No. EQUIPMENT QTY COMPANY SPECIFICATIONSCONTRACTOR SPECIFICATIONS
Please include equipment manuactu!e! andmodel num"e!
EQUIPMENT#OCATION
A. Ri$ Equipment and Accesso!ies
%. GeneralSpecification
Mobile self-contained core drilling rig,capable for drilling minimum 900 m PQ Size.With sufficient or!ing platform height to
accommodate minimum ""# $000 psi %&P'(nnular and Single Gate )am* and flo line.Must be able to safel+ and efficientl+ operateon a ell pad no greater than 0m 0m.
Manufacturerian /ungang uangaiMechiner+ 1actor+ 2o.,td2)-3 mobile self-contained all h+draulic coal-
bed gas drilling rig,drilling depth45Q4$000m6Q4"00m6PQ4"$00m7he height of platform is sufficient for ""8$000psi %&P and flo line. 7his smart rig canoperate on a ell pad smaller than 0m 0m.
&. rill Mast 1ull+ elded lattice construction ith min ""m or!ing height, complete ith h+draulicraising s+stem. 7his mast should be capableto support depth re:uired plus ade:uateo;erpull. min head tra;erse length is
-
8/10/2019 Rig 370 HP
2/15
rope, hoisting capacit+ min @=00 !g baredrum or 3=0 !g at full drum, A m > sechoisting speed.
Mechiner+ 1actor+ 2o.,td
rum capacit+4@000moisting capacit+4 "=00!g,oisting speed4 ma Am>sWire rope &4 %rea! out
" )od tong to ma!e and brea! all sl im-holecasing and drill rod sizes to their correcttor:ue ithout damage.
(de:uate drill pipe tongs and bac! up linesfitted ith line pull or tor:ue gauges to allofor the ma!e up and brea! out of all thecontractors rotar+ shouldered (P? tubular.
Manufacturer 4 ian /ungang uangaiMechiner+ 1actor+ 2o.,td7he tor:ue of rig for ma!ing up and brea!ing
out pipes is @A!5m.
+draulic poer 7ong can ma!e up and brea!don all !inds of (P? tubular.
2hina
,. 7able " )ecommended table opening of "< ">@# ith$0,000!g static loading. %ushings and slipsegments to support all contractors (P?rotar+ tubular and operators standard casingsizes. +draulic slip table to support allcontractors slim hole tubular.
Manufacturer 4 )G Gruop 2o.,td '%rand ne*
Maimum table opening of $0#,c> h+draulicclamp hich can supporting all !inds of (P?tubular and casing.
Static loading430,000!g7able height4 $.3m
2hina
-. Sur;e+ 7ool " 7otco or Magnetic Single Shot irelinecon;e+ed sur;e+ tool, cros foot andassociated spare parts and consumables.
%.
1uel suppl+ " 2ertified and bunded fuel storage tan!s ithsufficient capacit+ to operate rig ande:uipment for < da+s of normal operation.a+ tan!s as necessar+ complete ithnecessar+ appropriate piping and pumps tosafel+ transfer fuel.
Manufacturer4 ian /ungang uangaiMechiner+ 1actor+ 2o.,td
" 1or!lift " Suitable crane or for!lift to be able to handleand position all of the contractors, and
operators e:uipment.
@=7 crane,be able to handle and position alle:uipment.
)ental in ?ndonesia
?ndonesia
http://dict//key.20F22736C611DF408CBC4C2CBAC45A70/Indonesiahttp://dict//key.20F22736C611DF408CBC4C2CBAC45A70/Indonesiahttp://dict//key.20F22736C611DF408CBC4C2CBAC45A70/Indonesiahttp://dict//key.20F22736C611DF408CBC4C2CBAC45A70/Indonesia -
8/10/2019 Rig 370 HP
3/15
/. Mud and Ci!culatin$ Equipment
%. 2oring Pump 7riple pump, 1M2 or similar, capable tosuppl+ @0 E @00 lpm at "=00 Psi c>sufficient diesel engine or h+draulic motor,this pump complete ith safet+ pop off ;al;eand appropriate pressure gauge. Must beable to be operated from driller console.
