river trent a1133 nottingham to lincoln railway …...a1 a46 a1 newark rugby club cattle newark...

1
A1 A46 A1 NEWARK RUGBY CLUB CATTLE MARKET NEWARK CRICKET GROUND A46 A46 NEWARK SHOWGROUND A1133 WINTHORPE NEWARK-ON-TRENT NEWARK AIR MUSEUM KELHAM AVERHAM RIVER TRENT A616 FARNDON NEWARK CASTLE A617 BRITISH SUGAR A17 A1 CROSSING WINTHORPE JUNCTION CATTLE MARKET JUNCTION FARNDON JUNCTION PROPOSED A1/A46 JUNCTION NEWARK CASTLE STATION BROWNHILLS ROUNDABOUT EXISTING A1/A46 JUNCTION FRIENDLY FARMER ROUNDABOUT EAST COAST MAINLINE NOTTINGHAM TO LINCOLN RAILWAY NOTTINGHAM TO LINCOLN RAILWAY 6500.000 4000.000 3500.000 2500.000 0.000 500.000 1000.000 1500.000 2000.000 3000.000 4500.000 5000.000 5500.000 6000.000 6640.000 NEWARK SOUTHERN LINK ROAD SAFETY, HEALTH AND ENVIRONMENTAL INFORMATION In addition to the hazards/risks normally associated with the types of work detailed on this drawing, note the following significant residual risks (Reference shall also be made to the design hazard log). Construction NONE Maintenance / Cleaning NONE Use NONE Decommissioning / Demolition NONE A1 APPROVED - PUBLISHED A46 Newark Northern Bypass GENERAL ARRANGEMENT OPTION 1 AS SHOWN KM 1 KO 1 EN KM 14/01/21 HE551478 ATK GEN OP1 DR ZH 000001 C02 C02 A1 Notes updated KM KO EN KM 16/10/20 C01 A1 For Information 5162675 Copyright C Atkins Limited (2018) www.atkinsglobal.com Tel: Fax: The Axis 10 Holliday Street Birmingham West Midlands B1 1TF +44 (0)1214 835000 +44 (0)1214 835252 Drawing Title Project Title Drawing Suitability DO NOT SCALE Client Status Millimetres 100 10 0 Drawing Number Project Originator Volume Location Type Role Number - - - - - - A1 Scale: Original Size: Rev: Project Ref. No: of Sheet: Revision Checked Authorised Status Reviewed Drawn Issue Date Description Revision Checked Authorised Status Reviewed Drawn Issue Date Description Revision Checked Authorised Status Reviewed Drawn Issue Date Description Revision Checked Authorised Status Reviewed Drawn Issue Date Description Revision Checked Authorised Status Reviewed Drawn Issue Date Description This Drawing is saved on ProjectWise. Plotted: 14/01/2021 19:12:36 By: OLAL6527 KEY : RIVER CROSSING STRUCTURE RAILWAY TRACK RIVER NETWORK PUBLIC RIGHTS OF WAY NOTES: 1. ALL DIMENSIONS ARE IN METRES UNLESS OTHERWISE STATED. 2. FOR JUNCTION GENERAL ARRANGENMENT DRAWINGS REFER TO: HE551478-ATK-HGN-OP1_B6166_Z-DR-CH-000001 HE551478-ATK-HGN-OP3_A616_Z-DR-CH-000001 HE551478-ATK-HGN-OP2_A46A1_Z-DR-CH-000001 HE551478-ATK-HGN-OP3_A1133_Z-DR-CH-000002 3. ANY RETAINING WALLS AND BRIDGE DECKS SHOWN IN PLAN ARE INDICATIVE ONLY. PROPOSED RETAINING WALL PROPOSED BRIDGE EXISTING BRIDGE TO BE RETAINED EXISTING BRIDLEWAY EXISTING FOOTPATH ASSUMED PROJECT BOUNDARY FLOOD ZONE 3 This map is based on Ordnance Survey material with the permission of Ordnance Survey on behalf of the Controller of Her Majesty's Stationery Office. © Crown copyright. Unauthorised reproduction infringes Crown copyright and may lead to prosecution or civil proceedings. Highways England 100018928, 2019. Scale 1:10000 200m 0m 100m 600m 400m

Upload: others

Post on 31-Jan-2021

4 views

Category:

