APCONS Infrastructure Pvt. Ltd.D-502, Status-I, Nr. SAL Hospital, Opp: T.V. Tower, Thaltej, Ahmedabad-54Gujarat, India.Tele-Fax: (+) 91-79-2685 5563Email: [email protected]
APCONS Infrastructure Pvt. Ltd has been founded in 2007 by construction industry veterans with over 90 years of
collective experience in various infrastructure activities. The company offers its services in segments like roads,
building, Water Supply & Pipeline, EPC & turnkey projects. Apcons take proud for excellent integration of technology
with efficient project management skills. The company is dedicated to provide exclusive services to prominent clients.
APCONS Infrastructure Private Limited is Ahmedabad based APOLLO GROUP COMPANY leading and fast
growing multi-disciplinary construction company having strong presence in India with large number of associates all
over India. Earlier most of the construction & civil engineering projects were carried out under our group concern
namely Gujarat Apollo Equipments Limited and Apollo Construction Projects Pvt. Ltd which was established in the year
1980’s. Presently APCONS has full-time and well qualified professionals to offer multidisciplinary infrastructure
construction, engineering, planning and management services covering wide range of areas for public and private
sector clients. With group company’s offices located in major cities throughout India, APCONS is able to provide
customized, responsive client services in every region of the country. APCONS today offers years of comprehensive
project experience in construction industry.
About Us
VISION
To be a major professional Infrastructure services provider offering high quality work and a state of art project
management adding values to our customers' business.
MISSION
To deliver high quality construction services to our clients by providing time bound, qualitative, cost effective,
innovative and technically best solutions through our qualified, motivated and committed workforce and
resources.
STRENGTHS
Young and well experienced management staff from different areas of construction works
Highly qualified technical manpower in all the sectors
Capacity to mobilize large number of competent workforce anywhere in India
Commitment to work with Quality & Time as Priority
Professional approach to the work with high technical standards and comparatively low cost.
Available fleet of state of art plant & equipments
Vision, Mission & Strengths
Areas of Interests
Roads and Highways
Water Well Drilling & Services
Water and Waste Water Systems
Infrastructure for SEZ & Industrial Parks
Industrial and Building Engineering
Utility Services like Water, Gas & Electricity
Operation & Maintenance of Infrastructure & Utilities.
Highway Safety Systems
Concrete Structures
Bulk Storage & Material Handling (Grain Storage Silos)
Mining & Crushing
Areas of Interests
Local Memberships
The Gujarat Institute of Civil Engineers & Architects (GICEA)
Indian Road Congress (IRC)
Indian Institute of Engineers
Ahmedabad Management Associations (AMA)
International Memberships
American Society of Civil Engineers (ASCE), USA
Membership & Registration
Name of Company Activity
Apollo Industries Ltd. Construction Equipments
APCONS Infrastructure Pvt. Ltd. Infrastructure & Engineering
Apollo Construction Projects Pvt. Ltd. Construction
Gayatri Projects Bulk Storage Silo & Material
Handling
Apollo Construction Equipments Pvt. Ltd. Equipment Manufacturing
Apollo Earthmovers Ltd. Equipment Manufacturing
Apollo Industrial Products Ltd. Equipment Manufacturing
Apollo Industries & Projects Ltd. Investment & Finance
Group Companies
Group Companies
Name of Company Activity
Road Tech Equipments Pvt. Ltd. Precession Component Mfg.
Circuit Systems India Ltd. Electronics
APCONS Infotech Pvt. Ltd. IT Solutions & BPO
Apollo Infratech Pvt. Ltd. Concrete Equipments Mfg.
Fly Fortune World Travels Ltd. Tourism & Hospitality
Vibrant Planet Tradelink Pvt. Ltd. Export & Import
Johnson Screens India Ltd. Environment & Water Solutions
Supreme Creative Pvt. Ltd. Water well Drilling & Water Resources
Managements
Construction of Nagpur Bypass (Km: 20.000 to Km: 21.600) & Kamptee-Kanhan Bypass (Km: 8.250 to 21.632) on NH-7
Client Oriental Structural Engineers Pvt. Ltd.
