road summary
TRANSCRIPT
![Page 1: Road Summary](https://reader030.vdocuments.us/reader030/viewer/2022021213/577d256e1a28ab4e1e9ec653/html5/thumbnails/1.jpg)
8/3/2019 Road Summary
http://slidepdf.com/reader/full/road-summary 1/3
Sl. No. Description
1 Preparation of Sub grade with consolidation
2 150mm thick GSB
3 100mm thick WMM
4 Paver Block with 50mm sand filling
Total
Sl. No. Description
1 Preparation of Subgrade with consolidation
2 150mm thick soling
3 100mm thick WBM
4 50mm thick Bituminous macadam
5 20mm thick Bitumen carpet
Total
Variation
Road and Driveway Surface area
Total Cost Impact
Cost Increase on Sft Building Price
Note The sub base is assumed for CBR of 9.5 % ( 5- 10)
The cost for item 2, 3 in Concrete Paver Block Roa
The cost for item 3 in Bitumen Top Road is liable t
Bitu
Cost Comparison - Bitumen
Concret
![Page 2: Road Summary](https://reader030.vdocuments.us/reader030/viewer/2022021213/577d256e1a28ab4e1e9ec653/html5/thumbnails/2.jpg)
8/3/2019 Road Summary
http://slidepdf.com/reader/full/road-summary 2/3
As per IRC SP 63 - 2004, page no 13. Unit Rate
Preparation of Sub grade with consolidation Sqm 31.27
250mm GSB Sqm 347.51
250MM WMM Sqm 322.08
Paver Block with 20- 40mm sand filling Sqm 624.51
1,186.35
As per drawings Unit Rate
Preparation of Subgrade with consolidation Sqm 31.27
150mm thick soling Sqm 217.80
150mm thick WBM Sqm 413.51
50mm thick Bituminous macadam Sqm 332.45
20mm thick Bitumen carpet Sqm 106.77
1,101.81
Rs 84.55
Sqm 21,319.00
Rs 1,802,438.03
Rs 0.51
nd for residential street
d is liable to increase because of increase in thickness of WMM & GSB
o increase because of increase in thickness of WBM
men Top Road Broad Specification C
30 Mt point and ecen distributed l
60/70 Packed Bitumen.
30 Mt point and even distributed l
interlock M-30 Grade with shot bla
rest as per NBC standard.
op road v/s Concrete Paver Block Road.
e Paver Block Road Broad Specification c
![Page 3: Road Summary](https://reader030.vdocuments.us/reader030/viewer/2022021213/577d256e1a28ab4e1e9ec653/html5/thumbnails/3.jpg)
8/3/2019 Road Summary
http://slidepdf.com/reader/full/road-summary 3/3
onsidered
ad factor, 96Kg/Cum, Need large construction equipment base,Needs good
skilled manpower,not ECO friendly, spot repair is critical,
Maintenance free for minimum 3-4 Years. Repair needs
external skilled manpower.
ad factor, 60mm
sted Paver Blocks and
Easy and speedy installation, less number of heavy
construction equipment, can be managed with less
skilled manpower, easy to replace and repair, ECO
friendly, can earn green points, can be designed to
percolate surface water introducing some capillaries in
intermediate distance. Regular maintenance.
onsidered Advantage/Disadvantage