resume candidate c12706
DESCRIPTION
PERSONAL INFOTRANSCRIPT
-
Curriculum Vitae
Curriculum Vitae 1 of 7 pages Copyright Hadimpro B.V. and 12hoist4u
Candidate Nr. : C12706
Date of Birth : 28-07-1964
Nationality : Australian
City : Dundowran Beach
Introduction Our Heavy Lift & Transport Supervisor has over 30 years experience in the lifting and rigging industry in
different countries and across different industries; oil & gas, petrochemical, power generation and engineering.
Extensive knowledge of lifting equipment, heavy cranes, transport systems, gantry systems, skid systems and
strand jacks etc. Excellent background in hand rigging techniques and equipment inspection. The last 16 years
he acted in managerial and supervisory roles which involved the management of heavy lift, rigging and crane
contractors, management and supervision of multi-disciplined work forces (contract & direct hire) including
training. Our specialist has the ability to produce, review and approve calculations, CAD drawings, lifting
studies, method statements, safe job analysis and reports for lifting projects large or small.
Education : Mannesmann Demag and Liebherr Technology Training
: Construction (Design & Management) Regulations Course (CDM)
: Currently studying for NEBOSH National Certificate in Construction
Health & Safety
: CPCS Crawler Cranes, Truck Mounted Cranes, Wheeled Cranes, Forklift
Trucks, Lorry Loaders, Mobile Elevated Work Platforms, Slinger/Signaller
: City & Guilds Lifting Plant Operations
: CPCS Assessor / Validator
: Australian Advanced Rigging Certificate
: Managerial Safety Course (LOLER/ PUWER)
: CPCS Appointed Person
: City & Guilds Advanced Computer Aided Design (AutoCAD)
: BS7121 Planning & Control of Lifting Operations Course
: Lifting Equipment Inspector (Lloyds British Certificate)
: Norwegian Rigging Certificate (Complies with NORSOK R-005)
: COSHH, Health & Safety at Work Act
1975 - 1980 : Chesterfield High School
1998 - 1999 : Halton Technical College
-
Curriculum Vitae
Curriculum Vitae 2 of 7 pages Copyright Hadimpro B.V. and 12hoist4u
Work Experience 2010 - current : Heavy Lift Manager
Monadelphous Engineering Associates Pty Ltd
Responsible for managing all company owned and hired heavy lift
cranes and associated heavy lift and transport operations;
Leading a team of heavy lift engineers, superintendents and
supervisors within the Engineering Construction Division to plan
and execute heavy lift projects;
Acting as heavy lift specialist across the group to develop new
procedures, complete feasibility studies, assist with tender bids,
review and approve internal and external lifting and transport
schemes;
Supporting the group's activities cross Australia, China and Papua
New Guinea;
Company owned heavy cranes include 350te, 400te and 750te
superlift machines.
2009 - 2010 : Heavy Lift & Transport Engineer
Foster Wheeler / Worley Parsons Joint Venture
Project: Woodside Pluto LNG Project, Karratha, Western Australia
Responsible for reviewing and approval of heavy lift contractors
lifting, transport and jacking procedures;
Verification and supervision of crane, transport and jacking
operations;
Management of all "Test Inspection Records";
Responding to lifting contractors technical queries regarding
mechanical and civil issues;
Participating in hazard identification workshops, safety circles
and taps route investigations;
Acting Heavy Lift Superintendent during home leave periods;
Coordinating between management team, heavy lift, shipping,
civil and mechanical contractors;
Completing feasibility studies, checking crane capacities,
locations and elevations for clashes and transport route
clearances;
Onsite equipment included 800, 600, 400 & 350 tonne crawler
cranes, 192 lines of SPMT's, 48 Lines of multi axle conventional
trailers, heavy lift, RO-RO and wide deck vessels and 1000 tonne
hydraulic jacking arrangements;
The project involved the shipping, transportation and lifting of
over 350 heavy items including vessels up to 420te, PAR's up to
300te and PAU's up to 2000te.
-
Curriculum Vitae
Curriculum Vitae 3 of 7 pages Copyright Hadimpro B.V. and 12hoist4u
2008 - 2009 : Rigging Engineer
International Power Limited
Project: Indian Queens Power Plant, Cornwall, United Kingdom
Providing onsite planning and production of lifting studies,
method statement and review of crane contractor's proposals for
major turbine overhaul including exhaust stack replacement.