Project Cost INR 675.35 Millions
Scheme National Highway Authority of India
Status Completed
Service Provided • Route Survey & Base Map Preparation
• Requirement Planning
• Feasibility & High Level Design
• Fast Progress
• Works as per MORTH
• O&M Guidelines
Road & Transportation – (1) APCONS
Strengthening & widening of existing 2 lane road to 4 lane road dual carriageway including Service road. From Km: 30.000 to 50.000) NH-6
Client Atlanta Limited
Project Cost INR 368.93 Millions
Scheme National Highway Authority of India
Status Completed
Service Provided • Route Survey & Base Map Preparation
• Works as per MORTH
• Requirement Planning
• Fast Progress
• O&M Guidelines
• Feasibility & High Level Design
•Traffic Management
• Safety & Environment
Road & Transportation – (2) APCONS
Construction of Balance work of 8-Lanning of KM 16,500 to KM 29,300 of NH-1 in the state of Delhi
Client BRITE-APOLLO
Project Cost INR 657.32 Millions
Scheme National Highway Authority of India
Status Completed
Service Provided • Route Survey & Base Map Preparation
• Requirement Planning
• Feasibility & High Level Design
• Fast Progress
• Works as per MORTH
• O&M Guidelines
• Traffic Management
• Safety & Environment
Road & Transportation – (3) APCONS
Resurfacing of roads within limits of Ahmedabad Municipal Corporation with all plant & machinery for 3 years
Client Ahmedabad Municipal Corporation
Project Cost INR 96.00 Millions
Scheme AMC
Status Completed
Service Provided • Route Survey & Base Map Preparation
• Requirement Planning
•Fast Progress
• Works as per Specification
• O&M Guidelines
• Traffic Management
• Safety & Environment
Road & Transportation – (4) APCONS
Construction of 2 Lane Roads along the Railway Track for Mundra Port to Power Plant
Client Mundra Port & Special Economic Zone Ltd.
Project Cost INR 118.14 Millions
Scheme SEZ
Status Completed
Service Provided • Project Monitoring
• Progress Review
• Route Survey & Base Map Preparation
• Requirement Planning
• Fast Progress
• Works as per Specification
• O&M Guidelines
• Safety & Environment
Road & Transportation – (5) APCONS
Construction of 2 Lane Roads along the railway corridor for Mundra Port & SEZ –Phase 1B
Client Mundra Port & Special Economic Zone Ltd.
Project Cost INR 202.03 Millions
Scheme SEZ
Status Completed
Service Provided • Project Monitoring
• Route Survey & Base Map Preparation
• Requirement Planning
• Works as per Specification
• O&M Guidelines
• Fast Progress
• Safety & Environment
• Progress Review
Road & Transportation – (6) APCONS
Improvement & Carpeting of Roads from Panoli Railway Crossing to Kharod Village on NH-8 for ONGC
Client Oil & Natural Gas Limited, Ankleshwar
Project Cost INR 12.43 Millions
Scheme ONGC
Status Completed
Service Provided • Project Monitoring
• Progress Review
• Route Survey & Base Map Preparation
• Requirement Planning
• Fast Progress
• Works as per Specification
• O&M Guidelines
• Safety & Environment
Road & Transportation – (7) APCONS
Improvement & Carpeting of Roads from Ankleshwar-Umarwada-Alunj-Panoli-Telva Junction to Railway Crossing near Sanjali for ONGC
Client Oil & Natural Gas Limited, Ankleshwar
Project Cost INR 58.77 Millions
Scheme ONGC
Status Completed
Service Provided • Project Monitoring
• Route Survey & Base Map Preparation
• Progress Review
• Requirement Planning
• Works as per Specification
• Fast Progress
•O&M Guidelines
• Safety & Environment
Road & Transportation – (8) APCONS
Construction & up gradation of rural roads by providing and laying WMM, BM & BC using Hot mix Plant & Paver Finisher
Client Public Work Division, MANDLESHWAR, MP
Project Cost INR 60.49 Millions
Scheme PMGSY
Status Completed
Service Provided • Route Survey & Base Map Preparation
• Project Monitoring
