Minutes of the 12th

JCC Meeting of IPPs granted LTA in WR

Page 1 of 18

Minutes of the 12th Joint Co-ordination Committee meeting of IPPs granted LTA in WR held on

10.06.2016 at POWERGRID, Gurgaon

1. The 12th Joint Co-ordination Committee meeting of IPPs in WR was held at POWERGRID Office, Gurgaon on 10th Jun, 2016.

The list of participants of the meeting is enclosed at Annexure-I.

2. CTU welcomed the participants and informed that Minutes of the 11th meeting of the Joint Co-ordination Committee of IPPs granted LTA in WR held on 16.02.2016, were issued vide letter ref. no. C/CTU/W/OA/11JCC dated 03.03.2016. As no observations/comments were received on the minutes, accordingly the minutes of 11th Joint Co-ordination Committee as circulated are confirmed.

3. CTU stressed that generation developers should ensure completion of their dedicated lines to match with the commissioning of transmission network in order to prevent bottling up of power. It was further stated that interim arrangements through LILO of existing lines were provided only as a contingency measure and the IPPs need to implement the final dedicated transmission system as the matter has been very seriously looked into by Hon’ble CERC in Petition no. 112/TT/2013.

4. It was clarified by CTU that JCC forum has been created for co-ordination purposes to attempt matching of generation schedules with the associated transmission system, and accordingly, the information given by generation developers is being taken into cognizance for co-ordination purpose. However, for any substantial issue, it may kindly be submitted by official correspondence addressed to CTU, by clarifying the nature of issue to be dealt therein, as per the Regulatory framework. It was further informed that some letters are being sent by LTA customers related to relinquishment which are not clear in the content; therefore it was advised that such communication should strictly follow CERC Regulatory provisions (Regulation 18) specifically regarding notice, clearly therein mentioning the relinquishment quantum, date of relinquishment and consent for payment of applicable relinquishment charges.

5. All the LTA customers were advised to clear the consultancy payment liabilities at the earliest towards implementation of bays for termination of dedicated/connectivity lines for timely implementation of the same. In case of failure the IPPs shall only be responsible towards any delay in implementation of the bays.

6. All information exchanged, discussions/decisions taken in the JCC meeting shall be subject to the CERC Regulations and Detailed procedure made therein.

7. It is noted that some of the IPPs/ applicants have been repetitively not attending the JCC Meetings. All such IPPs/ applicants were requested to attend the future meetings so as to have a better co-ordination.

Minutes of the 12th

JCC Meeting of IPPs granted LTA in WR

Page 2 of 18

8. It was deliberated that all those generation projects that have achieved COD and have also completed dedicated transmission line may not be required to attend JCC as the coordination work has already been over. Therefore they may not be called for further JCC meetings (Details of all such generation projects as per Table T1 –(i) ,(ii) & (iii)

9. As per the 11th JCC meeting, a no. of LTA customers were requested to sign the Transmission Service Agreement (TSA) at the earliest in accordance with CERC Sharing Regulations. However, none of them have signed till date. It was once again advised that the LTA customers shall sign the TSA at the earliest. List of the IPPs who are yet to sign the TSA is enclosed herewith at Annexure - II.

10. The LTA customers were requested to update the progress of their generation projects and the discussion are summarised below :

Status of the Generation Projects

HIGH CAPACITY TRANSMISSION CORRIDOR – IV (Transmission System Associated with IPPs near Bilaspur complex in Chhattisgarh & MP projects)

Sl. No.

LTOA / LTA Applicant

LTOA Quantum (MW) Target Beneficiaries

Firm beneficiary

Comm. schedule (11

th JCC)

Comm. schedule (12

th JCC)

Dedicated / Connectivity line & Status

Remarks

WR NR

All the generation projects in Corridor-IV are commissioned /abandoned and their corresponding dedicated/connectivity transmission lines have also been commissioned.

Hence further participation in JCC is not required. Details provided in Table T1

HIGH CAPACITY TRANSMISSION CORRIDOR – V

(Transmission System Associated with Chhattisgarh IPPs) Sl. No.

