references - inflibnetshodhganga.inflibnet.ac.in/bitstream/10603/17896/17/17_referrances... · 310...

26
310 References [ABD 02] Abdennour A., (2002), “Adaptive Optimal Gain Scheduling for the Load Frequency Control Problem”, Electric Power Components and Systems, vol. 30(1), 45-56. [ABD 95] Abdel-Magidand Y.L., and Dawoud M.M., (1995), “Genetic algorithms applications in load frequency control”, Proc. First Int. Conf. Genetic Algorithms Eng. Syst.: Innovations and Application, 207213, Jan. [ADH 07] Adham A., Amnuaisuk P., Somnu, and Kuan H.C., (2007), “Particle Swarm Optimizations: A Critical Review”, IKT, 1-7. [ADI 03] Aditya S.K., and Das D., (2003), “Design of load frequency controllers using genetic algorithm for two area interconnected hydro power system”, Elect. Power Compon.and Syst., vol. 31, no.1, 8194, Jan. [ADI 10] ADITYA, (2010), “Design of Load Frequency Controllers Using Genetic Algorithm for Two Area Interconnected Hydro Power System”, Electric Power Components and Systems, vol. 31:1, 81-94, Jun. [AHA 02] Ahamed T.P.I., Rao P.S.N., and Sastry P.S., (2002), “A reinforcement learning approach to automatic generation control”, Elect. Power Syst. Res., vol. 63, 9 26, Aug. [AHA 06] AHAMED T.P.I., (2006), “A neural network based automatic generation controller design through reinforcement learning”, Int. J. Emerging Electr. Power Syst., vol. 6(1), 131. [AL 00] Al-Hamouz Z.M.,and Al-Duwaish H.N., (2000), “A new load frequency variable structure controller using genetic algorithms”, Electric Power Systems Research, vol. 55, 1 6.

Upload: phungtuong

Post on 06-Feb-2018

231 views

Category:

Documents


8 download

TRANSCRIPT

Page 1: References - INFLIBNETshodhganga.inflibnet.ac.in/bitstream/10603/17896/17/17_referrances... · 310 References [ABD 02] Abdennour A., (2002), “Adaptive Optimal Gain Scheduling for

310

References

[ABD 02] Abdennour A., (2002), “Adaptive Optimal Gain Scheduling for the Load

Frequency Control Problem”, Electric Power Components and Systems, vol.

30(1), 45-56.

[ABD 95] Abdel-Magidand Y.L., and Dawoud M.M., (1995), “Genetic algorithms

applications in load frequency control”, Proc. First Int. Conf. Genetic

Algorithms Eng. Syst.: Innovations and Application, 207–213, Jan.

[ADH 07] Adham A., Amnuaisuk P., Somnu, and Kuan H.C., (2007), “Particle Swarm

Optimizations: A Critical Review”, IKT, 1-7.

[ADI 03] Aditya S.K., and Das D., (2003), “Design of load frequency controllers

using genetic algorithm for two area interconnected hydro power system”,

Elect. Power Compon.and Syst., vol. 31, no.1, 81–94, Jan.

[ADI 10] ADITYA, (2010), “Design of Load Frequency Controllers Using Genetic

Algorithm for Two Area Interconnected Hydro Power System”, Electric

Power Components and Systems, vol. 31:1, 81-94, Jun.

[AHA 02] Ahamed T.P.I., Rao P.S.N., and Sastry P.S., (2002), “A reinforcement

learning approach to automatic generation control”, Elect. Power Syst. Res.,

vol. 63, 9 –26, Aug.

[AHA 06] AHAMED T.P.I., (2006), “A neural network based automatic generation

controller design through reinforcement learning”, Int. J. Emerging Electr.

Power Syst., vol. 6(1), 1–31.

[AL 00] Al-Hamouz Z.M.,and Al-Duwaish H.N., (2000), “A new load frequency

variable structure controller using genetic algorithms”, Electric Power

Systems Research, vol. 55, 1 – 6.

Page 2: References - INFLIBNETshodhganga.inflibnet.ac.in/bitstream/10603/17896/17/17_referrances... · 310 References [ABD 02] Abdennour A., (2002), “Adaptive Optimal Gain Scheduling for

311

[AL 07] Al-Tamirni, A., Lewis, F.L., Wang, Y., (2007), “Model-Free H-Infinity

Load-Frequency Controller Design for Power Systems”, ISIC. IEEE 22nd

International Symposium on, 118 – 125.

[ALI 10] Ali E.S., and Abd-Elazim S.M., (2010), “Optimal PID Tuning for Load

Frequency Control Using Bacteria Foraging Optimization Algorithm”,

Proceedings of the forteenth International Middle East Power Systems

Conference (MEPCON’10), Egypt, 19-21, December.

[ALR 06] Alrashidi R. M., and M. E. El-Hawary, (2006), “A Survey of Particle

Swarm Optimization Applications in Power System Operations”, Electric

Power Components and Systems, December, 1349–1357.

[ANA 09] Anand B., Jeyakumar A. Ebenezer, (2009), “Load frequency control with

fuzzy logic controller considering non-linearities and boiler dynamics”,

ICGST-ACSE Journal, vol. 8, 15-20, Jan.

[AND 05] Andersson G., Donalek P., and Farmer R., et al., (2005)“Causes of the 2003

major grid blackouts in North America and Europe and recommended

means to improve system dynamic performance”, IEEE Trans. Power Syst.,

vol. 20(4), 1922–1928.

[ANT 89] Antonisse, J., (1989), “A new interpretation of schema notation that

overturns the binary encoding constraint”, Proc. of the Third Int. Conf. on

Genetic Algorithms, J. David Schaffer (Ed.) (Morgan Kaufmann Publishers,

San Mateo), 86–91.

[ARA 09] Aravindan P., Sanavullah M.Y., (2009), “Fuzzy logic based automatic load

frequency control of two area power system with GRC”, International

Journal of Computational Intelligence Research, vol. 5, 37-44.

[ARI 11] Arivoli R., and Chidambaram I. A., (2011), “Design of Genetic Algorithm

(GA) Based Controller for Load-Frequency Control of Power Systems Inter

Page 3: References - INFLIBNETshodhganga.inflibnet.ac.in/bitstream/10603/17896/17/17_referrances... · 310 References [ABD 02] Abdennour A., (2002), “Adaptive Optimal Gain Scheduling for

312

Connected With AC-DC TIE-LINE”, Int. J Comp Sci. Emerging Tech, vol.