• Progress Review
• Requirement Planning
• Fast Progress
• Works as per Specification
• O&M Guidelines
• Safety & Environment
Road & Transportation – (9) APCONS
Construction & up gradation of rural roads by providing and laying WMM, BM & BC using Hot mix Plant & Paver Finisher
Client Public Work Division, RAJGADH, MP
Project Cost INR 55.56 Millions
Scheme PMGSY
Status Completed
Service Provided • Project Monitoring
• Route Survey & Base Map Preparation
• Works as per Specification
• Progress Review
• Requirement Planning
• Fast Progress
• Safety & Environment
• O&M Guidelines
Road & Transportation – (10) APCONS
Resurfacing of roads in Ahmedabad Municipal Corporation Limit by providing BM, DBM & AC by using Hot Mix Plant & Paver Finisher
Client Ahmedabad Municipal Corporation
Project Cost INR 23.60 Millions
Scheme AMC
Status Completed
Service Provided • Requirement Planning
• Project Monitoring
• Works as per Specification
• Route Survey & Base Map Preparation
• Progress Review
• Fast Progress
• Safety & Environment
• O&M Guidelines
Road & Transportation – (11) APCONS
Bituminous pavements for 4 lane and strengthening of NH-1 from Karnal to Ambala (km. 132.675 to km. 212.161)
Client Unitech - LG Construction (Korea) (JV)
Project Cost INR 152.60 Millions
Scheme PWD, Haryana
Status Completed
Service Provided • Route Survey & Base Map Preparation
• Requirement Planning
• Progress Review
• Works as per Specification
• Project Monitoring
• Fast Progress
• Safety & Environment
• O&M Guidelines
Road & Transportation – (12) APCONS
Operation & maintenance of Hot Mix Plant and resurfacing of Roads for Howrah City
Client Howrah Municipal Corporation
Project Cost INR 15.70 Millions
Scheme HMS, West Bengal
Status Completed
Service Provided • Project Monitoring
• Route Survey & Base Map Preparation
• Works as per Specification
• Progress Review
• Requirement Planning
• Fast Progress
• Safety & Environment
• O&M Guidelines
Road & Transportation – (13) APCONS
Drilling of 350x250 mm diameter and 300 meter 22 nos deep tube wells by direct rotary drilling rigs in Ahmedabad Municipal Corporation Limit
Client Ahmedabad Municipal Corporation
Contractor ---
Project Cost INR 33.75 Millions
Scheme AMC, Ahmedabad
Service Provided • Project Monitoring• Logging Report Record• Making Pipe Assembly• Verticality Test Report• Progress Review• Data Record• Approval & Implementation of quality system• Quality Audits• Material Inspection (Mechanical, Electrical & Instrumentation)
Water and Waste Water Systems – (1) APCONS
Drilling of 350x250 mm diameter and 300 meter 28 Nos deep tube wells by direct rotary drilling rigs with supply, delivery, testing & commissioning etc.
Client Gujarat Water Supply & Sewerage Board
Contractor ---
Project Cost INR 61.68 Millions
Scheme GWSSB, (Asian Development Bank)
Service Provided • Verticality Test Report
• Project Monitoring
• Logging Report Record
• Making Pipe Assembly
• Approval & Implementation of quality system
• Progress Review
• Data Record
• Quality Audits
• Finally Pump Test
Water and Waste Water Systems – (2) APCONS
Drilling of 250/200 mm diameter tube wells by DR drilling rigs in Kutch and Surndranagar districts under Gujarat Earthquake Reconstruction Project by Asian Development Bank Loan assistance
Client Gujarat Water Supply & Sewerage Board
Contractor ---
Project Cost INR 96.70 Millions
Scheme GWSSB, (Asian Development Bank)
Service Provided • Project Monitoring
•Verticality Test Report
• Logging Report Record
• Quality Audits
• Making Pipe Assembly
• Approval & Implementation of quality system
• Progress Review
• Data Record
• Finally Pump Test
Water and Waste Water Systems – (3) APCONS
Construction of Residential Appartment
Client Shri Rang Infrastructure Pvt. Ltd.
