resume laporan rafah minggu ke-60siprafourinone.info/report/5f523ef3921ba.pdf · 2020. 9. 4. ·...

1
KEGIATAN : The Support to the Development of Islamic of Higher Education Project PEKERJAAN : Construction of Nine (9) New Buildings and Supporting Infrastructures of UIN Raden Fatah Palembang LOKASI : UIN Raden Fatah Palembang PREPARATION WORKS : 2,244 % : PT Patroon Arsindo KSO PT Griksa Cipta CENTRE ADMINISTRATION BUILDING : 10,895 % PMSC : PT Deta Decon INTEGRATED LIBRARY : 16,949 % - Team Leader : Mardiana Daoed INTEGRATED LABORATORY : 13,631 % RENCANA S/D MINGGU INI : Penyedia Jasa : PT Nindya Karya (Persero) FACULTY OF ISLAMIC ECONOMY AND BUSINESS : 14,693 % REALISASI S/D MINGGU INI : - PM : Satriyo Fajar Dewantoro FACULTY OF SCIENCE AND TECHNOLOGY : 14,124 % DEVIASI : No. Loan : IND - 0164, February 16th 2012 FACULTY OF TARBIYAH : 8,032 % Nilai Pekerjaan : Rp 289.618.674.000,00 FACULTY OF PSYCHOLOGY : 7,878 % Waktu Pelaksanaan : 480 Hari Kalender (16 Oktober 2018 - 7 Februari 2020) SUPPORTING INFRASTRUCTURE : 11,556 % Waktu Pemeliharaan : 365 Hari Kalender (8 Februari 2020 - 6 Februari 2021) 100,000 % Jangka Waktu Pelaksanaan : 480 hari kalender Laporan Mingguan Ke : 60 Waktu Pelaksanaan : 421 hari Sisa Waktu Pelaksanaan : 59 hari No 1 Undangan Rapat Koordinasi 2 3 1 Pekerjaan pemasangan AC Cassette & Split 11 Pekerjaan Fixed & Armature 1 Pekerjaan pemasangan AC Cassette & Split 11 Pekerjaan Fixed & Armature 2 Pengetesan rendam Water Proofing 12 Pekerjaan penutup atap 2 Pengetesan rendam Water Proofing 12 Pekerjaan Plafond 3 13 Pekerjaan plafond 3 13 Pekerjaan Water Proofing 4 Pemasangan instalasi air bersih, air kotor & air bekas 14 Pekerjaan Cat (Sealer, Interior & Exterior) 4 Pemasangan instalasi air bersih, air kotor & air bekas 14 Pekerjaan Cat (Sealer, Interior & Exterior) 5 Pemasangan instalasi hydrant 15 Pekerjaan Water Proofing 5 Pekerjaan arsitektur (Pasangan dinding, pintu, jendela) 15 Pekerjaan Keramik Lantai, Dinding Toilet 6 Pengetesan kuat tekan beton 16 Pekerjaan Fasade 6 Pemasangan instalasi hydrant 16 Pekerjaan Fasade 7 Pekerjaan instalasi listrik 17 Pekerjaan Partisi (Glass, Gypsum & Movable) 7 Pengetesan kuat tekan beton 17 Pekerjaan Partisi (Glass, Gypsum & Movable) 8 Pekerjaan Pemasangan Keramik Lantai, Dinding Toilet 18 Test Rendam 8 Pekerjaan Instalasi Listrik 18 Test Rendam 9 Pekerjaan arsitektur (Pasangan dinding, pintu, jendela) 9 Pekerjaan metal ceilling 10 Pekerjaan metal ceilling 10 Pekerjaan penutup atap 1. 1. 2. 2. Jumlah AKTIVITAS PEKERJAAN MINGGU INI Service Crane Genset RENCANA PEKERJAAN MINGGU DEPAN Mandor Material Digunakan Peralatan Digunakan PERMASALAHAN / HAMBATAN DOKUMENTASI PELAKSANAAN Sell Concrete Mixer Machine Alat Las Alat Ukur Compressor PENYELESAIAN MASALAH Pekerjaan Railling Pekerjaan Railling Target progress sampai dengan akhir bulan Desember adalah 87,374% dan minggu ke 60 realisasi progress tercapai 80,766%. Water Proofing Bata ringan Mortar Kabel (Elektrikal) Tenaga Kerja Pekerja 5 589 Excavator Skop, Palu, Unting-unting, dll Scaffolding Jidar PIU, PPK, NK LAPORAN SURAT MENYURAT MINGGU INI RESUME LAPORAN HARIAN MINGGU INI PMSC NK DATA UMUM DEDC KURVA S PROGRESS PEKERJAAN BOBOT PEKERJAAN 80,750% 80,766% Perihal 0,016% EVALUASI WAKTU PELAKSANAAN PMSC Rencana Kerja Sisa progress yang harus dicapai setiap minggunya oleh kontraktor sampai minggu terakhir Desember adalah 2,203%, sehingga dilakukan percepatan penyelesaian pekerjaan khususnya pekerjaan bagian luar (fasade). Pekerjaan tampak luar (fasade) pada gedung Administrasi, Library, Laboratory, Psychology dan Febi harus selesai di akhir Desember 2019. Agar dilakukan penambahan tenaga kerja arsitek, khususnya pada pekerjaan cat luar, kusen dan finishing fasade. Untuk Kuas dan roll Kusen Alumunium Gypsum Keramik Kaca Cat Keahlian Karyawan 58 ACP Pipa (Hydrant & Hollow) Dari Pekerjaan Pemasangan Lift Palembang, 10 DESEMBER 2019 Konsultan PMSC Mardiana Daoed Ir. Team Leader PENGGUNA JASA PROJECT MANAGEMENT AND SUPERVISION CONSULTANT RESUME LAPORAN MINGGU KE - 60 10 DESEMBER 2019 - 2019 DESEMBER PERIODE 4 Tampak Gedung TARBIYAH Tampak Gedung TARBIYAH Tampak Gedung SAINTEK Tampak Gedung ADM Tampak Gedung LIBRARY Tampak Gedung LABORATORY Tampak Gedung PSYCHOLOGY Tampak Gedung FEBI Pekerjaan Fasade Pekerjaan Pasangan Pintu & Jendela Pekerjaan Partisi Glass Pemasangan Plafond Metal Ceiling Pekerjaan Pemasangan Sanitair Pekerjaan Cat Interior Rapat Kordinasi Mingguan 80.750% 80.766% 2.208% 1.589%

Upload: others

Post on 07-Mar-2021

5 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Resume laporan RAFAH minggu ke-60siprafourinone.info/report/5f523ef3921ba.pdf · 2020. 9. 4. · RESUME LAPORAN HARIAN MINGGU INI NK PMSC DATA UMUM DEDC KURVA S BOBOT PEKERJAAN PROGRESS