2 No 5, 280-286, October.

[ASA 04] Asanga R., Halgamuge S.K., and Watson H.C., (2004), “Self-Organizing

Hierarchical Particle Swarm Optimizer with Time-Varying Acceleration

Coefficients”, IEEE Transactions on Evolutionary Computation, vol. 8, No.

3, 240-255, June.

[BEL 07] Belanger J., Lapointe V., Dufour C., and Schoen L., (2007),"eMEGAsim:

An Open High-Performance Distributed Real-Time Power Grid Simulator.

Architecture and Specification", Presented at the International Conference

on Power Systems (ICPS’07), Bangalore, India, Dec.

[BEV 06] Bevrani H, Hiyama T, Mitani Y, Tsuji K and Teshnehlab M, (2006), “Load-

frequency regulation under a bilateral LFC scheme using flexible neural

networks”, Eng Int Syst, CRL Publishing Ltd, 109-117.

[BHO 11] Bhongade S., Tyagi B., Gupta H.O., (2011), “Genetic algorithm based PID

controller design for a multi-area AGC scheme in a restructured power

system, International Journal of Engineering, Science and Technology, vol.

3, No. 1, 220-236.

[BOR 11] Boroujeni S.M.S., Boroujeni B.K., Abdollahi M. and Delafkar A., (2009),

“Multi-area Load Frequency Control using IP Controller Tuned by Particle

Swarm Optimization”, Research Journal of Applied Sciences, E&T, vol.

3(12), 1396-1401.

[CHA 01] Chaturvedi D. K., (2001), "Artificial Neural Network Learning Using

Improved Genetic Algorithms", Journal of the Institution of Engineers

(India), 1-8.

[CHA 05] Chaudhary D.R., (2005), “Modern control engineering”, PHI, Private

Limited.

Page 4: References - INFLIBNETshodhganga.inflibnet.ac.in/bitstream/10603/17896/17/17_referrances... · 310 References [ABD 02] Abdennour A., (2002), “Adaptive Optimal Gain Scheduling for

313

[CHA 07] Chaturvedi D.K, (2007), “Soft Computing: Applications to Electrical

Engineering Problem”, Springer Verlag.

[CHA 09] Chaturvedi D.K., Malik O.P., and Choudhury U.K., (2009), “Polar fuzzy

adaptive power system stabilizer”, The Institution of Engineers (India), vol.

90, 35-45.

[CHA 11] Chatterjee K., (2011), “PI Controller for Automatic Generation Control

Based on Performance Indices”, World Academy of Science, Engineering

and Technology, vol. 75, 321-328.

[CHA 98] Chang C.S., Fu.W, and Wen F., (1998), “Load frequency control using

genetic-algorithm based fuzzy gain scheduling of PI controllers”, J. of Elect.

Machines Power Syst., vol. 26(1), 39–52, Jan.

[CHA 99] Chaturvedi D. K., Satsangi P. S., and Kalra P. K., (1999), “Load frequency

control: A generalized neural network approach”, Elect. Power Energy

Syst., vol. 21 (6), 405 –415, Aug.

[CHI 05] Chidambaram I.A., and Velusami S., (2005), “Decentralized biased

controllers for load-frequency control of interconnected power systems

considering governor dead band non-linearity”, IEEE INDICON 2005

Conference, Chennai, India, 521-525, Dec.

[CHI 96] Chilaliand M., Gahinet P., (1996), “H∞ design with pole placement

constraints: An LMI approach”, IEEE Trans. automa. Control,, vol. 41,

358–367, Mar.

[CHO 98] Chown G.A., and Hartman R.C., (1998), “Design and Experience with a

fuzzy logic controller for automatic generation control”, IEEE Transactions

on power system, vol. 13(3), 965-970.

[CIM 00] Cimen H., (2000), “Decentralized H∞ Load Frequency Controller Design

Based on SSVs”, TJEE, vol. 8(1), 43-53.

Page 5: References - INFLIBNETshodhganga.inflibnet.ac.in/bitstream/10603/17896/17/17_referrances... · 310 References [ABD 02] Abdennour A., (2002), “Adaptive Optimal Gain Scheduling for

314

[CLE 02] Clerc M.,and Kennedy J., (2002) “The particle swarm explosion, stability,

and convergence in a multidimensional complex space”, IEEE Trans.

Evolutionary Computation, vol. 6(1), 58-73, Feb.

[CLE 99] Clerc M., (1999), “The swarm and the queen: towards a deterministic and

adaptive particle swarm optimization”, Proceedings of the 1999 Congress on

Evolutionary Computation, 1999, vol. 3, 1951-1957, 6-9 July.

[COH 57] Cohn N., (1957), “Some aspects of tie-line bias control on interconnected

power systems”, Amer. Inst. Elect. Eng. Trans., vol. 75, 1415 –1436, Feb.

[CON 54] Concordia C., and Krichmayer L.K., (1954), “Tie-line power and frequency

control of electric power systems-part II”, AIEE Transactions, 133-146,

April.

[COO 01] Coodoon F.H., Hofhann F., and Magdalena L., (2001), “Genetic fuzzy

systems: evolutionary tuning and learning of fuzzy knowledge bases”,

Advances in Fuzzy Systems-Applications and Theory, World Scientific, vol.

19, Feb.

[DAN 10] Daneshfar F., H. Bevrani, (2010), “Load frequency control: A GA based

multi-agent reinforcement learning”, IET J. of Generation, Transmission &

Distribution., Vol.4(1), 13–26, Jan.

[DAS 03] Das D., and Aditya S.K., (2003), “Design of load frequency controllers

using genetic algorithm for two area interconnected hydropower system”,

Elect. Power Compon. Syst., 31(1), 81–94, Jan.

[DAS 11] Das D.C., Roy A. K., Sinha N., (2011), “PSO optimized frequency

controller for wind- solar thermal-diesel hybrid energy generation system: a

study”, International Journal of Wisdom Based Computing, Vol. 1(3), 128,

December,.

Page 6: References - INFLIBNETshodhganga.inflibnet.ac.in/bitstream/10603/17896/17/17_referrances... · 310 References [ABD 02] Abdennour A., (2002), “Adaptive Optimal Gain Scheduling for

315

[DAS 91] Das D., Kothari M.L., Kothari D.P., and Nanda J., (1991), “Variable

structure control strategy to automatic generation control of interconnected

reheat thermal systems”, Proc. Inst. Elect. Eng. Contr. Theory, vol. 138(6),

579-585, Nov.

