![Page 1: Retro-Commissioning: Energy Hero In Plain Sight · 1. Track : Benchmarks, Trends, KPIs 2. Tune Procedures and Setpoints 3. Find and Fix Faults 4. Improve Controls Programming 5. Increase](https://reader033.vdocuments.us/reader033/viewer/2022050120/5f5022a2cbaf1b58612fb989/html5/thumbnails/1.jpg)
Retro-Commissioning: Energy Hero In Plain Sight
Kevin Gombotz, PE
10-5-2017
11/10/2017 Copyright Envinity, 2015 1
![Page 2: Retro-Commissioning: Energy Hero In Plain Sight · 1. Track : Benchmarks, Trends, KPIs 2. Tune Procedures and Setpoints 3. Find and Fix Faults 4. Improve Controls Programming 5. Increase](https://reader033.vdocuments.us/reader033/viewer/2022050120/5f5022a2cbaf1b58612fb989/html5/thumbnails/2.jpg)
11/10/2017 Copyright Envinity, 2015 2
Kevin Gombotz, PE• Envinity Building Energy Solutions• Vice President• Treasure Hunter
![Page 3: Retro-Commissioning: Energy Hero In Plain Sight · 1. Track : Benchmarks, Trends, KPIs 2. Tune Procedures and Setpoints 3. Find and Fix Faults 4. Improve Controls Programming 5. Increase](https://reader033.vdocuments.us/reader033/viewer/2022050120/5f5022a2cbaf1b58612fb989/html5/thumbnails/3.jpg)
11/10/2017 Copyright Envinity, 2015 3
$-
$100,000
$200,000
$300,000
$400,000
$500,000
$600,000
Hospital Energy Cost
Before
After
What does a hero project look like?
Direct Cost: $40,000Savings: $85,000 / yr (15%)6 months duration6 month paybackPaid off in same fiscal year 2 days per month staff time!
![Page 4: Retro-Commissioning: Energy Hero In Plain Sight · 1. Track : Benchmarks, Trends, KPIs 2. Tune Procedures and Setpoints 3. Find and Fix Faults 4. Improve Controls Programming 5. Increase](https://reader033.vdocuments.us/reader033/viewer/2022050120/5f5022a2cbaf1b58612fb989/html5/thumbnails/4.jpg)
11/10/2017 Copyright Envinity, 2015 4
Old woman or young woman?
RCx: fresh set of eyes to• Spot opportunity• Solve problems• Serve the mission
![Page 5: Retro-Commissioning: Energy Hero In Plain Sight · 1. Track : Benchmarks, Trends, KPIs 2. Tune Procedures and Setpoints 3. Find and Fix Faults 4. Improve Controls Programming 5. Increase](https://reader033.vdocuments.us/reader033/viewer/2022050120/5f5022a2cbaf1b58612fb989/html5/thumbnails/5.jpg)
0
50
100
150
200
250
300
Before 1960 1960's 1970's 1980's 1990's 2000's
kbtu
/sf
Energy Use By Age
11/10/2017 Copyright Envinity, 2015 5
Even new hospitals are slacking!
10% Energy decrease
7% Energy increase
Credit: 2007 and 2012 CBECs building survey, EIA
Hospitals
All Commercial Buildings
![Page 6: Retro-Commissioning: Energy Hero In Plain Sight · 1. Track : Benchmarks, Trends, KPIs 2. Tune Procedures and Setpoints 3. Find and Fix Faults 4. Improve Controls Programming 5. Increase](https://reader033.vdocuments.us/reader033/viewer/2022050120/5f5022a2cbaf1b58612fb989/html5/thumbnails/6.jpg)
11/10/2017 Copyright Envinity, 2015 6
Are LEED hospitals any better?
Average Payback: 2.5 yearsAverage Savings : 22%Total Cost Savings: $1.8M
0%
5%
10%
15%
20%
25%
30%
35%
Hospital 12012
Hospital 22014
LEED certified
Hospital 32013
Hospital 42006
LEED certified
Hospital 52003
Hospital 62009
LEED certified
Annu
al S
avin
gs
RCx Savings 6 New Hospitals
LEED
LEED
LEED
![Page 7: Retro-Commissioning: Energy Hero In Plain Sight · 1. Track : Benchmarks, Trends, KPIs 2. Tune Procedures and Setpoints 3. Find and Fix Faults 4. Improve Controls Programming 5. Increase](https://reader033.vdocuments.us/reader033/viewer/2022050120/5f5022a2cbaf1b58612fb989/html5/thumbnails/7.jpg)
11/10/2017 Copyright Envinity, 2015 7
LEED isn’t leading
Only 5% of LEED hospitals are Energy Star certified.
