Robert W. DepkeJuvenile Justice Complex
Roof Replacement24647 North Milwaukee Avenue
Vernon Hills, Illinois 60061
JUNE 18, 2018
INDEX OF DRAWINGS
Arc
hite
ctu
re E
ngin
eering
P
lan
nin
g In
teriors
©
, D
LR
Gro
up
in
c., a
n Illi
no
is c
orp
ora
tio
n,
AL
L R
IGH
TS
RE
SE
RV
ED
BE
NJA
MIN
TA
LP
OS
Rev
isio
ns
6/2
9/2
018 3
:29:5
2 P
M
C:\R
evit\2
2-1
7132-0
0 D
epke_A
R_2016_jw
oznia
k65Q
8M
.rvt
22-1
7132-0
0
06/1
8/2
018
DE
PK
E J
UV
EN
ILE
JU
ST
ICE
CO
MP
LE
XR
OO
F R
EP
LA
CE
ME
NT
ISS
UE
D F
OR
BID
CO
VE
R S
HE
ET
/ IN
DE
X O
F D
RA
WIN
GS
G0.0
24647 N
ort
h M
ilwaukee A
venue
Vern
on H
ills, Illin
ois
60061
20
18
.ARCHITECTURAL.
AD4.0 ARCHITECTURAL DEMO ROOF PLAN
A4.0 OVERALL ROOF PLAN
A4.4 ROOF DETAILS
.GENERAL.
G0.1 GENERAL NOTES, SYMBOLS AND ABBREVIATIONS
.MECHANICAL ELECTRICAL PLUMBING.
RP-D-1.0 MEP DEMO PLAN - ROOF
RP-1.0 MEP NEW WORK PLAN - ROOF
AD
D-1
06.2
9.18
AD
DE
ND
UM
#1
B to B BACK TO BACKBBO BOILER BLOW OFFBC BALANCING COCKBCMU BURNISHED CONCRETE MASONRY UNITBD BOARDBD BACK DRAFT DAMPERBET BETWEENBFP BACKFLOW PREVENTORBFR BELOW FLOORBF BOILER FEEDBFV BUTTERFLY VALVEBHP BREAK HORSE POWERBKR BREAKERBL BUILDING LINEBLDG BUILDINGBLK BLOCKBLKG BLOCKINGBLKHD BULKHEADBM BEAMBM BENCH MARKBOD BOTTOM OF DUCTBOF BOTTOM OF FOOTINGBOTT BOTTOMBRDG BRIDGINGBRG BEARINGBRKT BRACKETBSMT BASEMENTBT BATH TUBBTU BRITISH THERMAL UNITBTUH BRITISH THERMAL UNIT PER HOURBUR BUILT UP ROOFINGBV BALL VALVE
C CONDENSER WATERC CONDUITCA COMBUSTION AIRCAB CABINETCANT CANTILEVERCAP CAPACITYCAS CASINGCBD CHALKBOARDCD CONDENSATE DRAINCCTV CLOSED CIRCUIT TELEVISIONCE COVER ELEVATIONCEM CEMENTCENT CENTRIFUGALCER CERAMICCF CUBIC FEETCFH CUBIC FEET PER HOURCFM CUBIC FEET PER MINUTECG CORNER GUARDCH CHANNELCI CAST IRONCI CURB INLETCIP CAST IN PLACECIP CAST IRON PIPECIRC CIRCULATINGCJ CONTROL JOINTCJA CONTROL JOINT ABOVECKT CIRCUITCKT BK CIRCUIT BREAKERCL CENTERLINECL CIRCUIT LINECLG CEILINGCLOS CLOSETCLR CLEARCM CEILING MOUNTEDCMP CORRUGATED METAL PIPECMU CONCRETE MASONRY UNITCO CLEAN OUTCO CONDUIT ONLYCO2 CARBON DIOXIDECOL COLUMNCOM COMMONCOMB COMBINATIONCOMM COMMUNICATIONSCOMP COMPOSITECOMP COMPRESSOR UNITCOMPR COMPRESSIBLECONC CONCRETECONF CONFERENCECONFIG CONFIGURATIONCONN CONNECTCONN CONNECTIONCONST CONSTRUCTIONCONT CONTINUOUSCONTR CONTRACTOR OR CONTRACTCONV CONVECTORCORR CORRIDORCP CONDENSER PUMPCP COVER PLATECPS CYCLES PER SECONDCPT CARPETCR CONDENSER WATER RETURN
CR CORROSION RESISTANTCS COUNTERSINKCS COMBINATION SEWERCS CONDENSER WATER SUPPLYCSK COUNTERSUNKCSMU CALCIUM SILICATE MASONRY UNITCSP COMBINATION STANDPIPECSTJ CONSTRUCTION JOINTCSWK CASEWORKCT COOLING TOWERCT CERAMIC TILECT CURRENT TRANSFORMERCTR CENTERCU COPPERCU CONDENSING UNITCU CUBICCU COMBINATION UNITCUH CABINET UNIT HEATERCW COLD WATERCV CONDOM VENDORCWR CHILLED WATER RETURNCWS CHILLED WATER SUPPLYCY CUBIC YARDCYL CYLINDER
D DRAIND DEPTHD DATADB DRY BULBDB DECIBELDBA DEFORMED BAR ANCHORDBL DOUBLEDC DIRECT CURRENTDC DUST COLLECTORDCJ DUMMY CONTROL JOINTd PENNY (AS NAIL 10D)DDC DIRECT DIGITAL CONTROLDE DEIONIZED WATERDEG DEGREEDEPR DEPRESS(ION)(ED)DEPT DEPARTMENTDET DETENTIONDF DRINKING FOUNTAINDFR DIESEL FUEL RETURNDFS DIESEL FUEL SUPPLYDFV DIESEL FUEL VENTDG DOOR GRILLEDH DUCT HEATERDI DISTILLED WATERDI DUCTILE IRONDIA DIAMETERDIAG DIAGONALDIFF DIFFUSERDIM DIMENSIONDISC SW DISCONNECT SWITCHDISC DISCONNECTDISCH DISCHARGEDISTR DISTRIBUTIONDL DEAD LOADDM DAMPER MOTORDMPR DAMPERDN DOWNDN DOWNSPOUT NOZZLEDO OR " DITTODPFG DAMPROOFINGDPS DIFFERENTIAL PRESSURE SWITCHDR DOORDR DRAINDS DOWNSPOUTDS DISTILLED WATERDSP DRY STANDPIPEDTL DETAILDTR DUCT THRU ROOFDW DISHWASHERDWG DRAWINGDWL DOWELDWR DRAWERDXS DOUBLE EXTRA STRONG
E EASTEA EACHEA EXHAUST AIREAT ENTERING AIR TEMPERATUREEB EXPANSION BOLTEC ELECTRICAL CONTRACTOREDH ELECTRIC DUCT HEATEREE EACH ENDEER ENERGY EFFICIENCY RATIOEEW EMERGENCY EYEWASHEEWS EMERGENCY EYEWASH/SHOWEREF EACH FACEEF EXHAUST FANEFF EFFICIENCYEH ELECTRICAL HEATEREIFS EXTERIOR INSULATION AND FINISH SYSTEMEJ EXPANSION JOINTEL ELEVATIONELAS ELASTOMERICELEC ELECTRIC(AL)ELEV ELEVATOREMER EMERGENCYEMD ESTIMATED MAXIMUM DEMANDEMT ELECTRICAL METALLIC TUBINGEMV EMERGENCY MIXING VALVEENCL ENCLOSUREENTR ENTRANCEEOMD END OF MAIN DRIPEP ELECTRO-PNEUMATICEP EXPLOSION PROOFEPO EMERGENCY POWER OFFERF EPOXY RESIN FLOORINGEQ EQUALEQUIP EQUIPMENTER EXHAUST REGISTERES EMERGENCY SHOWERES EXTRA STRONGESP EXTERNAL STATIC PRESSUREEST ESTIMATEET EXPANSION TANKEW EACH WAYEWC ELECTRIC WATER COOLEREWH ELECTRIC WATER HEATEREWT ENTERING WATER TEMPERATUREEXC EXCAVATEEXH EXHAUSTEXIST EXISTINGEXP EXPANSIONEXP EXPOSEDEXPL EXPLOSIONEXT EXTERIOR
F FAHRENHEITF FIRELINEF FURNACEFA FIRE ALARMFA FRESH AIRFAB FABRICATED
FB FACE BRICKFC FOOT CANDLEFCMU FLUTED CONCRETE MASONRY UNITFCO FLOOR CLEAN OUTFCU FAN COIL UNITFD FIRE DAMPERFD FLOOR DRAINFDC FIRE DEPARTMENT CONNECTIONFDN FOUNDATIONFDR FEEDERFE FIRE EXTINGUISHERFEC FIRE EXTINGUISHER CABINETFF FINISH FLOORFFE FINISH FLOOR ELEVATIONFH FIRE HYDRANTFHC FIRE HOSE CABINETFIG FIGUREFIN FINISHFIX FIXTUREFL FLOORFLASH FLASHINGFLEX FLEXIBLEFLUOR FLUORESCENTFLG FLOORINGFLM FULL LENGTH MIRRORFM FACTORY MUTUALFM FIRE MAINFME FLOW MEASURING EQUIPMENTFO FACE OFFO FINISH OPENINGFOC FACE OF CONCRETEFOF FACE OF FINISHFOF FUEL OIL FILLFOM FACE OF MASONRYFOR FUEL OIL RETURNFOS FACE OF STUDFOS FUEL OIL SUPPLYFOV FUEL OIL VENTFOW FACE OF WALLFP FIREPROOFINGFPD FIRE PUMP DISCHARGEFPM FEET PER MINUTEFR FIRE RESISTIVEFR FRAMEFRP FIBERGLASS REINFORCED PANELFS FLOOR SINKFS FLOW SWITCHFSD FIRE/SMOKE DAMPERFSS FOLDING SHOWER SEATFT FEET (FOOT)FT FIN TUBEFT FLOW TRANSMITTERFTG FOOTINGFUT FUTUREFVC FIRE VALVE CABINETFWC FABRIC WALL COVERING
G GRILLEG NATURAL GASGA GAUGEGAL GALLONGALV GALVANIZEDGB GRAB BARGC GENERAL CONTRACTORGCO GRADE CLEAN OUTGCMU GLAZED CONCRETE MASONRY UNITGD GARBAGE DISPOSALGEN GENERALGEN GENERATORGFA GROSS FLOOR AREAGFI GROUND FAULT INTERRUPTERGFRC GLASS FIBER REINFORCED CONCRETEGHR GLYCOL-WATER HEATING RETURNGHS GLYCOL-WATER HEATING SUPPLYGI GALVANIZED IRONGL GLUE LAMINATEDGL GLASSGMU GLASS MASONRY UNITGND GROUNDGOVT GOVERNMENTGPH GALLONS PER HOURGPM GALLONS PER MINUTEGR GUARD RAILGR GRADEGR GRILLEGRC GLAVANIZED RIGID CONDUITGRC GLASS REINFORCED CONCRETEGRGP GLASS REINFORCED GYPSUM PLASTERGRS GALVANIZED RIGID STEELGS GASOLINEGV GATE VALVEGW GREASE WASTEGWB GYPSUM WALL BOARDGYP GYPSUM