LTOA / LTA Applicant

LTOA Quantum

(MW)

Target Beneficiaries Firm benefici

ary

Comm. schedule (11

th JCC)

Comm. schedule (12

th JCC)

Dedicated / Connectivity line &

Status

Remarks

WR NR SR

RAIGARH (KOTRA) COMPLEX

1 RKM Powergen Ltd (4X360)

819 419 200 200

UP – 350 MW

Telangana – 200 MW

(Under process)

Not attended (U1/U2: COD in

Nov’15 / Feb’16- as informed through

email)

U1: Nov’15 U2: Feb’16 U3: Sep’16 U4: Oct’16

400kV RKM- Raigarh PS (Near Kotra) D/c (Quad) line – Jul’16

3 Kms OPGW of dedicated TL pending It was advised to submit fresh application for change in Region to supply power to UP

Minutes of the 12th

JCC Meeting of IPPs granted LTA in WR

Page 3 of 18

Sl. No.

LTOA / LTA Applicant

LTOA Quantum

(MW)

Target Beneficiaries Firm benefici

ary

Comm. schedule (11

th JCC)

Comm. schedule (12

th JCC)

Dedicated / Connectivity line &

Status

Remarks

WR NR SR

2

Athena Chhattisgarh Power Ltd. (2X600)

683 342 341 Nil U-1: Sep’ 16 U-2: Mar’ 17

U1: Dec’16 U2: Jun’17

400kV Athena - Raigarh PS (Near Kotra) D/c (Quad) line – Line ready and back charged from other end

Representative informed that 92% works of the generation plant are completed.

3 SKS Power Gen. (Ch) Ltd. (4X300)

683 319 364 Nil

Not attended (U1/2/3/4: Sept

16/Dec’16/Sept’18/Dec’18 - as

informed through letter)

U1/2/3/4: Sept 16 / Dec’16 /

Sept’18 / Dec’18

400kV SKS - Raigarh PS (Near Kotra) D/c line (Triple/Quad) - Commissioned in Feb’ 15

4 Visa Power Ltd. (1X600+1X660)

678 478 200

CSPTCL: 424 MW WB: 200 MW with option to increase to 510 MW

U-1: Sep’ 18 U-2: Mar’ 20

U1: Dec’18 U2: Mar’20

400kV Visa Power- Raigarh PS (Near Kotra) D/c (Triple) line - Jun’17 (informed through e-mail)

Project progress slow.

RAIGARH (TAMNAR) COMPLEX

5 TRN Energy Pvt. Ltd (2X300)

393 243

3

150 +

240

UP : 390 MW

U-1: Mar’ 16 U-2: Sept’ 16

U-1: Jun’16 U-2: Sep’16

TRN - Raigarh PS (Tamnar) 400kV D/c line : Commissioned in Jul’15

Against PPA of 390 MW to UP; 150 through target to NR and fresh application for 240 MW for change in beneficiary from target in WR to UP is under issuance

JANJGIR-CHAMPA COMPLEX

6. KSK Mahanadi Power Co. Ltd. (6X600)

2340 2340 840

0 1000

0 500

Tamil Nadu: 500

MW UP: 1000

MW Gujarat : 1010MW

U-1/2: Aug'13/Aug'14

(COD); U-3/4: Sep’16/

Mar’17; U-5/6: Sep/Dec’17

U-1/2: Aug'13/Aug'14

(COD); U-3/4: Sep’16/

Mar’17; U-5/6:

Sep/Dec’17

400kV KSK – Champa Pooling Station 2xD/c (Quad) – 1

st D/c line

expected by Jul’16; 2

nd line by Dec’16

The generation developer was advised to implement the dedicated line and remove the interim arrangement at the earliest Applicant has submitted a fresh application for change in beneficiary from Target WR to UP which is under issuance

Minutes of the 12th

JCC Meeting of IPPs granted LTA in WR

Page 4 of 18

Sl. No.

LTOA / LTA Applicant

LTOA Quantum

(MW)

Target Beneficiaries Firm benefici

ary

Comm. schedule (11

th JCC)

Comm. schedule (12

th JCC)

Dedicated / Connectivity line &

Status

Remarks

WR NR SR

7. Bharat Aluminium Co. Ltd. (BALCO-4X300)

200 100

0 100

0 0

200

Tamil Nadu :

200 MW Kerala : 95 MW

Chhattisgarh: 55

MW

10th JCC : U-1/2:

Commissioned, U-3: Nov’15 U4: Mar’16

Not attended

Balco – Dharamjaygarh / Korba PS 400kV D/c (Triple/Quad) line – Aug’16

8.

