  • 8/3/2019 Requirements for strategy of RWM

    1/14

    Andra

    )AGENCE NATIONALE POUR LA GESTION DES DCHETS RADIOACTIFS

    INT.TR.ADAI.10-00NN

    Jean-Louis TISON

    ANDRA (Agence Nationale pour la Gestion des Dchets Radioactifs)

    Requirements for strategy of RWM

  • 8/3/2019 Requirements for strategy of RWM

    2/14

    AGENCE NATIONALE POUR LA GESTION DES DCHETS RADIOACTIFS

    Andra2

    RWM ends up with Disposal Solutions.

    A Repository is a safe and effective

    combination of a site, an inventory and adesign.

    RWM is a societal achievement, not onlytechnical. (planning, Long term consequences,

    financing, siting).

  • 8/3/2019 Requirements for strategy of RWM

    3/14

    AGENCE NATIONALE POUR LA GESTION DES DCHETS RADIOACTIFS

    Andra3

    Safety.

    Independence of the regulatory body.Safety objectives clearly identified andcompatible with disposal options.(IAEArecommendations, National policies).

  • 8/3/2019 Requirements for strategy of RWM

    4/14

    AGENCE NATIONALE POUR LA GESTION DES DCHETS RADIOACTIFS

    Andra4

    Effective.

    Cost effectiveness.Look for an acceptable solution, not forthe best technical solution.Optimization with other programs(Dismantling for example).Financing to be secure and reliable.

  • 8/3/2019 Requirements for strategy of RWM

    5/14

    AGENCE NATIONALE POUR LA GESTION DES DCHETS RADIOACTIFS

    Andra5

    Inventory and National Plan.

    Requirement to know the inventory,

    present and future (quantities, activity,long lived nuclides).Caution on Sorting, preconditioning andconditioning (impact on safety ofrepository). Not too early.National Roadmap.Consistency with other nuclear programs(eg dismantling).

  • 8/3/2019 Requirements for strategy of RWM

    6/14

    AGENCE NATIONALE POUR LA GESTION DES DCHETS RADIOACTIFS

    Andra6

    Design of a disposal.

    Very critical for operational and short termmonitoring periods.

    Includes the conditioning of waste(Relations with storage area), flexibilityrequired.Compatibility between storage anddisposal design.Depending on site Characteristics,Designmight be very critical (Engineeredbarriers).

  • 8/3/2019 Requirements for strategy of RWM

    7/14

    AGENCE NATIONALE POUR LA GESTION DES DCHETS RADIOACTIFS

    Andra7

    SITE. Long term safety relies on Characteristicsof the site.Importance of favorable technical

    characteristicsLocal acceptance to be key to the solution.Means Required for siting.

  • 8/3/2019 Requirements for strategy of RWM

    8/14

    AGENCE NATIONALE POUR LA GESTION DES DCHETS RADIOACTIFS

    Andra8

    Means Required for SITING.Action / Involvement of Politicians andCommunities.Administrative Tools and Means for

    supporting development of local territories.Siting is not a regular regulatory process.Generate local activities and development(Employment and business).Generate the Acceptance

  • 8/3/2019 Requirements for strategy of RWM

    9/14

    AGENCE NATIONALE POUR LA GESTION DES DCHETS RADIOACTIFS

    Andra9

    Acceptance ProcessImplementation of National IndependentAssessment organisations( technical and societalexpertise)Call for international review by knowledgeable

    organisations (NEA, IAEA, etc).Acceptance of external review during theprocess.Implementation of local IndependentInformation Committees (financing included).Public Debate to be proposed.Show industrial references to the public asmuch as possible.Commitment from Waste producers required

  • 8/3/2019 Requirements for strategy of RWM

    10/14

    AGENCE NATIONALE POUR LA GESTION DES DCHETS RADIOACTIFS

    Andra10

    Commitment from the Waste Producers

    Extensive involvement needed from waste producers (waste,waste conditioning, cask design, transportation routes, etc).

    Beyond their financial commitment, they need to develop

    their own activities in local territories, to gain acceptance ofthe project.

    Producers need to be well identified in the local territory. (Which activity has generated the waste?, which benefit was

    gained for the society?).

    Producers to recognise that nuclear industry is at stake iffailure in Waste disposal implementation.

  • 8/3/2019 Requirements for strategy of RWM

    11/14

    AGENCE NATIONALE POUR LA GESTION DES DCHETS RADIOACTIFS

    Andra11

    Selection process in 1993conducted by MP ChristianBATAILLE resulted in fourcandidate districts:

    Vienne District Gard District

    Meuse District Haute-Marne District

    Votes of local councils , district and regionalassemblies in 1996.

  • 8/3/2019 Requirements for strategy of RWM

    12/14

    AGENCE NATIONALE POUR LA GESTION DES DCHETS RADIOACTIFS

    Andra

    PARISCIGEO FACILITY

    226 km

  • 8/3/2019 Requirements for strategy of RWM

    13/14

    AGENCE NATIONALE POUR LA GESTION DES DCHETS RADIOACTIFS

    Andra

  • 8/3/2019 Requirements for strategy of RWM

    14/14

    AGENCE NATIONALE POUR LA GESTION DES DCHETS RADIOACTIFS

    Andra14

    Interdependence of Site/Design/ Inventorycomponents for a successful Disposal solution.Interface with Storage/sorting and preconditioningactivities to be looked at.

    Compatibility of RWM Strategy with Nuclear Energy,D&D ,and ER programs. General Planning consistency.RWM strategy requires support from the Institutionsand from the Large Waste producers.

    The strategy might change with time, but it isimportant to have one!It takes a lot of time to implement a RWM strategy.