Page 1: National Site Awards · A46 Newark to Widmerpool Improvement Scheme Presented to: The A46 Project Team Contractor: Balfour Beatty Civil Engineering Client: Highways Agency Gteacre

2012National

Site AwardsThis special edition brochure from

the Considerate Constructors Scheme lists all of the 2012 National Site

Award winners.

Page 2: National Site Awards · A46 Newark to Widmerpool Improvement Scheme Presented to: The A46 Project Team Contractor: Balfour Beatty Civil Engineering Client: Highways Agency Gteacre

Most Considerate Site

Sainsbury’s BallymenaPresented to: The Site TeamContractor: McLaughlin & Harvey LtdClient: Sainsbury’s Supermarkets Ltd

Located in a busy retail park, this projectcalled for the refurbishment of aSainsbury’s supermarket which remainedoperational throughout the shortconstruction period.

Exceptional innovation, responsiveness tochallenge and constant attention to detailwere the hallmarks of the managementapproach. An MSc student was retained tostudy "virtual water" in constructionmaterial production to promotesustainability more widely. The impressiveresults will be used UK-wide by the clientand made available to other constructioncompanies. A further unique initiativeinvolved specially-developed ‘low carbon’

hoarding, which was both practical andattractive, and had less environmentalimpact from its production and placement.

First-class welfare facilities werecomplemented by a smoking cessationclub and operatives and staff wereincentivised in considerate performance.The team took part in leg waxing inpublic, in-store bag packing for ComicRelief and a celebrity chef healthy eatingcookery demonstration was held on site.Community initiatives included theproduction of a free, colourful‘Community Calendar’ containing photosof considerate initiatives, local bird-lifeenhancement, displays in the nearby Ecos centre and practical involvement inlocal schools and colleges.

With top scores across the spectrum ofconsiderate practices, the Scheme’sMonitor commented:

2012National Site AwardsThe National Site Awards recognisethe exceptional measures thatsites registered with theConsiderate Constructors Schemehave put in place to be moreconsiderate towards their localneighbourhoods, the public, their workforce and theenvironment. This year, over3000 guests attended 11 awardceremonies held across the UK where over 690 awards werepresented to the highest scoringregistered sites that completed in 2011.

The Scheme presented 371 Bronze, 232 Silver and 88 Gold Awards, with one GoldAward winning site given thecoveted title of UK’s MostConsiderate Site 2012 and afurther 20 Gold Award winningsites named as Most ConsiderateSite Runners-up.

From over 8500 eligible sites, onlythe highest scoring 7.5% werepresented with National SiteAwards. Registered sites aremonitored and scored on theirlevel of consideration by theScheme, and an independentpanel reviews all eligible sites todecide whether it has reachedthe standard required to win anaward and what level of award itshould receive.

For full details of this year’swinners, as well as previousaward winners, please visitwww.ccscheme.org.ukwhere you can search theNational Site Awards database.

MOST CONSIDERATE SITE

This short duration site showed thehighest levels of partnership, communityoutreach, respect for people andinnovation. Its outstanding performanceis a tribute to the efforts of all who takepart in considerate construction.

‘‘’’

Page 3: National Site Awards · A46 Newark to Widmerpool Improvement Scheme Presented to: The A46 Project Team Contractor: Balfour Beatty Civil Engineering Client: Highways Agency Gteacre

Considerate Constructors Scheme 2012 National Site Awards | 3

Aquatics CentrePresented to: The Aquatics Site TeamContractor: Balfour BeattyClient: Olympic Delivery Authority

Wolverhampton Interchange - Phase 1Presented to: John Buckley & BAM Site TeamContractor: BAM Construction Ltd - MidlandsClient: Neptune Wirral Ltd

Royal Albert Memorial Museum (RAMM)Presented to: Nigel Harris and The Site TeamContractor: BAM Construction Ltd - WesternClient: Exeter City Council

Campbeltown Waste Water Quality ProjectPresented to: Ian DarwinContractor: Black & VeatchClient: Scottish Water

Sainsbury’s Welwyn Garden CityPresented to: Matt MaiseyContractor: Bowmer & Kirkland LtdClient: Sainsbury’s Supermarkets Ltd

IBC - MPCPresented to: Kenny RyanContractor: Carillion BuildingClient: Olympic Delivery Authority

Cravenwood Community Primary SchoolPresented to: The Project TeamContractor: GB Building Solutions LtdClient: Manchester City Council

St Leger Homes of Doncaster - Intake Tower BlocksPresented to: Robert Barkworth and Ryan SpencerContractor: Henry Boot Construction LtdClient: St Leger Homes of Doncaster Ltd

Wimpey No Fines - HousesPresented to: Jonathan WatkinsContractor: Henry Boot Construction LtdClient: North Lincolnshire Homes

Blackpool 6th Form College Phase 3Presented to: Tim BriceContractor: ISG RegionsClient: Blackpool Sixth Form College

Mount WisePresented to: Neil Bowkett, Giles Staines and Jackie KellyContractor: LeadbitterClient: Mount Wise Guernsey Ltd

Tesco Hemel HempsteadPresented to: Steven PeersContractor: Longcross ConstructionClient: Tesco Stores Ltd

Kingfisher Community Special SchoolPresented to: Peter FineganContractor: Mansell Construction Services LtdClient: Oldham Metropolitan Borough Council

Sainsbury’s SalfordPresented to: The Site TeamContractor: McLaughlin & Harvey LtdClient: Sainsbury’s Supermarkets Ltd

Tesco Refresh, Coventry, WalsgravePresented to: The Site TeamContractor: McLaughlin & Harvey LtdClient: Tesco Stores Ltd

Wiggenhall St Germans Primary SchoolPresented to: Justin Dean & George WilliamsContractor: R G Carter LtdClient: Norfolk County Council

London 2012 Olympic StadiumPresented to: Team StadiumContractor: Sir Robert McAlpine LtdClient: Olympic Delivery Authority

Lea Manor High SchoolPresented to: Michael CoyleContractor: Wates Construction LtdClient: Luton Borough Council

West Yorkshire Police Scientific Support UnitPresented to: Stephen HartContractor: Wates Construction LtdClient: West Yorkshire Police Authority

Chipping Hill Primary SchoolPresented to: Lee SuffolkContractor: Willmott Dixon Construction LtdClient: Essex County Council

MOST CONSIDERATE SITERUNNER-UP

Most Considerate Site Runners-up

Page 4: National Site Awards · A46 Newark to Widmerpool Improvement Scheme Presented to: The A46 Project Team Contractor: Balfour Beatty Civil Engineering Client: Highways Agency Gteacre

Cleaner Seas for Sussex Scheme - InfrastructurePresented to: The Infrastructure TeamContractor: 4Delivery LtdClient: Southern Water

Cleaner Seas for Sussex Scheme - Peacehaven Wastewater Treatment WorksPresented to: The TeamContractor: 4Delivery LtdClient: Southern Water

A1 Dishforth to LeemingPresented to: Chris HaytonContractor: A1 Carillion Morgan Sindall Joint VentureClient: Highways Agency

Bramford SubstationPresented to: The Site TeamContractor: AMS Joint VentureClient: National Grid

L&Q ChrysalisPresented to: Donna Jennings & Steve PageContractor: Apollo Property Services Group LtdClient: London and Quadrant Group

M&S MacclesfieldPresented to: Paul DeverContractor: Audas Project ManagementClient: Marks & Spencer plc

Circinus ProjectPresented to: The Site TeamContractor: AWE plcClient: AWE

Project MENSAPresented to: The Project OfficeContractor: AWE plcClient: AWE

T2B ProjectPresented to: Keith CanninContractor: Balfour BeattyClient: Heathrow Airport Ltd

A46 Newark to Widmerpool Improvement SchemePresented to: The A46 Project TeamContractor: Balfour Beatty Civil EngineeringClient: Highways Agency

Gateacre & Hope SchoolPresented to: The Site TeamContractor: Balfour Beatty Construction Northern LtdClient: Liverpool City Council

The Co-operative Academy at BrownhillsPresented to: Stuart ScrimgeourContractor: Balfour Beatty Construction Northern LtdClient: Stoke-on-Trent City Council

Life Centre - PlymouthPresented to: Jim McGee - Senior Project ManagerContractor: Balfour Beatty Construction Scottish & Southern LtdClient: Plymouth City Council

Co Operative Head OfficePresented to: Tony GrindrodContractor: BAM Construction Ltd - North WestClient: The Cooperative Group Ltd

Borth Coastal Defence SchemePresented to: Ray JonesContractor: BAM Nuttall LtdClient: Ceredigion County Council

A5 Vicarage RoadPresented to: Staffordshire County Council and Birse CivilsContractor: Birse Civils LtdClient: Staffordshire County Council

Glencorse Water Treatment WorksPresented to: Andy OldContractor: Black & VeatchClient: Scottish Water Solutions

91”Code 6” New Build Homes at Park Dale, CastlefordPresented to: Rob SeamanContractor: Bramall Construction LtdClient: Wakefield District Housing and Synergy Housing Solutions

Greater Manchester Police Divisional HQPresented to: The Site TeamContractor: Carillion BuildingClient: ASK/Goodman

Library of BirminghamPresented to: The Project TeamContractor: Carillion BuildingClient: Birmingham City Council

New Rickstones AcademyPresented to: Russell LaneContractor: Carillion BuildingClient: Essex County Council

A40 Penblewin to Slebech Park ImprovementPresented to: The Project TeamContractor: Costain LtdClient: Welsh Government

M53 Bidston Moss Viaduct Strengthening ProjectPresented to: The Project TeamContractor: Costain LtdClient: Highways Agency

TFL - Beddington Lane DepotPresented to: Darren O’ConnorContractor: EnterpriseMouchelClient: Transport for London

Arecleoch WindfarmPresented to: Arecleoch Project TeamContractor: Farrans (Construction) LtdClient: Scottish Power Renewables

The GreenPresented to: Chris GoodallContractor: GB Building Solutions LtdClient: Mi7

Gold Award winners

It is only right that those who consider the impact onthe community and environment surrounding theirconstruction site, and go the extra mile to mitigateany impact, are recognised. The CCS awards set ahigh benchmark and really serve to encourage bestpractice across the industry. This year’s winners notonly get crowned the most considerate UK sites for2012, but importantly play a huge role in improvingthe image of the construction industry as a whole.

Nick Baveystock Director General, Institution of Civil Engineers

‘‘’’

Page 5: National Site Awards · A46 Newark to Widmerpool Improvement Scheme Presented to: The A46 Project Team Contractor: Balfour Beatty Civil Engineering Client: Highways Agency Gteacre

Prince Charles HousePresented to: Brendon Cocking and Craig KendallContractor: Gilbert & Goode LtdClient: Ocean Housing

Titanic BelfastPresented to: HCNI Site Management TeamContractor: Harcourt Construction NI LtdClient: Titanic Foundation Ltd

Tarran Bungalows Upgrade SchemePresented to: Jonathan WatkinsContractor: Henry Boot Construction LtdClient: Rotherham Metropolitan Borough Council

Man Group - Riverbank HousePresented to: David Gray and ISG Project TeamContractor: ISGClient: Man Group

Fullabrook Wind FarmPresented to: Alan DonnellyContractor: John Sisk & Son LtdClient: ESB Wind Developments

Estover Community CampusPresented to: Chris PalfreyContractor: Kier WesternClient: Plymouth City Council

National Composites CentrePresented to: Stephen BrookContractor: Kier WesternClient: University of Bristol

Royal Victoria BuildingPresented to: The Project TeamContractor: Laing O’Rourke Scotland LtdClient: NHS Lothian

Francis Crick InstitutePresented to: The Site Delivery TeamContractor: Laing O’Rourke Services LtdClient: Francis Crick Institute

Devonport Extra CarePresented to: Steve Tinney & The Devonport Extra Care TeamContractor: LeadbitterClient: DCH

Mariners Quay, NewportPresented to: Simon Thomas, Martin Philips, Nicole Barnes, Adam Portman, Claudio Reis andPamela DunnContractor: LeadbitterClient: Seren

Athletes Village, Stratford CityPresented to: Damian LeydonContractor: Lend Lease LtdClient: Olympic Delivery Authority

The Scottish Hydro ArenaPresented to: The Project TeamContractor: Lend Lease LtdClient: SECC Ltd

SSL Bybrook AshfordPresented to: Mark WhorlowContractor: Longcross ConstructionClient: SSL Sainsbury’s

Tesco WelshpoolPresented to: Andrew KitchenContractor: Longcross ConstructionClient: Tesco Stores Ltd

Arleston LanePresented to: Simon WilsonContractor: Lovell Partnerships LtdClient: Wrekin Housing Trust

Werneth Health CentrePresented to: Steve WimpennyContractor: Mansell Construction Services LtdClient: Community 1st Oldham Ltd

Kingsthorpe Bus CorridorPresented to: MGWSP Site TeamContractor: MGWSP/Northamptonshire County CouncilClient: Northamptonshire County Council

Grimsby Institute For Further and Higher EducationPresented to: Jaime HarperContractor: Miller Construction (UK) LtdClient: Humber Construction Ltd

