUS UTILITY SHELFUTIL UTILITYUV UNIT VENTILATOR

?

ROOM NAME

???

?

Arc

hite

ctu

re E

ngin

eering

P

lan

nin

g In

teriors

©

, D

LR

Gro

up

in

c., a

n Illi

no

is c

orp

ora

tio

n,

AL

L R

IGH

TS

RE

SE

RV

ED

BE

NJA

MIN

TA

LP

OS

Rev

isio

ns

6/2

9/2

018 3

:29:5

2 P

M

C:\R

evit\2

2-1

7132-0

0 D

epke_A

R_2016_jw

oznia

k65Q

8M

.rvt

22-1

7132-0

0

06/1

8/2

018

DE

PK

E J

UV

EN

ILE

JU

ST

ICE

CO

MP

LE

XR

OO

F R

EP

LA

CE

ME

NT

ISS

UE

D F

OR

BID

GE

NE

RA

L N

OT

ES

, S

YM

BO

LS

AN

D A

BB

RE

VIA

TIO

NS

G0.1

24647 N

ort

h M

ilwaukee A

venue

Vern

on H

ills, Illin

ois

60061

20

18

AD

D-1

06.2

9.18

AD

DE

ND

UM

#1

Page 3: Robert W. Depke Juvenile Justice Complex · 2018-07-02 · h height h 1e hook one end hb hose bib hc handicap hc hollow core hcb handicap bench hcr hot / chilled water return hcs

DN

DN

R2

R3

R1

R4

R1

R-15

R5 R5

R6 R6

R3

R7

R1

R3

R3

R3

R3

R3

R3

R8

R9

R-10

R-10

R-10

R-10

R-10

R-12 R-11

RTU

R-12

R-13

R1

R2

R2

ROOF AREA 1

ALTERNATE

ROOF AREA 9

ROOF AREA 5

ALTERNATE

ROOF AREA 7

ALTERNATE

ROOF AREA 3ROOF AREA 4

ALTERNATE

ROOF AREA 6

ALTERNATE

ROOF AREA 8

ROOF AREA 2

R1

R-14

R-14

RTU

RTU

RTU

RT

U

RT

U

R-16

R-16

R-16

R-16

R-17

DEMOLITION NOTES

A. DEMOLITION GENERAL NOTES APPLY TO ALL DEMOLITION SHEETS.B. COORDINATE DEMOLITION AND PHASING EFFORTS WITH ARCHITECT

AND OWNER'S REPRESENTATIVES. EVERY EFFORT SHALL BE MADETO MINIMIZE DISRUPTION OF OWNER'S OPERATIONS AND TOPROVIDE BUILDING USER'S SAFETY. EXCESSIVE NOISE ORVIBRATION SHALL BE PRE-APPROVED AND COORDINATED WITHOWNER'S REPRESENTATIVE.

C. COORDINATE DISRUPTION OF UTILITY SERVICES WITH OWNER ANDAS SPECIFIED.

D. MAINTAIN A SECURE AND WEATHER-TIGHT ENCLOSURE.E. VERIFY EXISTING CONDITIONS, DIMENSIONS, AND ELEVATIONS AND

NOTIFY ARCHITECT OF DISCREPANCIES.F. THE OWNER SHALL RESERVE THE RIGHT TO SALVAGE ANY

MATERIALS.G. PROVIDE PROTECTION FOR EXISTING BUILDING MATERIALS AND

EQUIPMENT FROM DAMAGE DUE TO DEMOLITION ORCONSTRUCTION-RELATED INCIDENT PERFORMED UNDER THISCONTRACT.

H. REPAIR OR REPLACE ITEMS DAMAGED AS A RESULT OF DEMOLITIONOR CONSTRUCTION TO MATCH EXISTING FINISH AND /ORCONDITION.

I. EXISTING MATERIALS SHALL NOT BE REUSED UNLESS NOTEDOTHERWISE OR AS AUTHORIZED BY ARCHITECT.

J. SEE MECHANICAL AND ELECTRICAL DRAWINGS AND NOTES FORFURTHER SEQUENCING AND SCOPE OF WORK.

Arc

hite

ctu

re E

ngin

eering

P

lan

nin

g In

teriors

©

, D

LR

Gro

up

in

c., a

n Illi

no

is c

orp

ora

tio

n,

AL

L R

IGH

TS

RE

SE

RV

ED

LEGEND NOTESLEGEND NOTES ARE COMMON TO ALLSOME NOTES MAY NOT APPLY TO THIS SHEET

Rev

isio

ns

22-1

7132-0

0

06/1

8/2

018

DE

PK

E J

UV

EN

ILE

JU

ST

ICE

CO

MP

LE

XR

OO

F R

EP

LA

CE

ME

NT

ISS

UE

D F

OR

BID

AR

CH

ITE

CT

UR

AL D

EM

O R

OO

F P

LA

NA

D4.0

24647 N

ort

h M

ilwaukee A

venue

Vern

on H

ills, Illin

ois

60061

20

18

SCALE: 1/16" = 1'-0"

ARCHITECTURAL DEMOLITION ROOF PLAN

NO

RTH

PLANNORTH

KEYNOTES - ARCHITECTURAL DEMOLITION

R1 REMOVE EXISTING ASPHALT BUILT-UP ROOF SYSTEM DOWN TOROOF STRUCTURE SUBSTRATE.

R2 REMOVE EXISTING METAL COPING AT ROOF PARAPET.

R3 REMOVE EXISTING COPING/GRAVEL EDGE AS REQUIRED FORNEW WORK.

R4 REMOVE EXISTING METAL ROOF SYSTEM DOWN TO EXISTINGROOF STRUCTURE SUBSTRATE.

R5 REMOVE EXISTING ASPHALT SHINGLES AND FELT DOWN TOEXISTING ROOF STRUCTURE SUBSTRATE.

R6 REMOVE EXISTING PREFINISHED ALUM. FASCIA, GUTTER,SOFFIT PANEL AND DOWNSPOUTS.

R7 REMOVE EXISTING SLOTTED BAR GRAVEL STOP, GUTTER ANDDOWNSPOUTS.

R8 REMOVE EXISTING METAL FASCIA.

R9 REMOVE EXISTING STUCCO DOWN TO CONCRETE BLOCK WALL.

R-10 REMOVE EXISTING DOUBLE ACRYLIC SKY DOME.

R-11 REMOVE EXISTING EIFS AT SOFFIT.

R-12 REMOVE CANTED SHEATHING AND EXISTING ROOF SYSTEM ONBACK SIDE OF PARAPET.

R-13 REMOVE EXISTING ROOF DRAIN; REFER TO MECH.

R-14 REMOVE EXISTING PREMANUFACTURED ROOF CURB.

R-15 REMOVE EXISTING MEMBRANE ROOF SYSTEM.