KEGIATAN : The Support to the Development of Islamic of Higher Education ProjectPEKERJAAN : Construction of Nine (9) New Buildings and Supporting Infrastructures of UIN Raden Fatah PalembangLOKASI : UIN Raden Fatah Palembang

PREPARATION WORKS : 2,244 % : PT Patroon Arsindo KSO PT Griksa CiptaCENTRE ADMINISTRATION BUILDING : 10,895 % PMSC : PT Deta DeconINTEGRATED LIBRARY : 16,949 % - Team Leader : Mardiana DaoedINTEGRATED LABORATORY : 13,631 % RENCANA S/D MINGGU INI : Penyedia Jasa : PT Nindya Karya (Persero)FACULTY OF ISLAMIC ECONOMY AND BUSINESS : 14,693 % REALISASI S/D MINGGU INI : - PM : Satriyo Fajar DewantoroFACULTY OF SCIENCE AND TECHNOLOGY : 14,124 % DEVIASI : No. Loan : IND - 0164, February 16th 2012FACULTY OF TARBIYAH : 8,032 % Nilai Pekerjaan : Rp 289.618.674.000,00FACULTY OF PSYCHOLOGY : 7,878 % Waktu Pelaksanaan : 480 Hari Kalender (16 Oktober 2018 - 7 Februari 2020) SUPPORTING INFRASTRUCTURE : 11,556 % Waktu Pemeliharaan : 365 Hari Kalender (8 Februari 2020 - 6 Februari 2021)

100,000 %

Jangka Waktu Pelaksanaan : 480 hari kalenderLaporan Mingguan Ke : 60Waktu Pelaksanaan : 421 hari

Sisa Waktu Pelaksanaan : 59 hari

No1 Undangan Rapat Koordinasi

2

3

1 Pekerjaan pemasangan AC Cassette & Split 11 Pekerjaan Fixed & Armature 1 Pekerjaan pemasangan AC Cassette & Split 11 Pekerjaan Fixed & Armature2 Pengetesan rendam Water Proofing 12 Pekerjaan penutup atap 2 Pengetesan rendam Water Proofing 12 Pekerjaan Plafond3 13 Pekerjaan plafond 3 13 Pekerjaan Water Proofing4 Pemasangan instalasi air bersih, air kotor & air bekas 14 Pekerjaan Cat (Sealer, Interior & Exterior) 4 Pemasangan instalasi air bersih, air kotor & air bekas 14 Pekerjaan Cat (Sealer, Interior & Exterior)5 Pemasangan instalasi hydrant 15 Pekerjaan Water Proofing 5 Pekerjaan arsitektur (Pasangan dinding, pintu, jendela) 15 Pekerjaan Keramik Lantai, Dinding Toilet6 Pengetesan kuat tekan beton 16 Pekerjaan Fasade 6 Pemasangan instalasi hydrant 16 Pekerjaan Fasade7 Pekerjaan instalasi listrik 17 Pekerjaan Partisi (Glass, Gypsum & Movable) 7 Pengetesan kuat tekan beton 17 Pekerjaan Partisi (Glass, Gypsum & Movable)8 Pekerjaan Pemasangan Keramik Lantai, Dinding Toilet 18 Test Rendam 8 Pekerjaan Instalasi Listrik 18 Test Rendam9 Pekerjaan arsitektur (Pasangan dinding, pintu, jendela) 9 Pekerjaan metal ceilling

10 Pekerjaan metal ceilling 10 Pekerjaan penutup atap

1. 1.

2. 2.

Jumlah

AKTIVITAS PEKERJAAN MINGGU INI

Service Crane

Genset

RENCANA PEKERJAAN MINGGU DEPAN

Mandor

Material Digunakan Peralatan Digunakan

PERMASALAHAN / HAMBATAN

DOKUMENTASI PELAKSANAAN

Sell Concrete Mixer MachineAlat Las

Alat UkurCompressor

PENYELESAIAN MASALAH

Pekerjaan Railling Pekerjaan Railling

Target progress sampai dengan akhir bulan Desember adalah 87,374% dan minggu ke 60 realisasi progress tercapai 80,766%.

Water Proofing

Bata ringanMortar

Kabel (Elektrikal)

Tenaga Kerja

Pekerja5

589Excavator

Skop, Palu, Unting-unting, dll

Scaffolding

Jidar

PIU, PPK, NK

LAPORAN SURAT MENYURAT MINGGU INI

RESUME LAPORAN HARIAN MINGGU INI

PMSCNK

DATA UMUM

DEDC

KURVA S

PROGRESS PEKERJAANBOBOT PEKERJAAN

80,750%

80,766%

Perihal

0,016%

EVALUASI WAKTU PELAKSANAAN

PMSC

Rencana Kerja

Sisa progress yang harus dicapai setiap minggunya oleh kontraktor sampai minggu terakhir Desember adalah 2,203%, sehingga dilakukan percepatan penyelesaian pekerjaan khususnya pekerjaan bagian luar (fasade).

Pekerjaan tampak luar (fasade) pada gedung Administrasi, Library, Laboratory, Psychology dan Febi harus selesai di akhir Desember 2019.

Agar dilakukan penambahan tenaga kerja arsitek, khususnya pada pekerjaan cat luar, kusen dan finishing fasade.

Untuk

Kuas dan roll

Kusen Alumunium

Gypsum

Keramik

Kaca

Cat

Keahlian

Karyawan 58 ACP

Pipa (Hydrant & Hollow)

Dari

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 6916-Oct 24-Oct 31-Oct 07-Nov 14-Nov 21-Nov 28-Nov 05-Dec 12-Dec 19-Dec 26-Dec 02-Jan 09-Jan 16-Jan 23-Jan 30-Jan 06-Feb 13-Feb 20-Feb 27-Feb 06-Mar 13-Mar 20-Mar 27-Mar 03-Apr 10-Apr 17-Apr 24-Apr 01-May 08-May 15-May 22-May 29-May 05-Jun 12-Jun 19-Jun 26-Jun 03-Jul 10-Jul 17-Jul 24-Jul 31-Jul 07-Aug 14-Aug 21-Aug 28-Aug 04-Sep 11-Sep 18-Sep 25-Sep 02-Oct 09-Oct 16-Oct 23-Oct 30-Oct 06-Nov 13-Nov 20-Nov 27-Nov 04-Dec 11-Dec 18-Dec 25-Dec 01-Jan 08-Jan 15-Jan 22-Jan 29-Jan 05-Feb