Scottish Centre for Regenerative MedicinePresented to: Cameron StewartContractor: Miller Construction (UK) LtdClient: The University of Edinburgh

Olympic ParkPresented to: John Winter and Dave PeacopContractor: Olympic Park OperationsClient: Olympic Delivery Authority

Pinderfields Hospital JVPresented to: Martin BuckleyContractor: PPHJV - Pinderfields and PontefractHospital Joint VentureClient: The Mid-Yorkshire Hospitals NHS Trust

Greyfriars Equitable Access CentrePresented to: Richard King and Tim HarringtonContractor: R G Carter LtdClient: Great Yarmouth & Waveney PCT

Osmaston ParkPresented to: Mike EmeryContractor: S Dudley and Sons LtdClient: Sainsbury’s Supermarkets Ltd

Sainsbury’s KimberleyPresented to: Julian KyteContractor: S Dudley and Sons LtdClient: Sainsbury’s Supermarkets Ltd

Bransholme Health Centre, Northpoint, HullPresented to: The Team - Sean Henderson, Jim Prest,Steve Wilson and Cavan Gray-NicholsonContractor: Sewell Construction LtdClient: Citycare

De Vere Gardens DevelopmentPresented to: The Site TeamContractor: Sir Robert McAlpine LtdClient: De Vere Estates Ltd

Milton CourtPresented to: The Site TeamContractor: Sir Robert McAlpine LtdClient: Heron Land Developments Ltd

Quadrant 3Presented to: Tim Hare, Gareth Healy, Nick Wright,Rachael Gregory and Amie ShuttleworthContractor: Sir Robert McAlpine LtdClient: The Crown Estate & Stanhope plc

Walker Technology CollegePresented to: Mark GibsonContractor: Sir Robert McAlpine LtdClient: Aura Newcastle Ltd

VSD AvenuePresented to: Marcus FoweatherContractor: VSDClient: East Midlands Development Agency

Kent History and Library CentrePresented to: Nigel Hardy and David ColeContractor: Warings Contractors LtdClient: Bouygues UK

Harborne Pool & Fitness CentrePresented to: David SquiresContractor: Wates Construction LtdClient: Birmingham City Council

Harrogate International Centre New Events HallsPresented to: Mark PowellContractor: Wates Construction LtdClient: Harrogate Borough Council

Stratford City DevelopmentPresented to: Derek BellringerContractor: Westfield Shoppingtowns LtdClient: Stratford City Development Ltd

Backwell School 6th Form & Lecture HallPresented to: David MorrisContractor: Willmott Dixon Construction LtdClient: North Somerset Council

Middlesbrough BSF - Acklam Grange SchoolPresented to: Simon DovenerContractor: Willmott Dixon Construction LtdClient: Middlesbrough Council

Stockwell Park High SchoolPresented to: BJ SmithContractor: Willmott Dixon Construction LtdClient: London Borough of Lambeth

Mardyke EstatePresented to: Osman Mustafa, Rob Finbow, Hatib Singhateh, Brendan Collins, Mike Bradsell and Reece WardContractor: Willmott Dixon HousingClient: Old Ford Housing Association

Considerate Constructors Scheme 2012 National Site Awards | 5

Gold Award winners

Page 6: National Site Awards · A46 Newark to Widmerpool Improvement Scheme Presented to: The A46 Project Team Contractor: Balfour Beatty Civil Engineering Client: Highways Agency Gteacre

A470 Cwm Bach to Newbridge on Wye Road ImprovementPresented to: Jas SandhuContractor: Alun Griffiths Contractors LtdClient: Welsh Assembly Government

Apollo/Gravesham Decent Homes PartnershipPresented to: Andy Ching and Steven DavenportContractor: Apollo Property Services Group LtdClient: Gravesham Services

Stevenage HomesPresented to: Darren Fraser & Ady FisherContractor: Apollo Property Services Group LtdClient: Stevenage Homes

Aldershot Project (Aldershot Military Town)Presented to: Rhod McGregorContractor: Aspire Defence Capital WorksClient: Project Allenby/Connaught

Larkhill ProjectPresented to: Richard TindalContractor: Aspire Defence Capital WorksClient: Project Allenby/Connaught

Tidworth ProjectPresented to: Gary CharlesContractor: Aspire Defence Capital WorksClient: Project Allenby/Connaught

M&S DeepdalePresented to: The Site Delivery TeamContractor: Audas Project ManagementClient: M & S

City of Lincoln AcademyPresented to: Keith WalkerContractor: Balfour Beatty Construction Northern LtdClient: Lincolnshire County Council

Salford Royal Hospital PC9Presented to: Naran Vekaria & The Site TeamContractor: Balfour Beatty Construction Northern LtdClient: Consort Healthcare

Thomas Tallis SchoolPresented to: Bob JenkinsContractor: Balfour Beatty Construction Scottish & Southern LtdClient: London Borough of Greenwich

A3 HindheadPresented to: David RossContractor: Balfour Beatty Major Civil EngineeringClient: Highways Agency

Polperro Sewage Treatment SchemePresented to: Nigel HabershonContractor: Balfour Beatty plcClient: South West Water

UCL Academy & Swiss Cottage SSEN SchoolPresented to: The Adelaide Road Site TeamContractor: BAM Construction Ltd - LondonClient: Camden BSF SPV Ltd

Bramall Music BuildingPresented to: Nick Ramswell & BAM Site TeamContractor: BAM Construction Ltd - MidlandsClient: University of Birmingham

Stourbridge College Brierly Hill CampusPresented to: Gordon McCartinContractor: BAM Construction Ltd - MidlandsClient: Stourbridge College

Leeds ArenaPresented to: Gordon AlexanderContractor: BAM Construction Ltd - North EastClient: Leeds City Council

Network Rail, National Centre, Milton KeynesPresented to: Adam Harding & The Site TeamContractor: BAM Construction Ltd - South EastClient: Network Rail

Stanley Park HighPresented to: Tony Hardy & The Site TeamContractor: BAM Construction Ltd - South EastClient: London Borough of Sutton

Robert Blake Science College & Elmwood SchoolPresented to: Richard DeweyContractor: BAM Construction Ltd - WesternClient: Somerset Schools 1 Ltd

BAM 1610 Luton Dunstable BuswayPresented to: Andy GrahamContractor: BAM Nuttall LtdClient: Luton Borough Council

Central Bridge, SouthamptonPresented to: Steve HickeyContractor: BAM Nuttall LtdClient: Network Rail

Glendoe Recovery ProjectPresented to: Mike VivianiContractor: BAM Nuttall LtdClient: Scottish - Southern Energy

Kings Cross Central DevelopmentPresented to: Leon PenderisContractor: BAM Nuttall LtdClient: Argent Group plc

Olympic Park, Lot 2 SBH and Lot 5 WetlandsPresented to: Doug MillsContractor: BAM Nuttall LtdClient: Olympic Delivery Authority

New Sainsbury Store NairnPresented to: Jim HarknessContractor: Barr ConstructionClient: Sainsbury’s Supermarkets Ltd

Tesco, St Helens, Store Fit OutPresented to: Steven Rennie & Ruairi MageeContractor: Barr ConstructionClient: Tesco Stores Ltd

Great West Quarter, BrentfordPresented to: Daniel FarendenContractor: Barratt Homes West LondonClient: Barratt West London

130-152 Buckingham Palace RoadPresented to: Almir Mujagic and the Bastows Project TeamContractor: Bastows LtdClient: Grosvenor Estate Management Scheme - Belgravia

Griffon StudiosPresented to: Danny EllisContractor: Berkeley First LtdClient: Berkeley First Ltd

Pier Road, GillinghamPresented to: The Site TeamContractor: Berkeley First LtdClient: Berkeley First Ltd

Silver Award winners

Page 7: National Site Awards · A46 Newark to Widmerpool Improvement Scheme Presented to: The A46 Project Team Contractor: Balfour Beatty Civil Engineering Client: Highways Agency Gteacre

Considerate Constructors Scheme 2012 National Site Awards | 7

Wrexham Industrial Estate Access RoadPresented to: Wrexham County Borough Council & Birse CivilsContractor: Birse Civils LtdClient: Wrexham County Borough Council

High Knocke to Dymchurch Sea DefencesPresented to: Gary PhoenixContractor: Birse CoastalClient: Environment Agency

Redcar Flood Alleviation and EnhancedLandscaping SchemePresented to: The Project TeamContractor: Birse Coastal LtdClient: Environment Agency

Mogden STW Main ContractPresented to: The Mogden Project TeamContractor: Black & Veatch and Thames WaterClient: Thames Water Utilities Ltd

Brent-The Mall ProjectPresented to: Emilie TourenneContractor: Bouygues UK LtdClient: Brent Coefficient Ltd

College Park SchoolPresented to: Renaud FaralContractor: Bouygues UK LtdClient: Westminster Local Education Partnership

Saint George’s SchoolPresented to: Fadi AlabedContractor: Bouygues UK LtdClient: Westminster Local Education Partnership

Shirebrook Academy & Stubbin Wood SchoolPresented to: The Site TeamContractor: Bowmer & Kirkland LtdClient: Derbyshire Learning & CommunityPartnership Ltd

Waitrose - Raynes ParkPresented to: Kevin Cowie & Richard ShawcroftContractor: Bowmer & Kirkland LtdClient: Waitrose Ltd

5217 Worsbrough Phase 3Presented to: Gerry DohertyContractor: Bramall Construction LtdClient: South Yorkshire Housing Association Ltd

5249 St David’s Close, DerbyPresented to: Bob CarrContractor: Bramall Construction LtdClient: Derby City Council

Kings Park Tower BlocksPresented to: Mike McCartanContractor: Bramall Construction LtdClient: One Vision Housing

100 BishopsgatePresented to: Dean MitchellContractor: Brookfield Multiplex Construction Europe LtdClient: The 100 Bishopsgate Partnership

Adult & Children WardsPresented to: Alan KeeleyContractor: Brookfield Multiplex ConstructionEurope LtdClient: Greater Glasgow Health Board

Canary Wharf Crossrail StationPresented to: Stephen PraterContractor: Canary Wharf Contractors LtdClient: Crossrail Ltd

Greater Manchester Police Divisional HQPresented to: John CurrieContractor: Carillion BuildingClient: ASK Property Development Ltd

Mossley Hollins High SchoolPresented to: David CarlyleContractor: Carillion BuildingClient: Inspiredspaces Tameside (ProjectCo1) Ltd

Nottingham Academy - Greenwood Road Site 1Presented to: Mike McCormickContractor: Carillion BuildingClient: Inspiredspaces

Oasis Mayfield AcademyPresented to: David MillsContractor: Carillion BuildingClient: Southampton City Council

Queen Elizabeth’s SchoolPresented to: David PritchardContractor: Carillion BuildingClient: Dorset County Council

Connect 2 Bedlington to BlythPresented to: The Site TeamContractor: Carillion Civil EngineeringClient: Northumberland County Council

Southmead Hospital Redevelopment ProjectPresented to: Keith HuttonContractor: Carillion Construction LtdClient: North Bristol NHS Trust

Two Straw Bale DwellingsPresented to: Shaun Allerton and Paul SkerrittContractor: Carter HomesClient: North Kesteven District Council

Bond Street Station UpgradePresented to: The Project TeamContractor: Costain Laing O’Rourke JVClient: London Underground

Parkway NewburyPresented to: The Parkway Newbury TeamContractor: Costain LtdClient: Standard Life Insurance (SLI)

Prendergast Vale SchoolPresented to: Steve Paine & James BatemanContractor: Costain LtdClient: Lewisham Schools for the Future

INTO Residential - University of ExeterPresented to: The Site TeamContractor: Cowlin Construction LtdClient: INTO Exeter LP

Belong AthertonPresented to: John FitzpatrickContractor: Cruden Construction LtdClient: Belong Construction Ltd

Gem BridgePresented to: Matt McDonald and Pete McGloneContractor: Dawnus Construction LtdClient: Devon County Council

Lewes HousePresented to: Graham RyeContractor: DenneClient: Southern Housing Group

EnterpriseMouchel Area 3Presented to: Area NorthContractor: EnterpriseMouchelClient: Highways Agency

Biddick Hall B, Refurbishment WorksPresented to: Shawn ClarkContractor: Esh Property ServicesClient: South Tyneside Homes

Belfast Streets Ahead Phase 1Presented to: Andrew ConnollyContractor: Farrans (Construction) LtdClient: Department of Social Development

1395 East Durham Homes Year 3 MODSPresented to: Graeme DoughertyContractor: Frank Haslam Milan & Co LtdClient: East Durham Homes

Bedlington TerrierPresented to: Andrew CooperContractor: Frank Haslam Milan & Co LtdClient: Bernicia Group

College Road Medical CentrePresented to: Craig PalmerContractor: G F Tomlinson Birmingham LtdClient: Dr Horton & Partners

Chelmsford Magistrates CourtPresented to: Andy BellContractor: Galliford Try Construction LtdClient: HMCS

Abraham Moss High SchoolPresented to: Steve PetrieContractor: GB Building Solutions LtdClient: Manchester City Council

Morpeth Road Primary SchoolPresented to: Harry GallonContractor: GB Building Solutions LtdClient: Northumberland County Council

Silver Award winners

The RIBA fully supports the ConsiderateConstructors Scheme. The RIBA also encouragesarchitects and designers to promote the CCS as itis a quality assurance to clients and the public aswell as highlighting the effective, safe andconsiderate work of enlightened contractors. TheRIBA’s purpose is to champion better buildings,communities and the environment througharchitecture and our members. The CCS objectivesare synergic with the RIBA’s aims.

