rig 370 hp

Upload: abdul-sani-yatim

Post on 02-Jun-2018

220 views

Category:

Documents


0 download

TRANSCRIPT

  • 8/10/2019 Rig 370 HP

    1/15

    No. EQUIPMENT QTY COMPANY SPECIFICATIONSCONTRACTOR SPECIFICATIONS

    Please include equipment manuactu!e! andmodel num"e!

    EQUIPMENT#OCATION

    A. Ri$ Equipment and Accesso!ies

    %. GeneralSpecification

    Mobile self-contained core drilling rig,capable for drilling minimum 900 m PQ Size.With sufficient or!ing platform height to

    accommodate minimum ""# $000 psi %&P'(nnular and Single Gate )am* and flo line.Must be able to safel+ and efficientl+ operateon a ell pad no greater than 0m 0m.

    Manufacturerian /ungang uangaiMechiner+ 1actor+ 2o.,td2)-3 mobile self-contained all h+draulic coal-

    bed gas drilling rig,drilling depth45Q4$000m6Q4"00m6PQ4"$00m7he height of platform is sufficient for ""8$000psi %&P and flo line. 7his smart rig canoperate on a ell pad smaller than 0m 0m.

    &. rill Mast 1ull+ elded lattice construction ith min ""m or!ing height, complete ith h+draulicraising s+stem. 7his mast should be capableto support depth re:uired plus ade:uateo;erpull. min head tra;erse length is

  • 8/10/2019 Rig 370 HP

    2/15

    rope, hoisting capacit+ min @=00 !g baredrum or 3=0 !g at full drum, A m > sechoisting speed.

    Mechiner+ 1actor+ 2o.,td

    rum capacit+4@000moisting capacit+4 "=00!g,oisting speed4 ma Am>sWire rope &4 %rea! out

    " )od tong to ma!e and brea! all sl im-holecasing and drill rod sizes to their correcttor:ue ithout damage.

    (de:uate drill pipe tongs and bac! up linesfitted ith line pull or tor:ue gauges to allofor the ma!e up and brea! out of all thecontractors rotar+ shouldered (P? tubular.

    Manufacturer 4 ian /ungang uangaiMechiner+ 1actor+ 2o.,td7he tor:ue of rig for ma!ing up and brea!ing

    out pipes is @A!5m.

    +draulic poer 7ong can ma!e up and brea!don all !inds of (P? tubular.

    2hina

    ,. 7able " )ecommended table opening of "< ">@# ith$0,000!g static loading. %ushings and slipsegments to support all contractors (P?rotar+ tubular and operators standard casingsizes. +draulic slip table to support allcontractors slim hole tubular.

    Manufacturer 4 )G Gruop 2o.,td '%rand ne*

    Maimum table opening of $0#,c> h+draulicclamp hich can supporting all !inds of (P?tubular and casing.

    Static loading430,000!g7able height4 $.3m

    2hina

    -. Sur;e+ 7ool " 7otco or Magnetic Single Shot irelinecon;e+ed sur;e+ tool, cros foot andassociated spare parts and consumables.

    %.

    1uel suppl+ " 2ertified and bunded fuel storage tan!s ithsufficient capacit+ to operate rig ande:uipment for < da+s of normal operation.a+ tan!s as necessar+ complete ithnecessar+ appropriate piping and pumps tosafel+ transfer fuel.

    Manufacturer4 ian /ungang uangaiMechiner+ 1actor+ 2o.,td

    " 1or!lift " Suitable crane or for!lift to be able to handleand position all of the contractors, and

    operators e:uipment.

    @=7 crane,be able to handle and position alle:uipment.

    )ental in ?ndonesia

    ?ndonesia

    http://dict//key.20F22736C611DF408CBC4C2CBAC45A70/Indonesiahttp://dict//key.20F22736C611DF408CBC4C2CBAC45A70/Indonesiahttp://dict//key.20F22736C611DF408CBC4C2CBAC45A70/Indonesiahttp://dict//key.20F22736C611DF408CBC4C2CBAC45A70/Indonesia
  • 8/10/2019 Rig 370 HP

    3/15

    /. Mud and Ci!culatin$ Equipment

    %. 2oring Pump 7riple pump, 1M2 or similar, capable tosuppl+ @0 E @00 lpm at "=00 Psi c>sufficient diesel engine or h+draulic motor,this pump complete ith safet+ pop off ;al;eand appropriate pressure gauge. Must beable to be operated from driller console.