Manufacturer4 ian /ungang uangaiMechiner+ 1actor+ 2o.,td%W$@0 orizontal triple reciprocal singleacting piston pump, be able to be operated fromdriller console.+draulic dri;e, stepless speed regulating
)ate of flo'l>m* 0-$@Wor!ing pressure4"0MPa
2hina
&. Mud Pump Min A00 P, S!id mounted triple pump,piston t+pe, transmission F ;ariable speeddri;e, capable to suppl+ min %PM capacit+and @,000 psi or!ing pressure. 2ompleteith appropriate diesel engine. Must be ableto be operated from driller console(lso including 4
(ppropriate Pressure gauge
Safet+ pop off ;al;e
)eturn line to tan! ischarge line
Spar! arrester co;ered b+ thermal co;er
Safet+ chain for line connection
2an be operated from driller console
2entrifugal charging pump
Manufacturer4 Shandong rongli machiner+factor+)$5%-=00 triple single acting pump , s!idmounted.
PW)4=00P6 ength of stro!e"00mm and"s
Pump speed 1206 Gear ratio A.96Ma.
pressure $=MPa
&utside dimension 4 $$=0@@3=@03=mm6Weight4"076
iesel engine"@H"$=%I"
&ther parameter meet the re:uirement andspecification.
2hina
'. Mud 7an! " Min "=0 bbls capacit+, $ compartments, c>
circulating lines, mud agitator, mud miinghopper. (ppropriate graduated trip tan! ithle;el gauge ;isible from the drillers console.
Manufacturer4 tangshan.guanneng machiner+
factor+
$ sets of 3000@$00@$00mmmmMud 7an! c>circulating lines, mud agitator, mud miinghopper.
2hina
(. Mud 2leaning " Min " unit linier motion shale sha!er capableof handling A00gpm of pol+mer drilling mudSingle cone desander and multi cone desilterith mission st+le centrifugal pump.
Manufacturer4 7angshan Guanneng Machiner+J:uipment 2o.,td
ouble shale sha!er capable of handlingA00gpm of pol+mer drilling mud.
Mud cleaner, agitator, desanderKdesilter matchthe operation re:uirement.
2hina
-
8/10/2019 Rig 370 HP
4/15
). 2irculatings+stem
" (ll circulat ing lines to be min @000psior!ing pressure ith elded or 5P7 fittings.
(ll shoc! hoses to be manufactured to (P?
-
8/10/2019 Rig 370 HP
5/15
completed ith steel thread protectors asell as recesses for slips and ele;ators. ength 4 $m '$0Nt*
Size 4 A ">@8
2onnection 4 52$3
Matches the (P? standard and operation asre:uired.
'. rill 2ollar "@ A-">@# &, Spiral t+pe, ith ele;ator recess,)ange " ith $-">@# ?1 2onnection.
(. rill 2ollar "@ $ # &, Spiral t+pe, ith ele;ator recess,)ange " ith @-$>3# )JG 2onnection.
). rill Pipe =0M $-">@#, "$.$ PP1, (P? Grade G-"0= $-">@#?1connection, premium class " ith metalthread protectors. ardbanding on rill pipeare Rsmooth hardbanding#. 2omplete ithcurrent (P? )P
-
8/10/2019 Rig 370 HP
6/15
all of contractors donhole tools.(ll bit subs must include a float recess to suitthe contractor supplied float ;al;es.Sa;er sub MS7 be installed on the topdri;e :uill shaft at all times and ade:uatespare subs be maintained at all times.
%'. Pipe ope (s)e:d. ead-free copper based (P? pipe dope to beused on all rotar+-shouldered connections.(ll tubing and casing to be run ith (P?modified dope ith friction factor of ".
Good unctuosit+6 insure the antielding abilit+and eas+ to unscre at high temperature. Jas+to unction the scre thread again.
?ndonesia
A. 0!ill St!in$ Equipment3Co!e 0!illin$
%. PQ rill )ods 300m PQ 'P* drill rods in $m or m lengths.&uter diameter E ""A.$ mm 'A.=0 in* ?nnerdiameter "0".mm 'A.00 in*. Ooint min +ieldstrength-@" MPa '90,000 psi*, min tensilestrength
-
8/10/2019 Rig 370 HP
7/15
Pro;ide $ complete sets of $m and m Q$ andPQ$ core barrels, inner tubes, head assemblies,reamers, o;ershots ,handling tools andade:uate spare consumable parts for theabo;e e:uipments.
