Retro-Commissioning: Energy Hero In Plain Sight Kevin Gombotz, PE 10-5-2017 11/10/2017 Copyright Envinity, 2015 1

Upload: others

Post on 17-Jul-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Retro-Commissioning: Energy Hero In Plain Sight · 1. Track : Benchmarks, Trends, KPIs 2. Tune Procedures and Setpoints 3. Find and Fix Faults 4. Improve Controls Programming 5. Increase

Retro-Commissioning: Energy Hero In Plain Sight

Kevin Gombotz, PE

10-5-2017

11/10/2017 Copyright Envinity, 2015 1

Page 2: Retro-Commissioning: Energy Hero In Plain Sight · 1. Track : Benchmarks, Trends, KPIs 2. Tune Procedures and Setpoints 3. Find and Fix Faults 4. Improve Controls Programming 5. Increase

11/10/2017 Copyright Envinity, 2015 2

Kevin Gombotz, PE• Envinity Building Energy Solutions• Vice President• Treasure Hunter

Page 3: Retro-Commissioning: Energy Hero In Plain Sight · 1. Track : Benchmarks, Trends, KPIs 2. Tune Procedures and Setpoints 3. Find and Fix Faults 4. Improve Controls Programming 5. Increase

11/10/2017 Copyright Envinity, 2015 3

$-

$100,000

$200,000

$300,000

$400,000

$500,000

$600,000

Hospital Energy Cost

Before

After

What does a hero project look like?

Direct Cost: $40,000Savings: $85,000 / yr (15%)6 months duration6 month paybackPaid off in same fiscal year 2 days per month staff time!

Page 4: Retro-Commissioning: Energy Hero In Plain Sight · 1. Track : Benchmarks, Trends, KPIs 2. Tune Procedures and Setpoints 3. Find and Fix Faults 4. Improve Controls Programming 5. Increase

11/10/2017 Copyright Envinity, 2015 4

Old woman or young woman?

RCx: fresh set of eyes to• Spot opportunity• Solve problems• Serve the mission

Page 5: Retro-Commissioning: Energy Hero In Plain Sight · 1. Track : Benchmarks, Trends, KPIs 2. Tune Procedures and Setpoints 3. Find and Fix Faults 4. Improve Controls Programming 5. Increase

0

50

100

150

200

250

300

Before 1960 1960's 1970's 1980's 1990's 2000's

kbtu

/sf

Energy Use By Age

11/10/2017 Copyright Envinity, 2015 5

Even new hospitals are slacking!

10% Energy decrease

7% Energy increase

Credit: 2007 and 2012 CBECs building survey, EIA

Hospitals

All Commercial Buildings

Page 6: Retro-Commissioning: Energy Hero In Plain Sight · 1. Track : Benchmarks, Trends, KPIs 2. Tune Procedures and Setpoints 3. Find and Fix Faults 4. Improve Controls Programming 5. Increase

11/10/2017 Copyright Envinity, 2015 6

Are LEED hospitals any better?

Average Payback: 2.5 yearsAverage Savings : 22%Total Cost Savings: $1.8M

0%

5%

10%

15%

20%

25%

30%

35%

Hospital 12012

Hospital 22014

LEED certified

Hospital 32013

Hospital 42006

LEED certified

Hospital 52003

Hospital 62009

LEED certified

Annu

al S

avin

gs

RCx Savings 6 New Hospitals

LEED

LEED

LEED

Page 7: Retro-Commissioning: Energy Hero In Plain Sight · 1. Track : Benchmarks, Trends, KPIs 2. Tune Procedures and Setpoints 3. Find and Fix Faults 4. Improve Controls Programming 5. Increase

11/10/2017 Copyright Envinity, 2015 7

LEED isn’t leading

Only 5% of LEED hospitals are Energy Star certified.

Credit: USGBC and Energy Star online certification listings

Page 8: Retro-Commissioning: Energy Hero In Plain Sight · 1. Track : Benchmarks, Trends, KPIs 2. Tune Procedures and Setpoints 3. Find and Fix Faults 4. Improve Controls Programming 5. Increase

RCx can be the difference

11/10/2017 Copyright Envinity, 2017 8

• 73 beds, specialty surgery• 146,000 square feet• Built 2012

• Commissioned by 3rd Party• Retro-commissioned by 4th Party!• 15% cost savings, 6 month payback

0

10

20

30

40

50

Energy Star Score

Before Retro-Commissioning

After Retro-Commissioning

Wellspan Case Study - Rehab Hospital

$-

$100,000

$200,000

$300,000

$400,000

$500,000

$600,000

Energy Cost 2012 Hospital

Before Retro-Commissioning

After Retro-Commissioning

Page 9: Retro-Commissioning: Energy Hero In Plain Sight · 1. Track : Benchmarks, Trends, KPIs 2. Tune Procedures and Setpoints 3. Find and Fix Faults 4. Improve Controls Programming 5. Increase

Is it worth fixing?