I am pleased to offer my congratulations, onbehalf of the RIBA and architects’ profession to allof this year’s winners of the ConsiderateConstructors Scheme and to thank them for thegreat standards they are achieving for ourconstruction industry.

Richard Brindley Executive Director Membership and ProfessionalSupport, RIBA

‘‘’’

Page 8: National Site Awards · A46 Newark to Widmerpool Improvement Scheme Presented to: The A46 Project Team Contractor: Balfour Beatty Civil Engineering Client: Highways Agency Gteacre

M74 CompletionPresented to: The Project TeamContractor: Interlink M74 JVClient: Glasgow City Council

Beam River Pumping StationPresented to: The Project TeamContractor: Interserve Construction LtdClient: Environment Agency

Gores Brook Pumping StationPresented to: The Project TeamContractor: Interserve Construction LtdClient: Environment Agency

Ripon Flood Alleviation SchemePresented to: Graham HoughContractor: Interserve Construction LtdClient: Environment Agency

Shaldon and Ringmore Tidal Defence SchemePresented to: Andy Beech & The Site TeamContractor: Interserve Construction LtdClient: Environment Agency

John Hunt Primary SchoolPresented to: Tony DaglishContractor: Interserve Construction LtdClient: Nottinghamshire County Council

M&S Carmine BuildingPresented to: The Project TeamContractor: ISGClient: Marks & Spencer plc

The Moat HousePresented to: Gerry RosebladeContractor: ISGClient: Retirement Villages Ltd

The Shropshire PortalPresented to: John McStayContractor: ISGClient: Shropshire Council

Biomedical Research Centre BuildingPresented to: ISG Project TeamContractor: ISG ConstructionClient: University of Newcastle Upon Tyne

Blessed Thomas Holford Catholic CollegePresented to: Adrian DavidsonContractor: ISG ConstructionClient: Shrewsbury Diocesan Trustees Registered

Mill O’Mains Regeneration - Phase OnePresented to: The Site TeamContractor: ISG Construction LtdClient: Home Scotland

Merlin CrescentPresented to: Richard BoothContractor: ISG PearceClient: Exeter City Council

Nottingham Left Bank FAS Meadows SectionPresented to: The Meadows Site TeamContractor: Jackson Frameworks LtdClient: Environment Agency

Nottingham Left Bank FAS Attenborough SectionPresented to: The Attenborough Site TeamContractor: Jackson Frameworks LtdClient: Environment Agency

Bombardier Phase 2, Airport Road WestPresented to: Greg HamillContractor: John Sisk & Son LtdClient: Bombardier

Cleveland STV 4&5Presented to: Don MoynihanContractor: John Sisk & Son LtdClient: Hitacui Zosen Inova

Wembley W05Presented to: Sean FoleyContractor: John Sisk & Son LtdClient: Quintain Estates and Development plc

Bluebell Views Student ResidencesPresented to: Kerry SharpeContractor: Kier ConstructionClient: University of Warwick

Great Yarmouth Police Investigation CentrePresented to: The Site TeamContractor: Kier ConstructionClient: Justice Support Services

Josephine Butler CampusPresented to: Stuart SempleContractor: Kier ConstructionClient: Northumberland County Council

Ormiston Bushfield AcademyPresented to: The Site TeamContractor: Kier ConstructionClient: Peterborough City Council

Sidney Stringer AcademyPresented to: Craig GarroodContractor: Kier ConstructionClient: Coventry City Council

University of Reading Enterprise HubPresented to: Ali LongContractor: Kier Construction (Central)Client: Kier Ventures

Francis Combe AcademyPresented to: Peter DixonContractor: Kier Construction (London)Client: Hertfordshire County Council

Richard Rose Central AcademyPresented to: The Project TeamContractor: Kier Construction LtdClient: Cumbria County Council

HMP Featherstone 2Presented to: Phil JamesContractor: Kier Construction-Major ProjectsClient: Ministry of Justice

Godstow WalkPresented to: Andrew ChisholmeContractor: Kier Local Authority HousingClient: Leicester City Council

St Catherines Academy & Firwood SchoolPresented to: Phil JonesContractor: Kier NorthernClient: Bolton Town Council

Orpen House Sheltered SchemePresented to: Bob Ireland, Paul Hodge and Helen ClarkeContractor: Kier Sheffield LLPClient: Sheffield Homes Ltd

Hengrove Park Leisure CentrePresented to: Alan Keey and Roger PearceContractor: Kier WesternClient: Bristol Active Ltd

Teignmouth Response Patrol StationPresented to: Simon ParsonsContractor: Kier WesternClient: Devon & Cornwall Constabulary

A1 Black Cat to Sandy Street Lighting RenewalsPresented to: Alex SoudenContractor: Lafarge Costain JVClient: Highways Agency

Severn Crossing MaintenancePresented to: Paul RamshawContractor: Laing O’RourkeClient: Severn River Crossing

Somerville College Student AccommodationPresented to: Rob Cooper, Mick Sheehan and Frank ConnollyContractor: Laing O’RourkeClient: Somerville College

Forth Valley Royal HospitalPresented to: Andrew ShanklandContractor: Laing O’Rourke Construction LtdClient: NHS Forth Valley

Wombwell Foulstone Joint ALCPresented to: Darren SwainContractor: Laing O’Rourke Construction NorthClient: Barnsley Metropolitan Borough Council

Darlington Memorial Hospital ProjectsPresented to: Ian DawsonContractor: Laing O’Rourke Construction North LtdClient: Darlington Memorial Hospital

City of Westminster CourtsPresented to: Howard AmonContractor: Laing O’Rourke Construction South LtdClient: Her Majesty’s Court Service

Emergency Care Centre and Day SurgeryPresented to: Peter SharpeContractor: Laing O’Rourke Wales and WestClient: Cwn Taf Health Board

Barons Court SchoolPresented to: Jamie BrownContractor: LakehouseClient: Camal Architects Designers

Loudoun Square Phase 2Presented to: Ceri Harries, Nick Cope, Nicole Barnes and Carl HayesContractor: LeadbitterClient: Cardiff Community Housing Association Ltd

Phase 2a Brewery Square Signature House - DorchesterPresented to: The Project TeamContractor: Leadbitter GroupClient: The Brewery Square Development Company / SRT Signature House Ltd

Silver Award winners

The CCS continues to bring out the best in ourconstructors. It enables them to demonstrate thattheir sites are above reproach when they come faceto face with the public. The National Site Awardsrecognise the considerable work undertaken by thecompanies and their staff and the fact that teamscome back year after year is testament to theirappetite for what the CCS stands for and thecollective commitment to showing the best face of the construction industry. In the difficult timeswe have it is too easy to take short cuts. Our CCS sites show this does not have to be the case.

Chris Blythe Chief Executive, The Chartered Institute of Building

‘‘’’

Page 9: National Site Awards · A46 Newark to Widmerpool Improvement Scheme Presented to: The A46 Project Team Contractor: Balfour Beatty Civil Engineering Client: Highways Agency Gteacre

Considerate Constructors Scheme 2012 National Site Awards | 9

Media City UKPresented to: Martin GregoryContractor: Lend Lease Construction LtdClient: Peel Holdings plc

20 Triton StreetPresented to: The Project TeamContractor: Lend Lease LtdClient: Lend Lease

Dundee College - Gardyne CampusPresented to: The Project TeamContractor: Lend Lease LtdClient: Dundee College

Dundee HousePresented to: The Project TeamContractor: Lend Lease LtdClient: Dundee City Council

University of the West of Scotland Ayr CampusPresented to: The Project TeamContractor: Lend Lease LtdClient: University of the West of Scotland

Tesco WarwickPresented to: Andrew Kitchen and Sunil JohalContractor: Longcross ConstructionClient: Tesco Stores Ltd

160 Charles Street Kitchen & BathroomRefurbishmentPresented to: Alex RankinContractor: Lovell Partnerships LtdClient: Glasgow Housing Association

Camp Hill Phase 2Presented to: Adam Cooper & John LucasContractor: Lovell Partnerships LtdClient: Pride in Camp Hill

Morville StreetPresented to: Jonathan Perrett & Derrick EvansContractor: Lovell Partnerships LtdClient: Birmingham Municipal Housing Trust

Weston HeightsPresented to: Greg BarlowContractor: Lovell Partnerships LtdClient: Riverside Consultancy Services

Park HousePresented to: Dean EmblinContractor: Mace LtdClient: Land Securities

Shard London BridgePresented to: Mike LynchContractor: Mace LtdClient: Sellar Property Group

Washwood Heath Health and Wellbeing CentrePresented to: Neil SlaterContractor: Mansell Construction Services LtdClient: Prime (UK) Developments Ltd

Tesco NorthcottPresented to: The Site TeamContractor: McLaughlin & Harvey LtdClient: Tesco Stores Ltd

Tesco ThirskPresented to: The Site TeamContractor: McLaughlin & Harvey LtdClient: Tesco

Morrison’s ExeterPresented to: Terry MortimerContractor: Midas Retail LtdClient: Wm Morrison Supermarkets plc

Woking - Guildford RoadPresented to: James MarkhamContractor: Midgard LtdClient: Barratt Homes

Hartlepool College of Further EducationPresented to: Jeff HedleyContractor: Miller Construction (UK) LtdClient: Hartlepool College of Further Education

Holyoake StreetPresented to: Chris HerronContractor: Mi-space UK LtdClient: Charter (SW) Ltd

Weymouth Community Fire StationPresented to: Paul FinchContractor: Morgan SindallClient: Dorset Fire Authority

Ashford Gateway PlusPresented to: James RobertsContractor: Morgan Sindall plcClient: Kent County Council

Bedford College Workshop Block RefurbishmentPresented to: Andrew WalshamContractor: Morgan Sindall plcClient: Bedford College

Cathedral Primary School, Firpark ASN PrimarySchool and Daisy Park Community CentrePresented to: Fraser SimContractor: Morgan Sindall plcClient: North Lanarkshire Council

Coinsbrough Primary Care CentrePresented to: Douglas Eastwood, John Geraghtyand James EastwoodContractor: Morgan Sindall plcClient: Doncaster Community Solutions

Ebbsfleet International Station Terrazzo ProjectPresented to: Tony Ingram, Peter Jacobs and Gary CoulsonContractor: Morgan Sindall plcClient: HSI Ltd

Milton Primary SchoolPresented to: Tom BlairContractor: Morgan Sindall plcClient: South Lanarkshire Council

Park Primary SchoolPresented to: Ryan Joseph JonesContractor: Morgan Sindall plcClient: Wirral Metropolitan Borough Council

Sudbury Primary SchoolPresented to: Neil DunbarContractor: Morgan Sindall plcClient: Mace Ltd

T4 Baggage Reclaim HallPresented to: Graham SteerContractor: Morgan Sindall plcClient: BAA

Winifred Holtby & TweendykesPresented to: Sean SweetContractor: Morgan Sindall plcClient: ESTEEM

Meadowhead & Stevenston WP 6.2Presented to: WP6.2 TeamContractor: Morrison Black & Veatch JVClient: Scottish Water

Meadowhead & Stevenston WP6.3Presented to: WP6.3 TeamContractor: Morrison Black & Veatch JVClient: Scottish Water

Manchester Airport LinePresented to: Andy Hyman and Alex MabbottContractor: M-Pact-Thales Joint Venture (MPT)Client: Transport for Greater Manchester

Manchester Metrolink Phase 3 Oldham Rochdale Line (ORL)Presented to: Anthony SlaterContractor: M-Pact-Thales Joint Venture (MPT)Client: Transport for Greater Manchester

137-139 Royal Oak Court & 1-42 Linale HousePresented to: The Project TeamContractor: Mulalley & Co LtdClient: Hackney Homes

Point Blocks, Gascoyne EstatePresented to: The Project TeamContractor: Mulalley & Co LtdClient: Hackney Homes

Lee Tunnel ProjectPresented to: François PoguContractor: MVBClient: Thames Water Utilities

Nottingham City HomesPresented to: The Project TeamContractor: Nationwide Windows LtdClient: Nottingham City Homes

Scotswood Masterplan - Site Preparation ContractPresented to: The Project TeamContractor: Newcastle City Council & Galliford TryInfrastructure LtdClient: Newcastle City Council

John Lewis, CheadlePresented to: The Site TeamContractor: PattonClient: John Lewis Partnership

Jarrolds Foot BridgePresented to: David LowContractor: R G Carter LtdClient: Jarrolds & Sons Ltd

LittlehamptonPresented to: Mark SharkeyContractor: R G Carter Projects LtdClient: Waitrose Ltd

Asda Stores Ltd - BirkenheadPresented to: Tim CrockerContractor: RG GroupClient: ASDA Stores Ltd

Silver Award winners

As I visit many parts of the country I can’t help but be impressed by the improved presentation ofconstruction sites particularly when I comparethem to other parts of the world. There is no doubtin my mind that the Considerate ConstructorsScheme has had a crucial role to play in raising thestandards. My congratulations to all the winners.

