risk assessment - the return

2
 Risk Assessment-  The Return Low Risk = 1-2 Medium Risk =3-4 High Risk=5 Location 1 – rent!ord "ocks# ridge  - $eo%&e ma' (e in the wa'# more time consuming) *ur!ace o! the (ridge is wet so take caution when wa&king)  - Location 2- rent!ord "ocks# ehind the estate  - +&ooring= ,rae& which is rough sur!ace and can cause 'ou to !a&& i! not care!u& "o not stand on the edge o! the (ank as there is a risk o! !a&&ing into the rier) Rier is dee% and no one is around to sae 'ou i! 'ou accident&' s&i% in) .eather -  The weather cou&d a/ ect the 0&ming# cast and crew) The rainsnow can make the area more %rone to accidents) .e wi&& make sure eer'one (rings suita(&e c&othing de%ending on the weather) )g) raining= water%roo! c&othing and sensi(&e shoes) Make u% can (e ruined due to the weather# so we can (ring a kit to re-a%%&' i! needed) - ui%ment- amera# Tri%od# Lighting# - - utside-"amaged or get sto&en i! care is not taken)  T o %reent this high risk we wi&& (ring an um(re&&a to %rotect !rom the rain) Take e6tra care i! 7oor conditions are s&i%%er') $air on the eui%ment hand&ing to %reent it !rom !a&&ing) e discreet when not using the eui%ment = reduce chances o! the!t)

Upload: rayaanhm

Post on 08-Oct-2015

160 views

Category:

Documents


0 download

DESCRIPTION

Media AS

TRANSCRIPT

  • 5/19/2018 Risk Assessment - The Return

    1/3

    Risk Assessment-

    The Return

    Low Risk = 1-2 Medium Risk =3-4 High Risk=5

    Location 1

    rent!ord "ocks#

    ridge

    -

    $eo%&e ma' (e in the

    wa'# more time

    consuming)

    *ur!ace o! the (ridge iswet so take caution when

    wa&king) -Location 2-

    rent!ord "ocks#

    ehind the estate

    -+&ooring= ,rae& which is

    rough sur!ace and can

    cause 'ou to !a&& i! not

    care!u&

    "o not stand on the edge

    o! the (ank as there is a

    risk o! !a&&ing into the rier)

    Rier is dee% and no one is

    around to sae 'ou i! 'ou

    accident&' s&i% in)

    .eather

    -The weather cou&d a/ect

    the 0&ming# cast and

    crew) The rainsnow can

    make the area more

    %rone to accidents) .e

    wi&& make sure eer'one

    (rings suita(&e c&othing

    de%ending on the

    weather) )g) raining=

    water%roo! c&othing and

    sensi(&e shoes) Make u%

    can (e ruined due to the

    weather# so we can (ring

    a kit to re-a%%&' i!

    needed)

    -

    ui%ment-

    amera# Tri%od#

    Lighting#

    - -

    utside-"amaged or get

    sto&en i! care is not taken)

    To %reent this high risk we

    wi&& (ring an um(re&&a to

    %rotect !rom the rain) Takee6tra care i! 7oor

    conditions are s&i%%er') $air

    on the eui%ment hand&ing

    to %reent it !rom !a&&ing)

    e discreet when not using

    the eui%ment = reduce

    chances o! the!t)

  • 5/19/2018 Risk Assessment - The Return

    2/3

    $ro%s &arinet and ring- (e

    care!u& when 'ou are

    using the o(8ects)

    This is to %reent it

    !rom getting

    damaged when it ison the 7oor)

    - -Actors +irst aid kit (roughtin case o! minor

    in8uries) )g a cut) -Risk o! the!t !or actors

    when the' are out in an'

    hours) .a's to %reent

    are9 kee% %ersona& (e&ongs

    c&ose and not (ring on too

    much attention)

  • 5/19/2018 Risk Assessment - The Return

    3/3