Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Design, Manufacture, Transport and Integration in Chile of ALMA Antennas Page 3 t Introduction to the Design Concept AEM at the KOM presented an operating plan, regarding all the phases of ENGINEERING & DESIGN subdivided in 4 main sections: T1 - Detailed Conceptual Design Definition T2 - Freezing of Design & Industrial Processes T3 - Finalization of all Construction Dwgs & Manufacturing Documentation T4 - Preparation of all Construction & Workshop Dwgs and all Documentation for ProductionTRANSCRIPT
Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Page 1
Design, Manufacture, Transport and Integration in Chile of ALMA Antennas
Design, Manufacture, Transport and Integration on-site in Chile of ALMA Antennas
Progress Meeting # 3 Alcatel Alenia Space / TORINO
DESIGN CONCEPT PHASEDESIGN CONCEPT PHASE
Dated April 5th, 2006
Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Page 2
Design, Manufacture, Transport and Integration in Chile of ALMA Antennas
DEC JAN FEB MAR APR MAY JUNE JULY AUG SEP OCT NOV DEC JAN
2006
PPDRK.O.
Antenna Detailed Concept Design Definition
Antenna Detailed Design
PPDR D.P
System Analysis & Budgets
Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Page 3
Design, Manufacture, Transport and Integration in Chile of ALMA Antennas
Introduction to the Design Concept
AEM at the KOM presented an operating plan, regarding all the phases of ENGINEERING & DESIGN subdivided in 4 main sections:
T1 - Detailed Conceptual Design Definition
T2 - Freezing of Design & Industrial Processes
T3 - Finalization of all Construction Dwgs & Manufacturing Documentation
T4 - Preparation of all Construction & Workshop Dwgs and all Documentation for Production
Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Page 4
Design, Manufacture, Transport and Integration in Chile of ALMA Antennas
DEC JAN FEB MAR APR MAY JUNE JULY AUG SEP OCT NOV DEC JAN
2006
AntennaDesign updating Antenna Detailed Design
PPDRK.O.PPDR
Data Pack.CDR
T1
T2
T3
T4
Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Page 5
Design, Manufacture, Transport and Integration in Chile of ALMA Antennas
Detailed schedule and milestones for Design & Engineering activities
KOM
T1= Detailed Concept Design Definition Main Spec.s General Dwg.s for Pre-Industrialization
T2= Freezing of Design & Qualification Results Suppliers & Industrial Processes Definitions
T3= CDR AEM Critical Design Review
T4= PPDR Data Package Documentation Delivery
T5= PPDR Review Meeting
T6= Closure of PPDR
T7= AIPC1 Documentation Delivery
T8= Support of Manufacturing & Integration Activities
+3m
+3m
+AIPC1
+1m
+3m
+1m
+2m
+AIPC#
6m
……..
31.5m
12m 13m
11m9m
3m
Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Page 6
Design, Manufacture, Transport and Integration in Chile of ALMA Antennas
END of PHASE T1: Detailed Concept Design Definition
OBJECTIVE:
Identify an Antenna Concept able to satisfy the main Requirements of the Specifications (geometrical, functional, etc…),
production of the basic documentation and distribution of the knowledge inside the Consortium
to guarantee the manufacturing and erection process of the antenna
Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Page 7
Design, Manufacture, Transport and Integration in Chile of ALMA Antennas
END of PHASE T1: Detailed Concept Design Definition
MODALITY:
Development of drawings activities, modellization, analysis and calculation to support the solutions adopted.
INPUTS:
contract documentation knowledge of Prototype
OUTPUTS:
main specifications Assembly and interface drawings
Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Page 8
Design, Manufacture, Transport and Integration in Chile of ALMA Antennas
T1 - technical documentation supporting this phase
From KOM (19-20 Dec ‘05) to T1 (13-14 Mar ‘06 )• General Design Assumption:
• Finite Element Analysis:
• Error Budget Calculations:
• System Engineering Activities:
- General Layout & Dimensions - Design Optimisation for Production - Global FEM Model - Preliminary Engineering Calculations - Static & Dynamic Analysis
- Survival Conditions Load Cases - Wind & Thermal Analysis
- Surface Accuracy - Absolute non reapeatable pointing error - Offset non reapeatable pointing error - Absolute reapeatable pointing error - Offset reapeatable pointing error - Non reapeatable residual delay - Reapeatable residual delay - Mass & Balance Budget
- Dynamic Servo Simulation - Lifetime, RAMS Analysis - EMC Plan
Detailed Concept Design Definition
Main Spec.s
General Dwg.s for Pre-
Industrialization
Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Page 9
Design, Manufacture, Transport and Integration in Chile of ALMA Antennas
T1 - technical documentation supporting this phase
Main Spec.s
General
Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Page 10
Design, Manufacture, Transport and Integration in Chile of ALMA Antennas
T1 - technical documentation supporting this phase
Dwg.s for Pre-
Industrialization
Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Page 11
Design, Manufacture, Transport and Integration in Chile of ALMA Antennas
T1 - technical documentation supporting this phase
Dwg.s for Pre-
Industrialization
Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Page 12
Design, Manufacture, Transport and Integration in Chile of ALMA Antennas
T1 - technical documentation supporting this phase
Dwg.s for Pre-
Industrialization
Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Page 13
Design, Manufacture, Transport and Integration in Chile of ALMA Antennas
T1 - technical documentation supporting this phase
Dwg.s for Pre-
Industrialization
Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Page 14
Design, Manufacture, Transport and Integration in Chile of ALMA Antennas
T2 - Freezing of Design & Industrial Processes
From T1 (13-14 Mar ‘06 ) to T2 (12-13 Jun ‘06 )• Freezing of Design & Qualification:
• Suppliers & Industrial Processes Definitions
- Detailed cross-check off all Requirements from Spec.s, Manufacturing Processes & Qualification Program - Start of all qualification tests of all major items - Identification of all main suppliers and relative products
- Definition of all main manufacturing processes
Scope of this phase is to acquire into the design of the main components the informations coming from the manufacturer and partners, for the production and industrialization.
Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Page 15
Design, Manufacture, Transport and Integration in Chile of ALMA Antennas
Start and Organization of Phase T2FROM DEFINED CONCEPT TO CONSOLIDATED DESIGN
CROSS-CHECK OF ALL
SPECIFICATION REQUIREMENTS
CROSS-CHECK WITH MANUFACTURING
PROCESSES
DATA FROM QUALIFICATION
REPORTS
SPECIFIC REQUIREMENTS
SYSTEM REQUIREMENTS
ICD REQUIREMENTS
DATA SHEETS OF COMPONENTSCONSTRUCTION REQUIREMENTS
ASSEMBLY REQUIREMENTS
PACKING & TRANSPORT REQUIREMENTS
TESTS ON COMPONENTS
TESTS ON SUB-SYSTEMS
FROM VERIFICATION
PLANFROM
SUB-SUPPLIERS AND PARTNERS
FROM QUALIFICATION
PROGRAM
Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Page 16
Design, Manufacture, Transport and Integration in Chile of ALMA Antennas
T3 - Finalization of all Construction Dwgs & Manufacturing Documentation
From T2 (12-13 Jun ‘06 ) to T3 (14-15 Sep ‘06 )• CDR
- Verification by compliance matrix of all performancies- Finalization of all construction drawins and manufacturing documentations (critical items)-Freezing af all the interfaces between AEM/Supplier and ALMA
The purpose of this part of the design phase is to develop all the activities of calculation, analysis and design, that may guaranty the total overview of the performances specification and meet the entire manufacturing process (from manufacturing to integration on site)
A specific internal review (CDR) will be performed at the and of this phase with the ESO presence
Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Page 17
Design, Manufacture, Transport and Integration in Chile of ALMA Antennas
Detailed schedule and milestones for Design & Engineering activities
From T3 (14-15 Sep ‘06 ) to T4 (13 Nov ‘06 )• PPDR Data Package
- Finite Element Analysis (DRD-23)- Error Budget Computations (DRD-21)- Mass and Balance Budget (DRD-24)- Dynamic servo simulation analysis for fast switching and other dynamical performances of the antenna. (DRD-23)- HVAC system calculations (DRD-22)- Lifetime, reliability and maintainability analyses (DRD-25)- EMC Control Plan (DRD-32)- Engineering analysis and reports not specifically mentioned here, if necessary (DRD-22)- Preparation of spare parts list. The spare part list shall be the update of the spare part list provided in the Bid phase, and adapted to take into account the results of the reliability requirements and calculations (DRD-35).- Drawings
On the Base of the review performed in previous period, during this Design Phase will be made all the construction and workshop drawings and documents to support all the production Phase and all the required documentation of the PPDR.
Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Page 18
Design, Manufacture, Transport and Integration in Chile of ALMA Antennas
Detailed schedule and milestones for Design & Engineering activities
From T4 (13 Nov ‘06 ) to T5 (12-13 Dec ‘06 )• PPDR Review Meeting
This task represents the moment for the verification of the entire design at all levels from antenna system to antenna components
Complete design review of the antenna
Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Page 19
Design, Manufacture, Transport and Integration in Chile of ALMA Antennas
Documentation delivery to ESO:
END of T3 - Critical Design Review (CDR): no contractual ( cfr MoM of ALMA KOM)
END of T4 - Pre-Production Design Review (PPDR): contractual
Both phases need specific meetings with ESO for review with prior delivery of documentation on due date
AEM confirms its strong willingness to offer the relevant visibility to ESO along the ALMA Project.