Beaufort CountyPublic Works
Stormwater InfrastructureProject Summary
Project Summary: Bluffton Vacuum Truck - Kitty Road, Sailors Choice, Bluffton Parkway, Cherry Point Road, Activity: Routine/Preventive Maintenance
Bluffton Government Center and Sandy Pointe Drive
After During Before
$0.00 $4,851.61
$0.00$0.00 $89.10 $278.54
$36.46
$0.00 $1,029.23
Total Cost
0.5 $11.75 $0.00 $0.00107.022.0
$2,450.83 $345.36$18.36
Labor Labor Material Contractor IndirectHours
$522.88 $66.92
$729.14
Cost Cost LaborCost
$343.95$970.15 $117.52
Duration: 7/2/15 - 11/17/15
2016-310 / Bluffton Vacuum Truck Equipment
Narrative Description of Project:
$6.62
Cost
AUDIT / Audit Project $0.00$464.38
CLPJT / Crossline Pipe - Jetted $95.48$136.1640.0
$1,591.05CBCO / Catch basin - clean out
$640.64
$61.50
CPJ / Channel Pipe - Jetted $1,864.47DPJT / Driveway Pipe - Jetted 6.0 $137.30 $26.04 $26.10
Sub Total
2.0 $7.08 $1.70 $0.00PI / Project Inspection $106.742016-310 / Bluffton Vacuum Truck 177.5 $4,154.40 $729.14 $557.60 $0.00 $2,707.81 $8,148.95
$8,148.95
Project improved 433 L.F. of drainage system. Cleaned out (19) catch basins. Jetted (3) driveway pipes, (12) crossline pipes, 40 L.F. of overflow pipe, 48 L.F. of roadside pipe and 345 L.F. of channel pipe.
Grand Total 177.5 $4,154.40 $557.60 $0.00 $2,707.81
KITTY
RD
BUCK ISLAND RD
HENR
Y JONE
S DR
LegendDrainage Type
Access PipeBleeder PipeChannel PipeChannelStreamCrossline PipeDriveway PipeLateralLateral PipeRiverRoad PipeRoadsideRoadside Pipe
®Project: BlufftonVacuum Truck-Kitty RoadMap #1Activity: Routine/Preventive MaintenanceProject #:2016-310Township/ SW Dist:Bluffton/9Completed:November 2015
0 60 120 180 24030Feet
1 inch = 130 feet Prepared By: BC Stormwater Management UtilityDate Print:11/23/15File:C:\project summaries map/Bluffton Vacuum Truck-Kitty Road Map #1_2016-310
Jetted (3) driveway pipes.
#0
#0
#0
"/
"/")
")
")
")
")
") SAILORS CHOICE
TROU
T ST
BLAC
KFISH
ST
MULL
ET ST
THOM
AS LA
WTON D
R
LURAY ST
LegendDrainage Type
Access PipeBleeder PipeChannel PipeChannelStreamCrossline PipeDriveway PipeLateralLateral PipeRiverRoad PipeRoadsideRoadside Pipe
®Project: BlufftonVacuum Truck-Sailors ChoiceMap #2Activity: Routine/Preventive MaintenanceProject #:2016-310Township/SW Dist:Bluffton/9Completed:November 2015
0 20 40 60 8010Feet 1 inch = 50 feet
Prepared By: BC Stormwater Management UtilityDate Print:08/19/2015File:C:\project summaries map/Bluffton Vacuum Truck-Sailors Choice Map #2_2016-310
Cleaned out (3) catch basins.
Cleaned out (3) catch basins.
Jetted 24 LF ofroadside pipe.
Jetted 24 LF ofroadside pipe.
")
")
")
")
")
")
")
")
")")
")
")
")
SKYLARK DR
SANDY POINTE DR
E MORNINGSIDE DR
LegendDrainage Type
Access PipeBleeder PipeChannel PipeChannelStreamCrossline PipeDriveway PipeLateralLateral PipeRiverRoad PipeRoadsideRoadside Pipe
®Project: BlufftonVacuum Truck-Sandy PointeDriveMap #3Activity: Routine/PreventiveMaintenanceProject #:2016-310Township/SW Dist:Bluffton/9Completed:November 2016
0 40 80 120 16020Feet
1 inch = 83 feet Prepared By: BC Stormwater Management UtilityDate Print:11/23/15File:C:\project summaries map/Bluffton Vacuum Truck- Sandy Pointe Drive Map #3_2016-310
Cleaned out (2) catch basins.Jetted (1) crossline pipe.