• Build trust through RCx• Get recognized by AHA• Get consistent funding

11/10/2017 Copyright Envinity, 2015 9

x 500,000 sf = $2.5M investment

x 25% savings

x 5 Year Payback = $5/sf upfront investment

$4/sf utilities

Page 10: Retro-Commissioning: Energy Hero In Plain Sight · 1. Track : Benchmarks, Trends, KPIs 2. Tune Procedures and Setpoints 3. Find and Fix Faults 4. Improve Controls Programming 5. Increase

RCx lays foundation for $$$

11/10/2017 Copyright Envinity, 2015 10

5%

25%

70%

Path to 30% Reduction

Retro-commissioning

Capital Energy Projects

Improved Use

Page 11: Retro-Commissioning: Energy Hero In Plain Sight · 1. Track : Benchmarks, Trends, KPIs 2. Tune Procedures and Setpoints 3. Find and Fix Faults 4. Improve Controls Programming 5. Increase

Worth fixing? … Joint Commission

RCx Targets JACO Compliance Issues• Temp and humidity • Room pressure requirements (Tissue test)• Final filter condition

11/10/2017 Copyright Envinity, 2015 11

Page 12: Retro-Commissioning: Energy Hero In Plain Sight · 1. Track : Benchmarks, Trends, KPIs 2. Tune Procedures and Setpoints 3. Find and Fix Faults 4. Improve Controls Programming 5. Increase

Worth fixing? … Reduce work orders

RCx Reduces • Hot/cold calls• Sweating windows• Building pressurization• Freeze stat trips• Unplanned failures (short cycling, hunting, etc)• Angry surgeons

11/10/2017 Copyright Envinity, 2015 12

Page 13: Retro-Commissioning: Energy Hero In Plain Sight · 1. Track : Benchmarks, Trends, KPIs 2. Tune Procedures and Setpoints 3. Find and Fix Faults 4. Improve Controls Programming 5. Increase

RCx Process Steps

11/10/2017 Copyright Envinity, 2015 13

1. Track : Benchmarks, Trends, KPIs2. Tune Procedures and Setpoints3. Find and Fix Faults4. Improve Controls Programming5. Increase Scheduling6. Re-engineer Airflows for Current Use

Best

Pay

back

Page 14: Retro-Commissioning: Energy Hero In Plain Sight · 1. Track : Benchmarks, Trends, KPIs 2. Tune Procedures and Setpoints 3. Find and Fix Faults 4. Improve Controls Programming 5. Increase

1. Track : benchmarks, trends, KPIs

E.g. Tracked kW/ton and CHW load improvements through BAS trend data

Page 15: Retro-Commissioning: Energy Hero In Plain Sight · 1. Track : Benchmarks, Trends, KPIs 2. Tune Procedures and Setpoints 3. Find and Fix Faults 4. Improve Controls Programming 5. Increase

2. Tune procedures and setpoints

E.g. Reduce condenser setpoint for improved part-load performance; increased economizer setpoints

Page 16: Retro-Commissioning: Energy Hero In Plain Sight · 1. Track : Benchmarks, Trends, KPIs 2. Tune Procedures and Setpoints 3. Find and Fix Faults 4. Improve Controls Programming 5. Increase

11/10/2017 Copyright Envinity, 2015 16

Procedures : Let the leader lead

Lag Boiler 15 KW less$9,500 / yr just to make it the “lead”

Electric Boiler, Sterile Processing

Page 17: Retro-Commissioning: Energy Hero In Plain Sight · 1. Track : Benchmarks, Trends, KPIs 2. Tune Procedures and Setpoints 3. Find and Fix Faults 4. Improve Controls Programming 5. Increase

11/10/2017 Copyright Envinity, 2015 17

Setpoints

20 KW less chiller power • Turned knob to lower tower setpoint

• 1 hour fix• $5,000 per year

Page 18: Retro-Commissioning: Energy Hero In Plain Sight · 1. Track : Benchmarks, Trends, KPIs 2. Tune Procedures and Setpoints 3. Find and Fix Faults 4. Improve Controls Programming 5. Increase