Credit: USGBC and Energy Star online certification listings
![Page 8: Retro-Commissioning: Energy Hero In Plain Sight · 1. Track : Benchmarks, Trends, KPIs 2. Tune Procedures and Setpoints 3. Find and Fix Faults 4. Improve Controls Programming 5. Increase](https://reader033.vdocuments.us/reader033/viewer/2022050120/5f5022a2cbaf1b58612fb989/html5/thumbnails/8.jpg)
RCx can be the difference
11/10/2017 Copyright Envinity, 2017 8
• 73 beds, specialty surgery• 146,000 square feet• Built 2012
• Commissioned by 3rd Party• Retro-commissioned by 4th Party!• 15% cost savings, 6 month payback
0
10
20
30
40
50
Energy Star Score
Before Retro-Commissioning
After Retro-Commissioning
Wellspan Case Study - Rehab Hospital
$-
$100,000
$200,000
$300,000
$400,000
$500,000
$600,000
Energy Cost 2012 Hospital
Before Retro-Commissioning
After Retro-Commissioning
![Page 9: Retro-Commissioning: Energy Hero In Plain Sight · 1. Track : Benchmarks, Trends, KPIs 2. Tune Procedures and Setpoints 3. Find and Fix Faults 4. Improve Controls Programming 5. Increase](https://reader033.vdocuments.us/reader033/viewer/2022050120/5f5022a2cbaf1b58612fb989/html5/thumbnails/9.jpg)
Is it worth fixing?
• Build trust through RCx• Get recognized by AHA• Get consistent funding
11/10/2017 Copyright Envinity, 2015 9
x 500,000 sf = $2.5M investment
x 25% savings
x 5 Year Payback = $5/sf upfront investment
$4/sf utilities
![Page 10: Retro-Commissioning: Energy Hero In Plain Sight · 1. Track : Benchmarks, Trends, KPIs 2. Tune Procedures and Setpoints 3. Find and Fix Faults 4. Improve Controls Programming 5. Increase](https://reader033.vdocuments.us/reader033/viewer/2022050120/5f5022a2cbaf1b58612fb989/html5/thumbnails/10.jpg)
RCx lays foundation for $$$
11/10/2017 Copyright Envinity, 2015 10
5%
25%
70%
Path to 30% Reduction
Retro-commissioning
Capital Energy Projects
Improved Use
![Page 11: Retro-Commissioning: Energy Hero In Plain Sight · 1. Track : Benchmarks, Trends, KPIs 2. Tune Procedures and Setpoints 3. Find and Fix Faults 4. Improve Controls Programming 5. Increase](https://reader033.vdocuments.us/reader033/viewer/2022050120/5f5022a2cbaf1b58612fb989/html5/thumbnails/11.jpg)
Worth fixing? … Joint Commission
RCx Targets JACO Compliance Issues• Temp and humidity • Room pressure requirements (Tissue test)• Final filter condition
11/10/2017 Copyright Envinity, 2015 11
![Page 12: Retro-Commissioning: Energy Hero In Plain Sight · 1. Track : Benchmarks, Trends, KPIs 2. Tune Procedures and Setpoints 3. Find and Fix Faults 4. Improve Controls Programming 5. Increase](https://reader033.vdocuments.us/reader033/viewer/2022050120/5f5022a2cbaf1b58612fb989/html5/thumbnails/12.jpg)
Worth fixing? … Reduce work orders
RCx Reduces • Hot/cold calls• Sweating windows• Building pressurization• Freeze stat trips• Unplanned failures (short cycling, hunting, etc)• Angry surgeons
11/10/2017 Copyright Envinity, 2015 12
![Page 13: Retro-Commissioning: Energy Hero In Plain Sight · 1. Track : Benchmarks, Trends, KPIs 2. Tune Procedures and Setpoints 3. Find and Fix Faults 4. Improve Controls Programming 5. Increase](https://reader033.vdocuments.us/reader033/viewer/2022050120/5f5022a2cbaf1b58612fb989/html5/thumbnails/13.jpg)
RCx Process Steps
11/10/2017 Copyright Envinity, 2015 13
1. Track : Benchmarks, Trends, KPIs2. Tune Procedures and Setpoints3. Find and Fix Faults4. Improve Controls Programming5. Increase Scheduling6. Re-engineer Airflows for Current Use
Best
Pay
back
![Page 14: Retro-Commissioning: Energy Hero In Plain Sight · 1. Track : Benchmarks, Trends, KPIs 2. Tune Procedures and Setpoints 3. Find and Fix Faults 4. Improve Controls Programming 5. Increase](https://reader033.vdocuments.us/reader033/viewer/2022050120/5f5022a2cbaf1b58612fb989/html5/thumbnails/14.jpg)
1. Track : benchmarks, trends, KPIs
E.g. Tracked kW/ton and CHW load improvements through BAS trend data