    Manufacturer4 ian /ungang uangaiMechiner+ 1actor+ 2o.,td%W$@0 orizontal triple reciprocal singleacting piston pump, be able to be operated fromdriller console.+draulic dri;e, stepless speed regulating

    )ate of flo'l>m* 0-$@Wor!ing pressure4"0MPa

    2hina

    &. Mud Pump Min A00 P, S!id mounted triple pump,piston t+pe, transmission F ;ariable speeddri;e, capable to suppl+ min %PM capacit+and @,000 psi or!ing pressure. 2ompleteith appropriate diesel engine. Must be ableto be operated from driller console(lso including 4

    (ppropriate Pressure gauge

    Safet+ pop off ;al;e

    )eturn line to tan! ischarge line

    Spar! arrester co;ered b+ thermal co;er

    Safet+ chain for line connection

    2an be operated from driller console

    2entrifugal charging pump

    Manufacturer4 Shandong rongli machiner+factor+)$5%-=00 triple single acting pump , s!idmounted.

    PW)4=00P6 ength of stro!e"00mm and"s

    Pump speed 1206 Gear ratio A.96Ma.

    pressure $=MPa

    &utside dimension 4 $$=0@@3=@03=mm6Weight4"076

    iesel engine"@H"$=%I"

    &ther parameter meet the re:uirement andspecification.

    2hina

    '. Mud 7an! " Min "=0 bbls capacit+, $ compartments, c>

    circulating lines, mud agitator, mud miinghopper. (ppropriate graduated trip tan! ithle;el gauge ;isible from the drillers console.

    Manufacturer4 tangshan.guanneng machiner+

    factor+

    $ sets of 3000@$00@$00mmmmMud 7an! c>circulating lines, mud agitator, mud miinghopper.

    2hina

    (. Mud 2leaning " Min " unit linier motion shale sha!er capableof handling A00gpm of pol+mer drilling mudSingle cone desander and multi cone desilterith mission st+le centrifugal pump.

    Manufacturer4 7angshan Guanneng Machiner+J:uipment 2o.,td

    ouble shale sha!er capable of handlingA00gpm of pol+mer drilling mud.

    Mud cleaner, agitator, desanderKdesilter matchthe operation re:uirement.

    2hina

  • 8/10/2019 Rig 370 HP

    4/15

    ). 2irculatings+stem

    " (ll circulat ing lines to be min @000psior!ing pressure ith elded or 5P7 fittings.

    (ll shoc! hoses to be manufactured to (P?

  • 8/10/2019 Rig 370 HP

    5/15

    completed ith steel thread protectors asell as recesses for slips and ele;ators. ength 4 $m '$0Nt*

    Size 4 A ">@8

    2onnection 4 52$3

    Matches the (P? standard and operation asre:uired.

    '. rill 2ollar "@ A-">@# &, Spiral t+pe, ith ele;ator recess,)ange " ith $-">@# ?1 2onnection.

    (. rill 2ollar "@ $ # &, Spiral t+pe, ith ele;ator recess,)ange " ith @-$>3# )JG 2onnection.

    ). rill Pipe =0M $-">@#, "$.$ PP1, (P? Grade G-"0= $-">@#?1connection, premium class " ith metalthread protectors. ardbanding on rill pipeare Rsmooth hardbanding#. 2omplete ithcurrent (P? )P

  • 8/10/2019 Rig 370 HP

    6/15

    all of contractors donhole tools.(ll bit subs must include a float recess to suitthe contractor supplied float ;al;es.Sa;er sub MS7 be installed on the topdri;e :uill shaft at all times and ade:uatespare subs be maintained at all times.

    %'. Pipe ope (s)e:d. ead-free copper based (P? pipe dope to beused on all rotar+-shouldered connections.(ll tubing and casing to be run ith (P?modified dope ith friction factor of ".

    Good unctuosit+6 insure the antielding abilit+and eas+ to unscre at high temperature. Jas+to unction the scre thread again.

    ?ndonesia

    A. 0!ill St!in$ Equipment3Co!e 0!illin$

    %. PQ rill )ods 300m PQ 'P* drill rods in $m or m lengths.&uter diameter E ""A.$ mm 'A.=0 in* ?nnerdiameter "0".mm 'A.00 in*. Ooint min +ieldstrength-@" MPa '90,000 psi*, min tensilestrength

  • 8/10/2019 Rig 370 HP

    7/15

    Pro;ide $ complete sets of $m and m Q$ andPQ$ core barrels, inner tubes, head assemblies,reamers, o;ershots ,handling tools andade:uate spare consumable parts for theabo;e e:uipments.

