Detail DTL TLT Toilet Curtain Wall PLBG Plumbing VB Vinyl Base Expansion Joint EJ Glass Fiber Reinforced Gypsum GFRG Unless Otherwise Noted UON On Center Opposite OC OD PLAM OPP Plastic Laminate Outside Diameter Radius Roof drain Painted Plywood PTD PLWD PT R RD Revision Required Room Reference, Refrigerator REV REQD RM RO REF Rough opening Sound Attenuation Blanket Pressure Treated Schedule Similar SCHED SIM SAB RTU Structure, Structural Steel Storage STRUCT SST STOR STL SPEC SF Stainless Steel Specification Square foot Roof Top Unit Typical Top of Temporary, Temperature TOW TYP TO TEMP Water Closet With Vertical Underwriters Laboratory WC W/ VWC VCT VERT UL Vinyl Composition Tile Vinyl Wall covering Top of wall Wood WD WO Window Opening FEC FHC FLR FD Floor AFF A/C ACT Acoustical Ceiling Tile Above Finished Floor Air Conditioning GFRC Glass Fiber Reinforced Concrete GA GALV GC Gauge FP Fire Protection HC HM GWB APPROX AP ARCH ALT ALUM ANOD BO BLKG BD BITUM Blocking Bottom Of Bituminous Board Anodize Access Panel Architect, Architecture Approximate Alternate Aluminum INSUL INV Interior Invert HORIZ HVAC HT HP Height JAN Janitor INT CLG CJ CMU CAB CT COL CONC CPT CONT Continuous Carpet Ceramic Tile Concrete Masonry Unit Concrete Column Ceiling Control Joint Cabinet MIN MAX MECH NIC MO MTL Metal MISC MM DIA DIM DN DWG DF EWC EXP EPS EQ ELEV EL Electric Water Cooler Exposed Elevation Equal Elevator Expanded Polystyrene Drawing, Drawings Diameter Dimension Down Drinking Fountain NO NOM NTS EXT Exterior Number Nominal Not in contract Not to scale Masonry Opening Minimum Miscellaneous Millimeter Maximum Mechanical Insulation Horizontal High Point Heating, Ventilation, and Air Conditioning Hollow Core Hollow Metal Gypsum Wallboard Galvinized General contractor Fire Hose and Valve Cabinet Fire Extinguisher Cabinet Floor drain CW Opposite Hand OH Overhead OHD FRP Fiberglass Reinforced Plastic RWC Rainwater conducter Verify In Field VIF Open To Structure OTS ABBREVIATIONS CG Corner Guard C Centerline L Downspout DS DBL Double WP Waterproofing FT Feet ELEC Electric, Electrical TOP Top of Parapet Sprayed Fire-Resistant Materials SFRM XPS Extruded Polystyrene Polyvinyl chloride PVC PNT Paint Owner Furnished / Owner Installed OFOI Owner Furnished / Contractor Installed OFCI CFCI Contractor Furnished / Contractor Installed MFR Manufacturer LAV LP Lavatory Low Point FIP Foamed-In-Place TOILET ACCESSORY TAG Room name 101 150 SF ROOM TAG: NAME, NUMBER, AREA A101 1 SIM 101 DOOR TAG DETAIL NUMBER & SHEET REFERENCE (SIM: SIMILAR, OPP: OPPOSITE, MIR: MIRRORED) CENTERLINE A101 1 Ref 1 Ref 1 Ref 1 Ref INTERIOR ELEVATION TAG: DRAWING NUMBER & SHEET REFERENCE EXTERIOR ELEVATION TAG: DRAWING NUMBER & SHEET REFERENCE ELEVATION LEVEL REFERENCE SECTION TAG REFERENCE A101 1 Ref 1 Ref 1 Ref 1 Ref SPOT ELEVATION REFERENCE 1i 1t PARTITION TYPE TAG SHEET DRAWING REFERENCE: NUMBER, NAME, & SCALE WINDOW TYPE TAG SYMBOLS LEGEND KEYNOTE TAG (REFER TO ASSOCIATED SHEET NOTES) 1 View Name 1/8" = 1'-0" Name Elevation 1 A101 SIM X FFE TAG 1i X BHA Job Number: ISSUED FOR DCA SUBMISSION 12/4/17 ISSUE INFORMATION OWNER ROWAN UNIVERSITY phone: 856.256.4948 email: [email protected] CONTACT PERSON: Anthony Kula ARCHITECT Blackney Hayes Architects 150 S. Independence Mall West, Suite 1200 Philadelphia, PA 19106 phone: 215.829.0922 facsimile: 215.829.0596 CONTACT PERSON: MEGAN HAYES ROWAN REVIEW SET 09.01.17 ISSUED FOR BID 11.28.17 ISSUED FOR DCA SUBMISSION 12.4.17 12/4/2017 1:30:25 PM REC CENTER RENOVATIONS ROWAN UNIVERSITY- RECREATION CENTER GLASSBORO, NJ REC CENTER RENOVATIONS ROWAN UNIVERSITY- RECREATION CENTER GLASSBORO, NJ 17-092 SHEET LIST SHEET NUMBER SHEET NAME _CS PROJECT COVER SHEET A0.1 AREA OF WORK PLANS A1.1 SCOPE OF WORK-FLOOR PLANS A2.1 REFLECTED CEILING PLAN E1.1 ELEECTRICAL NEW WORK AND DEMOLITION E1.2 ELECTRICAL SPECIFICATION AND NOTES REC CENTER LOCATION PROJECT DESCRIPTION: ALTERATION TYPE 1- INTERIOR CHANGES TO FINISHES IN KIND. NO CHANGES EGRESS OR LIFE SAFETY IS EFFECTED. NO CHANGES TO STRUCTURE, WALLS AND OR DOORS.