(. 2ore %its PQ$andQ$
Suitable core bits to drill the ell to 7 in softto medium formations.
Manufacturer4 7angShan OinShi or e:ual
Super (brasi;e 2&.,7'%rand ne*
2ore bit4 PQ$,Q$
Meet the re:uirement of drilling in the soft tomedium formations
2hina
/. 4andlin$ Equipment
%. Jle;ator (s)e:d.
5eed to demonstrate the rigs abilit+ to safel+pic! up, ma!e up and drill ith (P? drill pipeand drill collars.While hoisting drill string it must be done b+
using ele;ators or directl+ connected to thetop dri;e using an appropriate crosso;er.
(ll drill collars to be handled using certifiedlifting nubbins or ele;ators.
Manufacturer4 Oiangsu )udong'%rand ne* ore:ual
Size4 @-3$-">@A-">@8
7+pe4 2enter latch
oad 2apacit+4"=07
7he demonstration of the rigs abilit+ to safel+pic! up, ma!e up and drill ith (P? drill pipe anddrill collars ill be pro;ided as re:uired.
se the ele;ators as re:uired.
2hina
&. Safet+ 2lamp (s
)e:d.
Safet+ clamps must be used on drill collars at
all times.
Manufacturer 4Oiangsu )udong'%rand ne*
Pro;ide the safet+ clamps in accordance iththe drill string .
Quantit+4@ Size "-">38-A-">@8
sing safet+ clamp as re:uired b+ compan+ .
Safet+ clamp meet (P? specifications.
2hina
-
8/10/2019 Rig 370 HP
8/15
'. 2asingandling
(s)e:d.
Single lift ele;ators to be used hene;erhoisting Noints of casing abo;e the rig floor.When suspending the casing string it mustbe connected to the top dri;e using anappropriate crosso;er.2asing to be supported using (P? slips andspider if possible.
Manufacturer 4Oiangsu )udong'%rand ne*
Size4 9-=>3,3#!"#$%&'!"$
2hina
=. 2oring " (ll re:uired renches, support, corereco;er+ e:uipment and suitable or!ingtable to safel+ remo;e and handle the corefrom the inner tube.
(ll slings 'lifting F pulling slings* shall meet
industr+ standard c> certificate F loadrating.
Manufacturer4 7angShan OinShi
Super (brasi;e 2&.,7'%rand ne*
Pro;ide renches, Supports ,core reco;er+
e:uipment and suitable or!ing table .
(ll slings meet industr+ standard c> certificateF loading rating.
2hina
. Slings (s)e:d.
(ll slings and chains 'lifting F pulling slings*shall meet industr+ standard c> certificate Fload rating.
( polic+ MS7 be in place to periodicall+inspect and replace slings and chains asnecessar+.
Manufacturer 4Oiangsu )udong'%rand ne*
(ll slings and chains shall meet industr+standard c> certificate F load rating.
Ma!e a related polic+ to inspect themperiodicall+.
2hina
C. 5ell Cont!ol Equipment
-
8/10/2019 Rig 370 HP
9/15
". i;erter " ea ""# di;erter s+stem. Ma+ consist of annular%&P and $# ;ent line.
@. %lo &utPre;enters
" ea < ">"# $000 psi single ram and annular %&Pmanufactured b+ an (P? certifiedmanufacturer. 2omplete ith ;alid Migas2ertificate.5ote4 2ontractor must maintain a complete
in;entor+ of spare rubber parts and elementsfor the abo;e e:uipment at all times.
Manufacturer 4/ancheng San+i PetrochemicalMachiner+ 2o.,td.'%rand ne* 1I"3-@",1"3-@"(rental), $=-$=%&P*+
Size4 < ">"8
Wor!ing Pressure 'psi*4 $000 psi
Pro;ide A-">@8, $-">@8 and @-38 rams andannular rubber core
2hina
$. 7rip 7an! " (ppropriate graduated trip tan! ith le;elgauge ;isible from the drillers console.