2007 - 2008 : Heavy Lift / Rigging Superintendent
Ledwood Mechanical Engineering Limited
Project: RCCU Revamp Project, StatoilHydro, Mongstad Refinery,
Mongstad, Norway
Providing onsite planning and supervision during the revamp of
the regenerator and reactor;
Producing pre-tender documentation, lift studies, method
statements, risk assessments for all lifting activities and review/
evaluation of crane, shipping and transport contractor proposals;
Overseeing and coordinating of load outs, crane erection, lifting
and transport operations;
Set-up of onsite rigging store, lifting equipment inspection and
verification;
Operations included the load out / offload, transport and
placement of the new regenerator head weighing 400 tonnes;
Some of the onsite equipment included 1350 tonne crawler
crane, 36 Lines of SPMT's, Jumbo Shipping heavy lift vessel and
150 tonne strand jacking system.
2006 - 2007 : Rigging Engineer / Rigging Superintendent
Bechtel International
Project: Fjardaal Aluminium Smelter, Iceland
Planning and supervision of all critical, heavy and medium lifts
including production of lifting studies, drawings, calculations,
method statements and safe job analysis;
Providing onsite crane and rigging training for Icelandic and
Polish supervision and trades;
Lifting equipment inspection / verification and onsite testing of
overhead travelling cranes prior to operation;
Operations included the offload and positioning of a 600 tonne
Hartmann Vacuum ship unloader and the transportation and
lifting to position of 200 tonne transformers;
Onsite equipment included 600 tonne crawler crane, 48 Lines of
SPMT's, 1000 tonne strand jacking system, BigLift heavy lift
vessels and up to 40 mobile and crawlers cranes daily.
-
Curriculum Vitae
Curriculum Vitae 4 of 7 pages Copyright Hadimpro B.V. and 12hoist4u
2005 - 2006 : Heavy Lift Superintendent
Abnormal Load Engineering
FCCU Shutdown, BP Coryton Refinery, Essex UK
Providing onsite supervision and coordination of all heavy lifts
and transport during the shutdown;
Operations included the transportation and lifting of the 300
tonne new reactor vessel and 250 tonne new regenerator head;
Some of the onsite equipment included a 1200 tonne strut jib
pedestal crane, 48 Lines of SPMT's and 600 tonne jacking /
weighing equipment.
2004 : Lifting Superintendent
Shell UK Limited
Project: Block 1 Shutdown, Shell Ellesmere Port Refinery, Wirral, UK
Acting as third party consultant to evaluate review and sign off
on all contractors lifting proposals and method statements;
Onsite coordination and supervision to verify all lifting operations
comply with Shell regulations and procedures;
Lifting equipment inspection and verification prior to lifting
operations;
Verify all training documentation for crane operators and rigging
personnel;
Some of the onsite equipment included up to 60 mobile
telescopic cranes, 1000 tonne pedestal crane, Mersey Mammoth
250 tonne floating crane and 500 tonne jacking and skidding
system.
2003 : Heavy Lift Superintendent
Foster Wheeler Energy Limited
Project: Acrylic Acid and Acrylates Project, Sasol, Sasolburg, South Africa
Providing onsite review and sign off on heavy lift contractor's
procedures and methods for the installation of two 320 tonne
reactor vessels;
Supervision and verification of crane erection, transport and
lifting operations;
Some of the onsite equipment included 400 tonne crawler crane
and multi axle conventional trailers.
-
Curriculum Vitae
Curriculum Vitae 5 of 7 pages Copyright Hadimpro B.V. and 12hoist4u
2002 : Project Rigging Engineer
Slattery Skanska USA Inc / Bay Crane Inc
Project: Ravenswood Cogeneration Power Plant, Queens, New York, USA
Production of lifting / rigging plans for all critical, heavy and
medium Lifts including drawings, calculations, method
statements and safe job analysis;
Coordination between client and crane / heavy lift contractor;
Operations included the load out / offload transportation and
positioning of turbines and generators, transportation and lifting
of 150 tonne transformers and load out / offload of HRSG boiler
sections;
Some of the onsite equipment included 400 & 300 tonne crawler
cranes, 600 & 400 ton telescopic cranes, 1000 ton barge mounted
crane, 900 ton hydraulic gantry systems and multi axle
conventional trailers.