Lanco Amarkantak Power Pvt. Ltd. (2X660)

858 858 NIL

Not Attended (10

th JCC:

U-1: Aug’16 U-2: Dec’16)

U-1: Dec’16 U-2: Mar’17

LANCO – Champa PS 400kV D/c (Quad) line - expected by Oct’16

Applicant is contemplating signing of PPA with UP; Advised to apply for LTA in advance in such an event

9. Vandana Vidyut Ltd. (2X135 + 1X270)

265 165 100

CSPTCL :

25 MW Telangan

a : 120 MW

Not Attended (10

th JCC

U-1: Apr’14 (COD) ;

U-2:Mar’16 U-3:Apr’19)

Not Attended (10

th JCC

U-1: Apr’14 (COD) ;

U-2:Mar’16 U-3:Apr’19)

Vandana Vidhyut – Dharamjaygarh PS 400kV D/c line : Mar’17

TSA may be signed at the earliest.

Other Generation Projects in Chhattisgarh & Madhya Pradesh

Sl. No.

LTOA / LTA Applicant

LTOA Quantum

(MW)

Target Beneficiaries Firm beneficiary

Comm. schedule (11

th JCC)

Comm. schedule (12

th JCC)

Dedicated / Connectivity line & Status

Remarks

WR NR ER SR

1. 1 Mahan (Essar power Ltd.(2X600)

1200 1200 0 0 0 MP: 150 MW

U-1: Apr’ 13 (COD)

U-2: Jun’ 16

U-1: Apr’ 13 (COD)

U-2: Sep’16

Mahan TPS – WR PS 400kV D/c line - expected by Mar’17

Representative stated that the dedicated transmission line is getting delayed by 5-6 months. Petition filed in CERC for tariff of dedicated line. Applicant was advised to expedite the implementation of dedicated line

2. 2

Karnataka Power Corporation Ltd (Godhna) (2X800)

763 0 0 0 763 NIL

Not Attended (MOEF

clearance awaited-as

informed vide email)

MOEF clearance awaited;

(Not expected

before 2021-22)

KPCL - Champa PS 400kV D/c (Quad) line: to match with Generation project

Representative informed that MOEF clearance for the project still awaited After award, U-1 expected in 48 months and U-2 in 52 months

Minutes of the 12th

JCC Meeting of IPPs granted LTA in WR

Page 5 of 18

Sl. No.

LTOA / LTA Applicant

LTOA Quantum

(MW)

Target Beneficiaries Firm beneficiary

Comm. schedule (11

th JCC)

Comm. schedule (12

th JCC)

Dedicated / Connectivity line & Status

Remarks

WR NR ER SR

3. 3 Essar Power Gujarat Ltd.

250 0 0 0 250 NIL

Uncertain (No certain date

given despite repetitive

requests) – 3 years from

MoEF Clearance

Project Uncertain;

Salaya TPS - Bachau 400kV D/c (Triple) line - advanced stage of completion

Applicant informed that they have submitted letter for relinquishment of LTA CTU already informing that relinquishment has to be in accordance with CERC Regulations with the consent to pay the relinquishment charges as to be decided by CERC in Petition No. 92/MP/2015

4. 4 Torrent Energy Ltd.

800 400 400 0 0 NIL

Not Attended (9

th JCC: U-

1/2/3: Dec’ 14 (COD))

Not Attended

(Commissioned)

TEL(DGEN) TPS- Navsari 400kV D/c (Triple/Quad) line – commissioned - Jul’13

TSA need to be signed by the developer.

5. 5 NPCIL (Kakrapar) – 2x700 MW

1400 1400 0 0 0 * Not attended U3: Nov’17 U4: Mar’18

Kakrapar NPP - Navsari 400kV D/c (Under ISTS): Oct’16

Quantum firmed up; *Representative informed that the beneficiaries have been finalized NPCIL was requested to forward the break-up of quantum with beneficiaries;

6. 6 NTPC (Lara-I) 1586.51 1586.

51 0 0 0 NIL

U1: Apr’17; U2: Oct’17

Not Attended

Lara - Raigarh PS (Kotra) 400 kV D/c line - commissioned

Minutes of the 12th

JCC Meeting of IPPs granted LTA in WR

Page 6 of 18

List of generation projects commissioned along with the dedicated/connectivity lines and further coordination not required

HIGH CAPACITY TRANSMISSION CORRIDOR – IV (Transmission System Associated with IPPs near Bilaspur complex in Chhattisgarh & MP projects)

Table T1 (i)

Sl. No.