H HEIGHTH 1E HOOK ONE ENDHB HOSE BIBHC HANDICAPHC HOLLOW COREHCB HANDICAP BENCHHCR HOT / CHILLED WATER RETURNHCS HOT / CHILLED WATER SUPPLYHD HAND DRYER OR HAIR DRYERHDBD HARDBOARDHDR HEADERHDWD HARDWOODHDWR HARDWAREHEV HOSE END VALVEHID HIGH INTENSITY DISCHARGEHM HOLLOW METALHOA HAND OFF AUTOMATICHORIZ HORIZONTALHP HEAT PUMPHP HIGH PRESSUREHP HORSEPOWERHPR HIGH PRESSURE STEAM RETURNHPS HIGH PRESSURE SODIUMHPS HIGH PRESSURE STEAM SUPPLYHR HANDRAILHR HOURHS HEADSTUDHSS HOLLOW STRUCTURAL SECTIONHSTR HIGH STRENGTHHT HEIGHTHTG HEATINGHTR HEATERHTWR HIGH TEMP HOT WATER RETURNHTWS HIGH TEMP HOT WATER SUPPLYHUM HUMIDIFIERHV HEATING VENTILATING UNITHVAC HEATING VENTILATING AND AIR CONDITIONINGHW DOMESTIC HOT WATERHWC DOMESTIC HOT WATER RECIRCULATINGHWR LOW TEMP HOT WATER RETURNHWS LOW TEMP HOT WATER SUPPLYHX HEAT EXCHANGERHZ HERTZ
JAN JANITORJB JUNCTION BOXJCT JUNCTIONJST JOISTJFB JOINT FILLER BOARDJT JOINT
KCJ KEYED CONSTRUCTION JOINTKCP KEENE'S CEMENT PLASTERKD KNOCKDOWNKH KITCHEN HOODKHE KITCHEN HOOD EXHAUST FANKHS KITCHEN HOOD SUPPLY FANKIT KITCHENKO KNOCKOUTKS KITCHEN SINKKV KILOVOLTKVA KILOVOLT AMPERESKVAR KILOVOLT AMPERES REACTIVEKW KILOWATTKWH KILOWATT HOUR
L ANGLEL LAVATORYLA LABORATORY COMPRESSED AIRLAB LABORATORYLAM LAMINATE(D)LAT LEAVING AIR TEMPERATURELAV LAVATORYLB POUNDLBR LUMBERLBS POUNDSLDG LOADINGLF LINEAR FOOT (FEET)LG LENGTH (LONG)LIN LINEARLINO LINOLEUMLKR LOCKERLL LIVE LOADLLH LONG LEG HORIZONTALLLV LONG LEG VERTICALLOC LOCATIONLONG LONGITUDINALLOX LIQUID OXYGENLPG LIQUEFIED PETROLEUM GASLPR LOW PRESSURE STEAM RETURNLPS LOW PRESSURE STEAM SUPPLYLR LIVING ROOMLS LAWN SPRINKLERLSC LIFE SAFETY CODELT LIGHTLTD LINED TRANSFER DUCTLTG LIGHTINGLV LOUVERLV LABORATORY VACUUMLW LONG WAYLWT LEAVING WATER TEMPERATURE
M THOUSANDMA MIXED AIRMA MEDICAL COMPRESSED AIRMAC MACHINEMAG MAGNETICMAINT MAINTENANCEMAN MANUALMAS MASONRYMATL MATERIALMAU MAKEUP AIR UNITMAV MANUAL AIR VENTMAX MAXIMUMMB MACHINE BOLTMB MOP BASINMBD MARKER BOARDMBH THOUSAND BTU PER HOURMBTUH THOUSAND BTU PER HOURMC MECHANICAL CONTRACTORMC MEDICINE CABINETMCA MINIMUM CIRCUIT AMPSMCB MAIN CIRCUIT BREAKERJMCM THOUSAND CIRCULAR MILLSMD MANUAL VOLUME DAMPERMDO MEDIUM DENSITY OVERLAYMECH MECHANICALMEMB MEMBRANEMET METALMEZZ MEZZANINEMFR MANUFACTURERMFRG MANUFACTURINGMG MOTOR GENERATORMH MANHOLEMH METAL HALIDEMH MOP HOLDERMIN MINIMUMMISC MISCELLANEOUSML MOTORIZED LOUVERMLDG MOLDINGMLO MAIN LUGS ONLYMLWK MILLWORKMO MASONRY OPENINGMPG MEDIUM PRESSURE GASMPR MEDIUM PRESSURE STEAM RETURNMPS MEDIUM PRESSURE STEAM SUPPLYMR MIRRORMR/S MIRROR WITH SHELFMS MAGNETIC STARTERMTD MOUNTEDMTG MOUNTINGMTL METALMTWR MEDIUM TEMP HOT WATER RETURNMTWS MEDIUM TEMP HOT WATER SUPPLYMUL MULLIONMV MERCURY VAPORMV MEDICAL VACUUMMW MARKER WALL
N NITROGENN NORTHN2O NITROUS OXIDEN/A NOT APPLICABLE
P PAINTP POLEP/T PRESSURE/TEMPERATURE TEST PORTP PUMPPA PUBLIC ADDRESSPAN B PANIC BOLTPAR PARALLELPB PARTICLE BOARDPB PULL BOXPB PUSH BUTTONPBS PUSH BUTTON STATIONPC PRECASTPC PUMPED CONDENSATEPCD PAPER CUP DISPENSERPCF POUNDS PER CUBIC FOOTPCT PORCELAIN CERAMIC TILEPD PRESSURE DROPPD PUMP DISCHARGEPDI PLUMBING & DRAINAGE INSTITUTEPENT PENTHOUSEPERF PERFORATEDPERP PERPENDICULARPF POWER FACTORPG PRESSURE GAGEPH PHASEPI POINT OF INTERSECTIONPI PRESSURE INDICATORPIC PORTABLE INSTRUMENT CONNECTIONPIV POST INDICATOR VALVEPL PLACE(S)PL PLATEPLAM;PL PLASTIC LAMINATEPLAS PLASTERPLBG PLUMBINGPLYWD PLYWOODPNEU PNEUMATICPNL PANELPOC POINT OF CONNECTIONPORC PORCELAINPPM PARTS PER MILLIONPR PAIRPREFAB PREFABRICATEDPROJ PROJECTIONPRV PRESSURE REDUCING VALVEPS PIPE SUPPORTPS PROJECTION SCREENPSF POUNDS PER SQUARE FOOTPSI POUNDS PER SQUARE INCHPSV PRESSURE SAFETY VALVEPT PLASTER TRAPPT POINTPT POTENTIAL TRANSFORMERPTD PAPER TOWEL DISPENSERPTD/R COMBINATION TOWEL DISPENSER/RECEPTACLEPTN PARTITIONPVC POLYVINYL CHLORIDEPVI POINT OF VERTICAL INTERSECTIONPVT POINT OF VERTICAL TANGENCYPWL SOUND POWER LEVELPWR POWER
QT QUARRY TILEQTR RND QUARTER ROUND
R RISERRA RETURN AIRRAD RADIATORRAD or R RADIUSRB RUBBER BASERC REMOVE CONTROLRCP REFLECTED CEILING PLANRCP REINFORCED CONCRETE PIPERCU RECIPROCATING CHILLER JOINTRD ROOF DRAINRD REFRIGERANT DISCHARGERECP RECEPTACLEREF REFERENCEREFL REFLECTEDREFR REFRIGERANTREFR REFRIGERATORREG REGISTERREINF REINFORCEMENTREM REMOVABLEREQ(D) REQUIRE(D)RESIL RESILIENTRET RETAINING (WALL)REV REVISIONSRF RETURN FANRF RUBBER FLOORRFM RECESSED FLOOR MATRH RELATIVE HUMIDITYRH RELIEF HOODRHC REHEAT COILRH ROBE HOOKRHG REFRIGERANT HOT GASRI&C ROUGH IN AND CONNECTRIJS RISE IN JOIST SPACERL REFRIGERANT LIQUIDRM ROOMRND ROUNDRO ROUGH OPENING
S SINKS SANITARY SEWERS SOAP DISHS SOUTHS SPRINKLER LINESA SHOCK ABSORBERSA SUPPLY AIRSAN SANITARY WASTESC SECURITYSC SOLID CORESC SHOWER CURTAINSC SPECIAL COATINGSCD SEAT COVER DISPENSERSCH SHOWER CURTAIN HOOKSSCHED SCHEDULESCR SHOWER CURTAIN RODSCT STRUCTURAL CLAY TILESCUT SCUTTLESCW SOFT COLD WATERSD SOAP DISPENSERSD SMOKE DAMPERSD SMOKE DETECTORSD STORM DRAINSE STEAM EXHAUST VENTSEC SECONDARYSECT SECTIONSECY SECRETARYSENS SENSIBLESF SQUARE FOOTSF SUPPLY FANSFCMU SPLIT-FACED CONCRETE MASONRY UNITSFU STRUCTURAL FACING UNITSGL SINGLESH SHOWERSHEATH SHEATHINGSHM SECURITY HOLLOW METALSHT SHEETSHWSOFT HOT WATERSIM SIMILARSL SHORT LEGSLNT SEALANTSM SHEET METALSM SPRINKLER MAINSND SANITARY NAPKIN DISPOSALSNV SANITARY NAPKIN VENDORSP STATIC PRESSURE (H2O)SP STAND PIPESP STATIC PRESSURESPEC SPECIFICATIONSSPK SPRINKLERSPL SOUND PRESSURE LEVELSPL SPECIALSPL BLK SPLASH BLOCKSQ SQUARESS STAINLESS STEELSSA STORM SHELTER AREASS SERVICE SINKSS SOLID SURFACEST STAIRST STORM SEWERSTAG'D STAGGEREDSTC SOUND TRANSMISSION CLASSSTD STANDARDSTE SINGLE TAPERED ENDSTGR STRINGERSTL STEELSTOR STORAGESTR STRUCTURAL - STRUCTURESUB SUBSTATIONSUBFL SUBFLOORSURF SURFACESUSP SUSPENDEDSV SHEET VINYLSV SOLENOID VALVESW SHORT WAYSW SWITCHSWBD SWITCH BOARDSWP STEAM WORKING PORESSURESYM SYMMETRICAL
