  • 8/17/2019 Risk Assessment Scope. Cockhedge Centre

    1/3

    RISK ASSESSMENT RECORDING FORMLocation orAddress: Scope, Cockhede Centre

    Date Assess!ent"ndertaken: #$%%#'

    Assess!ent (ndertaken)*: )ethan* Ed+ards

    Actiit* orSit(ation -hotoraphs

    Reie+Date: #$%%#'

    Sinat(re

    .#/ 0a1ard Risk .2/ 3ho !iht 4e har!ed and ho+5 .6/ 3hat contro7s e8ist to red(cerisk

    .9/ 3hat action can 4e takento (rther red(ce risk5

    Shoppers

    Doors

    Lifted Pavement

     A1B2

     A2B4

     A2B4

    Shoppers and members of the crewnudging and pushing past eachother 

    Doors opening outwards and hittinga member of the crew or public

    Members of the cast and crewcould trip and fall onto the floor fromthe raised pavement

     Avoid shoppers as best aspossible

    Stand awa! from the doors

    Sta! clear of all raised pavementsand put a sign up nearb! to warnthe cast and crew

    1 List ha"ards so!ethin +ith the potentia7 to ca(se har! here#See$ to %uantif! the level of ris$ the 7ike7ihood o har! arisin based on the number of persons affected& how often the! are e'posed to the ha"ard and theseverit! of an! conse%uence

    2 List groups of people who are especiall! at ris$ from the significant ha"ards which !ou have identified( List e'isting controls here or note where the information ma! be found

  • 8/17/2019 Risk Assessment Scope. Cockhedge Centre

    2/3

    4 List the ris$s which are not ade%uatel! controlled and the action !ou will ta$e )ave regard for the level of ris$& the cost of an! action and the benefit !ou e'pect togain

    .#/ 0a1ard Risk .2/ 3ho !iht 4e har!ed and ho+5 .6/ 3hat contro7s e8ist to red(cerisk

    .;/ 3hat action can 4e takento (rther red(ce risk5

    RISK RATING

    a SEB Medi(! risk 7ee7 Tihten (p contro7s and!ake a p7an to do so!ethin a4o(t risk

    2 3i77 need !edica7 attention 2 Een 7ess 7ike7* 6>; Fair7* 7o+ risk 7ee7 Lo+ priorit* 4(t keeppossi47e action in !ind

    # Minor in@(r* e )r(ise, ra1e # "n7ike7* to happen at a77 #>2 Lo+ or triia7 risk No (rther actionre(ired

    SO: a 8 4 c

    Action Re(ired Responsi47e -erson Date or Co!p7etion

  • 8/17/2019 Risk Assessment Scope. Cockhedge Centre

    3/3