Upload: ngokhanh

Post on 28-Apr-2018

215 views

Category:

Documents


3 download

TRANSCRIPT

Page 1: REC CENTER RENOVATIONS - sites.rowan.edu · GFRC Glass Fiber Reinforced Concrete GA GALV GC ... AN EXPERIENCED LARGE VOLUME COMMERCIAL FITNESS EQUIPMENT MOVER ... PAINT STAND PIPE

DetailDTL

TLT Toilet

Curtain Wall

PLBG Plumbing

VB Vinyl Base

Expansion JointEJ

Glass Fiber Reinforced GypsumGFRG

Unless Otherwise NotedUON

On Center

Opposite

OCOD

PLAM

OPP

Plastic Laminate

Outside Diameter

RadiusRoof drain

PaintedPlywood

PTDPLWD

PT

RRD

RevisionRequired

Room

Reference, Refrigerator

REVREQD

RMRO

REF

Rough opening

Sound Attenuation Blanket

Pressure Treated

Schedule

Similar

SCHED

SIM

SAB

RTU

Structure, Structural

SteelStorage

STRUCTSST

STORSTL

SPECSF

Stainless Steel

SpecificationSquare foot

Roof Top Unit

Typical

Top of

Temporary, Temperature

TOWTYP

TO

TEMP

Water ClosetWith

Vertical

Underwriters Laboratory

WCW/

VWC

VCTVERT

UL

Vinyl Composition Tile

Vinyl Wall covering

Top of wall

WoodWDWO Window Opening

FECFHC

FLRFD

Floor

AFF

A/CACT Acoustical Ceiling Tile

Above Finished Floor

Air Conditioning

GFRC Glass Fiber Reinforced Concrete

GAGALVGC

Gauge

FP Fire Protection

HCHM

GWB

APPROXAPARCH

ALTALUMANOD

BOBLKG

BDBITUM

BlockingBottom Of

BituminousBoard

Anodize

Access PanelArchitect, Architecture

Approximate

AlternateAluminum

INSULINV

InteriorInvert

HORIZ

HVACHTHP

Height

JAN Janitor

INT

CLGCJ

CMU

CAB

CT

COLCONC

CPTCONT Continuous

CarpetCeramic Tile

Concrete Masonry Unit

ConcreteColumn

CeilingControl Joint

Cabinet

MIN

MAXMECH

NIC

MOMTL Metal

MISCMM

DIADIMDN

DWG

DF

EWCEXP

EPSEQ

ELEV

EL

Electric Water CoolerExposed

Elevation

Equal

ElevatorExpanded Polystyrene

Drawing, Drawings

DiameterDimensionDown

Drinking Fountain

NONOMNTS

EXT Exterior

NumberNominal

Not in contract

Not to scale

Masonry Opening

MinimumMiscellaneousMillimeter

MaximumMechanical

Insulation

HorizontalHigh PointHeating, Ventilation, and Air Conditioning

Hollow CoreHollow Metal

Gypsum Wallboard

GalvinizedGeneral contractor

Fire Hose and Valve CabinetFire Extinguisher Cabinet

Floor drain

CW

Opposite HandOHOverheadOHD

FRP Fiberglass Reinforced Plastic

RWC Rainwater conducter

Verify In FieldVIF

Open To StructureOTS

ABBREVIATIONS

CG Corner Guard

C CenterlineL

DownspoutDS

DBL DoubleWP Waterproofing

FT Feet

ELEC Electric, Electrical

TOP Top of Parapet

Sprayed Fire-Resistant MaterialsSFRM

XPS Extruded Polystyrene

Polyvinyl chloridePVC

PNT Paint

Owner Furnished / Owner InstalledOFOI Owner Furnished / Contractor InstalledOFCI

CFCI Contractor Furnished / Contractor Installed

MFR Manufacturer

LAVLP

LavatoryLow Point