LTOA / LTA Applicant

LTOA Quantum

(MW)

Target Beneficiaries

Firm beneficiary

Last updated status

Dedicated / Connectivity line & Status

Remarks

WR NR

CHATTISGARH IPP

1 Maruti Clean Coal (1X300)

171 126 45 Rajasthan: 250

MW CSPTCL : 14 MW

U-1: Commissioned, COD in Jul’15

LILO of one ckt of ACB TPS - WR PS(Bilaspur) 400kV D/c line is Commissioned

Against the PPA of 250 MW with Rajasthan ; 45 on Target to NR and fresh application of 205 MW filed in Feb’16 with relinquishment of 126 MW from WR

2 Dheeru Power Gen

450 367.5 82.5 NIL 9

th JCC :

Uncertain

Dheeru gen - WR PS (Bilaspur) 400kV D/c line

Matter is sub judice in High Court

3. Chhattisgarh State Power Trading Co. Ltd

432 260 172 NIL approached CERC for

relinquishment

MADHYA PRADESH IPP

4.

Jaiprakash Power Ventures Ltd. (2X660)

1240.8 465.3

853.5 465.3

387.3 0

MP-465.3 MW (Operational)

9th JCC U-1& 2 : Commissioned in Sep’ 14 & Feb’ 15

Jaiprakash - Satna 400kV D/c (High Capacity) line – commissioned

465.3 MW on Firm basis to MP is under operation and Matter in CERC for keeping the LTA in abeyance for balance quantum (775.5 MW)

5. Aryan MP Power generation Pvt. Ltd (2X600)

1122.0 841.5 280.5 NIL 9

th JCC:

Abandoned Aryan MP - Vindhyachal Pooling station 400kV D/c (High Capacity)

Petition filed for relinquishment of 1122 MW. Order reserved.

6 Bina Power Supply Company Ltd (2X250)

265.35 132.68 132.67 NIL 10th JCC:

Commissioned

Bina TPS - Bina (PG) / Bina (MPPTCL) 400kV D/c line - Commissioned

Matter in CERC for relinquishment of LTA for full quantum.

Minutes of the 12th

JCC Meeting of IPPs granted LTA in WR

Page 7 of 18

HIGH CAPACITY TRANSMISSION CORRIDOR – V (Transmission System Associated with Chhattisgarh IPPs)

Table T1 (ii) Sl. No.

LTOA / LTA Applicant

LTOA Quantum (MW)

Target Beneficiaries Firm benefici

ary

Last updated status

Dedicated / Connectivity line & Status

Remarks

WR NR SR

RAIGARH (KOTRA) COMPLEX

1. Korba West Power Co. Ltd. (1X600)

240 140 100 CSPTCL:

5% U-1: Mar'14

(COD)

400kV Korba (W)- Raigarh PS (near Kotra) D/c line – Commissioned

2. DB Power Ltd. (2X600)

705 530 322

175

0 208

Tamil Nadu:

208 MW Rajastha

n-250 (matter in RERC)

U-1: Feb’ 14 U-2: Mar’ 15

(COD)

DB Power – Raigarh PS (near Kotra) 400kV D/c (Triple/Quad) line - commissioned

Against PPA of 250 MW to Rajasthan ; 175 MW through Target to NR and request for change in Target region for 75 MW to Rajasthan made to CTU which is under issuance

RAIGARH (TAMNAR) COMPLEX

3. Jindal Power Ltd. (4X600)

1400 700 110

700 557.

5

0 732.

5

Tamil Nadu :

400 MW Kerala: 190 & 142.5 MW

10th JCC: U-1/2: Mar’14

(COD) U-3: Jan’15

(COD) U-4:

Commissioned

JPL – Raigarh PS (near Tamnar) 2xD/c 400kV (Quad) – 3 ckts commissioned, 4th circuit expected by Oct’15 (as informed in 10th JCC)

400 MW to Tamil Nadu under operation

4. Jindal Power Ltd. (400 MW)

400 400 NIL

Commissioned

RAIGARH COMPLEX

5.

GMR Chhattisgarh Energy Pvt. Ltd. (2X685)

816 386 430 NIL U-1: Jun’15

(COD); U-2: Feb’16

GMR - Raipur PS 400kV D/c (Quad) line - commissioned in Jan’14

6.

Chhattisgarh State Power Trading Co. Ltd*

5809 3487 2322 NIL M/s CSPTCL has filed a petition at CERC seeking relinquishment

Minutes of the 12th

JCC Meeting of IPPs granted LTA in WR

Page 8 of 18

Other Generation Projects in Chhattisgarh & Madhya Pradesh

Table T1 (iii)

Sl. No.