[DEM 01] Demiroren A., Sengor N.S., and Zeynelgil H.L., (2001), “Automatic

generation control by using ANN technique”, Elect. Power Compon. Syst.,

vol. 29(10), 883–896, Oct.

[DEM 72] Demello F.P., Mills R.J., Brells W.F., (1972), “Automatic Generation

Control Part I - Process Modeling”, IEEE PES Summer Meeting, San

Francisco, Calif., 710-715, July.

[DO 99] Do V. Q., Soumagne J.-C., Sybille G., Turmel G., Giroux P., Cloutier G.,

and Poulin S., (1999), “Hypersim, an Integrated Real-Time Simulator for

Power Networks and Control Systems”, ICDS’99, Vasteras, Sweden, 1-6,

may.

[DON 10] Dong L., Zhang Y., (2010), “On Design of a Robust Load Frequency

Controller for Interconnected Power Systems”, 2010 American Control

Conference, Baltimore, 1731-1736, June-July.

[DOR 08] Dorigo M., Montes de O.M.A., and Engelbrecht A., (2008), “Particle swarm

optimization”, Scholarpedia, vol. 3(11):1486, 1-4.

[DU 06] Du X., and Li P., (2006), “Fuzzy Logic Control Optimal Realization Using

GA for Multi-Area AGC Systems”, International Journal of Information

Technology, vol. 12 (7).

[EBE 01] Eberhart R.C., and Shi Y., (2001), “Particle swarm optimization:

Developments, Applications and Resources”, Proceedings of the 2001

Congress on Evolutionary Computation, vol. 1, 81-86, 27-30 May.

Page 7: References - INFLIBNETshodhganga.inflibnet.ac.in/bitstream/10603/17896/17/17_referrances... · 310 References [ABD 02] Abdennour A., (2002), “Adaptive Optimal Gain Scheduling for

316

[EI 08] El-Metwally K.A., (2008), “An Adaptive Fuzzy Logic Controller for a Two

Area Load Frequency Control Problem”, IEEE conf, 300-306, March.

[FOS 70] Fosha C. E., and Elgerd O.I., (1970), “The megawatt-frequency control

problem: a new approach via optimal control theory”, IEEE Trans. PAS-89,

563-577.

[GAH 94] Gahinet P., (1994), “Explicit controller formulas for LMI-based H∞

synthesis”, Amer. Cont. Conf., vol.3, 2396–2400, Jun.

[GAN 10] Ganapathy S., and Velusami S., (2010), “MOEA based Design of

Decentralized Load-Frequency Controllers for Interconnected Power

Systems with AC-DC Parallel Tie-lines and Considering Nonlinearities”,

International Journal of Computer Applications, vol. 1(8), 32-37.

[GAU 10] Gautam S.K., Goyal K., (2010), “Improved Particle Swarm Optimization

Based Load Frequency Control in A Single Area Power System”, Annual

IEEE India Conference (INDICON), 978-981.

[GEG 95] Gegov A.E., and Frank P.M., (1995), “Decomposition of multivariable

systems for distributed fuzzy control [power system load frequency

control]”, Fuzzy Sets Syst., vol. 73(3), 329–340, Aug.

[GHO 03] Ghoshal S.P., and Goswami S., (2003), “Application of GA based Optimal

Integral Gains in Fuzzy Based Active Power-Frequency Control of Non-

Reheat and Reheat Thermal Generating Systems”, Electric Power Systems

Research, vol. 67, 79-88, Mar.

[GHO 04] Ghoshal S.P., (2004), “Application of GA/GA-SA based fuzzy automatic

generation control of a multi-area thermal generating system”, Elect. Power

Syst. Res., vol. 70(2), 115–127, Jul.

[GOL 89] Goldberg D.E., (1989), “Genetic algorithms in search optimization and

machine learning”, Addison–Wesley, 2nd

edition.

Page 8: References - INFLIBNETshodhganga.inflibnet.ac.in/bitstream/10603/17896/17/17_referrances... · 310 References [ABD 02] Abdennour A., (2002), “Adaptive Optimal Gain Scheduling for

317

[GOL 90] Goldberg, D.E., (1990), “Real-Coded Genetic Algorithms, Virtual

Alphabets, and Blocking”, University of Illinois at Urbana-Champaign,

Technical Report No. 90001, Sep.

[GOZ 08] Gozde H., Taplamacioglu M. C., Kocaarslan I., Cam E., (2008), “Particle

Swarm Optimization Based Load Frequency Control in a Single Area Power

System”, UPECSB, vol. 2(8).

[GOZ 09] Gozde H., Taplamaclu M.C., Kocaarslan I., (2009), “A Swarm Optimization

Based Load Frequency Control Application in a Two Area Thermal Power

System”, ELECO, Busra, 124-128, Nov.

[GRE 96] Green R.K., (1996), “Transformed automatic generation control”, IEEE

Trans. Power Sys., vol. 11(4), 1799-1804, Nov.

[GUA 07] Guangyou Y., (2007), “A Modified Particle Swarm Optimizer Algorithm”,

8th International Conference on Electronic Measurement and Instruments,

2675 - 2679.

[HA 98] Ha Q.P., (1998), “A fuzzy sliding mode controller for power system load

frequency control”, In Proc. second international conference on knowledge

based intelligent electronic systems, 149-154.

[HAD 90] Hadipriono F. C. and Sun K., (1990), “Angular fuzzy set models for

linguistic values”, Civil Engineering and Environmental Systems, vol. 7:3,

148–156.

[HAN 02] Hang C.F., and Lu C.F., (2002), “Power system load frequency control with

fuzzy gain scheduling designed by new genetic algorithms’’, Proc. of IEEE

Int. Conf. on Fuzzy systems, Hawaiian, USA, 64-68, May.

[HAS 12] Hasan N., Ibraheem, Farooq S., (2012), “Real Time Simulation of

Automatic Generation Control for Interconnected Power System,”

Page 9: References - INFLIBNETshodhganga.inflibnet.ac.in/bitstream/10603/17896/17/17_referrances... · 310 References [ABD 02] Abdennour A., (2002), “Adaptive Optimal Gain Scheduling for

318

International Journal on Electrical Engineering and Informatics, vol. 4 (1),

March.