T TEMPEREDT THERMOSTATT & B TOP & BOTTOMT& G TONGUE & GROOVET TREADTA TRANSFER AIRTAB TEST AND BALANCETAN TANGENTTB TERMINAL BOXTB TOWEL BARTBD TACK BOARDTC TEMPERATURE CONTROLTC TIME CLOCKTD TRANSFER DUCTTD TRENCH DRAINTDH TOTAL DYNAMIC HEADTEL TELEPHONETEMP TEMPERED - TEMPORARYTEMP TEMPERATURETERR TERRAZZOTEXT TEXTUREDTGL TOGGLETH THRESHOLDTH TOWEL HOOKTHK THICK(NESS)TMR TILT MIRROR UNITTMV THERMOSTATIC MIXING VALVETOB TOP OF BEAMTOC TOP OF CONCRETETOF TOP OF FOOTINGTOIL TOILETTOP TOP OF PAVINGTOS TOP OF STEELTOW TOP OF WALLTPV TRAP PRIMERTR TRIPTRANS TRANSVERSETRD TREADTS TEMPERATURE SENSORTSP TOTAL STATIC PRESSURETT TEMPERATURE TRANSMITTERTT TERRAZZO TILETTD TOILET TISSUE DISPENSERTV TELEVISIONTW TACK WALLTYP TYPICAL
U URINALUC UNIT COOLERUG UNDERGROUND
V VENTV VOLTV VACUUMVA VALVEVAC VACUUMVAV VARIABLE AIR VOLUMEVB VAPOR BARRIERVB VINYL BASEVBF VENT BELOW FLOORVCB VENTED COVE BASEVCP VITRIFIED CLAY PIPEVCT VINYL COMPOSITION TILEVD VOLUME DAMPER - MANUALVEL VELOCITYVENT VENTILATIONVENT VENTILATORVERT VERTICALVEST VESTIBULEVF VINYL FLOORVFD VARIABLE FREQUENCY DRIVEVM VOLTMETERVOL VOLUMEVP VENEER PLASTERVP VACUUM PUMPVSMC VARIABLE SPEED MOTOR CONTROLLERVT VINYL TILEVTR VENT THROUGH ROOFVWC VINYL WALLCOVERING
W WATER SERVICEW WIDE; WIDTHW WASTE (PLUG)W WATTW WESTW WIDE FLANGEW/ WITHW/O WITHOUTWB WET BULBWC WALL COVERINGWC WATER COLUMNWC WATER CLOSETWCC WATER COOLED CONDENSERWCL WATER CLOSET/LAVATORY COMBINATIONWCO WALL CLEAN OUTWD WOODWDW WINDOWWF WASH FOUNTAINWH WALL HYDRANTWFMD WATER FLOW MEASURING DEVICEWH WATER HEATERWHM WATT HOUR METERWI WROUGHT IRONWLR WATER LOOP RETURNWLS WATER LOOP SUPPLYWMG WATER MOTOR GONGWNSCT WAINSCOTWP WEATHERPROOFWPB WHIRLPOOL BATHWPF WATERPROOFWPFG WATERPROOFINGWR WATER RESISTANTWR WASTE RECEPTACLEWSP WET STAND PIPEWT WEIGHTWW WARM WHITEWWF WELDED WIRE FABRIC
XFMR TRANSFORMERXMTR TRANSMITTER
YD YARDYH YARD HYDRANT
Z IMPEDANCEZCV ZONE CONTROL VALVEZVB ZONE VALVE BOX
& AND@ ATi.e. THAT IS# NUMBER
CG CLEAR FLOAT GLASSCIG CLEAR INSULATING GLASSCTG CLEAR TEMPERED FLOAT GLASSCTIG CLEAR TEMPERED INSULATING GLASSLG LAMINATED GLASSPG PATTERN GLASSPIG PATTERN INSULATING GLASSSG SPANDREL GLASSTG TINTED FLOAT GLASSTIG TINTED INSULATING GLASSTTG TINTED TEMPERED FLOAT GLASSTTIG TINTED TEMPERED INSULATING GLASSWG POLISHED WIRE GLASS
THE FOLLOWING ABBREVIATIONSARE USED WITH GLAZING:
IAQ INDOOR AIR QUALITYIAW IN ACCORDANCE WITHIBC INTERNATIONAL BUILDING CODEIC INTERCOMID INSIDE DIAMETERIE INVERT ELEVATIONIES ILLUMINATING ENGINEERING SOCIETYIF INSIDE FACEIG ISOLATED GROUNDIH INTAKE HOODIJ ISOLATION JOINTIJS IN JOIST SPACEIMC INTERMEDIATE METAL CONDUITIN INCHINC INCLUDE (ING)INSUL INSULATIONINT INTERIORIP IRON PIPEIW INDIRECT WASTE
O&M OPERATION AND MAINTENANCEO to O OUT TO OUTOA OVERALLOA OUTSIDE AIROBSC OBSCUREOC ON CENTEROD OUTSIDE DIAMETEROD OVERFLOW DRAINOF OUTSIDE FACEOVFL OVERFLOWOFC OWNER FURNISHED CONTRACTOR INSTALLEDOFF OFFICEOFOI OWNER FURNISHED OWNER INSTALLEDOHP OVERHEAD POWEROHT OVERHEAD TELEPHONEOPG OPENINGOPP OPPOSITEOSD OVERFLOW STORM DRAINOS&Y OUTSIDE SCREW AND YOKEOTCS OPEN TO CEILING SPACEOVHD OVERHEADOX OXYGEN
A/C AIR CONDITIONING(ER)A AMP AMPEREA COMPRESSED AIRAAP AREA ALARM PANELAAV AUTOMATIC AIR VENTAB ANCHOR BOLTABS ACRYLONITRILE-BUTADIENE-STYRENEAC ACOUSTICAL CEILINGAC ALTERNATING CURRENTACC AIR COOLED CONDENSERACCU AIR COOLED CONDENSING UNITACM ALUMINUM COMPOSITE MATERIALACST ACOUSTICAD ACCESS DOORAD AREA DRAINADDN ADDITION OR ADDITIONALADJ ADJUSTABLEADJT ADJACENTADMIN ADMINISTRATIONAF AIR FILTERAFF ABOVE FINISH FLOORAHJ AUTHORITY HAVING JURISDICTIONAHU AIR HANDLING UNITAI AREA INLETALT ALTERNATEALUM ALUMINUMAMB AMBIENTANCH ANCHORAP ACCESS PANELAPC ACOUSTICAL PANEL CEILINGAPPROX APPROXIMATEAR ACID RESISTINGARCH ARCHITECTURALASB ASBESTOSASPH ASPHALTAUTO AUTOMATICAV ACID VENTAV AIR VENTAV AVERAGEAW ACID WASTEAWG AMERICAN WIRE GAUGEAWP ACOUSTICAL WALL PANEL
ABBREVIATIONS GENERAL SYMBOLS
SHEET ON WHICH DRAWN
REVISION NUMBER
WALL TYPE
DETENTION DOOR NUMBEROR WINDOW NUMBER
COMMERCIAL DOOR NUMBEROR WINDOW NUMBER
ROOM NUMBER
COLUMN LINE
LEGEND/KEY NOTE
BUILDING ELEVATIONINTERIOR ELEVATION
DETAIL OR WALL SECTION
CROSS REFERENCE
DETAIL NUMBER
(CONTINUOUS BLOCKING)
BATT INSULATION
RIGID INSULATION
CARPET (LARGE SCALE)
TILE (LARGE SCALE)
ACOUSTICAL TILE (LARGE SCALE)
PROTECTION BOARD
CONCRETE MASONRY UNIT
METAL STUDS
STEEL (LARGE SCALE)
(LARGE SCALE)GYPSUM WALL BOARD
PLYWOOD (LARGE SCALE)
BRICK VENEER
SHINGLES
STONE
GLASS
(TRIM/FINISH)WOOD
(NON-CONTINUOS BLOCKING)WOOD
GRAVEL/BALLAST
WOOD
GYM FLOOR
STEEL
PRECAST CONCRETE
CONCRETE
SAND
EARTH
CASEWORKELEVATION
SIMILAR OR TYPICAL REFERENCE
SIMILAR OR TYPICAL REFERENCE
?
???
SIMSIM
??E
ast
?/ ?
?
DESCRIPTION
?
???
? SIM
?
???
SIMSIM ?
???
SIMSIM
BUILDING SECTION
1. GENERAL NOTES APPLY TO ALL DRAWINGS
2. ALL DIMENSIONS ARE ACTUAL AND ARE TO FACE OF METALSTUDS, FACE OF MASONRY OR CENTERLINE OF COLUMN,UNLESS NOTED OTHERWISE.
3. ALL ASPECTS OF THE WORK AND ITEMS NOT SPECIFICALLYMENTIONED, BUT WHICH ARE NECESSARY TO MAKE ACOMPLETE WORKING INSTALLATION, SHALL BE INCLUDED,AND INDICATED IN THE CONTRACTORS BID.
4. NO ASBESTOS OR PCB CONTAINING MATERIALS SHALL BEUSED ON THIS PROJECT.
5. THE GENERAL CONTRACTOR AND ALL SUBCONTRACTORSARE RESPONSIBLE FOR PROPER REMOVAL AND DISPOSALOF ALL DEBRIS GENERATED BY CONSTRUCTION OF THISPROJECT. THE REMOVAL AND DISPOSAL OF ALLCONSTRUCTION DEBRIS SHALL BE IN FULL COMPLIANCEWITH ALL FEDERAL, STATE AND LOCAL REGULATIONS. THEPREMISES SHALL BE KEPT CLEAN AND FREE FROM ALLWASTE MATERIALS.
6. GENERAL CONTRACTOR SHALL PROTECT NEWCONSTRUCTION FROM DAMAGE BY ALL TRADES. ALLSUCH DAMAGE CAUSED BY THE CONTRACTOR DURINGTHE COURSE OF THIS WORK SHALL BE REPAIRED ORREPLACED AT THE CONTRACTORS EXPENSE.
7. CONTRACTOR IS RESPONSIBLE FOR FIELDVERIFICATION OF ALL DIMENSIONS AND FIELDCONDITIONS PRIOR TO ORDERING OR INSTALLINGMATERIALS OR EQUIPMENT.
GENERAL NOTES
?