![Page 15: Retro-Commissioning: Energy Hero In Plain Sight · 1. Track : Benchmarks, Trends, KPIs 2. Tune Procedures and Setpoints 3. Find and Fix Faults 4. Improve Controls Programming 5. Increase](https://reader033.vdocuments.us/reader033/viewer/2022050120/5f5022a2cbaf1b58612fb989/html5/thumbnails/15.jpg)
2. Tune procedures and setpoints
E.g. Reduce condenser setpoint for improved part-load performance; increased economizer setpoints
![Page 16: Retro-Commissioning: Energy Hero In Plain Sight · 1. Track : Benchmarks, Trends, KPIs 2. Tune Procedures and Setpoints 3. Find and Fix Faults 4. Improve Controls Programming 5. Increase](https://reader033.vdocuments.us/reader033/viewer/2022050120/5f5022a2cbaf1b58612fb989/html5/thumbnails/16.jpg)
11/10/2017 Copyright Envinity, 2015 16
Procedures : Let the leader lead
Lag Boiler 15 KW less$9,500 / yr just to make it the “lead”
Electric Boiler, Sterile Processing
![Page 17: Retro-Commissioning: Energy Hero In Plain Sight · 1. Track : Benchmarks, Trends, KPIs 2. Tune Procedures and Setpoints 3. Find and Fix Faults 4. Improve Controls Programming 5. Increase](https://reader033.vdocuments.us/reader033/viewer/2022050120/5f5022a2cbaf1b58612fb989/html5/thumbnails/17.jpg)
11/10/2017 Copyright Envinity, 2015 17
Setpoints
20 KW less chiller power • Turned knob to lower tower setpoint
• 1 hour fix• $5,000 per year
![Page 18: Retro-Commissioning: Energy Hero In Plain Sight · 1. Track : Benchmarks, Trends, KPIs 2. Tune Procedures and Setpoints 3. Find and Fix Faults 4. Improve Controls Programming 5. Increase](https://reader033.vdocuments.us/reader033/viewer/2022050120/5f5022a2cbaf1b58612fb989/html5/thumbnails/18.jpg)
3. Find and fix faults
E.g. Repaired OA damper actuator on RTU serving Sterile Storage
![Page 19: Retro-Commissioning: Energy Hero In Plain Sight · 1. Track : Benchmarks, Trends, KPIs 2. Tune Procedures and Setpoints 3. Find and Fix Faults 4. Improve Controls Programming 5. Increase](https://reader033.vdocuments.us/reader033/viewer/2022050120/5f5022a2cbaf1b58612fb989/html5/thumbnails/19.jpg)
11/10/2017 Copyright Envinity, 2015 19
Find and fix faults
Inlet Temp 55F
8degF waste x 1.085 x 2000 cfm / 12000 = 1.5 tons needed3 tons supplied$2000/yr savings
![Page 20: Retro-Commissioning: Energy Hero In Plain Sight · 1. Track : Benchmarks, Trends, KPIs 2. Tune Procedures and Setpoints 3. Find and Fix Faults 4. Improve Controls Programming 5. Increase](https://reader033.vdocuments.us/reader033/viewer/2022050120/5f5022a2cbaf1b58612fb989/html5/thumbnails/20.jpg)
4. Improve controls programming
E.g. add SAT reset with zone demand, pump pressure reset
![Page 21: Retro-Commissioning: Energy Hero In Plain Sight · 1. Track : Benchmarks, Trends, KPIs 2. Tune Procedures and Setpoints 3. Find and Fix Faults 4. Improve Controls Programming 5. Increase](https://reader033.vdocuments.us/reader033/viewer/2022050120/5f5022a2cbaf1b58612fb989/html5/thumbnails/21.jpg)
11/10/2017 Copyright Envinity, 2015 21
0100200300400500600
6/14/2017 6/24/2017 7/4/2017 7/14/2017 7/24/2017 8/3/2017 8/13/2017
MBH
010203040506070
6/14/2017 6/24/2017 7/4/2017 7/14/2017 7/24/2017 8/3/2017 8/13/2017
Tons
05
10152025303540
6/14/2017 6/24/2017 7/4/2017 7/14/2017 7/24/2017 8/3/2017 8/13/2017
KW
Change VAV sequence to “dual max” to allow lower heating min:• 4 hours programming• $17,500/yr
10 KW $9,000/yr electric
15 tons $4,500/yr chilled water
150 MBH $5,000/yr reheat
Programming
![Page 22: Retro-Commissioning: Energy Hero In Plain Sight · 1. Track : Benchmarks, Trends, KPIs 2. Tune Procedures and Setpoints 3. Find and Fix Faults 4. Improve Controls Programming 5. Increase](https://reader033.vdocuments.us/reader033/viewer/2022050120/5f5022a2cbaf1b58612fb989/html5/thumbnails/22.jpg)
5. Increase scheduling
Scheduling was good, but only 5% of total air. Needed to enhance. Therapy room needed a “walk through” mode
E.g. Provide unoccupied mode Offices, Kitchen, Outpatient. Respond to operator feedback to refine mode.