James Wates Deputy Chairman, Wates Group Ltd

‘‘’’

Page 10: National Site Awards · A46 Newark to Widmerpool Improvement Scheme Presented to: The A46 Project Team Contractor: Balfour Beatty Civil Engineering Client: Highways Agency Gteacre

Sainsbury’s Supermarkets Ltd - HythePresented to: John WilsonContractor: RG GroupClient: Sainsbury’s Supermarkets Ltd

Sainsbury’s Supermarkets Ltd - Kidderminster ExtensionPresented to: The Project TeamContractor: RG GroupClient: Sainsbury’s Supermarkets Ltd

Sainsbury’s Supermarkets Ltd - Talbot Heath ExtensionPresented to: John Henderson and Bill SmithContractor: RG GroupClient: Sainsbury’s Supermarkets Ltd

Unite Group plc - Holloway RoadPresented to: Byron WellsContractor: RG GroupClient: UNITE Group plc

Waitrose Ltd - Brent Cross RefurbishmentPresented to: Robert GottContractor: RG GroupClient: Waitrose Ltd

Replacement Migdale HospitalPresented to: John DawsonContractor: RobertsonClient: NHS Highland

Heathside & Lethbridge Estate - Phase 1Presented to: Jon DonnellyContractor: Rydon Construction LtdClient: Family Mosaic Housing

CannockPresented to: Paul JonesContractor: S Dudley and Sons LtdClient: Sainsbury’s Supermarkets Ltd

North Staffs YMCAPresented to: The Management TeamContractor: Seddon Construction LtdClient: North Staffs YMCA

Wilberforce Health CentrePresented to: Mark Dodgson and Dave BarleyContractor: Sewell Construction LtdClient: Citycare

Liverpool St PaulsPresented to: Tony MaskellContractor: Shepherd Construction LtdClient: English Cities Fund

ASDA NewarkPresented to: John GinnellyContractor: Simons Construction LtdClient: ASDA Stores Ltd

CCURV-PSDHPresented to: The Site TeamContractor: Sir Robert McAlpine LtdClient: CCURV LLP

M25 Widening, Junction 18-21aPresented to: Project Construction TeamContractor: Skanska Balfour Beatty JVClient: Highways Agency

SBBJV- A1M Hatfield Tunnel Refurbishment ProjectPresented to: A1M - Hatfield Tunnel RefurbishmentProject TeamContractor: Skanska Balfour Beatty JVClient: Highways Agency

Heron TowerPresented to: Richard McNaughton, Gavin Phippsand Gary CliffordContractor: Skanska Building - London & South EastClient: Heron International plc

Kings Mill HospitalPresented to: Les DuttonContractor: Skanska Central Nottinghamshire JVClient: Central Nottinghamshire Hospitals plc

Borough ViaductPresented to: The Project TeamContractor: Skanska Civil EngineeringClient: Network Rail

Brent Civic CentrePresented to: Paul RobertsContractor: Skanska Construction UK LtdClient: London Borough of Brent

Weymouth Relief RoadPresented to: Willie McCormickContractor: Skanska Construction UK LtdClient: Dorset County Council

St Barts HospitalPresented to: Bill JamesContractor: Skanska Integrated ProjectsClient: Capital Hospitals Ltd

Project PridePresented to: Matthew CollinsContractor: Skanska UK plcClient: Defence Estates

Beaufort ParkPresented to: Paul JealContractor: St George Central London LtdClient: St George Central London Ltd

Block J2.1 & J2.2 Chelsea CreekPresented to: Paul StedmanContractor: St George Central London LtdClient: St George West London Ltd

Imperial WharfPresented to: Paul StedmanContractor: St George Central London LtdClient: St George Central London Ltd

The Tower St George Wharf - Shell and Core and Internal Fit OutPresented to: Steve Kirwan and Ryan MitchellContractor: St George South London-BrookfieldConstruction JVClient: St George South London Ltd

Dickens YardPresented to: Wayne McCormackContractor: St George West London LtdClient: St George West London Ltd

Kew BridgePresented to: Dan ArsicContractor: St George West London LtdClient: St George West London Ltd

Queen Mary’s PlacePresented to: Bob RosenbergerContractor: St JamesClient: St James

Oldchurch Road, RomfordPresented to: Paul Hardy, Igor Lobanov andMatthew OsbornContractor: Swan New Homes LtdClient: Swan Housing Association

Warleigh VillagePresented to: Mike CrawfordContractor: Taylor Wimpey ExeterClient: Taylor Wimpey Exeter

King’s Cross Station Redevelopment ProgrammePresented to: Sam WoodyattContractor: Taylor Woodrow ConstructionClient: Network Rail

Tottenham Court Road Station UpgradePresented to: TCR Project TeamContractor: Taylor Woodrow Construction BAMNuttall Ltd Joint VentureClient: London Underground Ltd

Renfrewshire InternalsPresented to: Neil WilliamsContractor: The Apollo GroupClient: Renfrewshire Council

Coventry War Memorial ParkPresented to: Shaun HarveyContractor: Thomas Vale Construction plcClient: Coventry City Council

Newbury College Sports Hall and Construction Skills CentrePresented to: Simon SparkesContractor: Thomas Vale Construction plcClient: Newbury College

Tipton Green Junior SchoolPresented to: Chris GettingsContractor: Thomas Vale Construction plcClient: Sandwell Metropolitan Borough Council

BBC Roath Lock StudiosPresented to: Matthew DaviesContractor: VINCI Construction UK LtdClient: Igloo Regeneration

Bradfield School Project (PFI)Presented to: Craig McLackland, Jon Quick andMatthew KingstonContractor: VINCI Construction UK LtdClient: Sheffield Learning Education Partnership

Clifton Campus Nottingham Trent UniversityPresented to: Brian ScottContractor: VINCI Construction UK LtdClient: UPP Projects Ltd

Cochrane BuildingPresented to: David Rhys-JonesContractor: VINCI Construction UK LtdClient: Cardiff University

Connaught TunnelPresented to: Richard Wall-MorrisContractor: VINCI Construction UK LtdClient: Crossrail Ltd

Langford Small Animal SurgeryPresented to: Daniel SouchContractor: VINCI Construction UK LtdClient: University of Bristol

Middlesex University Phase III (Hendon Campus)Presented to: Malkit ChanaContractor: VINCI Construction UK LtdClient: Middlesex University (Hendon Campus)

Southwark IWMFPresented to: Chris Sims, Tsepo Dingaan, DanielMortimer, Vincent Chadwick and Willy O’BrienContractor: Volker HighwayClient: Veolia Environmental Services

Silver Award winners

Page 11: National Site Awards · A46 Newark to Widmerpool Improvement Scheme Presented to: The A46 Project Team Contractor: Balfour Beatty Civil Engineering Client: Highways Agency Gteacre

London Borough of Hackney Term MaintenanceContract 2011-2015Presented to: Mark MascarContractor: VolkerHighways LtdClient: London Borough of Hackney

Lower Todmorden and Walsden FAS Phase 3Presented to: Donald MurrayContractor: VolkerStevinClient: Environment Agency

100 Park LanePresented to: The Park Lane Site TeamContractor: Walter Lilly & Co LtdClient: DTZ

Berwick Hills Primary SchoolPresented to: Ian Walker & Ian SayeContractor: Walter Thompson (Contractors) LtdClient: Middlesbrough Council

Green Lane Primary SchoolPresented to: Mike HammContractor: Walter Thompson (Contractors) LtdClient: Middlesbrough Council

Barnfield South AcademyPresented to: Colin LudlowContractor: Wates Construction LtdClient: Luton Borough Council

Doncaster Civic OfficesPresented to: Adam KnowlesContractor: Wates Construction LtdClient: Muse Developments Ltd

Elm Park Primary SchoolPresented to: Stephen WilliamsContractor: Wates Construction LtdClient: London Borough of Havering

Kingston UniversityPresented to: David RowsellContractor: Wates Construction LtdClient: Kingston University

Liverpool John Moore’s Mount Pleasant DevelopmentPresented to: John ParryContractor: Wates Construction LtdClient: Liverpool John Moores University

Marks & Spencer, Ecclesall RoadPresented to: Richard AshfordContractor: Wates Construction LtdClient: Marks & Spencer plc

Raithwaite HallPresented to: Damien Brown, Sean Hammonds and Stuart GeldardContractor: Wates Construction LtdClient: Skelwith Leisure Ltd

The Malls RefurbishmentPresented to: Paul NightingaleContractor: Wates Construction LtdClient: Basingstoke & Deane Borough Council

Ward End Primary SchoolPresented to: Michael QuinneyContractor: Wates Construction LtdClient: Birmingham City Council

Woolwich Civic CentrePresented to: Nasser DavariContractor: Wates Construction LtdClient: London Borough of Greenwich

John Lewis, ReadingPresented to: Wates Project Team: Richard Hollings, Abu Harun, Brian Cargil, Mark Bridges and Martin BeddallContractor: Wates Construction Ltd (Retail)Client: John Lewis Partnership

Grove HousePresented to: Des MullerContractor: Wates Interiors LtdClient: Grove House UK Ltd

Cambridge YardPresented to: Lawrence BaxterContractor: Wates Living SpaceClient: Genesis Housing Group

Ocean Estate RefurbishmentPresented to: Mark FletcherContractor: Wates Living SpaceClient: East Thames LTD

Wates Retail - Project BoundaryPresented to: Grant CowleyContractor: Wates RetailClient: Bracknell Regeneration Partnership

Shuttlewood RoadPresented to: Mark DixonContractor: Westleigh Developments LtdClient: Acis Group Ltd

Birkenhead High School AcademyPresented to: Brian HanlonContractor: Willmott Dixon Construction LtdClient: Wirral Metropolitan Borough Council

Birmingham City UniversityPresented to: Chris HuffordContractor: Willmott Dixon Construction LtdClient: Birmingham City University

Crouch Hill Community ParkPresented to: Simon WilsonContractor: Willmott Dixon Construction LtdClient: London Borough of Islington

Fitton Hill Neighbourhood CentrePresented to: Harry BasraContractor: Willmott Dixon Construction LtdClient: Equity Solutions

Grange SEN SchoolPresented to: Darrell CullenContractor: Willmott Dixon Construction LtdClient: Manchester City Council

Haberdashers’ Aske’s Crayford AcademyPresented to: Duncan PurvisContractor: Willmott Dixon Construction LtdClient: Bexley Council

Northfleet School for GirlsPresented to: Terry O’NeilContractor: Willmott Dixon Construction LtdClient: Kent LEP 1 Ltd

Oasis Academy CoulsdonPresented to: Scott DawsonContractor: Willmott Dixon Construction LtdClient: London Borough of Croydon

Waingels CollegePresented to: Neil Fox & Ian EdwardsContractor: Willmott Dixon Construction LtdClient: Wokingham Borough Council

Waterhead AcademyPresented to: Daniel MillerContractor: Willmott Dixon Construction LtdClient: Oldham Metropolitan Borough Council

49 Affordable Dwellings at 100 St Benedicts StreetPresented to: David Gluckstein and Jason GoodeyContractor: Youngs HomesClient: St Benedict’s Homes Ltd

Considerate Constructors Scheme 2012 National Site Awards | 11

Silver Award winners

Page 12: National Site Awards · A46 Newark to Widmerpool Improvement Scheme Presented to: The A46 Project Team Contractor: Balfour Beatty Civil Engineering Client: Highways Agency Gteacre

Fawkham WSWPresented to: Daniel ChilcottContractor: 4Delivery LtdClient: Southern Water

Saffron SquarePresented to: Nick GilmoreContractor: A J Morrisroe & Sons LtdClient: Berkeley Homes Capital plc

HUS 22Presented to: Tim WalsinghamContractor: Abel Homes LtdClient: Abel Homes Ltd

Kirklees College - The Vision, Waterfront QuarterPresented to: Khurram Zulfi, Ronnie Brown and Daryl JacksonContractor: Allenbuild Ltd (North East Region)Client: Kirklees College

Calderdale Highways Term MaintenancePresented to: Stuart NicholsContractor: Amey LG LtdClient: Calderdale Metropolitan Borough Council

Affinity Sutton - BroomleighPresented to: The Site TeamContractor: Apollo Property Services Group LtdClient: Affinity Homes Group

Gladys Malpass HousePresented to: Ben GuszpitContractor: Apollo Property Services Group LtdClient: Greenfields Community Housing

Granville Road Tower BlocksPresented to: John Dorling & Tony EdwardsContractor: Apollo Property Services Group LtdClient: Barnet Homes

Milton Keynes ContractPresented to: Barry ClayContractor: Apollo Property Services Group LtdClient: Mouchel Building Services/Milton Keynes Council