3. Find and fix faults

E.g. Repaired OA damper actuator on RTU serving Sterile Storage

Page 19: Retro-Commissioning: Energy Hero In Plain Sight · 1. Track : Benchmarks, Trends, KPIs 2. Tune Procedures and Setpoints 3. Find and Fix Faults 4. Improve Controls Programming 5. Increase

11/10/2017 Copyright Envinity, 2015 19

Find and fix faults

Inlet Temp 55F

8degF waste x 1.085 x 2000 cfm / 12000 = 1.5 tons needed3 tons supplied$2000/yr savings

Page 20: Retro-Commissioning: Energy Hero In Plain Sight · 1. Track : Benchmarks, Trends, KPIs 2. Tune Procedures and Setpoints 3. Find and Fix Faults 4. Improve Controls Programming 5. Increase

4. Improve controls programming

E.g. add SAT reset with zone demand, pump pressure reset

Page 21: Retro-Commissioning: Energy Hero In Plain Sight · 1. Track : Benchmarks, Trends, KPIs 2. Tune Procedures and Setpoints 3. Find and Fix Faults 4. Improve Controls Programming 5. Increase

11/10/2017 Copyright Envinity, 2015 21

0100200300400500600

6/14/2017 6/24/2017 7/4/2017 7/14/2017 7/24/2017 8/3/2017 8/13/2017

MBH

010203040506070

6/14/2017 6/24/2017 7/4/2017 7/14/2017 7/24/2017 8/3/2017 8/13/2017

Tons

05

10152025303540

6/14/2017 6/24/2017 7/4/2017 7/14/2017 7/24/2017 8/3/2017 8/13/2017

KW

Change VAV sequence to “dual max” to allow lower heating min:• 4 hours programming• $17,500/yr

10 KW $9,000/yr electric

15 tons $4,500/yr chilled water

150 MBH $5,000/yr reheat

Programming

Page 22: Retro-Commissioning: Energy Hero In Plain Sight · 1. Track : Benchmarks, Trends, KPIs 2. Tune Procedures and Setpoints 3. Find and Fix Faults 4. Improve Controls Programming 5. Increase

5. Increase scheduling

Scheduling was good, but only 5% of total air. Needed to enhance. Therapy room needed a “walk through” mode

E.g. Provide unoccupied mode Offices, Kitchen, Outpatient. Respond to operator feedback to refine mode.

Page 23: Retro-Commissioning: Energy Hero In Plain Sight · 1. Track : Benchmarks, Trends, KPIs 2. Tune Procedures and Setpoints 3. Find and Fix Faults 4. Improve Controls Programming 5. Increase

11/10/2017 Copyright Envinity, 2015 23

Scheduling

0

5

10

15

20

25

30

35

4/25/2017 5/5/2017 5/15/2017 5/25/2017 6/4/2017 6/14/2017 6/24/2017

KW

Total fan powerLobby Air Handler:• Zone level schedule• 20 hrs programming• 5 KW daily average reduction• $7,000 / yr savings

Page 24: Retro-Commissioning: Energy Hero In Plain Sight · 1. Track : Benchmarks, Trends, KPIs 2. Tune Procedures and Setpoints 3. Find and Fix Faults 4. Improve Controls Programming 5. Increase

6. Engineer airflows for current use

Reduced 9,500 cfm of SA (11%) from heating minimum by providing dual-maximum control. Modified damper and reheat sequencing.

Further opportunities to re-engineer minimum flows for current use and code requirements.

Page 25: Retro-Commissioning: Energy Hero In Plain Sight · 1. Track : Benchmarks, Trends, KPIs 2. Tune Procedures and Setpoints 3. Find and Fix Faults 4. Improve Controls Programming 5. Increase

11/10/2017 Copyright Envinity, 2015 25

0100020003000400050006000700080009000

3/26

3/31 4/

5

4/10

4/15

4/20

4/25

4/30 5/

5

Cfm

Airflow

0102030405060708090

3/26

3/31 4/

5

4/10

4/15

4/20

4/25

4/30 5/

5

Avg

Vavl

e %

Reheat

Engineer airflows to current code

Blood bank example:• Designed at 30 ACH• Left at 30 ACH• Current code 6 ACH• 4500 cfm reduction• 4 hr change• $11,000 / yr savings