R-16 REMOVE EXISTING RTU. REFERENCE MECHANICAL.

R-17 REMOVE EXISTING METAL DECK IN PREPARATION FOR NEWDUCT PENETRATION. REFERENCE MECHANICAL FOR LOCATIONAND DIMENSIONS.

AD

D-1

06.2

9.18

AD

DE

ND

UM

#1

0 5 10 20

Page 4: Robert W. Depke Juvenile Justice Complex · 2018-07-02 · h height h 1e hook one end hb hose bib hc handicap hc hollow core hcb handicap bench hcr hot / chilled water return hcs

EXISTING BALLASTED BUILT-UPROOF SYSTEM TO REMAIN

EXISTING HVAC ROOF TOP EQUIPMENTAND DUCTWORK WHERE OCCURS, TYP.

EXISTING STANDING SEAMMETAL ROOFING TO REMAIN

NEW ASHPALT SHINGLES

EXISTING ROOF SYSTEM TO REMAIN

SLO

PE

1/8" PE

R F

T.

SLO

PE

1/8" PE

R F

T.

ROOF AREA 1

RCB

ROOF AREA 5

RCC

ALTERNATE

ROOF AREA 7

RCA

ALTERNATE

ROOF AREA 3

RCDROOF AREA 4

RCB

ALTERNATE

ROOF AREA 6

RCA

DS

DS

DS

DS

DS

DS

DS

DS DS

DS

DS DS

DS

DS

8" S

TRUCTURAL PIT

CH

6" STRUCTURALPITCH

60" STRUCTURAL PITCH

8" S

TRUCTURAL PIT

CH

24

A4.4

43

A4.4

42

A4.4

51

A4.4

54

A4.4

EXISTING ICE BARRIER MEMBRANETO REMAIN; COVER W NEW LAYEROF ICE BARRIER MEMBRANE

EXISTING ROOF SYSTEM TO REMAIN

26

A4.4

45

A4.4

26

A4.4

44

A4.4

55

A4.4

55

A4.4

56

A4.4

56

A4.4

26

A4.4

26

A4.4

26

A4.4

26

A4.4

42

A4.4

43

A4.4

56

A4.4 SIM

26

A4.4

26

A4.4

32

A4.4

53

A4.4

DS

ROOF WALKWAY PAD, TYP.

ROOF TOP EXHAUST FANS;PROVIDE FLASHING UNIT, TYP

V

V

V

V

V

V

PROVIDE FLASHING AT VENTS, TYP

EXH

EXH

EXH

EXH

(E)RTU

(E)RTU

(E)RTU

EXH

EXH

EXH

(E)R

TU

SKYDOME INFILL, TYP.

SKYDOME INFILL

41

A4.4ALTERNATE

ROOF AREA 8

(E)RD RD

SLOPE

1/8" PER FT.

SLOPE

1/8" PER FT.

SLOPE

1/8" PER FT.

SLOPE

1/8" PER FT.

(E)R

TU

52

A4.4

54

A4.4

NEW RTU BY OWNER, TYP.

ROOF AREA 2

RCB

A4.4

14

A4.0

2

A4.0

1

LINE OF BUILDING PERIMETER BELOW

EXH

33

A4.4

INFILL WALL AT REMOVED DUCTWORK TOMATCH EXISTING EIFS WALL ASSEMBLY

24

A4.4

SLO

PE

1/8" PE

R F

T.

SLOPE

1/8" PER FT.

SLO

PE

1/8" PE

R F

T.

SLOPE

1/8" PER FT.

SLO

PE

1/8" PE

R F

T.

SLOPE

1/8" PER FT.

SIM

DS

DS

ALTERNATE

ROOF AREA 9

RCB

8" STRUCT.

PITCH

8" STRUCT.

PITCH

EXISTING COAL TAR OVERBALLASTED BUILT-UP ROOFSYSTEM

EXISTING MODIFIED BITUMENROOF SYSTEM TO REMAIN

(E)RD

DUCTPENETRATIONINFILL

46

A4.4

46

A4.4

46

A4.4

DUCTPENETRATIONINFILL24

A4.4SIM

DUCTPENETRATIONINFILL

24

A4.4SIM

(E)R

TU

NEW EQUIPMENTPLATFORM AT RTU;REF EXP STRUCTURALDRAWINGS

A4.4

22

TYP

NEW EQUIPMENTPLATFORM AT RTU;REF EXP STRUCTURALDRAWINGS

46

A4.4

24

A4.4 SIM

ADD-1

EXISTING ROOF DRAINTO REMAIN

ADD-1

NEW ROOF DRAIN ADD-1

EXISTING RAZOR WIRE TO REMAIN;UTILIZE PROTECTIVE GEAR ASREQUIRED TO WORK IN THIS AREA

ADD-1

1

1

1

1

1

1

ADD-1ADD-1

ADD-1

ADD-1

ADD-1

ADD-1

+10.7"

+11.8"

+5.2"

+10.5"

ADD-1

+6.7"

ADD-1

ADD-1

2

2

3

2

2

2

0 5 10 20

ROOF PLAN GENERAL NOTES:

A. ROOF PLAN NOTES APPLY TO ALL ROOF PLAN SHEETS.B. MOST ROOF SLOPES ARE CREATED BY SLOPED ROOF

STRUCTURE. SEE STRUCTURAL SLOPE NOTED TODETERMINE PROPER TAPER IN INSULATION. SHADEDAREAS INDICATE TAPERED INSULATION. TAPEREDINSULATION SHALL PROVIDE A MININUM OF 1/8-INCH PERFOOT OF SLOPE TO ROOF DRAINS, UNLESS NOTEDOTHERWISE.

C. ASPHALT SHINGLE ROOFING SYSTEM ROOF SLOPES ARECREATED BY SLOPING THE ROOF STRUCTURE.

D. CONTRACTOR IS RESPONSIBLE FOR FIELD VERIFICATIONOF ALL DIMENSIONS AND FIELD CONDITIONS PRIOR TOORDERING OR INSTALLING MATERIALS OR EQUIPMENT.

E. COORDINATE THE SIZE AND LOCATION OF ROOFPENETRATIONS FOR MECHANICAL AND ELECTRICALEQUIPMENT.

F. FLASH DRAINS, CURBS, VENTS AND STACKS PERMANUFACTURER'S RECOMMENDATIONS IF DETAIL NOTSHOWN ON PLANS.

G. PROVIDE TAPERED INSULATION CRICKETS AT HIGH SIDEOF ALL ROOF OBSTRUCTIONS AS REQUIRED FORPOSITIVE DRAINAGE.

H. CONSTRUCTION STAGING AREA TO BE COORDINATEDWITH AND APPROVED BY OWNER.

I. SCHEDULE WORK HOURS W/ OWNER. DO NOT DISRUPTBUILDING ACTIVITIES UNLESS PREVIOUSLY DISCUSSED &APPROVED BY OWNER.

ROOF PLAN KEYED NOTES:

FURNISH AND INSTALL NEW RTU CURB FOREXISTING RTU. CONTRACTOR IS RESPONSIBLEFOR LIFTING EXISTING UNITS & COORDINATINGWITH OWNER REGARDING DOWN TIME.REFERENCE DETAIL 15/A4.4 FOR HEIGHT ANDFLASHING REQUIREMENTS. REFERENCEMECHANICAL DRAWINGS FOR CONNECTIONS.