Contractor ----
Project Cost INR 612.60 Millions
Scheme Shyam Hills (EPC /Trunky Basis)
Status Completed
Service Provided • Project Monitoring
• Progress Review
• Document Control & Managements
• Construction Supervision
• Approval & Implementation of quality system
• Quality Audits
• Material Inspection (Mechanical,
Electrical & Instrumentation)
• Bill Certification
Building & Industries Work – (1) APCONS
Construction of multi storied commercial building with a three star hotel for APOLLO Enclave at Mehsana
Client Apollo
Contractor ----
Project Cost INR 34.92 Millions
Scheme Apollo Enclave, Mehsana
Status Completed
Service Provided • Project Monitoring
• Construction Supervision
• Document Control & Managements
• Approval & Implementation of quality system
• Progress Review
• Architectural Works
•Structural Design
• Quality Audits
Building & Industries Work – (2) APCONS
Reconstruction Higher secondary School Building at village Ranuj, Dist. Patan under Prime Minister’s Earth quack Relief Fund
Client Gujarat Industrial Development Corporation
Contractor ----
Project Cost INR 10.21 Millions
Scheme G.I.D.C., Gandhinagar
Status Completed
Service Provided • Approval & Implementation of quality system
• Document Control & Managements
• Project Monitoring
• Progress Review
• Construction Supervision
• Material Inspection (Mechanical,
Electrical & Instrumentation)
• Quality Audits
Building & Industries Work – (3) APCONS
Construction of School Building at Bhachau Dist. Kutch under Prime Minister’s Earth quack Relief Fund
Client Gujarat Industrial Development Corporation
Contractor ----
Project Cost INR 28.76 Millions
Scheme G.I.D.C., Gandhinagar
Status Completed
Service Provided • Project Monitoring
• Construction Supervision
• Document Control & Managements
• Approval & Implementation of quality system
• Progress Review
• Architectural Works
•Structural Design
• Quality Audits
Building & Industries Work – (4) APCONS
Supply, erection, testing, commissioning, operation & maintenance of magnetically coupled water meters at 1500 villages in Gujarat State.
Client Gujarat Water Supply & Sewerage Board
Contractor ---
Project Cost INR 63.11 Millions
Scheme GWSSB, Gandhinagar
Service Provided • Project Monitoring• Progress Review• Document Control & Managements• Data Record• Approval & Implementation of quality system• Quality Audits• Material Inspection (Mechanical, Electrical & Instrumentation)• Monthly Reading
Water and Waste Water Systems – (1) APCONS
Supply, installation, testing & commissioning of water supply distribution systems for Bodakdev Area of western AUDA
Client Ahmedabad Urban Development Authority
Contractor ---
Project Cost INR 12.63Millions
Scheme AUDA, Ahmedabad
Service Provided • Project Monitoring
• Progress Review
• Document Control & Managements
• Data Record
• Approval & Implementation of quality system
• Quality Audits
• Material Inspection (Mechanical,
Electrical & Instrumentation)
Water Supply Distribution– (1) APCONS
Providing At Site The Requisite Materials and Laying of 250 mm, 200 mm & 100 mm ND GRP Pipeline from main pump house to ONGC colony & office at Ankleshwar
Client Oil & Natural Gas Limited
Contractor ---
Project Cost INR 23.03Millions
Scheme ONGC, Ankleshwar
Service Provided • Document Control & Managements
• Progress Review
• Quality Audits
• Project Monitoring
• Data Record
• Approval & Implementation of quality system
• Material Inspection (Mechanical,
Electrical & Instrumentation)
Water Supply Distribution– (2) APCONS
Chanasma Pilot Project Covering (1) Sujanpur, (2) Bhatvasana (3) Lanva & (4) Pimpal regional water supply scheme.
