Case History Case History Case History Case History Case History Case History Case History Case History Case History Case History Case History Case History Case History Case History Case History Case History Case History Case History Case History Case History Case History Case History Case History Case History Case History Case History Case History Case History Case History Case History Case History Case History Case History Case History Case History Case History Case History Case History Case History Case History Case History Case History Case History Case History Case History Case History Case History Case History Case History Case History Case History Case History Case History Case History Case History Case History
Rm 1512-13,Grand Century Place, Tower 1, 193 Prince Edward Road West, Mongkok, Kowloon, Hong Kong SARTel: (852) 2311-1123 Fax: (852) 2723-6019 E-mail: [email protected]
TM
Reconstruction & Improvement of Tuen Mun Road, Eastern Section
Contract No.:
HY/2007/09
Application:
Fill Slope Drainage
Product:
MiraDRAIN 5000
Main Contractor:
Gammon Construction Limited
Date:
July 2009
CCW MiraDRAIN 5000, a drainage geocomposite system, has
been applied at the slope for drainage. More than 80,000m2 of
MiraDRIAN 5000 will be installed as slope drainage in this project.
By comparing the traditional granular filter, using MiraDRIAN 5000
can save a lot of time and labor cost during installation.
CCW MiraDRIAN 5000 provides an aggregate free drainage
system. Each panel consists of a uniquely molded
three-dimensional dimpled core formed out of high-impact
polystyrene. This high-strength, crush-resistant core is laminated to
filter fabric that prevents soil from entering the drainage channel
at both sides.
Seeking for thinner drainage layer is necessary in this project as
the slope area is very limited. The thickness of MiraDRIAN 5000 is
10.2mm, which can replace 300mm thick granular filter. In
addition, MiraDRIAN 5000 provide excellent water flow rate. Due to
its lightweight and ease installation, it can reduce the time of
installation.