LTOA / LTA Applicant

LTOA Quantum

(MW)

Target Beneficiaries Firm beneficiary

Latest updated status

Dedicated / Connectivity line & Status

Remarks

WR NR ER SR

1 PTC(Lanco-II) (1X300)

300 0 300 0 0 Haryana – 300

MW Commissioned

Pathadi TPS - WR PS (near Sipat) 400kV D/c (Quad) line - commissioned

2.

MB Power (Madhya Pradesh) Limited (2X600)

392 200 192 0 0 UP-192 MW (Operational)

U-1: May’ 15 (COD)

U-2: Mar’ 16

MB TPS - Jabalpur PS 400kV D/c (Triple) line – Commissioned

392 MW operational; Representative requested for return of CBG as per Regulations.

3.

Dhariwal Infrastructure Ltd.

300 150 50

150 0 0

100 Tamil Nadu: 100

MW

Not Attended (Commissione

d -submitted

though e-mail)

LILO of one ckt of Bhadravati - Parli 400kV line at Dhariwal TPS - Commissioned

LTA for 100 MW to Tamil Nadu is operational

4 NTPC (Vindhyachal -V)

495.78 495.7

8 0 0 0 GoI Allocation Oct’ 15 (COD)

Interconnection at 400kV Bus of Vindhyachal TPS-IV switchyard

5 Jhabua Power Ltd

210 210 0

0 0 0

204.25

Kerala: 204.25 MW

U-1: May’16 (COD)

Jhabua TPS - Jabalpur PS 400kV D/c (Triple) line - Commissioned

Balance LTA of 5.75 MW relinquished

6 MP Power Management Company Ltd.

246 197.5

246 197.5

0 0 0 NIL

U-1: May’16 (COD – from

Jhabua Power)

Jhabua TPS - Jabalpur Pool 400kV D/c (Triple) line: Commissioned

197.5 MW LTA under operation and balance LTA of 48.5 MW relinquished

Minutes of the 12th

JCC Meeting of IPPs granted LTA in WR

Page 9 of 18

Status of the Associated Transmission System

HIGH CAPACITY TRANSMISSION CORRIDOR – IV (Transmission System Associated with IPPs near Bilaspur complex in Chhattisgarh & MP projects)

Transmission System under the Scope of POWERGRID:

Transfer of power from generation projects near Bilaspur complex in Chhattisgarh & MP projects

Sl. No.

Tr. System Status (as per 11th JCC)

Status (as per 12th JCC)

Remarks

1 Indore- Vadodara 765kV S/c Commissioned Commissioned

2 Vadodara – Pirana 400kV D/c (Quad) Commissioned Commissioned

3 Establishment of 765/400kV, 2x1500 MVA substation at Vadodara

Commissioned Commissioned

Status of other associated transmission lines

Sl. No.

Transmission System Status (as per 11th JCC)

Status (as per 12th JCC)

Remarks

1 765 KV S/C Bina - Gwalior line (3rd Ckt) Commissioned Commissioned Commissioned in May' 14.

2 765KV S/C Gwalior-Jaipur line (2nd Ckt) Commissioned Commissioned

3 765 KV S/C Jaipur - Bhiwani line Commissioned Commissioned

Minutes of the 12th

JCC Meeting of IPPs granted LTA in WR

Page 10 of 18

HIGH CAPACITY TRANSMISSION CORRIDOR – V

(Transmission System Associated with Chhattisgarh IPPs) Transmission System under the Scope of POWERGRID

Establishment of Pooling Stations at Raigarh (Near Kotra) and Raipur for IPP Generation Projects in Chhattisgarh Part-1

Sl. No.

Transmission System Status (as per 11th JCC)

Status (as per 12th JCC)

Remarks

1 Raigarh Pooling Station (Near Kotra) – Raipur Pooling Station 765kV D/c 2x240 MVAR line reactors at each end on both circuits

Commissioned Commissioned

2 Raigarh Pooling Station (Near Kotra) – Raigarh 400kV D/c

Commissioned Commissioned

3 Raipur Pooling Station – Raipur 400kV D/c

Commissioned Commissioned

4 Establishment of 765/400kV 4x1500MVA Raigarh Pooling Station (near Kotra) (1x240 MVAR B/R) at 765kV, 1x80 MVAR bus reactor (charged at 400kV)

Commissioned with 1x1500 MVA

transformer

Commissioned

5 Establishment of 765/400kV 1x1500MVA Raipur Pooling Station (1x240 MVAR B/R)

Commissioned Commissioned

Establishment of Pooling Stations at Champa and Raigarh (Near Tamnar) for IPP Generation Projects in Chhattisgarh Part-2

Sl. No.