APPROXIMATE ROOF CURB DIMENSION: 6'-0" X 3'-6"CONTRACTOR RESPONSIBLE FOR VERIFYINGDIMENSIONS IN FIELD.

APPROXIMATE ROOF CURB DIMENSION: 4'-8" X 7'-0"CONTRACTOR RESPONSIBLE FOR VERIFYINGDIMENSIONS IN FIELD.

TAPERED INSULATION

ADD-1

1

TOTAL INSULATION HEIGHT

2

3

ROOF CONSTRUCTION A - RCANEW ASPHALT SHINGLE ROOFSYSTEM OVER PLYWOOD SHEATHING12" BATT INSULATION BELOWR-VALUE = 38

1/2"

5 1/

2"

ASPHALT SHINGLE ROOFING

EXISTING 5/8" CDX PLYWOOD SHEATHING OVER WOOD TRUSS

1/2"

5 1/

2"

1/2"

1 1/

2"

ROOF CONSTRUCTION B - RCBNEW MEMBRANE ROOFING SYSTEMOVER METAL ROOF DECKR-VALUE = 30

ROOF CONSTRUCTION C - RCCNEW MEMBRANE ROOFING SYSTEMOVER EXISTING PRECAST STRUCTURER-VALUE = 30

VAPOR RETARDER

EXISTING METAL ROOF DECK

1/2" DECK SUBSTRATE BOARD - MECHANICALLY FASTENED

BASE INSULATION: 2 LAYERS POLYISOCYANURATEINSULATION (R-30 MINIMUM) FULLY ADHERED

REFER TO OVERALL PLAN FOR TAPERED INSULATIONLOCATIONS

1/2" COVER BOARD - FULLY ADHERED

MEMBRANE ROOFING SYSTEM - FULLY ADHERED

EXISTING PRECAST CONCRETE ROOF STRUCTURE

BASE INSULATION: 2 LAYERS POLYISOCYANURATEINSULATION (R-30 MINIMUM) FULLY ADHERED

REFER TO OVERALL PLAN FOR TAPERED INSULATIONLOCATIONS

1/2" COVER BOARD - FULLY ADHERED

MEMBRANE ROOFING SYSTEM - FULLY ADHERED

UNDERLAYMENT

EXISTING 12" BATT INSULATION

ROOF CONSTRUCTION D - RCDINSULATED STANDING SEAM ROOFINGSYSTEM OVER METAL ROOF DECKR-VALUE = 30

EXISTING METAL ROOF DECK

INSULATED STANDING SEAM ROOFING ASSEMBLY

VAPOR RETARDER

ADD-1 ADD-1

41

A4.4

ALTERNATE

ROOF AREA 8

RCC

54

A4.4

33

A4.4

SLO

PE

1/8" PE

R F

T.

SLOPE

1/8" PER FT.

DS 43

A4.4SIM

41

A4.4 SIM

1

1+10.5"

ADD-1

LEVEL 01100' - 0"

LOWER ROOF LEVEL112' - 0"

EXIST PRECAST ROOF BRG108' - 0"

EXISTING MASONRY WALL ASSEMBLY

INSTALL NEW EIFS TO MATCH EXISTING

INSTALL NEW PREFINISHED ALUM. FASCIA32

A4.4TYP

NEW DOWNSPOUT AT NEWROOF DRAIN

ADD-1

0 5 10

SCALE: 1/8" = 1'=0"

20

Arc

hite

ctu

re E

ngin

eering

P

lan

nin

g In

teriors

©

, D

LR

Gro

up

in

c., a

n Illi

no

is c

orp

ora

tio

n,

AL

L R

IGH

TS

RE

SE

RV

ED

LEGEND NOTES ARE COMMON TO ALLSOME NOTES MAY NOT APPLY TO THIS SHEET

BE

NJA

MIN

TA

LP

OS

Rev

isio

ns

6/2

9/2

018 4

:50:2

0 P

M

C:\R

evit\2

2-1

7132-0

0 D

epke_A

R_2016_jw

oznia

k65Q

8M

.rvt

22-1

7132-0

0

06/1

8/2

018

DE

PK

E J

UV

EN

ILE

JU

ST

ICE

CO

MP

LE

XR

OO

F R

EP

LA

CE

ME

NT

ISS

UE

D F

OR

BID

OV

ER

ALL R

OO

F P

LA

NA

4.0

24647 N

ort

h M

ilwaukee A

venue

Vern

on H

ills, Illin

ois

60061

20

18

SCALE: 1/16" = 1'-0"

OVERALL ROOF PLAN

NO

RTH

PLANNORTH

SCALE: 1 1/2" = 1'-0"

ROOF TYPES

SCALE: 1/16" = 1'-0"

ALTERNATE - ROOF AREA 8

AD

D-1

06.2

9.18

AD

DE

ND

UM

#1

SCALE: 1/8" = 1'-0"A4.0

1 EXISTING WEST ELEVATION (RENOVATION)

ADD-1

0 5 10 20

Page 5: Robert W. Depke Juvenile Justice Complex · 2018-07-02 · h height h 1e hook one end hb hose bib hc handicap hc hollow core hcb handicap bench hcr hot / chilled water return hcs

EXISTING METAL DECK

MEMBRANE ROOFING SYSTEM ORINSULATED STANDING SEAMROOFING ASSEMBLY AS NOTED;REF PLANS

REMOVE EXISTING SKYDOME

SPLICE NEW CORRUGATEDMETAL DECK TO MATCHEXISTING; LAP 6" OVER EXISTING;VERIFY DIMENSIONS IN FIELD

EXPANDABLE FOAMINSUL - CONT

EXPANDABLE FOAMINSUL - CONT

SINGLE PLYROOFINGSYSTEM

SEALANT, CONT.

SEALANT, CONT.

STAINLESS STEELCLAMPING RING

FIELD FORMEDFLASHING, TYP.

EXISTING PIPE, TYP.

12" MIN. TO CURB OR PARAPET OR OTHER PENETRATION

SEALANT, CONT.

STAINLESS STEELCLAMPING RING

SEALANT, CONT.

EXISTING PIPE, TYP.

PREFORMED CONE FLASHING

12" MIN. TO CURB OR PARAPET OR OTHER PENETRATION

SINGLE PLYROOFINGSYSTEM

ROOF STRUCTURE

BA

ROOF STRUCTURE

TYP. PIPE PENETRATION USE WHERE DETAIL "A" CAN NOT BE USED

8" M

IN.