![Page 23: Retro-Commissioning: Energy Hero In Plain Sight · 1. Track : Benchmarks, Trends, KPIs 2. Tune Procedures and Setpoints 3. Find and Fix Faults 4. Improve Controls Programming 5. Increase](https://reader033.vdocuments.us/reader033/viewer/2022050120/5f5022a2cbaf1b58612fb989/html5/thumbnails/23.jpg)
11/10/2017 Copyright Envinity, 2015 23
Scheduling
0
5
10
15
20
25
30
35
4/25/2017 5/5/2017 5/15/2017 5/25/2017 6/4/2017 6/14/2017 6/24/2017
KW
Total fan powerLobby Air Handler:• Zone level schedule• 20 hrs programming• 5 KW daily average reduction• $7,000 / yr savings
![Page 24: Retro-Commissioning: Energy Hero In Plain Sight · 1. Track : Benchmarks, Trends, KPIs 2. Tune Procedures and Setpoints 3. Find and Fix Faults 4. Improve Controls Programming 5. Increase](https://reader033.vdocuments.us/reader033/viewer/2022050120/5f5022a2cbaf1b58612fb989/html5/thumbnails/24.jpg)
6. Engineer airflows for current use
Reduced 9,500 cfm of SA (11%) from heating minimum by providing dual-maximum control. Modified damper and reheat sequencing.
Further opportunities to re-engineer minimum flows for current use and code requirements.
![Page 25: Retro-Commissioning: Energy Hero In Plain Sight · 1. Track : Benchmarks, Trends, KPIs 2. Tune Procedures and Setpoints 3. Find and Fix Faults 4. Improve Controls Programming 5. Increase](https://reader033.vdocuments.us/reader033/viewer/2022050120/5f5022a2cbaf1b58612fb989/html5/thumbnails/25.jpg)
11/10/2017 Copyright Envinity, 2015 25
0100020003000400050006000700080009000
3/26
3/31 4/
5
4/10
4/15
4/20
4/25
4/30 5/
5
Cfm
Airflow
0102030405060708090
3/26
3/31 4/
5
4/10
4/15
4/20
4/25
4/30 5/
5
Avg
Vavl
e %
Reheat
Engineer airflows to current code
Blood bank example:• Designed at 30 ACH• Left at 30 ACH• Current code 6 ACH• 4500 cfm reduction• 4 hr change• $11,000 / yr savings
Fan Energy: $ 6,504 Chilled Water: $ 1,831 Reheat: $ 2,807 TOTAL SAVINGS: $ 11,142
![Page 26: Retro-Commissioning: Energy Hero In Plain Sight · 1. Track : Benchmarks, Trends, KPIs 2. Tune Procedures and Setpoints 3. Find and Fix Faults 4. Improve Controls Programming 5. Increase](https://reader033.vdocuments.us/reader033/viewer/2022050120/5f5022a2cbaf1b58612fb989/html5/thumbnails/26.jpg)
RCx Process
11/10/2017 Copyright Envinity, 2015 26
Interview staff about opportunities and trouble callsDocument controls settings and enable trendingSurvey drawings and controls, follow-up with inspectionWork closely controls tech and mechanic to modifyEffective communication with maintenance teamDocument Issues Log, BAS Change Log, and trip reports
![Page 27: Retro-Commissioning: Energy Hero In Plain Sight · 1. Track : Benchmarks, Trends, KPIs 2. Tune Procedures and Setpoints 3. Find and Fix Faults 4. Improve Controls Programming 5. Increase](https://reader033.vdocuments.us/reader033/viewer/2022050120/5f5022a2cbaf1b58612fb989/html5/thumbnails/27.jpg)
11/10/2017 Copyright Envinity, 2015 27
Owner’s strategy
![Page 28: Retro-Commissioning: Energy Hero In Plain Sight · 1. Track : Benchmarks, Trends, KPIs 2. Tune Procedures and Setpoints 3. Find and Fix Faults 4. Improve Controls Programming 5. Increase](https://reader033.vdocuments.us/reader033/viewer/2022050120/5f5022a2cbaf1b58612fb989/html5/thumbnails/28.jpg)
11/10/2017 Copyright Envinity, 2015 28
![Page 29: Retro-Commissioning: Energy Hero In Plain Sight · 1. Track : Benchmarks, Trends, KPIs 2. Tune Procedures and Setpoints 3. Find and Fix Faults 4. Improve Controls Programming 5. Increase](https://reader033.vdocuments.us/reader033/viewer/2022050120/5f5022a2cbaf1b58612fb989/html5/thumbnails/29.jpg)
11/10/2017 Copyright Envinity, 2015 29
BTUs
Find a champion – is it you?