[HIS 06] Hsin-Chuan K., Jiang-Ren C., and Ching-Hsiang L., (2006), “Particle

Swarm Optimization for Global Optimization Problems”, Journal of Marine

Science and Technology, vol. 14 (3), 170-181.

[HO 05] Ho L.S., Shiyou Y., Guangzheng N., Edward W.C.L., and Wong H.C.,

(2005), “A Particle Swarm Optimization- Based Method for Multi-objective

Design Optimizations”, IEEE Transactions on Magnetics, vol. 41(5), 1756-

1759, May.

[HOL 08] Hollman J. A. and Marti J. R., (2008), "Real Time Network Simulation with

PC-Cluster", IEEE Trans. Power Systems, vol. 18(2), pp. 563-569.

[HOL 75] Holland J., (1975), “Adaptation in natural and artificial systems”, 2nd

edition, Univ. Michigan Press.

[IBR 06] Ibraheem, and Kumar P., et al., (2006), “Overview of power system

operation and control philosophies”, International Journal of Power and

energy System, vol. 26(1), 203-214.

[IBR 04] Ibraheem, and Kumar P., (2004), “Study of dynamic performance of power

system with asynchronous tie line considering parameter uncertainties”,

IE(I) Journal-EL, vol. 85, 35-42.

[IBR 05] Ibraheem, Kumar P., and Kothari D.P., (2005), “Recent philosophies of

automatic generation control strategies in power systems”, IEEE

Transactions on Power Systems, vol. 20(1), 346-357, Feb.

[IBR 09] Ibraheem, Singh O., and Hasan N., (2005), “Genetic algorithm based

scheme for optimization of AGC gains of interconnected power system”,

Journal of Theoretical and Applied Information Technology, 33-39.

Page 10: References - INFLIBNETshodhganga.inflibnet.ac.in/bitstream/10603/17896/17/17_referrances... · 310 References [ABD 02] Abdennour A., (2002), “Adaptive Optimal Gain Scheduling for

319

[IEEE 92] IEEE PES Working Group, (1992), “Hydraulic turbine and turbine control

models for system dynamic”, IEEE Trans. Power Syst., vol. PWRS-7, no.1,

167–174, Feb.

[IND 95] Indulkar C.S., and Raj B., (1995), “Application of fuzzy controller to

automatic generation control”, Elect. Machines Power Syst., vol. 23(2),

209–220, Mar.–Apr.

[ISH 01] ISHI T., SHIRAI G., FUJITA G., (2001), “Decentralized load frequency

based on H∞ control”, Electr. Eng. Journal, vol. 3(136), 28–38.

[ISM 12] Ismail M.M., and Hassan M.A.M., (2012), “Load Frequency Control

Adaptation Using Artificial Intelligent Techniques for One and Two

Different Areas Power System”, International journal of control,

automation and systems, vol. 1(1), Jan.

[ISM 92] Ismail A., (1992), “Robust load frequency control”, Proc. IEEE Conf.

Contr. A, 2, New York, Dayton, OH, 634–5, Sep.

[JAL 92] Jaleeli N., Vanslyck L.S., Ewart D.N., Fink L.H., and Hoffman A.G.,

(1992), “Understanding automatic generation control”, PAS-7(3), 1106-

1122, Aug.

[JAY 11] Jayanthi R., Chidambaram I.A., (2011), “Decentralized controller gain

scheduling using PSO for power system restoration assessment of an

interconnected power system with SMES unit”, IJRRCS, vol. 2(2), 389-396,

April.

[JAY 12] Jayanthi R ., Chidambaram I.A., (2012), “Power System Restoration Index

for Load Frequency Control Assessment Using Artificial Bee Colony

Algorithm in a Two-Area Reheat Interconnected Power System Coordinated

with SMES Units”, International Journal of Soft Computing and

Engineering (IJSCE), vol. 1(6), January.

Page 11: References - INFLIBNETshodhganga.inflibnet.ac.in/bitstream/10603/17896/17/17_referrances... · 310 References [ABD 02] Abdennour A., (2002), “Adaptive Optimal Gain Scheduling for

320

[JHO 96] Jhou K., Doyle J.C, and Glover K., (1996), “Robust and Optimal Control”,

Englewood Cliffs, Prentice-Hall, 1st edition.

[JUA 02] Juang C.F., and Lu C.F., (2002), “Power system load frequency control with

fuzzy gain scheduling designed by new genetic algorithms”, Proc. of the

IEEE Int. Conf. on Fuzzy Sys., vol. 1, 64-68.

[JUA 04] Juang C.F., (2004), “A hybrid of genetic algorithm and particle swarm

optimization for recurrent network design”, IEEE Trans. Syst., vol. 34(2),

997–1006, Nov.

[JUA 06] Juang C.F., and Lu C.F., (2006), “Load-frequency control by hybrid

evolutionary fuzzy PI controller”, IEE Proc.-Generation Transmission

Distribution, vol. 153(2), 196-204, March.

[KAK 09] Kakilli A., Oguz Y., Calik H., (2009), “The Modeling of Electric Power

Systems on the State Space and Controlling of Optimal LQR Load

Frequency”, Journal of Electrical & Electronics Engineering, vol. 9 (2),

977-982.

[KAN 05] Kanchanaharuthai A. and Ngamsom P.,(2005), “Robust H∞ Load-

Frequency Control for Interconnected Power Systems with D -Stability

Constraints via LMI Approach”, American Control Conference, 8-10, June,

Portland, 4387-4392.

[KAR 02] Karnavas Y. L., and Papadopoulos D.P., (2002), “AGC for autonomous

power system using combined intelligent techniques”, Elect. Power Syst.

Res., vol. 62(3), 225-239, Jul.

[KAZ 02] Kazemim H., Karrari M., Menhajm B., (2002), “Decentralized robust

adaptive-output feedback controller for power system load frequency

control”, Electr. Eng. J., vol. 84, 75–83.

Page 12: References - INFLIBNETshodhganga.inflibnet.ac.in/bitstream/10603/17896/17/17_referrances... · 310 References [ABD 02] Abdennour A., (2002), “Adaptive Optimal Gain Scheduling for

321

[KEN 95] Kennedy J., and Eberhart R., (1995), “Particle swarm optimization”, Proc.

of IEEE Int. Conf. on Neural Networks, Perth, Australia, 1942-1948, Dec.

[KEN 97] Kennedy J., (1997), “The particle swarm: social adaptation of knowledge”,

Proc. IEEE Int. Conf. Evolutionary Computation, 303–308, April.