(Rp.) (%) 23-Oct 30-Oct 06-Nov 13-Nov 20-Nov 27-Nov 04-Dec 11-Dec 18-Dec 25-Dec 01-Jan 08-Jan 15-Jan 22-Jan 29-Jan 05-Feb 12-Feb 19-Feb 26-Feb 05-Mar 12-Mar 19-Mar 26-Mar 02-Apr 09-Apr 16-Apr 23-Apr 30-Apr 07-May 14-May 21-May 28-May 04-Jun 11-Jun 18-Jun 25-Jun 02-Jul 09-Jul 16-Jul 23-Jul 30-Jul 06-Aug 13-Aug 20-Aug 27-Aug 03-Sep 10-Sep 17-Sep 24-Sep 01-Oct 08-Oct 15-Oct 22-Oct 29-Oct 05-Nov 12-Nov 19-Nov 26-Nov 03-Dec 10-Dec 17-Dec 24-Dec 31-Dec 07-Jan 14-Jan 21-Jan 28-Jan 04-Feb 07-Feb

PREPARATION WORKS 6,498,081,367.95 2.244% 0.033% 0.033% 0.033% 0.033% 0.033% 0.033% 0.033% 0.033% 0.033% 0.033% 0.033% 0.033% 0.033% 0.033% 0.033% 0.033% 0.033% 0.033% 0.033% 0.033% 0.033% 0.033% 0.033% 0.033% 0.033% 0.033% 0.033% 0.033% 0.033% 0.033% 0.033% 0.033% 0.033% 0.033% 0.033% 0.033% 0.033% 0.033% 0.033% 0.033% 0.033% 0.033% 0.033% 0.033% 0.033% 0.033% 0.033% 0.015% 0.015% 0.015% 0.015% 0.015% 0.015% 0.015% 0.015% 0.015% 0.015% 0.015% 0.015% 0.015% 0.015% 0.015% 0.015% 0.015% 0.015% 0.015% 0.006%BUILDING ADMINISTRATION

I D U L F I T R I

STRUCTURE WORKS BUILDING ADMINISTRATIONFOUNDATION 6,402,155,221.58 2.211% 0.134% 0.134% 0.134% 0.134% 0.134% 0.134% 0.134% 0.134% 0.134% 0.134% 0.134% 0.134% 0.134% 0.134% 0.035% 0.035% 0.035% 0.035% 0.035% 0.035% 0.201%1ST FLOOR EL - 0.050 2,843,360,373.70 0.982% 0.074% 0.074% 0.074% 0.074% 0.035% 0.035% 0.035% 0.035% 0.035% 0.035% 0.035% 0.035% 0.035% 0.035% 0.035% 0.035% 0.035% 0.035% 0.035% 0.035% 0.035% 0.152%2ND FLOOR EL + 3.860 1,305,401,997.74 0.451% 0.025% 0.025% 0.025% 0.025% 0.025% 0.025% 0.025% 0.025% 0.025% 0.025% 0.025% 0.025% 0.025% 0.025% 0.025% 0.025% 0.034% 0.034%3RD FLOOR 1,267,770,399.78 0.438% 0.026% 0.026% 0.026% 0.026% 0.026% 0.026% 0.026% 0.026% 0.026% 0.026% 0.026% 0.026% 0.026% 0.026% 0.043% 0.043%4 TH FLOOR EL + 1,079,356,395.27 0.373% 0.045% 0.045% 0.045% 0.045% 0.045% 0.045% 0.045% 0.003% 0.003% 0.003% 0.003% 0.003% 0.003% 0.025% 0.025% 0.025%MAINTENANCE FLOOR EL + 15.59 1,014,959,868.64 0.350% 0.038% 0.038% 0.038% 0.038% 0.038% 0.038% 0.038% 0.003% 0.003% 0.003% 0.003% 0.003% 0.003% 0.042% 0.042% 0.042%

ARCHITECTURE WORKS BUILDING ADMINISTRATION1St. FLOOR 3,106,470,203.96 1.073% 0.043% 0.043% 0.043% 0.043% 0.043% 0.043% 0.043% 0.043% 0.043% 0.043% 0.043% 0.043% 0.043% 0.043% 0.043% 0.043% 0.043% 0.031% 0.003% 0.032% 0.032% 0.032% 0.032% 0.032% 0.032% 0.032% 0.032% 0.032% 0.032% 0.032% 0.032% 0.032% 0.032%2Nd. FLOOR 2,063,895,991.33 0.713% 0.029% 0.029% 0.029% 0.029% 0.029% 0.029% 0.029% 0.029% 0.029% 0.029% 0.029% 0.029% 0.029% 0.029% 0.029% 0.026% 0.000% 0.028% 0.028% 0.028% 0.028% 0.028% 0.028% 0.028% 0.028% 0.028% 0.028% 0.028% 0.028% 0.028% 0.028%3Rd. FLOOR 1,729,904,814.82 0.597% 0.026% 0.026% 0.026% 0.026% 0.026% 0.026% 0.026% 0.026% 0.026% 0.026% 0.026% 0.026% 0.026% 0.018% 0.000% 0.000% 0.021% 0.021% 0.021% 0.021% 0.021% 0.021% 0.021% 0.021% 0.021% 0.021% 0.021% 0.021% 0.021%4Th. FLOOR 1,984,962,408.61 0.685% 0.026% 0.026% 0.026% 0.026% 0.026% 0.026% 0.026% 0.026% 0.026% 0.026% 0.026% 0.000% 0.000% 0.000% 0.000% 0.041% 0.041% 0.041% 0.041% 0.041% 0.041% 0.041% 0.041% 0.041% 0.041% 0.041% 0.041%ATTIC AND ROOF FLOOR 1,279,002,035.28 0.442% 0.020% 0.020% 0.020% 0.020% 0.020% 0.020% 0.020% 0.020% 0.020% 0.000% 0.000% 0.000% 0.000% 0.000% 0.020% 0.020% 0.020% 0.020% 0.020% 0.020% 0.020% 0.020% 0.020% 0.020% 0.020%FASADE 529,935,924.88 0.183% 0.010% 0.010% 0.010% 0.000% 0.000% 0.000% 0.000% 0.000% 0.006% 0.006% 0.006% 0.006% 0.006% 0.006% 0.006% 0.006% 0.006% 0.006% 0.006%

MECHANICAL & ELECTRICAL BUILDING ADMINISTRATION 8,436,235,951.94 2.913% 0.246% 0.246% 0.246% 0.246% 0.001% 0.001% 0.001% 0.001% 0.001% 0.001% 0.001% 0.001% 0.001% 0.001% 0.001% 0.001% 0.001% 0.001% 0.001% 0.001% 0.001% 0.001% 0.001% 0.001% 0.001% 0.001% 0.050% 0.050% 0.050% 0.050% 0.050% 0.050% 0.050% 0.050% 0.050% 0.050% 0.050% 0.050% 0.050% 0.050% 0.050% 0.094% 0.000% 0.000% 0.001% 0.001% 0.001% 0.001% 0.001% 0.001% 0.146% 0.146% 0.146% 0.146% 0.146% 0.146% 0.146% 0.146% 0.146% 0.146% 0.146%INTEGRATED LIBRARYSTRUCTURE WORKS INTEGRATED LIBRARY