Orchard Primary SchoolPresented to: Martin Perkins and The Site TeamContractor: Apollo Property Services Group LtdClient: London Borough of Hackney

Phase 5 Pitch Roofing Hanworth HousesPresented to: Chris CordContractor: Apollo Property Services Group LtdClient: Hounslow Homes Ltd

Roofing Phase 5, Haverfield HousesPresented to: Ray McNeilContractor: Apollo Property Services Group LtdClient: Hounslow Homes Ltd

150 High Street, StratfordPresented to: Alan EdgarContractor: Ardmore Construction LtdClient: Genesis Housing Group

Bulford ProjectPresented to: Russ CoustonContractor: Aspire Defence Capital WorksClient: Project Allenby/Connaught

Warminster ProjectPresented to: Simon Burkitt and Richard TindalContractor: Aspire Defence Capital WorksClient: Project Allenby/Connaught

M&S GrimsbyPresented to: Andy SharpContractor: Audas Project ManagementClient: Marks & Spencer plc

AWE Project PegasusPresented to: Pegasus ProjectContractor: AWE plcClient: AWE

St Richards RC Primary SchoolPresented to: The Project TeamContractor: B & D Croft Building & Civil Engineers LtdClient: The Board of Governors St Richards RC School

Edith Murphy HousePresented to: Bryn JonesContractor: Baggaley Construction LtdClient: De Montfort University

Darwen Vale High SchoolPresented to: Andrew FergusonContractor: Balfour Beatty Construction Northern LtdClient: Blackburn with Darwen & Bolton LEP Ltd

INTO Newcastle UniversityPresented to: Kevin AldenContractor: Balfour Beatty Construction Northern LtdClient: INTO Newcastle LP

Saint Ambrose CollegePresented to: The Site TeamContractor: Balfour Beatty Construction Northern LtdClient: Trafford Borough Council

Sirius and Ganton AcademyPresented to: Andrew EasbyContractor: Balfour Beatty Construction Northern LtdClient: Hull City Council, Children & Young Peoples Services

Crown Woods School - Phase 2Presented to: The Site TeamContractor: Balfour Beatty Construction Scottish & Southern LtdClient: London Borough of Greenwich

Sir Robert Woodard AcademyPresented to: The Site TeamContractor: Balfour Beatty Construction Scottish & Southern LtdClient: West Sussex County Council

St Ambrose High School & Drumpark A.S.NPresented to: The Site TeamContractor: Balfour Beatty Construction Scottish & Southern LtdClient: North Lanarkshire Council

Plot 8 Hamilton International ParkPresented to: The Project TeamContractor: Balfour Beatty Construction Scottish and Southern LtdClient: High Blantyre Construction (HFD Group)

New Extension to the Existing Victoria HospitalPresented to: George YoungContractor: Balfour Beatty Fife HospitalClient: Consort Healthcare

1-5 Lower George StreetPresented to: Ron CottrellContractor: BAM Construction Ltd - LondonClient: Wereldhave Property Management

Unison CentrePresented to: Paul JoyceContractor: BAM Construction Ltd - LondonClient: Unison

Bronze Award winners

Page 13: National Site Awards · A46 Newark to Widmerpool Improvement Scheme Presented to: The A46 Project Team Contractor: Balfour Beatty Civil Engineering Client: Highways Agency Gteacre

Considerate Constructors Scheme 2012 National Site Awards | 13

Tresham College Corby CampusPresented to: Alan BellContractor: BAM Construction Ltd - MidlandsClient: Tresham College Corby Campus

University of Warwick Chemistry & Physics BuildingPresented to: Colin LawrenceContractor: BAM Construction Ltd - MidlandsClient: University of Warwick

Culture Fusion ProjectPresented to: Jonathan ConwayContractor: BAM Construction Ltd - North EastClient: YMCA

Selby Community ProjectPresented to: Jason PinkContractor: BAM Construction Ltd - North EastClient: Selby District Council

BAE Restaurant & Welfare FacilityPresented to: Paul HarrisContractor: BAM Construction Ltd - North WestClient: BAE Systems (Operations) Ltd

Mann Island Mixed Use DevelopmentPresented to: Neil MillwardContractor: BAM Construction Ltd - North WestClient: Countryside Neptune LLP

Skelmersdale & Ormskirk CollegePresented to: Gordon FlintContractor: BAM Construction Ltd - North WestClient: Newcastle College Group

Glow, BluewaterPresented to: George Cuttle & The Site TeamContractor: BAM Construction Ltd - South EastClient: Bluecoe Ltd

St Mary’s Hospital PortsmouthPresented to: Nick Butler and The Site TeamContractor: BAM Construction Ltd - South EastClient: Portsmouth City Primary Care Trust

Chilton Trinity Technology CollegePresented to: Andrew SyddallContractor: BAM Construction Ltd - WesternClient: Somerset Schools 1 Ltd

Student Enterprise BuildingPresented to: Paul Hayfield and BAM Site TeamContractor: BAM Construction UK LtdClient: Coventry University Estates Department

RAF MarhamPresented to: Scott ThompsonContractor: BAM Nuttall LtdClient: Babock Dyncorp Ltd

Southport GasworksPresented to: Sion ThomasContractor: BAM Nuttall LtdClient: National Grid Property Holdings Ltd

Bolton StationPresented to: Steve BrownContractor: Barhale Construction plcClient: Network Rail

New Tesco Store, CarlukePresented to: Stuart YoungContractor: Barr ConstructionClient: Tesco Stores Ltd

Lillies HillPresented to: Peter Scott and The Site TeamContractor: Barratt David Wilson SouthamptonClient: David Wilson Homes, Southampton

The AcresPresented to: Maartens van RensburgContractor: Barratt Homes Southern CountiesClient: Barratt Southern Counties

Crawley West GreenPresented to: Richard WarnerContractor: Base Build Services LtdClient: Sainsbury’s Supermarkets Ltd

Sainsbury’s HeathfieldPresented to: Dan GrahamContractor: Base Build Services LtdClient: Sainsbury’s Supermarkets Ltd

Griffon StudiosPresented to: Danny EllisContractor: Berkeley First LtdClient: Berkeley First Ltd

The Costume StorePresented to: David JonesContractor: Berkeley First LtdClient: Berkeley First Ltd

Kidbrooke Extra CarePresented to: Lee McGinleyContractor: Berkeley Homes (Urban Renaissance) LtdClient: Berkeley Homes (Urban Renaissance) Ltd

Kidbrooke Phase 1Presented to: Chris HaydenContractor: Berkeley Homes (Urban Renaissance) LtdClient: Berkeley Homes (Urban Renaissance) Ltd

West 3 Napier HousePresented to: Fraser WilsonContractor: Berkeley Homes (Urban Renaissance) LtdClient: Berkeley Homes (Urban Renaissance) Ltd

Woodberry Down Kick Start Site 2Presented to: Ian Spencer-WoodbridgeContractor: Berkeley Homes Capital plcClient: Berkeley Homes Capital plc

Merryhills Primary SchoolPresented to: Jim McIntoshContractor: Borras Construction LtdClient: London Borough of Enfield

Boots UK LtdPresented to: Stuart GossContractor: Bowmer & Kirkland LtdClient: Boots

Ocado, Birch Coppice Business ParkPresented to: Scott MorganContractor: Bowmer & Kirkland LtdClient: Ocado Group plc

Sainsbury’s at PenrithPresented to: The Site TeamContractor: Bowmer & Kirkland LtdClient: Sainsbury’s Supermarkets Ltd

Sainsbury’s Bedford ADCPresented to: Stuart Goss & Ian RobinsonContractor: Bowmer & Kirkland LtdClient: Sainsbury’s Supermarkets Ltd

Sainsbury’s Heaton Replacement StorePresented to: B&K Heaton TeamContractor: Bowmer & Kirkland LtdClient: Sainsbury’s Supermarkets Ltd

Springwell Community CollegePresented to: Ben HowardContractor: Bowmer & Kirkland LtdClient: Derbyshire County Council

5219 Woodville CourtPresented to: Andy AdlingtonContractor: Bramall Construction LtdClient: Wakefield and District Housing

5239 Leeds Road, GlasshoughtonPresented to: Steve RedfordContractor: Bramall Construction LtdClient: Wakefield and District Housing

5246 Redbrook CourtPresented to: Paul JezusekContractor: Bramall Construction LtdClient: Chevin Housing Association

Barnes Park RegenerationPresented to: Keith RattrayContractor: Brambledown Landscape Services LtdClient: Sunderland City Council

Greater Peterborough Health Investment Plan(Edith Cavell Site)Presented to: Mike SharplesContractor: Brookfield Multiplex ConstructionEurope LtdClient: Progress Health (Peterborough) plc

Handball ArenaPresented to: Rob O’BrienContractor: Buckingham Group Contracting LtdClient: Delivery Partner - Olympic Delivery Authority

Chestnut GrangePresented to: Geoff BownContractor: Bullock Construction LtdClient: Trent & Dove Housing Association

Ickenham Park - NorthernPresented to: Tony BoneContractor: CALA Ventures LtdClient: Paradigm Housing Group

Nascot GrangePresented to: Martin DaviesContractor: CALA Ventures LtdClient: CALA Ventures Ltd

Ashton Campus (New Charter Academy & Samuel Laycock)Presented to: John Millward and TeamContractor: Carillion (UK) ConstructionClient: Tameside Metropolitan Borough Council

Broadbottom Primary SchoolPresented to: Billy RourkeContractor: Carillion BuildingClient: Tameside Metropolitan Borough Council

Bronze Award winners

Construction activity is critical to the economicrecovery of the UK but its impact on localcommunities needs to minimized. The ConsiderateConstructors Scheme fulfills this role by helping toensure that construction work is done in such a waythat causes minimal disruption and ensures thehighest standards of care are adopted towards allthose affected by the construction work. TheFederation of Master Builders (FMB) as the largesttrade association in the building sector is pleasedto be associated with the CCS in helping to deliverthis essential best practice.

Derek Bostock National President, Federation of Master Builders

‘‘’’

Page 14: National Site Awards · A46 Newark to Widmerpool Improvement Scheme Presented to: The A46 Project Team Contractor: Balfour Beatty Civil Engineering Client: Highways Agency Gteacre

Cornwallis AcademyPresented to: Tony HarrisContractor: Carillion BuildingClient: Kent County Council

Easington Community CollegePresented to: Leanne SwainstonContractor: Carillion BuildingClient: Durham County Council

Globe Lane KS4 Learning CentrePresented to: Richard ShattockContractor: Carillion BuildingClient: Inspired Spaces (Tameside)

H M P ShottsPresented to: Gary PorterContractor: Carillion BuildingClient: Scottish Prison Services

Harton Technology CollegePresented to: David JohnstoneContractor: Carillion BuildingClient: Inspiredspaces Tameside (ProjectCo1) Ltd

HMP Low MossPresented to: Fergus ShawContractor: Carillion BuildingClient: Scottish Prison Services

Longfield AcademyPresented to: Longfield Site TeamContractor: Carillion BuildingClient: Kent County Council

New Line Learning AcademyPresented to: Martin Clark and Andy BeavisContractor: Carillion BuildingClient: Kent County Council

New Trinity AcademyPresented to: Brendan LunnContractor: Carillion BuildingClient: Calderdale Metropolitan Borough Council

Nottingham AcademyPresented to: David HollywoodContractor: Carillion BuildingClient: Inspiredspaces

St Damian’s RC Science CollegePresented to: Dave RowlandsContractor: Carillion BuildingClient: Inspiredspaces Tameside (ProjectCo1) Ltd

St Joseph’s VA RC Comprehensive SchoolPresented to: Farid DidiContractor: Carillion BuildingClient: Inspiredspaces STaG Ltd

Worcester LowesmoorPresented to: The Site TeamContractor: Carillion BuildingClient: Carillion Developments

Hebburn Comprehensive SchoolPresented to: Graham Taylor and The Project TeamContractor: Carillion Building North East & ScotlandClient: Inspiredspaces STaG Ltd

A12 Junction 28Presented to: The A12 Site TeamContractor: Carillion Civil EngineeringClient: Highways Agency

Birmingham Box Managed Motorways Phase 1+ 2Presented to: The Site Management TeamContractor: Carillion Civil EngineeringClient: Highways Agency

M25 Controlled Motorway Junction 7-10 Phase 1Presented to: Rami BadawiContractor: Carillion Civil EngineeringClient: Highways Agency

Cardinal Langley R C High SchoolPresented to: Andrew Hand & TeamContractor: Carillion Construction LtdClient: Rochdale Metropolitan Borough Council

The Marsh AcademyPresented to: Steve ShorrockContractor: Carillion Construction LtdClient: Kent County Council

Dale GrovePresented to: Ross LathamContractor: Carillion National BuildingClient: Carillion

Droylsden AcademyPresented to: Stuart McFarlaneContractor: Carillion National BuildingClient: Tameside Council/Inspiredspaces

CCD WadhurstPresented to: Barrie Herbert and Stephen JonesContractor: CastleoakClient: Care Home Investments Wadhurst Ltd

Royston Road/Blochairn RoadPresented to: Gary WeirContractor: CCG (Scotland) LtdClient: Blochairn Housing Association