    (. 2ore %its PQ$andQ$

    Suitable core bits to drill the ell to 7 in softto medium formations.

    Manufacturer4 7angShan OinShi or e:ual

    Super (brasi;e 2&.,7'%rand ne*

    2ore bit4 PQ$,Q$

    Meet the re:uirement of drilling in the soft tomedium formations

    2hina

    /. 4andlin$ Equipment

    %. Jle;ator (s)e:d.

    5eed to demonstrate the rigs abilit+ to safel+pic! up, ma!e up and drill ith (P? drill pipeand drill collars.While hoisting drill string it must be done b+

    using ele;ators or directl+ connected to thetop dri;e using an appropriate crosso;er.

    (ll drill collars to be handled using certifiedlifting nubbins or ele;ators.

    Manufacturer4 Oiangsu )udong'%rand ne* ore:ual

    Size4 @-3$-">@A-">@8

    7+pe4 2enter latch

    oad 2apacit+4"=07

    7he demonstration of the rigs abilit+ to safel+pic! up, ma!e up and drill ith (P? drill pipe anddrill collars ill be pro;ided as re:uired.

    se the ele;ators as re:uired.

    2hina

    &. Safet+ 2lamp (s

    )e:d.

    Safet+ clamps must be used on drill collars at

    all times.

    Manufacturer 4Oiangsu )udong'%rand ne*

    Pro;ide the safet+ clamps in accordance iththe drill string .

    Quantit+4@ Size "-">38-A-">@8

    sing safet+ clamp as re:uired b+ compan+ .

    Safet+ clamp meet (P? specifications.

    2hina

  • 8/10/2019 Rig 370 HP

    8/15

    '. 2asingandling

    (s)e:d.

    Single lift ele;ators to be used hene;erhoisting Noints of casing abo;e the rig floor.When suspending the casing string it mustbe connected to the top dri;e using anappropriate crosso;er.2asing to be supported using (P? slips andspider if possible.

    Manufacturer 4Oiangsu )udong'%rand ne*

    Size4 9-=>3,3#!"#$%&'!"$

    2hina

    =. 2oring " (ll re:uired renches, support, corereco;er+ e:uipment and suitable or!ingtable to safel+ remo;e and handle the corefrom the inner tube.

    (ll slings 'lifting F pulling slings* shall meet

    industr+ standard c> certificate F loadrating.

    Manufacturer4 7angShan OinShi

    Super (brasi;e 2&.,7'%rand ne*

    Pro;ide renches, Supports ,core reco;er+

    e:uipment and suitable or!ing table .

    (ll slings meet industr+ standard c> certificateF loading rating.

    2hina

    . Slings (s)e:d.

    (ll slings and chains 'lifting F pulling slings*shall meet industr+ standard c> certificate Fload rating.

    ( polic+ MS7 be in place to periodicall+inspect and replace slings and chains asnecessar+.

    Manufacturer 4Oiangsu )udong'%rand ne*

    (ll slings and chains shall meet industr+standard c> certificate F load rating.

    Ma!e a related polic+ to inspect themperiodicall+.

    2hina

    C. 5ell Cont!ol Equipment

  • 8/10/2019 Rig 370 HP

    9/15

    ". i;erter " ea ""# di;erter s+stem. Ma+ consist of annular%&P and $# ;ent line.

    @. %lo &utPre;enters

    " ea < ">"# $000 psi single ram and annular %&Pmanufactured b+ an (P? certifiedmanufacturer. 2omplete ith ;alid Migas2ertificate.5ote4 2ontractor must maintain a complete

    in;entor+ of spare rubber parts and elementsfor the abo;e e:uipment at all times.

    Manufacturer 4/ancheng San+i PetrochemicalMachiner+ 2o.,td.'%rand ne* 1I"3-@",1"3-@"(rental), $=-$=%&P*+

    Size4 < ">"8

    Wor!ing Pressure 'psi*4 $000 psi

    Pro;ide A-">@8, $-">@8 and @-38 rams andannular rubber core

    2hina

    $. 7rip 7an! " (ppropriate graduated trip tan! ith le;elgauge ;isible from the drillers console.