Cleaned out (2) catch basins.Jetted (1) crossline pipe and20 LF of channel pipe.
")
")
")
")
")
")
")
")
")
E MORNINGSIDE DR
STONEY XING
LegendDrainage Type
Access PipeBleeder PipeChannel PipeChannelStreamCrossline PipeDriveway PipeLateralLateral PipeRiverRoad PipeRoadsideRoadside Pipe
®Project:BlufftonVacuum Truck-Sandy Pointe DriveMap #4Activity: Routine/PreventiveMaintenanceProject #:2016-310Township/SW Dist:Bluffton/9Completed:November 2015
0 40 80 120 16020Feet
1 inch = 83 feet Prepared By: BC Stormwater Management UtilityDate Print:11/1/16File:C:\project summaries map/Bluffton Vacuum Truck- Sandy Pointe Drive Map#4_2016-310
Cleaned out (2) catch basins.Jetted (1) crossline pipe.
Jetted 30 LF of channelpipe.
Cleaned out (1) catch basin.Jetted (1) crossline pipe.
")
")
")
")
")
")
")
")
")
") ")
")
") ")
") ")#0
#0#0#0
#0#0
#0#0
#0
#0 #0
")
")
")")
")
BLUFFTON PKWY
LegendDrainage Type
Access PipeBleeder PipeChannel PipeChannelStreamCrossline PipeDriveway PipeLateralLateral PipeRiverRoad PipeRoadsideRoadside Pipe
®Project:BlufftonVacuum Truck-GovernmentCenterMap #5Activity: Routine/Preventive MaintenanceProject #:2016-310Township/SW Dist:Bluffton/9Completed:November 2015
0 50 100 150 20025Feet 1 inch = 100 feet
Prepared By: BC Stormwater Management UtilityDate Print:10/31/16File:C:\project summaries map/Bluffton Vacuum Truck- Government Center_2016-310
Cleaned out (1) catch basin.Jetted 155 LF of channel pipe
Cleaned out (1) catch basin.Jetted 140 LF of channel pipe
Jetted (2) crossline pipes.
CHERRY POINT RD
LegendDrainage Type
Access PipeBleeder PipeChannel PipeChannelStreamCrossline PipeDriveway PipeLateralLateral PipeRiverRoad PipeRoadsideRoadside Pipe
®Project: BlufftonVacuum Truck-Cherry Point RoadMap #6Activity: Routine/Preventive MaintenanceProject #:2016-310Township/ SW Dist:Bluffton/9Completed:November 2015
0 80 160 240 32040Feet
1 inch = 170 feet Prepared By: BC Stormwater Management UtilityDate Print:11/23/15File:C:\project summaries map/Bluffton Vacuum Truck- Cherry Point Road Map #6_2016-310
Jetted (1) crossline pipe.
") ")
")
#0#0
#0
#0#0#0
"
BLUFFTON PKWY
BLUFFTON PKWY
LegendDrainage Type
Access PipeBleeder PipeChannel PipeChannelStreamCrossline PipeDriveway PipeLateralLateral PipeRiverRoad PipeRoadsideRoadside Pipe
®Project: BlufftonVacuum Truck-Bluffton ParkwayMap #7Activity: Routine/PreventiveMaintenanceProject #:2016-310Township/SW Dist:Bluffton/9Completed:November 2016
0 40 80 120 16020Feet
1 inch = 83 feet Prepared By: BC Stormwater Management UtilityDate Print:11/23/15File:C:\project summaries map/Bluffton Vacuum Truck- Bluffton Parkway Map #7_2016-310
Jetted 48 LF of overflow pipe.
")
")
")
")
#0
#0
#0
#0
")")
")")
BLUFFTON PKWY
BLUFFTON PKWY LegendDrainage Type
Access PipeBleeder PipeChannel PipeChannelStreamCrossline PipeDriveway PipeLateralLateral PipeRiverRoad PipeRoadsideRoadside Pipe
®Project: BlufftonVacuum Truck-Bluffton ParkwayMap #8Activity: Routine/PreventiveMaintenanceProject #:2016-310Township/SW Dist:Bluffton/9Completed:November 2016
0 20 40 60 8010Feet
1 inch = 42 feet Prepared By: BC Stormwater Management UtilityDate Print:11/23/15File:C:\project summaries map/Bluffton Vacuum Truck- Bluffton Parkway Map #8_2016-310
Cleaned out (2) catch basins.Jetted (1) crossline pipe.
Cleaned out (2) catch basins.Jetted (1) crossline pipe.
Jetted (1) crossline pipe.