renewable energy in kuwait between vision & reality...mew roof top pv projects applying pv’s...
TRANSCRIPT
Renewable Energy in Kuwait Between Vision & Reality
By 2030 about 900,000 Barrels / day will be use to
cover the Demand for Electricity & Water
Which will be 1/3 of Kuwait
OIL Production
Kuwait Renewable Energy Vision
Power Demand Forecasting 2030
Housing Projects 12,000 MW
KOC Upstream 1,100MW
NEW University 450 MW
Commercial & Industrial 600 MW
KNPC (NRP+CFP) 800 MW
Bobyan Island 900 MW
Additional Power Required for Kuwait Projects up to 2030
18,000 MW
Peak Load & Available Capacity - 2030
5000
10000
15000
20000
25000
30000
35000
2010 2016 2020 2025 2030
Peak Load Including Projects (MW) Available + Expected Capacity (MW)
13390 MW
30274 MW
33710 MW
22622 MW
10890 MW
15682 MW
20700 MW
29510 MW
11650 MW
16905 MW
Completed VS. Future
Since 2013
26 project have been completed
Total installed capacity 39.5 MW
By 2022
35 project are under design and/or construction
Total installed capacity 1,658 MW
Renewable contribution estimated to reach 11.42%
MEW & MPW Buildings
First project with Mega capacity
Operation on April 20 2014
Installed Capacity 1 MW
MEW Roof Top PV Projects
Applying PV’s on the Roofs of (6) Stores in Sabhan
Installed Capacity 3.75 MW.
Tendering Installation PV’s on the roofs of existing and new parking areas at
Phase I - Main Workshops - Installed Capacity 2.7 MW
Phase II - Power Stations - Installed Capacity 3.0 MW
Phase III - Other MEW Buildings - Installed Capacity 3.3 MW
Planned date for operation by 2019
First CDM PV Project
Sidra 500
• Installed capacity 10 MW
• Operation date October 2016
PV @ MEW Ground Water Reservoirs
• 25 Locations
• 300 MW Total Installed Capacity
• Phase 1- to be tendered 2nd Quarter 2017
• Location : Subiya - Capacity 30 MW
Under Evaluation
Waste capacity 3,275 tons/day.
80 MW of production
25 yrs. from operate.
Total area of 500,000 m2.
Municipal Solid Waste Treatment Facility – Kabd Location
Abdaleyah Integrated Solar Combined Cycle “ISCC” Project
Total 280 MW including 60 MW Solar.
PQ List includes 8 Consortiums.
0,00 0,02 0,03 0,30 0,84
3,70 3,72
10,85 11,30 11,42
0,00
2,00
4,00
6,00
8,00
10,00
12,00
2013 2014 2015 2016 2017 2018 2019 2020 2012 2022
RENEWABLE VS DEMAND