![Page 1: Risk based design of flood defence systems: A preliminary analysis for the New Orleans Metropolitan Area S.N. Jonkman M. Kok M. Van Ledden J.K. Vrijling](https://reader035.vdocuments.us/reader035/viewer/2022062717/56649e405503460f94b318ff/html5/thumbnails/1.jpg)
Risk based design of flood defence systems:
A preliminary analysis for the New Orleans Metropolitan Area
S.N. JonkmanM. Kok
M. Van LeddenJ.K. Vrijling
![Page 2: Risk based design of flood defence systems: A preliminary analysis for the New Orleans Metropolitan Area S.N. Jonkman M. Kok M. Van Ledden J.K. Vrijling](https://reader035.vdocuments.us/reader035/viewer/2022062717/56649e405503460f94b318ff/html5/thumbnails/2.jpg)
Background
Flooding of New Orleans due to hurricane KatrinaImprovements to hurricane protection system
Question: “How safe is safe enough?”Risk informed decision-making
Objective: “Apply economic optimization to New Orleans metropolitan area” Simplified and indicative approachStudy was part of “Dutch Perspective for Coastal Louisiana” by Netherlands Water Partnership
![Page 3: Risk based design of flood defence systems: A preliminary analysis for the New Orleans Metropolitan Area S.N. Jonkman M. Kok M. Van Ledden J.K. Vrijling](https://reader035.vdocuments.us/reader035/viewer/2022062717/56649e405503460f94b318ff/html5/thumbnails/3.jpg)
Economic optimization
0
500
1000
1500
2000
2500
3000
3500
4000
3 3.5 4 4.5 5 5.5 6
dike height (m)
Co
sts
(fl
10
ex
p6
)
Investments
Risk
Total Costs
optimum
![Page 4: Risk based design of flood defence systems: A preliminary analysis for the New Orleans Metropolitan Area S.N. Jonkman M. Kok M. Van Ledden J.K. Vrijling](https://reader035.vdocuments.us/reader035/viewer/2022062717/56649e405503460f94b318ff/html5/thumbnails/4.jpg)
Safety standards in the Netherlands
Applied after 1953 flood disaster in the Netherlands(Indirect) basis for safety standardsCurrent safety standards (derived in 1960’s) are expected to be outdated, due to growth of economy and population
![Page 5: Risk based design of flood defence systems: A preliminary analysis for the New Orleans Metropolitan Area S.N. Jonkman M. Kok M. Van Ledden J.K. Vrijling](https://reader035.vdocuments.us/reader035/viewer/2022062717/56649e405503460f94b318ff/html5/thumbnails/5.jpg)
Proposed flood protection system
Flood protection system proposed in Dutch perspective
Leading to different bowls / dike rings
![Page 6: Risk based design of flood defence systems: A preliminary analysis for the New Orleans Metropolitan Area S.N. Jonkman M. Kok M. Van Ledden J.K. Vrijling](https://reader035.vdocuments.us/reader035/viewer/2022062717/56649e405503460f94b318ff/html5/thumbnails/6.jpg)
Approach
Data is needed: Flood Damage Safety level: Flooding probability Investment costs and relationship with flooding
probability
Full scale risk analysis is preferred (IPET or FLORIS in the NL)
Here: Simplified approach is used Indicative estimates (‘order of magnitude’) Limited number of safety levels: 1/100, 1/1000,
1/5000, 1/10.000, …. Focussed on hurricane flooding (no rainfall and river
flooding)
![Page 7: Risk based design of flood defence systems: A preliminary analysis for the New Orleans Metropolitan Area S.N. Jonkman M. Kok M. Van Ledden J.K. Vrijling](https://reader035.vdocuments.us/reader035/viewer/2022062717/56649e405503460f94b318ff/html5/thumbnails/7.jpg)
Flood Damage
Based on evaluations of damage (IPET, Kok et al.): north NO (central part) $15 billion north NO: (eastern part) $ 10 billion south NO: $ 5 billion
(pre Katrina damages)
Risk to life and other types of consequences are not taken into account
Risk (=prob. x damage) determined as net present value
Real discount rate of 2% is used
![Page 8: Risk based design of flood defence systems: A preliminary analysis for the New Orleans Metropolitan Area S.N. Jonkman M. Kok M. Van Ledden J.K. Vrijling](https://reader035.vdocuments.us/reader035/viewer/2022062717/56649e405503460f94b318ff/html5/thumbnails/8.jpg)