2001 : Rigging Superintendent
Ledwood Mechanical Engineering Limited
Project: FCCU Turnaround, ExxonMobil Refinery, Fawley, United Kingdom
Providing onsite planning and production for all lifting studies for
the exchange of the 800te FCCU reactor vessel;
Review and evaluate crane and heavy lift contractor's proposals;
Onsite supervision and coordination of all lifting activities, set-up
and control of site rigging stores, lifting equipment inspection
and verification;
Operations included the exchange of the 800 tonne reactor
vessel along with all associated overhead line, risers, steel work;
Some of the onsite equipment included 1200 tonne crawler
crane, two 1000 tonne telescopic cranes, 3000 tonne strand jack
& skidding system and up to 20 telescopic cranes daily.
2001 - 2008 : Heavy Lift Transport Engineer / Rigging Engineer / Rigging
Superintendent / Partner
Techlift UK Limited
Various Lifting / Rigging and Transportation projects
Overseeing, planning and execution of the above mentioned
heavy lifting / rigging and transportation projects;
Providing consultancy, planning and supervisory services to major
Petrochemical / Engineering and Construction companies for all
aspects of lifting operations;
Undertaking 3rd party reviews of major lifting projects by crane
and rigging companies on behalf of clients.
-
Curriculum Vitae
Curriculum Vitae 6 of 7 pages Copyright Hadimpro B.V. and 12hoist4u
2000 - 2001 : Senior Contracts Manager
Ainscough Group Limited (Engineering Services Division)
Heavy Lifting / Rigging / Plant Installation & Relocation projects
Management of lifting and rigging projects and relocation
turnkey packages, undertake projects as principal contractor
under CDM regulations as project manager;
Formulating and submitting full construction phase health and
safety plans;
Formulate and submit project proposals and final tender bids;
Ensure all technical / contractual issues have been addressed and
that all obligations relating to LOLER, PUWER and CDM
regulations have been covered.
2000 : Heavy Lift Contracts Engineer
Baldwins Industrial Services PLC (Heavy Lift Contracts Division)
Pre-planning and site supervision of heavy contract lifting, special
projects, heavy crane and transportation projects;
Producing lifting studies, method statements, schedules and risk
assessments etc for projects involving cranes up to and over 1000
tonne capacity.
1998 - 2000 : Contracts Manager
Ainscough Group Limited (Engineering Services Division) Heavy
Heavy Lifting / Rigging / Plant Installation & Relocation projects
Manage lifting, rigging and plant relocation projects utilising the
group's equipment such as heavy telescopic crane up to 1000
tonne capacity, 400 tonne hydraulic gantry systems, specialist
industrial machine moving equipment and conventional
transportation equipment;
Undertaking site surveys and producing tender bids and
quotations;
Ensure all technical / contractual issues have been addressed and
that all obligations relating to LOLER, PUWER and CDM
regulations have been covered.
1995 - 1998 : Technical Representative
Ainscough Crane Hire Limited
Responsible for assessing and planning lifting projects for cranes
from 10 - 1000 tonne capacity for major petrochemical, chemical,
construction and engineering companies;
Onsite coordination and technical planning for major plant
shutdowns and construction contracts;
Representing the company on site as Appointed Person in overall
charge of lifting during contract lifting operations;
-
Curriculum Vitae
Curriculum Vitae 7 of 7 pages Copyright Hadimpro B.V. and 12hoist4u
Production of site visit / survey reports, detailed crane berthing
studies, method statements and risk assessments.
1992 - 1995 : Operator / Rigger / Appointed Person
Ainscough Crane Hire Limited
Operating a large variety of modern cranes from 10 - 80 ton and
on occasion up to 300 ton capacity;
Undertaking slinging, rigging work and representing the company
as Appointed Person and lift supervisor.
1987 - 1992 : Proprietor/ Rigging Foreman
Kearney Industrial Services
Leading small rigging teams for plant and machinery installations
and relocation projects around the UK and Germany;
Working mainly in engineering and construction industries,
planning and executing small projects with cranes, transport and
machine handling equipment.
1980 - 1988 : Apprentice / Rigger / Foreman Rigger
Sefton Contractors Limited
Serving as apprentice then qualified rigger and moved to foreman
rigger on various UK projects;
Working across a wide variety of industries, steel erecting, lifting
/ rigging projects and plant and machinery installations and
relocations;
Qualified to operate mobile, wheeled and crawler cranes, heavy
goods vehicles, large industrial fork lift trucks, mobile elevated
work platforms and lorry loaders.
Other skills
Computer skills
Crane Manufacturer Software, Liebherr Liccon, Cranimation, Manitowoc Ground Pressure Program,
Compucrane