NC NOISE CRITERIANC NORMALLY CLOSEDNC NURSE CALLNEC NATIONAL ELECTRIC CODENEMA NATIONAL ELECTRICAL MANUFACTURERS ASSN.NEUT NEUTRALNIC NOT IN CONTRACTNO NORMALLY OPENNO NUMBERNO NITROUS OXIDENOM NOMINALNS NEUTRAL SENSORNTS NOT TO SCALE
RPM REVOLUTIONS PER MINUTERPZ REDUCED PRESSURE BACKFLOW PREVENTERRS REFRIGERANT SUCTIONRWL RAIN WATER LEADERS SENSOR
UGE UNDERGROUND ELECTRICALUGT UNDERGROUND TELEPHONEUH UNIT HEATERUL UNDERWRITERS LABORATORIESUNEX UNEXCAVATEDUNFIN UNFINISHEDUNO UNLESS NOTED OTHERWISEUR URINALURD UNDERGROUND RESIDENTIAL DISTRIBUTIONUS UTILITY SHELFUTIL UTILITYUV UNIT VENTILATOR
?
ROOM NAME
???
?
Arc
hite
ctu
re E
ngin
eering
P
lan
nin
g In
teriors
©
, D
LR
Gro
up
in
c., a
n Illi
no
is c
orp
ora
tio
n,
AL
L R
IGH
TS
RE
SE
RV
ED
BE
NJA
MIN
TA
LP
OS
Rev
isio
ns
6/2
9/2
018 3
:29:5
2 P
M
C:\R
evit\2
2-1
7132-0
0 D
epke_A
R_2016_jw
oznia
k65Q
8M
.rvt
22-1
7132-0
0
06/1
8/2
018
DE
PK
E J
UV
EN
ILE
JU
ST
ICE
CO
MP
LE
XR
OO
F R
EP
LA
CE
ME
NT
ISS
UE
D F
OR
BID
GE
NE
RA
L N
OT
ES
, S
YM
BO
LS
AN
D A
BB
RE
VIA
TIO
NS
G0.1
24647 N
ort
h M
ilwaukee A
venue
Vern
on H
ills, Illin
ois
60061
20
18
AD
D-1
06.2
9.18
AD
DE
ND
UM
#1
DN
DN
R2
R3
R1
R4
R1
R-15
R5 R5
R6 R6
R3
R7
R1
R3
R3
R3
R3
R3
R3
R8
R9
R-10
R-10
R-10
R-10
R-10
R-12 R-11
RTU
R-12
R-13
R1
R2
R2
ROOF AREA 1
ALTERNATE
ROOF AREA 9
ROOF AREA 5
ALTERNATE
ROOF AREA 7
ALTERNATE
ROOF AREA 3ROOF AREA 4
ALTERNATE
ROOF AREA 6
ALTERNATE
ROOF AREA 8
ROOF AREA 2
R1
R-14
R-14
RTU
RTU
RTU
RT
U
RT
U
R-16
R-16
R-16
R-16
R-17
DEMOLITION NOTES
A. DEMOLITION GENERAL NOTES APPLY TO ALL DEMOLITION SHEETS.B. COORDINATE DEMOLITION AND PHASING EFFORTS WITH ARCHITECT
AND OWNER'S REPRESENTATIVES. EVERY EFFORT SHALL BE MADETO MINIMIZE DISRUPTION OF OWNER'S OPERATIONS AND TOPROVIDE BUILDING USER'S SAFETY. EXCESSIVE NOISE ORVIBRATION SHALL BE PRE-APPROVED AND COORDINATED WITHOWNER'S REPRESENTATIVE.
C. COORDINATE DISRUPTION OF UTILITY SERVICES WITH OWNER ANDAS SPECIFIED.
D. MAINTAIN A SECURE AND WEATHER-TIGHT ENCLOSURE.E. VERIFY EXISTING CONDITIONS, DIMENSIONS, AND ELEVATIONS AND
NOTIFY ARCHITECT OF DISCREPANCIES.F. THE OWNER SHALL RESERVE THE RIGHT TO SALVAGE ANY
MATERIALS.G. PROVIDE PROTECTION FOR EXISTING BUILDING MATERIALS AND
EQUIPMENT FROM DAMAGE DUE TO DEMOLITION ORCONSTRUCTION-RELATED INCIDENT PERFORMED UNDER THISCONTRACT.
H. REPAIR OR REPLACE ITEMS DAMAGED AS A RESULT OF DEMOLITIONOR CONSTRUCTION TO MATCH EXISTING FINISH AND /ORCONDITION.
I. EXISTING MATERIALS SHALL NOT BE REUSED UNLESS NOTEDOTHERWISE OR AS AUTHORIZED BY ARCHITECT.
J. SEE MECHANICAL AND ELECTRICAL DRAWINGS AND NOTES FORFURTHER SEQUENCING AND SCOPE OF WORK.
Arc
hite
ctu
re E
ngin
eering
P
lan
nin
g In
teriors
©
, D
LR
Gro
up
in
c., a
n Illi
no
is c
orp
ora
tio
n,
AL
L R
IGH
TS
RE
SE
RV
ED
LEGEND NOTESLEGEND NOTES ARE COMMON TO ALLSOME NOTES MAY NOT APPLY TO THIS SHEET
Rev
isio
ns
22-1
7132-0
0
06/1
8/2
018
DE
PK
E J
UV
EN
ILE
JU
ST
ICE
CO
MP
LE
XR
OO
F R
EP
LA
CE
ME
NT
ISS
UE
D F
OR
BID
AR
CH
ITE
CT
UR
AL D
EM
O R
OO
F P
LA
NA
D4.0
24647 N
ort
h M
ilwaukee A
venue
Vern
on H
ills, Illin
ois
60061
20
18
SCALE: 1/16" = 1'-0"
ARCHITECTURAL DEMOLITION ROOF PLAN
NO
RTH
PLANNORTH
KEYNOTES - ARCHITECTURAL DEMOLITION
R1 REMOVE EXISTING ASPHALT BUILT-UP ROOF SYSTEM DOWN TOROOF STRUCTURE SUBSTRATE.
R2 REMOVE EXISTING METAL COPING AT ROOF PARAPET.
R3 REMOVE EXISTING COPING/GRAVEL EDGE AS REQUIRED FORNEW WORK.
R4 REMOVE EXISTING METAL ROOF SYSTEM DOWN TO EXISTINGROOF STRUCTURE SUBSTRATE.
R5 REMOVE EXISTING ASPHALT SHINGLES AND FELT DOWN TOEXISTING ROOF STRUCTURE SUBSTRATE.
R6 REMOVE EXISTING PREFINISHED ALUM. FASCIA, GUTTER,SOFFIT PANEL AND DOWNSPOUTS.
R7 REMOVE EXISTING SLOTTED BAR GRAVEL STOP, GUTTER ANDDOWNSPOUTS.
R8 REMOVE EXISTING METAL FASCIA.
R9 REMOVE EXISTING STUCCO DOWN TO CONCRETE BLOCK WALL.
R-10 REMOVE EXISTING DOUBLE ACRYLIC SKY DOME.
R-11 REMOVE EXISTING EIFS AT SOFFIT.
R-12 REMOVE CANTED SHEATHING AND EXISTING ROOF SYSTEM ONBACK SIDE OF PARAPET.
R-13 REMOVE EXISTING ROOF DRAIN; REFER TO MECH.
R-14 REMOVE EXISTING PREMANUFACTURED ROOF CURB.
R-15 REMOVE EXISTING MEMBRANE ROOF SYSTEM.
R-16 REMOVE EXISTING RTU. REFERENCE MECHANICAL.
R-17 REMOVE EXISTING METAL DECK IN PREPARATION FOR NEWDUCT PENETRATION. REFERENCE MECHANICAL FOR LOCATIONAND DIMENSIONS.
AD
D-1
06.2
9.18
AD
DE
ND
UM
#1
0 5 10 20
EXISTING BALLASTED BUILT-UPROOF SYSTEM TO REMAIN
EXISTING HVAC ROOF TOP EQUIPMENTAND DUCTWORK WHERE OCCURS, TYP.
EXISTING STANDING SEAMMETAL ROOFING TO REMAIN
NEW ASHPALT SHINGLES
EXISTING ROOF SYSTEM TO REMAIN
SLO
PE
1/8" PE
R F
T.
SLO
PE
1/8" PE
R F
T.
ROOF AREA 1
RCB
ROOF AREA 5
RCC
ALTERNATE
ROOF AREA 7
RCA
ALTERNATE
ROOF AREA 3
RCDROOF AREA 4
RCB
ALTERNATE
ROOF AREA 6
RCA
DS
DS
DS
DS
DS
DS
DS
DS DS
DS
DS DS
DS
DS
8" S
TRUCTURAL PIT
CH
6" STRUCTURALPITCH
60" STRUCTURAL PITCH
8" S
TRUCTURAL PIT
CH
24
A4.4
43
A4.4
42
A4.4
51
A4.4
54
A4.4
EXISTING ICE BARRIER MEMBRANETO REMAIN; COVER W NEW LAYEROF ICE BARRIER MEMBRANE
EXISTING ROOF SYSTEM TO REMAIN
26
A4.4
45
A4.4
26
A4.4
44
A4.4
55
A4.4
55
A4.4
56
A4.4
56
A4.4
26
A4.4
26
A4.4
26
A4.4
26
A4.4
42
A4.4
43
A4.4
56
A4.4 SIM
26
A4.4
26
A4.4
32
A4.4
53
A4.4
DS
ROOF WALKWAY PAD, TYP.
ROOF TOP EXHAUST FANS;PROVIDE FLASHING UNIT, TYP
V
V
V
V
V
V
PROVIDE FLASHING AT VENTS, TYP
EXH
EXH
EXH
EXH
(E)RTU
(E)RTU
(E)RTU
EXH
EXH
EXH
(E)R
TU
SKYDOME INFILL, TYP.
SKYDOME INFILL
41
A4.4ALTERNATE
ROOF AREA 8
(E)RD RD
SLOPE
1/8" PER FT.
SLOPE
1/8" PER FT.
SLOPE
1/8" PER FT.
SLOPE
1/8" PER FT.
(E)R
TU
52
A4.4
54
A4.4
NEW RTU BY OWNER, TYP.
ROOF AREA 2
RCB
A4.4
14
A4.0
2
A4.0
1
LINE OF BUILDING PERIMETER BELOW
EXH
33
A4.4
INFILL WALL AT REMOVED DUCTWORK TOMATCH EXISTING EIFS WALL ASSEMBLY
24
A4.4
SLO
PE
1/8" PE
R F
T.
SLOPE
1/8" PER FT.
SLO
PE
1/8" PE
R F
T.
SLOPE
1/8" PER FT.
SLO
PE
1/8" PE
R F
T.
SLOPE
1/8" PER FT.
SIM
DS
DS
ALTERNATE
ROOF AREA 9
RCB
8" STRUCT.
PITCH
8" STRUCT.