FOUNDATION 8,393,391,185.97 2.898% 0.195% 0.195% 0.195% 0.195% 0.195% 0.195% 0.195% 0.195% 0.104% 0.104% 0.104% 0.104% 0.104% 0.104% 0.104% 0.104% 0.104% 0.104% 0.104% 0.253%1ST FLOOR EL - 0.050 3,032,891,418.29 1.047% 0.105% 0.105% 0.105% 0.105% 0.035% 0.035% 0.035% 0.035% 0.035% 0.035% 0.035% 0.035% 0.035% 0.035% 0.035% 0.035% 0.035% 0.035% 0.035% 0.035% 0.035% 0.035% 0.066%2ND FLOOR EL + 3.860 1,824,722,447.13 0.630% 0.037% 0.037% 0.037% 0.037% 0.037% 0.037% 0.037% 0.037% 0.037% 0.037% 0.037% 0.037% 0.020% 0.020% 0.020% 0.020% 0.020% 0.020% 0.020% 0.020% 0.020% 0.006% 0.006%3RD FLOOR 1,784,250,707.27 0.616% 0.042% 0.042% 0.042% 0.042% 0.042% 0.042% 0.042% 0.042% 0.042% 0.042% 0.042% 0.042% 0.042% 0.014% 0.014% 0.014% 0.014% 0.014% 0.014% 0.014% 0.014% 0.014% 0.018% 0.018%4 TH FLOOR EL + 1,604,285,214.13 0.554% 0.033% 0.033% 0.033% 0.033% 0.033% 0.033% 0.033% 0.033% 0.033% 0.033% 0.033% 0.016% 0.016% 0.016% 0.016% 0.016% 0.016% 0.016% 0.016% 0.016% 0.038% 0.038% 0.038%ROOF FLOOR EL + 1,794,204,257.46 0.620% 0.027% 0.027% 0.027% 0.027% 0.027% 0.027% 0.027% 0.027% 0.027% 0.027% 0.027% 0.012% 0.012% 0.012% 0.012% 0.012% 0.012% 0.012% 0.012% 0.012% 0.012% 0.099% 0.099% 0.099%

ARCHITECTURE WORKS INTEGRATED LIBRARY1St. FLOOR 3,136,987,986.57 1.083% 0.062% 0.062% 0.062% 0.062% 0.062% 0.062% 0.062% 0.062% 0.062% 0.062% 0.062% 0.062% 0.062% 0.062% 0.062% 0.027% 0.000% 0.029% 0.029% 0.029% 0.029% 0.029% 0.029% 0.029% 0.029% 0.029% 0.029% 0.029% 0.029% 0.029% 0.029%2Nd. FLOOR 2,437,559,760.26 0.842% 0.044% 0.044% 0.044% 0.044% 0.044% 0.044% 0.044% 0.044% 0.044% 0.044% 0.044% 0.000% 0.000% 0.000% 0.034% 0.034% 0.034% 0.034% 0.034% 0.034% 0.034% 0.034% 0.034% 0.034% 0.034% 0.034% 0.034%3Rd. FLOOR 3,280,949,512.56 1.133% 0.063% 0.063% 0.063% 0.063% 0.063% 0.063% 0.063% 0.000% 0.000% 0.000% 0.000% 0.068% 0.068% 0.068% 0.068% 0.068% 0.068% 0.068% 0.068% 0.068% 0.068% 0.068% 0.068%4Th. FLOOR 2,610,869,573.40 0.901% 0.054% 0.054% 0.054% 0.054% 0.054% 0.000% 0.000% 0.000% 0.000% 0.000% 0.046% 0.046% 0.046% 0.046% 0.046% 0.046% 0.046% 0.046% 0.046% 0.046% 0.046%ATTIC AND ROOF FLOOR 903,907,645.95 0.312% 0.021% 0.021% 0.021% 0.000% 0.000% 0.000% 0.000% 0.000% 0.013% 0.013% 0.013% 0.013% 0.013% 0.013% 0.013% 0.013% 0.013% 0.013% 0.013%FASADE 691,955,351.41 0.239% 0.017% 0.017% 0.017% 0.017% 0.017% 0.017% 0.000% 0.000% 0.000% 0.000% 0.000% 0.007% 0.007% 0.007% 0.007% 0.007% 0.007% 0.007% 0.007% 0.007% 0.007% 0.007%

MECHANICAL & ELECTRICAL INTEGRATED LIBRARY 17,063,058,556.94 5.892% 0.172% 0.172% 0.172% 0.172% 0.001% 0.001% 0.001% 0.001% 0.001% 0.001% 0.001% 0.001% 0.001% 0.001% 0.001% 0.001% 0.001% 0.001% 0.001% 0.001% 0.001% 0.001% 0.001% 0.001% 0.001% 0.001% 0.147% 0.147% 0.147% 0.147% 0.147% 0.147% 0.147% 0.147% 0.147% 0.147% 0.147% 0.147% 0.147% 0.147% 0.147% 0.000% 0.000% 0.000% 0.001% 0.001% 0.001% 0.001% 0.001% 0.001% 0.359% 0.359% 0.359% 0.359% 0.359% 0.359% 0.359% 0.359% 0.359% 0.359% 0.359%INTEGRATED LABORATORYSTRUCTURE WORKS INTEGRATED LABORATORY

FOUNDATION 6,820,974,627.74 2.355% 0.148% 0.148% 0.148% 0.148% 0.148% 0.148% 0.148% 0.148% 0.148% 0.148% 0.148% 0.148% 0.148% 0.148% 0.034% 0.034% 0.034% 0.034% 0.034% 0.034% 0.034% 0.034% 0.034% 0.034% 0.118%1ST FLOOR EL - 0.050 3,973,690,048.74 1.372% 0.085% 0.085% 0.085% 0.085% 0.085% 0.085% 0.085% 0.085% 0.085% 0.060% 0.060% 0.060% 0.060% 0.060% 0.060% 0.060% 0.060% 0.060% 0.060% 0.060% 0.060% 0.060% 0.060% 0.137%2ND FLOOR EL + 3.860 2,069,692,372.73 0.715% 0.030% 0.030% 0.030% 0.030% 0.030% 0.030% 0.030% 0.030% 0.030% 0.043% 0.043% 0.043% 0.043% 0.043% 0.043% 0.043% 0.043% 0.043% 0.037% 0.037%3RD FLOOR 2,026,832,396.23 0.700% 0.039% 0.039% 0.039% 0.039% 0.039% 0.039% 0.039% 0.039% 0.039% 0.039% 0.039% 0.039% 0.039% 0.039% 0.039% 0.039% 0.054% 0.054%4 TH FLOOR EL + 1,925,559,576.77 0.665% 0.052% 0.052% 0.052% 0.052% 0.052% 0.052% 0.052% 0.022% 0.022% 0.022% 0.022% 0.022% 0.022% 0.022% 0.022% 0.022% 0.057% 0.057% 0.057%ROOF FLOOR EL + 15.590 145,062,114.83 0.050% 0.008% 0.008% 0.008% 0.008% 0.008% 0.008% 0.008% 0.008% 0.001% 0.001% 0.001%