8" M

IN.

NEW UNIT (BY OWNER) ORREINSTALL EXIST. MECHANICALUNIT AS NOTED; REF MECHANICAL

METAL CAP FLASHING

ROOF FLASHING AND MEMBRANE

MIN

1' -

0"

FASTEN EQUIPMENT TO RAILPER MANUFACTURER'SSTANDARDS

EXISTING ROOF STRUCTURE

CUSTOM PREMANUFACTUREDINSULATED CURB BYMECHANICAL CONTRACTOR

TWO PIECE GALVANIZED FLASHING CAP UNIT.ROLL LEAD FLASHING DOWN INTO PIPE.

PLUMBING VENT STACK.EXTEND PIPING TO MIN. 12" ABOVE ROOF.

PREFORMED BOOT/CONE

SET FLANGE IN MASTIC. PRIME FLANGE.

EXISTING METAL DECK

1'-0

" M

IN.

3" MIN

EXTEND SCUPPER FLASHING UP ANDUNDER COPING

LAP SEALANT

PREFINISHED GAVANIZEDSHEET METAL COPING

TREATED WOOD BLOCKINGAS NEEDED TO ACCOMODATENEW INSULATION HEIGHT

EXISTING METAL DECK

4"

EXISTING EXTERIOR WALL ASSEMBLY

EXISTING EXTERIOR WALLASSEMBLY

ADD-1

REMOVE EXISTING BLOCK ABOVESCUPPER OPENING TO ACHIEVEMINIMUM SCUPPER HEIGHT

4" M

IN

ADD-1

8 " M

IN

ADD-1

EXISTING EXTERIOR WALL ASSEMBLY

EXISTING METAL DECK

CONTINUOUS SEALANT

MEMBRANE FLASHING

CANT STRIP

TREATED WOOD BLOCKING

PREFINISHED GAVANIZEDSHEET METAL COPING

TREATED WOOD BLOCKINGAS NEEDED TO ACCOMODATENEW INSULATION HEIGHT

EXISTING EIFS WALL ASSEMBLY

EXISTING PRECAST HOLLOWCORE PLANK ROOF SLAB

MEMBRANE ROOF SYSTEM

PREFINISHED GAVANIZEDSHEET METAL FASCIA

TAPERED INSULATION

ADD-1ADD-1

GUTTER AND DOWNSPOUT

TREATED WOOD BLOCKINGAS NEEDED TO ACCOMODATENEW INSULATION HEIGHT

EXISTING EIFS WALL ASSEMBLY

EXISTING 1/2" CDX PLYWOODSHEATHING SCREWED TO STEELJOISTS

ADD-1

EXISTING PRECAST HOLLOWCORE PLANK ROOF SLAB

SPM REINFORCEMENT STRIP

EXISTING METAL DECK

MEMBRANE ROOF SYSTEM

TREATED WOOD BLOCKINGAS NEEDED TO ACCOMODATENEW INSULATION HEIGHT

TAPERED INSULATION

ADD-1

ADD-1

EXISTING PRECAST CONC. PLANK

EXISTING EIFS WALL ASSEMBLY

ASPHALT SHINGLES ON 30 LB FELT

EXISTING 5/8" CDX PLYWOOD SHEATHING

PREFINISHED ALUM. FASCIA, GUTTER &SOFFIT PANEL BY ROOFING CONTRACTOR

EXISTING ICE BARRIER MEMBRANE TOREMAIN; COVER W ADDITIONAL LAYEROF ICE BARRIER MEMBRANE

A4.4

25

EXISTING FASCIA NAILER

EXISTING 5/8"PLYWOOD DECKING

ICE & WATER SHIELD

PREFINISHED SHEETMETALFASCIA WRAPPED UNDER ANDBEHIND SOFFIT.

ASPHALT SHINGLES

EAVE FLASHING

UNDERLAYMENT

EXISTING METAL DECK

EXISTING CMU WALL ASSEMBLY

SPM REINFORCEMENT STRIP

PREFINISHED STEEL METALCOUNTERFLASHING AND TERMINATION BAR

8" M

IN

NEW EIFS

MEMBRANE ROOF SYSTEM

WEEP SCREED

BACK ROD AND SEALANT WITHWEEP HOLES

INSULATED STANDING SEAMROOFING ASSEMBLY

EAVE TRIM

EXISTING METAL DECK

DIRECT APPLIED FINISHSYSTEM

EXISTING CMU WALLASSEMBLY

PREFINISHEDSHEETMETAL FASCIA

INSULATED STANDING SEAMROOFING ASSEMBLY

EXISTING METAL DECK

STUCCO BEYOND

METAL COPING BEYOND

55

A4.4

GUTTER ANDDOWNSPOUT

EXISTING METAL DECKAND BAR JOISTS

EXISTING STUCCO/ CMUWALL ASSEMBLY

INSULATED STANDINGSEAM ROOF ASSEMBLY

ICE & WATER SHIELD

PREFINISHED GAVANIZEDSHEET METAL COPING

COUNTERFLASHING

TREATED WOOD BLOCKING

EXISTING METAL DECKAND BAR JOISTS

EXISTING FACE BRICK / CMUWALL ASSEMBLY

SPM REINFORCEMENT STRIP

PREFINISHED GAVANIZEDSHEET METAL COPING

MEMBRANE ROOF SYSTEM

TREATED WOOD BLOCKING

ROOF MEMBRANE LAPPED UP,OVER AND DOWN WOOD BLOCKING

EXISTING CMU

SPM REINFORCEMENT STRIP

MEMBRANE ROOF SYSTEM

EXISTING PRECAST HOLLOWCORE PLANK ROOF SLAB

EXISTING PARAPET

TREATED WOOD BLOCKING

PREFINISHED GAVANIZEDSHEET METAL COPING

NEW EIFS

CURB FASTENERSPER MANUF.

#12 SELF TAPPING GALVANIZEDSCREWS W/ NEOPRENE WASHER@ 6" O.C., MAX. VERIFY WITHMANUF.

FACTORY FURNISHED ROOF CURB

MECHANICAL EXHAUST/ VENTILATOR DUCT

WRAP MEMBRANE FLASHING OVERTOP OF CURB & FULLY ADHERE TOHORIZONTAL AND VERTICALSUBSTRATES TYP.

LEVEL

SHEATHING

4" MTL FRAMINGX 18 GA.

5/8" TYPE "X" GYP.BD.

ACCEPTABLE RESILIENT CAULKING

ROOFING MEMBRANE &FLASHING O/ SEPARATIONBOARD

EXISTING STRUCTURE

W/ MANUF.1 1/4" VARIFY

VERIFY W/ MANUF.