FIP Foamed-In-Place

TOILET ACCESSORY TAG

Room name101

150 SF

ROOM TAG: NAME, NUMBER, AREA

A1011

SIM

101 DOOR TAG

DETAIL NUMBER & SHEET REFERENCE(SIM: SIMILAR, OPP: OPPOSITE, MIR: MIRRORED)

CENTERLINE

A101

1 Ref

1

Ref

1 Ref

1

Ref INTERIOR ELEVATION TAG:

DRAWING NUMBER & SHEET REFERENCE

EXTERIOR ELEVATION TAG:DRAWING NUMBER & SHEET REFERENCE

ELEVATION LEVEL REFERENCE

SECTION TAG REFERENCE

A101

1

Ref

1Ref 1 Ref

1

Ref

SPOT ELEVATION REFERENCE

1i

1t

PARTITION TYPE TAG

SHEET DRAWING REFERENCE:NUMBER, NAME, & SCALE

WINDOW TYPE TAG

SYMBOLS LEGEND

KEYNOTE TAG (REFER TO ASSOCIATED SHEET NOTES)

1 View Name1/8" = 1'-0"

NameElevation

1A101

SIM

X

FFE TAG1i

X

BH

A J

ob N

umbe

r:

ISSU

ED F

OR D

CA S

UBMI

SSIO

N 12

/4/17

ISSUE INFORMATION

OWNERROWAN UNIVERSITYphone: 856.256.4948

email: [email protected] PERSON: Anthony Kula

ARCHITECTBlackney Hayes Architects

150 S. Independence Mall West, Suite 1200Philadelphia, PA 19106phone: 215.829.0922

facsimile: 215.829.0596CONTACT PERSON: MEGAN HAYES

ROWAN REVIEW SET 09.01.17

ISSUED FOR BID 11.28.17

ISSUED FOR DCA SUBMISSION 12.4.17

12/4

/201

7 1:

30:2

5 PM

REC CENTER RENOVATIONSROWAN UNIVERSITY- RECREATION CENTER GLASSBORO, NJ

REC

CENT

E RR E

NOVA

TIO N

SR O

WAN

UN I

VERS

ITY -

REC

REAT

ION

C ENT

ER G

LASS

BORO

, NJ

17-0

92

SHEET LIST

SHEET NUMBER SHEET NAME

_CS PROJECT COVER SHEETA0.1 AREA OF WORK PLANSA1.1 SCOPE OF WORK-FLOOR PLANSA2.1 REFLECTED CEILING PLANE1.1 ELEECTRICAL NEW WORK AND DEMOLITIONE1.2 ELECTRICAL SPECIFICATION AND NOTES

REC CENTER LOCATION

PROJECT DESCRIPTION:ALTERATION TYPE 1- INTERIOR CHANGES TO FINISHES IN KIND. NO CHANGES EGRESS OR LIFE SAFETY IS EFFECTED. NO CHANGES TO STRUCTURE, WALLS AND OR DOORS.

Page 2: REC CENTER RENOVATIONS - sites.rowan.edu · GFRC Glass Fiber Reinforced Concrete GA GALV GC ... AN EXPERIENCED LARGE VOLUME COMMERCIAL FITNESS EQUIPMENT MOVER ... PAINT STAND PIPE

UP

dnA1.1

1

A1.12

STORAGE203

STORAGE204

STAIR #2ST2

STAIR 1ST 1

RACQUET BALL COURT#1

207

CORRIDOR215

RACQUET BALL COURT#2

208

ELEV. MACH206

ELEVE1

WEIGHT ROOM202

FITNESS201

A1.13

Sim

REC CENTER MAIN ENTRANCE

LOBBYL100

CONFERENCE113

AEROBICS132

RoomL102

JUICE BAR102

STORAGE131

STORAGE130

STAIRSS2

STAIRSS1

MEN118

WOMEN120

OFFICEMZ101

OFFICE104

OFFICE105

OFFICE106

OFFICE107

STORAGE108

OFFICE110

STORAGE121

WOMEN119

MEN117

STORAGE115

STORAGE114

ELEV1

A1.14

Sim

OFFICE007 SHOWERS

001B

LOCKER ROOM001

LOBBYL001

WOMENS001A

CORRIDORH001

STAIR 1ST1

Warning: Actual conditions may vary from conditions shown on this drawing. Confirm all information in the field before proceeding with any work and notify the Architect in writing if a variation is discovered.