PITCH
EXISTING COAL TAR OVERBALLASTED BUILT-UP ROOFSYSTEM
EXISTING MODIFIED BITUMENROOF SYSTEM TO REMAIN
(E)RD
DUCTPENETRATIONINFILL
46
A4.4
46
A4.4
46
A4.4
DUCTPENETRATIONINFILL24
A4.4SIM
DUCTPENETRATIONINFILL
24
A4.4SIM
(E)R
TU
NEW EQUIPMENTPLATFORM AT RTU;REF EXP STRUCTURALDRAWINGS
A4.4
22
TYP
NEW EQUIPMENTPLATFORM AT RTU;REF EXP STRUCTURALDRAWINGS
46
A4.4
24
A4.4 SIM
ADD-1
EXISTING ROOF DRAINTO REMAIN
ADD-1
NEW ROOF DRAIN ADD-1
EXISTING RAZOR WIRE TO REMAIN;UTILIZE PROTECTIVE GEAR ASREQUIRED TO WORK IN THIS AREA
ADD-1
1
1
1
1
1
1
ADD-1ADD-1
ADD-1
ADD-1
ADD-1
ADD-1
+10.7"
+11.8"
+5.2"
+10.5"
ADD-1
+6.7"
ADD-1
ADD-1
2
2
3
2
2
2
0 5 10 20
ROOF PLAN GENERAL NOTES:
A. ROOF PLAN NOTES APPLY TO ALL ROOF PLAN SHEETS.B. MOST ROOF SLOPES ARE CREATED BY SLOPED ROOF
STRUCTURE. SEE STRUCTURAL SLOPE NOTED TODETERMINE PROPER TAPER IN INSULATION. SHADEDAREAS INDICATE TAPERED INSULATION. TAPEREDINSULATION SHALL PROVIDE A MININUM OF 1/8-INCH PERFOOT OF SLOPE TO ROOF DRAINS, UNLESS NOTEDOTHERWISE.
C. ASPHALT SHINGLE ROOFING SYSTEM ROOF SLOPES ARECREATED BY SLOPING THE ROOF STRUCTURE.
D. CONTRACTOR IS RESPONSIBLE FOR FIELD VERIFICATIONOF ALL DIMENSIONS AND FIELD CONDITIONS PRIOR TOORDERING OR INSTALLING MATERIALS OR EQUIPMENT.
E. COORDINATE THE SIZE AND LOCATION OF ROOFPENETRATIONS FOR MECHANICAL AND ELECTRICALEQUIPMENT.
F. FLASH DRAINS, CURBS, VENTS AND STACKS PERMANUFACTURER'S RECOMMENDATIONS IF DETAIL NOTSHOWN ON PLANS.
G. PROVIDE TAPERED INSULATION CRICKETS AT HIGH SIDEOF ALL ROOF OBSTRUCTIONS AS REQUIRED FORPOSITIVE DRAINAGE.
H. CONSTRUCTION STAGING AREA TO BE COORDINATEDWITH AND APPROVED BY OWNER.
I. SCHEDULE WORK HOURS W/ OWNER. DO NOT DISRUPTBUILDING ACTIVITIES UNLESS PREVIOUSLY DISCUSSED &APPROVED BY OWNER.
ROOF PLAN KEYED NOTES:
FURNISH AND INSTALL NEW RTU CURB FOREXISTING RTU. CONTRACTOR IS RESPONSIBLEFOR LIFTING EXISTING UNITS & COORDINATINGWITH OWNER REGARDING DOWN TIME.REFERENCE DETAIL 15/A4.4 FOR HEIGHT ANDFLASHING REQUIREMENTS. REFERENCEMECHANICAL DRAWINGS FOR CONNECTIONS.
APPROXIMATE ROOF CURB DIMENSION: 6'-0" X 3'-6"CONTRACTOR RESPONSIBLE FOR VERIFYINGDIMENSIONS IN FIELD.
APPROXIMATE ROOF CURB DIMENSION: 4'-8" X 7'-0"CONTRACTOR RESPONSIBLE FOR VERIFYINGDIMENSIONS IN FIELD.
TAPERED INSULATION
ADD-1
1
TOTAL INSULATION HEIGHT
2
3
ROOF CONSTRUCTION A - RCANEW ASPHALT SHINGLE ROOFSYSTEM OVER PLYWOOD SHEATHING12" BATT INSULATION BELOWR-VALUE = 38
1/2"
5 1/
2"
ASPHALT SHINGLE ROOFING
EXISTING 5/8" CDX PLYWOOD SHEATHING OVER WOOD TRUSS
1/2"
5 1/
2"
1/2"
1 1/
2"
ROOF CONSTRUCTION B - RCBNEW MEMBRANE ROOFING SYSTEMOVER METAL ROOF DECKR-VALUE = 30
ROOF CONSTRUCTION C - RCCNEW MEMBRANE ROOFING SYSTEMOVER EXISTING PRECAST STRUCTURER-VALUE = 30
VAPOR RETARDER
EXISTING METAL ROOF DECK
1/2" DECK SUBSTRATE BOARD - MECHANICALLY FASTENED
BASE INSULATION: 2 LAYERS POLYISOCYANURATEINSULATION (R-30 MINIMUM) FULLY ADHERED
REFER TO OVERALL PLAN FOR TAPERED INSULATIONLOCATIONS
1/2" COVER BOARD - FULLY ADHERED
MEMBRANE ROOFING SYSTEM - FULLY ADHERED
EXISTING PRECAST CONCRETE ROOF STRUCTURE
BASE INSULATION: 2 LAYERS POLYISOCYANURATEINSULATION (R-30 MINIMUM) FULLY ADHERED
REFER TO OVERALL PLAN FOR TAPERED INSULATIONLOCATIONS
1/2" COVER BOARD - FULLY ADHERED
MEMBRANE ROOFING SYSTEM - FULLY ADHERED
UNDERLAYMENT
EXISTING 12" BATT INSULATION
ROOF CONSTRUCTION D - RCDINSULATED STANDING SEAM ROOFINGSYSTEM OVER METAL ROOF DECKR-VALUE = 30
EXISTING METAL ROOF DECK
INSULATED STANDING SEAM ROOFING ASSEMBLY
VAPOR RETARDER
ADD-1 ADD-1
41
A4.4
ALTERNATE
ROOF AREA 8
RCC
54
A4.4
33
A4.4
SLO
PE
1/8" PE
R F
T.
SLOPE
1/8" PER FT.
DS 43
A4.4SIM
41
A4.4 SIM
1
1+10.5"
ADD-1
LEVEL 01100' - 0"
LOWER ROOF LEVEL112' - 0"
EXIST PRECAST ROOF BRG108' - 0"
EXISTING MASONRY WALL ASSEMBLY
INSTALL NEW EIFS TO MATCH EXISTING
INSTALL NEW PREFINISHED ALUM. FASCIA32
A4.4TYP
NEW DOWNSPOUT AT NEWROOF DRAIN
ADD-1
0 5 10
SCALE: 1/8" = 1'=0"
20
Arc
hite
ctu
re E
ngin
eering
P
lan
nin
g In
teriors
©
, D
LR
Gro
up
in
c., a
n Illi
no
is c
orp
ora
tio
n,
AL
L R
IGH
TS
RE
SE
RV
ED
LEGEND NOTES ARE COMMON TO ALLSOME NOTES MAY NOT APPLY TO THIS SHEET
BE
NJA
MIN
TA
LP
OS
Rev
isio
ns
6/2
9/2
018 4
:50:2
0 P
M
C:\R
evit\2
2-1
7132-0
0 D
epke_A
R_2016_jw
oznia
k65Q
8M
.rvt
22-1
7132-0
0
06/1
8/2
018
DE
PK
E J
UV
EN
ILE
JU
ST
ICE
CO
MP
LE
XR
OO
F R
EP
LA
CE
ME
NT
ISS
UE
D F
OR
BID
OV
ER
ALL R
OO
F P
LA
NA
4.0
24647 N
ort
h M
ilwaukee A
venue
Vern
on H
ills, Illin
ois
60061
20
18
SCALE: 1/16" = 1'-0"
OVERALL ROOF PLAN
NO
RTH
PLANNORTH
SCALE: 1 1/2" = 1'-0"
ROOF TYPES
SCALE: 1/16" = 1'-0"
ALTERNATE - ROOF AREA 8
AD
D-1
06.2
9.18
AD
DE
ND
UM
#1
SCALE: 1/8" = 1'-0"A4.0
1 EXISTING WEST ELEVATION (RENOVATION)
ADD-1
0 5 10 20
EXISTING METAL DECK
MEMBRANE ROOFING SYSTEM ORINSULATED STANDING SEAMROOFING ASSEMBLY AS NOTED;REF PLANS
REMOVE EXISTING SKYDOME
SPLICE NEW CORRUGATEDMETAL DECK TO MATCHEXISTING; LAP 6" OVER EXISTING;VERIFY DIMENSIONS IN FIELD
EXPANDABLE FOAMINSUL - CONT
EXPANDABLE FOAMINSUL - CONT
SINGLE PLYROOFINGSYSTEM
SEALANT, CONT.
SEALANT, CONT.
STAINLESS STEELCLAMPING RING
FIELD FORMEDFLASHING, TYP.
EXISTING PIPE, TYP.
12" MIN. TO CURB OR PARAPET OR OTHER PENETRATION
SEALANT, CONT.
STAINLESS STEELCLAMPING RING
SEALANT, CONT.
EXISTING PIPE, TYP.
PREFORMED CONE FLASHING
12" MIN. TO CURB OR PARAPET OR OTHER PENETRATION
SINGLE PLYROOFINGSYSTEM
ROOF STRUCTURE
BA
ROOF STRUCTURE
TYP. PIPE PENETRATION USE WHERE DETAIL "A" CAN NOT BE USED
8" M
IN.
8" M
IN.
NEW UNIT (BY OWNER) ORREINSTALL EXIST. MECHANICALUNIT AS NOTED; REF MECHANICAL
METAL CAP FLASHING
ROOF FLASHING AND MEMBRANE
MIN
1' -
0"
FASTEN EQUIPMENT TO RAILPER MANUFACTURER'SSTANDARDS
EXISTING ROOF STRUCTURE
CUSTOM PREMANUFACTUREDINSULATED CURB BYMECHANICAL CONTRACTOR
TWO PIECE GALVANIZED FLASHING CAP UNIT.ROLL LEAD FLASHING DOWN INTO PIPE.
PLUMBING VENT STACK.EXTEND PIPING TO MIN. 12" ABOVE ROOF.
PREFORMED BOOT/CONE
SET FLANGE IN MASTIC. PRIME FLANGE.
EXISTING METAL DECK
1'-0
" M
IN.