Client Gujarat Water Supply & Sewerage Board
Contractor ---
Project Cost INR 102.82Millions
Scheme GWSSB, Ahmedabad
Service Provided • Project Monitoring
• Progress Review
• Document Control & Managements
• Data Record
• Approval & Implementation of quality system
• Quality Audits
• Material Inspection (Mechanical,
Electrical & Instrumentation)
Water Supply Distribution– (3) APCONS
APCONSOverseas ProjectsDrilling , Construction, Erection, Testing and
Commissioning of 24 nos.Tubewells in Heart Province, Afghanistan
Client Water & Power Consultancy Service s (I) Ltd.
Owner Ministry of External Affairs, Government of INDIA
Project Cost INR 16.49Millions
Scheme WAPCOS, New Delhi
Service Provided • Project Monitoring• Logging Report Record• Making Pipe Assembly• Verticality Test Report• Progress Review• Data Record• Pump Unit Erection & Testing• Quality Audits• Material Inspection (Mechanical, Electrical & Instrumentation)
Video-1
Video-2
GAYATRI PROJECT ENGINEERING
BULK STORAGE & BULK MATERIAL HANDLING
www.stomaha.com
SINCE 1987
• We offer the total bulk storage silo system, The safe deposit vault for Grain & seeds “ Stop Grain Losses”
• The world is too hungry to west it. Our company is Indigenous Silo manufacturing Company in INDIA Since 1987. we executed Turnkey Project INDIA and Abroad also.
• Our installations of storage silos are for our different clients for bulk storing of Paddy, Castor Seeds, Maize, Soyabeans, Sugar & other materials.
HOPPER BOTTOM GIC STORAGE SILO 5 TON TO 1000 TON
PRODUCT TYPE
FLAT BOTTOM GIC STORAGE SILO 50 TON TO 15000 TON
• Our service from planning to installation provide long term & superior storage solutions. We get to know our customers and requirements through personal relationships prior going to design.
• The Grain are living organs. They require fresh air to breath. The temperature & moisture are key factors for safe storage. The high temp 21° c to 43°c accelerates the life of destructive organism. At 50° c most of food grain get killed. The respiration of grain stops at 50° c. The grain viability and germination reduced to zero level. The grains are to be cooled before storage. Grain heat create problems due to condensation. Rate of respiration of heated grains will be high. Lower temp. greater retarding influence on respiration. If in stored wheat temp. is risen to 66° c damages are caused to both germination & gluten value. Hence not economical & viable. Temp. below 15°c retard insect reproduction & development. At 10°c for long time will result death of insects. Moisture content 10 to 12 % ( Wet Basis ) for storage preferable with Aeration for safe Storage.
TERATION SYSTEM
PRECAUTION FOR STORAGE• Clean the grain before storage Dry grain to safe moisture content recommended, cool
grain, fill grain when out side relative humidity may not be more than 65% storage silo is to be cleaned properly & disinfected before storage. Grain are to be cooled during storage & heat of respiration be removed through Aeration for longer & Safe storage. Temp. of grain is to be measured twice or thrice in day at all prefixed levels & location through temp. Monitor & Control system. During aeration, monitor temp at interval of 12 hrs. for uniformly in grain mass at prefixed levels & locations. No aeration when R.H more than 65 %. No aeration when ambient temp. higher than grain temp. Respiration rate to be lower hence moisture content should be optimum. Insecticide not to mix with grain. No good for human consumption. Consider the Dry material loss at 0.5 % i.e 5 kg/M.T during storage
Silo Loading :- Four truck standing on road near Dumping Hopper. The bags would be
dumped on grill of Hopper & bag get emptied manually. Also bulk wheat receiving from market is
to be encouraged to save bags cost & handling cost. From Dumping hopper to Intake Elevator to
cleaning to distribution chain conveyor to silos, the wheat will be loaded to fill full capacity.
Silo Unloading :- From the silos outlet the wheat will be discharged through discharge
chain conveyor to feeding elevator to loading Silo & then through Rotary feeder the wheat will be fed
in to dumper of 10 Tons cap. when 10 Tons loaded in the dumper feeding stops automatically.
SYSTEM
CLEANING SYSTEM
Rotary cleaner Vibratory
cleaner Aspiration Dust cleaner Destoner Cyclone
CONVEYING SYSTEM
Elevator Belt Conveyor Chain
Conveyor Screw
Conveyor Towers Catwalks