ARCHITECTURE WORKS INTEGRATED LABORATORY1St. FLOOR 2,255,372,535.90 0.779% 0.038% 0.038% 0.038% 0.038% 0.038% 0.038% 0.038% 0.038% 0.038% 0.038% 0.038% 0.038% 0.038% 0.038% 0.027% 0.027% 0.027% 0.027% 0.027% 0.027% 0.027% 0.027% 0.027% 0.027% 0.027% 0.027% 0.027% 0.027% 0.027% 0.027% 0.027% 0.027%2Nd. FLOOR 1,898,260,423.85 0.655% 0.034% 0.034% 0.034% 0.034% 0.034% 0.034% 0.034% 0.034% 0.034% 0.034% 0.028% 0.028% 0.028% 0.028% 0.028% 0.028% 0.028% 0.028% 0.028% 0.028% 0.028% 0.028% 0.028% 0.028% 0.028% 0.028% 0.028% 0.028%3Rd. FLOOR 1,843,260,946.42 0.636% 0.034% 0.034% 0.034% 0.034% 0.034% 0.034% 0.000% 0.000% 0.000% 0.035% 0.035% 0.035% 0.035% 0.035% 0.035% 0.035% 0.035% 0.035% 0.035% 0.035% 0.035% 0.035% 0.035% 0.035%4Th. FLOOR 1,995,901,165.03 0.689% 0.035% 0.035% 0.000% 0.000% 0.000% 0.000% 0.040% 0.040% 0.040% 0.040% 0.040% 0.040% 0.040% 0.040% 0.040% 0.040% 0.040% 0.040% 0.040% 0.040%ATTIC AND ROOF FLOOR 2,062,002,100.54 0.712% 0.000% 0.000% 0.000% 0.000% 0.043% 0.043% 0.043% 0.043% 0.043% 0.043% 0.043% 0.043% 0.043% 0.043% 0.043% 0.043% 0.043% 0.043%FASADE 425,422,001.62 0.147% 0.029% 0.029% 0.029% 0.029% 0.029% 0.029% 0.029% 0.000% 0.000% 0.000% 0.000% 0.000% 0.006% 0.006% 0.006% 0.006% 0.006% 0.006% 0.006% 0.006% 0.006% 0.006% 0.006% 0.006% 0.006%

MECHANICAL & ELECTRICAL INTEGRATED LABORATORY 10,876,456,295.97 3.755% 0.137% 0.137% 0.137% 0.137% 0.002% 0.002% 0.002% 0.002% 0.002% 0.002% 0.002% 0.002% 0.002% 0.002% 0.002% 0.002% 0.002% 0.002% 0.002% 0.002% 0.002% 0.002% 0.002% 0.002% 0.002% 0.002% 0.091% 0.091% 0.091% 0.091% 0.091% 0.091% 0.091% 0.091% 0.091% 0.091% 0.091% 0.091% 0.091% 0.091% 0.091% 0.000% 0.000% 0.000% 0.100% 0.001% 0.001% 0.001% 0.001% 0.001% 0.229% 0.229% 0.229% 0.229% 0.229% 0.229% 0.229% 0.229% 0.229% 0.229% 0.229%FACULTY OF ISLAMIC ECONOMY AND BUSINESSSTRUCTURE WORKS FACULTY OF ISLAMIC ECONOMY AND BUSINESS

FOUNDATION 8,905,240,653.17 3.075% 0.183% 0.183% 0.183% 0.183% 0.183% 0.183% 0.183% 0.183% 0.116% 0.116% 0.116% 0.116% 0.116% 0.056% 0.056% 0.056% 0.056% 0.056% 0.056% 0.056% 0.056% 0.056% 0.056% 0.056% 0.056% 0.056% 0.056% 0.328%1ST FLOOR EL - 0.050 3,218,980,376.91 1.111% 0.028% 0.028% 0.028% 0.028% 0.028% 0.028% 0.028% 0.028% 0.052% 0.052% 0.052% 0.052% 0.052% 0.052% 0.052% 0.052% 0.052% 0.052% 0.052% 0.052% 0.052% 0.052% 0.214%2ND FLOOR EL + 3.860 2,018,380,461.61 0.697% 0.023% 0.023% 0.023% 0.023% 0.023% 0.023% 0.023% 0.023% 0.023% 0.052% 0.052% 0.052% 0.052% 0.052% 0.052% 0.052% 0.052% 0.052% 0.021% 0.021%3RD FLOOR 1,960,198,354.00 0.677% 0.044% 0.044% 0.044% 0.044% 0.044% 0.044% 0.041% 0.041% 0.041% 0.041% 0.041% 0.041% 0.041% 0.041% 0.041% 0.054% 0.054%4 TH FLOOR EL + 2,257,123,938.17 0.779% 0.039% 0.039% 0.039% 0.039% 0.039% 0.039% 0.039% 0.044% 0.044% 0.044% 0.044% 0.044% 0.044% 0.044% 0.044% 0.044% 0.130% 0.130% 0.130%ROOF FLOOR EL + 15.590 1,975,101,370.67 0.682% 0.020% 0.020% 0.020% 0.020% 0.020% 0.020% 0.020% 0.020% 0.050% 0.050% 0.050% 0.050% 0.050% 0.050% 0.083% 0.083% 0.083%

ARCHITECTURE WORKS FACULTY OF ISLAMIC ECONOMY AND BUSINESS1St. FLOOR 3,295,184,234.79 1.138% 0.077% 0.077% 0.077% 0.077% 0.077% 0.077% 0.077% 0.077% 0.077% 0.077% 0.077% 0.077% 0.077% 0.077% 0.077% 0.077% 0.039% 0.039% 0.038% 0.038% 0.038% 0.038% 0.038% 0.038% 0.038% 0.038% 0.038% 0.038% 0.038% 0.038% 0.038% 0.038% 0.038% 0.038% 0.038% 0.038%2Nd. FLOOR 2,626,559,159.32 0.907% 0.047% 0.047% 0.047% 0.047% 0.047% 0.047% 0.047% 0.047% 0.047% 0.047% 0.047% 0.047% 0.033% 0.000% 0.000% 0.036% 0.036% 0.036% 0.036% 0.036% 0.036% 0.036% 0.036% 0.036% 0.036% 0.036% 0.036% 0.036% 0.036% 0.036% 0.036% 0.036%3Rd. FLOOR 2,493,312,144.47 0.861% 0.046% 0.046% 0.046% 0.046% 0.046% 0.046% 0.046% 0.046% 0.033% 0.000% 0.000% 0.000% 0.038% 0.038% 0.038% 0.038% 0.038% 0.038% 0.038% 0.038% 0.038% 0.038% 0.038% 0.038% 0.038% 0.038% 0.038% 0.038%4Th. FLOOR 2,142,465,232.14 0.740% 0.029% 0.000% 0.000% 0.000% 0.034% 0.034% 0.034% 0.034% 0.034% 0.034% 0.034% 0.034% 0.034% 0.034% 0.034% 0.034% 0.034% 0.034% 0.034% 0.034%ATTIC AND ROOF FLOOR 2,087,246,457.82 0.721% 0.000% 0.000% 0.000% 0.000% 0.000% 0.035% 0.035% 0.035% 0.035% 0.035% 0.035% 0.035% 0.035% 0.035% 0.035% 0.035% 0.035% 0.035% 0.035% 0.035%FASADE 678,223,929.78 0.234% 0.016% 0.016% 0.016% 0.016% 0.016% 0.016% 0.016% 0.016% 0.016% 0.000% 0.000% 0.000% 0.000% 0.000% 0.005% 0.005% 0.005% 0.005% 0.005% 0.005% 0.005% 0.005% 0.005% 0.005% 0.005% 0.005% 0.005% 0.005% 0.005%