Manufacturer 4Shandong )ongli PetroleumMachiner+ 2o.,td'%rand ne*
Pro;ide graduated trip tan! ith le;el gauge
2hina
A. ifting Slings (s)e:d
edicated lifting slings or chains for use onthe %&Ps must be pro;ided ith current
inspection certificates.
Manufacturer 4ian+ang baoshi PetroleumMachiner+ 2o.,td
edicated lifting slings or chainsT inspectioncertificates ill be pro;ided as re:uired.
2hina
=. Boome+'2ontrol nit*
" 7+pe 30, $000 psi accumulator s+stem ithsufficient usable fluid ;olume and controlstations to close and hold %&Ps on openhole and open the 2) >o assistance fromcharging s+stem and still ha;e "=00 psiremaining after functioning. 7he s+stem mustbe capable closing indi;idual componentithin $0 seconds or less, e:uipped ithboth electric and pneumatic charging pumpss+stem ith sufficient pump size to buildpressure in shorten time 'less than "=minute*. ?ndependence (ir 2ompressorattached to closing unit s!id.
( remote control panel must be placed nearthe drilling console.
Manufacturer 4/ancheng San+i PetrochemicalMachiner+ 2o.,td.'%rand ne*
Model4 1B"@=-@
7he electrical pump rate-flo4@0>minL"
7he pneumatic pump rate-flo40>stro!eL"
7he accumulator s+stem meet the re:uirementsand specifications.
Pro;ide drillerTs control console for remotecontrol.
2hina
. 2ho!e Manifold " @-">"# $000psi manifold ith flangedcomponents built to (P? Spec "2 c>
@ 'to* manual adNustable cho!es, $000
psi, all assembl+ are flange t+peconnection and elded t+pe Noint nipple
@ 'to* Steel gate ;al;es in the cho!e lineat rilling Spool, one must be
Manufacturer 4/ancheng San+i PetrochemicalMachiner+ 2o.,td.'%rand ne*
Model4OG=@>@"
2onnection 4flanged
2hina
-
8/10/2019 Rig 370 HP
10/15
h+draulicall+ operated
@ 'to* Steel Gate ;al;es beteen both
cho!es and one at the cross
" 'one* gate ;al;e at each donstream of
both cho!es
%looe+ line hich run straight through the
cross and is isolated b+ a steel gate ;al;e
and sedge outlet line size @# to $# flangeconnection at =0m in length
?ncludes a ;al;e isolated pressure gauge
hich can displa+ the casing pressureithin ;ie of the cho!e operator
Size 4@-">"8
Wor!ing pressure 4 $000psi
Meet (P? Spec "2
7he cho!e manifold meet the placingre:uirements pro;ided b+ compan+ at least.
-
8/10/2019 Rig 370 HP
11/15
. ">3# outlets.
"".
Gas Separator " Poor bo+ gas separator to allo thecirculating of gas cut mud bac! to the muds+stem hile ;enting an+ h+drocarbons.
0. Fis6in$ Tools
". Jternal
Jngagement7ools
(s
)e:d.
%oen "=0 or e:ui;alent o;ershot for each
hole size and the correct grapples, pac!-offsand controls to fit each of the contractorstubular.
Manufacturer 47ianhe &il Group 2o., td .'%rand
ne*
Pro;ide the tools e:ui;alent to %oen "=0
7+pe4 self-releasing o;ershot, bo bell
Size 4 @-38,$-">@8,A-">@ etc.
/ @-30+Prabu12345
2hina
@. ?nternalJngagement7ools
@ ?tco releasing spear and slips for each of thecontractors slim hole drill rods.
Manufacturer 47ianhe &il Group 2o., td .'%randne*
Pin bell for drill string4 @-38,$-">@8, A-">@8etc.
?n addition,pro;ide ?tco releasing spear and slipsfor slim drill rods.
2hina
$. ?mpact 7ools (s)e:d.
(bilit+ to source and pro;ide %oen 7+pe Ifishing Nars and accelerator if deemednecessar+.
678"
A. Milling 7ools (s)e:d.
1lat bottomed Nun! mill for each hole size. 9:%;?@A
=. ?nternal cutters @ +draulic pipe cutters for the contractor slimhole drill rods.