SPM REINFORCEMENT STRIP

NEW MEMBRANE ROOF SYSTEM

EXISTING PRECAST HOLLOWCORE PLANK ROOF SLAB

3" NAIL BASE INSULATION

TREATED WOOD BLOCKING

PREFINISHED GAVANIZEDSHEET METAL COPING

EXISTING MODIFIEDBITUMEN ORBALLASTED BUILT-UPROOF ASSEMBLY ASNOTED; (GRAVEL MUSTBE REMOVED AT TIE-INAREA)

8 " M

IN

REPLACE EXISTINGGRAVEL

SEAM TAPE ANDPRIMER/ADHESIVE

TIE-IN FLASHING ANDMEMBRANE SPLICE

ASPHALT & FELTS

FIBERGLASS BATT INSULATIONLAP SEALANT

TAPERED INSULATION

ADD-1

PREFINISHED GAVANIZEDSHEET METAL COPING

EXISTING EIFS

EXISTING 1/2" CDX PLYWOODSHEATHING SCREWED TO STEELJOISTS

MEMBRANE ROOF SYSTEM

TREATED WOOD BLOCKINGAS NEEDED TO ACCOMODATENEW INSULATION HEIGHT

ADD-1

24" x 24" SUMP RECEIVERROOF MEMBRANE

COVER BOARD

ROOF INSULATION

EXISTING PRECAST HOLLOWCORE PLANK EXTERIOR SOFFIT

DOWNSPOUT

EXISTING PRECAST HOLLOWCORE PLANK ROOF SLAB

EXISTING WALL ASSEMBLY

SPM REINFORCEMENT STRIP

PREFINISHED STEEL COUNTERFLASHINGAND TERMINATION BAR

8" M

IN

EXISTING EIFS; REMOVE UP TO 8" MIN. ABOVETAPERED ROOF INSULATION FOR NEW FLASHING.PATCH WHERE REQUIRED

MEMBRANE ROOF SYSTEM

WEEP SCREED

BACK ROD AND SEALANT WITHWEEP HOLES

EXISTING ROOF STRUCTURE

NEW ROOFING SYSTEM; REF PLAN

COVER OPENING IN ROOF DECKW/ 16 GA STAINLESS STEEL PLATEFASTENED INTO DECK

SPM REINFORCEMENTSTRIP

NEW MEMBRANEROOF SYSTEM

EXISTING PRECASTHOLLOW COREPLANK ROOF SLAB

3" NAIL BASEINSULATION

DUCTWORK,REFERENCEMECHANICAL; FIELDVERIFY DIMENSIONS

PREFINISHED SHEETMETAL CAP

FIBERGLASS BATTINSULATION

TREATED WOODBLOCKING

ELASTOMERICSEALANT

8" M

IN

ROOF MEMBRANELAPPED UP, OVERAND DOWN WOODBLOCKING

SLOPED 3/4"PLYWOOD TOP

4"M

IN

1'-0

"M

IN

1'-0"

MIN

1'-0"MIN

4" MIN

SHEET METAL CAP

UTILITY FEED; REF MECHANICAL

ROOFING MEMBRANE W/TERMINATION BAR AND SEALANT

PERIMETER CANTS

LINE OF SHEET METAL, EXTENDUNDER ROOF MEMBRANE

CONT SEALANT AROUND PIPEPENETRATION

EXISTING METAL DECK

LAP ROOF MEMBRANEOVER HSS MIN 8"

TERMINATION BAR

HSS POST; REF EXPSTRUCTURAL DRAWINGS

Arc

hite

ctu

re E

ngin

eering

P

lan

nin

g In

teriors

©

, D

LR

Gro

up

in

c., a

n Illi

no

is c

orp

ora

tio

n,

AL

L R

IGH

TS

RE

SE

RV

ED

LEGEND NOTES ARE COMMON TO ALLSOME NOTES MAY NOT APPLY TO THIS SHEET

BE

NJA

MIN

TA

LP

OS

Rev

isio

ns

6/2

9/2

018 3

:29:5

0 P

M

C:\R

evit\2

2-1

7132-0

0 D

epke_A

R_2016_jw

oznia

k65Q

8M

.rvt

22-1

7132-0

0

06/1

8/2

018

DE

PK

E J

UV

EN

ILE

JU

ST

ICE

CO

MP

LE

XR

OO

F R

EP

LA

CE

ME

NT

ISS

UE

D F

OR

BID

RO

OF

DE

TA

ILS

A4.4

24647 N

ort

h M

ilwaukee A

venue

Vern

on H

ills, Illin

ois

60061

20

18

SCALE: 1 1/2" = 1'-0"A4.4

24 EXISTING SKYDOME DETAIL

SCALE: 1 1/2" = 1'-0"A4.4

11 TYPICAL PIPE PENETRATION DETAILSSCALE: 1 1/2" = 1'-0"A4.4

15 TYP. MECHANICAL CURB DETAILSCALE: 1 1/2" = 1'-0"A4.4

13 TYP. VENT STACK DETAIL

SCALE: 1 1/2" = 1'-0"A4.4

43 SCUPPER DETAILSCALE: 1 1/2" = 1'-0"A4.4

42 METAL COPING DETAIL

SCALE: 1 1/2" = 1'-0"A4.4

53 METAL COPING DETAILSCALE: 1 1/2" = 1'-0"A4.4

51 METAL COPING DETAILSCALE: 1 1/2" = 1'-0"A4.4

54 METAL COPING DETAIL

SCALE: 1 1/2" = 1'-0"A4.4

26 ASPHALT SHINGLESSCALE: 3" = 1'-0"A4.4

25 EAVE DETAIL

SCALE: 1 1/2" = 1'-0"A4.4

45 METAL ROOFING DETAILSCALE: 1 1/2" = 1'-0"A4.4

44 METAL ROOFING DETAIL

SCALE: 1 1/2" = 1'-0"A4.4

55 METAL COPING DETAILSCALE: 1 1/2" = 1'-0"A4.4

56 METAL COPING DETAIL

SCALE: 1 1/2" = 1'-0"A4.4

32 METAL COPING DETAILSCALE: 1 1/2" = 1'-0"A4.4

31 EXHAUST FAN

SCALE: 1 1/2" = 1'-0"A4.4

41 ROOF CURB DETAIL

AD

D-1

06.2

9.18

AD

DE

ND

UM

#1

SCALE: 1 1/2" = 1'-0"A4.4

52 METAL COPING DETAIL

NO SCALEA4.4

14 ROOF DRAIN DETAIL

SCALE: 1 1/2" = 1'-0"A4.4

33 METAL ROOFING DETAIL

SCALE: 1 1/2" = 1'-0"A4.4

16 EXIST. PIPE PENETRATION INFILL DETAIL

SCALE: 1 1/2" = 1'-0"A4.4

46 DUCT ENCLOSURE

SCALE: 1 1/2" = 1'-0"A4.4

23 TYP. ROOFTOP UTILITY PORTAL DETAILSCALE: 1 1/2" = 1'-0"A4.4

22 HSS POST FLASHING DETAIL

ADD-1

Page 6: Robert W. Depke Juvenile Justice Complex · 2018-07-02 · h height h 1e hook one end hb hose bib hc handicap hc hollow core hcb handicap bench hcr hot / chilled water return hcs