MECHANICAL & ELECTRICAL FACULTY OF ISLAMIC ECONOMY AND BUSINESS 9,971,338,904.98 3.443% 0.012% 0.012% 0.012% 0.012% 0.001% 0.001% 0.001% 0.001% 0.001% 0.001% 0.001% 0.001% 0.001% 0.001% 0.001% 0.001% 0.001% 0.001% 0.001% 0.001% 0.001% 0.001% 0.001% 0.001% 0.001% 0.001% 0.097% 0.097% 0.097% 0.097% 0.097% 0.097% 0.097% 0.097% 0.097% 0.097% 0.097% 0.097% 0.097% 0.097% 0.097% 0.000% 0.000% 0.000% 0.100% 0.001% 0.001% 0.001% 0.001% 0.001% 0.202% 0.202% 0.202% 0.202% 0.202% 0.202% 0.202% 0.202% 0.202% 0.202% 0.202%FACULTY OF SCIENCE AND TECHNOLOGYSTRUCTURE WORKS FACULTY OF SCIENCE AND TECHNOLOGY

FOUNDATION 9,041,277,315.32 3.122% 0.482% 0.482% 0.482% 0.482% 0.482% 0.013% 0.013% 0.013% 0.009% 0.009% 0.009% 0.009% 0.016% 0.016% 0.016% 0.016% 0.016% 0.016% 0.110%1ST FLOOR EL - 0.050 2,879,023,935.08 0.994% 0.079% 0.079% 0.079% 0.079% 0.079% 0.079% 0.079% 0.079% 0.079% 0.079% 0.079% 0.079% 0.052%2ND FLOOR EL + 3.860 2,018,380,461.61 0.697% 0.075% 0.075% 0.075% 0.075% 0.075% 0.075% 0.075% 0.075% 0.075% 0.027%3RD FLOOR 1,960,198,354.00 0.677% 0.071% 0.071% 0.071% 0.071% 0.071% 0.071% 0.071% 0.071% 0.071% 0.041%4 TH FLOOR EL + 2,257,123,938.17 0.779% 0.075% 0.075% 0.075% 0.075% 0.075% 0.075% 0.075% 0.075% 0.075% 0.149%ROOF FLOOR EL + 15.590 1,978,907,191.34 0.683% 0.062% 0.062% 0.062% 0.062% 0.062% 0.062% 0.062% 0.062% 0.062% 0.122%

ARCHITECTURE WORKS FACULTY OF SCIENCE AND TECHNOLOGY1St. FLOOR 4,019,072,279.81 1.388% 0.071% 0.071% 0.071% 0.071% 0.071% 0.071% 0.071% 0.071% 0.071% 0.071% 0.071% 0.071% 0.071% 0.071% 0.071% 0.071% 0.071% 0.071% 0.071% 0.071% 0.071% 0.071% 0.040% 0.040% 0.040% 0.040% 0.040% 0.040% 0.040% 0.040% 0.040% 0.040% 0.040% 0.040% 0.040% 0.040%2Nd. FLOOR 2,587,339,910.74 0.893% 0.041% 0.041% 0.041% 0.041% 0.041% 0.041% 0.041% 0.041% 0.041% 0.041% 0.041% 0.041% 0.041% 0.041% 0.041% 0.041% 0.041% 0.041% 0.041% 0.041% 0.026% 0.026% 0.026% 0.026% 0.026% 0.026% 0.026% 0.026% 0.026% 0.026% 0.026% 0.026% 0.026% 0.026%3Rd. FLOOR 2,615,995,553.22 0.903% 0.040% 0.040% 0.040% 0.040% 0.040% 0.040% 0.040% 0.040% 0.040% 0.040% 0.040% 0.040% 0.040% 0.040% 0.040% 0.040% 0.027% 0.027% 0.027% 0.027% 0.027% 0.027% 0.027% 0.027% 0.027% 0.027% 0.027% 0.027% 0.027% 0.027%4Th. FLOOR 2,125,984,469.36 0.734% 0.033% 0.033% 0.033% 0.033% 0.033% 0.033% 0.033% 0.033% 0.033% 0.033% 0.033% 0.033% 0.024% 0.000% 0.026% 0.026% 0.026% 0.026% 0.026% 0.026% 0.026% 0.026% 0.026% 0.026% 0.026% 0.026%ATTIC AND ROOF FLOOR 1,726,621,545.64 0.596% 0.024% 0.024% 0.024% 0.024% 0.024% 0.024% 0.024% 0.024% 0.024% 0.024% 0.024% 0.024% 0.021% 0.000% 0.023% 0.023% 0.023% 0.023% 0.023% 0.023% 0.023% 0.023% 0.023% 0.023% 0.023% 0.023%FASADE 655,028,068.68 0.226% 0.016% 0.016% 0.016% 0.016% 0.016% 0.016% 0.016% 0.016% 0.016% 0.016% 0.016% 0.000% 0.000% 0.006% 0.006% 0.006% 0.006% 0.006% 0.006% 0.006% 0.006% 0.006% 0.006% 0.006% 0.006%

MECHANICAL & ELECTRICAL FACULTY OF SCIENCE AND TECHNOLOGY 9,613,382,954.66 3.319% 0.097% 0.097% 0.097% 0.097% 0.010% 0.010% 0.010% 0.010% 0.010% 0.010% 0.010% 0.010% 0.010% 0.010% 0.010% 0.010% 0.010% 0.010% 0.010% 0.010% 0.010% 0.010% 0.010% 0.010% 0.010% 0.010% 0.010% 0.010% 0.010% 0.010% 0.083% 0.083% 0.083% 0.083% 0.083% 0.083% 0.083% 0.083% 0.083% 0.083% 0.083% 0.080% 0.000% 0.086% 0.086% 0.086% 0.086% 0.086% 0.086% 0.086% 0.086% 0.086% 0.086% 0.086% 0.086% 0.086% 0.086%FACULTY OF TARBIYAHSTRUCTURE WORKS FACULTY OF TARBIYAH