Harley Street ClinicPresented to: The Project TeamContractor: Collins Construction plcClient: HCA International Ltd

Wellfield Junior SchoolPresented to: John Fearon, Anthony Price and John BlowContractor: Conlon Construction LtdClient: Trafford Metropolitan Borough Council

Cargo Fleet Business CentrePresented to: Shaun CooperContractor: Conservatek LtdClient: Python Properties

M1 J10-13 Improvement SchemePresented to: The Project TeamContractor: Costain - Carillion Joint Venture (CCJV)Client: Highways Agency

The Thameslink Programme - Farringdon StationPresented to: Dan PowrieContractor: Costain Laing O’Rourke Joint VentureClient: Network Rail

GMW Arkwright StreetPresented to: Adrian GrocottContractor: Costain LtdClient: Viridor Laing

Longley LanePresented to: Jon GriffithsContractor: Costain LtdClient: Viridor Laing

Pontypridd Town Centre RegenerationPresented to: The Site TeamContractor: Costain LtdClient: Rhondda Cynon Taf County Borough Council

Port Talbot PDR Phase 2Presented to: John SkentelberyContractor: Costain LtdClient: Neath Port Talbot County Borough Council

Prendergast Hilly FieldsPresented to: Paul Middleton and Aubrey DaviesContractor: Costain LtdClient: Lewisham Schools for the Future

Crossrail Royal Oak Tunnel PortalPresented to: Vicknayson ThevendranContractor: Costain Skanska Joint VentureClient: Crossrail Ltd

37 EsplanadePresented to: Stuart WeardenContractor: Dandara Jersey LtdClient: Dandara Jersey Ltd

Barrow Upon Soar - Meadow GrangePresented to: Ian BentleyContractor: David Wilson Homes East MidlandsClient: David Wilson Homes East Midlands

Building B1A CollegelandsPresented to: David BoyleContractor: Dawn Construction LtdClient: TDI (Corporation) Ltd

Wokingham Fire StationPresented to: Nick Walls and Chris BellContractor: Dawnus Construction LtdClient: Royal Berkshire Fire Authority

UKHO RefurbishmentPresented to: James Darby and Alan RickettsContractor: Debut Services (South West) LtdClient: Defence Infrastructure Organisation

D1 & D2 Hangers & SOBPresented to: The Culdrose TeamContractor: Debut Services (South West) LtdClient: Debut Services (South West) Ltd

Aston Students VillagePresented to: Billy YoungContractor: DSM Demolition LtdClient: Aston Students Village

New Performing Arts Centre, Hornsey Road BathsPresented to: Richard Mullaney, Ritchie Knight,Andy Holland and Pat YusufContractor: Durkan LtdClient: London Borough of Islington

St Peter’s Catholic Primary SchoolPresented to: Thomas JonesContractor: E G Carter & Company LtdClient: Gloucestershire County Council

Bronze Award winners

The Considerate Constructors Scheme continues togo from strength to strength despite the recession.There is no doubt that the Industry acknowledgesthe benefits of supporting the Scheme and theimportance of working to minimise the impact ofprojects on the public and neighbours.

John Spanswick CBE Past Chairman, Bovis Lend Lease

‘‘’’

Page 15: National Site Awards · A46 Newark to Widmerpool Improvement Scheme Presented to: The A46 Project Team Contractor: Balfour Beatty Civil Engineering Client: Highways Agency Gteacre

Considerate Constructors Scheme 2012 National Site Awards | 15

EnterpriseMouchel Area 3Presented to: Area SouthContractor: EnterpriseMouchelClient: Highways Agency

TFL - Greenwich DepotPresented to: Darren O’ConnorContractor: EnterpriseMouchelClient: Transport for London

Hindley Green Community Primary SchoolPresented to: The Site TeamContractor: Eric Wright Construction LtdClient: Wigan Council Children & Young Peoples Services

Bangor Leisure Centre & 50m PoolPresented to: Paul McClementsContractor: Farrans (Construction) LtdClient: North Down Borough Council

‘The Atrium’ - North Walsham High SchoolPresented to: Phil BrowneContractor: Farrans (Construction) LtdClient: Norfolk Property Services

Lancaster CourtPresented to: Paul Thomson and Martin BullenContractor: Forrest LtdClient: Places for People

Little Hulton 4 & 5Presented to: Steve CorbettContractor: Forrest LtdClient: City West Housing

Redditch Borough Council KitchenRefurbishmentPresented to: Steve BaylissContractor: Frank Haslam Milan & Co LtdClient: Redditch Borough Council

Stobbhill Year 3 ModsPresented to: Dave BowmakerContractor: Frank Haslam Milan & Co LtdClient: Castle Morpeth Housing

The CrossingsPresented to: Gary WilliamsContractor: Frank Haslam Milan & Co LtdClient: Riverside North East

Greenwich Commercial CentrePresented to: Chris HoyleContractor: Galliard Construction LtdClient: Galliard Homes

Neale-Wade Community CollegePresented to: Richard BlytheContractor: Galliford TryClient: Equitix

Wigan Flood Alleviation Scheme Phase 2Presented to: Paul CornerContractor: Galliford TryClient: Environment Agency

Northfields, Turner RoadPresented to: Wayne SuchContractor: Galliford Try Partnerships SouthClient: Sentient Ventures LLP

CIAC MiddlehavenPresented to: John Currie & Andrew TodhunterContractor: GB Building Solutions LtdClient: Bioregional Quintain Ltd

Church View - DoncasterPresented to: Peter BarnicoatContractor: Geo Houlton & Sons LtdClient: Doncaster Central Development Trust

Broadacre House, BradfordPresented to: Andrew ThompsonContractor: GMI Construction Group PLCClient: Gregory Projects (Leeds) Ltd

Peace BridgePresented to: Paul Scott and The Site TeamContractor: GrahamClient: ILEX

Pools on the ForeshorePresented to: Keith McCahonContractor: Graham ConstructionClient: South Tyneside Council

Woodfield SchoolPresented to: The TeamContractor: Grehan Contractors LtdClient: Governors of Woodfield School

Magherafelt High SchoolPresented to: Colin MichaelContractor: Heron Bros LtdClient: North Eastern Education & Library Board

Braintree Decent Homes Phase 3Presented to: The Site TeamContractor: Higgins Construction plcClient: Greenfields Community Housing

Crayford Town HallPresented to: The Site TeamContractor: Higgins Construction plcClient: R & M Crayford Ltd

Former Waverley Working Mans ClubPresented to: The Project TeamContractor: Highbank HomesClient: Jephson Homes Housing Association

Suttons Wharf NorthPresented to: Jim McKennaContractor: Hollybrook Homes LtdClient: CHA Ventures Ltd

Bradgate Mental Health Ward 2 Phase 4Presented to: Patrick CassilyContractor: Interserve Construction LtdClient: Leicester Partnership NHS Trust

Leeds West AcademyPresented to: Graham CarvellContractor: Interserve Construction LtdClient: Leeds City Council

Strood Riverside and Corporation StreetPresented to: Darryl Allen, Adrian Harper, PeteNoakes, Spencer Coote and the Site TeamContractor: Interserve Construction LtdClient: Medway Council

John Lewis OfficesPresented to: The Operations TeamContractor: ISGClient: John Lewis Partnership

Nido Notting HillPresented to: Patrick GillamContractor: ISGClient: Blackstone Property Management

BAE Warton 354 GPresented to: Tony DouganContractor: ISG ConstructionClient: BAE Systems

Reaseheath College (Food Centre of Excellence)Presented to: Steve LowtonContractor: ISG ConstructionClient: Reaseheath College

St Thomas More Sixth Form CentrePresented to: Greg MellonContractor: ISG ConstructionClient: Diocese Schools Commission

Sainsbury’s DawlishPresented to: Peter RichardsContractor: ISG PearceClient: Sainsbury’s Store Ltd

Tesco SeatonPresented to: Garry MountainContractor: ISG PearceClient: Tesco Stores plc

Herons ReachPresented to: Andrew DelvardContractor: ISG RegionsClient: The Alternative Hotel Group

Dickens YardPresented to: Richard RorrisonContractor: J Reddington LtdClient: St George West London Ltd

University of Essex - Knowledge GatewayPresented to: Graham JoynerContractor: Jackson Civil EngineeringClient: University of Essex

New Apartments at D5aPresented to: Nyron WoodContractor: Jehu Project Services LtdClient: Coastal Housing Group

New Arley Phase 2Presented to: Ian JacobContractor: Jessup Build DevelopClient: Waterloo Housing Association

Bolsover Street - Phase 2Presented to: Gerry LonerganContractor: John Sisk & Son LtdClient: Bolsover Street Ltd

Mansion Court RefurbishmentPresented to: Nigel LynchContractor: John Sisk & Son LtdClient: Mansion Group

Market Place Buildings, KetteringPresented to: Nigel LynchContractor: John Sisk & Son LtdClient: Kettering Borough Council

Oak Tree CourtPresented to: Neil ArmstrongContractor: John Sisk & Son LtdClient: Coventry Building Society

The Sainsbury Laboratory - University of CambridgePresented to: SLC Project TeamContractor: KierClient: Lynxvale Ltd

Eastpoint CentrePresented to: Andrew OliverContractor: Kier ConstructionClient: Eastpoint Centre Ltd

Bronze Award winners

Page 16: National Site Awards · A46 Newark to Widmerpool Improvement Scheme Presented to: The A46 Project Team Contractor: Balfour Beatty Civil Engineering Client: Highways Agency Gteacre

Heath Road/HaywardPresented to: The Site TeamContractor: Kier ConstructionClient: Suffolk Mental Health Partnership Trust

HMP Warren HillPresented to: The Site TeamContractor: Kier ConstructionClient: Ministry Of Justice

Houghton Primary SchoolPresented to: The Site TeamContractor: Kier ConstructionClient: Cambridgeshire County Council

Kings Community ChurchPresented to: Ian BurrellContractor: Kier ConstructionClient: Northam Developments

Post 16 Building - Chase High SchoolPresented to: The Site TeamContractor: Kier ConstructionClient: Chase High School

Richard Rose Morton AcademyPresented to: Mark PatersonContractor: Kier ConstructionClient: Richard Rose Morton Academy

Shelfield Community AcademyPresented to: The Shelfield TeamContractor: Kier ConstructionClient: Walsall Council

Solum Regeneration, Epsom StationPresented to: The Site TeamContractor: Kier ConstructionClient: Solum Regeneration Ltd

Thomas Clarkson Community College SitePresented to: The Site TeamContractor: Kier ConstructionClient: Equitix

Ysgol Gyfun GwynllywPresented to: John ParryContractor: Kier ConstructionClient: Torfaen County Borough Council

Francis Combe AcademyPresented to: Peter DixonContractor: Kier Construction (London)Client: Hertfordshire County Council

William Brookes School Phase 2Presented to: Gareth McGillContractor: Kier MossClient: Shropshire Council

ESSA AcademyPresented to: Phillip WhiteContractor: Kier NorthernClient: ESSA

Shaw Hedge RoadPresented to: Gareth WilkesContractor: Kier Partnership Homes LtdClient: Wyre Forest Community Housing

Sainsbury’s StirlingPresented to: Alexander GerrieContractor: Kier ScotlandClient: Sainsbury’s Supermarkets Ltd

Hull Decent HomesPresented to: Dave PaddisonContractor: Kier Services - Maintenance HullClient: Kingston upon Hull City Council

Sheaf Training CentrePresented to: Peter Woodward & Clive BrookContractor: Kier Sheffield LLPClient: Sheffield City Council

Blackpool Victoria HospitalPresented to: Peter StephensonContractor: Laing O’Rourke Construction North LtdClient: Blackpool, Fylde & Wyre Hospital NHS Trust

Ferndene Children and Young Peoples UnitPresented to: The Ferndene Site TeamContractor: Laing O’Rourke Construction North LtdClient: Northumberland, Tyne & Wear NHS Trust

Walkden High SchoolPresented to: Guto JonesContractor: Laing O’Rourke Construction North LtdClient: Salford City Council - Children’s ServicesDirectorate

Cannon Place ProjectPresented to: The Site TeamContractor: Laing O’Rourke Construction South LtdClient: Hines UK

Pembury Hospital PFI RedevelopmentPresented to: The Project TeamContractor: Laing O’Rourke Construction South LtdClient: Kent & East Sussex Weald Hospital Ltd

North Inch Community CampusPresented to: Bruce SpaldingContractor: Laing O’Rourke Scotland LtdClient: Axiom Education (Perth & Kinross) Ltd

Taf Ely Learning CampusPresented to: Stephen RobbinsContractor: Laing O’Rourke Wales and WestClient: Coleg Morgannwg

Taf Ely Learning CampusPresented to: Paul NormanContractor: Laing O’Rourke Wales and WestClient: Coleg Morgannwg

Purford Green SchoolPresented to: Shane SheffieldContractor: LakehouseClient: Essex County Council

Rockliffe Manor Primary SchoolPresented to: Shane LawsonContractor: LakehouseClient: London Borough of Greenwich