Release

BHA Job Number:

Scale:

Drawn By:

Checked By:

Approved By:

Sheet No.

© Copyright 2015 Blackney Hayes Architects

Seal

Sheet Title:

Project:

Date Comments

Architect:Blackney Hayes Architectsphone: 215.829.0922CONTACT PERSON: Megan Hayes

MEP:

Project Address:

This drawing is not to be copied or transmitted in any form without the express written authorization of Blackney Hayes Architects. All ideas and concepts depicted or suggested in this drawing are the property of Blackney Hayes Architects.

DUTY TO INSPECT CONTRACT DOCUMENTS PRIOR TO STARTING WORK: Any party who relies in part or whole on the content of these Construction Documents shall, before beginning any work, be responsible for fully inspecting the complete set of Contract Documents, including all Drawings, Specifications, and Addenda, for completeness, conflicts, scope of work, and suitability for constructing the building. Contractors and Suppliers must, prior to beginning work, submit all requests for clarifications and additional information to the architect in writing. All parties who begin work hereby certify that the documents are suitable for their intended purposes unless noted in specific written exception.

12/4/17 ISSUED FOR DCA SUBMISSION

Client:Rowan Universityphone: 856.256.4948CONTACT PERSON: Tony Kula

Blackney Hayes Engineeringphone: 215.829.0922CONTACT PERSON: Andrew O'Pella

11/28/17 ISSUED FOR BID9/1/17 ISSUED FOR CLIENT REVEIW

1/16" = 1'-0"

A0.1

AREA OF WORKPLANS

REC CENTERRENOVATIONS

17-092

AuthorCheckerApprover

ROWAN UNIVERSITY-RECREATION CENTERGLASSBORO, NJ

1/16" = 1'-0"1 2nd Floor Overall Plan

1/16" = 1'-0"2 1st Floor Overall Plan

1/16" = 1'-0"3 Basement Overall Plan

Page 3: REC CENTER RENOVATIONS - sites.rowan.edu · GFRC Glass Fiber Reinforced Concrete GA GALV GC ... AN EXPERIENCED LARGE VOLUME COMMERCIAL FITNESS EQUIPMENT MOVER ... PAINT STAND PIPE

1

2

2 2

23

3

3 3

3

3

3

44

4

5 6

TYPICAL THROUGHOUT WEIGHT ROOM

10

11 11 11

11

11

11

N.I.C. N.I.C. N.I.C.

N.I.C.

N.I.C.

N.I.C.

3

17

3

13

131313

17

15

PT-3

7 89

RS-1 RS-1

N.I.C.

PT-3

12

14 14

PT-3

N.I.C.

7 8

BASE

BID

8

9

9

RS-1

RS-1

PT-3

14 14

16

PT-3

N.I.C.

879

RS-1RS-1

PT-3

15

14

ALL MATERIALS TO BE INSTALLED ACCORDING TO MANUFACTURER'S RECOMMENDED INSTRUCTIONS.

PROVIDE REDUCER STRIPS AT CHANGE OF FLOOR MATERIALS AS REQUIRED. COLOR TO MATCH VINYL BASE. REDUCER STRIPS TO BE ADA COMPLIANT.

WHERE ATYPICAL CONDITIONS OCCUR, CONTRACTOR IS TO VERIFY FINISH TREATMENT WITH ARCHITECT BEFORE PROCEEDING.

PAINT ALL DIFFUSERS, GRILLES, ACCESS PANELS ETC. TO MATCH ADJACENT SURFACES.

SUB-FLOOR IS TO BE PATCHED, REPAIRED AND MADE SMOOTH AND LEVEL TO RECEIVE NEW FLOORING.

ALL SOFFITS TO BE SAME FINISH AND COLOR AS ADJACENT WALL U.O.N.

ALL BASE TO BE 4" COVE U.O.N

EXP = EXPOSED

SUBMIT FINISH SAMPLES TO ROWAN UNIVERSITY AND BHA FOR WRITTEN APPROVAL PRIOR TO ORDERING.