AREA NOT IN ROOFING SCOPE

AREA NOT IN ROOFING SCOPE

NO MEP DEMO/NE WORK IN THIS AREA REQUIREDFOR ROOFING REPLACEMENT

AREA NOT IN ROOFING SCOPE

AREA NOT IN ROOFING SCOPE

AREA NOT IN ROOFING SCOPE

AREA NOT IN ROOFING SCOPE

AREA NOT IN ROOFING SCOPE

AREA NOT IN ROOFING SCOPE

NO MEP DEMO/NE WORK IN THIS AREA REQUIREDFOR ROOFING REPLACEMENT

NO MEP DEMO/NE WORK IN THIS AREA REQUIREDFOR ROOFING REPLACEMENT

DEMO EXISTINGGAS PIPING UPTO TEE.

EXISTING GAS PIPINGDOWN TO SERVICEENTRANCE TO REMAIN.

DEMO GAS PIPING UP TOELBOW IN THIS AREA.PIPING EXTENDING TOOTHER SECTION OFROOF BEYOND, IS TOREMAIN.

GAS PIPING DEMO INTHIS AREA IS ANALTERNATEASSOCIATED WITHROOF AREA 8.REFER TO NEWWORK PLAN FORNEW PIPING.

GAS PIPING DOWN TODRYERS. DEMO GASPIPING TO CEILING OFUNDERSIDE OF ROOF.

GAS PIPING TO WRS IS EXISTINGTO REMAIN. PROVIDEFLANGE/ISOLATION VALVE.

BID ALTERNATE

BID ALTERNATE

BID

ALTE

RNAT

E

D.8-1

D.8-1D.8-1

D.8-1

D.8-2

D.8-2

D.8-3

1 3

1 3

1 3

1 3

1

1

1

1

3

3

3

3

3

3

3

4

4

4

3

4

5 6

2 2 2

2

2

2

2

7

7

7

7

7

7

7

7

7

7

8

NOROOF PLAN KEYED NOTES1. EXISTING EXHAUST FAN CURB TO BE DEMOLISHED IN ITS ENTIRETY.

EXISTING ELECTRICAL FEEDER, CONDUIT, DISCONNECT, LOW VOLTAGEWIRING & CONDUIT, ETC, SHALL BE DEMOLISHED AS REQUIRED FORNEW ROOF INSTALLATION. CONTRACTOR SHALL PROVIDE TEMPORARYPROTECTION OF OPENING DURING CONSTRUCTION. REFER TO NEWWORK PLAN AND DETAIL FOR NEW CURB REQUIREMENTS.

2. CONTRACTOR SHALL DEMOLISH EXISTING GAS PIPING, ANCHORS,SUPPORTS, CONNECTIONS TO RTUS, ETC PER THE EXTENTS SHOWN ONTHIS SHEET. NEW GAS PIPING SHALL BE INSTALLED AT AN ELEVATIONAS REQUIRED FOR HEIGHT OF NEW ROOF. REFER TO NEW WORK PLANAND DETAILS FOR ADDITIONAL INFORMATION.

3. CONTRACTOR SHALL DEMO ALL EXISTING PLUMBING VENT OPENINGSIN ALL AREAS OF NEW ROOF. CONTRACTOR SHALL INSTALL NEWPLUMBING VENTS AS REQUIRED FOR HEIGHT OF NEW ROOF. REFER TONEW WORK PLAN AND DETAILS FOR ADDITIONAL INFORMATION.

4. CONTRACTOR SHALL DEMO EXISTING COMBUSTION AIR AND VENTOPENINGS. REFER TO ARCHITECTURAL DETAILS FOR ROOF INFILL.

5. DEMO EXTERIOR SUPPLY DUCT OFF OF EXISTING RTU THATPENETRATES THROUGH GYMNASIUM WALL. PREP EXISTING RTU FORNEW DUCT CONNECTIONS PER NEW WORK DETAIL. REFER TOARCHITECTURAL NEW WORK PLAN FOR WALL INFILL.

6. DEMO ABANDONED DUCT ON EXTERIOR OF GYMNASIUM WALL. REFERTO ARCHITECTURAL NEW WORK PLAN FOR WALL INFILL.

7. DEMOLISH EXISTING ROOF CURB, GAS CONNECTION, ELECTRICALCONDUIT & CABLING, & CONTROLS CABLE AND CONDUIT INPREPARATION FOR NEW ROOF CURB AND CONNECTIONS. FOR RTUSTHAT HAVE HORIZTONAL DUCT TAKEOFFS LOCATED ON ROOF,CONTRACTOR SHALL MODIFY DUCT & DEMOLISH DUCT PENETRATIONCURBS AS REQUIRED FOR NEW ROOF HEIGHT AND CONNECTIONDETAILS. REFER TO NEW WORK PLAN AND DETAILS FOR ADDITIONALINFORMATION.

8. DEMO EXISTING ROOF DRAIN & DRAIN BODY. REFER TOARCHITECTURAL DRAWINGS FOR ROOF INFILL DETAIL.

NOROOF PLAN KEYED NOTES - BID ALTERNATE• DEMO GAS PIPING IN THIS AREA AS INDICATED. REFER TO NEW WORK FOR ADDITIONAL INFO.• DEMOLISH EXISTING ROOF CURB, GAS CONNECTION, ELECTRICAL CONDUIT & CABLING, &

CONTROLS CABLE AND CONDUIT IN PREPARATION FOR NEW ROOF CURB AND CONNECTIONS.• EXISTING EXHAUST FAN CURB TO BE DEMOLISHED IN ITS ENTIRETY. EXISTING ELECTRICAL

FEEDER, CONDUIT, DISCONNECT, LOW VOLTAGE WIRING & CONDUIT, ETC, SHALL BEDEMOLISHED AS REQUIRED FOR NEW ROOF INSTALLATION. CONTRACTOR SHALL PROVIDETEMPORARY PROTECTION OF OPENING DURING CONSTRUCTION. REFER TO NEW WORK PLANAND DETAIL FOR NEW CURB REQUIREMENTS.