    Manufacturer 4Shandong )ongli PetroleumMachiner+ 2o.,td'%rand ne*

    Pro;ide graduated trip tan! ith le;el gauge

    2hina

    A. ifting Slings (s)e:d

    edicated lifting slings or chains for use onthe %&Ps must be pro;ided ith current

    inspection certificates.

    Manufacturer 4ian+ang baoshi PetroleumMachiner+ 2o.,td

    edicated lifting slings or chainsT inspectioncertificates ill be pro;ided as re:uired.

    2hina

    =. Boome+'2ontrol nit*

    " 7+pe 30, $000 psi accumulator s+stem ithsufficient usable fluid ;olume and controlstations to close and hold %&Ps on openhole and open the 2) >o assistance fromcharging s+stem and still ha;e "=00 psiremaining after functioning. 7he s+stem mustbe capable closing indi;idual componentithin $0 seconds or less, e:uipped ithboth electric and pneumatic charging pumpss+stem ith sufficient pump size to buildpressure in shorten time 'less than "=minute*. ?ndependence (ir 2ompressorattached to closing unit s!id.

    ( remote control panel must be placed nearthe drilling console.

    Manufacturer 4/ancheng San+i PetrochemicalMachiner+ 2o.,td.'%rand ne*

    Model4 1B"@=-@

    7he electrical pump rate-flo4@0>minL"

    7he pneumatic pump rate-flo40>stro!eL"

    7he accumulator s+stem meet the re:uirementsand specifications.

    Pro;ide drillerTs control console for remotecontrol.

    2hina

    . 2ho!e Manifold " @-">"# $000psi manifold ith flangedcomponents built to (P? Spec "2 c>

    @ 'to* manual adNustable cho!es, $000

    psi, all assembl+ are flange t+peconnection and elded t+pe Noint nipple

    @ 'to* Steel gate ;al;es in the cho!e lineat rilling Spool, one must be

    Manufacturer 4/ancheng San+i PetrochemicalMachiner+ 2o.,td.'%rand ne*

    Model4OG=@>@"

    2onnection 4flanged

    2hina

  • 8/10/2019 Rig 370 HP

    10/15

    h+draulicall+ operated

    @ 'to* Steel Gate ;al;es beteen both

    cho!es and one at the cross

    " 'one* gate ;al;e at each donstream of

    both cho!es

    %looe+ line hich run straight through the

    cross and is isolated b+ a steel gate ;al;e

    and sedge outlet line size @# to $# flangeconnection at =0m in length

    ?ncludes a ;al;e isolated pressure gauge

    hich can displa+ the casing pressureithin ;ie of the cho!e operator

    Size 4@-">"8

    Wor!ing pressure 4 $000psi

    Meet (P? Spec "2

    7he cho!e manifold meet the placingre:uirements pro;ided b+ compan+ at least.

  • 8/10/2019 Rig 370 HP

    11/15

    . ">3# outlets.

    "".

    Gas Separator " Poor bo+ gas separator to allo thecirculating of gas cut mud bac! to the muds+stem hile ;enting an+ h+drocarbons.

    0. Fis6in$ Tools

    ". Jternal

    Jngagement7ools

    (s

    )e:d.

    %oen "=0 or e:ui;alent o;ershot for each

    hole size and the correct grapples, pac!-offsand controls to fit each of the contractorstubular.

    Manufacturer 47ianhe &il Group 2o., td .'%rand

    ne*

    Pro;ide the tools e:ui;alent to %oen "=0

    7+pe4 self-releasing o;ershot, bo bell

    Size 4 @-38,$-">@8,A-">@ etc.

    / @-30+Prabu12345

    2hina

    @. ?nternalJngagement7ools

    @ ?tco releasing spear and slips for each of thecontractors slim hole drill rods.

    Manufacturer 47ianhe &il Group 2o., td .'%randne*

    Pin bell for drill string4 @-38,$-">@8, A-">@8etc.

    ?n addition,pro;ide ?tco releasing spear and slipsfor slim drill rods.

    2hina

    $. ?mpact 7ools (s)e:d.

    (bilit+ to source and pro;ide %oen 7+pe Ifishing Nars and accelerator if deemednecessar+.

    678"

    A. Milling 7ools (s)e:d.

    1lat bottomed Nun! mill for each hole size. 9:%;?@A

    =. ?nternal cutters @ +draulic pipe cutters for the contractor slimhole drill rods.

