Scope of worksKangaroo Creek Dam Upgrade2 x 1m diameter MSCL pipelines constructed inside the dam wall tunnel, all platform and structural included.One line done at a time keeping flow to feed the River Torrens.ClientBardavcol / SA WaterLocationKangaroo Creek DamParacombe SAProject duration12 months
![Page 3: Recent Projects rev3 - Reimann Manufacturing · 2019-06-24 · Recent Projects . Scope of works Kangaroo Creek Dam Upgrade 2 x 1m diameter MSCL pipelines constructed inside the dam](https://reader034.vdocuments.us/reader034/viewer/2022050100/5f3f77c2830ffd3252746b33/html5/thumbnails/3.jpg)
Scope of works Blackwood PRV UpgradeMSCL WorksClientFulton Hogan / SA WaterLocationBlackwood SAProject duration2 months
![Page 4: Recent Projects rev3 - Reimann Manufacturing · 2019-06-24 · Recent Projects . Scope of works Kangaroo Creek Dam Upgrade 2 x 1m diameter MSCL pipelines constructed inside the dam](https://reader034.vdocuments.us/reader034/viewer/2022050100/5f3f77c2830ffd3252746b33/html5/thumbnails/4.jpg)
Scope of works Fit out of new process plantVarious hoppersAll steam and boiler line workStainless steel ductingClientAhrens GroupLocationMurray Bridge SAProject duration3 months
![Page 5: Recent Projects rev3 - Reimann Manufacturing · 2019-06-24 · Recent Projects . Scope of works Kangaroo Creek Dam Upgrade 2 x 1m diameter MSCL pipelines constructed inside the dam](https://reader034.vdocuments.us/reader034/viewer/2022050100/5f3f77c2830ffd3252746b33/html5/thumbnails/5.jpg)
Scope of worksMillbrook Landslip and Pipeline Repair1m diameter MSCL fittings and pipeline workClientBardavcol / SA WaterLocationMillbrook SAProject duration1.5 months
![Page 6: Recent Projects rev3 - Reimann Manufacturing · 2019-06-24 · Recent Projects . Scope of works Kangaroo Creek Dam Upgrade 2 x 1m diameter MSCL pipelines constructed inside the dam](https://reader034.vdocuments.us/reader034/viewer/2022050100/5f3f77c2830ffd3252746b33/html5/thumbnails/6.jpg)
Scope of worksAldinga WWTP Stage 2 Upgrade Stainless steel pipe spoolsClientLeed /SA water LocationAldinga SA Project duration2 months
![Page 7: Recent Projects rev3 - Reimann Manufacturing · 2019-06-24 · Recent Projects . Scope of works Kangaroo Creek Dam Upgrade 2 x 1m diameter MSCL pipelines constructed inside the dam](https://reader034.vdocuments.us/reader034/viewer/2022050100/5f3f77c2830ffd3252746b33/html5/thumbnails/7.jpg)
Scope of worksNAIS MAR Headworks MSCL manifolds and Stainless steel spooling ClientLeed Valoriza Joint venture LocationTwo Wells SAProject duration2 months
![Page 8: Recent Projects rev3 - Reimann Manufacturing · 2019-06-24 · Recent Projects . Scope of works Kangaroo Creek Dam Upgrade 2 x 1m diameter MSCL pipelines constructed inside the dam](https://reader034.vdocuments.us/reader034/viewer/2022050100/5f3f77c2830ffd3252746b33/html5/thumbnails/8.jpg)
Scope of worksSA water M & E Frame work Trunk main replacements ClientFulton Hogan LocationVarious sites Adelaide SAProject duration2 months
![Page 9: Recent Projects rev3 - Reimann Manufacturing · 2019-06-24 · Recent Projects . Scope of works Kangaroo Creek Dam Upgrade 2 x 1m diameter MSCL pipelines constructed inside the dam](https://reader034.vdocuments.us/reader034/viewer/2022050100/5f3f77c2830ffd3252746b33/html5/thumbnails/9.jpg)