H5 SchemePresented to: Mathew Cadwallader, EdwardMcNamara, Charlie Hargreaves, Nicole Barnes, JamesBacon and Adam SturgeonContractor: LeadbitterClient: Sovereign Housing Group

Helliers Lane, CheddarPresented to: Robert Insa-Stephens, CharlieHargreaves, Mark Essex, Kevin Querl, Steve Ellaway,Eliot Hopkins and Adam SturgeonContractor: LeadbitterClient: First Step Homes (SW) Ltd

Institute of Life Sciences 2Presented to: Paul Keber & Craig NowellContractor: LeadbitterClient: Swansea University

Eastgate Square, ChichesterPresented to: The Project TeamContractor: Leadbitter GroupClient: Seaward Properties Ltd

Langley Park School for BoysPresented to: Peter DeakinContractor: Leadbitter GroupClient: London Borough of Bromley

St Cross Grange, WinchesterPresented to: The Project TeamContractor: Leadbitter GroupClient: Greensleeves Homes Trust

Project SLAM, RAF LossiemouthPresented to: Cheryl WardContractor: Lend Lease LtdClient: Defence Estates

Burntwood SchoolPresented to: George MasonContractor: Lend Lease LtdClient: Wandsworth Borough Council

Regent’s Place NEQPresented to: Tony McAreeContractor: Lend Lease LtdClient: British Land (The Mary Street Estate Ltd)

Southport Cultural CentrePresented to: Bill AckersContractor: Lend Lease LtdClient: Sefton Metropolitan Borough Council

Nash Mills WharfPresented to: Barry PortContractor: Linden Homes Chiltern LtdClient: Linden Homes Chiltern Ltd

Halifax Sainsbury’sPresented to: Team 7Contractor: Longcross ConstructionClient: Sainsbury’s Supermarkets Ltd

Tesco PontypriddPresented to: Sunil Johal and Gareth JonesContractor: Longcross ConstructionClient: Tesco Stores Ltd

Waitrose PoundburyPresented to: Paul Clarke and Paresh BulsaraContractor: Longcross ConstructionClient: Waitrose Ltd

Bearwood HousePresented to: Tim Powell & Richard HarrisContractor: Lovell Partnerships LtdClient: Sandwell Homes

Cannock Kitchen RefurbishmentsPresented to: Warren Armstrong and Colin MartinContractor: Lovell Partnerships LtdClient: Cannock Chase District Council

Dudley Internal ImprovementsPresented to: Brian Berry and Colin MartinContractor: Lovell Partnerships LtdClient: Dudley Metropolitan Borough Council

Bronze Award winners

I congratulate all the winners of the 2012 NationalSite Awards. You all showcase the UK industry at itsvery best. This is a year when British constructionwill be on display to the whole world as wecelebrate the 2102 Olympics. And we have everyreason to be proud of our achievements.

Stephen Ratcliffe Director, UK Contractors Group

‘‘’’

Page 17: National Site Awards · A46 Newark to Widmerpool Improvement Scheme Presented to: The A46 Project Team Contractor: Balfour Beatty Civil Engineering Client: Highways Agency Gteacre

Considerate Constructors Scheme 2012 National Site Awards | 17

Earls GrangePresented to: Darren PeckContractor: Lovell Partnerships LtdClient: Midland Heart

Kestrel Avenue, Kitchen and BathroomRefurbishmentPresented to: Alex RankinContractor: Lovell Partnerships LtdClient: Glasgow Housing Association

Nimmings FarmPresented to: Dave Jones and James FeakesContractor: Lovell Partnerships LtdClient: West Mercia Homes

Old ArleyPresented to: Kevin WhitehouseContractor: Lovell Partnerships LtdClient: Midland Heart

Pershore RoadPresented to: Carl Deakin & Colin GimsonContractor: Lovell Partnerships LtdClient: Birmingham City Council

Wauchope Phase 8Presented to: Mark ElliottContractor: Lovell Partnerships LtdClient: PARC Craigmillar Developments Ltd

Biffa West Sussex MRMCPresented to: Phil SheltonContractor: M + W GroupClient: Biffa Waste Services Ltd

Garth Hill CollegePresented to: Robin NormanContractor: Mace LtdClient: Bracknell Forest Council

Victoria Hall LtdPresented to: David Tosh and Jason LiuContractor: Mace LivingClient: Victoria Hall Ltd

ITV TWR Coronation StreetPresented to: Simon HallContractor: Mace LtdClient: ITV Properties (Developments) Ltd

Project CelsiusPresented to: Chris JarmanContractor: Mace LtdClient: Legal & General

The PlacePresented to: Oliver ClarkeContractor: Mace LtdClient: Sellar Property Group

Caroline House Refurbishment, Colman HospitalPresented to: Jonathan ScottContractor: Mansell Construction Services LtdClient: Norlife Ltd

Aces CourtPresented to: John LyneContractor: Mansell Construction Services LtdClient: Catalyst Housing Group

Archbishop Courtenay C of E (Aided) Primary SchoolPresented to: Richard Hall, Clive Vardakis, Jamie Hawkins, Barry Robbins, Jo Law and Roddy MacdonaldContractor: Mansell Construction Services LtdClient: Canterbury Diocesan Board of Education

Engineering & Science Learning Centre, University of NottinghamPresented to: Tajinder KhambayContractor: Mansell Construction Services LtdClient: Nottingham University

James Terry CourtPresented to: Andrew Nicholson, Colin Low, WilliamSym, Gavin Haines and Kunwer SinghContractor: Mansell Construction Services LtdClient: Royal Masonic Benevolent Institution

Peabody AvenuePresented to: Spyros DemetriouContractor: Mansell Construction Services LtdClient: Peabody Trust

Reigate Grammar School - Science BuildingPresented to: Mike YoungContractor: Mansell Construction Services LtdClient: Reigate Grammar School

Sandwell Pathfinder Millfields RegenerationPresented to: Lewis JonesContractor: Mansell Construction Services LtdClient: Riverside Housing Association

South Park CourtPresented to: Tony BroadContractor: Mansell Construction Services LtdClient: Red Square Developments (Havant) LLP

St Andrew HousePresented to: Paul DobieContractor: Mansell Construction Services LtdClient: West Nile Construction Ltd

4-5 Princes GatePresented to: Barry ConnollyContractor: McGee Group LtdClient: Hill Spink Properties

Abbey Crest Care HomePresented to: Craig GiblettContractor: Miller Construction (UK) LtdClient: Caring Homes Group

Washington Galleries Wessington Square ProjectPresented to: Chris LaneContractor: Miller Construction (UK) LtdClient: Prudential Assurance Company Ltd

DeansleighPresented to: Garry BowlerContractor: Miller Homes Ltd - East Midlands RegionClient: Miller Homes Ltd - East Midlands Region

Archbishop Sancroft High SchoolPresented to: Lee WymerContractor: Morgan Sindall plcClient: Diocese of Norwich

Colville Primary SchoolPresented to: Stuart LoveseyContractor: Morgan Sindall plcClient: Cambridgeshire County Council

KMBC - Stockbridge VillagePresented to: Ray ClarkeContractor: Morgan Sindall plcClient: Knowsley Metropolitan Borough Council -Dept of Education and Lifelong Learning

Maidstone Museum & Bentlif Art GalleryPresented to: Ian LockContractor: Morgan Sindall plcClient: Maidstone Borough Council

Manufacturing Technology CentrePresented to: Jerry FinchContractor: Morgan Sindall plcClient: Manufacturing Technology Centre

Murray Royal HospitalPresented to: David GrayContractor: Morgan Sindall plcClient: NHS Tayside

Northumberland Halls ReplacementPresented to: Keith WilliamsContractor: Morgan Sindall plcClient: Royal Veterinary College

Park Brow Primary SchoolPresented to: Justin Kay, Reg Scriven, Steve Rooney, Tony McCabe and John LuxfordContractor: Morgan Sindall plcClient: 2020 Liverpool Ltd

Three Crowns HousePresented to: Andrew WalshamContractor: Morgan Sindall plcClient: Royal Asset & London Management Company

Town Hub Primary Care CentrePresented to: Paul LimbContractor: Morgan Sindall plcClient: Doncaster Community Solutions

West Midlands Gas AlliancePresented to: Lynn HotchkissContractor: Morgan Sindall plcClient: National Grid

Westbourne Park Advanced CivilsPresented to: Steve GollaContractor: Morgan Sindall plcClient: Crossrail Ltd

Wigan Life CentrePresented to: Brian BarrittContractor: Morgan Sindall plcClient: Hochtief Developments

Ings Beck FASPresented to: Steve HamerContractor: Morrison ConstructionClient: Environment Agency

Mill Leese Reservoir ImprovementsPresented to: The Site TeamContractor: Morrison ConstructionClient: Environment Agency

Highbury ParkPresented to: Peter GoreContractor: Mount Anvil plcClient: Mount Anvil plc

Oaklee Housing SchemePresented to: Barry AgnewContractor: MSM Contracts LtdClient: Oaklee Housing Association

Low Rise Enveloping, PlaistowPresented to: The Project TeamContractor: Mulalley & Co LtdClient: London Borough of Newham

Newham Homes Low Rise EnvelopingPresented to: The Project TeamContractor: Mulalley & Co LtdClient: London Borough of Newham

Bronze Award winners

Page 18: National Site Awards · A46 Newark to Widmerpool Improvement Scheme Presented to: The A46 Project Team Contractor: Balfour Beatty Civil Engineering Client: Highways Agency Gteacre

Woodberry Down Phase 2Presented to: The Project TeamContractor: Mulalley & Co LtdClient: Hackney Homes

Internal/External Refurbishment 2010/2011 Area 4 - Ealing HomesPresented to: Marcus PittContractor: Niblock (Builders) LtdClient: Ealing Council

STW Anson Road Willenhall West MidlandsPresented to: Mark Clarke and The Site TeamContractor: North Midland Construction plcClient: Severn Trent Sewage

Bathroom ReplacementPresented to: Mark YellandContractor: Ocean Services (SW) LtdClient: Ocean Group Ltd

Central Heating InstallationPresented to: Jason WhiteContractor: Ocean Services (SW) LtdClient: Ocean Housing Ltd

Kitchen ReplacementPresented to: Jason Whitmore-PayneContractor: Ocean Services (SW) LtdClient: Ocean Group Ltd

Roof RenewalPresented to: Tim EllisContractor: Ocean Services (SW) LtdClient: Ocean Group Ltd

Vine Court Student ResidencesPresented to: Steve JeramsContractor: Ocon Construction LtdClient: The University of Liverpool

St Mary’s CollegePresented to: Eamon O’Hare, Breda McAteer,Norman Ellis and Paul McNameeContractor: O’Hare & McGovern LtdClient: Belfast Education Services (Derry)

50/51 Sloane SquarePresented to: Roger Pettitt & Gareth WilliamsContractor: OsborneClient: Cadogan Estate Ltd

A46 Dumbbells/Ansty Park Junction ImprovementPresented to: Deane HoggContractor: OsborneClient: Highways Agency

Lowther Castle and GardensPresented to: The Site TeamContractor: PattonClient: Lowther Castle & Gardens Trust

Pevensey Bay Sea DefencesPresented to: Ian ThomasContractor: Pevensey Coastal Defence LtdClient: Environment Agency

Priors Court SchoolPresented to: Dave GillContractor: PMC Construction & Development Services LtdClient: Priors Court School

Travelodge ManchesterPresented to: John BoardmanContractor: Pochin Construction LtdClient: Braidwater Developments

Blackwood Primary SchoolPresented to: Stephen HarrisonContractor: Quantum Construction LtdClient: Blackwood Primary School

School of Humanities & Social Sciences,University of CambridgePresented to: Will Robinson and Craig CarterContractor: R G Carter Cambridge LtdClient: University of Cambridge

Red HousesPresented to: Ross MartinContractor: R G Carter Projects LtdClient: Waitrose Ltd

UckfieldPresented to: David TabbronContractor: R G Carter Projects LtdClient: Waitrose Ltd

Hedera GreenPresented to: Alex HenesyContractor: Redrow Homes South MidlandsClient: Redrow Homes South Midlands

Sainsbury’s Supermarkets Ltd - MarlowPresented to: Ciaran Tobin and The Project TeamContractor: RG GroupClient: Sainsbury’s Supermarkets Ltd

Waitrose Ltd - Canary Wharf RefurbishmentPresented to: Bryony LevermoreContractor: RG GroupClient: Waitrose Ltd

Waitrose Ltd - CanterburyPresented to: Robert GottContractor: RG GroupClient: Waitrose Ltd

Waitrose Ltd - JesmondPresented to: Dan JordanContractor: RG GroupClient: Waitrose Ltd

Bow Common DepotPresented to: The TeamContractor: Ringway JacobsClient: Transport for London

Hicks Lodge Cycle CentrePresented to: Peter WinsonContractor: Robert Woodhead LtdClient: Forestry Commission

Emergency Care CentrePresented to: Craig SmithContractor: RobertsonClient: Grampian Health Board

BMW/Mini DealershipPresented to: Geoff Halfpenny on behalf of the Site TeamContractor: SDC Builders LtdClient: Bedfordia Developments Ltd