[KO 08] Ko H.S., Jatskevich J., Dumont G., and Yoon G. G., (2008), “An advanced

LMI-based-LQR design for voltage control of grid-connected wind farm”,

Electric Power Systems Research, vol. 78(4), 539–546, April.

[KOK 08] Kok S., and Snyman J.A., (2008), “A Strongly Interacting Dynamic Particle

Swarm Optimization Method”, Journal of Artificial Evolution and

Applications, vol. 9, 134-139.

[KRI 02] Krink T., and Lovberd M., (2002), “The life cycle model: combining

particle swarm optimization, genetic algorithm and hill climbers”, Proc.

Parallel Problem Solving from Nature, Granada, Sprain, 115-119, Sept.

[KUF 95] Kuffel R., Giesbrecht J., Maguire T., Wierckx R. P., and McLaren P.,

(1995), "RTDS – a fully digital power system simulator operating in

real time", First International Conference on Digital Power System

Simulators (ICDS '95), College Station, Texas, U.S.A., 19-24, April.

[KUM 96] Kumar P., and Ibraheem, (1996) “AGC strategies: A comprehensive

review”, Int.J. Power Energy Syst., vol. 16(1), 371–376.

[KUM 98] Kumar P., and Ibraheem, (1998), “Dynamic performance evaluation of 2-

area interconnected power systems: A comparative study”, J. Inst. Eng., vol.

78, 199–208.

[KUN 04] Kundur P., (2004), “Power system stability and control”, TMH Publication.

Page 13: References - INFLIBNETshodhganga.inflibnet.ac.in/bitstream/10603/17896/17/17_referrances... · 310 References [ABD 02] Abdennour A., (2002), “Adaptive Optimal Gain Scheduling for

322

[KWA 75] Kwatny H.G., Kalnitsky K.C. and Bhatt A., (1975), “An optimal tracking

approach to load frequency control”, IEEE Trans. Power and Syst., PAS-94,

no.5, 1635–1643, Sep/Oct.

[LEE 91] Lee K. A., Yee H., and Teo C. Y., (1991), “Self-tuning algorithm for

automatic generation control in an interconnected power system”, vol.

20(2), 157 –165, Feb.

[LIA 93] Liawc. M., and Chaok. H., (1993), “On the design of an optimal automatic

generation controller for interconnected power systems”, Int. J. Control, 58,

113–127.

[LIA 94] Liaw C. M., (1994), “Design of a reduced-order adaptive LFC for an

interconnected hydrothermal power system,” Int. J. Contr., vol. 60(6),

1051–1063, Dec.

[LIM 96] LIMK. Y., WANG Y., ZHOU R., (1996), “Robust decentralized load

frequency control of multi-area power systems”, IEE Proc. Gener. Transm.

Distrib., vol. 5(143), 377–386.

[LIP 03] Liping Z., Huanjun Y., Shangxu H., (2003), “A New Approach to Improve

Particle Swarm Optimization”, Genetic and Evolutionary Computational

Conference, 134–139.

[MA 06] Ma F., and Chen X., (2006), “Application of varying population size particle

swarm optimization algorithm to AGC of power systems”, Proc. of the 6th

World Cong. On Intelligent Control and Automation, Dalian, China, 21-23,

June.

[MAK 05] Makarov Y. V., Reshetov V. I., and Stroev V. A., et al., (2005), “Blackout

prevention in the United States, Europe and Russia”, Proc. IEEE, vol.

93(11), 1942–1955.

Page 14: References - INFLIBNETshodhganga.inflibnet.ac.in/bitstream/10603/17896/17/17_referrances... · 310 References [ABD 02] Abdennour A., (2002), “Adaptive Optimal Gain Scheduling for

323

[MAN 10] Mandour M.E., Ali, E.S., Lotfy M.E., (2010), “Modern Electric Power

Systems (MEPS)”, Proc. of the International Symposium, Wroclaw, 1-6

Sept.

[MAT 02] Matsuhita S., Yukita K., Goto Y., Ichiyangi K., Aoki S., and Mizutani Y.,

(2002), “Automatic generation control using GA considering distributed

generation”, Trans. and Distr. Conf. and Exhibition2002:Asia Pacific, vol.

3, 1579-1583, Oct.

[MAT 06] Mathur H. D., and Manjunath H.V., (2006), “A fuzzy based improved

intelligent controller for automatic generation control”, International

Journal of Engineering Simulation, vol. 7(3), 29-35.

[MAT 07] Mathur, H.D., and Manjunath, H.V., (2007), “Study of dynamic

performance of thermal units with asynchronous tie-lines using fuzzy based

controller”, J. Electrical System, 124-130.

[MAT 10] Matar M. and Iravani R., (2010), "FPGA Implementation of the Power

Electronic Converter Model for Real-Time Simulation of

Electromagnetic Transients", IEEE Transactions on Power Delivery, vol.

25(2), 852-860, April.

[MEN 03] Meng X., Gong X., Feng X., Zheng X., and Zhang W., (2003), “ PI fuzzy

sliding mode load frequency control of multi-area interconnected power

systems”, Proc. of the 2003 IEEE International Symposium on Intelligent

Control, Houston, Texas, 5-8, Oct.

[MIC 92] Michalewicz Z., (1992), “Genetic Algorithms+Data Structures = Evolution

Programs”, 1st edition, Springer- Verlag, Berlin Heidelberg New York.

[MIL 71] Milan C., (1971), “Linear regulator design for a load and frequency

control”, IEEE Transactions on Power Apparatus and Systems, PAS-91(6),

2271-2285, November.

Page 15: References - INFLIBNETshodhganga.inflibnet.ac.in/bitstream/10603/17896/17/17_referrances... · 310 References [ABD 02] Abdennour A., (2002), “Adaptive Optimal Gain Scheduling for

324

[MOM 08] Momoh A.J., (2008), “Electric power system applications of optimization”,

2nd edition, Dekker Publication, USA.

[MOO 01] Moon,Y.H., Heon-Su R., Baik K., Park S.C., (2001), “Fuzzy logic based

extended integral control for load frequency control”, Proceeding of IEEE

winter meeting, vol.1, 1289-1293, May.

[MOO 72] Moorthi V.R., and Agarawal R.P., (1972), “Suboptimal and near optimal

control of a load frequency control system,” Proc. Inst. Elect. Eng., vol.119,

1653–1660, Nov.

[NAG 05] Nagrath I.J., and Kothari D.P., (2005), “Power System Engineering”, 2nd

edition, TMH Publication.