Transmission System Status (as per 11th JCC)

Status (as per 12th JCC)

Remarks

1 Champa Pooling Station – Raipur Pooling Station 765kV D/c -150 KM - 2x240 MVAR line reactors at Raipur

Commissioned Commissioned

Minutes of the 12th

JCC Meeting of IPPs granted LTA in WR

Page 11 of 18

Sl. No.

Transmission System Status (as per 11th JCC)

Status (as per 12th JCC)

Remarks

2 Raigarh Pooling station(near Kotra) – Raigarh pooling station(near Tamnar) 765kV D/c

Commissioned Commissioned

3 Champa Pooling Station – Dharamjaygarh/Korba 765kV S/c

Commissioned Commissioned

4 Raigarh Pooling Station (near Kotra) – Champa Pooling Station 765kV S/c

Commissioned Commissioned

5 Establishment of 765/400kV 6x1500MVA Champa Pooling Station (1x240 MVAR B/R) 1x80 MVAR bus reactor when charged at 400kV)

Commissioned Commissioned

6 Establishment of 765/400kV 3x1500MVA Raigarh Pooling Station(near Tamnar) (1x240 MVAR B/R)

Commissioned Commissioned

Integration of Pooling Stations in Chhattisgarh with Central part of WR for IPP Generation Projects in Chhattisgarh Part-3

Sl. No

Transmission System Status (as per 11th JCC)

Status (as per 12th JCC)

Remarks

1 Raipur Pooling Station – Wardha 765kV D/c - 2x240 MVAR line reactor at Raipur Pooling Station and 2x330 MVAR line reactor at Wardha

Commissioned Commissioned

2 Wardha bus reactor – 1x330 MVAR Commissioned Commissioned

Transmission System strengthening in Western part of WR for IPP Generation Projects in Chhattisgarh Part-4

Sl. No

Transmission System Status (as per 11th JCC)

Status (as per 12th JCC)

Remarks

1 Wardha – Aurangabad (PG) 765kV D/c - 2x330 MVAR line reactors at Wardha and 2x240 at Aurangabad

Commissioned Commissioned

Minutes of the 12th

JCC Meeting of IPPs granted LTA in WR

Page 12 of 18

Sl. No

Transmission System Status (as per 11th JCC)

Status (as per 12th JCC)

Remarks

2 Aurangabad(PG) – Boisar 400kV D/c (Quad)-300 km - 2x63 MVAR line reactors at each end on both circuits

Dec’16 Dec’16

Severe RoW issues in Nashik Dist. due to grape garden

3 Establishment of 765/400kV 2x1500MVA Aurangabad (PG) S/s (1x240 MVAR B/R)

Commissioned Commissioned

4 Augmentation of transformation capacity at Boisar by 1x500MVA

Commissioned Commissioned

System strengthening in North/West part of WR for IPP Projects in Chhattisgarh Part-5

Sl. No.

Transmission System Status (as per 11th JCC)

Status (as per 12th JCC)

Remarks

1 Padghe – Padghe(PG) 400kV D/c (Quad)-25 km

Oct’16 Mar’17 The LILO of under construction 400 kV Tarapur-Padghe line (MSETCL) bypassing Kudus substation is not workable as the work of LILO of 400 kV Tarpur-Padghe line is stopped for the last 2 years due to severe RoW & n0n-avavilability of forest clearance. (Unless Kudus Substation of MSETCL is constructed, Power cannot be evacuated from Padghe)

2 Vadodara – Asoj 400kV D/c(Quad)-15 km -

Commissioned Commissioned

3 Aurangabad (PG) – Padghe(PG) 765kV 1×D/c - 2x240 MVAR line reactors at each end on both circuits

Oct’16 Mar’17

4 Establishment of 765/400kV 2x1500MVA Padghe(PG) S/s [GIS] (1x240 MVAR B/R)

Oct’16

Mar’17

Minutes of the 12th

JCC Meeting of IPPs granted LTA in WR

Page 13 of 18

System strengthening in Raipur-Wardha corridor for IPP Projects in Chhattisgarh Part-6

Sl. No

Transmission System Status (as per 11th JCC)

Status (as per 12th JCC)