Documents


0 download

TRANSCRIPT

  • A

    1

    A

    4

    6

    A

    1

    NEWARK

    RUGBY CLUB

    CATTLE

    MARKET

    NEWARK

    CRICKET

    GROUND

    A

    4

    6

    A

    4

    6

    NEWARK

    SHOWGROUND

    A

    1

    1

    3

    3

    WINTHORPE

    NEWARK-ON-TRENT

    NEWARK AIR

    MUSEUM

    KELHAM

    AVERHAM

    R

    I

    V

    E

    R

    T

    R

    E

    N

    T

    A616

    FARNDON

    NEWARK

    CASTLE

    A

    6

    1

    7

    BRITISH

    SUGAR

    A

    1

    7

    A1 CROSSING

    WINTHORPE

    JUNCTION

    CATTLE MARKET

    JUNCTION

    FARNDON

    JUNCTION

    PROPOSED A1/A46

    JUNCTION

    NEWARK CASTLE

    STATION

    BROWNHILLS

    ROUNDABOUT

    EXISTING

    A1/A46

    JUNCTION

    FRIENDLY

    FARMER

    ROUNDABOUT

    EA

    ST

    C

    OA

    ST

    M

    AIN

    LIN

    E

    N

    O

    T

    T

    IN

    G

    H

    A

    M

    T

    O

    L

    IN

    C

    O

    L

    N

    R

    A

    IL

    W

    A

    Y

    N

    O

    T

    T

    I

    N

    G

    H

    A

    M

    T

    O

    L

    I

    N

    C

    O

    L

    N

    R

    A

    I

    L

    W

    A

    Y

    6

    5

    0

    0

    .

    0

    0

    0

    4

    0

    0

    0

    .

    0

    0

    0

    3

    5

    0

    0

    .

    0

    0

    0

    2500.000

    0

    .

    0

    0

    0

    5

    0

    0

    .

    0

    0

    0

    1

    0

    0

    0

    .

    0

    0

    0

    1

    5

    0

    0

    .

    0

    0

    0

    2

    0

    0

    0

    .

    0

    0

    0

    3000.000

    4

    5

    0

    0

    .0

    0

    0

    5

    0

    0

    0

    .

    0

    0

    0

    5500.000

    6

    0

    0

    0

    .

    0

    0

    0

    6

    6

    4

    0

    .

    0

    0

    0

    NEWARK

    SOUTHERN LINK

    ROAD

    SAFETY, HEALTH AND ENVIRONMENTAL

    INFORMATION

    In addition to the hazards/risks normally associated with the types of work

    detailed on this drawing, note the following significant residual risks

    (Reference shall also be made to the design hazard log).

    Construction

    NONE

    Maintenance / Cleaning

    NONE

    Use

    NONE

    Decommissioning / Demolition

    NONE

    A1APPROVED - PUBLISHED A46 Newark Northern Bypass

    GENERAL ARRANGEMENT

    OPTION 1

    AS SHOWN

    KM

    1

    KO

    1

    EN KM 14/01/21

    HE551478 ATK GEN

    OP1 DR ZH 000001

    C02C02A1

    Notes updated

    KMKO EN KM 16/10/20C01A1

    For Information

    5162675

    Copyright C Atkins Limited (2018)

    www.atkinsglobal.com

    Tel:

    Fax:

    The Axis

    10 Holliday Street

    Birmingham

    West Midlands

    B1 1TF

    +44 (0)1214 835000

    +44 (0)1214 835252

    Drawing Title

    Project TitleDrawing Suitability

    DO

    N

    OT

    S

    CA

    LE

    Client

    Status

    Millim

    etres

    10

    010

    0

    Drawing Number

    Project Originator Volume

    Location Type RoleNumber

    -

    - - -

    --

    A1

    Scale:

    Original

    Size:

    Rev:

    Project

    Ref. No:

    of

    Sheet:

    Revision Checked AuthorisedStatus ReviewedDrawn Issue Date

    Description

    Revision Checked AuthorisedStatus ReviewedDrawn Issue Date

    Description

    Revision Checked AuthorisedStatus ReviewedDrawn Issue Date

    Description

    Revision Checked AuthorisedStatus ReviewedDrawn Issue Date

    Description

    Revision Checked AuthorisedStatus ReviewedDrawn Issue Date

    Description

    This Drawing is saved on ProjectWise. Plotted: 14/01/2021 19:12:36 By: OLAL6527

    KEY :

    RIVER CROSSING STRUCTURE

    RAILWAY TRACK

    RIVER NETWORK

    PUBLIC RIGHTS OF WAY

    NOTES:

    1. ALL DIMENSIONS ARE IN METRES UNLESS OTHERWISE STATED.

    2. FOR JUNCTION GENERAL ARRANGENMENT DRAWINGS REFER TO:

    HE551478-ATK-HGN-OP1_B6166_Z-DR-CH-000001

    HE551478-ATK-HGN-OP3_A616_Z-DR-CH-000001

    HE551478-ATK-HGN-OP2_A46A1_Z-DR-CH-000001

    HE551478-ATK-HGN-OP3_A1133_Z-DR-CH-000002

    3. ANY RETAINING WALLS AND BRIDGE DECKS SHOWN IN PLAN ARE

    INDICATIVE ONLY.

    PROPOSED RETAINING WALL

    PROPOSED BRIDGE

    EXISTING BRIDGE TO BE RETAINED

    EXISTING BRIDLEWAY

    EXISTING FOOTPATH

    ASSUMED PROJECT BOUNDARY

    FLOOD ZONE 3

    This map is based on Ordnance Survey material with the

    permission of Ordnance Survey on behalf of the Controller

    of Her Majesty's Stationery Office. © Crown copyright.

    Unauthorised reproduction infringes Crown copyright and

    may lead to prosecution or civil proceedings. Highways

    England 100018928, 2019.

    Scale 1:10000

    200m0m100m 600m400m

    Sheets and ViewsLayout1