Recent Projects
Scope of worksKangaroo Creek Dam Upgrade2 x 1m diameter MSCL pipelines constructed inside the dam wall tunnel, all platform and structural included.One line done at a time keeping flow to feed the River Torrens.ClientBardavcol / SA WaterLocationKangaroo Creek DamParacombe SAProject duration12 months
Scope of works Blackwood PRV UpgradeMSCL WorksClientFulton Hogan / SA WaterLocationBlackwood SAProject duration2 months
Scope of works Fit out of new process plantVarious hoppersAll steam and boiler line workStainless steel ductingClientAhrens GroupLocationMurray Bridge SAProject duration3 months
Scope of worksMillbrook Landslip and Pipeline Repair1m diameter MSCL fittings and pipeline workClientBardavcol / SA WaterLocationMillbrook SAProject duration1.5 months
Scope of worksAldinga WWTP Stage 2 Upgrade Stainless steel pipe spoolsClientLeed /SA water LocationAldinga SA Project duration2 months
Scope of worksNAIS MAR Headworks MSCL manifolds and Stainless steel spooling ClientLeed Valoriza Joint venture LocationTwo Wells SAProject duration2 months
Scope of worksSA water M & E Frame work Trunk main replacements ClientFulton Hogan LocationVarious sites Adelaide SAProject duration2 months
Scope of worksOrange Pipe line various size pipe and joints mainly 600mm diameter MSCLVarious welded sections for water infrastructureClientLeed Construction and EngineeringLocationOrange NSWProject duration3 months
Scope of worksGeehi river aqueduct replacement2KM’s of 2 meter diameter MSCL pipe up and down mountain access roads for water infrastructureClientLeed Construction and EngineeringLocationGeehi NSWProject duration6 months
Scope of worksADCHEM heat exchanger Project all structural steel and pipe works Tie-ins carried out during select shutdowns to not effect Plant productionClientADCHEM AustraliaLocationBurra SAProject duration2 months
Scope of worksRenmark Irrigation trust all Stainless steel infrastructure, to line up with the clients shut down, all pipe rolled in-house, 1 / 1.2 meter diameter pipe works. Various fittings. ClientExact Mining and Lams Joint VentureLocationRenmark SAProject duration2 months
Scope of worksPressure Vessel Manufacture or Modification
-Various Specification’s -Pressure testing -Welding inspection -Non Destructive testing -Welding Management -Material Data Reports
Contact Us
Plant 1 & Billing address: 91 Industry Road Eudunda SA 5374
Plant 2: 223 South terrace, Wingfield SA 5013
Phone 08 8581 1207
Mobile Matt Reimann 0431 245 670Stuart Reimann 0400 263 587
Email [email protected] [email protected]
Website www.reimannmanufacturing.com.au