Remarks

1 Raipur Pooling Station – Wardha 765kV 2nd D/c-380 km - 2x240 MVAR line

Jun’16

Oct’16

2 Reactor at Raipur Pooling Station and 2x330 MVAR line reactor at Wardha

System strengthening in Wardha-Aurangabad corridor for IPP Projects in projects in Chhattisgarh Part-7

Sl. No

Transmission System Status (as per 11th JCC)

Status (as per 12th JCC)

Remarks

1 Wardha – Aurangabad (PG) 765kV 2nd D/c – 2x330 MVAR line reactor at Wardha and 2x240 line reactor at Aurangabad

Commissioned

Commissioned

WR-NR HVDC interconnector for IPP Projects in Chhattisgarh Part-9

Sl. No

Transmission System Status (as per 11th JCC)

Status (as per 12th JCC)

Remarks

1 Establishment of 3000MW 800KV HVDC bipole terminal each at Champa Pooling station and Kurukshetra (NR)

1500 MW - Jun’16 1500 MW -Sept’16

Sep’16/ Dec’16

2 Kurukshetra(NR) - Jallandhar 400kV D/c(Quad) one ckt. via 400/220kV Nakodar S/s

Commissioned

Commissioned

3 LILO of Abdullapur – Sonepat 400kV D/c(triple) at Kurukshetra Commissioned

Commissioned

4 Establishment of 3000MW 800KV HVDC bipole terminal each at Champa Pooling station and Kurukshetra(NR) respectively:

Mar’18 Mar’18

Minutes of the 12th

JCC Meeting of IPPs granted LTA in WR

Page 14 of 18

Sl. No

Transmission System Status (as per 11th JCC)

Status (as per 12th JCC)

Remarks

to be upgraded to 6000MW

5 Establishment of 400/220kV 2x500 MVA S/s at Kurukshetra

Commissioned

Commissioned

Transmission elements being implemented by transmission licensee through tariff based competitive bidding process. Part-10

[TBCB award placed to succesful bidder Sterlite in Mar ’12 with commissioning schedule of 39 months(June ’15)]

Sl. No

Transmission System Status (as per 11th JCC)

Status (as per 12th JCC)

Remarks

1 Aurangabad(PG) – Dhule (IPTC) 765kV S/c line

Commissioned Commissioned

2 Dhule (IPTC) – Vadodara (PG) 765kV S/c line

Commissioned Commissioned

3 Dhule (IPTC) – Dhule (MSETCL) 400kV D/c Quad line

Commissioned Commissioned

4 Establishment of 765/400kV, 2x1500MVA Dhule(IPTC) S/s

Commissioned Commissioned

Status of other Transmission Lines

Sl. No

Transmission System Status (as per 11th JCC)

Status (as per 12th JCC)

Remarks

2 400KV D/C Kurukshetra - Jind line (Q) Mar’18 Mar’18

3 765 KV D/C Jabalpur Pooling Station - Bina line Commissioned Commissioned Line commissioned in Dec'13.

4 Jabalpur PS-Bhopal 765kV S/c Commissioned Commissioned TBCB

5 Bhopal- Indore 765kV S/c Commissioned Commissioned TBCB

6 TEL(DGEN) TPS- Vadodara 400kV D/c May’18 May’18 TBCB (SPV transferred)

Minutes of the 12th

JCC Meeting of IPPs granted LTA in WR

Page 15 of 18

Sl. No

Transmission System Status (as per 11th JCC)

Status (as per 12th JCC)

Remarks

7 220kV Navsari- Besthan May’18 May’18 TBCB

8 765KV D/C Jabalpur Poolin Stn. - Orai line

Apr’18 Apr’18

9 765kV Orai- Aligarh Apr’18 Apr’18

10 765KV D/C Narendra (New Kudgi) - Kolhapur line (initialy charged at 400KV) *

Commissioned Commissioned

11 400KV D/C Kakrapar APP - Vapi line Oct’16 Oct’16

12 Vindhayachal PS- Jabalpur PS 765kV D/c Oct’16 Jun’18 TBCB

13 400KV D/C Lara STPS - Raigarh (Kotra) line Jun’18 Commissioned Commissioned in Apr’16

Sl. No

Name of the Sub-Station Status (as per 11th JCC)

Status (as per 12th JCC)

Remarks

1 765/400 KV Champa Pooling Station

Commissioned Commissioned

2 765/400KV Jabalpur Pooling station (2x1500MVA) Commissioned Commissioned

Sub-station commissioned along with ICT-I in Dec.'13 & ICT-II in Mar'14.