PATCH WALL AND REPAIN TO MATCH EXISTING WHERE DAMAGE HAS OCCURED DURING REMOVAL OF WALL BASE, WALL PROTECTION PANELS AND/ OR CORNER GAURDS.

GENERAL NOTES1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

KEY NOTESREMOVE EXISTING FLOORING IN ELEVATOR. PREP FLOOR FOR NEW FLOORING. INSTALL NEW RUBBER FLOORING (RF-1).

REMOVE EXISTING CORNER GUARDS AND WALL PROTECTION PANELS. PREP SURFACE FOR NEW PAINT FINISH AND WALL PROTECTION PANELS. INSTALL NEW WALL PROTECTION PANELS (WP-1) AND CORNER GUARDS (CG-1) TO HEIGHT ALIGNED WITH TOP OF WALL MIRRORS. REMOVE OUTLET FACE PLACES, CUT WALL PROTECTION PANELS AROUND OUTLETS AND RE-INSTALL FACEPLATES ON NEW SURFACE. REMOVE FACILITY RULES AND ADHESIVE. RE-ATTACH IN SAME LOCATION AT END OF JOB.

REMOVE EXISTING WALL PROTECTION PANELS. PATCH AND PREPARE EXISTING WALL FOR NEW WALL PROTECTION PANELS. INSTALL NEW WALL PROTECTION PANELS (WP-1) FROM FLOOR TO UNDERSIDE OF WINDOW FRAME OR MIRROR. HEIGHT OF WALL PROTECTION PANELS SHOULD BE CONTINUOUS AROUND ROOM WHERE IT IS LOCATED BELOW MIRROR OR WINDOWS. REMOVE OUTLET FACE PLACES, CUT WALL PROTECTION PANELS AROUND OUTLETS AND RE-INSTALL FACEPLATES ON NEW SURFACE.

REMOVE EXISTING CORNER GUARDS. PREP SURFACE AND INSTALL NEW CORNER GUARDS (CG-1) FROM, ABOVE WALL BASE TO ALIGN TO TOP OF MIRRORS.

CLEAN, REMOVE CURRENT ROLLED RUBBER AND ADHESIVE AND PREP EXISTING FLOORING TO RECEIVE NEW SPORTS FLOORING OVER EXISTING. INSTALL NEW FLOORING (SF-1). INSTALL PER MANUFACTURERS RECOMMENDATIONS.

REMOVE EXISTING WALL BASE AND PROVIDE NEW THROUGHOUT. (VB-1).

PAINT ALL TRIM, INCLUDING BUT NOT LIMITED TO METAL STAIR STRINGERS, LANDING STRINGERS, UNDERSIDE OF METAL STAIRS, DOOR FRAMES AND STAIR INTERIOR SIDE OF DOORS (PT-4).

PAINT ENTIRE STAIRCASE WALLS (PT-1) U.O.N.

REMOVE EXISTING RUBBER FLOORING ON LANDING, WALL BASE, AND RUBBER STAIR TREADS. PREP FLOOR AS REQUIRED TO RECEIVE NEW FINISH. INSTALL NEW NORA, NORAMENT (RS-1). INSTALL NORA NORAMENT RUBBER SHEET (RF-1) AT STAIR LANDINGS. INSTALL PER MANUFACTURERS RECOMMENDATIONS, FLOOR PREP AND ADHESIVE. INSTALL NEW WALL BASE (VB-1) AT ALL LANDING AND CORRIDOR LOCATIONS THAT DO NOT HAVE METAL STRINGER PERIMETER.

REPAINT STRIPING TO MATCH ADJACENT PAINT BOARDER IN WEIGHT ROOM ABOVE NEW WALL PANELS.

PROVIDE REDUCER STRIP AS SPECIFIED WITH (SF-1) AT DOOR LOCATIONS TO CREATE ADA COMPLIANT TRANSITION. CUT IN FIELD TO ACCOMMODATE DIFFERENT FLOOR PROFILE HEIGHTS. REFER TO DETAIL 5/A1.1

REMOVE EXISTING BULLETIN BOARDS. RETURN TO ROWAN UNIVERSITY.

SAND, PRIME AND PREP ALL DOORS TO RECEIVE NEW PAINT TO MATCH EXISTING.

CLEAN AND REMOVE DEBRIS BETWEEN OVERHEAD STAIR STRINGER AND WALL. PROVIDE CAULK TO FILL GAP PRIOR TO PAINTING.