D.8-1D.8-2

D.8-3

Arch

itect

ure

Eng

inee

ring

Pla

nnin

g In

terio

rs

©

, DLR

Gro

up in

c., a

n Ill

inoi

s co

rpor

atio

n, A

LL R

IGH

TS R

ESER

VED

LEGEND NOTESLEGEND NOTES ARE COMMON TO ALLSOME NOTES MAY NOT APPLY TO THIS SHEET

BEN

JAM

IN T

ALPO

S

Revis

i ons

6/18

/201

8 12

:23:

02 P

M

C:\R

evit\

22-1

7132

-00

Dep

ke_M

EP_2

016_

jwoz

niak

65Q

8M.rv

t

22-1

6106

-00

JUN

E 18

, 201

8D

EPKE

JU

VEN

ILE

JUST

ICE

CEN

TER

RO

OF

REP

LAC

EMEN

T

ISSU

ED F

ORCO

NSTR

UCTI

ONM

EP D

EMO

PLA

N -

RO

OF

RP-D-1.0

2464

7 N

orth

Milw

auke

e Av

enue

Vern

on H

ills, I

llinoi

s 60

061

2016

1. THIS SHEET CONTAINS SCOPE OF WORK FOR MULTIPLE TRADES,WHICH WILL REQUIRE CLOSE COORDINATION. IT IS THERESPONSIBILITY OF EACH TRADE TO REVIEW THIS SHEET TOENSURE A FULL UNDERSTANDING OF THE SCOPE ITEMS, AS WELLAS THE COORDINATION THAT WILL BE REQUIRED TOSUCCESSFULLY COMPLETE THIS PROJECT.

2. NOT ALL EXISTING ROOF DRAINS, PLUMBING VENTS, AIR INTAKES& EXHAUSTS, ETC. ARE INDICATED ON THIS PLAN. IT IS THERESPONSIBILITY OF THE CONTRACTOR TO SURVEY THE SITE &VERIFY EXISTING CONDITIONS. KEYED NOTES ON THIS SHEET AREINTENDED TO APPLY TO ALL EXISTING ROOF ITEMS REQUIRED TOBE MODIFIED AS PART OF THIS ROOFING PROJECT WITHIN THEAREA OF NEW ROOFING WORK.

ISS

UE

D F

OR

BID

AD

D-1

06/2

9/18

Page 7: Robert W. Depke Juvenile Justice Complex · 2018-07-02 · h height h 1e hook one end hb hose bib hc handicap hc hollow core hcb handicap bench hcr hot / chilled water return hcs

AREA NOT IN ROOFING SCOPE

AREA NOT IN ROOFING SCOPE

NO MEP DEMO/NE WORK IN THIS AREA REQUIRED

FOR ROOFING REPLACEMENT

AREA NOT IN ROOFING SCOPE

AREA NOT IN ROOFING SCOPE

AREA NOT IN ROOFING SCOPE

AREA NOT IN ROOFING SCOPE

AREA NOT IN ROOFING SCOPE

AREA NOT IN ROOFING SCOPE

NO MEP DEMO/NE WORK IN THIS AREA REQUIRED

FOR ROOFING REPLACEMENT

NO MEP DEMO/NE WORK IN THIS AREA REQUIRED

FOR ROOFING REPLACEMENT

EXISTING GAS PIPING DOWN TO SERVICE

ENTRANCE TO REMAIN. NEW GAS PIPING SHALL

BE COORDINATED WITH NEW ROOF HEIGHT.

CONNECT NEW GAS

PIPING TO EXISTING GAS

PIPE TO DETENTION

AREA. PROVIDE

ISOLATION VALVE AT

CONNECTION.

NEW GAS PIPING TO CONNECT TO

EXISTING PIPING. PROVIDE OFFSET TO

ACCOUNT FOR ELEVATION OF NEW

ROOF WITH AN ISOLATION VALVE.

WORK IN THIS AREA IS COVERED

UNDER A BIDDING ALTERNATE. REFER

TO ARCHITECTURAL PLANS FOR

ADDITIONAL INFO.

GAS PIPING DOWN TO

DRYERS. NEW GAS

PIPING THRU ROOF TO

CONNECT TO EXISTING

GAS PIPING.

CONNECT NEW GAS PIPING TO

EXISTING GAS CONNECTION.

PROVIDE ISOLATION VALVE.

BID ALTERNATE

BID

AL

TE

RN

AT

E

BID ALTERNATE

3/4"

ø

4"ø

4"ø

4"ø

4"ø

4"ø

4"ø

4"ø

4"ø4"ø

4"ø

4"ø

NEW RTU - MOUNT ON

STEEL STRUCTURE.

REFER TO EXP

DRAWINGS.

NEW RTUs TO BE

MOUNTED ON STEEL

STRUCTURE. REFER

TO EXP DRAWINGS.

12

1 2

1 2

1

2 1

2

2

2

2

2

2

2

2

1

1

1

3 4

3 4

4

3 4

4

5

5

5

10

10

4

6

7

7

7

7

7

7

7

77

7

7A3

A3

8

8

3/4"

ø

3/4"

ø

3/4"

ø

3/4"

ø

RTU -

EXISTING

TO REMAIN

9 9

ADD-1

CONFIRM 15'

CLEARANCE FROM

PLUMBING VENT TO

OUTSIDE AIR

INTAKE OF RTU.

3

10

ADD-1

PROVIDE NEW ISOLATION VALVE IN

ORDER TO KEEP OTHER BUILDING AREAS

IN OPERATION DURING CONSTRUCTION.

PROVIDE NEW ISOLATION VALVE IN

ORDER TO KEEP OTHER BUILDING AREAS

IN OPERATION DURING CONSTRUCTION.

ADD-1

ADD-1

ADD-1

NOROOF PLAN KEYED NOTES

1. PROVIDE NEW EXHAUST FAN CURB, ELECTRICAL CONDUIT & WIRE, CONTROL CABLE &

CONDUIT, ETC. AS REQUIRED FOR NEW ROOF HEIGHT. REFER TO DETAIL 31 ON A4.4.

2. PROVIDE NEW PLUMBING VENT CONNECTION AS REQUIRED FOR NEW ROOF HEIGHT. REFER

TO DETAIL 13 ON A4.4 FOR ADDITIONAL INFORMATION.

3. PROVIDE NEW DUCT ENCLOSURE & CURB FOR HORIZONTAL DUCT CONNECTION THROUGH

ROOF. CONTRACTOR TO MATCH EXISTING DUCT SIZE. REFER TO DETAIL 46 ON A4.4 &

MECHANICAL DETAILS FOR DUCT INSULATION REQUIREMENTS.

4. FURNISH AND INSTALL NEW RTU CURB FOR EXISTING/NEW RTU. PROVIDE NEW GAS, DUCT,

ELECTRICAL & CONTROLS CONNECTIONS AS REQUIRED FOR NEW ROOF HEIGHT.

CONTRACTOR IS RESPONSIBLE FOR LIFTING EXISTING UNITS & COORDINATING WITH OWNER

REGARDING DOWNTIME. REFER TO DETAIL 15 ON A4.4.