3 1x1500 MVA 765/400kV ICT at Vindhayachal PS Jul’17 Jul’17

Minutes of the 12th

JCC Meeting of IPPs granted LTA in WR

Page 16 of 18

Annexure-I

List of Participants in the 12th Joint Co-ordination Committee meeting of IPPs granted LTA in WR held on 10.06.2016

Sl. No.

Name Designation Organization E-mail

1. Seema Gupta COO (CTU-Plg.) Power Grid Corporation of India Ltd [email protected]

2. Rishika Sharan Director (PSP&A-I) Central Electricty Authority [email protected]

3. Santosh Kumar Dy. Director (PSP&A-II) Central Electricty Authority [email protected]

4. Ashok Pal GM (CTU-Plg.) Power Grid Corporation of India Ltd. [email protected]

5. Avinash Pavgi GM (Commercial) Power Grid Corporation of India Ltd. [email protected]

6. R Nagpal GM (CMG) Power Grid Corporation of India Ltd. [email protected]

7. D N Rozekar AGM (CTU-Plg.) Power Grid Corporation of India Ltd. [email protected]

8. B P Kundu DGM (BDD) Power Grid Corporation of India Ltd. [email protected]

9. Jyoti Prasad DGM (CTU-Plg.) Power Grid Corporation of India Ltd. [email protected]

10. Rajesh Verma CDE (CTU-Plg.) Power Grid Corporation of India Ltd. [email protected]

11. Anil Kumar Meena CDE (CTU-Plg.) Power Grid Corporation of India Ltd. [email protected]

12. Laxmi Kant Manager (CTU-Plg) Power Grid Corporation of India Ltd. [email protected]

13. Anita A. Srivastava Manager, Law (Commercial)

Power Grid Corporation of India Ltd. [email protected]

14. K Jyoth Kumar Officer (CTU-Plg.) Power Grid Corporation of India Ltd. [email protected]

15. Manish Pareta Sr. Engineer (CTU-Plg.) Power Grid Corporation of India Ltd [email protected]

16. Swapnil Verma Law Officer (CTU-Plg.) Power Grid Corporation of India Ltd [email protected]

Minutes of the 12th

JCC Meeting of IPPs granted LTA in WR

Page 17 of 18

Sl. No.

Name Designation Organization E-mail

17. Dwaipayen Sen Engineer (CTU – Plg.) Power Grid Corporation of India Ltd [email protected]

18. Pratyush Singh Engineer (CTU – Plg.) Power Grid Corporation of India Ltd [email protected]

19. Rishu Garg AM-Transmission GMR Chhattisgarh Energy Pvt. Ltd. [email protected]

20. N.M. Ambade GM (Project Finance) SKS Power Generation (CG) Ltd. [email protected]

21. P. K. Gupta SME (E) NPCIL (KAPP- 3&4) [email protected]

22. H Sharma AGM DB Power Ltd. [email protected]

23. Mohan Menon Advisor Athena Chhattisgarh Power Ltd. [email protected]

24. T. Rajesh Kumar Manager RKM Powergen Pvt. Ltd. [email protected]

25. S. N. Sharma President- Engineering Karnataka Power Corporation Ltd. [email protected]

26. Vijender Gupta Manager (Projects) TRN Energy Pvt. Ltd. Aryan MP Power Generation Pvt. Ltd.

[email protected]

27. V. Ravindran Dy. Chief Lanco Amarkantak Power Pvt. Ltd. [email protected]

28. S.K. Bhardwaj Sr. DGM Lanco Amarkantak Power Pvt. Ltd. [email protected]

29. C Narasimha Manager KSK Mahanadi Power Company Ltd. [email protected]

30. R. Srinivasan Vice President (Corp.) Athena Chhattisgarh Power Ltd. [email protected]

31. Ranjan Mishra Executive Director Visa Power Ltd. [email protected]

32. S.R. Parida J.G.M. Essar Power MP Ltd. / Essar Power Gujarat Ltd.

[email protected]

33. Roopam bansal Deputy Manager-BDD Jhabua Power Ltd. [email protected]

Minutes of the 12th

JCC Meeting of IPPs granted LTA in WR

Page 18 of 18

Annexure-II

The following applicants are requested to sign the Transmission Service Agreement

Sl. No. LTOA / LTA Applicant

LTA Quantum (MW)

Target Beneficiaries

NR WR ER SR

1. Vandana Vidyut Ltd. (2X135 + 1X270)

265 100 165 0 0