BCDE
. Side 7rac!7ools (s)e:d. J:uipment re:uired to perform open holeside trac! in open hole should rods becomestuc!. 2ontractor ma+ sho e;idence oftools being a;ailable ith short notice if notbeing !ept on the rig site.
+draulic NettingFGHI
-
8/10/2019 Rig 370 HP
12/15
Poer suppl+ must be @@0-@A0 H, =0-0 z.T6e d!illin$ plant MUST compl2 7it6!ele8ant Elect!ical installation standa!dsIEC +-3%9 +-3+ o! +-3%%.
(de:uate spare parts to ensure minimumdon time.Pro;ision or access to a reliable bac!-ups+stem ithin @Ahrs MS7 be demonstratedin cast of primar+ generator failure.5oise suppression must pro;ide a or!ingen;ironment that complies ith ?ndonesianstandards.
Model42"= for drilling rig
Poer 4$@0BW>"00BW
Model 4 &l+mpian GJP"=0>"03BW for campsite
Poer 4"03BW
7he drilling plant compl+ ith rele;ant Jlectrical
installation standards ?J2
-
8/10/2019 Rig 370 HP
13/15
repaired or replaced hene;er necessar+.(n+ time the de;ice is used to arrest the fallof a person, it must be immediatel+ remo;edfrom the derric! and sent to the manufacturerfor repair>recertification.
Ma!e a related polic+ to manage the fall
pre;ention de;ices.
Purchase in ?ndonesia.
$. 1ireJtinguisher
(s)e:d.
'min*
9 !g (%2 t+pe fire etinguisher complete ithor!ing pressure gauges.
"=0V r+ poder t+pe fire etinguisher class%2@=V 2&@ fire etinguishers.90 trs foam fire etinguishers
1ire pump
Model4L%2$.@>@0-"00;s
isplacement 4"A>S
1ire hose 4$0m
"=0V r+ poer fire etinguisher
@=V 2&@fire etinguishers.
99foam fire etinguishers.
Pro;ision as re:uired to meet contractors
insurance and local regulator+ re:uirements.
Purchase in ?ndonesia.
?ndonesia
A. Gas etector @ Multi-gas detector c> all standardaccessories for detecting methane, @S and2&@, digital sound alarm complete >charger F appro;ed b+ authorized agent.2ontractor responsible to perform calibrationas per manufacturer recommendation.
Manufacturer 4aofang Petroleum Machiner+2o.,td'%rand ne*
1our in one portable gas detection instrument.
%e responsible to perform calibration as permanufacturer recommendation.
2hina
=. 1irst (id (s
)e:d.
2omprehensi;e 1irst (id !it c> sna!e bite !it
suitable for remote operations.
1irst aid !it in accordance ith compan+Ts
re:uirement.
Purchase in ?ndonesia.
?ndonesia
. )eco;er+ " Stretcher as per 2P? standard4 light eight,durable, folded t+pe, can be used to bring thepatient from high ele;ation, fit the space atdog house F rig medical room. ?t shall becompleted ith four bod+ straps and bridesling 'pole stretcher is not acceptable*
Stretcher
Size 4 "3==@@$cm
Weight 4= !g
oad-bearing capacit+ 4 "=9BG
Stretcher meet 2P? standard.
?ndonesia
-
8/10/2019 Rig 370 HP
14/15
Purchase in ?ndonesia.
-
8/10/2019 Rig 370 HP
15/15
$. )ig 2amp (s)e:d.
2apable of accommodating all contractorsrig personnel complete ith h+gienic ablutionfacilities, running ater, ater heater, airconditioning, laundr+ facilities, !itchens andsleeping accommodations.2ontractor shall pro;ide Water treatmentfacilit+ and aste handling facilit+.
" &ffice room, @ to-room, A four-room,
@ eight-room, " !itchen, " bathroom'the campcompletes ith the facilities as re:uired *
Pro;ide ater treatment facilit+ and astehandling facilit+.
Purchase in ?ndonesia.
?ndonesia
A. WasteManagement
(s)e:d.
Suitable aste storage and transportationser;ices to ensure a clean and safe or!en;ironment.
Store and transport the aste and ensure theen;ironment clean and safe.
Purchase in ?ndonesia.
?ndonesia