Scope of worksOrange Pipe line various size pipe and joints mainly 600mm diameter MSCLVarious welded sections for water infrastructureClientLeed Construction and EngineeringLocationOrange NSWProject duration3 months
![Page 10: Recent Projects rev3 - Reimann Manufacturing · 2019-06-24 · Recent Projects . Scope of works Kangaroo Creek Dam Upgrade 2 x 1m diameter MSCL pipelines constructed inside the dam](https://reader034.vdocuments.us/reader034/viewer/2022050100/5f3f77c2830ffd3252746b33/html5/thumbnails/10.jpg)
Scope of worksGeehi river aqueduct replacement2KM’s of 2 meter diameter MSCL pipe up and down mountain access roads for water infrastructureClientLeed Construction and EngineeringLocationGeehi NSWProject duration6 months
![Page 11: Recent Projects rev3 - Reimann Manufacturing · 2019-06-24 · Recent Projects . Scope of works Kangaroo Creek Dam Upgrade 2 x 1m diameter MSCL pipelines constructed inside the dam](https://reader034.vdocuments.us/reader034/viewer/2022050100/5f3f77c2830ffd3252746b33/html5/thumbnails/11.jpg)
Scope of worksADCHEM heat exchanger Project all structural steel and pipe works Tie-ins carried out during select shutdowns to not effect Plant productionClientADCHEM AustraliaLocationBurra SAProject duration2 months
![Page 12: Recent Projects rev3 - Reimann Manufacturing · 2019-06-24 · Recent Projects . Scope of works Kangaroo Creek Dam Upgrade 2 x 1m diameter MSCL pipelines constructed inside the dam](https://reader034.vdocuments.us/reader034/viewer/2022050100/5f3f77c2830ffd3252746b33/html5/thumbnails/12.jpg)
Scope of worksRenmark Irrigation trust all Stainless steel infrastructure, to line up with the clients shut down, all pipe rolled in-house, 1 / 1.2 meter diameter pipe works. Various fittings. ClientExact Mining and Lams Joint VentureLocationRenmark SAProject duration2 months
![Page 13: Recent Projects rev3 - Reimann Manufacturing · 2019-06-24 · Recent Projects . Scope of works Kangaroo Creek Dam Upgrade 2 x 1m diameter MSCL pipelines constructed inside the dam](https://reader034.vdocuments.us/reader034/viewer/2022050100/5f3f77c2830ffd3252746b33/html5/thumbnails/13.jpg)
Scope of worksPressure Vessel Manufacture or Modification
-Various Specification’s -Pressure testing -Welding inspection -Non Destructive testing -Welding Management -Material Data Reports
![Page 14: Recent Projects rev3 - Reimann Manufacturing · 2019-06-24 · Recent Projects . Scope of works Kangaroo Creek Dam Upgrade 2 x 1m diameter MSCL pipelines constructed inside the dam](https://reader034.vdocuments.us/reader034/viewer/2022050100/5f3f77c2830ffd3252746b33/html5/thumbnails/14.jpg)
![Page 15: Recent Projects rev3 - Reimann Manufacturing · 2019-06-24 · Recent Projects . Scope of works Kangaroo Creek Dam Upgrade 2 x 1m diameter MSCL pipelines constructed inside the dam](https://reader034.vdocuments.us/reader034/viewer/2022050100/5f3f77c2830ffd3252746b33/html5/thumbnails/15.jpg)
![Page 16: Recent Projects rev3 - Reimann Manufacturing · 2019-06-24 · Recent Projects . Scope of works Kangaroo Creek Dam Upgrade 2 x 1m diameter MSCL pipelines constructed inside the dam](https://reader034.vdocuments.us/reader034/viewer/2022050100/5f3f77c2830ffd3252746b33/html5/thumbnails/16.jpg)
Contact Us
Plant 1 & Billing address: 91 Industry Road Eudunda SA 5374
Plant 2: 223 South terrace, Wingfield SA 5013
Phone 08 8581 1207
Mobile Matt Reimann 0431 245 670Stuart Reimann 0400 263 587
Email [email protected] [email protected]
Website www.reimannmanufacturing.com.au