[NAK 03] Naka S., Genji T., Yuru T., and Fukuyama Y., (2003), “A hybrid particle

swarm optimization for distribution state estimation”, IEEE Trans. on

Power Systems, vol. 18, 60-68, Feb.

[NAN 04] Nanda J., and Mangla A., (2004), “Automatic generation control of an

interconnected hydro-thermal system using conventional integral and fuzzy

logic controller”, IEEE International Conference on Electric Utility

Deregulation, Restructuring and Power Technologies, 372-377.

[NAN 09] Nanda J., Mishra S., Saikia L.C., (2009), “Maiden Application of Bacterial

Foraging-Based Optimization Technique in Multiarea Automatic Generation

Control”, IEEE Trans. on Power Sys., vol. 24(2), MAY.

[NAN 78] Nanda J., and Kaul B.L., (1978), “Automatic generation control of an

interconnected power system”, IEE Proc., vol. 125(5), 385-390, May.

[NAS 92] Nasser J., Louis S. V., Donald N. E., Lester H. F., and Arthur G. H., (1992),

“Understanding automatic generation control: the agc task force”, IEEE

Transactions on Power Systems, vol. 7(3), 1106-1122, August.

Page 16: References - INFLIBNETshodhganga.inflibnet.ac.in/bitstream/10603/17896/17/17_referrances... · 310 References [ABD 02] Abdennour A., (2002), “Adaptive Optimal Gain Scheduling for

325

[NIK 10] Nikzad M., Hemmati R., Farahani S.S.S.A.and Mojtaba S., Boroujeni S.,

(2010), “Comparison of Artificial Intelligence Methods for Load Frequency

Control Problem”, Australian Journal of Basic and Applied Sciences, vol.

4(10): 4910-4921.

[NIK 11] Nikzad M., Farahani S.S.S., Naraghi M.G., Tabar M.B., and Javadian A.,

(2011), “Comparison of meta heuristic optimization methods in load

frequency control”, Indian Journal of Science and Technology, Vol. 4 (7),

July.

[OGA 02] Ogata K., (2002), “Modern control engineering”, 2nd

edition, PHI

Publication.

[OMA 07] Omari B.S.A., and Hinai A.S.A., (2007), “Design of PID-Swarm Load

Frequency Controller of Interconnected Power System”, International

Conference on Communication, Computer & Power (ICCCP’07) Muscat,

February 19-21.

[ORT 95] Ortmeyer T.H., and Hiyama T., (1995), “Frequency response characteristics

of the fuzzy polar power system stabilizer”, IEEE Transactions on Energy

Conversion, vol. 10(2), June.

[OYS 05] Oysal Y., Yilmaz A.S., and Koklukaya E., (2005), “Adaptive Load

Frequency Control with Dynamic Fuzzy Networks in Power Systems”,

IWANN, LNCS 3512, 1108-1115.

[OZK 10] Ozkop E, Altas I.H., Sharaf A.M., (2010), “Load Frequency Control in Four

Area Power Systems Using Fuzzy Logic PI Controller” , 16th National

Power Systems Conference, 15-17 Dec.

[PAD 08] Padhy B. P., and Tyagi B., (2008), “Tuning of PID Controller Used In Agc

Scheme with Genetic Algorithms”, XXXII national systems conference,

Dec.17-19, 2008.

Page 17: References - INFLIBNETshodhganga.inflibnet.ac.in/bitstream/10603/17896/17/17_referrances... · 310 References [ABD 02] Abdennour A., (2002), “Adaptive Optimal Gain Scheduling for

326

[PAN 10] Panda G., Panda S. and Ardil C., (2010), “Automatic Generation Control of

Multi-Area Electric Energy Systems Using Modified GA”, International

Journal of Electrical and Electronics Engineering, vol. 4(6).

[PAN 89] Pan C.T., and Liaw C.M., (1989), “An adaptive controller for power system

and load frequency control”, IEEE Trans. Power Syst., vol. 4(1), 122–128,

Feb.

[PAR 11] Paramasivam B., and Chidambaram I.A., (2011), “Design of Load-

frequency Controller using Artificial Bee Colony Algorithm for an

Interconnected Power System Coordinated with UPFC and RFB”,

International Journal of Computer Applications, Vol. 36(5), December.

[PAT 90] Patil D.R., (1990), “Two area load frequency control with fuzzy gain

scheduling of PI controller, parts 1 and 2”, IEEE Trans. Syst., Man Cybern,

vol. 20(2).

[POT 06] Pothiya S., Ngamroo I., Runggeratigul S., and Tantaswadi P., (2006),

“Design of Optimal Fuzzy Logic based PI Controller using Multiple Tabu

Search Algorithm for Load Frequency Control”, International Journal of

Control Automation and Systems, vol. 4(2), 155-164, April.

[PRA 08] Prasanth B. V., Kumar S. V. J., (2008), “Load frequency control for a two

area interconnected power system using robust genetic algorithm

controller”, Journal of Theoretical and Applied Information Technology,

1204-1212.

[PRA 09] Prakash S., Sinha S.K., Pandey A.S., and Singh B., (2009), “Impact of slider

gain on load frequency control using fuzzy logic controller”, ARPN Journal

of Engineering and Applied Sciences, vol. 4(7), September.

Page 18: References - INFLIBNETshodhganga.inflibnet.ac.in/bitstream/10603/17896/17/17_referrances... · 310 References [ABD 02] Abdennour A., (2002), “Adaptive Optimal Gain Scheduling for

327

[QI 06] Qi K., Lei W., and Wu Q., (2006), “Research on Fuzzy Adaptive

Optimization Strategy of Particle Swarm Algorithm”, International Journal

of Information Technology, vol. 12(3), 65-77.

[QUA 77] Quazza G., (1977), “Large scale control problems in electric power

systems”, Automatica, vol. 13(6), 579–593, Nov.

[RAD 92] Radcliffe N.J., (1992), “Non-Linear Genetic Representations. Parallel

Problem Solving from Nature”, R.M Anner and B. Manderick (Ed.)

(Elsevier Science Publishers, Amsterdam), 259–268.

[RAH 98] Rahi M. H., and Feliachi A., (1998), “H∞ robust decentralized controller for

nonlinear power systems”, Proc. 30th

South eastern Symp. Syst. Theory,

268–270, Mar.