CONTRACTOR IS RESPONSIBLE FOR RELOCATING ALL FITNESS EQUIPMENT FROM WEIGHT ROOMDURING CONSTRUCTION. AN EXPERIENCED LARGE VOLUME COMMERCIAL FITNESS EQUIPMENT MOVER MUST BE USED FOR THIS JOB ANDAPPROVED BY ROWAN UNIVERSITY PRIOR TO AWARDING JOB. MUST HAVE EXPERIENCE MOVING RACKS, MULTI-JUNGLES AND LARGE PIECES OF FITNESS EQUIPMENT. COORDINATE WITH ROWAN UNIVERSITY FACILITIES FOR REQUIREMENTS OF WHERE FITNESS EQUIPMENT WILL NEED TO BE STORED AND WHICH PIECES REQUIRE DISMANTLING AND REASSEMBLY. G.C.'S FITNESS EQUIPMENT VENDOR IS RESPONSIBLE FOR RELOCATION AND ASSEMBLY OF ALL EQUIPMENT BACK IN WEIGHT ROOM AT PROJECT COMPLETION. REFER TO EQUIPMENT LEGEND FOR ITEMIZED LIST OF EQUIPMENT TO BE RELOCATED.

PAINT STAND PIPE PT-3

PREP SURFACE FOR NEW WALL PROTECTION PANELS. INSTALL NEW WALL PROTECTION PANELS (WP1) TO HEIGHT ALIGNED WITH TOP OF WALL MIRRORS. REMOVE OUTLET FACE PLACES, CUT WALL PROTECTION PANELS AROUND OUTLETS AND RE-INSTALL FACEPLATES ON NEW SURFACE.

1

2

3

4

5

7

8

FINISH LEGENDPAINT:

PT-1 MNF: SHERWIN WILLIAMSCOLOR: MATCH EXISTING GENERAL COLORFINISH: EGGSHELLLOCATION: GENERAL WALLS

PT-2 MNF: SHERWIN WILLIAMSCOLOR: 7545 THUNDER GRAYFINISH: EGGSHELLLOCATION: ACCENT WALLS

PT-3 MNF: SHERWIN WILLIAMSCOLOR: 7607 SANTORINI BLUEFINISH: EGGSHELLLOCATION: ACCENT WALLS

PT-4 MNF: SHERWIN WILLIAMSCOLOR: 7545 THUNDER GRAYFINISH: SEMI-GLOSSLOCATION: TRIM

RUBBER FLOORING:

RF-1 MNF: NORASTYLE: 925 GRANOCOLOR: 4882 BANDED AGATESIZE: 39.45" X 39.45" X .14" THICKLOCATION: STAIR LANDINGS/

CORRIDORS

RUBBER STAIRS:

RS-1 MNF: NORASTYLE: 925- GRANO STAIRTREADS

W/ VISUALLY IMPARED ANTI-SLIP GRIT STRIP (BLACK) ON EVERY TREAD

COLOR: 4882 BANDED AGATESIZE: 6' LONGLOCATION: STAIR TREADS

SPORTS FLOOR:

SF-1 MNF: THOR PERFORMANCE PRODUCTSSTYLE: THOR RESI32 SYSTEM– 32MM ROLLED RUBBERCOLOR: CUSTOM 15% COLOR: 10% LIGHT GRAY, 5% PEARLSIZE: 4’ WIDE ROLLED GOODSCONSTRUCTION: 8MM REGUPOL AKTIV (TOP LAYER) AND THOR THUNDER FLAT UNDERLAYMENT 24MM (BASE LAYER).LOCATION: WEIGHT ROOMNOTE: PROVIDE REGUPOL AKUSTIPRO REDUCER AT ALL DOORS AND TRANSITIONS BETWEEN SPORTS FLOORING AND ADJACENT SURFACES WHERE NEEDED. PLEASE CUT TO HEIGHT IN PLACE, USE RECOMMENDED MNF ADHESIVE. CONTACT: JOE LOPEZ- THOR PERFORMANCE PRODUCTS (917) 485-3200

WALL PROTECTION:

WP-1 MNF: ACROVYNSTYLE: HIGH IMPACT WALL COVERING

RIGID SHEETSCOLOR: GALVENSTON GREYTEXTURE: QUATROSIZE: .075" THICKLOCATION: WEIGHT ROOMNOTE: PROVIDE FINSIHING TRIM PEICE

FOR ALL EXPOSED EDGES

CORNER GAURD:

CG-1 MNF: ACROVYNSTYLE: SM SERIESCOLOR: GALVENSTON GREYSIZE: REFER TO NOTESLOCATION: WEIGHT ROOM

VINYL BASE:

VB-1 MNF: JOHNSONITESTYLE: COVE BASECOLOR: MOON ROCKSIZE: 4"LOCATION: WEIGHT ROOM/ STAIRWELL

6

9

10

11

12

13

14

15

16

17

SPORTS FLOORING

RUBBER REDUCER STRIPCUT TO HEIGHT.SLOPE MUST NOT EXCEED 1:13

EXISTING FLOOR COVERINGS

VARIES

Warning: Actual conditions may vary from conditions shown on this drawing. Confirm all information in the field before proceeding with any work and notify the Architect in writing if a variation is discovered.