    BCDE

    . Side 7rac!7ools (s)e:d. J:uipment re:uired to perform open holeside trac! in open hole should rods becomestuc!. 2ontractor ma+ sho e;idence oftools being a;ailable ith short notice if notbeing !ept on the rig site.

    +draulic NettingFGHI

  • 8/10/2019 Rig 370 HP

    12/15

    Poer suppl+ must be @@0-@A0 H, =0-0 z.T6e d!illin$ plant MUST compl2 7it6!ele8ant Elect!ical installation standa!dsIEC +-3%9 +-3+ o! +-3%%.

    (de:uate spare parts to ensure minimumdon time.Pro;ision or access to a reliable bac!-ups+stem ithin @Ahrs MS7 be demonstratedin cast of primar+ generator failure.5oise suppression must pro;ide a or!ingen;ironment that complies ith ?ndonesianstandards.

    Model42"= for drilling rig

    Poer 4$@0BW>"00BW

    Model 4 &l+mpian GJP"=0>"03BW for campsite

    Poer 4"03BW

    7he drilling plant compl+ ith rele;ant Jlectrical

    installation standards ?J2

  • 8/10/2019 Rig 370 HP

    13/15

    repaired or replaced hene;er necessar+.(n+ time the de;ice is used to arrest the fallof a person, it must be immediatel+ remo;edfrom the derric! and sent to the manufacturerfor repair>recertification.

    Ma!e a related polic+ to manage the fall

    pre;ention de;ices.

    Purchase in ?ndonesia.

    $. 1ireJtinguisher

    (s)e:d.

    'min*

    9 !g (%2 t+pe fire etinguisher complete ithor!ing pressure gauges.

    "=0V r+ poder t+pe fire etinguisher class%2@=V 2&@ fire etinguishers.90 trs foam fire etinguishers

    1ire pump

    Model4L%2$.@>@0-"00;s

    isplacement 4"A>S

    1ire hose 4$0m

    "=0V r+ poer fire etinguisher

    @=V 2&@fire etinguishers.

    99foam fire etinguishers.

    Pro;ision as re:uired to meet contractors

    insurance and local regulator+ re:uirements.

    Purchase in ?ndonesia.

    ?ndonesia

    A. Gas etector @ Multi-gas detector c> all standardaccessories for detecting methane, @S and2&@, digital sound alarm complete >charger F appro;ed b+ authorized agent.2ontractor responsible to perform calibrationas per manufacturer recommendation.

    Manufacturer 4aofang Petroleum Machiner+2o.,td'%rand ne*

    1our in one portable gas detection instrument.

    %e responsible to perform calibration as permanufacturer recommendation.

    2hina

    =. 1irst (id (s

    )e:d.

    2omprehensi;e 1irst (id !it c> sna!e bite !it

    suitable for remote operations.

    1irst aid !it in accordance ith compan+Ts

    re:uirement.

    Purchase in ?ndonesia.

    ?ndonesia

    . )eco;er+ " Stretcher as per 2P? standard4 light eight,durable, folded t+pe, can be used to bring thepatient from high ele;ation, fit the space atdog house F rig medical room. ?t shall becompleted ith four bod+ straps and bridesling 'pole stretcher is not acceptable*

    Stretcher

    Size 4 "3==@@$cm

    Weight 4= !g

    oad-bearing capacit+ 4 "=9BG

    Stretcher meet 2P? standard.

    ?ndonesia

  • 8/10/2019 Rig 370 HP

    14/15

    Purchase in ?ndonesia.

  • 8/10/2019 Rig 370 HP

    15/15

    $. )ig 2amp (s)e:d.

    2apable of accommodating all contractorsrig personnel complete ith h+gienic ablutionfacilities, running ater, ater heater, airconditioning, laundr+ facilities, !itchens andsleeping accommodations.2ontractor shall pro;ide Water treatmentfacilit+ and aste handling facilit+.

    " &ffice room, @ to-room, A four-room,

    @ eight-room, " !itchen, " bathroom'the campcompletes ith the facilities as re:uired *

    Pro;ide ater treatment facilit+ and astehandling facilit+.

    Purchase in ?ndonesia.

    ?ndonesia

    A. WasteManagement

    (s)e:d.

    Suitable aste storage and transportationser;ices to ensure a clean and safe or!en;ironment.

    Store and transport the aste and ensure theen;ironment clean and safe.

    Purchase in ?ndonesia.

    ?ndonesia