[RAM 06] Ramanathan R.M., Pogo Linux. [Online]. Ramnathan

http://www.pogolinux.com/learn/files/quad-core-06.pdf.

[RAM 10] Ramesh S., and Krishnan A., (2010), “Fuzzy rule based load frequency

control in a parallel ac – dc interconnected power systems through HVDC

link”, International Journal of Computer Applications, vol. 1(4), 78-87, Oct.

[RAN 04] Rania H., and Cohanim B., (2004), “A Comparison of Particle Swarm

Optimization and the Genetic Algorithm”, American Institute of

Aeronautics and Astronautics, 1-13.

[RAY 01] Ray G. and Rani C. S., (2001), “Stabilizing decentralized robust controllers

of interconnected uncertain power systems based on the Heisenberg form:

Simulated results”, Int. J. Syst. Sci., vol. 32(3), 387 –399.

[RAY 09] Ray G., Prasad A.N., and Prasad G.D., (2009), “A new approach to the

design of robust load-frequency controller for large scale power systems”,

Journal of Electrical & Electronics Engineering, vol. 9 (2), 977-982.

Page 19: References - INFLIBNETshodhganga.inflibnet.ac.in/bitstream/10603/17896/17/17_referrances... · 310 References [ABD 02] Abdennour A., (2002), “Adaptive Optimal Gain Scheduling for

328

[RER 03] Rerkpreedapong D., Hasanovic A., and Feliachi A., (2003), “Robust Load

Frequency Control Using Genetic Algorithms and Linear Matrix

Inequalities”, IEEE Transactions on Power Systems, vol. 18(2), 855-861,

May.

[ROS 67] Ross C. W., (1967), “A comprehensive direct digital load frequency

controller”, Proc. IEEE PICA Conf. , Pittsburgh, PA, 231 –238.

[ROY 06] Roy R., and Ghoshal S.P., (2006), “Evolutionary Computation Based

Optimization in Fuzzy Automatic Generation Control”, IEEE Trans. on

Power Systems, vol. 8, 61-68, May.

[RUB 94] Rubaai A., and Udo V., (1994), “Self-tuning LFC: Multilevel adaptive

approach”, Proc. Inst. Elect. Eng. Generation, Transmission, Distrib., vol.

141(4), 285–290, Jul.

[SAB 07] Sabahi K., Teshnehlab M., Aliyari M., and Mansouri M., (2007), “Load

Frequency Control in Interconnected Power System Using Modified

Dynamic Neural Networks”, Fifteenth Mediterranean conference on control

and automation, Greece 27-29, July.

[SAB 08] Sabhi K., Sharifi A., Aliyari M., Teshnhlab, and Aliasghary M., (2008),

“Load frequency control in interconnected power system using multi-

objective PID controller”, Journal of Applied Science, 3676-3682.

[SAK 11] Sakhavati A., Gharehpetian G.B., Hosseini S.H., (2011), Decentralized

robust load-frequency control of power system based on quantitative

feedback theory”, Turk J Elec Eng & Comp Sci,, vol. 19(4), 513-530.

[SAN 07] Sanaye-Pasand M., (2007), “Security of the Iranian national grid”, IEEE

Power Energy Mag., vol. 5(1), 31–39, 2007.

[SAR 12] Sarma E.A.S., (2012), “It’s lights out for India”, The Times of India,

Bennet, Coleman and Co. Ltd Rep., 2 Aug. 2012.

Page 20: References - INFLIBNETshodhganga.inflibnet.ac.in/bitstream/10603/17896/17/17_referrances... · 310 References [ABD 02] Abdennour A., (2002), “Adaptive Optimal Gain Scheduling for

329

[SCH 96] Schulte R.P., (1996), “An automatic generation control modifications for

present Demands on interconnected power systems”, IEEE Trans. Power

Syst., vol. 11(3), 1286–1294, Aug.

[SHA 09] Shayeghi H., Shayanfar H.A., Jalili A., (2009), “LFC Design of a

Deregulated Power System with TCPS Using PSO”, International Journal

of Electrical and Electronics Engineering, vol. 3(10), 632-640.

[SHA 12] Shankar R.et al., (2012), “Facts based controller for interconnected

hydrothermal power system”, International Journal of Engineering Science

and Technology, vol.4 (4), 1776-1786.

[SHE 84] Sheirah M.A., and Abid-Ei-Fattah M.M., (1984), “Improved load frequency

self-tuning regulator”, Int. J. Contr., vol. 39(1), 143–158, Jan.

[SHI 98] Shi Y., and Eberhart, R., (1998), “A modified particle swarm optimizer”,

Proceedings for IEEE International Conference on Evolutionary

Computation, 69 – 73, 4-9 May.

[SHO 93] Shoultsand R.R., Ibarra J.A.J., (1993), “Multi area adaptive LFC developed

for a comprehensive AGC simulator”, IEEE Trans. Power A Syst., vol.8(2),

541–547,Mar.

[SID 07] Sidhartha P., Padhy N. P., (2007), “Comparison of Particle Swarm

Optimization and Genetic Algorithm for TCSC-based Controller Design”,

International Journal of Computer Science and Engineering, vol. 1, 41-49.

[SIJ 02] Sijak T., Kuljaca O., Kuljaca L., and S. Tesnjak, (2002), “Design of fuzzy

regulator for power system secondary load frequency control”, Proc. of the

10th Med. Conf. on Control and Automation- MED2002, Lisbon, Portugal,

July.

[SOH 12] Soheilirad M.S., Ghasab M.A.J., Sefidgar S., Saberian A., (2012), Tuning of

PID Controller for Multi Area Load Frequency Control by Using Imperialist

Page 21: References - INFLIBNETshodhganga.inflibnet.ac.in/bitstream/10603/17896/17/17_referrances... · 310 References [ABD 02] Abdennour A., (2002), “Adaptive Optimal Gain Scheduling for

330

Competitive Algorithm”, Journal of Basic and Applied Scientific Research,

vol. 2(4), 3461-3469.

[SON 97] Song Y.H., and Johns A.T., (1997), “Application of fuzzy logic in power

systems: part 1 general introduction to fuzzy logic”, IEE Power Engineering

Journal, vol. 11(5), 219-222.

[SON 98] Song Y.H., and Johns A.T., (1998), “Application of fuzzy logic in power

systems: part 2 general introduction to fuzzy logic”, IEE power Engineering

Journal, vol. 12(4), 185-190.