FOUNDATION 4,812,070,270.79 1.662% 0.133% 0.133% 0.133% 0.180% 0.180% 0.180% 0.180% 0.180% 0.180% 0.019% 0.019% 0.019% 0.019% 0.019% 0.019% 0.079%1ST FLOOR EL - 0.050 2,150,315,081.05 0.742% 0.087% 0.087% 0.087% 0.087% 0.087% 0.087% 0.087% 0.087% 0.047%2ND FLOOR EL + 4.950 1,015,106,522.91 0.350% 0.067% 0.067% 0.067% 0.067% 0.067% 0.018%3 RD FLOOR EL + 992,866,510.45 0.343% 0.067% 0.067% 0.067% 0.067% 0.067% 0.009%4 TH FLOOR EL + 858,384,433.58 0.296% 0.068% 0.068% 0.068% 0.068% 0.023%ROOF FLOOR EL + 618,106,285.66 0.213% 0.025% 0.025% 0.025% 0.025% 0.025% 0.025% 0.025% 0.025% 0.013%

ARCHITECTURE WORKS FACULTY OF TARBIYAH1St. FLOOR 1,887,736,659.84 0.652% 0.038% 0.038% 0.038% 0.038% 0.038% 0.038% 0.038% 0.038% 0.038% 0.038% 0.038% 0.038% 0.038% 0.038% 0.038% 0.038% 0.038% 0.038% 0.038% 0.038% 0.012% 0.012% 0.012% 0.012% 0.012% 0.012% 0.012% 0.012% 0.012% 0.012% 0.012% 0.012% 0.012% 0.012%2Nd. FLOOR 1,382,211,681.42 0.477% 0.024% 0.024% 0.024% 0.024% 0.024% 0.024% 0.024% 0.024% 0.024% 0.024% 0.024% 0.024% 0.024% 0.024% 0.024% 0.024% 0.024% 0.024% 0.024% 0.010% 0.010% 0.010% 0.010% 0.010% 0.010% 0.010% 0.010% 0.010% 0.010% 0.010% 0.010% 0.010% 0.010%3Rd. FLOOR 1,302,159,173.40 0.450% 0.024% 0.024% 0.024% 0.024% 0.024% 0.024% 0.024% 0.024% 0.024% 0.024% 0.024% 0.024% 0.024% 0.024% 0.024% 0.010% 0.010% 0.010% 0.010% 0.010% 0.010% 0.010% 0.010% 0.010% 0.010% 0.010% 0.010% 0.010% 0.010%4Th. FLOOR 1,423,417,004.11 0.491% 0.025% 0.025% 0.025% 0.025% 0.025% 0.025% 0.025% 0.025% 0.025% 0.025% 0.025% 0.012% 0.012% 0.012% 0.012% 0.012% 0.012% 0.012% 0.012% 0.012% 0.012% 0.012% 0.012% 0.012% 0.012%ATTIC AND ROOF FLOOR 731,220,027.52 0.252% 0.013% 0.013% 0.013% 0.013% 0.013% 0.013% 0.013% 0.013% 0.013% 0.013% 0.013% 0.005% 0.005% 0.005% 0.005% 0.005% 0.005% 0.005% 0.005% 0.005% 0.005% 0.005% 0.005% 0.005% 0.005%FASADE 443,369,092.65 0.153% 0.008% 0.008% 0.008% 0.008% 0.008% 0.008% 0.008% 0.008% 0.008% 0.008% 0.008% 0.008% 0.008% 0.008% 0.008% 0.008% 0.008% 0.008% 0.008% 0.008% 0.000% 0.000% 0.004% 0.004% 0.004% 0.004% 0.004% 0.004% 0.004% 0.004% 0.004% 0.004% 0.004% 0.004%

MECHANICAL & ELECTRICAL FACULTY OF TARBIYAH 5,795,758,406.10 2.001% 0.010% 0.010% 0.010% 0.010% 0.001% 0.001% 0.001% 0.001% 0.001% 0.001% 0.001% 0.001% 0.001% 0.001% 0.001% 0.001% 0.001% 0.001% 0.001% 0.001% 0.001% 0.001% 0.001% 0.001% 0.001% 0.001% 0.056% 0.056% 0.056% 0.056% 0.056% 0.056% 0.056% 0.056% 0.056% 0.056% 0.056% 0.056% 0.056% 0.056% 0.056% 0.050% 0.000% 0.054% 0.054% 0.054% 0.054% 0.054% 0.054% 0.054% 0.054% 0.054% 0.054% 0.054% 0.054% 0.054% 0.054%FACULTY OF PSYCHOLOGYSTRUCTURE WORKS FACULTY OF PSYCHOLOGY

FOUNDATION 4,525,449,577.28 1.563% 0.167% 0.167% 0.167% 0.167% 0.010% 0.010% 0.010% 0.010% 0.010% 0.010% 0.095% 0.095% 0.095% 0.095% 0.095% 0.095% 0.095% 0.095% 0.141%1ST FLOOR 2,151,789,719.77 0.743% 0.087% 0.087% 0.087% 0.087% 0.087% 0.087% 0.087% 0.087% 0.075% 0.002%2ND FLOOR 1,016,581,161.63 0.351% 0.065% 0.065% 0.065% 0.065% 0.065% 0.017% 0.017%3RD FLOOR 993,709,161.15 0.343% 0.067% 0.067% 0.067% 0.067% 0.067% 0.011% 0.011%4 TH FLOOR EL + 858,384,433.58 0.296% 0.055% 0.055% 0.055% 0.055% 0.055% 0.027% 0.027% 0.027%ROOF FLOOR EL + 15.590 618,106,285.66 0.213% 0.025% 0.025% 0.025% 0.025% 0.025% 0.025% 0.025% 0.025% 0.015% 0.015% 0.015%