Release

BHA Job Number:

Scale:

Drawn By:

Checked By:

Approved By:

Sheet No.

© Copyright 2015 Blackney Hayes Architects

Seal

Sheet Title:

Project:

Date Comments

Architect:Blackney Hayes Architectsphone: 215.829.0922CONTACT PERSON: Megan Hayes

MEP:

Project Address:

This drawing is not to be copied or transmitted in any form without the express written authorization of Blackney Hayes Architects. All ideas and concepts depicted or suggested in this drawing are the property of Blackney Hayes Architects.

DUTY TO INSPECT CONTRACT DOCUMENTS PRIOR TO STARTING WORK: Any party who relies in part or whole on the content of these Construction Documents shall, before beginning any work, be responsible for fully inspecting the complete set of Contract Documents, including all Drawings, Specifications, and Addenda, for completeness, conflicts, scope of work, and suitability for constructing the building. Contractors and Suppliers must, prior to beginning work, submit all requests for clarifications and additional information to the architect in writing. All parties who begin work hereby certify that the documents are suitable for their intended purposes unless noted in specific written exception.

12/4/17 ISSUED FOR DCA SUBMISSION

Client:Rowan Universityphone: 856.256.4948CONTACT PERSON: Tony Kula

Blackney Hayes Engineeringphone: 215.829.0922CONTACT PERSON: Andrew O'Pella

11/28/17 ISSUED FOR BID9/1/17 ISSUED FOR CLIENT REVEIW

As indicated

A1.1

SCOPE OFWORK-FLOORPLANS

REC CENTERRENOVATIONS

17-092

MCHMLBKB/JH

ROWAN UNIVERSITY-RECREATION CENTERGLASSBORO, NJ

1/4" = 1'-0"1 2nd Fl Weight Room- BASE BID

1/4" = 1'-0"2 2nd Floor Stairs 1/4" = 1'-0"3 1st Floor Stairs 1/4" = 1'-0"4 Basement Stairs

6" = 1'-0"5 FLOOR TRANSISTION DETAIL

Page 4: REC CENTER RENOVATIONS - sites.rowan.edu · GFRC Glass Fiber Reinforced Concrete GA GALV GC ... AN EXPERIENCED LARGE VOLUME COMMERCIAL FITNESS EQUIPMENT MOVER ... PAINT STAND PIPE

1

"A"

"B" "B"

"B"

3

2

2

"B"

KEY NOTES

REMOVE EXISTING CEILING TILES AND GRID. INSTALL NEW CEILING (ACT-1) AT SAME HEIGHT AND LAYOUT AS EXISTING CEILING. REMOVE EXISTING LIGHT FIXTURES, INSTALL NEW2X4 LED (TYPE C) FIXTURES IN SAME LOCATION AS EXISITNG WERE REMOVED, TIE NEW LIGHTS INTO CIRCUIT AND SWITCH OF EXISTING LIGHTS THAT WERE REMOVED. SALVAGE ANY DEVICES FOR RE-INSTALLATION AT SAME LOCATION. NOT LIMITED TO MECHANICAL GRILLS/ REGISTERS, FIRE ALARM AND PROTECTION, EXIT SIGNS, OCCUPANCY SENSORS AND SPEAKERS. INSTALL NEW CEILING GRID IN SAME LOCATION AS PREVIOUSLY EXISTING CEILING. RE-INSTALL ALL DEVICES, LIGHT FIXTURES, GRILLS AND DIFFUSERS, ELECTRICAL AND LIFE SAFETY IN SAME LOCATION AS EXISTING. REFER TO LIGHTING LEGEND FOR WEIGHT ROOM RECESSED LIGHT FIXTURE SPEC. REFER TO ELECTRICAL DRAWINGS.

REMOVE EXISTING WALL SCONCES FROM WALL. PATCH CMU AND PREP FOR NEW PAINT.