3" MIN
EXTEND SCUPPER FLASHING UP ANDUNDER COPING
LAP SEALANT
PREFINISHED GAVANIZEDSHEET METAL COPING
TREATED WOOD BLOCKINGAS NEEDED TO ACCOMODATENEW INSULATION HEIGHT
EXISTING METAL DECK
4"
EXISTING EXTERIOR WALL ASSEMBLY
EXISTING EXTERIOR WALLASSEMBLY
ADD-1
REMOVE EXISTING BLOCK ABOVESCUPPER OPENING TO ACHIEVEMINIMUM SCUPPER HEIGHT
4" M
IN
ADD-1
8 " M
IN
ADD-1
EXISTING EXTERIOR WALL ASSEMBLY
EXISTING METAL DECK
CONTINUOUS SEALANT
MEMBRANE FLASHING
CANT STRIP
TREATED WOOD BLOCKING
PREFINISHED GAVANIZEDSHEET METAL COPING
TREATED WOOD BLOCKINGAS NEEDED TO ACCOMODATENEW INSULATION HEIGHT
EXISTING EIFS WALL ASSEMBLY
EXISTING PRECAST HOLLOWCORE PLANK ROOF SLAB
MEMBRANE ROOF SYSTEM
PREFINISHED GAVANIZEDSHEET METAL FASCIA
TAPERED INSULATION
ADD-1ADD-1
GUTTER AND DOWNSPOUT
TREATED WOOD BLOCKINGAS NEEDED TO ACCOMODATENEW INSULATION HEIGHT
EXISTING EIFS WALL ASSEMBLY
EXISTING 1/2" CDX PLYWOODSHEATHING SCREWED TO STEELJOISTS
ADD-1
EXISTING PRECAST HOLLOWCORE PLANK ROOF SLAB
SPM REINFORCEMENT STRIP
EXISTING METAL DECK
MEMBRANE ROOF SYSTEM
TREATED WOOD BLOCKINGAS NEEDED TO ACCOMODATENEW INSULATION HEIGHT
TAPERED INSULATION
ADD-1
ADD-1
EXISTING PRECAST CONC. PLANK
EXISTING EIFS WALL ASSEMBLY
ASPHALT SHINGLES ON 30 LB FELT
EXISTING 5/8" CDX PLYWOOD SHEATHING
PREFINISHED ALUM. FASCIA, GUTTER &SOFFIT PANEL BY ROOFING CONTRACTOR
EXISTING ICE BARRIER MEMBRANE TOREMAIN; COVER W ADDITIONAL LAYEROF ICE BARRIER MEMBRANE
A4.4
25
EXISTING FASCIA NAILER
EXISTING 5/8"PLYWOOD DECKING
ICE & WATER SHIELD
PREFINISHED SHEETMETALFASCIA WRAPPED UNDER ANDBEHIND SOFFIT.
ASPHALT SHINGLES
EAVE FLASHING
UNDERLAYMENT
EXISTING METAL DECK
EXISTING CMU WALL ASSEMBLY
SPM REINFORCEMENT STRIP
PREFINISHED STEEL METALCOUNTERFLASHING AND TERMINATION BAR
8" M
IN
NEW EIFS
MEMBRANE ROOF SYSTEM
WEEP SCREED
BACK ROD AND SEALANT WITHWEEP HOLES
INSULATED STANDING SEAMROOFING ASSEMBLY
EAVE TRIM
EXISTING METAL DECK
DIRECT APPLIED FINISHSYSTEM
EXISTING CMU WALLASSEMBLY
PREFINISHEDSHEETMETAL FASCIA
INSULATED STANDING SEAMROOFING ASSEMBLY
EXISTING METAL DECK
STUCCO BEYOND
METAL COPING BEYOND
55
A4.4
GUTTER ANDDOWNSPOUT
EXISTING METAL DECKAND BAR JOISTS
EXISTING STUCCO/ CMUWALL ASSEMBLY
INSULATED STANDINGSEAM ROOF ASSEMBLY
ICE & WATER SHIELD
PREFINISHED GAVANIZEDSHEET METAL COPING
COUNTERFLASHING
TREATED WOOD BLOCKING
EXISTING METAL DECKAND BAR JOISTS
EXISTING FACE BRICK / CMUWALL ASSEMBLY
SPM REINFORCEMENT STRIP
PREFINISHED GAVANIZEDSHEET METAL COPING
MEMBRANE ROOF SYSTEM
TREATED WOOD BLOCKING
ROOF MEMBRANE LAPPED UP,OVER AND DOWN WOOD BLOCKING
EXISTING CMU
SPM REINFORCEMENT STRIP
MEMBRANE ROOF SYSTEM
EXISTING PRECAST HOLLOWCORE PLANK ROOF SLAB
EXISTING PARAPET
TREATED WOOD BLOCKING
PREFINISHED GAVANIZEDSHEET METAL COPING
NEW EIFS
CURB FASTENERSPER MANUF.
#12 SELF TAPPING GALVANIZEDSCREWS W/ NEOPRENE WASHER@ 6" O.C., MAX. VERIFY WITHMANUF.
FACTORY FURNISHED ROOF CURB
MECHANICAL EXHAUST/ VENTILATOR DUCT
WRAP MEMBRANE FLASHING OVERTOP OF CURB & FULLY ADHERE TOHORIZONTAL AND VERTICALSUBSTRATES TYP.
LEVEL
SHEATHING
4" MTL FRAMINGX 18 GA.
5/8" TYPE "X" GYP.BD.
ACCEPTABLE RESILIENT CAULKING
ROOFING MEMBRANE &FLASHING O/ SEPARATIONBOARD
EXISTING STRUCTURE
W/ MANUF.1 1/4" VARIFY
VERIFY W/ MANUF.
SPM REINFORCEMENT STRIP
NEW MEMBRANE ROOF SYSTEM
EXISTING PRECAST HOLLOWCORE PLANK ROOF SLAB
3" NAIL BASE INSULATION
TREATED WOOD BLOCKING
PREFINISHED GAVANIZEDSHEET METAL COPING
EXISTING MODIFIEDBITUMEN ORBALLASTED BUILT-UPROOF ASSEMBLY ASNOTED; (GRAVEL MUSTBE REMOVED AT TIE-INAREA)
8 " M
IN
REPLACE EXISTINGGRAVEL
SEAM TAPE ANDPRIMER/ADHESIVE
TIE-IN FLASHING ANDMEMBRANE SPLICE
ASPHALT & FELTS
FIBERGLASS BATT INSULATIONLAP SEALANT
TAPERED INSULATION
ADD-1
PREFINISHED GAVANIZEDSHEET METAL COPING
EXISTING EIFS
EXISTING 1/2" CDX PLYWOODSHEATHING SCREWED TO STEELJOISTS
MEMBRANE ROOF SYSTEM
TREATED WOOD BLOCKINGAS NEEDED TO ACCOMODATENEW INSULATION HEIGHT
ADD-1
24" x 24" SUMP RECEIVERROOF MEMBRANE
COVER BOARD
ROOF INSULATION
EXISTING PRECAST HOLLOWCORE PLANK EXTERIOR SOFFIT
DOWNSPOUT
EXISTING PRECAST HOLLOWCORE PLANK ROOF SLAB
EXISTING WALL ASSEMBLY
SPM REINFORCEMENT STRIP
PREFINISHED STEEL COUNTERFLASHINGAND TERMINATION BAR
8" M
IN
EXISTING EIFS; REMOVE UP TO 8" MIN. ABOVETAPERED ROOF INSULATION FOR NEW FLASHING.PATCH WHERE REQUIRED
MEMBRANE ROOF SYSTEM
WEEP SCREED
BACK ROD AND SEALANT WITHWEEP HOLES
EXISTING ROOF STRUCTURE
NEW ROOFING SYSTEM; REF PLAN
COVER OPENING IN ROOF DECKW/ 16 GA STAINLESS STEEL PLATEFASTENED INTO DECK
SPM REINFORCEMENTSTRIP
NEW MEMBRANEROOF SYSTEM
EXISTING PRECASTHOLLOW COREPLANK ROOF SLAB
3" NAIL BASEINSULATION
DUCTWORK,REFERENCEMECHANICAL; FIELDVERIFY DIMENSIONS
PREFINISHED SHEETMETAL CAP
FIBERGLASS BATTINSULATION
TREATED WOODBLOCKING
ELASTOMERICSEALANT
8" M
IN
ROOF MEMBRANELAPPED UP, OVERAND DOWN WOODBLOCKING
SLOPED 3/4"PLYWOOD TOP
4"M
IN
1'-0
"M
IN
1'-0"
MIN
1'-0"MIN
4" MIN
SHEET METAL CAP
UTILITY FEED; REF MECHANICAL
ROOFING MEMBRANE W/TERMINATION BAR AND SEALANT
PERIMETER CANTS
LINE OF SHEET METAL, EXTENDUNDER ROOF MEMBRANE
CONT SEALANT AROUND PIPEPENETRATION
EXISTING METAL DECK
LAP ROOF MEMBRANEOVER HSS MIN 8"
TERMINATION BAR
HSS POST; REF EXPSTRUCTURAL DRAWINGS
Arc
hite
ctu
re E
ngin
eering
P
lan
nin
g In
teriors
©
, D
LR
Gro
up
in
c., a
n Illi
no
is c
orp
ora
tio
n,
AL
L R
IGH
TS
RE
SE
RV
ED
LEGEND NOTES ARE COMMON TO ALLSOME NOTES MAY NOT APPLY TO THIS SHEET
BE
NJA
MIN
TA
LP
OS
Rev
isio
ns
6/2
9/2
018 3
:29:5
0 P
M
C:\R
evit\2
2-1
7132-0
0 D
epke_A
R_2016_jw
oznia
k65Q
8M
.rvt
22-1
7132-0
0
06/1
8/2
018
DE
PK
E J
UV
EN
ILE
JU
ST
ICE
CO
MP
LE
XR
OO
F R
EP
LA
CE
ME
NT
ISS
UE
D F
OR
BID
RO
OF
DE
TA
ILS
A4.4
24647 N
ort
h M
ilwaukee A
venue
Vern
on H
ills, Illin
ois
60061
20
18
SCALE: 1 1/2" = 1'-0"A4.4
24 EXISTING SKYDOME DETAIL
SCALE: 1 1/2" = 1'-0"A4.4
11 TYPICAL PIPE PENETRATION DETAILSSCALE: 1 1/2" = 1'-0"A4.4
15 TYP. MECHANICAL CURB DETAILSCALE: 1 1/2" = 1'-0"A4.4
13 TYP. VENT STACK DETAIL
SCALE: 1 1/2" = 1'-0"A4.4
43 SCUPPER DETAILSCALE: 1 1/2" = 1'-0"A4.4
42 METAL COPING DETAIL
SCALE: 1 1/2" = 1'-0"A4.4
53 METAL COPING DETAILSCALE: 1 1/2" = 1'-0"A4.4
51 METAL COPING DETAILSCALE: 1 1/2" = 1'-0"A4.4
54 METAL COPING DETAIL
SCALE: 1 1/2" = 1'-0"A4.4
26 ASPHALT SHINGLESSCALE: 3" = 1'-0"A4.4
25 EAVE DETAIL
SCALE: 1 1/2" = 1'-0"A4.4
45 METAL ROOFING DETAILSCALE: 1 1/2" = 1'-0"A4.4
44 METAL ROOFING DETAIL
SCALE: 1 1/2" = 1'-0"A4.4
55 METAL COPING DETAILSCALE: 1 1/2" = 1'-0"A4.4
56 METAL COPING DETAIL
SCALE: 1 1/2" = 1'-0"A4.4
32 METAL COPING DETAILSCALE: 1 1/2" = 1'-0"A4.4
31 EXHAUST FAN
SCALE: 1 1/2" = 1'-0"A4.4
41 ROOF CURB DETAIL
AD
D-1
06.2
9.18
AD
DE
ND
UM
#1
SCALE: 1 1/2" = 1'-0"A4.4
52 METAL COPING DETAIL
NO SCALEA4.4
14 ROOF DRAIN DETAIL
SCALE: 1 1/2" = 1'-0"A4.4
33 METAL ROOFING DETAIL
SCALE: 1 1/2" = 1'-0"A4.4
16 EXIST. PIPE PENETRATION INFILL DETAIL
SCALE: 1 1/2" = 1'-0"A4.4
46 DUCT ENCLOSURE
SCALE: 1 1/2" = 1'-0"A4.4
23 TYP. ROOFTOP UTILITY PORTAL DETAILSCALE: 1 1/2" = 1'-0"A4.4
22 HSS POST FLASHING DETAIL
ADD-1
AREA NOT IN ROOFING SCOPE
AREA NOT IN ROOFING SCOPE
NO MEP DEMO/NE WORK IN THIS AREA REQUIREDFOR ROOFING REPLACEMENT
AREA NOT IN ROOFING SCOPE
AREA NOT IN ROOFING SCOPE
AREA NOT IN ROOFING SCOPE
AREA NOT IN ROOFING SCOPE
AREA NOT IN ROOFING SCOPE
AREA NOT IN ROOFING SCOPE
NO MEP DEMO/NE WORK IN THIS AREA REQUIREDFOR ROOFING REPLACEMENT
NO MEP DEMO/NE WORK IN THIS AREA REQUIREDFOR ROOFING REPLACEMENT
DEMO EXISTINGGAS PIPING UPTO TEE.