ARCHITECTURE WORKS FACULTY OF PSYCHOLOGY1St. FLOOR 1,919,495,759.22 0.663% 0.039% 0.039% 0.039% 0.039% 0.039% 0.039% 0.039% 0.039% 0.039% 0.039% 0.039% 0.039% 0.039% 0.019% 0.019% 0.018% 0.018% 0.018% 0.018% 0.018% 0.018% 0.018% 0.018% 0.018% 0.018% 0.018% 0.018% 0.018% 0.018% 0.018% 0.018% 0.018% 0.018%2Nd. FLOOR 1,491,418,351.62 0.515% 0.029% 0.029% 0.029% 0.029% 0.029% 0.029% 0.029% 0.029% 0.029% 0.019% 0.013% 0.019% 0.019% 0.019% 0.019% 0.019% 0.019% 0.019% 0.019% 0.019% 0.019% 0.019% 0.019% 0.019% 0.019% 0.019% 0.019% 0.019% 0.019%3Rd. FLOOR 1,463,524,276.44 0.505% 0.028% 0.028% 0.028% 0.028% 0.028% 0.057% 0.000% 0.000% 0.019% 0.019% 0.019% 0.019% 0.019% 0.019% 0.019% 0.019% 0.019% 0.019% 0.019% 0.019% 0.019% 0.019% 0.019% 0.019% 0.019%4Th. FLOOR 1,345,245,540.81 0.464% 0.000% 0.000% 0.000% 0.020% 0.020% 0.020% 0.020% 0.020% 0.020% 0.020% 0.020% 0.020% 0.020% 0.020% 0.020% 0.020% 0.020% 0.020% 0.020% 0.020%ATTIC AND ROOF FLOOR 744,914,997.78 0.257% 0.000% 0.000% 0.000% 0.010% 0.010% 0.010% 0.010% 0.010% 0.010% 0.010% 0.010% 0.010% 0.010% 0.010% 0.010% 0.010% 0.010% 0.010% 0.010% 0.010%FASADE 403,915,695.93 0.139% 0.010% 0.010% 0.010% 0.010% 0.010% 0.000% 0.000% 0.000% 0.003% 0.003% 0.003% 0.003% 0.003% 0.003% 0.003% 0.003% 0.003% 0.003% 0.003% 0.003% 0.003% 0.003% 0.003% 0.003% 0.003%

MECHANICAL & ELECTRICAL FACULTY OF PSYCHOLOGY 5,228,324,508.69 1.805% 0.005% 0.005% 0.005% 0.005% 0.005% 0.005% 0.005% 0.005% 0.005% 0.005% 0.005% 0.005% 0.005% 0.005% 0.005% 0.005% 0.005% 0.005% 0.005% 0.005% 0.005% 0.005% 0.005% 0.005% 0.005% 0.005% 0.015% 0.015% 0.015% 0.015% 0.015% 0.015% 0.015% 0.015% 0.015% 0.015% 0.067% 0.067% 0.067% 0.067% 0.067% 0.000% 0.000% 0.000% 0.100% 0.001% 0.001% 0.001% 0.001% 0.001% 0.094% 0.094% 0.094% 0.094% 0.094% 0.094% 0.094% 0.094% 0.094% 0.094% 0.094%EXTERNAL WORKS

ROADS & PARKING PAVEMENT 2,169,177,773.11 0.749% 0.033% 0.033% 0.004% 0.004% 0.004% 0.004% 0.004% 0.004% 0.004% 0.004% 0.004% 0.004% 0.002%PEDESTRIAN PAVEMENT 505,638,275.71 0.175% 0.037% 0.037% 0.017% 0.017% 0.017% 0.017% 0.017% 0.017% 0.017% 0.017% 0.017% 0.017% 0.007%DRAINAGE 99,521,961.19 0.034% 0.006% 0.006% 0.001% 0.001% 0.001% 0.001% 0.001% 0.001% 0.001% 0.001%Electricity connection 18,295,929,347.48 6.317% 0.030% 0.030% 0.030% 0.030% 0.030% 0.030% 0.030% 0.030% 0.030% 0.030% 0.030% 0.030% 0.030% 0.030% 0.030% 0.030% 0.030% 0.030% 0.030% 0.030% 0.030% 0.030% 0.250% 0.250% 0.250% 0.250% 0.250% 0.539% 0.539% 0.539% 0.539% 0.539% 0.231%Sawage Treamant Plant / STP + WTP + POWER HOUSE

Structure 7,262,417,155.04 2.508% 0.051% 0.051% 0.051% 0.051% 0.051% 0.051% 0.051% 0.051% 0.051% 0.051% 0.051% 0.051% 0.051% 0.051% 0.051% 0.051% 0.051% 0.051% 0.051% 0.051% 0.051% 0.051% 0.051% 0.051% 0.051% 0.051% 0.051% 0.051% 0.033% 0.033% 0.033% 0.033% 0.033% 0.033%Arsitecture 1,585,704,660.18 0.548% 0.024% 0.024% 0.131% 0.131% 0.131%

Total ##################Rencana Mingguan 0.033% 0.033% 0.362% 1.160% 1.307% 1.307% 2.380% 2.380% 1.912% 1.949% 0.933% 0.946% 0.905% 0.905% 0.992% 1.024% 1.010% 1.010% 0.953% 1.101% 1.246% 1.175% 1.077% 1.147% 1.090% 1.172% 1.170% 1.128% 1.079% 1.197% 1.204% 1.266% 0.000% 0.000% 1.826% 1.935% 1.762% 1.832% 1.958% 1.901% 1.860% 1.914% 1.891% 1.917% 2.240% 2.240% 2.225% 2.242% 2.198% 4.038% 1.138% 1.131% 1.221% 1.186% 1.324% 1.161% 1.161% 1.161% 2.208% 2.208% 2.208% 2.208% 2.208% 2.542% 2.542% 2.057% 2.057% 1.878% 1.550%Kum. Renc Mingguan 0.000% 0.033% 0.067% 0.429% 1.589% 2.897% 4.204% 6.584% 8.965% 10.876% 12.825% 13.758% 14.704% 15.609% 16.515% 17.507% 18.530% 19.540% 20.550% 21.503% 22.604% 23.849% 25.025% 26.101% 27.249% 28.338% 29.510% 30.680% 31.808% 32.887% 34.084% 35.288% 36.554% 36.554% 36.554% 38.380% 40.315% 42.077% 43.909% 45.867% 47.769% 49.629% 51.543% 53.433% 55.350% 57.590% 59.830% 62.055% 64.296% 66.494% 66.851% 67.989% 69.119% 70.340% 71.527% 72.850% 74.012% 75.173% 76.334% 78.542% 80.750% 82.958% 85.166% 87.374% 89.916% 92.459% 94.516% 96.573% 98.450% 100.000%

URAIAN PEKERJAAN TOTAL NILAI ADD-1 BOBOT ADD-1

TAHUN 2018 TAHUN 2019 TAHUN 2020

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70

Pekerjaan Pemasangan Lift

Palembang, 10 DESEMBER 2019Konsultan PMSC

Mardiana DaoedIr.Team Leader

PENGGUNA JASA PROJECT MANAGEMENT AND SUPERVISION CONSULTANTRESUME LAPORAN

MINGGU KE - 6010 DESEMBER 2019-2019 DESEMBERPERIODE 4

Tampak Gedung TARBIYAH Tampak Gedung TARBIYAH Tampak Gedung SAINTEK Tampak Gedung ADM

Tampak Gedung LIBRARY Tampak Gedung LABORATORY Tampak Gedung PSYCHOLOGY Tampak Gedung FEBI

Pekerjaan Fasade Pekerjaan Pasangan Pintu & Jendela Pekerjaan Partisi Glass

Pemasangan Plafond Metal Ceiling Pekerjaan Pemasangan Sanitair

Pekerjaan Cat Interior

Rapat Kordinasi Mingguan

80.750%

80.766%

2.208%

1.589%