report gis application

Upload: mohd-qazar-yusop

Post on 01-Mar-2018

217 views

Category:

Documents


0 download

TRANSCRIPT

  • 7/26/2019 Report GIS application

    1/16

    Start Add jpg. data KML to layer

    Add control point Updategeoreferencing

    Add data lot

    Create new shapefile.

    boundary,line andpoint

    Geoprocessing Clip

    !ditingConstructpoint, copy parallel

    and "erge

    Selection.

    Select bylocation !nd

    1. Introduction.

    G#S application widely used on $ariable area of technical proble"s, with different "ethod application

    pro$ided by G#S software, G#S application able to gi$e accurate result of wor%. #nfor"ation in this report,

    show how area fro" different coordinate syste" con$ert to coordinate syste" needed and identify area

    which in$ol$ed with location of &'( &ower.

    2. Objective.

    ). Co$ert original coordinate of "ap into coordinate syste" needed.*. +eter"ine and identify how "any towers, how "any location in$ol$e and costing.

    3. Methodology.

    lowchart of "ethodology.

    1

  • 7/26/2019 Report GIS application

    2/16

    3.1 KML to layer.

    KML is an -ML based file for"at used to represent geographic features in application such as ArcG#S

    !plore and Google !arth. KML allow to draw points, lines, and polygons on "aps and globes and share

    the" with others. Using KML you can also designate tet, pictures, "o$ies, or lin%s to other G#S ser$ice

    that appear when the user clic%s the feature.

    3.2 New shape ile.

    igure /.*

    * point, * polyline and ) polygon new shapefile created. 0oint shapefile represented for &'( tower,

    polyline shapefile represented &'( &rans"ission Line and polygon represented boundary area.

    3.3 !elect by location eatures.

    2

  • 7/26/2019 Report GIS application

    3/16

    &he select by location function to select

    features based on their location relati$ely to

    other features. or this tas%, # ai"ed to want to

    %now about how "any lot cadastral were

    in$ol$ed with &'( tower trans"ission line

    area.

    igure /./ Select (y Location.

    ". #esult

    3

  • 7/26/2019 Report GIS application

    4/16

    A. Kelantan

    igure 1A) Kelantan &'( &rans"ission Line )*2%$

    #. &otal of 'u"ber Lot.

    3 42 Lot.

    5&ower.

    ##. Cost in$ol$ed, ) cadastral lot 3 677.

    3 42 778 2 9*:6

    ###. &otal Cost &'( &ower, ) &ower 3 )*76.

    3 )* )*78 ) 2/46

    #;. &otal cost )*2%$ construction.

    3 29*: < )2/48 9 *246

    4

  • 7/26/2019 Report GIS application

    5/16

    ;. 'o. Lot in$ol$ed.

    igure 1A);#8 L=& in$ol$ed

    5

  • 7/26/2019 Report GIS application

    6/16

    igure 1A*

    &'( &rans"ission Line *92 %$

    #. &otal of 'u"ber Lot.

    3 )49 Lot.

    ##. &otal &'( &ower 'eeded.

    3)/ &ower.

    ###. Cost in$ol$ed, ) cadastral lot 3 677.

    3 )49 778 )1 4>46

    #;. &otal Cost &'( &ower, ) &ower 3 )*76.

    3 )/ )*78 ) 4416

    6

  • 7/26/2019 Report GIS application

    7/16

    ;. &otal cost )*2%$ construction.

    3 )14>4< )4418 )4 /4:6

    ;#. 'o. Lot in$ol$ed.

    igure 1A*;#8 L=&

    in$ol$ed.

    $. %erangganu.

    7

  • 7/26/2019 Report GIS application

    8/16

    igure 1( &'( &rans"ission Line )*2%$

    #. &otal of 'u"ber Lot.3 >) Lot.

    ##. &otal &'( &ower 'eeded.37 &ower.

    ###. Cost in$ol$ed, ) cadastral lot 3 677.3 >) 778 7 ::76

    #;. &otal Cost &'( &ower, ) &ower 3 )*76.3 7 )*78 ) :*16

    ;. &otal cost )*2%$ construction.3 7 ::7< ) :*18 > :/*6

    ;#. 'o. Lot in$ol$ed.