Safety levels
Flooding probability is assumed to be equal to the probability of exceedance of design conditions (water level, waves)
Post Katrina safety level: 1/100 per year
Investments: Investments relate to levee improvement and
structures, e.g. floodgates Costs are in the range of $ 20 - $ 60 million / km
8
10
12
14
16
18
20
22
10 100 1000 10000 100000
return perod (yr)
surg
e le
vel
![Page 9: Risk based design of flood defence systems: A preliminary analysis for the New Orleans Metropolitan Area S.N. Jonkman M. Kok M. Van Ledden J.K. Vrijling](https://reader035.vdocuments.us/reader035/viewer/2022062717/56649e405503460f94b318ff/html5/thumbnails/9.jpg)
Results: Central part of New Orleans
Optimal safety level: 1/5000
0,0E+00
2,0E+09
4,0E+09
6,0E+09
8,0E+09
1,0E+10
1,2E+10
1,4E+10
1,6E+10
1,8E+10
10 100 1000 10000 100000 1000000
return period (yr)
Co
sts
(U
S $
)
Investments Risk Total costs
![Page 10: Risk based design of flood defence systems: A preliminary analysis for the New Orleans Metropolitan Area S.N. Jonkman M. Kok M. Van Ledden J.K. Vrijling](https://reader035.vdocuments.us/reader035/viewer/2022062717/56649e405503460f94b318ff/html5/thumbnails/10.jpg)
Results: Eastern part
Optimal safety level: 1/1000
0,0E+00
2,0E+09
4,0E+09
6,0E+09
8,0E+09
1,0E+10
1,2E+10
1,4E+10
1,6E+10
10 100 1000 10000 100000 1000000
return period (yr)
Co
sts
(U
S $
)
Investments Risk Total costs
![Page 11: Risk based design of flood defence systems: A preliminary analysis for the New Orleans Metropolitan Area S.N. Jonkman M. Kok M. Van Ledden J.K. Vrijling](https://reader035.vdocuments.us/reader035/viewer/2022062717/56649e405503460f94b318ff/html5/thumbnails/11.jpg)
South NO
Optimal safety level: 1/1000
0,0E+00
1,0E+09
2,0E+09
3,0E+09
4,0E+09
5,0E+09
6,0E+09
7,0E+09
8,0E+09
9,0E+09
10 100 1000 10000 100000 1000000
return period (yr)
Co
sts
(U
S $
)
Investments Risk Total costs
![Page 12: Risk based design of flood defence systems: A preliminary analysis for the New Orleans Metropolitan Area S.N. Jonkman M. Kok M. Van Ledden J.K. Vrijling](https://reader035.vdocuments.us/reader035/viewer/2022062717/56649e405503460f94b318ff/html5/thumbnails/12.jpg)
Sensitivity analysis: central part
flood probability Base case 1/5000 Flood Damage
- 50 % lower - 100% higher
1/1000 1/5000
Net Discount rate - 50% lower - 100% higher
1/5000 1/5000
Investment costs - 50% lower - 50% higher
1/5000 1/5000
![Page 13: Risk based design of flood defence systems: A preliminary analysis for the New Orleans Metropolitan Area S.N. Jonkman M. Kok M. Van Ledden J.K. Vrijling](https://reader035.vdocuments.us/reader035/viewer/2022062717/56649e405503460f94b318ff/html5/thumbnails/13.jpg)
Conclusions
It is possible to apply economic optimization to NO (and other areas)
Higher safety levels than 1/100 per year are obtained for densely populated areas
Obtained safety level for central NO is 1/5000 per year
With recent (higher) cost estimates a somewhat lower safety level (e.g. 1/1000 per year) could be obtained
Application of optimization leads to differentiation in protection levels
![Page 14: Risk based design of flood defence systems: A preliminary analysis for the New Orleans Metropolitan Area S.N. Jonkman M. Kok M. Van Ledden J.K. Vrijling](https://reader035.vdocuments.us/reader035/viewer/2022062717/56649e405503460f94b318ff/html5/thumbnails/14.jpg)
Recommendations
Similar analysis based on better estimates (costs, damage, safety levels and flooding probabilities)
Also for river flooding and rainfall Apply other perspective in decision-making, esp.
Risk to life Integrate such analyses in the decision-making
process with stakeholders
1.0E-09
1.0E-08
1.0E-07
1.0E-06
1.0E-05
1.0E-04
1.0E-03
1.0E-02
1.0E-01
1.0E+00
0 1 10 100 1,000 10,000 100,000
An
nu
al F
ailu
re P
rob
ab
ilit
y, f
Loss of Life, N