![Page 30: Retro-Commissioning: Energy Hero In Plain Sight · 1. Track : Benchmarks, Trends, KPIs 2. Tune Procedures and Setpoints 3. Find and Fix Faults 4. Improve Controls Programming 5. Increase](https://reader033.vdocuments.us/reader033/viewer/2022050120/5f5022a2cbaf1b58612fb989/html5/thumbnails/30.jpg)
Build a team
11/10/2017 Copyright Envinity, 2015 30
BTUs
![Page 31: Retro-Commissioning: Energy Hero In Plain Sight · 1. Track : Benchmarks, Trends, KPIs 2. Tune Procedures and Setpoints 3. Find and Fix Faults 4. Improve Controls Programming 5. Increase](https://reader033.vdocuments.us/reader033/viewer/2022050120/5f5022a2cbaf1b58612fb989/html5/thumbnails/31.jpg)
Tips for the owner
11/10/2017 Copyright Envinity, 2015 31
Appoint Internal Cx Leader and TeamFind a CoachLeverage Controls Service AgreementSet Aside Repair BudgetInitiate a HVAC Trouble Tracking Process with StaffProvide Offsite BAS Access for Consultant / Analyst
![Page 32: Retro-Commissioning: Energy Hero In Plain Sight · 1. Track : Benchmarks, Trends, KPIs 2. Tune Procedures and Setpoints 3. Find and Fix Faults 4. Improve Controls Programming 5. Increase](https://reader033.vdocuments.us/reader033/viewer/2022050120/5f5022a2cbaf1b58612fb989/html5/thumbnails/32.jpg)
Most Important Tip!
11/10/2017 Copyright Envinity, 2015 32
Don’t save too much!!!
5%
25%
70%
Path to 30% Reduction
Retro-commissioning
Capital Energy ProjectsImproved Use
Until you get the $$ for Capital Projects!
![Page 33: Retro-Commissioning: Energy Hero In Plain Sight · 1. Track : Benchmarks, Trends, KPIs 2. Tune Procedures and Setpoints 3. Find and Fix Faults 4. Improve Controls Programming 5. Increase](https://reader033.vdocuments.us/reader033/viewer/2022050120/5f5022a2cbaf1b58612fb989/html5/thumbnails/33.jpg)
Thank You.
Questions?Kevin Gombotz, PE
Vice President of Commercial Energy Services
11/10/2017 Copyright Envinity, 2015 33
![Page 34: Retro-Commissioning: Energy Hero In Plain Sight · 1. Track : Benchmarks, Trends, KPIs 2. Tune Procedures and Setpoints 3. Find and Fix Faults 4. Improve Controls Programming 5. Increase](https://reader033.vdocuments.us/reader033/viewer/2022050120/5f5022a2cbaf1b58612fb989/html5/thumbnails/34.jpg)
More Examples
11/10/2017 Copyright Envinity, 2015 34
Leaking valves
Broken dampers
Valve conflicts …. Like “gas and brake”
Follow the work orders
“But
ton
push
”
One day RCx effort initiated $60,000 / yr savings
![Page 35: Retro-Commissioning: Energy Hero In Plain Sight · 1. Track : Benchmarks, Trends, KPIs 2. Tune Procedures and Setpoints 3. Find and Fix Faults 4. Improve Controls Programming 5. Increase](https://reader033.vdocuments.us/reader033/viewer/2022050120/5f5022a2cbaf1b58612fb989/html5/thumbnails/35.jpg)
Benchmarks Show Potential
11/10/2017 Copyright Envinity, 2015 35
Clinical Quality Upper 10%
60
Main Hospital Current
RehabCurrent
5710% savings