Bridson StreetPresented to: Rory WhalleyContractor: Seddon Construction LtdClient: Urban Vision Ltd

Craig House BuryPresented to: Nigel CarrContractor: Seddon Construction LtdClient: Seddon Estates

William Simpson’s Care HomePresented to: The Management TeamContractor: Seddon Construction LtdClient: William Simpson’s

Liverpool Central LibraryPresented to: Steve GerardContractor: Shepherd Construction LtdClient: Inspire Partnership

Doctors NewarkPresented to: Simon RuddickContractor: Simons Construction LtdClient: M F Strawson Ltd

Refurbishment Work of Marks and Spencer - BuxtonPresented to: Neil O’BrienContractor: Simons Construction LtdClient: Marks & Spencer plc

Biomedical Science Research ComplexPresented to: Peter UnwinContractor: Sir Robert McAlpine LtdClient: University of St Andrews

Brandon Primary SchoolPresented to: Richard AttleyContractor: Sir Robert McAlpine LtdClient: Durham County Council

Bulgari Hotel and ResidencePresented to: Mark WilliamsonContractor: Sir Robert McAlpine LtdClient: Prime Development Ltd

Esh Winning Primary SchoolPresented to: Lee WayperContractor: Sir Robert McAlpine LtdClient: Durham County Council

Exeter ForumPresented to: Rebecca SmithContractor: Sir Robert McAlpine LtdClient: University of Exeter

Gosforth Junior High SchoolPresented to: Wayne Denham and George DonkinContractor: Sir Robert McAlpine LtdClient: Aura Newcastle Ltd

Marischal CollegePresented to: The Site TeamContractor: Sir Robert McAlpine LtdClient: Aberdeen City Council

Vestas Blade Technology CentrePresented to: George RayContractor: Sir Robert McAlpine LtdClient: Vestas Technology UK Ltd

Ashton Park SchoolPresented to: Owen WrightContractor: Skanska UK plcClient: Bristol LEP Ltd

Skanska Walsall Joint Venture, Pleck RoadPresented to: Paul WealeContractor: Skanska UK plcClient: Walsall Hospitals NHS Trust

Bronze Award winners

At a time when the outlook for the constructionindustry remains uncertain, it is really encouragingto see more and more companies recognising thatbeing part of the Considerate Constructors Scheme ishelping to differentiate them from their competitors.

Michael Ankers OBE Chief Executive, Construction Products Association

‘‘’’

Page 19: National Site Awards · A46 Newark to Widmerpool Improvement Scheme Presented to: The A46 Project Team Contractor: Balfour Beatty Civil Engineering Client: Highways Agency Gteacre

Considerate Constructors Scheme 2012 National Site Awards | 19

W C H A RewiresPresented to: Electrical Project TeamContractor: Spectrum Property Care LtdClient: Western Challenge Housing Association Ltd

Newton AbbottPresented to: Derek Lyon and John CowlinContractor: Speymill Contracts LtdClient: Whitbread Restaurants

Honeypot Lane, StanmorePresented to: Jason MortensonContractor: St EdwardClient: Berkeley Homes (Urban Living) Ltd

Battersea Reach Block SPresented to: Chris WyethContractor: St George South London LtdClient: St George South London Ltd

High Wycombe Phase 2Presented to: The Site TeamContractor: St JamesClient: St James Homes (Thames Valley)

The Hamptons, Worcester ParkPresented to: Suzanne JamisonContractor: St JamesClient: St James

Trinity Place Coombe Lane, Raynes ParkPresented to: Gary RoffeContractor: St JamesClient: St James

Butlers CourtPresented to: Dean CunninghamContractor: St James Group - WestClient: St James Group - West

SilvermillPresented to: Brian MaynardContractor: St James Group LtdClient: St James Group Ltd

Enterprise Business CentrePresented to: Alan RoderickContractor: Stainforth ConstructionClient: Newlands Community Association Trading Ltd

South Tyneside CollegePresented to: Michael BraysonContractor: Surgo ConstructionClient: South Tyneside College

Ashton Northern Bypass - Stage 2Presented to: ANB Site TeamContractor: Tameside Metropolitan Borough CouncilClient: Tameside Metropolitan Borough Council

Tamesis CrossnessPresented to: Dave EvansContractor: TamesisClient: Thames Water Utilities

Tamesis BecktonPresented to: The Site TeamContractor: Tamesis JVClient: Thames Water Utilities

Highway Works AlliancePresented to: Scott KilbyContractor: Tarmac National ContractingClient: Leicestershire County Council

Cooks ShipyardPresented to: Trevor MillsContractor: Taylor Wimpey East LondonClient: Taylor Wimpey East London

Ellowes Hall Sports CollegePresented to: Simon SparkesContractor: Thomas Vale Construction plcClient: The Governors of Ellowes Hall School

Oak Meadow Primary SchoolPresented to: John HickmanContractor: Thomas Vale Construction plcClient: Wolverhampton City Council

Wolverhampton Decent HomesPresented to: Jonathan WellingtonContractor: Thomas Vale Construction plcClient: Wolverhampton Homes

Factory Youth ZonePresented to: Ian ThorpeContractor: Tolent Construction LtdClient: OnSide North West

Central St Giles - Private ResidentialPresented to: David Martin and The Site TeamContractor: United House LtdClient: SGRDL

Four Courts EstatePresented to: The Project Team in Memory of Trevor HolmesContractor: United House LtdClient: AmicusHorizon

Bamford WTW - Treatment Enhancements -Works Order WO 5Presented to: STW and VINCI / MWH TeamContractor: VINCI / MWH AllianceClient: Severn Trent Water Ltd

Gatwick Airport Pier 2Presented to: Stephen BannonContractor: VINCI Construction UK LtdClient: London Gatwick Airport

Bagot Street Student AccommodationPresented to: Edward BiddleContractor: VINCI Construction UK LtdClient: Iliad Special Projects Ltd

Bents Green SchoolPresented to: Mark Johnson, Don Grafton and theVinci Site TeamContractor: VINCI Construction UK LtdClient: Sheffield Learning Education Partnership

Bishops Park & Fulham PalacePresented to: Matt StevensonContractor: Vinci Construction UK LtdClient: London Borough of Hammersmith & Fulham

Langford Equine SurgeryPresented to: Stephanie ColeContractor: VINCI Construction UK LtdClient: University of Bristol

Whiston Hospital PFI - Phase 2Presented to: The Project TeamContractor: VINCI Construction UK LtdClient: New Hospitals, Taylor Woodrow Construction

Ysgol Plasmawr Phase 7Presented to: Adrian MillsContractor: VINCI Construction UK LtdClient: City and County of Cardiff

East Kent Access Phase 2Presented to: The Project TeamContractor: VolkerFitzpatrick Hochtief Joint VentureClient: Kent County Council

Tipping Street Development, StaffordPresented to: The Site TeamContractor: VolkerFitzpatrick LtdClient: Stoford Retail Ltd

Whitecart Water Contract 2 FPS (Sections 14-17)Presented to: The Site TeamContractor: VolkerStevinClient: Glasgow City Council (Development &Regeneration Services)

M&S GuernseyPresented to: Darren TaylorContractor: W B Projects LtdClient: Creasey’s Ltd (M&S Franchise Store)

Marks & Spencer Newbury RemodelPresented to: Darren TaylorContractor: W B Projects LtdClient: Marks & Spencer plc

A S A P Project for Southampton City CouncilPresented to: Jason WooldridgeContractor: Wates Construction LtdClient: Southampton City Council

Hainault Forest High SchoolPresented to: Martyn RichmondContractor: Wates Construction LtdClient: London Borough of Redbridge

Harborne Pool & Fitness CentrePresented to: David SquiresContractor: Wates Construction LtdClient: Birmingham City Council

Inspire Luton Sports VillagePresented to: The Wates Project TeamContractor: Wates Construction LtdClient: Luton Borough Council

John Gulson Primary SchoolPresented to: Stuart LoaderContractor: Wates Construction LtdClient: Coventry City Council

Kingswood Civic Centre & Childrens Locality HUBPresented to: Sean FranksContractor: Wates Construction LtdClient: South Gloucestershire Council

Redgrave Children & Young People’s CentrePresented to: Joe Staunton and Dave BucknellContractor: Wates Construction LtdClient: LLCP

Sir Stanley Matthews AcadamyPresented to: Mark AlkerContractor: Wates Construction LtdClient: Stoke-on-Trent City Council

UCL DarwinPresented to: The Site TeamContractor: Wates Interiors LtdClient: UCL

Bristol City Council Decent Homes ProgrammePresented to: Steve PearceContractor: Wates Living SpaceClient: Bristol City Council

Manton and ReynoldsPresented to: Paul GreavesContractor: Wates Living SpaceClient: Birmingham City Council

Bronze Award winners

Page 20: National Site Awards · A46 Newark to Widmerpool Improvement Scheme Presented to: The A46 Project Team Contractor: Balfour Beatty Civil Engineering Client: Highways Agency Gteacre

Printed on recycled stock | Published 04/12 | Please recycle

Bronze Award winners

For full details of all the winners, visitwww.ccscheme.org.uk

Improving the image of construction

Whitebeck CourtPresented to: Gary DawsonContractor: Wates Living SpaceClient: Northwards Housing

John Lewis StratfordPresented to: The Site TeamContractor: Wates RetailClient: John Lewis Partnership

M&S Simply Food, Cheetham HillPresented to: Mark GaleContractor: Wates RetailClient: Marks & Spencer plc

Marks and Spencer, BirkenheadPresented to: Darryn Davies, Dominik Turaz andRichard GreatorexContractor: Wates RetailClient: Marks & Spencer plc

Ffordd ElinPresented to: Mr D N MorganContractor: Weston ContractorsClient: Newydd Housing Association

Grange ParkPresented to: Russell PitmanContractor: William Davis LtdClient: William Davis

All Saints AcademyPresented to: Ian DenmeadContractor: Willmott Dixon Construction LtdClient: Central Bedfordshire Council

Barcroft Primary SchoolPresented to: Jackson TurnerContractor: Willmott Dixon Construction LtdClient: Walsall Metropolitan Borough Council

Christ the King Primary SchoolPresented to: Michael WalmsleyContractor: Willmott Dixon Construction LtdClient: Cheshire East Council

Dersingham Primary SchoolPresented to: Barry JamesContractor: Willmott Dixon Construction LtdClient: London Borough of Newham

Ellingham Primary SchoolPresented to: Chris GreetContractor: Willmott Dixon Construction LtdClient: Royal Borough of Kingston upon Thames

Gordano Growth ProjectPresented to: Jon CookeContractor: Willmott Dixon Construction LtdClient: North Somerset Council

Gunhild Way Primary SchoolPresented to: Mark DoranContractor: Willmott Dixon Construction LtdClient: Cambridgeshire County Council

Harris Academy, PurleyPresented to: Chris YatesContractor: Willmott Dixon Construction LtdClient: London Borough of Croydon

HealthtecPresented to: Kieran Danby, Sam Lewis andRichard WhiteheadContractor: Willmott Dixon Construction LtdClient: Walsall Metropolitan Borough Council

Landau Forte Academy (Post 16)Presented to: Roger WinferContractor: Willmott Dixon Construction LtdClient: Staffordshire County Council

Longfield High SchoolPresented to: Marc TurnerContractor: Willmott Dixon Construction LtdClient: Leicestershire County Council

New Yate International AcademyPresented to: The Site TeamContractor: Willmott Dixon Construction LtdClient: South Gloucestershire Council

Oasis AcademyPresented to: Andy HowarthContractor: Willmott Dixon Construction LtdClient: Oldham Metropolitan Borough Council

Rotherham MortuaryPresented to: Anthony CooperContractor: Willmott Dixon Construction LtdClient: The Rotherham NHS Foundation Trust

St Francis Primary SchoolPresented to: St Francis School Site TeamContractor: Willmott Dixon Construction LtdClient: Isle of Wight Council

Trinity Anglican Methodist Primary SchoolPresented to: Jon CookeContractor: Willmott Dixon Construction LtdClient: North Somerset Council

Williamstown Primary SchoolPresented to: Darren HancockContractor: Willmott Dixon Construction LtdClient: Rhondda Cynon Taf County Borough Council

Britannia ClosePresented to: Lewis BlakeContractor: Willmott Dixon HousingClient: London Borough of Ealing

Chawton Park RoadPresented to: Dominic JankowskiContractor: Willmott Dixon HousingClient: Sentinel Housing Association Ltd

Dee Park Phase 1APresented to: Keith RichardsContractor: Willmott Dixon HousingClient: Dee Park Partnerships

Morrisons - StangroundPresented to: The Site TeamContractor: Willmott Dixon Interiors LtdClient: Wm Morrison Supermarkets plc

EMDCPresented to: Robin OrgillContractor: Winvic Construction LtdClient: Clowes Developments (UK) Ltd

Considerate Constructors SchemeSite RegistrationPO Box 75WareHertfordshire SG12 0YXTelephone 01920 485959Fax 01920 485958Freephone 0800 783 1423

[email protected]