[SOU 10] Soundarrajan A., Sumathi S., Sundar C.; (2010), “Particle Swarm

Optimization Based LFC and AVR of Autonomous Power Generating

System”, International Journal of Computer Science, vol. 37 (1), 55-63.

[SU 08] Su H. T., Chan K. W., and Snider L. A., (2008), "Hybrid Simulation of

Large Electrical Networks with Asymmetrical Fault Modeling",

International Journal of Modeling and Simulation, vol. 28(2), 55-60.

[SUN 11] Sundaram V.S., and Jayabarathi T., (2011), “A novel approach of load

frequency control in multi area power system”, International Journal of

Engineering Science and Technology, vol. 3(3), 2494-2506, Mar.

[SWA 08] Swagatam D., Ajith A., and Amit K., (2008), “Particle Swarm Optimization

and Differential Evolution Algorithms: Technical Analysis, Applications

and Hybridization Perspectives”, Computational Intelligence (SCI), vol.

116, 1–38.

[TAH 08] Taher S. A., Hematti R., Abdolalipour A., and Tabei S. H., (2008), “Optimal

Decentralized Load Frequency Control Using HPSO Algorithms in

Deregulated Power System”, American Journal of Applied Sciences, vol.

5(9), 1167-1174.

Page 22: References - INFLIBNETshodhganga.inflibnet.ac.in/bitstream/10603/17896/17/17_referrances... · 310 References [ABD 02] Abdennour A., (2002), “Adaptive Optimal Gain Scheduling for

331

[TAL 99] Talaq J., and Al-Basri F., (1999), “Adaptive fuzzy gain scheduling for load-

frequency control”, IEEE Trans. Power Syst., vol. 14(1), 145–150, Feb.

[TRA 04] Trabelsi A., Lafon T.F., Kamoun M., Enea G., (2004), “Identification of

nonlinear multivariable systems by adaptive fuzzy Takagi-Sugeno model”,

International Journal of Computational Cognition, vol. 2(3), 137–153, Sep.

[TRI 84] Tripathy S.C., Bhatti T.S., Jha C.S., Malik O.P., and Hope G.S., (1984),

“Sampled data automatic generation control analysis with reheat steam

turbines and governor dead band effects”, IEEE Trans. Power A Syst., vol.

PAS-103, no. 5, 1045–1051, May.

[TSA 04] Tsai, Jinn-Tsong, Liu, Tung-Kuan, Chou, and Jyh-Horng, (2004), “Hybrid

Taguchi-Genetic Algorithm for Global Numerical Optimization”, IEEE

Trans. on Evolutionary Computation, vol. 8(4), 365-377, August.

[UCT 04] UCTE, Final report of the investigation committee on the 28 September

2003 blackout in Italy, Available online at http://www.ucte.org, 2004.

[UMR 10] Umrao R., and Chaturvedi D.K., (2010), “Load Frequency Control using

Polar Fuzzy Controller”, IEEE conference, TENCON, Fukuoka, Japan,

557-562, 21-24 November.

[VAJ 85] Vajk I., Vajta M., and Keviczky L., (1985), “Adaptive load frequency

controlof Hungarian power system,” Automatica, vol. 21, no. 2, 129 –137.

[VAL 04] Vladimiro M., and Fonseca N., (2004), “EPSO - Evolutionary Particle

Swarm Optimization, a New Algorithm with Applications in Power

Systems”, 1-6.

[VIN 98] Vinod Kumar D.M., (1998), “Intelligent controllers for automatic generation

control”, In Proc. 1998 IEEE region 10 International Conference on Global

connectivity in Energy, Computer, Communication and Control, 557-574.

Page 23: References - INFLIBNETshodhganga.inflibnet.ac.in/bitstream/10603/17896/17/17_referrances... · 310 References [ABD 02] Abdennour A., (2002), “Adaptive Optimal Gain Scheduling for

332

[VRD 10] Vrdoljak K., Peric N., Petrovic I., (2010), “Sliding mode based load-

frequency control in power systems”, Electric Power Systems Research, vol.

80, 514–527.

[WAN 93] Wang Y., Zhou R., and Wen C., (1993) “Robust load-frequency controller

design for power systems”, Proc. Inst. Elect. Eng. C, vol. 140(1), 111–116,

Jan.

[WOO 96] Wood A. J., and Wollenberg B. F., (1996), “Power Generation, Operation,

and Control”, 2nd edition, Wiley, New York.

[XIU 06] XIUXIA D., PINGKANG L., (2006), “Fuzzy logic control optimal

realization using GA for multi-area AGC systems”, Int. J. Inf. Technol., vol.

12(7), 63–72.

[YAM 89] Yamashita K. and Miyagi H., (1989), “Load-frequency self-tuning regulator

for interconnected power systems with unknown deterministic load

disturbances”, Int. J. Contr., vol. 49(5), 1556 –1568, May.

[YAN 02] Yang T. C., Ding Z. T., and Yu H., (2002), “Decentralized power system

load frequency control beyond the limit of diagonal dominance”, Int. J.

Elect. Power Energy Syst., vol. 24, 173 -184.

[YAN 96] Yang T. C., and Cimen H., (1996), “Applying structured singular values and

a new LQR design to robust decentralized power system load frequency

control”, ICIT, 880-884, Dec.

[YOU 00] Young-Hyun M., (2000), “Extended integral control for load frequency

control with consideration of generation-rate constrains”, Proceedings of the

IEEE PES 2000 Summer Meeting.

[ZEY 02] Zeynelgil H.L., Demiroren A., and Sengor N.S., (2002), “The application of

ANN technique to automatic generation control for multi-area power

system”, Elect. Power Energy Syst., vol. 24(5), 345–354, Jun.

Page 24: References - INFLIBNETshodhganga.inflibnet.ac.in/bitstream/10603/17896/17/17_referrances... · 310 References [ABD 02] Abdennour A., (2002), “Adaptive Optimal Gain Scheduling for

333

Appendix

Hardware Architecture of OPAL RT 5142

System diagram

Page 25: References - INFLIBNETshodhganga.inflibnet.ac.in/bitstream/10603/17896/17/17_referrances... · 310 References [ABD 02] Abdennour A., (2002), “Adaptive Optimal Gain Scheduling for

334

PCI card configuration

Page 26: References - INFLIBNETshodhganga.inflibnet.ac.in/bitstream/10603/17896/17/17_referrances... · 310 References [ABD 02] Abdennour A., (2002), “Adaptive Optimal Gain Scheduling for

335

PCI configuration