    8

  • 7/26/2019 Report GIS application

    9/16

    igure 1(;#8 L=& in$ol$ed.

    igure 1() &'( &rans"ission Line *92%$

    9

  • 7/26/2019 Report GIS application

    10/16

    #. &otal of 'u"ber Lot.3 >2 Lot.

    ##. &otal &'( &ower 'eeded.3> &ower.

    ###. Cost in$ol$ed, ) cadastral lot 3 677.3 >2 778 7 /4:6

    #;. &otal Cost &'( &ower, ) &ower 3 )*76.3 > )*78 ) )2*6

    ;. &otal cost )*2%$ construction.3 7 /4:< ) )2*8 > 2)*6

    ;#. 'o. Lot in$ol$ed.

    10

  • 7/26/2019 Report GIS application

    11/16

    Figure 4BVI: LOT involved.

    &. 'ohor.

    11

  • 7/26/2019 Report GIS application

    12/16

    igure 1C &'( &rans"ission Line )*2%$#. &otal of 'u"ber Lot.

    3 )** Lot.

    ##. &otal &'( &ower 'eeded.3/9 &ower.

    ###. Cost in$ol$ed, ) cadastral lot 3 677.3 )** 778 ): 9/46

    #;. &otal Cost &'( &ower, ) &ower 3 )*76.3 /9 )*78 1 9/46

    ;. &otal cost )*2%$ construction.3 ): 9/4

  • 7/26/2019 Report GIS application

    13/16

    Figure

    4CVI: LOT

    involved.

    (igure "&1 %N$ %rans)ission Line 2*+,v

    13

  • 7/26/2019 Report GIS application

    14/16

    #. &otal of 'u"ber Lot.3 1* Lot.

    ##. &otal &'( &ower 'eeded.3/7 &ower.

    ###. Cost in$ol$ed, ) cadastral lot 3 677.3 1* 778 / 4>46

    #;. &otal Cost &'( &ower, ) &ower 3 )*76.3 /7 )*78 1 4716

    ;. &otal cost )*2%$ construction.3 / 4>4

  • 7/26/2019 Report GIS application

    15/16

    igure

    1C);#8 L=&

    in$ol$ed.

    2. +iscussion.

    &hrough process selection by location, the lot cadastral which in$ol$ed with &'( &rans"ission

    Line )*2%$ ? *92%$ are deter"ained. &he lot cadastral which blue highlight show that the area

    of &rans"isson line and tower, thus the nu"ber lot can indentify by open the attribute table and

    already selected in the attribute table. Costing for trans"isson line area and tower area are

    calculate for reparation to owner of lot. &hus, the nu"ber lot which in$ol$ed are recorded. As

    well as Kelantan for )*2%$ is 9 *24 6 and *92%$ is )4/2:6, &erangganu for )*2%$ is > :/*6 and

    *92%$ is > 2)*6, and @ohor, )*2%$ the cost is )) 19*6 and *92%$ is )2 )476. &he highest

    reparation is Kelantan *92%$ with )4 /4:6, this is because the "any lot cadastral in$ol$e with

    tower construction and trans"ission line.

    or other application, by this process, we also can "anage and analy5e the suitable location for

    &'( tower and &rans"ission Line if the cost of reparation too high or if the location on the lot

    with not suitable soil, such as soft soil.

    15

  • 7/26/2019 Report GIS application

    16/16

    4. Conclusion.

    (ased the wor% has be done, G#S application can analy5e until to s"all lot of area without change

    any original infor"ation. &hat "eans, the result is accurate. &hus, we can detect each lot cadastralwhich in$ol$ed with the project for reparation process, and we can "a%e a sur$ey on the land

    which in$ol$ed with project, to in$estigate either that point is suitable for construction &'(

    tower and trans"ission line, or not. urther, any job can be done with accurate on G#S

    Application and can sa$e "oney for field wor%.