5. MODIFY EXISTING VENT AND PROVIDE NEW ROOFING PER ARCHITECTURAL DETAILS.

6. NEW HORIZONTAL DUCTWORK CONNECTION THROUGH GYMNASIUM WALL. HEIGHT OF

DUCTWORK SHALL BE COORDINATED WITH NEW ROOF ELEVATION, AND SHALL CONNECT TO

EXISTING DUCTWORK INSIDE GYMNASIUM.

7. PROVIDE NEW GAS PIPING. COORDINATE INSTALLED ELEVATION WITH NEW ROOF HEIGHTS.

GAS PIPING SHALL BE SCHD. 40, THREADED PIPE. PROVIDE 2 COATS WHITE PAINT ALL NEW

GAS PIPING. REFER TO DETAILS FOR ADDITIONAL INFORMATION.

8. DUCT DROPS THROUGH ROOF SHALL BE REPLACED WITH NEW DUCT PENETRATION CURB.

NEW CURBS SHALL BE COORDINATED WITH NEW ROOF HEIGHT. REFER TO DETAILS FOR

ADDITIONAL INFORMATION.

9. REPLACE EXISTING/PROVIDE NEW ROOF DRAIN IN THIS LOCATION. REFER TO

ARCHITECTURAL DRAWINGS FOR ADDITIONAL INFORMATION.

10. MOUNT NEW/EXISTING UNIT ON STEEL STRUCTURE. SECURE PER MANUFACTURER'S

RECOMMENDATIONS. PROVIDE NEW GAS, DUCT, ELECTRICAL & CONTROLS CONNECTIONS

AS REQUIRED FOR NEW ROOF HEIGHT. CONTRACTOR IS RESPONSIBLE FOR LIFTING

EXISTING UNITS & COORDINATING WITH OWNER REGARDING DOWNTIME.

NOROOF PLAN KEYED NOTES - BID ALTERNATE

• DUCT DROPS THROUGH ROOF SHALL BE REPLACED WITH NEW DUCT PENETRATION CURB.

NEW CURBS SHALL BE COORDINATED WITH NEW ROOF HEIGHT. REFER TO DETAILS FOR

ADDITIONAL INFORMATION.

• FURNISH AND INSTALL NEW RTU CURB FOR EXISTING RTU. PROVIDE NEW GAS, DUCT,

ELECTRICAL & CONTROLS CONNECTIONS AS REQUIRED FOR NEW ROOF HEIGHT.

CONTRACTOR IS RESPONSIBLE FOR LIFTING EXISTING UNITS & COORDINATING WITH OWNER

REGARDING DOWNTIME. REFER TO DETAIL 15 ON A4.4.

• PROVIDE NEW GAS PIPING. COORDINATE INSTALLED ELEVATION WITH NEW ROOF HEIGHTS.

GAS PIPING SHALL BE SCHD. 40, THREADED PIPE. PROVIDE 2 COATS WHITE PAINT ALL NEW

GAS PIPING. REFER TO DETAILS FOR ADDITIONAL INFORMATION.

A1

A2

A3

MINIMUM 1" PER FOOT SLOPE

2" THICK RIGID BOARD POLYISOCYANURATEINSULATION ON EXTERIOR OF SUPPLY ANDRETURN W/ "VENTURE CLAD" PLUS 1579CWJACKETING SYSTEM OVER ENTIRE SURFACE.

GALVANIZED DUCTWORK

NOTES:1. ATTACH INSULATION TO DUCTWORK WITH SUITABLE ADHESIVE.2. ATTACH EXTERIOR JACKET TO INSULATION WITH SUITABLE ADHESIVE.3. TAPE LONGITUDINAL JOINTS CONTINUOUSLY.4. TAPE PERPINDICULAR JOINTS AT SEAMS.5. PROVIDE SMACNA STANDARD DUCT SUPPORTS ON ROOF / VERTICAL WALL /

OR GROUND SLAB (AREA WELL)

END VIEW SIDE VIEW

GAS PIPE

RIGID POLYCARBONATE RESIN PIPESUPPORT STANDS. STACK ASREQUIRED FOR DESIRED HEIGHT.SPACE SUPPORTS PERMANUFACTURER RECOMMENDATION.

Arc

hite

ctu

re E

ngin

eering

P

lan

nin

g In

teriors

©

, D

LR

Gro

up

in

c., a

n Illi

no

is c

orp

ora

tio

n,

AL

L R

IGH

TS

RE

SE

RV

ED

LEGEND NOTESLEGEND NOTES ARE COMMON TO ALLSOME NOTES MAY NOT APPLY TO THIS SHEET

BE

NJA

MIN

TA

LP

OS

Rev

isio

ns

6/2

9/2

018 1

1:2

1:0

5 A

M

C:\R

evit\2

2-1

7132-0

0 D

epke_M

EP

_2016_pw

oods.r

vt

22-1

6106-0

0

JU

NE

29, 2018

DE

PK

E J

UV

EN

ILE

JU

ST

ICE

CE

NT

ER

- IN

TE

RIM

PR

OJE

CT

AD

DE

ND

UM

-1M

EP

NE

W W

OR

K P

LA

N -

RO

OF

RP-1.0

24647 N

ort

h M

ilwaukee A

venue

Vern

on H

ills, Illin

ois

60061

20

18

AD

D-1

06/2

9/18SCALE: 1/16" = 1'-0"RP-1.0

1 MEP NEW WORK PLAN - ROOF LEVEL

A1

A1

A1

A1A1A1

A2

A2

NO SCALERP-1.0

3 OUTDOOR DUCTWORK INSULATION

NO SCALERP-1.0

2 ROOF GAS PIPING SUPPORT - 6"Ø OR LESS

1. THIS SHEET CONTAINS SCOPE OF WORK FOR MULTIPLE TRADES,

WHICH WILL REQUIRE CLOSE COORDINATION. IT IS THE

RESPONSIBILITY OF EACH TRADE TO REVIEW THIS SHEET TO

ENSURE A FULL UNDERSTANDING OF THE SCOPE ITEMS, AS WELL

AS THE COORDINATION THAT WILL BE REQUIRED TO

SUCCESSFULLY COMPLETE THIS PROJECT.

2. NOT ALL EXISTING ROOF DRAINS, PLUMBING VENTS, AIR INTAKES

& EXHAUSTS, ETC. ARE INDICATED ON THIS PLAN. IT IS THE

RESPONSIBILITY OF THE CONTRACTOR TO SURVEY THE SITE &

VERIFY EXISTING CONDITIONS. KEYED NOTES ON THIS SHEET ARE

INTENDED TO APPLY TO ALL EXISTING ROOF ITEMS REQUIRED TO

BE MODIFIED AS PART OF THIS ROOFING PROJECT WITHIN THE

AREA OF NEW ROOFING WORK.

ISS

UE

D F

OR

BID

JUN

E 18

, 201

8