INSTALL NEW DOWN LIGHTS IN EXISTING CEILING (TYPE A AND B) REPLACE DAMAGED CEILING TILES TO MATCH EXISTING AS REQUIRED. SWITCH NEW LIGHT FIXTURES TOGETHER TO TIE INTO EXISTING STAIRWELL LIGHT FIXTURES. REFER TO ELECTRICAL DRAWINGS.

1

2

3

A

LED HIGH HAT 6"FOCAL POINTFL6H-RO-5000l-25k-WFL-XX-L11-T L6H-RD-DN-WP

LED HIGH HAT 6"FOCAL POINTFLC6D-3000l-120-L11-T-EM-LC6EM-RC-300-L-35K-DN-WH-WPUSE EMERGENCY FIXTURES AS REQUIRED ON ELECTRICAL DRAWINGS

B

LIGHTING LEGEND

TYPE C:LED DIRECT/INDIRECT 2X4 RECESSED FIXTUREFOCAL POINTAMICA 2X4FAML-24-ACR-4000L-35K-XXX-LD1-XXX-WH

COORIDNATE MOUNTING TYPE WITH GRID. USE EMERGENCY FIXTURES AS REQUIRED ON ELECTRICAL DRAWINGS.

WEIGHT ROOM RECESSED LIGHTING SPEC

EXISTING SUPPLY REGISTER TO BE TEMPORARILY REMOVED, CLEANED AND RELOCATED

EXISTING RETURN REGISTER TO BE TEMPORARILY REMOVED, CLEANED AND RELOCATED

EXISTING SPRINKLER HEAD. REMOVE ESCUTCHEON CAPS AND REPLACE WITH NEW

EXISTING EXIT SIGN. REMOVE FOR CONSTRUCTION AND RE-INSTALL.

(ACT-1)ARMSTRONG ULTIMA WHITE, 2X4 TEGULAR BEVELED (CONFIRM CEILING PROFILE MATCHES EXISTING TILE PRIOR TO ORDERING FOR COORDINATION WITH HEIGHTS OF EXISTING SPRINKLER HEADS) SUPERFINE XL 9/16"

Warning: Actual conditions may vary from conditions shown on this drawing. Confirm all information in the field before proceeding with any work and notify the Architect in writing if a variation is discovered.

Release

BHA Job Number:

Scale:

Drawn By:

Checked By:

Approved By:

Sheet No.

© Copyright 2015 Blackney Hayes Architects

Seal

Sheet Title:

Project:

Date Comments

Architect:Blackney Hayes Architectsphone: 215.829.0922CONTACT PERSON: Megan Hayes

MEP:

Project Address:

This drawing is not to be copied or transmitted in any form without the express written authorization of Blackney Hayes Architects. All ideas and concepts depicted or suggested in this drawing are the property of Blackney Hayes Architects.

DUTY TO INSPECT CONTRACT DOCUMENTS PRIOR TO STARTING WORK: Any party who relies in part or whole on the content of these Construction Documents shall, before beginning any work, be responsible for fully inspecting the complete set of Contract Documents, including all Drawings, Specifications, and Addenda, for completeness, conflicts, scope of work, and suitability for constructing the building. Contractors and Suppliers must, prior to beginning work, submit all requests for clarifications and additional information to the architect in writing. All parties who begin work hereby certify that the documents are suitable for their intended purposes unless noted in specific written exception.

12/4/17 ISSUED FOR DCA SUBMISSION

Client:Rowan Universityphone: 856.256.4948CONTACT PERSON: Tony Kula

Blackney Hayes Engineeringphone: 215.829.0922CONTACT PERSON: Andrew O'Pella

11/28/17 ISSUED FOR BID9/1/17 ISSUED FOR CLIENT REVEIW

As indicated

A2.1

REFLECTEDCEILING PLAN

REC CENTERRENOVATIONS

17-092

AuthorCheckerApprover

ROWAN UNIVERSITY-RECREATION CENTERGLASSBORO, NJ 1/4" = 1'-0"1 WEIGHT ROOM- REFLECTED CEILING PLAN

1/4" = 1'-0"2 2nd Floor Stairs

Page 5: REC CENTER RENOVATIONS - sites.rowan.edu · GFRC Glass Fiber Reinforced Concrete GA GALV GC ... AN EXPERIENCED LARGE VOLUME COMMERCIAL FITNESS EQUIPMENT MOVER ... PAINT STAND PIPE
Page 6: REC CENTER RENOVATIONS - sites.rowan.edu · GFRC Glass Fiber Reinforced Concrete GA GALV GC ... AN EXPERIENCED LARGE VOLUME COMMERCIAL FITNESS EQUIPMENT MOVER ... PAINT STAND PIPE