Fan Energy: $ 6,504 Chilled Water: $ 1,831 Reheat: $ 2,807 TOTAL SAVINGS: $ 11,142

Page 26: Retro-Commissioning: Energy Hero In Plain Sight · 1. Track : Benchmarks, Trends, KPIs 2. Tune Procedures and Setpoints 3. Find and Fix Faults 4. Improve Controls Programming 5. Increase

RCx Process

11/10/2017 Copyright Envinity, 2015 26

Interview staff about opportunities and trouble callsDocument controls settings and enable trendingSurvey drawings and controls, follow-up with inspectionWork closely controls tech and mechanic to modifyEffective communication with maintenance teamDocument Issues Log, BAS Change Log, and trip reports

Page 27: Retro-Commissioning: Energy Hero In Plain Sight · 1. Track : Benchmarks, Trends, KPIs 2. Tune Procedures and Setpoints 3. Find and Fix Faults 4. Improve Controls Programming 5. Increase

11/10/2017 Copyright Envinity, 2015 27

Owner’s strategy

Page 28: Retro-Commissioning: Energy Hero In Plain Sight · 1. Track : Benchmarks, Trends, KPIs 2. Tune Procedures and Setpoints 3. Find and Fix Faults 4. Improve Controls Programming 5. Increase

11/10/2017 Copyright Envinity, 2015 28

Page 29: Retro-Commissioning: Energy Hero In Plain Sight · 1. Track : Benchmarks, Trends, KPIs 2. Tune Procedures and Setpoints 3. Find and Fix Faults 4. Improve Controls Programming 5. Increase

11/10/2017 Copyright Envinity, 2015 29

BTUs

Find a champion – is it you?

Page 30: Retro-Commissioning: Energy Hero In Plain Sight · 1. Track : Benchmarks, Trends, KPIs 2. Tune Procedures and Setpoints 3. Find and Fix Faults 4. Improve Controls Programming 5. Increase

Build a team

11/10/2017 Copyright Envinity, 2015 30

BTUs

Page 31: Retro-Commissioning: Energy Hero In Plain Sight · 1. Track : Benchmarks, Trends, KPIs 2. Tune Procedures and Setpoints 3. Find and Fix Faults 4. Improve Controls Programming 5. Increase

Tips for the owner

11/10/2017 Copyright Envinity, 2015 31

Appoint Internal Cx Leader and TeamFind a CoachLeverage Controls Service AgreementSet Aside Repair BudgetInitiate a HVAC Trouble Tracking Process with StaffProvide Offsite BAS Access for Consultant / Analyst

Page 32: Retro-Commissioning: Energy Hero In Plain Sight · 1. Track : Benchmarks, Trends, KPIs 2. Tune Procedures and Setpoints 3. Find and Fix Faults 4. Improve Controls Programming 5. Increase

Most Important Tip!

11/10/2017 Copyright Envinity, 2015 32

Don’t save too much!!!

5%

25%

70%

Path to 30% Reduction

Retro-commissioning

Capital Energy ProjectsImproved Use

Until you get the $$ for Capital Projects!

Page 33: Retro-Commissioning: Energy Hero In Plain Sight · 1. Track : Benchmarks, Trends, KPIs 2. Tune Procedures and Setpoints 3. Find and Fix Faults 4. Improve Controls Programming 5. Increase

Thank You.

Questions?Kevin Gombotz, PE

Vice President of Commercial Energy Services

[email protected]

11/10/2017 Copyright Envinity, 2015 33

Page 34: Retro-Commissioning: Energy Hero In Plain Sight · 1. Track : Benchmarks, Trends, KPIs 2. Tune Procedures and Setpoints 3. Find and Fix Faults 4. Improve Controls Programming 5. Increase

More Examples

11/10/2017 Copyright Envinity, 2015 34

Leaking valves

Broken dampers

Valve conflicts …. Like “gas and brake”

Follow the work orders

“But

ton

push

One day RCx effort initiated $60,000 / yr savings

Page 35: Retro-Commissioning: Energy Hero In Plain Sight · 1. Track : Benchmarks, Trends, KPIs 2. Tune Procedures and Setpoints 3. Find and Fix Faults 4. Improve Controls Programming 5. Increase

Benchmarks Show Potential

11/10/2017 Copyright Envinity, 2015 35

Clinical Quality Upper 10%

60

Main Hospital Current

RehabCurrent

5710% savings