EXISTING GAS PIPINGDOWN TO SERVICEENTRANCE TO REMAIN.
DEMO GAS PIPING UP TOELBOW IN THIS AREA.PIPING EXTENDING TOOTHER SECTION OFROOF BEYOND, IS TOREMAIN.
GAS PIPING DEMO INTHIS AREA IS ANALTERNATEASSOCIATED WITHROOF AREA 8.REFER TO NEWWORK PLAN FORNEW PIPING.
GAS PIPING DOWN TODRYERS. DEMO GASPIPING TO CEILING OFUNDERSIDE OF ROOF.
GAS PIPING TO WRS IS EXISTINGTO REMAIN. PROVIDEFLANGE/ISOLATION VALVE.
BID ALTERNATE
BID ALTERNATE
BID
ALTE
RNAT
E
D.8-1
D.8-1D.8-1
D.8-1
D.8-2
D.8-2
D.8-3
1 3
1 3
1 3
1 3
1
1
1
1
3
3
3
3
3
3
3
4
4
4
3
4
5 6
2 2 2
2
2
2
2
7
7
7
7
7
7
7
7
7
7
8
NOROOF PLAN KEYED NOTES1. EXISTING EXHAUST FAN CURB TO BE DEMOLISHED IN ITS ENTIRETY.
EXISTING ELECTRICAL FEEDER, CONDUIT, DISCONNECT, LOW VOLTAGEWIRING & CONDUIT, ETC, SHALL BE DEMOLISHED AS REQUIRED FORNEW ROOF INSTALLATION. CONTRACTOR SHALL PROVIDE TEMPORARYPROTECTION OF OPENING DURING CONSTRUCTION. REFER TO NEWWORK PLAN AND DETAIL FOR NEW CURB REQUIREMENTS.
2. CONTRACTOR SHALL DEMOLISH EXISTING GAS PIPING, ANCHORS,SUPPORTS, CONNECTIONS TO RTUS, ETC PER THE EXTENTS SHOWN ONTHIS SHEET. NEW GAS PIPING SHALL BE INSTALLED AT AN ELEVATIONAS REQUIRED FOR HEIGHT OF NEW ROOF. REFER TO NEW WORK PLANAND DETAILS FOR ADDITIONAL INFORMATION.
3. CONTRACTOR SHALL DEMO ALL EXISTING PLUMBING VENT OPENINGSIN ALL AREAS OF NEW ROOF. CONTRACTOR SHALL INSTALL NEWPLUMBING VENTS AS REQUIRED FOR HEIGHT OF NEW ROOF. REFER TONEW WORK PLAN AND DETAILS FOR ADDITIONAL INFORMATION.
4. CONTRACTOR SHALL DEMO EXISTING COMBUSTION AIR AND VENTOPENINGS. REFER TO ARCHITECTURAL DETAILS FOR ROOF INFILL.
5. DEMO EXTERIOR SUPPLY DUCT OFF OF EXISTING RTU THATPENETRATES THROUGH GYMNASIUM WALL. PREP EXISTING RTU FORNEW DUCT CONNECTIONS PER NEW WORK DETAIL. REFER TOARCHITECTURAL NEW WORK PLAN FOR WALL INFILL.
6. DEMO ABANDONED DUCT ON EXTERIOR OF GYMNASIUM WALL. REFERTO ARCHITECTURAL NEW WORK PLAN FOR WALL INFILL.
7. DEMOLISH EXISTING ROOF CURB, GAS CONNECTION, ELECTRICALCONDUIT & CABLING, & CONTROLS CABLE AND CONDUIT INPREPARATION FOR NEW ROOF CURB AND CONNECTIONS. FOR RTUSTHAT HAVE HORIZTONAL DUCT TAKEOFFS LOCATED ON ROOF,CONTRACTOR SHALL MODIFY DUCT & DEMOLISH DUCT PENETRATIONCURBS AS REQUIRED FOR NEW ROOF HEIGHT AND CONNECTIONDETAILS. REFER TO NEW WORK PLAN AND DETAILS FOR ADDITIONALINFORMATION.
8. DEMO EXISTING ROOF DRAIN & DRAIN BODY. REFER TOARCHITECTURAL DRAWINGS FOR ROOF INFILL DETAIL.
NOROOF PLAN KEYED NOTES - BID ALTERNATE• DEMO GAS PIPING IN THIS AREA AS INDICATED. REFER TO NEW WORK FOR ADDITIONAL INFO.• DEMOLISH EXISTING ROOF CURB, GAS CONNECTION, ELECTRICAL CONDUIT & CABLING, &
CONTROLS CABLE AND CONDUIT IN PREPARATION FOR NEW ROOF CURB AND CONNECTIONS.• EXISTING EXHAUST FAN CURB TO BE DEMOLISHED IN ITS ENTIRETY. EXISTING ELECTRICAL
FEEDER, CONDUIT, DISCONNECT, LOW VOLTAGE WIRING & CONDUIT, ETC, SHALL BEDEMOLISHED AS REQUIRED FOR NEW ROOF INSTALLATION. CONTRACTOR SHALL PROVIDETEMPORARY PROTECTION OF OPENING DURING CONSTRUCTION. REFER TO NEW WORK PLANAND DETAIL FOR NEW CURB REQUIREMENTS.
D.8-1D.8-2
D.8-3
Arch
itect
ure
Eng
inee
ring
Pla
nnin
g In
terio
rs
©
, DLR
Gro
up in
c., a
n Ill
inoi
s co
rpor
atio
n, A
LL R
IGH
TS R
ESER
VED
LEGEND NOTESLEGEND NOTES ARE COMMON TO ALLSOME NOTES MAY NOT APPLY TO THIS SHEET
BEN
JAM
IN T
ALPO
S
Revis
i ons
6/18
/201
8 12
:23:
02 P
M
C:\R
evit\
22-1
7132
-00
Dep
ke_M
EP_2
016_
jwoz
niak
65Q
8M.rv
t
22-1
6106
-00
JUN
E 18
, 201
8D
EPKE
JU
VEN
ILE
JUST
ICE
CEN
TER
RO
OF
REP
LAC
EMEN
T
ISSU
ED F
ORCO
NSTR
UCTI
ONM
EP D
EMO
PLA
N -
RO
OF
RP-D-1.0
2464
7 N
orth
Milw
auke
e Av
enue
Vern
on H
ills, I
llinoi
s 60
061
2016
1. THIS SHEET CONTAINS SCOPE OF WORK FOR MULTIPLE TRADES,WHICH WILL REQUIRE CLOSE COORDINATION. IT IS THERESPONSIBILITY OF EACH TRADE TO REVIEW THIS SHEET TOENSURE A FULL UNDERSTANDING OF THE SCOPE ITEMS, AS WELLAS THE COORDINATION THAT WILL BE REQUIRED TOSUCCESSFULLY COMPLETE THIS PROJECT.
2. NOT ALL EXISTING ROOF DRAINS, PLUMBING VENTS, AIR INTAKES& EXHAUSTS, ETC. ARE INDICATED ON THIS PLAN. IT IS THERESPONSIBILITY OF THE CONTRACTOR TO SURVEY THE SITE &VERIFY EXISTING CONDITIONS. KEYED NOTES ON THIS SHEET AREINTENDED TO APPLY TO ALL EXISTING ROOF ITEMS REQUIRED TOBE MODIFIED AS PART OF THIS ROOFING PROJECT WITHIN THEAREA OF NEW ROOFING WORK.
ISS
UE
D F
OR
BID
AD
D-1
06/2
9/18
AREA NOT IN ROOFING SCOPE
AREA NOT IN ROOFING SCOPE
NO MEP DEMO/NE WORK IN THIS AREA REQUIRED
FOR ROOFING REPLACEMENT
AREA NOT IN ROOFING SCOPE
AREA NOT IN ROOFING SCOPE
AREA NOT IN ROOFING SCOPE
AREA NOT IN ROOFING SCOPE
AREA NOT IN ROOFING SCOPE
AREA NOT IN ROOFING SCOPE
NO MEP DEMO/NE WORK IN THIS AREA REQUIRED
FOR ROOFING REPLACEMENT
NO MEP DEMO/NE WORK IN THIS AREA REQUIRED
FOR ROOFING REPLACEMENT
EXISTING GAS PIPING DOWN TO SERVICE
ENTRANCE TO REMAIN. NEW GAS PIPING SHALL
BE COORDINATED WITH NEW ROOF HEIGHT.
CONNECT NEW GAS
PIPING TO EXISTING GAS
PIPE TO DETENTION
AREA. PROVIDE
ISOLATION VALVE AT
CONNECTION.
NEW GAS PIPING TO CONNECT TO
EXISTING PIPING. PROVIDE OFFSET TO
ACCOUNT FOR ELEVATION OF NEW
ROOF WITH AN ISOLATION VALVE.
WORK IN THIS AREA IS COVERED
UNDER A BIDDING ALTERNATE. REFER
TO ARCHITECTURAL PLANS FOR
ADDITIONAL INFO.
GAS PIPING DOWN TO
DRYERS. NEW GAS
PIPING THRU ROOF TO
CONNECT TO EXISTING
GAS PIPING.
CONNECT NEW GAS PIPING TO
EXISTING GAS CONNECTION.
PROVIDE ISOLATION VALVE.
BID ALTERNATE
BID
AL
TE
RN
AT
E
BID ALTERNATE
3/4"
ø
4"ø
4"ø
4"ø
4"ø
4"ø
4"ø
4"ø
4"ø4"ø
4"ø
4"ø
NEW RTU - MOUNT ON
STEEL STRUCTURE.
REFER TO EXP
DRAWINGS.
NEW RTUs TO BE
MOUNTED ON STEEL
STRUCTURE. REFER
TO EXP DRAWINGS.
12
1 2
1 2
1
2 1
2
2
2
2
2
2
2
2
1
1
1
3 4
3 4
4
3 4
4
5
5
5
10
10
4
6
7
7
7
7
7
7
7
77
7
7A3
A3
8
8
3/4"
ø
3/4"
ø
3/4"
ø
3/4"
ø
RTU -
EXISTING
TO REMAIN
9 9
ADD-1
CONFIRM 15'
CLEARANCE FROM
PLUMBING VENT TO
OUTSIDE AIR
INTAKE OF RTU.
3
10
ADD-1
PROVIDE NEW ISOLATION VALVE IN
ORDER TO KEEP OTHER BUILDING AREAS
IN OPERATION DURING CONSTRUCTION.
PROVIDE NEW ISOLATION VALVE IN
ORDER TO KEEP OTHER BUILDING AREAS
IN OPERATION DURING CONSTRUCTION.
ADD-1
ADD-1
ADD-1
NOROOF PLAN KEYED NOTES
1. PROVIDE NEW EXHAUST FAN CURB, ELECTRICAL CONDUIT & WIRE, CONTROL CABLE &
CONDUIT, ETC. AS REQUIRED FOR NEW ROOF HEIGHT. REFER TO DETAIL 31 ON A4.4.
2. PROVIDE NEW PLUMBING VENT CONNECTION AS REQUIRED FOR NEW ROOF HEIGHT. REFER
TO DETAIL 13 ON A4.4 FOR ADDITIONAL INFORMATION.
3. PROVIDE NEW DUCT ENCLOSURE & CURB FOR HORIZONTAL DUCT CONNECTION THROUGH
ROOF. CONTRACTOR TO MATCH EXISTING DUCT SIZE. REFER TO DETAIL 46 ON A4.4 &
MECHANICAL DETAILS FOR DUCT INSULATION REQUIREMENTS.
4. FURNISH AND INSTALL NEW RTU CURB FOR EXISTING/NEW RTU. PROVIDE NEW GAS, DUCT,
ELECTRICAL & CONTROLS CONNECTIONS AS REQUIRED FOR NEW ROOF HEIGHT.
CONTRACTOR IS RESPONSIBLE FOR LIFTING EXISTING UNITS & COORDINATING WITH OWNER
REGARDING DOWNTIME. REFER TO DETAIL 15 ON A4.4.
5. MODIFY EXISTING VENT AND PROVIDE NEW ROOFING PER ARCHITECTURAL DETAILS.
6. NEW HORIZONTAL DUCTWORK CONNECTION THROUGH GYMNASIUM WALL. HEIGHT OF
DUCTWORK SHALL BE COORDINATED WITH NEW ROOF ELEVATION, AND SHALL CONNECT TO
EXISTING DUCTWORK INSIDE GYMNASIUM.
7. PROVIDE NEW GAS PIPING. COORDINATE INSTALLED ELEVATION WITH NEW ROOF HEIGHTS.
GAS PIPING SHALL BE SCHD. 40, THREADED PIPE. PROVIDE 2 COATS WHITE PAINT ALL NEW
GAS PIPING. REFER TO DETAILS FOR ADDITIONAL INFORMATION.
8. DUCT DROPS THROUGH ROOF SHALL BE REPLACED WITH NEW DUCT PENETRATION CURB.
NEW CURBS SHALL BE COORDINATED WITH NEW ROOF HEIGHT. REFER TO DETAILS FOR
ADDITIONAL INFORMATION.
9. REPLACE EXISTING/PROVIDE NEW ROOF DRAIN IN THIS LOCATION. REFER TO
ARCHITECTURAL DRAWINGS FOR ADDITIONAL INFORMATION.
10. MOUNT NEW/EXISTING UNIT ON STEEL STRUCTURE. SECURE PER MANUFACTURER'S
RECOMMENDATIONS. PROVIDE NEW GAS, DUCT, ELECTRICAL & CONTROLS CONNECTIONS
AS REQUIRED FOR NEW ROOF HEIGHT. CONTRACTOR IS RESPONSIBLE FOR LIFTING
EXISTING UNITS & COORDINATING WITH OWNER REGARDING DOWNTIME.
NOROOF PLAN KEYED NOTES - BID ALTERNATE
• DUCT DROPS THROUGH ROOF SHALL BE REPLACED WITH NEW DUCT PENETRATION CURB.
NEW CURBS SHALL BE COORDINATED WITH NEW ROOF HEIGHT. REFER TO DETAILS FOR
ADDITIONAL INFORMATION.
• FURNISH AND INSTALL NEW RTU CURB FOR EXISTING RTU. PROVIDE NEW GAS, DUCT,
ELECTRICAL & CONTROLS CONNECTIONS AS REQUIRED FOR NEW ROOF HEIGHT.
CONTRACTOR IS RESPONSIBLE FOR LIFTING EXISTING UNITS & COORDINATING WITH OWNER
REGARDING DOWNTIME. REFER TO DETAIL 15 ON A4.4.
• PROVIDE NEW GAS PIPING. COORDINATE INSTALLED ELEVATION WITH NEW ROOF HEIGHTS.
GAS PIPING SHALL BE SCHD. 40, THREADED PIPE. PROVIDE 2 COATS WHITE PAINT ALL NEW
GAS PIPING. REFER TO DETAILS FOR ADDITIONAL INFORMATION.
A1
A2
A3
MINIMUM 1" PER FOOT SLOPE
2" THICK RIGID BOARD POLYISOCYANURATEINSULATION ON EXTERIOR OF SUPPLY ANDRETURN W/ "VENTURE CLAD" PLUS 1579CWJACKETING SYSTEM OVER ENTIRE SURFACE.
GALVANIZED DUCTWORK
NOTES:1. ATTACH INSULATION TO DUCTWORK WITH SUITABLE ADHESIVE.2. ATTACH EXTERIOR JACKET TO INSULATION WITH SUITABLE ADHESIVE.3. TAPE LONGITUDINAL JOINTS CONTINUOUSLY.4. TAPE PERPINDICULAR JOINTS AT SEAMS.5. PROVIDE SMACNA STANDARD DUCT SUPPORTS ON ROOF / VERTICAL WALL /
OR GROUND SLAB (AREA WELL)
END VIEW SIDE VIEW
GAS PIPE
RIGID POLYCARBONATE RESIN PIPESUPPORT STANDS. STACK ASREQUIRED FOR DESIRED HEIGHT.SPACE SUPPORTS PERMANUFACTURER RECOMMENDATION.
Arc
hite
ctu
re E
ngin
eering
P
lan
nin
g In
teriors
©
, D
LR
Gro
up
in
c., a
n Illi
no
is c
orp
ora
tio
n,
AL
L R
IGH
TS
RE
SE
RV
ED
LEGEND NOTESLEGEND NOTES ARE COMMON TO ALLSOME NOTES MAY NOT APPLY TO THIS SHEET
BE
NJA
MIN
TA
LP
OS
Rev
isio
ns
6/2
9/2
018 1
1:2
1:0
5 A
M
C:\R
evit\2
2-1
7132-0
0 D
epke_M
EP
_2016_pw
oods.r
vt
22-1
6106-0
0
JU
NE
29, 2018
DE
PK
E J
UV
EN
ILE
JU
ST
ICE
CE
NT
ER
- IN
TE
RIM
PR
OJE
CT
AD
DE
ND
UM
-1M
EP
NE
W W
OR
K P
LA
N -
RO
OF
RP-1.0
24647 N
ort
h M
ilwaukee A
venue
Vern
on H
ills, Illin
ois
60061
20
18
AD
D-1
06/2
9/18SCALE: 1/16" = 1'-0"RP-1.0
1 MEP NEW WORK PLAN - ROOF LEVEL
A1
A1
A1
A1A1A1
A2
A2
NO SCALERP-1.0
3 OUTDOOR DUCTWORK INSULATION
NO SCALERP-1.0
2 ROOF GAS PIPING SUPPORT - 6"Ø OR LESS
1. THIS SHEET CONTAINS SCOPE OF WORK FOR MULTIPLE TRADES,
WHICH WILL REQUIRE CLOSE COORDINATION. IT IS THE
RESPONSIBILITY OF EACH TRADE TO REVIEW THIS SHEET TO
ENSURE A FULL UNDERSTANDING OF THE SCOPE ITEMS, AS WELL
AS THE COORDINATION THAT WILL BE REQUIRED TO
SUCCESSFULLY COMPLETE THIS PROJECT.
2. NOT ALL EXISTING ROOF DRAINS, PLUMBING VENTS, AIR INTAKES
& EXHAUSTS, ETC. ARE INDICATED ON THIS PLAN. IT IS THE
RESPONSIBILITY OF THE CONTRACTOR TO SURVEY THE SITE &
VERIFY EXISTING CONDITIONS. KEYED NOTES ON THIS SHEET ARE
INTENDED TO APPLY TO ALL EXISTING ROOF ITEMS REQUIRED TO
BE MODIFIED AS PART OF THIS ROOFING PROJECT WITHIN THE
AREA OF NEW ROOFING WORK.
ISS
UE
D F
OR
BID
JUN
E 18
, 201